HomeMy WebLinkAboutAgenda - 06-16-2008-1dAttachment 1D
IU I \/ :: \ ') STU
From: Roger L. Stancil, Town Manager, Town of Chapel Hill
Steve Stewart, Town Manager, Town of Carrboro
To: Orange County Solid Waste Management Department
Subject: Future Orange County Solid Waste Transfer Station
Date: May 30, 2008
The Towns of Chapel Hill and Carrboro have significant interests in the selection of a site for a
future solid waste transfer station within Orange County. Although each town's operations may
be impacted differently depending on the ultimate location of the site, the towns do share some
common interests. These interests include controlling costs, maintaining service levels, and
minimizing environmental impacts. With these common. interests in mind, the towns have
collaborated to provide information to Orange County, outlining potential effects that each town
may experience. More detailed information is contained in the attached memoranda from the
Chapel Hill and Carrboro public works directors to their respective town managers.
Time, distance and road types in the routes to the disposal site are important factors in the design
of solid waste systems and affect the common interests of the towns cited above. Increasing (or
decreasing) the time and distance travelled, or changing the types of roads used to drive to the
new site as compared to the current site; could potentially affect the amount of labor needed,
number of trucks required, required truck modifications, and/or fuel consumption in order to
maintain levels of service. Both towns used similar methodology in determining effects at
various distances from the center of their town, and determined a "break point" where time and
distance would have significant effect on operations. Basic assumptions were made for such
items as truck gas mileage and the price per gallon of fuel.
It should be noted that costs are based on today's dollars. Of great concern is the rising price of
fuel and how it has already affected local government budgets. Limiting fuel consumption, and
controlling emissions, is of great importance to Chapel Hill and Carrboro, who work to control
costs and support the environmental sustainability of our communities.
The Town's of Chapel Hill and Carrboro kindly request that this information be duly considered.
The information provided is simply an analysis of potential impacts on the towns' cost and
operations and should not be misconstrued as suggesting or recommending a particular transfer
station site.
Cc: Mayor, Town of Chapel Hill
Mayor, Town of Carrboro
Robert Sallach, Olver Inc. (consultant)
10 _ UL of 1
TO: Roger Stancil, Town Manager
FROM: Lance Norris, Public Works Director
SUBJECT: Orange County Transfer Siting Process
DATE: May 6, 2008
Background and Discussion
The Town of Chapel Hill currently collects and hauls its municipal solid waste (MSW) to
the Orange County Regional Landfill. That landfill is scheduled for closure in 2011.
Currently, the Orange County Board of Commissioners is conducting a site search to
construct a Transfer Station. The selected location could impact the Town of Chapel Hill
negatively and/or financially.
The Town of Chapel Hill's interest is, "To sport the environmental sustainability of
our community by actively pursuinz the goal of 61 % waste reduction and by reducing
our carbon f ootprint by 50% by 2020.
Criteria that could impact our operation are:
• An increase in non - productive route time, driving to and from the route to the
disposal site is a major consideration. We have conducted time and distance,
studies from the geographic center of Chapel Hill to distances of 10, 12, 15 and
20 miles away. These study included Highway 54 West, I -40 West and Highway
86 North. Beyond the 12 mile point, which adds 38 to 40 minutes round trip drive
time depending on location, we would need to add another crew with equipment
to continue the same level of service we currently provide.
• An equipment change to a dual axle residential fleet. Currently, only two trucks
are dual axle. Three more will be delivered to the Town due to the normal fleet
replacement cycle this fall. That will leave five rear loaders to be changed out at
cost of approximately $700,000.
• Fuel cost will increase if the site is other than the current site. The amount of
increase would vary depending on the distance and time of travel.
As an example of the impact of changing to a more remote hauling site, a time and
distance study was conducted from various Chapel Hill locations to the Durham Transfer
Station (DTS).
Southern Village center to DTS.
Miles: 20.3
Meadowmont center to DTS.
Miles: 17.6
Parkside Neighborhood to DTS.
Miles: 17.4
Downtown ChapelHill to DTS.
Miles: 17.1
DTS to Town Operations Center.
