HomeMy WebLinkAboutAgenda - 09-08-2014 - C2ORANGE COUNTY
BOARD OF COMMISSIONERS AND
PLANNING BOARD
QUARTERLY PUBLIC HEARING ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 8, 2014
Action Agenda
Item No. C.2
SUBJECT: 2030 Comprehensive Plan Future Land Use Map Amendment — Related to
Town of Hillsborough Extraterritorial Jurisdiction (ETJ) Relinquishment
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) Yes
ATTACHMENT(S):
1. Comprehensive Plan /Future Land Use
Map and UDO Amendment Outline Form
(CP and Zoning 2013 -02)
2. Joint Resolution Amending the
Hillsborough- Orange Interlocal Land
Management Agreement
3. Notification Materials
INFORMATION CONTACT: (919)
Tom Altieri, Planning, 245 -2575
Craig Benedict, Planning, 245 -2592
PURPOSE: To hold a public hearing on a County initiated amendment to the 2030
Comprehensive Plan Land Use Element Map affecting approximately 500 -acres located
generally near the Eno River between US 70 W and 1- 85/1 -40 in Cheeks and Hillsborough
Townships. This amendment assigns County land use classifications to properties that are to
be removed from the Town of Hillsborough Extraterritorial Jurisdiction (ETJ), which is to become
effective October 1, 2014. This item is companion to Action Agenda Item No. C.3, "Zoning
Atlas Amendment."
BACKGROUND: Through a previous joint planning process with Orange County, the Town of
Hillsborough identified an Urban Service Area outside of which municipal services, such as
public water or sewer, will not be provided. To establish consistency with the Urban Service
Area, the Town is adjusting its ETJ boundary to exclude any properties located outside its
intended area for urban services. Please see Section B of Attachment 1 for relevant
information.
The "Amendment Outline Form" (Attachment 1) for these amendments was approved by the
BOCC at its November 19, 2013 regular meeting.
In May of this year, the BOCC and Hillsborough Town Board approved a resolution (Attachment
2) amending a 2009 agreement to reflect the intent to continue coordination with Hillsborough to
relinquish some areas of its ETJ but to end the ETJ expansion process that had been initiated.
Properties are to be classified to County Future Land Use Land Use Classifications, which in this
case includes: Agricultural Residential and Public Interest District (portions to include Watershed
Protection Overlay Districts). A map showing the proposed Future Land Use Classifications is
provided in Attachment 1.
Notification Procedural Requirements
In accordance with Section 2.3.6 of the Unified Development Ordinance, the public hearing for
this item was advertised consistent with the requirements of the Ordinance. Legal ads were
placed in two newspapers of general circulation in the County for two (2) successive weeks;
notices were mailed to affected property owners and property owners within 500 -feet of affected
properties; and signs were posted in the affected area. Attachment 3 includes the following:
• Affected property owner notification letter (22 properties)
• Notification postcards (5.5" x 8.5 ") for property owners within 500 -feet of affected
properties (150 properties)
FINANCIAL IMPACT: See Sections C.3 of Attachment 1.
RECOMMENDATION(S): The Planning Director recommends the Board:
1. Receive the proposal to amend the Comprehensive Plan Future Land Use Map.
2. Conduct the Public Hearing and accept public, BOCC, and Planning Board comment on
the proposed amendments.
3. Refer the matter to the Planning Board with a request that a recommendation be
returned to the County Board of Commissioners in time for the November 6, 2014
BOCC regular meeting.
4. Adjourn the public hearing until November 6, 2014 in order to receive and accept the
Planning Board's recommendation and any submitted written comments.
Attachment 1
COMPREHENSIVE PLAN / FUTURE LAND USE MAP
AND
UNIFIED DEVELOPMENT ORDINANCE (UDO)
AMENDMENT OUTLINE
CP and Zoning- 2013 -02
Town of Hillsborough /Orange County Interlocal Agreement
Implementation —Adjustment of Hillsborough Extraterritorial Jurisdiction
(ETJ) and Application of County Future Land Use Map Classifications and
Zoning
A. AMENDMENT TYPE
Map Amendments (Also see maps attached at end)
® Future Land Use Map:
From: Town of Hillsborough Land Use Classification
To: Agricultural Residential (Portions to include Watershed Critical Area and
Resource Protection Area overlays)
® Zoning Map:
From: Town of Hillsborough Zoning
To: AR Agricultural Residential and PID Public Interest District (Portions to
include Watershed Protection Overlay Districts)
® Other: To address Town of Hillsborough Extraterritorial Jurisdiction (ETJ)
retraction
® Other:
B. RATIONALE
1
1. Purpose /Mission
Continue the implementation of the Hillsborough- Orange Interlocal Land
Management Agreement (2009) through adjustment of the Town's Extra Territorial
Jurisdiction (abandonment of some existing ETJ).
