Loading...
HomeMy WebLinkAboutAgenda - 10-14-2014 - 4ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 14, 2014 Action Agenda Item No. 4 SUBJECT: Jordan Lake Allocation Application DEPARTMENT: Planning PUBLIC HEARING: (Y /N) No ATTACHMENT(S): INFORMATION CONTACT A) Future Service Areas — Excerpt Craig Benedict, Planning, (919) 245 - from Jordan Lake Allocation 2592 Application Kevin Lindley, Planning, (919) 245 -2583 B) Draft Jordan Lake Allocation Application — Cover and Introduction C) Triangle Regional Water Supply Plan — Executive Summary PURPOSE: To receive information regarding the Jordan Lake Allocation Application and provide direction as necessary. BACKGROUND: Orange County is in the process of applying for an increase in its existing Jordan Lake Allocation. The County currently holds an allocation of 1.0 million gallons per day (MGD) and is applying for an additional 0.5 MGD. This allocation is meant to provide a secure water supply through the year 2045 for portions of the County designated for economic growth. The County does not have a public water utility and there are no plans to develop a water utility service. Rather, the County will rely upon municipalities located adjacent to the economic development regions to provide the finished water. The Jordan Lake Allocation will be used to supplement the water supply of these municipalities, as needed. There are three areas of economic interest (see Attachment A) which staff used to develop estimates of future demand, the Buckhorn- Mebane area (western Orange), Hillsborough area (central Orange) and Eno area (eastern Orange). These areas already have or will have water supplied by the City of Mebane, Town of Hillsborough, and City of Durham, respectively. The water from Jordan Lake can be accessed via Durham's interconnect with the Town of Cary. The water would then be used to augment the Durham supply or be sent to Hillsborough via the interconnect shared between Durham and Hillsborough. The Buckhorn- Mebane area is supplied by the City of Mebane as the area does not have a viable method to access an allocation from Jordan Lake. The City of Mebane has access to a robust supply of water from the reservoir it shares with the City of Graham. In addition, Mebane has interconnections that allow access to the City of Burlington's water system, which has a robust water supply in its own right. The water demand from the Buckhorn- Mebane area is expected to be met from Mebane's water supplies, without the need to supplement with Jordan Lake water. 1 Orange County currently holds a Level II allocation. This means the water is not expected to be needed within the first five years of the thirty year demand projection. Typically, Level II allocations account for the projected need during the last 10 -15 years of the thirty year water supply plan. The submitted allocation application requests an additional 0.5 MGD Level II allocation. The draft application also provides validation and peer- reviewed justification for the 1.0 MGD, Level II allocation the County currently holds. The draft application was submitted to the State Division of Water Resources on May 1, 2014 (see Attachment B for cover and introduction; full application available at http: / /orangecountync.gov /planning /documents /Orange Co Application 05012014.pdf. County staff had been working with the Jordan Lake Partnership (JLP), a group of representatives from several municipalities located near Jordan Lake, and the Triangle J Council of Governments to develop a cohesive plan which showed all projected water demands for the various entities and how these would be met using current water supplies and interconnections, Jordan Lake allocations, conservation and reuse, along with other future water supplies. The work done to develop a regionally coherent water supply plan which demonstrates how all JLP members will be able to meet water demands through the year 2060 developed into the Triangle Regional Water Supply Plan (Plan). The Plan is a clear demonstration that all the individual partner requests for Jordan Lake Allocation in the current round were arrived at through careful consideration of all members. In other words, the Plan gives regional context to each municipality's Jordan Lake request. The County's application for a Jordan Lake allocation is one piece of a regional "preferred solution" developed by the JLP to meet future water demands. The Executive Summary of the Plan is attached (Attachment C). County staff has received comments back from the Division of Water Resources regarding the County's draft allocation application. These comments will need to be incorporated into the application document and submitted as a final application by close of business on November 14, 2014. According to the Division of Water Resources project schedule, the applications will be forwarded to the Environmental Management Commission (EMC) and will be under review for approximately one year. The EMC is expected to approve or disapprove the allocation requests by November 2015. FINANCIAL IMPACT: There is no financial impact associated with submitting the allocation request. If Orange County's request is approved, there will a yearly charge assessed of approximately $2,200 per MGD for a Level II allocation. This would represent an additional $1,100 more than the County is paying per year for its current 1.0 MGD allocation. RECOMMENDATION(S): The Manager recommends the Board receive this information regarding the Jordan Lake Allocation Application and provide direction as necessary. ATTACHMENT A Figure 1.1. Map of Service Areas. Orange County Future Water Service Areas Caswell Alamance Person '1 �i Carrboro Future Water Service Area (Efland /Mebane) = City Limits _ Future Water Service Area (Eno) ETJ - Future Water Service Area (Hillsborough) Durham Chatham �� tin = Smiles �.