Miles: 20.6
Time: 28 minutes
Time: 26 minutes
Time: 22 minutes
Time: 27 minutes
Time: 27 minutes
This would increase our travel time during the day to 1 hour. Transfer station wait time
could approach 15 minutes. The additional time per route would compromise our ability
to complete routes within a work day with additional resources.
We would need to add 1 crew, with equipment to sustain our current task system.
1 Equipment Operator H Salary and Benefits. $43,800
2 Collectors Salary and Benefits. $74,000
Total personnel costs. $117,800
Additional rear - loader, fuel and maintenance. $200,000
Total. $317,800
Fuel Projections.
Estimated data on increased annual fuel cost from the DTS to the TOC for residential
trucks only would increase $28,900 dollars(Rounded).
14,996 miles(14 routes x 52 weeks x 20.6 miles) divided by 1.6 miles per gallon average
rear loader multiplied by $3.08 which was the average 3rd quarter fuel cost for this FY.
Estimated data on increased annual fuel cost only by all routes to DTS would increase
$76,100 dollars(Rounded).
14 routes x 52 weeks x 1.5 trips per day x 36.2 miles round trip average all routes divided
by 116 miles per gallon x $3.08 which was the average 3rd quarter fuel cost for this FY.
Commercial fuel cost estimated at $48,000(Rounded).
Total fuel estimate: $153,000.
The residential fleet is currently being converted to rear dual axles to bring us into
compliance with DOT weight guidelines. We currently have two rear loaders that are
dual axle. Three more are being order this year. That will leave five rear loaders to be
converted.
Conversion of equipment. $700,000.
PJ-
The actual impact of other sites would vary depending on their location. For example,
sites north of Hillsborough would require travel through the town, so even relatively short
hauling distances would result in longer hauling times. Likewise, sites adjacent to
Interstate 40 could require shorter hauling time for longer distances.
3
Town of Carrboro
y° �= Public Works Department memorandum
To: Steve Stewart, Town Manager From: George Seiz, Public Works Director
Cc:
Re: Future Transfer Station Site - Impact on Town Date: May 21, 2008
of Carrboro Solid Waste Services
I. Introduction
This memo provides a brief summary on how various Town solid waste services may be
impacted depending on the future site chosen for a solid waste transfer station. The information
contained herein is simply an analysis of potential impacts and should not be misconstrued as
suggesting or recommending a particular transfer station site. The impacts discussed are based
on time and distance travelled from the center of Town (determined to be a roughly the
intersection of Sudbury Lane and Pathway Drive). The services that will be directly impacted
are the multi - family /commercial dumpster service, single family residential waste collection, and
bulky item pick -up. Yard Waste and recycling materials will continue to go to the current
disposal site at Eubanks Rd.
The time and distance travelled to a disposal site is an important factor in the design. of solid
waste systems. Services provided by the Town of Carrboro have been designed around the time
and distance to travel to the current disposal site at Eubanks Rd. which is approximately 5.9
miles from the center of Town, and takes on average 11 minutes to drive one way in a large solid
waste vehicle.
II. Impact on Multi- family /Commercial Dumpster Service:
See attached Table 1.0 for dumpster service information and assumptions.
The Town has provided dumpster service to Multi - family housing units and commercial
businesses for many years. This service is supported by the General Fund and fees charged to
commercial customers. The number of commercial businesses utilizing the service was cut
roughly in half when the Town started charging for this service in 2003/2004 (about 35 accounts
remaining). The number of commercial accounts has been relatively stable for the last couple of
years. In an effort to increase efficiency and reduce cost, the Public Works Department
combined the multifamily and commercial routes in 2006/2007 and was able to reduce the
number of trucks for this operation from 3 to 2. The oldest truck (which was up for replacement)
was auctioned off in October of 2007 based on the fact that there was no foreseeable growth in
this service area, and the anticipation that the transfer station was going to be at the current
Eubanks Rd. site. The combined service reduced the labor hours from 1.15 fte to 1.0 fte, and the
expense of a third truck was eliminated.