2. Analysis
As required under Sections 2.3.9 and 2.8.5 of the Orange County Unified
Development Ordinance, the Planning Director is required to: `cause an analysis to
be made of the application and, based upon that analysis, prepare a
recommendation for consideration by the Planning Board and the Board of County
Commissioners'. In analyzing this proposal, the following information is offered:
a. Staff has been authorized by the Board of County Commissioners to pursue
implementation of the Hillsborough- Orange Interlocal Land Management Agreement
(2009 and as amended 2014).
b. This amendment is consistent with land use goals and objectives of the 2030
Comprehensive Plan.
c. The request for the amendment has been deemed complete in accordance with
the requirements of Sections 2.3 and 2.8 and of the Unified Development Ordinance.
d. The proposed Future Land Use Classifications and zoning districts are consistent
and compatible with those of the surrounding area and in general, are of a very low
density residential and conservation minded nature.
Proposed Changes
2030 Comprehensive Plan Future Land Use Map Amendment - Properties are to be
classified to County Land Use Classifications, which in these cases include:
Agricultural Residential and Public Interest District (portions to include Watershed
Protection Overlay Districts). The Parcel Identification Numbers (PIN) of the twenty -
two parcels included in this amendment are:
9864212218
9864294255
9864165305
9854989358
9864111534
9864012864
9864175152
9864135926
9864015589
9864074274
9864210925
9864111926
9864122219
9864028637
9864312586
9864155705
9864124872
9864138329
9864319480
9864224688
9864069297
9854980353
Zoning Atlas Amendment - Properties are to be zoned to County zoning districts,
which in these cases include: Agricultural Residential (AR) and Public Interest District
(PID) (portions to include Watershed Protection Overlay Districts and Special Flood
Hazard Area). The Parcel Identification Numbers (PIN) of the twenty -two parcels
included in this amendment are:
9864212218
9864294255
9864165305
9854989358
9864111534
9864012864
9864175152
9864135926
9864015589
9864074274
9864210925
9864111926
2
9864122219
9864028637
9864312586
9864155705
9864124872
9864138329
9864319480
9864224688
9864069297
9854980353
Maps depicting the proposed Land Use Classifications and zoning districts are
provided immediately following this amendment outline form.
Background
Town of Hillsborough Initiation - Orange County received a letter in September 2013
conveying Town Board action and adoption of a resolution indicating its interest in
releasing areas west of town from its Extraterritorial Jurisdiction (ETJ) and requesting
jurisdiction over areas defined in the Interlocal Land Management Agreement.
Coordination between the respective staffs was also requested to begin identifying
the required steps and to process the adjustments.
Joint Information Meeting - A Town of Hillsborough /Orange County Joint Information
Meeting was held January 9, 2014 to help inform property owners of the process,
implications, and answer questions. Over 50 residents attended the meeting,
including some BOCC and Town Board representatives. Nearly all attendees were
owners of property within the areas proposed to be added to the ETJ.
Joint BOCC and Hillsborough Town Board Meeting:
At a February 27, 2014 Joint Meeting, the Boards received an update on the process
and outreach from staff. Following discussion between the boards, it was informally
concluded that due to feedback received from the public, changes in State
annexation law, and achievement of the vision articulated by the Agreement, both
parties agreed to consider stopping ETJ expansion and formally consider a joint
resolution amending the Agreement to that effect.
Joint Resolution Amendina the Hillsborouah - Oranae Interlocal Land Manaaement
Agreement for the Central Orange Coordinated Area — At its meeting on May 8,
2014, the BOCC adopted a resolution amending the Interlocal Agreement to reflect
the intent to continue coordination with Hillsborough to relinquish some areas of its
Extraterritorial Jurisdiction (ETJ), as defined in the Agreement, back to the County
and end the ETJ expansion process. The Hillsborough Town Board followed suit at
its meeting on May 12, 2014.
