Loading...
HomeMy WebLinkAboutAgenda - 11-19-2013 - 5bORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 19, 2013 Action Agenda Item No. 5 -b SUBJECT: Safe Routes to School (SRTS) Strategic Action Plan 1 DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) YO ATTACHMENT(S): 1. Amendment Outline Form 2. SRTS Action Plan Overview 3. Process Flowchart 4. Draft SRTS Strategic Action Plan http: / /orangecountync.gov /planning /d ocuments/UpdatedSRTSPlan- allchapterscombined.pdf (264 Pages; Hard Copy Available Upon Request) INFORMATION CONTACT: Abigaile Pittman, Transportation /Land Use Planner, 245 -2567 Tom Altieri, Comprehensive Planning Supervisor, 245 -2579 Craig Benedict, Planning Director, 245 -2592 PURPOSE: To hold a public hearing on the Safe Routes to School (SRTS) Strategic Action Plan required for implementing a Safe Routes to School program in Orange County. BACKGROUND: Background information on the SRTS program can be found in Section B.2 of Attachment 1, the Amendment form, approved by the BOCC on October 15, 2013. The Amendment form contains details regarding the timeframe for the adoption process. The form also outlines the rationale, process, and implications of the development and adoption of the Safe Routes to School (SRTS) Strategic Action Plan. The Draft SRTS Plan was reviewed by the North Carolina Department of Transportation (NCDOT) Bicycle and Pedestrian Division, and a final draft was completed and returned to the Planning Staff in December 2012. The three schools chosen for the SRTS Action Plan are part of the Orange County Schools system, and all are located inside or adjacent to the Town of Hillsborough: • Grady A. Brown Elementary School • Cameron Park Elementary School • C.W. Stanford Middle School An overview of the SRTS program purpose, considerations for chosen school sites, recommended projects, and information on project funding can be found in Attachment 2. Staff's pre- adoption activities on the Draft SRTS Strategic Action Plan can be found in Section C.1 of Attachment 1. 2 Public Outreach: The Plan development process included a public workshop completed in April 2008 that sought input from residents, including parents, teachers, principals, children, Town of Hillsborough staff, and Orange County staff. Attachment 3 is a flowchart describing the process for the development and adoption of the SRTS Strategic Action Plan. Attachment 4 is the full (264 -page) Draft SRTS Action Plan for public hearing and can be accessed via http: / /orangecountync.gov /planning /documents /UpdatedSRTSPlan- allchapterscombined.pdf. A hard copy is available upon request. For Additional Information Information about the SRTS Action Plan previously submitted to the Board of County Commissioners (BOCC) on April 9, 2013 can be found at the below link: http: / /server3.co.orange.nc.us- 8088 /WebLink8 /DocView.aspx ?id= 28037 &dbid =0 FINANCIAL IMPACT: Other than staff time, there is no financial impact associated with receiving, considering and holding a public hearing on the SRTS Action Plan. Review of the Draft Plan has been done by existing Planning staff in the Department's Comprehensive Planning Division. Following adoption, Plan implementation will require assistance from the NCDOT SRTS Program staff, the Orange County Schools staff, and the Town of Hillsborough staff. RECOMMENDATION(S): The Interim Manager recommends the Board: 1. Receive the Draft Safe Routes to School (SRTS) Strategic Action Plan (Attachment 4); 2. Conduct the public hearing and accept public and BOCC comments on the proposed Plan; 3. Refer the Plan to the Orange County Schools and the Town of Hillsborough for review and adoption consideration, and report the review comments and actions to the BOCC in time for the February 18, 2014 regular Board meeting; 4. Refer the matter to the Orange Unified Transportation Board (OUTBoard) with a request that a recommendation be returned to the BOCC in time for the February 18, 2014 BOCC regular meeting; and 5. Adjourn the public hearing until the February 18, 2014 regular Board meeting in order to receive and accept the review comments and actions of the Orange County Schools and the Town of Hillsborough, and the OUTBoard's recommendations, and any submitted written comments. Attachment 1 COMPREHENSIVE