- Omnge County Planning and Inspections Bran Carson (413012014) Page 1 10 Orange County 2014 Jordan Allocation Request 3 TTACHMENT B L 0 OUNTY NORTH CAROL-INA JORDAN LAKE ALLOCATION APPLICATION Orange County is seeking an allocation of 1.5 million gallons per day from Jordan Lake to secure water supply for areas within the County which are slated for development in the coming years. 0 ORANGE COUNTY NORTH CAROLINA COUNTY MANAGER'S OFFICE 200 South Cameron Street Post Office Box 8181 Hillsborough, North Carolina 27278 Tom Fransen Michael S. Talbert, Interim County Manager May 1, 2014 Water Resources Management Section Chief North Carolina Division of Water Resources 1611 Mail Service Center Raleigh, NC 27699 -1611 Dear Mr. Fransen: GW Phone (919) 245 -2300 Fax (919) 644 -3004 This draft Jordan Lake Allocation Application being submitted by Orange County represents a request for storage allocation needed to meet Orange County's planning needs for additional water supply through 2045. This Application constitutes a request for water supply that makes up a portion of a Regional Water Supply Plan (RWSP) that has been developed by the Jordan Lake Partnership (JLP), a collection of 13 local governments and water systems that was created to collaboratively plan for the future of water supply in the Triangle Region, including for the future use of Jordan Lake. The JLP's RWSP is built with the intention of meeting needs for all JLP members while keeping impacts on other water users (including downstream water systems), the environment, and rate payers at acceptable levels. Additionally, it is a goal of JLP to present a set of coordinated allocation requests for Jordan Lake water supply storage that result neither in overallocating the storage pool nor a situation in which water systems will have to compete for allocation. As such, all Jordan Lake Allocation requests submitted by the Jordan Lake Partnership member entities have been made transparent to other partners, and should match the designated allocation requests that are presented in the JLPs RWSP. As such, Orange County affirms that this request for a 1.5% Level 2 allocation is recognized to be: ❑x 1 IN AGREEMENT ❑ NOT IN AGREEMENT with the JLPs RWSP. Orange County currently holds a 1 million gallon per day (MGD) Level 2 allocation from Jordan Lake, so this application represents an increase over our current allocation. As will be shown in the following documents, Orange County is anticipating growth along major transportation corridors in three distinct areas of the County. These have been An Equal Opportunity/Affirmative Action Employer www. o ra ngeco u ntync.gov designated on the County's Land Use Plan as areas in which urban density growth is appropriate. This allocation request represents Orange County's efforts to procure a reliable source of water supply for these areas in advance of the anticipated growth over the next 30 years. Because Orange County holds an allocation currently, we are familiar with the financial requirements necessary to maintain the allocation. The County understands and is committed to the financial responsibility that comes along with the granting of our allocation request. Thank you for the opportunity to apply for this additional allocation from Jordan Lake. County staff looks forward to working with both the State and the Environmental Management Commission throughout this application process. Sincerely, Michael S. Talbert County Manager 7 TABLE OF CONTENTS Introduction........................................................................................... ............................... 2 Developing the Regional Water Supply Plan ............................................... ............................... 3 Water Demand Projections and Projected Need ..................................... ............................... 3 Recommended Regional Alternative ........................................................... ............................... 5 Jordan Lake Allocations proposed in JLP Recommended Alternative ..... ............................... 6 Moving toward implementation .................................................................. ............................... 7 Section I. Water Demand Forecast .......................................................... ............................... 9 UserSectors ................................................................................................. ............................... 9 SectorProjections ...................................................................................... ............................... 12 PopulationEstimates .............................................................................. ............................... 12 Water Demand Projections .................................................................... ............................... 13 DemandProjections ................................................................................... ............................... 13 References................................................................................................. ............................... 15 Section II. Conservation and Demand Management .............................. ............................... 16 Current water conservation actions .......................................................... ............................... 16 Planned future water conservation measures .......................................... ............................... 