HomeMy WebLinkAboutAgenda - 02-07-2008-6Option A: Lease/Purchase Hillsborough Commons (HC) Estimated Total Estimated Total Cost Minimum Cost After Anticipated Reimbursements Lease amount through February 2012 $2,611,972 $1,305,986 HC Upfit: • County responsibility upfit costs limited sustainable design (materials, lighting, low flow fixtures, but no structural or parking lot) • Basis: 56,327square feet at $35.50 per square foot, with the Landlord picking up a total of $600,000 of upfit costs. Sustainable Design: • Additional upfit costs for sustainable design elements desired if HC is purchased. Includes structural changes of entranceways, installation of windows, changes in parking lot. Purchase Option of Entire Shopping Center: • Purchase price, if exercised by deadline of February 2012 • Assumes an April 1, 2008 commencement date of lease, with 3 months free rent during which no rent credit is assessed, thereby allowing $660,000 rent credit (44 months@ $15,000/mo) Upfit for Health Department at HC: • Estimated upfit costs for Health Department at Hillsborough Commons after February 2012. • Estimate is based on 30,000 square feet at $175/s.f., which is the need articulate by the Health Department for space in Central/Northern Orange. • Remaining 20,000 s.f. may be available for leasing to existing tenants or other non- profit or non-County agencies who may be able to pay rent. • Upfit of the additional 20,000 s.f. would be carried out when needed. $1,400,000 $700,000 $600,000 $600,000 $14,829,000 $11,121,750 $5,250,000 $5,250,000 Estimated cost to provide space for human $26,090,972 $20,377,736 services delivery in Central Orange County. (This supplants the need to expand the Whitted Building as indicated in the space study. Does not eliminate the need for additional space in Chapel Hill, although the proposed addition to the SHSC could be smaller than the study pro osed . A(_- CJ 1r11LaA4 Option B: NEW CONSTRUCTION OF DSS BUILDING Estimated Total Estimated Total Cost Minimum Cost After Anticipated Reimbursements Construction of new facility: • Estimated construction costs for 50,000 s.f. DSS building @$350/square foot for project costs, exclusive of furniture/equipment. • Assumes construction would begin approximately two years hence. $17,500,000 $8,750,000 Estimated upfit costs of vacated space for Health Department clinic space at SHSC: • Assumes approximately 10,000 s.f. @$250/s.f. including design costs, permits and construction. • Does not include equipment necessary to outfit clinics • Does not include site work, including parking. • Note: $200/s.f. is current estimate of medical facility upfit. $2,500,000 $2,500,000 Estimated renovation of Whitted Building: • Renovate approximately 30,000 square feet of the 59,000 square feet in Whiffed Building for Health Department operations. • Remaining 29,000 square feet would not be renovated in this scenario. $6,000,000 $6,000,000 Total Option B $26,000,000 $17,250,000 Option C: SHSC Addition and Subsequent Addition of DSS Building Estimated Total Minimum Cost Addition to SHSC: • Assume 25,000 square foot addition to SHSC @$350/s.f.f • Assume SHSC expansion would be completed no later than 3 years 6 months after Board approves the action. This includes 9 months SUP Modification and 6 months ZCP, 6 months planning, 20 months construction and 1 month for architect selection with Board approval. Anticipated completion would therefore be around January 1, 2012. This is an aggressive time line. • Assumes DSS would occupy new space in order to maximize reimbursement at the rate of 50% over 20 year depreciation schedule. • Assume Board approves project no later than July 1, 2008. SHSC upfit of space vacated by DSS as they move to the new section of the building; • Assume 10,000 square feet @$250/s.f $8,750,000 $2,500,000 Estimated Total Cost After Anticipated Reimbursements $4,375,000 $2,500,000 Total Addition to SHSC $11,250,000 $6,875,000 Construction of DSS building: • Assume 50,000 s.f. DSS building • Assume the completed building will accommodate needs for five years after completion of construction. This would place commencement of construction of new DSS building sometime in 2017. • Based on a very conservative 4% per year construction cost escalation, the square footage cost in 2017 is estimated to be $426 square foot or $21,291,426. $21,291,426 $10,645,713 Grand Total of both additions: $31,937,139