Town of Hillsborough Public Hearing - The Town of Hillsborough held a public
hearing on July 17, 2014 for relinquishing the respective properties from its ETJ.
There were no public comments conveyed and no discussion among board
members. Subsequently, on August 21, 2014 the Town's Planning Board
unanimously recommended approval of the ETJ adjustment as proposed. At its
meeting on September 8, 2014, the Hillsborough Town Board is expected to approve
the ETJ adjustment to become effective on October 1, 2014. The effective date was
selected to allow Orange County sufficient time to process its Future Land Use Map
and zonina atlas amendments within 60 -days, consistent with State law.
3. Comprehensive Plan Linkage (i.e. Goals and Objectives)
3
Land Use Goal 1: Fiscally and environmentally responsible, sustainable growth,
consistent with the provision of adequate services and facilities and a high quality of
life.
Objective LU -1.1:
Coordinate the location of higher intensity / high density residential and non-
residential development with existing or planned locations of public transportation,
commercial and community services, and adequate supporting infrastructure (i.e.,
water and sewer, high -speed internet access, streets, and sidewalks), while avoiding
areas with protected natural and cultural resources. This could be achieved by
increasing allowable densities and creating new mixed -use zoning districts where
adequate public services are available.
Land Use Goal 6: A land use planning process that is transparent, fair, open,
efficient, and responsive.
Objective LU -6.1:
Undertake a comprehensive effort to inform and involve the citizens of Orange
County in the land use planning process.
Objective LU -6.2:
Maintain a cooperative joint planning process among the County municipalities and
those organizations responsible for the provision of water and sewer services to
guide the extension of service in accordance with the Comprehensive Plan, the
Orange County - Chapel Hill - Carrboro Joint Planning Agreement and Land Use Plan,
and the policies of the municipalities.
4. New Statutes and Rules
N/A
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
C. PROCESS
1. TIMEFRAME /MILESTONES /DEADLINES
a. BOCC Authorization to Proceed
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
November 19, 2013
b. BOCC Public Hearir
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
September 8, 2014
c. BOCC Uadates /Checkpoints
May 8, 2014 —Adopted Joint resolution amending Interlocal Agreement
June 17, 2014 — Approved Legal Ad for public hearing
d. Other
11
Summary of Timeline and Key Steps
Adjustment of Hillsborough Extraterritorial Jurisdiction (ETJ) and Application of
County Land Use Element Map Classifications and Zoning
2013
September 9 Town adopted resolution of intent
November 19 BOCC authorization to proceed
December Preparation of public outreach and notification materials (i.e. ETJ
Q &A document and maps)
2014
January 9 Joint Public Information Meeting (Property owners notified via
First Class Mail)
February 27 Joint BOCC and Hillsborough Town Board Meeting
May 8 BOCC adopted joint resolution amending the Interlocal
Agreement to end ETJ expansion and continue retraction
(Property owners notified via First Class Mail)
June 17 BOCC legal ad approved for September Quarterly Public Hearing
September 8 BOCC Quarterly Public Hearing to apply Future Land Use and
Zoning designations to areas of new County jurisdiction
(Property owners notified via First Class Mail)
October 8 Orange County Planning Board recommendation
November 6 BOCC adoption of Future Land Use and Zoning designations
2. PUBLIC INVOLVEMENT PROGRAM
Mission /Scope: Public Hearing process consistent with NC State Statutes and
Orange County ordinance requirements. Additionally, staff held a Joint Public
Information Meeting on January 9, 2014 to explain the process and its implications to
the public and property owners in affected areas. Property owners were notified of
the Joint Public Information Meeting, as well as the May 8, 2014 BOCC meeting for
consideration of the joint resolution amending the Interlocal Agreement, via First
Class Mail.
a. Planning Board Review:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
October 8, 2014
b. Advisory Boards:
c. Local Government Review:
July 17, 2014 Town of Hillsborough
Public Hearing (No public comments
offered)
August 21, 2014 Town Planning
Board Recommendation for approval
(Unanimous)
d. Notice Requirements
September 8, 2014 Town of
Hillsborough action (To become
effective October 1, 2014)
This item was included in the Quarterly Public Hearing legal ad; notices were
mailed to affected property owners and property owners within 500 -feet of
affected properties; and signs were posted in the affected area. The Town of
Hillsborough had additional legal ad and notification responsibilities consistent
with State law for its actions to relinquish portions of the Town's ETJ.