16 Mebane................................................................................................... ............................... 17 Hillsborough........................................................................................... ............................... 17 Durham................................................................................................... ............................... 17 Impact of Water Conservation Plans on Demand Projections .................. ............................... 18 Additional Water Conservation Information ............................................. ............................... 18 References................................................................................................. ............................... 22 Section III. Current Water Supply .......................................................... ............................... 23 AvailableSupply ......................................................................................... ............................... 23 References................................................................................................. ............................... 24 Section IV. Future Water Supply Needs ................................................. ............................... 25 References................................................................................................. ............................... 26 Section V. ALTERNATIVE WATER SUPPLY OPTIONS ................................ ............................... 27 SourceOptions ........................................................................................... ............................... 27 Supply Alternatives Summary .................................................................... ............................... 27 AlternativesAnalysis .................................................................................. ............................... 29 Alternative 1— Preferred Alternative ..................................................... ............................... 30 Alternative 2— Jordan Lake Only ............................................................ ............................... 34 SelectedAlternative ................................................................................... ............................... 38 Section VI. Plans to Use Jordan Lake ..................................................... ............................... 39 Table of Contents I i N Implementation Plan and Timeline ........................................................... ............................... 39 Accessto Jordan Lake ................................................................................ ............................... 40 Raw and Finished Water Quality Monitoring Plan .................................... ............................... 40 Estimateof Costs ....................................................................................... ............................... 41 JordanLake Costs ................................................................................... ............................... 41 OtherCapital Costs ................................................................................. ............................... 44 CostSummary ......................................................................................... ............................... 44 Discussion................................................................................................... ............................... 44 References................................................................................................. ............................... 45 APPENDICES......................................................................................... ............................... 46 Appendix A. DENR Jordan Lake Water supply workbook ....................... ............................... 47 IIFT1311111 We] MIFe1:l11111 V Table 1. Projected Water Supply Need (MGD) by Partner. 5 Table 2. JLP Recommended Alternative sources to be constructed. 6 Table 3. JLP Recommended Alternative proposed Jordan Lake Allocations by Partner (MGD). 7 Table 1.1. Water Use Sectors. 11 Table 1.2. Population projections for service area. 13 Table 1.3. Water Demand Projections by Sector (MGD). 13 Table 111.1. Existing Source Summary, Available Supply. 23 Table IVA. Projected Water Needs (5 -year increments). 25 Table V.1. Source Options Descriptions. 27 Table V.2. Alternatives Description. 28 Table V.3. Source Composition of Supply Alternatives (MGD). 28 Table V.4. Water Supply Alternative Ratings. Error! Bookmark not defined. Table VIA. Selected alternative implementation timeline (Need vs. Sources available). 40 Table VIA. Example of Payment Responsibilities for Allocation Holders (per percent of storage allocated). 43 TABLE OF FIGURES Figure 1. Future (2060) water service areas of the Jordan Lake Partners ...... ............................... 3 Figure 2. Regional demand projections, current supply, and reductions due to peer review...... 4 Figure 1.1. Map of Service Areas ................................................................... ............................... 10 Figure 1.2. Demand Projections by Sector ..................................................... ............................... 15 Figure 11.1. Approved Service Area Map from the WASMPBA Agreement .. ............................... 21 Figure IVA. Projected Demand and Need relative to Current Supply .......... ............................... 26 Table of Contents I ii Figure V.1. Alternatives - Timeline of need versus new water supply ......... ............................... 