F °��� "e "" �� Town of Carrboro
Public Works Department memorandum
8 CAn�v�
With the increased route efficiency, there is virtually no excess labor or equipment capacity
within the current system. One truck is needed daily for the collection operation leaving one
spare truck. The one person operating the truck currently finishes all routes each day with only
about 20 —30 minutes left at the end of the 8 -hour day. This remaining time is used for
maintaining the equipment and paper work. With two trips per day to the landfill, an additional
10 — 15 minutes round trip will completely fill the day and more realistically probably require
some overtime. If the routes are split, and two trucks are used at one time, there will be no spare
truck in the event of a breakdown. Therefore, as noted in Table 1.0 should the driving distance
increase approximately 5.4 miles farther one -way (20 minutes round trip increase) for a total
one -way distance of about 11.3 miles from the center of Town (total round trip of 42 minutes),
the operation will be impacted to where one person can no longer finish the routes in an 8 hour
day. The option of sending out two trucks with no spare is not a viable solution. Paying
overtime is one option depending on exactly how far away the new site is. Getting out of the
commercial side of the business is another option, however, from a budget standpoint there
would be a several thousand dollar net lose to the General Fund if the service was dropped. The
Town would also likely anger the faithful commercial customers who have stayed with the
Town's service. Another response is the need to go back to a three -truck system requiring the
purchase of an additional truck. Additional labor would be needed to offset the increase in
driving time not only for the commercial service, but the single - family residential collection as
well.
III. Impact on Single Family Residential Collection/bulky waste pick -up:
See attached Table 1.0 for Single Family refuse collection service information and
assumptions.
As with the multi- family /commercial service, any increase in driving distance impacts the labor
and fuel cost for this system as well. There is little or no excess equipment capacity with the
current system of one truck 5 days /week (sometimes two trucks, but less efficient), however,
excess equipment capacity can be created by revamping the current system to two trucks 3
days /week. Public Works has anticipated that this change would eventually need to take place as
population increased and daily routes filled up. There are other potential advantages to going to
a two- truck/3 day system in terms of scheduling for yard waste and around holidays.
Should the driving distance increase significantly (5.4 miles farther one -way increase, 20
minutes round trip or greater increase) Public Works would most likely recommend that the
system be revamped at that time. The downside of revamping the system will be some initial
inconvenience with the collection day changing for many of the residents.
** It should be noted that if the one -way distance increase from the center of town starts
approaching 15 miles (total one way distance of about 21 miles), it may be necessary to
consider an additional truck to the residential collection service.
K
og �Akgg
(F .° �� Town of Carrboro
��.,. a= Public Works Department memorandum
ncnno
IV. Summary of overall impact to Solid Waste Services:
Should the travel distance increase approximately 5.4 miles one -way (total one -way distance of
about 11.3 miles from center of Town) or greater (up to about a 15 mile increase one -way), the
following would be recommended:
1. Add a new front loader for the multi - family /commercial dumpster operation.
2. Hire one new person (full time w /CDL) to make up for lost labor hours.
3. Revamp current single - family residential system to a two -truck 3 day /week system.
Fiscal Impact:
Costs shown represent today's dollars and prices. *Fuel prices will likely increase
significantly in the coming months /year and will greatly impact annual fuel costs.
Start -up Costs: $215,000 - for new front loader if truck were purchased today.
Annual Costs: $38,000 per year for one person
$5,000 per year increase for equipment maintenance
$11,514 for every 5 miles farther (one -way) than current driving distance of 5.9
miles from center of Town
Should the one -way travel distance start approaching an increase of 15 miles (a total one -way
distance of about 21 miles from the center of town), a more thorough analysis should be
completed to determine if an additional truck will be needed for the residential collection service.
See attached Table 2.0 for Labor Loss and Fuel Cost increase for every 5 miles farther (one -way)
than current driving distance of 5.9 miles from center of Town. With increased fuel
consumption there will also be increased emissions.
Tom nf.Carrbo
(a ro
Public 8r[kc Department memorandum
Table 1.0 Solid Waste Services Analysis ~ Future Transfer Station G. Geiz
5/22/2OO8
5.9 miles
Distance from center of Town ho scale house at existing landfill.