PLAN/ FUTURE LAND USE MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENTOUTLINE A. AMENDMENT TYPE Map Amendments ❑ Land Use Element Map: From- - -- To: --- El Zoning Map: From- To: --- F] Other: Text Amendments ❑ Comprehensive Plan Text: ❑ UDO Text: ❑UDO General Text Changes ❑UDO Development Standards ❑UDO Development Approval Processes ❑ Other: Safe Routes to School (SRTS) Action Plan B. RATIONALE 1. Purpose /Mission The purpose of the SRTS program is to: ' • Enable and encourage children, including those with disabilities, to walk and bicycle to school; • Make bicycling and walking to school a safer and more appealing transportation alternative, thereby encouraging a healthy and active lifestyle from an early age; and • Facilitate the planning, development, and implementation of projects and activities that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity of schools. Attachment 1 4 The NC SRTS Program works with schools, local governments and agencies, advocacy and non - profit organizations, and public health professionals at a grassroots level to identify improvements that can help make bicycling and walking to and from school a safe and healthy transportation alternative. Orange County received a SRTS Strategic Action Plan Service Award in July 2008 for planning assistance to prepare an Action Plan for Grady A. Brown Elementary School, Cameron Park Elementary School and C.W. Stanford Middle School. In 2009 NCDOT contracted Greenways, Incorporated and Greene Transportation Solutions to work with County staff, local agency representatives, School Team leaders and principals of the three schools to identify non - motorized infrastructure improvements that enhance safety for walking and bicycling. The Plan development process included a visioning and goals session and map working session with the project staff, steering committee, and consultants. This was followed by comprehensive fieldwork and a public workshop that sought input from residents, including parents, teachers, principals, children, Town of Hillsborough staff, and Orange County staff. This input and analysis led to the development of a draft plan that consisted of an analysis of existing conditions, and recommendations in the program's framework of engineering, education, encouragement, enforcement, and evaluation (the essential `5 E's' of the program). 2. Analysis Additional analysis will be part of the subsequent evaluation and approval of project implementation actions. 3. Comprehensive Plan Linkaae (i.e. Principles. Goals and Obiectives) Chapter 9: Transportation Element Goals 1, 2, 3 and 4 and their supporting objectives address amulti -modal transportation system, promotion of public health and safety, and transportation planning that serves development. Several objectives specifically speak to the provision of bikeways and walkways. 4. New Statutes and Rules N/A C. PROCESS 1. TIMEFRAME /MILESTONES /DEADLINES a. Completion of Final Draft Plan by Consultant and NCDOT December 2012 L ^. Orange Count BOCC /Town of Hillsborough Commissioners Joint Meeting Updates February 24, 2011 February 21, 2013 2 Attachment 1 5 b. BOCC Authorization to Proceed April 9, 2013 (Initial adoption steps): • Joint staff planning meetings with Orange County Schools and the Town of Hillsborough; • Meetings with the Orange County School Board and the Town of Hillsborough Town Board to provide information and receive endorsement to proceed; and • The completion of updates to the draft SRTS Action Plan pertaining to the review of local planning document resources, federal and state funding sources, depicted school district boundaries, and general corrections such as the spelling of some road names, etc. October 15, 2013 (adoption steps) c. Joint Staff Meeting with Orange County Schools and the Town of Hillsborough On April 30, 2013 Planning staff met with staff from the Town of Hillsborough, Orange County Schools, Orange County Health Department, and representatives from the state Community Transformation Grant program (a related program and possible funding source). Additional conversations and meetings occurred in May, June and July to discuss the progress of pre- adoption steps; d. Meet with Orange County School Board and the Town Board of Hillsborough to Brief and