29 Table of Contents I iii 10 ORANGE COUNTY JORDAN LAKE ALLOCATION APPLICATION Page 1 1 Orange County 2014 Jordan Allocation Request 11 INTRODUCTION The Jordan Lake Partnership (JLP) has been working collaboratively since 2009 to plan for the future of the Triangle Region's water supply. They have developed a draft Triangle Regional Water Supply Plan ( TRWSP) to meet the 50 -year water needs of the thirteen partners listed below: • Town of Apex • Town of Cary • Chatham County (North water system) • City of Durham • Town of Hillsborough • Town of Holly Springs • Town of Morrisville • Orange Water and Sewer Authority (OWASA) • Orange County • Town of Pittsboro • City of Raleigh and Merger Partners • City of Sanford • Wake County (Research Triangle Park - South) The draft Triangle Regional Water Supply Plan has been provided to DWR by the JLP as an accompanying document to this Jordan Lake Allocation request. The TRWSP details the planning process used to develop the regional water supply plan, and the preferred regional alternative includes projected requests for Jordan Lake water supply allocation by several of the JLP members. This introduction briefly presents the preferred regional alternative, thus providing the regional context of Orange County's allocation request. As part of the regional water supply planning process, JLP members collaborated to develop demand projections, identify water source options, construct and evaluate alternatives, and present a mutually- supported plan for meeting the future water supply needs of the Triangle Region. In doing so, JLP members supported each other through a careful peer review of each other's demand projections; through shared information about conservation and water use efficiency efforts; through inter - utility infrastructure planning efforts (e.g. a regional distribution system interconnection study and hydraulic model and a feasibility study for a new intake and water treatment plant on the western side of Jordan Lake); and by expanding the pool of potential water supply source options. The 2060 future water service areas of the JLP members are shown in Figure 1. Page 1 2 Orange County 2014 Jordan Allocation Request 12 Future Water Service Areas Regional Water Service Areas Town of Apex wesrFore ORANGE CD County Boundaries olfheEno COUNTY Lake 0 Town of Cary RCSP o;, Myhre Major VYater Bodes Lille River 0 Chatham County -North System Lake Rase— 0 River Basin Boun daries 0 City of Durham IF— River o.ange 0 Town of Hillsborough rea Shown 0 Town of Holly Springs TPe Lake 13 Hill r ugh Town of Morrisville Johnston 0 Orange County •;� Orange Water & Sewer Authority G Town of Pittsboro Caneereek Reservoe City of Raleigh & Merger Partners scone Carrboro City of Sanford Quarry OYVAaA Fans Lake Wake County - RTP South U rsrry Chapel Hill ni v Lekc I r I Jordan Lake Apex CHATHAM wn aia COUNTY Neese River –`— -- _ - -- Cape Fear River Sanford � 4 Map created by Triangle J Counal of Govemments Data from a variety of sources 'Map for reference only Updated April. 3, 2014 Figure 1. Future (2060) water service areas of the Jordan Lake Partners. Developing the Regional Water Supply Plan The TRWSP has two basic components: 1) identification of regional waters need through 2060, and 2) a plan for meeting those needs. The Triangle Regional Water Supply Plan: Volume l — Water Needs Assessment (May 2, 2012) presented the demand projections and initial estimates of water supply needs for all of the JLP members. The Triangle Regional Water Supply Plan: Volume 11 — Regional Water Supply Alternatives Analysis (Draft, April 18, 2014) presented the methodology used to create and evaluate regional water supply alternatives and the details of the preferred alternative and regional water supply plan. These documents should be consulted for more information. The following information summarizes the regional needs, recommended regional water supply alternative, and proposed Jordan Lake allocations requests. Water Demand Projections and Projected Need Figure 2 illustrates the total regional water demand projections as compared to the current available water supply (horizontal line) of 199 MGD for the thirteen JLP members. Each of the partners developed its own initial projections, which were then reviewed and scrutinized by the Page 1 3 Orange County 2014 Jordan Allocation Request 13 other partners, and subsequently revised. The revised, peer- reviewed demand projections were approximately 10 -15% lower than the initial projections, as shown by the red shaded boxes in the figure below, and represent an historic consensus among local water system professionals about the present status and long -term needs of the Triangle Region's water supply resources. 4.111 Oill 0 c� 250 a E 0 200 E 1A 150 0 100 d a a� 50 0 Current Total `- - Regional Supply L _ _ _ 2010 2020 2030 2040 2050 2060 i - - Reduction from Initial Apex � Cary Morrisville � Wake Co -RTP South Chatham County N � Durham � Hillsborough � Holly Springs � Orange County OWASA � Pittsboro � Raleigh &Merger Partners Sanford Current Supply Figure 2. Regional demand projections, current supply, and reductions due to peer review. Each water system's need is presented as the average day demand minus the operational yield of its existing water supply sources (including existing Level 1 and Level //Jordan Lake allocations). Based on demand projections and existing supply, the need for each partner was computed for the 2010 -2060 planning period at five year intervals as shown in Table 1. The italicized columns for 2045 and 2060 highlight the key planning years for the Round 4 Jordan Lake Allocation process and the 50 -year TRWSP, respectively. Page 14 Orange County 2014 Jordan Allocation Request 14 Table 1. Proiected Water Suoolv Need IMGDI by Partner. 