e. Outreach:
® General Public: Joint Public Information Meeting January 9, 2014
❑ Small Area Plan Workgroup:
❑ Other:
3. FISCAL IMPACT
Existing Planning staff will accomplish the work required to coordinate with Town of
Hillsborough staff on its ETJ adjustment and application of County Future Land Use
Classifications and Zoning to areas removed from the Town's ETJ. The required
legal ad and first class mail notices were paid with Departmental funds already
budgeted for this purpose.
D. AMENDMENT IMPLICATIONS
See Sections B.1 and C. 2. Of this Amendment Outline.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
E. SPECIFIC AMENDMENT LANGUAGE
N/A
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Primary Staff Contact:
Tom Altieri, AICP
Planning Department
(919) 245 -2579
taltieri @orangecountync.gov
Assignment of County Land Use Classifications to Areas Removed from Hillsborough ETJ
Current Future Land Use Map Proposed Future Land Use Map
zijo
iPEE
� �'ti,:'` „• �
� •� °'�
.mot
j 0
-- (PEACE
O— —Q
�.rav hw rwe- .JqP °a 0 —Q
W 0
�� . , .'.�'•r�•'�- ',ter- �r,.s�' �.. R
BFN� OHyST0f1_RO
J+`aw
-�w�r/ry Jam' w
N 1 In= 1,320 feet -
0 500
Feet
Orange County Planning and Inspections ` jr
y Brian Carson (7/14/2014)
s o�YAPEE i
F/ /�C
„.sa+Y;•+%'JY�i•sw `cW',,e''�°° °' PEACE
'"'1RANDY
T w: �.. -.�- .gym. � *.a- C!fpri*' ��r* ,� wR -S.�' •� y+";r� I
..a.+'�.r �&r .r+ry welly ..1,.8�1,"�w•.J�•...tir.,�^ �Mr —u)
1 ER S T sire✓ a.r .w �wr f°+ �a4 .r Pd° ±r +4 u. sy� —�
:Jar Je+�• �+.+q "des •�,±+�'- +q -,°'y - .''•�� l:..- ❑— —Q
Urban Service Area `�"' `" '' ""' '° —�'
=Y
.Remove from ETJ
0 Parcels
10 Year Transition
Rural Residential
Agricultural Residential I I
City Limits 6�Nli!2VN ON_10
IN/
ti
T!
I
ETJ
Overlays so�T�r
—mh S
® Watershed Critical Areas �a� ±mow R ENO SS
[=water Supply Watersheds
Resource Protection Areas ^'
® Public Interest Areas r y 4 a
a Qi,
� � y Ly � ,'may •. '''. �, � .r%.t a �. ti' � -
,J �-•,�-
4 d ; r ,� • rYL �i• sT4 Li• �'1• � yi• � 4y ff'"'J' ♦ .SJL 4aY /f' �•'�4 tY'• a1
l b �� V .ad tiY4 V M~. �'+� M �tYti'yltru'•� ~. �..,ti �yfa.MrJti
,,•, � 11 J 4 .. "• J t,. _ „tip � �♦y�'... � pia ,,., ,�„ �S. ArS� ,� �. +� �P� r., `.
