HomeMy WebLinkAboutAgenda - 02-21-1995 - IX-C r 1 ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No.-T-)(-L' ACTION AGENDA ITEM ABSTRACT Meeting Date: February 21, 1995 SUBJECT: BID AWARD;PUBLIC WORKS MAINTENANCE FACILITY DEPARTMENT:PURCHASING AND CENTRAL SERVICES PUBLIC HEARING:YES: NO: XX ATTACHMENT(S): INFORMATION CONTACT: PAM JONES, eut.2650 Bid Tabulation Telephone Number- Hillsborough 732-8181 Chapel Hill 967-9251 Mebane 227-2031 Durham 688-7331 PURPOSE: To consider awarding a bid and approving contracts for the Public Works Maintenance Facility. BACKGROUND: Bids were received for the Public Works Maintenance Facility on January 12, 1995; a tabulation is attached. The bids,including all alternates,total$1,356,389. The available funds for the project total appro)dmatsly$1,020,000;a short-fall of approbmately$336,000. There are several factors which contribute to the short-fall: 1. The od*W appropriation did not include funds to develop the new access road to the facility. As you may recall,the existing driveway is located below the crest of a hill on Hwy 86,which creates numerous safety hazards while entering or leaving the Public Works facility. The new access road will line up approbmatey with the Hwy 86/57 intersection. 2. The Town and the County pursued to potential use of the site jointly in which case some of the cost of infrastructure would be shared. When this plan did not come to fruition,the full cost of a on-eke septic system was added. 3. The Hillsborough Board of Adjustment required the installation of a fire hydrant on the property. 4. The Hillsborough Board of Adjustment required the construction of a left turn lane on Hwy 86. 5. The state of the building market in general at this time is not favorable to the County. In order to build the project for the funds we have presently available,the following modifications to the project are suggested: 1. No alternates are accepted at this time. The alternates include: a. Construction of a fueling station with automated fuel dispensing and accounting system; $224,252. b. Metal roof in lieu of the shingled roof; $32,670. c. Larger waterline;$3,700. d. Canopy over fuel island;$10,000. i 2 2. In addition,the following items would be removed from the project a. All asphalt on roadways. Driveways and parking areas would be gravel. The 20'concrete apron at the vehicle entrances of the garage facility would remain. Credit$62,748. b. Two (2) above ground IitFs Q$10,750 each. Credit $21,500. (Note: These are not constructed as part of the building and could be easily added at a later date.) c. Electric hoist Credit$11,123. (Note: This equipment would assist in lifting items to the mezzanine level for storage,eg.tires. The function however,can be accomplished by using the bridge crane in a similar manner.) d. Sales tax was inadvertently added into the bid. Since the State reimburses for Sales Tax, it should not be considered as part of the bid price. Credit$25,609. Total credits from these sources is $391,602. While this amount of credit allows the bid to be awarded,three additional expenses must be considered as well. They include: a. The left turn lane;estimated cost$22,000; b. Construction of on-site septic system;estimated cost$15,000;and c. Project contingency. Note: The rule of thumb for contingency for a project such as this is around 5%of the construction budget,in this case around$50,000. The project requirements have been scrutinized carefully and although the budget will allow only$18,000+1-for contingency,we believe that the need for contingency funds will be minimal. The one area that remains unpredictable as it regards impact on the project contingency funds is the potential for unsuitable soils. We are requesting no additional funds for the project at this time,however,we fully acknowledge that if significant unsuitable soil is encountered,at some later date,the Board may be asked to consider reallocation of existing CIP funds in other projects to cover cost overruns. It is anticipated that the fueling station, paving and lifts will be requested as part of a future Capital Improvements Program. RECOMMENDATION: The Manager recommends that the Board award bids and approve construction contracts,contingent upon Attomey and Staff review,for the Public Works Maintenance Facility as follows: General: Quality Construction,Danville,VA $713,629 Electrical: O'Dell Electric,Durham,NC $98,958 Plumbing: Sparrow and Sons,Carrboro,NC $78,759 Mechanical: Comfort Engineers,Durham,NC $75,441 TOTAL CONTRACTS APPROVED: $964,787 and further that the Board authorize the Manager to execute change orders which may be required,to the extent said change orders do not exceed the project budget,and authorize the Chair to sign on behalf of the Board. 3 U1 O d� ^' A U--��to A E w CQ x� to CO d 0 rn z m m m m rn m m z M o co 0 0 M m co O C' C� ZA A �a O 0 0 0 r-0 0 0 xdW *AE., mo , aaa * dad m rn o rn d rn C m p E * A as 0 0 0 0 v 0 0 0 rn cl� I 00 � ° cl ci 0 ce) v co c) W * CQ p °o aA °o cQ c`i ° ° O W * .Ea o o ch cv co �n d z Lo * E p d'.4 U2 +► A E rn c\i � 4 cp o c\i +r d cv rn (M m w 0) o 0 cv cv d� O E� E * A GQ� A +*► d � z * HOC`' o U O * G� a d U w z z � * o F d z w z U z 0 0 z d z o d E- E. o c) 0 0 Z p a �v0z .av0UF w Cl) zz gzazz r F Qo �� w x z z � U d _ o0c, �UZ�ac� � W W H a�azOF.M0000mz°mxz0zo xzzzw C7 > a Z xw0mxzxzwaor0 O E» wow wc�xw'-'�5�xC0z der U z waam�az x x OZ cw��F�ax��x�ao�AO°�amarxArax 4 U1Od'^+ Lo co W r-O z��� xdw it st at F * t- co co O° co v a Z * oo co to r- p *� C o Lfi * * co °o °O ° �� Z * d '� � � � � � d O * a w * d z * w * z � s Z x w u 0 z F w U a z H F ww �zwzwz �z z G� w w Z O Axax�� °oww � W V waAa� OZ a.=OCaUo�- Ww ::ig -�F � S CD acn z� d z~~� zAx dux A y�- x� * s� 0 * xo v O� E- * r- m m E-+ c\2 r- o a E-, �-4 z O z z * A d a « w Azr• d z � * z z H W a UU d OC� ZZMU fx z Q 0 C7 � z zdooad z o �xaar�x 0 z udA 6 fl�Od�^+ cc U-�1n0 O C7>04 m zQx xdw A , ,a 4, * pq o * ti C\2 CQ * * O F o 4 o* °z z z � =o z * * z�, z E-,0 U * A o 0 ga Cat A d U * Ad Vic• W d * w A z c�• d z * E-' z z z U o aw z � W z w o z O U U x x Fzpc7 U ►-~ wzroazdz °�wz L7 U o z �6¢6z� Ew0°a FxHxox Hwx caw cn x z x x =x oxw=) d :)000 C UAUAUAUV]UA