11 minutes
Time to drive from center of Town to scale house - large GVVtruck.
32 mph
Average rate of speed from center of Town to scale house.
22 minutes
Round trip time to drive from center ofTown
3.2 mpg
Gas mileage for front loader truck #5O used ondumpaterroute.
2.4 mpg
Gas mileage for fully automated truck #54 used on regular refuse route.
Assumptions
2.8 mpg Average gas mileage for large 8VVtrucks
$3.1O per gal price from recent purchases. **Prices are very unstable and will most likely
increase significantly in the coming months/years.
Multifamily/Commercial DumpstenService
Staffing - 1.0 fte
Eouipment- There are two front loaders for this operation. 1-on route, 1-spare
Routing- Multifamily and commercial stops are integrated on each route.
Trips - The driver averages 2 trips per day hu the landfill which io1U trips per week.
Capecity' There io virtually no excess staffing capacity. Driver finishes with 2O-3O minutes left at end ofday
No excess equipment capacity.
Without any additional capacity and the potential for more customers, it would be necessary boadd
one additional truck unless the new sight is less than 5 min (2.7miles) farther (one way) than the current site.
Single Family Regular Refuse Collection
Given:
Stops- About 3700 per week. About 850 Mon, Tues.Thurs, Friday &300 on Wednesday.
Staffing - 1.4fte
Equ|pnlent- Two trucks for partial day, sometimes one truck for full day. 4 fully automated trucks.
Trips - 8 per week plus 1 for bulky waste for a total of1O trips per week.
Capacity - Little excess capacity if1truck/5 day system. Additional capacity if two trucks are
used and went ho2 truoh/3 day system, but would need additional labor
to make things work.
No excess staffing capacity. Could create excess equipment capacity bv revamping ayetamfnom
one truck 5 days/week to two trucks 3 days/week.
ImpaotbxovesaXlSokidWaoteServices:Breakmmimt - |mcreasemf approx. 5'4 miles M0 minutes) one-way
for e total one-way distance of about i1.3 miles from center of town /42 minutes round trip).
"Costs shown represent today's dollars and prices. Fuel prices will likely increase significantly.
Start-up Costs: $215,000 New front loader truck for multifamily/commercial dumpster service.
Annual Costs
Labor $38.000 Hire one new person ho make up for lost hours.
Equip. yNe|nt $5.000
Fuel $11`514 for every 5 miles farther (one-wuay) than current site. (2Utripe/wk)
FC
Town of Carrboro
Public Works Department memorandum
q CARD
Table 2.0 G. Seiz
5/21/2008
Labor Hours Lost - Town Of Carrboro
Labor loss calculated for every 5 miles farther one-way (9.3 mintes) than
current driving distance of 5.9 miles from center of Town (1 person on truck)
miles
round trip
I hrs
I round trip T
number
trips/wk
I wk/yr
labor hrs
I - lost/yr
fte
Equiv.
101
0.311
201
521
3221
0.16
miles
one-way
I miles
round Trip
labor hrs
lost/ ear
fte�
Equiv.
I Labor Impact
cost/Yr
5
10
306
0.16
Hire (1) staff $38,000
10
20
612
0.31
Hire (1) staff $38,000
15
30
918
0.47
Hire (1) staff $38,000
20
40
1224
0.62
Hire (1) staff $38,000
Additional Fuel Cost - Town of Carrboro,
Fuel cost increase for every 5 miles farther one-way than current driving
di.-,t;;nrp of 5.9 miles from center of Town.
miles
trip
gallons
per mile
gallons
per trip
I number
trips/wk
i wk/,r
unit
I price/ al
cost
I per / r
_round
.101
2.81
3.61
201
521
$3.101
$11,514
miles
one -way
miles
round Trip
number
I trips/wek
additional
miles / 1
additional
1 -g al/yr i
cost
pertyr
5
10
20
10,400
3,714
$11,514
10
20
20
20,800
7,429
$23,029
1 15
30
20
31,200
11,143
$34,543
1 20
40
20
41,600
14,857,
$46,057
**Average price from recent purchases. Prices are very unstable and will most