Receive Approval for Initial SRTS Adoption Steps On May 28, 2013 Planning staff presented an overview of the SRTS Action Plan and proposed pre- adoption steps to the Orange County School Board and received its endorsement. On June 10, 2013 Planning staff presented an overview of the SRTS Action Plan and proposed pre- adoption steps to the Town of Hillsborough Board and received its endorsement. e. Staff Editing of Draft SRTS Action Plan Planning staff made minor edits to the Draft SRTS Action Plan through August pertaining to the review of local planning document resources, federal and state funding sources, revisions to depicted school district boundaries, and general corrections such as the spelling of some road names, etc. No revisions were made to project recommendations developed by the Plan steering committee. f. BOCC Public Hearing November 19, 2013 (OUTBoard members encouraged to attend) g. Orange County Schools Adoption Consideration January 13, 2014 h. Town of Hillsborough Adoption Consideration February 10, 2014 i. BOCC Adoption Consideration February 18, 2014 3 Attachment 1 2. PUBLIC INVOLVEMENT PROGRAM The Plan development process included a public workshop completed in April 2008 that sought input from residents, including parents, teachers, principals, children, Town of Hillsborough staff, and Orange County staff. a. Advisory Boards: POUTBoard - March 20, 2013 update OUTBoard — December 18, 2013 review and recommendation b. Local Government Review: Town of Hillsborough, as noted in Section C.1. above c. Notice Requirements Not required for these adoption steps d. Outreach: ❑ General Public: The Plan development process included a public workshop completed in April 2008 that sought input from residents, including parents, teachers, principals, children, Town of Hillsborough staff, and Orange County staff. ❑ Small Area Plan Workgroup: N/A 1 ® Other: Joint staff meetings with Orange County Schools and the Town of Hillsborough; and meetings with the Orange County School Board and the Town Board of Hillsborough. FISCAL IMPACT Other than staff time, there is no financial impact associated with receiving, considering and authorizing the staff to proceed with adoption steps for the SRTS Action Plan. D. AMENDMENT IMPLICATIONS N/A E. SPECIFIC AMENDMENT LANGUAGE Primary Staff Contact: Abigaile Pittman Planning Department (919) 245 -2567 abpittman @orangecountync.gov 4 7 ATTACHMENT 2 Safe Routes to Schools (SRTS) Strategic Action Plan OVERVIEW November 19, 2013 SRTS PROGRAM BACKGROUND AND PURPOSE The Safe Routes to School (SRTS) Program was established in the 2005 Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA -LU). It is a federally- funded grant reimbursement program providing an opportunity for communities to improve conditions for bicycling and walking to school. Section 1404 of SAFETEA -LU mandates that the North Carolina Department of Transportation (NCDOT) administer this program within the state, providing financial assistance to state, local, and regional agencies, including non - profit organizations that demonstrate an ability to meet the requirements of the program. The purpose of the SRTS program is to: • Enable and encourage children, including those with disabilities, to walk and bicycle to school. • Make bicycling and walking to school a safer and more appealing transportation alternative, thereby encouraging a healthy and active lifestyle from an early age. • Facilitate the planning, development, and implementation of projects and activities that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity of schools. The NC SRTS Program works with schools, local governments and agencies, advocacy and non - profit organizations, and public health professionals at a grassroots level to identify improvements that can help make bicycling and walking to and from school a safe and healthy transportation alternative. THREE SCHOOLS ADDRESSED BY THE SRTS ACTION PLAN • Grady A. Brown Elementary School • Cameron Park Elementary School • C.W. Stanford Middle School The three schools chosen for the SRTS Action Plan are part of the Orange County school system, and all are located inside or adjacent to the Town of Hillsborough. A comprehensive, multi- faceted approach was taken to examine existing conditions including