0.0 0.0 0.0 0.0 0.0 0.3 1.4 2.1 2.5 2.8 3.1 3.9 5.1 6.3 6.3 6.3 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 2.3 4.1 5.9 7.0 8.2 10.1 12.1 - 0.0 0.0 0.0 0.0 0.0 0.0 0.2 2.1 4.0 5.2 6.5 0.4 0.6 0.8 0.9 1.1 0.1 0.6 1.1 1.6 2.1 0.0 0.1 0.5 0.9 1.3 1.8 2.2 2.6 3.0 3.3 3.7 0.0 0.0 0.0 0.0 0.0 - 0.0 0.0 - 0.0 0.0 0.0 1.3 0.0 3.6 0.0 5.8 0.9 0.0 6.9 7.5 1.3 8.1 14.0 3.2 8.4 19.7 5.8 _8.8 25.4 8.4 9.3 31.6 10.6 9.8 37.7 12.8 Total 0.0 0.1 1.8 5.3 11.2 24.7 39.4 54.0 68.4 81.8 95.2 * "Need" assumes that existing Level 1 and Level 11 Jordan Lake allocations are fully utilized Recommended Regional Alternative The JLP evaluated a multitude of regional water supply alternatives that could meet the Region's needs as presented in Table 1. The Triangle Regional Water Supply Plan: Volume 11- Regional Alternatives Analysis presents the methodology and analyses used to create and evaluate those alternatives. A preferred regional alternative for meeting the future needs of all partners through 2060 emerged from this effort and is referred to hereinafter as the "JLP Recommended Alternative." Table 2 presents new water supply sources that would be brought online as part of the JLP Recommended Alternative. The Projected New Supply column lists the estimated yield of supply sources in addition to existing yields currently available. These sources may include either new supply sources or the expansion of existing sources. The City of Raleigh's preferred source options remain uncertain with regard to timing and order of implementation, but include four priority sources, any of which could provide approximately 13.7 MGD of additional yield. These include 1) a new Little River Reservoir in eastern Wake County, 2) a reallocation of Falls Lake storage to increase the available water supply pool, 3) a direct withdrawal from the Neuse River upstream of Raleigh's Neuse River Wastewater Treatment Plant, and 4) a quarry reservoir adjacent to the Neuse River near Richland Creek. Under the JLP Recommended Alternative, Raleigh would meet its future demands from a combination of these Neuse Basin sources and would not require a Jordan Lake allocation. Page 1 5 Orange County 2014 Jordan Allocation Request 15 Table 2. JLP Recommended Alternative sources to be constructed. Jordan Lake - Round 4 Haw Storage Allocation 2015 28.2 Jordan Lake - Future Rounds Haw Storage Allocation 2025- 2045 8.2 Cape Fear River Withdrawal Cape Fear River Withdrawal 2025, 2045 12.8 Haw River Withdrawal Haw River Withdrawal 2015, 2020 4.0 W. Fork Eno Reservoir Expansion Neuse Reservoir Expansion 2015 1.2 i Stone Quarry Expansion Haw Quarry Reservoir 2035 2.1 i Town of Mebane Purchase Haw Purchase 2015 -2020 2 (0.5-2.5) Neuse Basin Option 1 Neuse TBD 2025 13.7(9-15) Neuse Basin Option 2 Neuse TBD 2035 -2045 13.7(9-15) Neuse Basin Option 3 Neuse TBD 2050 -2055 13.7(9-15) TOTAL All New Sources 96.2 -100 In total, the JLP Recommended Alternative provides approximately 100 MGD of additional supply by 2060, which would meet the Region's projected cumulative need of 95.2 MGD. The timing and sequence of bringing the new sources online would reduce the risk of a supply deficit for any partner during the planning period. Jordan Lake Allocations proposed in JLP Recommended Alternative The JLP Recommended Alternative includes new or expanded Jordan Lake Allocations for multiple partners, both in this current Round 4 and in future allocation cycles, to meet needs through 2060. Currently, 63% of Jordan Lake's water supply pool has been allocated, and a 1% storage allocation is assumed to yield approximately 1 MGD of average day supply. All existing allocations are currently held by Jordan Lake Partnership members, and the JLP Recommended Alternative proposes that all of these either be maintained or increased. Table 3 presents current allocations, the proposed Round 4 allocation requests, and future proposed allocation requests through 2060. Round 4 requests would meet water supply needs through 2045; future allocations would meet 2060 needs. Table 3 indicates the total allocation amounts for each partner, who are expected to distinguish between Level I and Level II requests in their respective Round 4 allocation applications. Table 3 includes all thirteen JLP members, even though Raleigh and Sanford are not expected to request Jordan Lake Allocations. The Towns of Apex and Cary currently hold a combined allocation that meets the needs of both communities. The Town of Cary also has finalized long- term agreements to serve the Town of Morrisville and the Wake County - RTP South service areas and is expected to make a joint allocation request. Table 3, therefore, includes the combined amount of the proposed allocation request, but it also shows the individual partners' amounts. Page 16 Orange County 2014 Jordan Allocation Request 16 Table 3. JLP Recommended Alternative 8.5 23.5 3.5 3.5 6 10 5 1 2 0 0 0 0 TOTAL JLP 63 Moving toward implementation Jordan Lake Allocations by Partner (MGD). 