HomeMy WebLinkAboutAgenda - 12-09-2014 - 7bORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: December 9, 2014
Action Agenda
Item No. 7 -b
SUBJECT: Limited Opening Plan - Blackwood Farm Park
DEPARTMENT: Department of Environment, PUBLIC HEARING: (Y /N) No
Agriculture, Parks and
Recreation
ATTACHMENT(S):
Proposed Limited Opening Plan
Map /List of Activities
Map of Trails
Park Master Plan
INFORMATION CONTACT:
David Stancil, 919 - 245 -2510
Marabeth Carr, 919 - 245 -2510
1
PURPOSE: To consider a plan to open Blackwood Farm Park on a limited basis to the public,
and to review the planned amenities and activities to be available.
BACKGROUND: Blackwood Farm Park is a 152 -acre site acquired through the County's Lands
Legacy Program as a future park site featuring low- impact recreation within an agricultural and
historic theme.
In June, the Board appropriated funds as part of the budget and Capital Investment Plan (CIP)
for personnel, operating and capital to open the park on a limited basis. Staff has been working
since that time to prepare the park for opening and construct facilities, including several miles of
trails that have been completed in -house by Parks staff.
As shown in the attached Limited Opening Plan overview, staff anticipates (pending necessary
approvals and bid processes) that the areas of the park will be able to be opened for public
enjoyment in or around early March, with a preliminary target opening date of Friday, March 6,
2015.
Based on the available funds and resources on site, staff proposes that the following amenities
be available upon opening:
• A picnic shelter (ADA- accessible);
• Picnic tables and benches around the farmstead area;
• Over four miles of natural - surface walking and hiking trails (with signage);
• A walking tour of the farmstead and 18th- century "Historic Old Chapel Hill- Hillsborough
Road" with Interpretive signage throughout;
• An open field for informal use (picnic blankets, Frisbee -toss, etc.);
• An informal fishing area at the pond; and
• An agricultural demonstration plot of local foods and heirloom crops.
In addition to these planned amenities, site infrastructure would be added, including a parking
area (with grass overflow parking), portable restrooms, entry gate, improvements to the
driveway and directional /park rule signage.
The above amenities and infrastructure are expected to exhaust all appropriated funds (with a
small amount to be transferred as shown below) for the remainder of the fiscal year, and allow
for the park to be open three days a week — projected to be Friday, Saturday and Sunday.
Future park personnel, operations and maintenance funding will be included in upcoming annual
County budgets.
Upon Board direction and /or approval of this plan, staff would proceed to:
• Prepare a site plan for the designated improvements, for submittal to the Planning
Department for approval;
• Beginning the hiring process for the Park staff person (augmented with backup from a
seasonal employee as reflected in the FY 2014 -15 budget);
• Solicit and award bids for the construction of the small parking lot and /or picnic shelter
An additional environmental trail, with boardwalk sections, is anticipated to be pursued after
park opening and completed over the next 18 months using existing and future budgeted funds.
The remainder of park facilities shown in the Blackwood Farm Park Master Plan, including an
amphitheatre, overlook and other amenities, is scheduled in the adopted CIP for design in FY
2016 -17 and construction in FY 2017 -18. Blackwood Farm Park is also the planned site for the
Parks Operations Base, currently housed in existing buildings at the future Millhouse Road Park.
In preparation for the limited opening of the park, staff has held two meetings with neighboring
property owners on site. Property owners along the northern boundary have expressed
pleasure in hearing about the limited opening plans, but also have concerns about some of the
facilities planned for the eventual park construction (in particular a proposed road and parking
lot along the northern boundary) that will need to be addressed prior to developing plans to
construct the remainder of the facility.
FINANCIAL IMPACT: A total of $197,400 has been appropriated to date for Blackwood Farm
Park capital improvements and operating. Funding was also approved for a permanent Parks
Technician and seasonal employee assistance. The need to have a second person on site
during operating hours has led staff to propose that $9,000 of the project capital funds be
transferred to personnel to help fund additional seasonal staffing. Project work will be adjusted
as needed to meet the available funds. The adopted FY 2014 -19 CIP reflects future funding of
$150,000 in FY 2016 -17 for construction design, and $1.9 million in FY 2017 -18 for construction.
Approximately $1.21 million in additional funding for the Parks Operations Base is reflected for
FY 2019 -2020. These amounts and their timing and source would be addressed each year
through updates to the CIP.
RECOMMENDATION(S): The Manager recommends that the Board review the proposed
Limited Opening Plan, provide feedback or direction to staff as needed, and authorize staff to
proceed with described actions to open the park on a limited basis with a target of March 2015.
3
Blackwood Farm Park
Limited Opening Plan
Target Opening Date: March 2015*
Proposed Days of Operation: Friday, Saturday and Sunday
Anticipated Park Hours *: 8:00 am to 5:00 pm (November — March)
8:00 am to 7:00 pm (April -May, September- October)
8:00 am to 8:00 pm (June- August)
Proposed Amenities *:
"Rustic" picnic shelter (ADA- accessible, may be reserved)
Natural - surface walking /hiking trails
Farmstead exhibits and interpretive signage
Historic "Old Chapel Hill- Hillsborough Road" segment, interpretive signage
Open field for informal free play
Informal fishing area at pond
Agricultural demonstration areas (heirloom crops, other crop examples)
Picnic tables, benches, trash and recycling receptacles, etc
Infrastructure:
Parking Area (with grass overflow parking), portable restrooms, gates and
directional /park rules signage.
Staffing:
One full -time Parks Technician, augmented with seasonal staff during park hours and
as needed for maintenance and other activities.
Next Steps:
Site Plan approval
Bids, specifications and bid awards for parking lot and shelter
Site preparation
Hiring of Parks Technician
* - Best estimate, subject to change
/I
I
0 187.5 375 750 Feet
here t
"Future" Blackwood Farm Park
'Ift gneult e,PmkorvPmmatio Adopted Master Plan
Agriculture, Parks �He¢reation
March 3, 2011*