,tom 1 W •. "6 y1 wJ'4 y+ n/4 �..tlh J' �'� a`� �yV• �' �.4 aY'� Qb 4'• � J
-y y .ti � / � �; ,�y�' -�H,�, � y,�+,: •�,tiy n y y Syr stir
.�� Rai° t� 11 u - •Yf K�•a +`4 J..i•. 9r•� yI, ?1 I/•
4 .enC,L'�' � ++4 ~ J s1� ~ jJS. p. � A 'P' ti �J0.v.` '•`n`�'� �'
,
Assignment of County Zoning to Areas Removed from Hillsborough ETJ o
Current Zoning Map Proposed Zoning Map
A
EE
70,
1 in = 1,320 feet
0 500
Feet
u
Orange County Planning and Inspections
Brian Carson (7/14/2014)
PEACE i T.' 2 �S PEA � 2
E_�T�
MIRANDY AV *' -- MtRANDY AVE,
ut–i– WADDEITI STS ,F�r t 2 Ti:3
❑ – TIM R ST �, d v ❑ TIM R ST '
0 ¢ f O Q z
U w = Urban Service Area U w Cn= WIND-
i- –{- CHIME
zDA Remove from ETJ —z �t/AY
Ar
rn
to Parcels . = (n KING ST
KtN J S Agricultural Residential (AR) � K1 G 3 �S G
® City Limits ❑�... �'
0 ETJ : s
® Existing Commercial (EC5)
_._..� ,INN •ON RD � � ,�
® Public Interest District (PID)
Rural Residential (R1) SOUTH -1
a. ST
Overlays
-pR ®Watershed Critical Areas R (pR_ ' tgo
OWater Supply Watersheds �
Major Transportation Corridor
s
Special Flood Hazard Areas
� 4s`
O
n r
RD
1
Attachment 2
JOINT RESOLUTION AMENDING THE HILLSBOROUGH- ORANGE INTERLOCAL
LAND MANAGEMENT AGREEMENT FOR
THE CENTRAL ORANGE COORDINATED AREA
WHEREAS, in December 2009 the Town of Hillsborough and Orange County entered
into the Hillsborough- Orange Interlocal Land Management Agreement (the
"Agreement ") pursuant to which, inter alia, the Town of Hillsborough ( "the
"Town ") and Orange County (the "County ") agreed to establish a method of
coordinated and comprehensive planning for an area identified in the
Agreement as the "Central Orange Coordinated Area" ( "COCA");
WHEREAS, the Town and County have memorialized the Urban Services Boundary by
amending the Water and Sewer Boundary agreement in 2009 to reflect the
Town's primary service area;
WHEREAS, North Carolina General Statutes related to annexation procedures have
changed since the Agreement was adopted, which place further limitations
on the ability to annex without the consent of property owners;
WHEREAS, adding predominately developed properties into the town's ETJ would
provide little to no benefit to the impacted property owners or the town;
WHEREAS, the vision articulated by the Agreement has been achieved and a Joint
Future Land Use Plan for areas within the Town's Urban Services
Boundary was adopted by both parties;
WHEREAS, the Town and County boards met and discussed the concept of stopping
the process to expand the Town's ETJ and need to independently consider
resolutions to this affect; and
WHEREAS, staff has notified all affected property owners of the boards intentions to
consider resolutions and the date and time of the meeting each board
would be considering.
NOW THEREFORE BE IT RESOLVED that the parties agree to cease implementation
of the Agreement at completion of Section 2.1, Adoption of Joint Land Use Plan, with
the exception of the following additional steps:
The town will proceed with releasing approximately 400 acres from the ETJ to align the
ETJ with the Urban Services Boundary on the west side of town and amend its zoning
map;
Orange County will amend its Future Land Use Map of the 2030 Comprehensive Plan,
as well as its zoning map, to include these areas in its jurisdiction; and
Orange County will consider amending its 2030 Comprehensive Plan to make any
necessary references to the Joint Future Land Use Plan for areas within the Town's
Urban Services Boundary (and amendments thereto).
The Agreement otherwise remains in effect for its remaining effective period (20 -years
and may thereafter be renewed).
Adopted by Orange County:
This 8th day of May, 2014.
Donna Baker
Clerk to the Orange County Board of
Commissioners
Adopted by the Town of Hillsborough:
This 12th day of May, 014.
cwt,
Tom Stevens, Mayor
Town of Hillsborough
Kat erine Cathey
Town Clerk
HILL
C� e®
�®
,
H.. Td��S G
�
ills gn �
,II���IAAa 91 �A1`
43
Attachment 3
ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT
Craig N. Benedict, AICP, Director
Administration 131 W. Margaret Lane
(919) 245 -2575 >l Suite 201
(919) 644 -3002 (FAX) P O Box 8181
WWW.co.orange.nc.us o Hillsborough, NC 27278
August 22, 2014
NOTICE OF PUBLIC HEARING
2030 Comprehensive Plan — Future Land Use Element Map and Zoning
Amendments
Dear Property Owner:
This letter is to notify you of an upcoming public hearing pertaining to proposed 2030
Comprehensive Plan Future Land Use Element Map and zoning changes that affect
your property. This notification is occurring in accordance with the provisions of
Sections 2.3 and 2.8 of the Orange County Unified Development Ordinance.