10.6 11.6 32.0 16.5 28.6 29.8 1.5 46.2 3.5 3.6 3.5 3.5 13 18.2 16.5 16.5 5 5 1.5 2 2 2.2 1 1 6 6 0 0 0 0 91.2 99.4 48.5 The JLP Recommended Alternative is the result of more than four years of collaborative planning by the Partnership. The water supply needs of the thirteen partners have been vetted through multiple rounds of peer review and represent the most complete long -term picture of the Region's demands compiled to date. A thorough regional water supply alternatives analysis determined that the JLP Recommended Alternative would be most acceptable in terms of implementability, environmental and community impacts, customer costs, and overall acceptance by local governments and the general public. The JLP efforts constituted the successful collaboration — including an unprecedented level of mutual trust and respect — among local entities planning, coordinating, and moving toward implementation of a water supply plan that will meet the long -term needs of the entire Triangle Region. Individual partners will continue to operate their own systems, but the success of this regional water supply plan will depend on each partner being able to implement its respective additional water supply sources as recommended. The partners investigated the various impacts of the JLP Recommended Alternative — including effects on the environment, downstream water users, and the general public — and found these impacts to be acceptable and preferable to those of the other options. Hydrologic effects of the JLP Recommended Alternative were modeled with the recently updated Cape Fear -Neuse Basin OASIS model. Preliminary results indicate the proposed alternative will meet long term Page 1 7 Orange County 2014 Jordan Allocation Request 17 demands without creating downstream shortages; is considered to be the most implementable from a regulatory and political perspective; and provides for coordinated allocation requests among JLP members. The remainder of this document presents the allocation request for Orange County. Page 18 Orange County 2014 Jordan Allocation Request ATTACHMENT C kol FAA 611 Ift -d id 064, affl 103 10 Pi M03P001■I,!jKTMU M Prepared For: Prepared By: II \ Jordan Lake Partnership Triangle J Council of Governments 19 Triangle Regional Water Supply Plan — Executive Summary This page intentionally left blank. Cover Photo: NMNC. Falls Lake along Mountains to Sea Trail. 2012. Downloaded from Panoramio.com. Used under Creative Commons noncommercial, nonderivative license. 14 Oct. 2012. 20 Triangle Regional Water Supply Plan — Executive Summary Executive Summary What is the Triangle Regional Water Supply Plan? The Triangle Regional Water Supply Plan (TRWSP) is a collaborative assessment of projected water demands and sources in the Triangle Region of North Carolina, developed by the Jordan Lake Partnership (JLP), that demonstrates the ability of existing and new or expanded sources of supply to meet demands through 2060. What is the Jordan Lake Partnership? The JLP is a consortium of 13 local governments and water systems (Partners) that was created in 2009 to collaboratively plan for the future of water supply in the Triangle Region, including the use of Jordan Lake. Figure 1 lists the thirteen Partners and shows their 2060 water service areas. Future Water Service Areas (2060) --- - -- - - - Regional Water Service Areas Town of Apex wesr Fv a ORANGE CD County Boundaries or mee "° COUNTY Le "e Town of Cary .j Resery °;r� Mmnie Major water Bodies ` y{ Little River iver Chatham County -North System a Lake Reservoir i River Basin Boundaries City of Durham Efo e"ae Town of Hillsborough Orange Area Shown Town of Holly Springs ' County Hllsl n Town of Morrisville a Orange County ��F Oran Coun Orange Water 8 Sewer Authority ^ f,; Town of Pittsboro Cane C —' aeseno�r � � City of Raleigh & Merger Partners ouarry Carr boro o r City of Sanford aeso: av Falls LA,, ownsa Wake County - RTP South Chapel Hill 11 Um —Ily I .]A • I Chatham County - North M orrisvill Jordan Ral igh Lake ke Pittsb.r. Apex Il —�wATHAM Whe he els CO -a� Neuse 'l H L ri River Cape Fear - -I. 1 r� � �N" _ River l � j Sanford y i` \ 1\ I Map created by Triangle J Council of Governments. Data from a variety of sources. Map for reference only Updated September 24, 2014. Figure 1. Future (2060) water service areas of the Jordan Lake Partners. 1 21 Triangle Regional Water Supply Plan — Executive Summary What are the Key Conclusions of the Plan? • The Partners' current total water supply of 199 million gallons per day (MGD) is projected to meet their combined needs through approximately 2030. • An additional 95 MGD of supply is needed to meet 2060 water supply needs (total 294 MGD). • The 2060 demands can be met in an environmentally and economically sound manner through a combination of: o 36.4MGD: Allocation of most of the remaining Jordan Lake water supply storage (Apex, Cary, Chatham County, Durham, Orange County, Hillsborough, Pittsboro); 0 20.6- 22.6MGD: Expansion of existing reservoirs, off - stream quarry storage, and run -of- river withdrawals (Hillsborough, Orange County, OWASA, Pittsboro, Sanford); and 0 41.1 MGD: Development of a combination — still to be determined — of new or expanded sources including reallocation from Falls Lake, a new intake in the Neuse River, off - stream quarry storage, and /or a new reservoir in eastern Wake County (Raleigh). • Implementation of water use efficiency and conservation practices and expanded use of reclaimed water will continue to be essential strategies for meeting the region's future water needs. • Hydrologic modeling has shown that the Triangle's water needs can be met without compromising the ability of downstream communities to meet their own water supply needs. • The region's ability to meet projected water demands in 2060 may be compromised if any of the TRWSP's recommended future water supply sources are not implemented as planned. Why was the Partnership Formed? The Partners elected to be proactive in identifying potential water shortfalls and mutually acceptable and beneficial solutions for meeting future needs. The region experienced two historic droughts in 2002 and 2007 -2008. Regional planning and collaboration — developing solutions on a geographic scale larger than individual water suppliers — will increase the resilience of our water supply under similar extreme conditions. In addition, the Partners wanted to use