Loading...
HomeMy WebLinkAboutAgenda - 12-09-2014-13 (3)INFORMATION ITEM 1 PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245 -2575 �'� '� Suite 201 (919) 644 -3002 (FAX) ORANGE COUNTY P. O. Box 8181 www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 MEMORANDUM TO: Board of County Commissioners; Bonnie Hammersley, County Manager FROM: Craig Benedict, Planning Director; Howard Fleming, Engineering and Stormwater Supervisor CC: John Roberts, County Attorney DATE: November 21, 2014 SUBJECT: Efland to Mebane, Buckhorn- Mebane EDD, Phase 2 Extension & West Ten Road Pump Station & Outfall (AKA CIP #44) This memo serves as a brief status report of the progress of the above project. The attached letter from the County Engineering / Stormwater Supervisor, Howard W. Fleming Jr., PE and our engineering design consultant, Hobbs - Upchurch, explains the progress and alignment. We have begun to contact the community that will be affected by this project and our area meeting of November 20, 2014 was productive and positive. The attorney's office is assisting with easement acquisition. We plan to have the project ready for Board approval in February or March 2014. The City of Mebane has been our partner in reviewing the design and specifications since they will eventually be the responsible maintenance entity. This project serves 2 purposes: One, to redirect the Efland sewer flow which stabilizes future sewer rates for county residents and businesses and reduces County operational expenses; and two, provides sewer backbone infrastructure for over 350 acres (with expansion capability for 350 additional acres) of economic development opportunity north of West Ten Road and 1- 85/1 -40 in the Efland area in the water and sewer boundary area. Note: I have not included engineering drawings noted in Mr. Fleming Jr.'s letter as items 4 through 7 but they are available if requested. If you have any questions please call my office. Thank you. PLANNING & INSPECTIONS DEPARTMENT 2 Craig N. Benedict, AICP, Director Engineering / Erosion C 131 W. Margaret Lane Control /Stormwater Suite 201 (919) 245 -2575 ORANGE COUNTY P. O. Box 8181 (919) 644 -3002 (FAX) NORTH CAROLINA Hillsborough, NC 27278 www.orangecountync.gov November 21, 2014 Craig Benedict, AICP Director, Planning & Inspections Department Orange County 131 W. Margaret Street, Suite 201 Hillsborough, NC 27278 PROJECT: Efland Sewer to Mebane, Buckhorn- Mebane EDD, Ph. 2 Extension & West Ten Road Pump Station & Outfall Aka CIP #44, Efland Sewer Flow Redirect to Mebane SUBJECT: West Ten Road Sanitary Sewer Routing Craig, As you are aware, we recently received what was identified as Revised 100% set of construction plans for the subject project from our consultant, Hobbs Upchurch Associates (HUA). Due to the fact that this alignment was adjacent to the Water & Sewer Management Plan and Boundary Agreement between all local governments and utility providers in the County, we had requested a detailed explanation of why the specific south -side route on West Ten Road was chosen. Back in August we received the enclosed professional opinion letter from HUA. As a visual aid, I have attached the following: 1. An Excerpt from the Orange County /City of Mebane Utility Area Service Agreement, dated 09/09/12, with service area acreage added. 2. Letter from HUA justifying south -side alignment along West Ten Road, dated 08101/14. 3. A two -page aerial photograph, entitled BOCC exhibit, which we prepared from GIS and data provided by HUA, dated 10/27/14. 4. Gravity Sewer Main Layout Sheet 2 of HUA's Revised 100% plans, received 11119/14. 5. Sewer Force Main Layout Sheet 3 of HUA's Revised 100% plans, received 11/19114. 6. West Ten Rd. Sewer Plan & Profile Shts 4 & 5 of HUA's Revised 100% plans, rec'd 11/19/14. 7. Proposed Seven Mile Farm easement and pump station lot plats (3), dated 10/31/14 — 11/17/14. Sincerely, Howard W. Fleming, Jr., PE Engineering /Stormwater (Division) Supervisor Orange County Planning and Inspections Department (919) 245 -2586 (W) (919) 357 -7748 (M) hfleming @orangecountync.gov Enclosures: 9 Orange County /City of Mebane Utility Area Service Agreement Excerpt 3 Project Area m BER'1VVI i, 9 a 1 0 GIJGL�EF� RD� P? U_ _ / I (.1RR -,TrAVE- 11RSftl�i i I nu Milli Un IF STAVE- — lD2 137 ac lm i y� C Area D1 Area D4 Q E1 QArea D2 Central Efland Phase '1 ® E2 Purple = Commercial Industrial Transition Future Land Use Lavender= Economic Development Transition Area D3 0 Central Efland Phase 2 Future Land Use N 1 inch = 1,500 feet O 0 1.000 Feet Orange County Planning and Inspections Department GIS Map Prepared by Brian Carson. 7/9/2012 rd Hobbs Upchurch Associates August 1, 2014 Mr. Craig Benedict, Director Orange County Planning & Inspections Department 131 W. Margaret Lane Hillsborough, NC 27278 RE: Sewer Line Location on West Ten Road HUA No.: OC1202.100 Dear Craig, Pursuant to your request, Hobbs Upchurch & Associates has evaluated the sewer gravity routing on West Ten Road to the pump station adjacent to Stephanie Creek. The cuts through this area to maintain gravity flow are in excess of 20 feet and if located on the North side of West Ten Road will require approximately 50 feet of easement to install the sewer, infringing on at least 5 houses. Several of these houses on the north side are relatively close to the roadway and will likely be impacted by the significant cuts requiring laid back side slopes. In addition, the potential for ancillary construction damage is significantly greater on the North side than on the South side. The South side routing is primarily through open pasture land and based on topography yields shallower cuts, but even where deeper cuts have to be made the land is available without interference from structures. The cost to lay the line on the South side rather than the North side is at least 20 -30% less in our professional opinion due to the easier laying conditions. In addition, the South side minimizes if not eliminates all cases of ancillary damage to structures during construction. Please see easement alignment sketch. We hope this addresses your concerns regarding this concerns regarding this matter, if you need further information please give us a call. Very Truly Yours, Ffed M. Hobbs, PE T 910 692.5616 1 F: 910.692.7342 1 300 SW BROAD STREET I SCUTHERN PINES, NC 28388 3 WWW.HOBBSUPCHURCH.COM SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN BOCC Exhibit - Buckhorn Mebane EDD, Efland Sewer to Mebane, Phase 2 Extension (Sheet 1 of 2) 5 1 in = 600 feet 0 200 Feet Orange County Planning and Inspections Brian Carson (10/2712014) BOCC Exhibit - Buckhorn Mebane EDD, Efland Sewer to Mebane, Phase 2 Extension (Sheet 2 of 2) 6 z A Project Area , -1 ^ LL F li s ss w ,* `o rt _ INDUSTRIp.I -.DR T� G ,Zr, i} a �< .5a��` ��AT RU LN sx bu; lv •"'+..�'�`""„ ."--- ..•.___.--- -�- -.._� � � a ' m ' im w� O. d �r 'U rA TEN RD r`� r ,w oWMP I - Force Main connects to existing system. ^, I oo, 0 k z } ,, (n RAM KAS c Proposed Force Main (Approx. 3.57 Miles ) � Existing Gravelly Pump Station N t in -1,800 feet Parcels O 0 1,000 � �'e..✓' MENEEK==Feet Proposed West Ten Pump Station ❑ -.4 Orange County Planning and Inspections "y Brian Carson (10/27/2014)