the collection of data from parent surveys and student travel tallies, site work and field interviews, and area mapping. A thorough inventory of existing conditions was assembled at each school site to provide a baseline by which to measure the results and outcome of the SRTS Program at the community, school and street levels. s ATTACHMENT 2 L po tLL, V EMO VE F - ec o�i-4w oLMaN o ' z = m kyoN a ? o; y Charles W. Stanford Middle e� o RFG G�T N H � AQ� p NFR ST 09 ¢ALMA R L/, o R ST S,P Y LO G� ..R �4N �RrcIANU oq Pp x K � PRE SEYS pO o m ° p c O�RR ar W RANGE ST CA E' N C1 W E o, On ST yy uN ON ST r E IONS O MIRFNOY AVE � P g � AOU EN ST x EQUE N PAP RrW K Z a z _ W T ON ST TRVO ST L4T MW a INR 9 Opp D4K U A Z KN 5 E INGSf Cameron Park Elementary R A HASH u - F gEN .IOHN57pNftP 9 G T y 91 P 'AR'_A LN weURN51VE p0 J to _a S � iR�l. 4r O p 14 w � Pp,O pN,I,,c N1A 'D 70A z a qw cF' o a � � y10 GoPPR9Te o P �FACO WIA b Q FbII�ON y EBGy.D Y Dp 2T Dl�� DR N m s O c e 9`O u NEW GRAY MOAN SCHOOL MlR' O E ^rcnaLF P� a GP E 'PO �R �oN s VP� OA GA o Nm WpR �1 o O G ��i,9'r ty ?o 4tE EDN M�'� O E z ¢ Q t qua o� Grady A. Brown Elementary RO l • D o p R`,p DIX R C o 1 AY & O w C 3 q � SLN pSPER o P Jt�m (' O QO • PmA 7E _lQ' l0 0o rrpj 1 , r CO NTV rp0� 2➢ �`- G ti (E1C ER Z ¢ P� OP JAMEST C IiLS oR O �4i ' Rv � j�p O Fm� m HOOT R j caY RIPPV = Sr yFDR �� WORT Qq m p z �m y ✓Gr4F DR O a4T A SAM .Ei"P O O p e(L NO O y O' er PAM R S tagy P W A S Zm LN O Ma P O � pHrL� �C o O C.qR rlryy O0. Nk AGE Chr'9%1 REV LN Gpf DR -R� FC S r ¢ oLD Q ° HERITAGEOT o NTON 9R o S Eg Charles W. Stanford Boundary O CHEYENNE DR Cameron Park Boundary Grady A. Brown Boundary N KEW Np Streets GE h0 Water Bodies Loins R Hillsborough City Limits Feet `y e c'R LN 0 1,500 3,006 H � U , L ATTACHMENT 2 CONSIDERATIONS FOR CHOSEN SCHOOL SITES 9 Grady Brown Elementary School — located on New Grady Brown School road just off Orange Grove Road. • The school is south of 1 -40 and the roadway bridge has very narrow shoulders. • There are multiple two -lane rural roadways that pose safety barriers for school - age cyclists and pedestrians. • There are no sidewalks or pedestrian sidewalks or pedestrian facilities of any kind leading to and away from the school. • There are no bicycle racks on campus. • There are no crossing guards. • Tallies: 240 students were driven by their parents; 225 students took the bus; 0 students walked; and 0 students bicycled. • Unofficial bus stops lack clear designation and safe harbor in some locations. • Existing safety concerns expressed by parents: distance; traffic speeds along routes (45 and 55 mph); traffic volumes along routes; lack of sidewalks or pathways; and unsafe intersections and crossings. • Crime not a significant issue of concern based on field analysis and public input. • Motorist's behaviors observed as "good" on campus and "fair" along Orange Grove Road. • Pedestrian behaviors observed to be generally safe around the school. • Minor backups of automobile traffic during drop -off times, with more congested backups during pickup times (causing some thru- traffic weaving and blind spots). • There is a clear school zone and pedestrian crossing signage along New Grady Brown School Road. • There are on- campus sidewalks along the building front, adjacent to the car drop - off line. • Access concerns along Orange Grove Road were highlighted by the BOCC /Hillsborough- approved Orange Grove Road Access Management Report (2003). • The nearby Patriots Pointe multifamily development has one of the highest densities in the County and is within walking distance of the school. • Projects for the school would also benefit Cedar Ridge High School. CW Stanford Middle School — located next to Orange High School inside a neighborhood with residential roads • The school is flanked by US 70 and Orange High School Road. • There is no sidewalk connectivity to neighborhoods and streets in the vicinity of the school; and the residential land use and street pattern on the eastern side of the school prevents a direct connection to the school, currently requiring students to use US 70. • There are no bicycle racks on campus. 