hydrologic modeling to confirm that other upstream and downstream water needs within the Cape Fear and Neuse River Basins would not be impacted by a proposed strategy that met the needs of the Triangle. The challenges associated with utility management including increasing costs, greater regulatory requirements and increasing drought vulnerability can be more successfully met through inter -local collaboration in facility planning, design, construction, operation and management. The Partners, in various combinations, are engaged in joint projects including increasing the number and size of interconnections between water supply systems and consolidating utility systems through merger agreements. Some efforts include water supply planning over the entire hydrologic cycle where water, wastewater and stormwater service delivery are integrated to protect watersheds and improve response during drought or other water shortage conditions. The JLP was formed to complement these efforts, continuing to better prepare the Triangle Region to address water shortages on a regional basis. 2 22 Triangle Regional Water Supply Plan — Executive Summary What has the Partnership Accomplished? The first step was for JLP members to develop demand projections through 2060, and a key part of this effort was engaging in a careful peer review of each other's demand projections. The Partners also shared information about conservation and water use efficiency efforts, identified existing interconnections and evaluated new interconnection opportunities. After determining future needs, the Partners developed a pool of potential water supply source options, and coordinated with the NCDENR Division of Water Resources (DWR) to use the combined Cape Fear - Neuse River Basin hydrologic model to define and evaluate alternatives. The result is the mutually- supported Triangle Regional Water Supply Plan for meeting the future water supply needs of the Triangle Region. What are the Region's Water Supply Needs? The region's existing and planned water supplies (Figure 2) are associated primarily with man -made reservoirs, along with a few run -of -river withdrawals and supplemental quarry storage. The region does not import water from outside the Neuse and Cape Fear River basins; though the Partners currently have a combined net transfer of surface water from the Neuse basin to the Cape Fear basin. - - -' ------ - - - - -- ---------------------- _ _ Triangle Area Raw Water Sources - -- I O County Boundaries • Existing Water Source Municipal Boundaries • Future Water Source W Fork En. Lake Miclrie Major Water Bodies $e��r 14 Are.Daily Supply(MGD) �� Lake Li He River Orange eservoir Eno River rea Shown ` w�s ® T Lake Ben Hillsborough Quaker Creek 2 Reserveir 0 _ 4i1i (via Mebane) reer Quarry Falls Lake tt�s ORANGE DURHAM Can Creek \ R ervoir 1 Durham / Wake Forest Carrboro OWASAI Nor Reservoir Chapal Hill Quarry %Rolesville 2 University RTP° RDU River Little River Lake —� Reservoir Raleigh Rocky River j�Q Morrisville Zebulon t Haw R/ver Cary Knightdale Wendell r Jordan CHATHAM Lake Sitar Lake Benson city Pihsboro Apex Lake wrreeler Garner WAKE Holly Springs l I;oldston �pe Fear Fuquay- Varina River Deep Ri er LEE Gpe Fear Weer / O (via Hamad Co.) Sanford Figure 2. Existing and future water supply sources; JLP Recommended Alternative. Single dots sometimes represent multiple sources that are geographically close (e.g., OWASA's reservoirs) and /or more than one utility using the same source (e.g., Jordan Lake). The numbers by each source represent approximate yield in MGD, but have been rounded to whole numbers in this graphic. Details of each source are provided in the TRWSP. 3 23 Triangle Regional Water Supply Plan - Executive Summary The Triangle area is one of the fastest growing regions in the country, and as a result, the combined JLP water service area population is projected to increase from 1,066,000 in 2010 to 2,774,000 by 2060, a compounded rate of increase of about 1.9 percent. The corresponding water demands are projected to increase from 118 MGD in 2010 to 294 MGD by 2060, a compounded rate of increase of about 1.8 percent. The fact that water use is projected to grow slower than service area population illustrates the impact of the Partners' water efficiency and conservation programs, including increased use of reclaimed water. While existing water supplies of 199 MGD are expected to meet the region's needs through approximately 2030, new water supplies of 95 MGD will be needed to meet 2060 estimated demands of 294 MGD. Figure 3 illustrates the growth in water demand for each partner. Raleigh makes up almost half of the JLP's combined demands — making the implementation of their future water supply projects essential to successfully meeting the needs of the Triangle Region. 300 Apex Cary 250 � Morrisrrille Current Total Wake Co -RTP South Regional Supply 200 Chatham County N a E ■ d Durham 0 E Hillsborough *2 150 H Holly Springs a o Orange County 100 — c ■ OWASA v Pittsboro T 50 Raleigh &Merger Partners a Sanford 0 Current Supply 2010 2020 2030 2040 2050 2060 Figure 3: Regional demand projections and current supplies, including Jordan Lake allocations. How will the Partners Meet 2060 Water Demands? Many of the Partners have their own long -range master plans in which they have identified and evaluated a variety of water supply options. Using the information from these plans as a foundation, the JLP identified potentially feasible strategies for meeting the region's long -term water supply needs. These strategies were evaluated relative to each other according to their ability to meet regional water supply demands, costs, regulatory complexity and environmental impacts; and the strategy selected by the Partners is presented in detail in the TRWSP (JLP Recommended Alternative). 