Through a previous joint planning process with Orange County, the Town of
Hillsborough identified an Urban Service Area outside of which municipal services, such
as public water or sewer, will not be provided. To establish consistency with the Urban
Service Area, the Town is adjusting its Extraterritorial Jurisdiction or "ETJ" boundary to
exclude any properties located outside its intended area for urban services. The
purpose of this County Future Land Use Map and zoning amendment process is to
assign County land use classifications to properties that are to be removed from the
Town of Hillsborough ETJ, which is to become effective October 1, 2014. Affected
property owners have also received notification from the Town of Hillsborough, as this is
a two -step, coordinated process: 1) Town adjusts /reduces its ETJ and with that, its
jurisdiction over land use and zoning; and 2) The County applies its Future Land Use
Classifications and zoning.
Areas for application of County Future Land Use Classifications and zoning comprise
approximately 500 -acres located generally near the Eno River between US 70 W and 1-
85/1-40 in Cheeks and Hillsborough Townships. Properties are to be classified to Future
Land Use Classifications including: Agricultural Residential and Public Interest District
(portions to include Watershed Protection Overlay Districts); and zoning districts
including: Agricultural Residential (AR) and Public Interest District (PID) (portions to include
Watershed Protection Overlay Districts and Special Flood Hazard Area).
This action does not affect the present use of your property. Due to the proximity of the
Eno River, sensitive natural areas, and floodplain, all proposed Future Land Use
Classifications and zoning districts listed above are of a very low- density residential,
agricultural and preservation nature. No commercial or industrial classifications are
proposed (See Attached Maps).
The Orange County Board of Commissioners and Planning Board will hold a Joint
Public Hearing on the proposed amendments on Monday, September 8, 2014 at 7:00
p.m. at the Whitted Human Services Center located at 300 West Tryon Street in
Hillsborough, North Carolina. Interested persons are invited to address the boards with
their comments at this Joint Public Hearing.
If you cannot attend the Joint Public Hearing and have questions about the proposed
amendments, you may call Tom Altieri, Comprehensive Planning Supervisor, at (919)
245 -2579 during regular business hours.
Sincerely,
Craig N. Benedict, AICP
Planning Director
33
Orange County Planning Department
P.O. Box 8181
Hillsborough, NC 27278
NOTICE OF PUBLIC HEARING
Dear Property Owner: August 22, 2014
This letter is to notify you of an upcoming public hearing pertaining to proposed 2030 Comprehensive Plan Future Land
Use Element Map and zoning changes. This notification is occurring in accordance with the provisions of Sections 2.3
and 2.8 of the Orange County Unified Development Ordinance. You are receiving this notice because you own
property located within 500 -feet of parcels affected by the proposed amendment.
YOUR PROPERTY IS NOT AFFECTED BY THE PROPOSED AMENDMENTS.
The purpose of this County Future Land Use Map and zoning amendment process is to assign County land use
classifications to properties that are to be removed from the Town of Hillsborough ETJ, which is to become effective
October 1, 2014. Areas for application of County Future Land Use Classifications and zoning comprise approximately
500 -acres located generally near the Eno River between US 70 W and 1- 85/1 -40 in Cheeks and Hillsborough
Townships. Properties are to be classified to Future Land Use Classifications including: Agricultural Residential and
Public Interest District (portions to include Watershed Protection Overlay Districts); and zoning districts including:
Agricultural Residential (AR) and Public Interest District (PID) (portions to include Watershed Protection Overlay
Districts and Special Flood Hazard Area).
The Orange County Board of Commissioners and Planning Board will hold a Joint Public Hearing on the
proposed amendments on Monday, September 8, 2014 at 7:00 p.m. at the Whitted Human Services Center
located at 300 West Tryon Street in Hillsborough, North Carolina. Interested persons are invited to address
the boards with their comments at this Joint Public Hearing.
Maps and other information regarding the proposed change can be viewed on or shortly after August 25, 2014 at the
following website (September 8th meeting link): http: / /www.co. orange .nc.us /OCCLERKS /agenmenu.asp
If you are interested but cannot attend the Joint Public Hearing and have questions about the proposed amendments,
you may call Tom Altieri, Comprehensive Planning Supervisor, at (919) 245 -2579 during regular business hours.