3 ATTACHMENT 2 10 • US 70 presents a serious safety threat for pedestrians and bicyclists because of its lack of infrastructure, high speeds, and high traffic volumes. • There are very few traffic calming facilities in the area of the school • Tallies: 357 students were driven by their parents; 211 students took the bus; 3 students walked; and 0 students bicycled • Existing safety concerns expressed by parents: distance; traffic volumes along routes; traffic speeds along routes; safety of intersections and crossings; and the lack of sidewalks or pathways • Motorist's behaviors observed as "good" on campus, "fair" along Orange High School Road, and "bad" on US 70 • Crime not a significant issue of concern based on field analysis and public input • Minor backups of automobile traffic during drop -off and pickup times. • There are possibilities of connecting neighborhoods to the school using trails and greenways along current easements and "cut throughs ". • On- campus sidewalks and crosswalks are adequate. Cameron Park Elementary School — located next to St. Matthews Episcopal Church on St. Mary's Road near downtown Hillsborough, with adjacent small businesses and low density residential development • The traffic volumes are very high on St. Mary's Road, especially during commuter hours. • There are no sidewalks or bicycle lanes in the vicinity of the school. • There are multiple roadways that pose safety barriers and challenges for elementary school age pedestrians and bicyclists. • Tallies: 237 students were driven by their parents; 187 students took the bus; 19 students carpooled; 3 students walked; and 0 students bicycled. • Existing safety concerns expressed by parents: traffic speeds along routes; traffic volumes along routes; distance; safety of intersections and crossings; and the lack of sidewalks or pathways. • Motorist's behaviors observed as "fair" on campus, and "bad" on St. Mary's Road. • Significant backups of automobile traffic during drop -off and pickup times that impact off and on -site traffic, turning movements, and relate to dangerous vehicular maneuvers. • Not all curb ramps comply with ADA regulations. • The existing bicycle rack on the school's campus is situated where only one side can be used and is not covered. • There is a clearly defined school zone on St. Mary's Road. • Besides the crossing on St. Mary's Road at Thomas Ruffin Road, there are no marked crosswalks in the vicinity of the school. • There is an established trail connecting to the adjacent property to the school grounds that can give children access without having to walk along St. Mary's Road. • Projects for the school would also benefit Orange High School. M ATTACHMENT 2 SRTS PROJECTS 11 The SRTS program allows for a great variety of programs that can be implemented. Eligible SRTS projects can be bundled as infrastructure and non - infrastructure. Funding can include training volunteers, street crossings, safety and Intelligent Transportation Systems (ITS), bicycle /pedestrian lanes, etc. All projects must be within two (2) miles of a K -8 school. In response to previous questions from Commissioners regarding whether the SRTS Program will allow projects for high schools, staff has learned that the NCDOT SRTS Program will fund only those activities that specifically plan for improvements and programs that promote safe, active travel to K -8 schools, however the benefit of a project does not have to be exclusively for a K -8 school addressed by the Plan. While project inclusion in the adopted plan is encouraged, not all projects must be included in the adopted SRTS plan. Projects from the Plan with multiple purposes /greater impact are favored. If, for example, a proposed project for CW Stanford Middle School met the objectives of the SRTS program, but also happened to provide a benefit to the Orange High School, that is acceptable and even encouraged. However, there are projects that are not allowed. The following are ineligible activities: • Recurring costs, such as school crossing guards • Pick -up and drop -off sites • Educational focus buses • Bus stop improvements The NCDOT SRTS Program will fund only those activities that specifically plan for improvements and programs that promote safe, active travel to K -8 schools and while project inclusion in the adopted plan is encouraged, not all projects must be included in the adopted SRTS plan. A variety of sources were