4 24 Triangle Regional Water Supply Plan — Executive Summary The JLP Recommended Alternative meets the region's cumulative 2060 water supply needs of 294 MGD with 36.4 MGD of new allocations from Jordan Lake, and development of about 63 MGD in water supply from increased and new withdrawals from river sources, increased and new supplemental quarry storage and a new reservoir on the Little River in eastern Wake County. Implementation of the JLP Recommended Alternative would decrease the existing net interbasin transfer from the Neuse River Basin to the Cape Fear River basin. Currently, 63 percent of Jordan Lake's water supply pool has been allocated (a 1 percent storage allocation is estimated to yield approximately 1 MGD of average day supply). The JLP Recommended Alternative includes the same or increased allocations for all existing allocation holders (each is also a member of the JLP), as well as new allocations for several of the Partners. While the JLP is planning for 2060, the next round of Jordan Lake allocations (Round 4) will be based on 2045 needs. Table 1 presents current allocations and the total Jordan Lake allocation needs for 2045 (proposed Round 4 allocation requests) and 2060. Table 1. JLP Recommended Alternative Jordan Lake Allocations (MGD). 8.5 10.6 11.6 32.0 23.5 28.6 29.8 46.2 3.5 3.5 3.6 3.5 3.5 3.5 6 13 10 16.5 5 5 1 1.5 2 2 0 1 0 6 0 0 0 0 18.2 16.5 5 2 2.2 1 6 0 0 TOTAL JLP 63 91.2 99.4 48.5 Table 2 summarizes additional water supply (62 -64 MGD) from sources other than Jordan Lake in the JLP Recommended Alternative. While most of the sources are expansions of existing water supplies, about 41 MGD of the proposed water supply — nearly half of the 95 MGD in new supplies needed to meet regional 2060 demands — will come from a combination of new projects that are planned by the City of Raleigh. 5 25 Triangle Regional Water Supply Plan — Executive Summary Table 2. JLP Recommended Alternative Water Supplies (MGD). W. Fork Eno Expansion Purchase from Town of Mebane Quarry Reservoir Expansion euse Reservoir Expansion 1J Haw Purchase 0.5 -2.5 Haw Quarry Expansion 2.1 Haw River - Increased Haw River Withdrawal 4.0 Withdrawal New Reservoir; Reallocation of Falls Exploring 4 options; Neuse Lake Storage; Neuse 41.1 must develop 3 River Withdrawal; Quarry Cape Fear River - In Withdrawal Can Downstream Communities Meet 2060 Needs under the TRWSP? Yes. The JLP used DWR's combined hydrologic model of the Neuse and Cape Fear River Basins to simulate 2060 water demands, including the JLP Recommended Alternative, under the entire 80+ year range of hydrologic conditions and historic droughts. The results indicate that the long term water supply needs of the Partners, as well as those of downstream water users, can be met under the TRWSP. A preliminary modeling analysis by DWR, as they work toward development of a Cape Fear Basin Water Supply Plan, confirmed these results. What Could Affect the Success of the TRWSP? The TRWSP conclusion that the Triangle Region will have enough water to meet projected water demands through 2060 hinges on the accuracy of many assumptions, on Jordan Lake water supply allocations consistent with Table 1, and on each Partner implementing its water supply projects. The JLP Recommended Alternative will require implementation of many complex projects, with numerous regulatory and environmental challenges. Key uncertainties include: • Rate of population growth; • Adoption of water efficiency and conservation practices including reclaimed water use; • Water quality policies, environmental permits, endangered species impacts, environmental justice concerns or evolving regulations, especially as they relate to the development of new water supply sources; • Legislative and /or regulatory actions regarding competing water uses; and 11 26 Triangle Regional Water Supply Plan — Executive Summary • Declining source yields due to issues such as hydrologic variability (from climate and /or land use impacts), faster than assumed sedimentation of reservoirs or changes in required downstream releases. What are the Partnership's Next Steps? Consistent with the TRWSP and Table 1, those Partners who use or plan to use Jordan Lake submitted draft allocation requests to DWR on May 1, 2014; final applications will be submitted later in 2014 and the JLP will continue to coordinate with DWR on the allocation process and development of the Cape Fear Basin Water Supply Plan. The Partners are developing a regional water distribution system computer model that will be used to evaluate system interconnection capacities and performance under different demand scenarios, with the goal of identifying joint projects to increase reliability for all customers and optimize water supplies during times of water shortage. Several of the Partners have begun planning for the design and development of a new intake, water treatment plant and transmission facilities on the western side of Jordan Lake. Working together to build new infrastructure minimizes environmental impacts, and decreases both capital and operational costs due to economies of scale. A new intake and treatment plant at Jordan Lake, along with major interconnections between systems, would also provide redundancy in the event the existing Cary -Apex intake had to be taken offline for any reason. The Partners will continue to work together toward successful implementation of the TRWSP, and to look for areas where they can improve the region's ability to address water supply needs and effectively prepare for and respond to water shortage conditions through cooperation and preparation. 7