consulted during the development of the infrastructure recommendations: • Plans and studies • Existing conditions • The Consultant's fieldwork inventory • Public input • Noted patterns of development Grady Brown Elementary Projects Identified in the SRTS Action Plan: • Project #1: New Grady Brown School Road Sidewalk and Midblock Crossing • Project #2: Orange Grove Road / 1 -40 Bridge Pedestrian Facilities • Project #3: Oakdale Road Safety Improvements • Project #4: Patriots Pointe Trail Connection CW Stanford Middle School Projects Identified in the SRTS Action Plan: • Corridor Improvement Projects (8) (sidewalks, multi -use paths) along Orange High School Road, US 70, Harold Latta Road, Miller Road, NC 86, NC 57, and along new off -road multi -use paths. ATTACHMENT 2 12 • Crossing Improvement Projects (9) along US 70, Orange High School Road, NC 86, and Gwen Road. • Traffic Calming Measures along US 70. • On- campus Improvements (sidewalks, crosswalks, bicycle racks, curb ramps). • Enhance `cut throughs' to school from neighborhoods to the north and west. • Follow Town of Hillsborough's sidewalk/greenway planning. Cameron Park Elementary School Projects Identified in the SRTS Action Plan: • Corridor Improvement Projects (11) (sidewalks, bicycle lanes, greenway trails) along Cameron Street, St. Mary's Road, US 70, Queen Street, Thomas Ruffin Street, and several new off -road sites. • Crossing Improvement Projects (4) along Thomas Ruffin Street, St. Mary's Road, Cameron Street, and Churton Street. • Traffic Calming Measures along Queen Street, Thomas Ruffin Street, Cameron Street, and St. Mary's Road. • Off - campus Improvements (bicycle racks, crossing guards, left -turn restrictions, alleviating conflicts with parking areas). • Pedestrian signals at signalized intersections along Churton Street. PROJECT FUNDING The Safe Routes to School (SRTS) Program was established in the 2005 Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA -LU) legislation as a federally- funded grant reimbursement program providing an opportunity for communities to improve conditions for bicycling and walking to school. The SRTS program is a reimbursement program that does not require a local match (100% federally funded). Section 1404 of SAFETEA -LU mandated that the North Carolina Department of Transportation ( NCDOT) administer this program within the state, providing financial assistance to state, local, and regional agencies, including non - profit organizations that demonstrate an ability to meet the requirements of the program. There were some revisions to federal and state funding sources in October 2012 that will impact future funding sources for the Safe Routes to School program. Specifically, the federal Moving Ahead for Progress in the 21st Century Bill (MAP -21) SRTS program direct allocation funds were removed. MAP -21 authorized the Transportation Alternatives Program (TAP) to provide funding for programs and projects defined as transportation alternatives, including safe routes to school projects. The TAP replaced the funding from pre- MAP -21 programs, including the SRTS program. However, NCDOT staff has advised the Planning staff that there will continue to be SAFETEA -LU funds available for the program under its rolling grant cycle. It is anticipated that these funds will be continued on an annual basis through FFY 2014 (i.e. September 2015). SAFETEA -LU funds apportioned for the SRTS Program prior to MAP -21 are available until expended. In 2012 the North Carolina SRTS Program received an allocation of $4,699,927, from which projects have been funded in Chapel Hill, Asheville, Greenville, Mooresville, and Brevard. A ATTACHMENT 2 13 After identifying projects from the Plan to implement, the County would apply through the NCDOT Division 7 office. Project funding is based on project priority with as much local support as possible (Schools, PTA, Superintendent, municipalities, BOCC, supporting plans, etc.), and projects from the Plan with multiple purposes /greater impact are favored. If, for example, a proposed project for CW Stanford Middle School met the objectives of the SRTS program, but also happened to provide a benefit to the Orange High School, that is acceptable and even encouraged. Post expenditure of the existing SAFETEA -LU SRTS Program funds, future funding for SRTS projects will be with TAP funds. The Federal share will be the same as for the general Federal -aid highway program: 80 percent Federal /20 percent State or local match. Also, to address the shift in funding programs, prioritized SRTS projects will be included on the list of future year projects submitted for SPOT 3.0 scoring. The recommended first step in successful future SRTS project funding is the adoption of the Plan by Orange County, Orange County Schools, and the Town of Hillsborough. Adoption of the SRTS Action Plan demonstrates local commitment to the objectives of the SRTS program and serves to incentivize NCDOT to fund local projects in a competitive atmosphere. Some haste with the adoption and future project submission processes is recommended given the limited remaining pool of 100% federally funded SAFETEA -LU money. IMPLEMENTATION The SRTS Action Plan emphasizes that successful implementation will require the dedication of local government staff, commitment of the school system and local schools, the creation of a SRTS Advisory Committee, and the continued support of local advocates and parents. The recommended first step is the adoption of the Plan by Orange County, Orange County Schools, and the Town of Hillsborough. Adoption of the SRTS Action Plan demonstrates local commitment and incentivizes NCDOT to fund local projects. The second recommended step is to establish a SRTS Action Plan Advisory Committee (SRTS APAC). Planning staff's initial thought is that the SRTS Advisory Committee be a sub - committee of the OUTBoard, supplemented by additional staff from other agencies /jurisdictions as needed. The Advisory Committee would be responsible for advocating plan implementation and assist with programming and grant writing, evaluating plan progress, and assessing plan priorities. Multiple subsequent implementation action steps are outlined and prioritized in the Plan, the fruition of which would be subject to the recommendations of the Advisory Committee and the approval of the BOCC, School Board, and Town of Hillsborough. Lead Planning Agency Role Orange County will serve as the Lead Planning Agency in advancing implementation of the SRTS Action Plan. 7 ATTACHMENT 3 Safe Routes to School (SRTS) Strategic Action Plan Process Flowchart SRTS PLAN DEVELOPMENT Orange County received NCDOT award to prepare SRTS Action Plan July 2008 Final draft plan completed by Consultant and NCDOT December 2012 Staff contact with Community Transformation Grant Program staff and Public Health Dept. staff May 2013 E 14 NCDOT contracted Greenways, Inc. and Green Transportation to prepare draft plan 2009 Pre - adoption joint staff meetings with Orange County Schools and Town of Hillsborough April -July 2013 Staff minor edits /updates to draft plan August 2013 PUBLIC INVOLVEMENT Plan visioning and goals and public workshop Steering Committee work, fieldwork, and selection of 2008-2009 the three schools 2008 - 2009 UPDATES and AUTHORIZATIONS TO PROCEED Z Orange County/Town of Hillsborough Joint Meeting Update February 24, 2011 BOCC authorization to proceed with initial adoption steps April 9, 2013 Staff presentation to Town of Hillsborough, received endorsement of initial adoption steps June 10, 2013 We're Here! Orange County/Town of Hillsborough Joint Meeting Update February 21, 2013 Staff presentation to Orange County Schools, received endorsement of initial adoption steps May 28, 2013 BOCC authorization to proceed with adoption steps October 15, 2013 ADVISORY BOARD UPDATE, REVIEW and RECOMMENDATION OUTBoard Update March 20, 2013 OUTBoard Review and Recommendation December 18, 2013 PUBLIC HEARINGS / ADOPTION CONSIDERATION BOCC public hearing November 19, 2013 Town of Hillsborough public hearing and adoption consideration February 10, 2014 Orange County Schools adoption consideration January 13, 2014 BOCC 2nd public hearing and adoption consideration February 18, 2014 IMPLEMENTATION J Establish SRTS Advisory Committee as a Project prioritization, constructability and cost review of subcommittee of the OUTBoard 2014 projects with NCDOT, project scoping, etc. 2014 Project(s) approved by BOCC Project application(s) for funding; construction and 2014 - future years administration — future years