1. CENTRAL LOCATION TO COLLECTION ROUTES Very Important 10
Consideration: To maximize waste cellection efficiency, transfer stations should be located centrally to waste Site with shortest road mile distance from
collection routes, As a rule of thumb in urban and suburban areas, transfer stations should be no the centroitl will be ranked highest
more than 10 miles away from the end of all collection routes. Beyond that distance, collection Distance will be measured using most direct
routes might need to be altered to enable refuse to be collected and deposited at the transfer route to proposed site. Route maybe
station within one operating shift, comprised of interstates,highways, major
arterials, and street or roadway connectors.
Definition: Road mile distance measured from proposed site to waste generation centroid - 2025 Mean
Center (weighted by population and employment).
9
$ 1 1
2. ACCESS TO MAJOR TRANSPORTATION ROUTES Very Important 10
Consideration: The transfer station should have direct and convenient access to truck routes, major arterials, and Site with most direct or convenient access to
highways. Access to rail would also afford additional transfer and disposal flexibility in the future. truck routes, major arterials, and highways
It is preferable to avoid routing collection and transfer vehicle Uaffic through residenflal subdivision will be ranked highest. Street or roadway
areas because traffic generated by transfer stations contributes to congestion; increased risk to connectors must accommodate through
pedestrians; increased air emissions, noise, and wear on roads; and might contribute to litter traffic with the following functional
problems, requirements: Parking-restricted (no
parking on road); Major Intersections -
Definition: Direct or convenient access to truck routes, major arterials, highways, andlar potential rail or traffic signals & cross street stops; Posted
intermodel access. Major truck routes, arterials, and highways will be defined as 15-501, NC 54; Speed Limit- 35.45 MPH; and Truck Traffic
NC 86 (excluding NC 86 north of Hillsborough), US 70, I-40, or I.85. -unrestricted. Potental rail access will be
used to futther differentiate site rankings
(e.g., sites with a lower truck access ranking
that have rail access will be reevaluated in
terms of final technical ranking.
Attachment 1A
Page 1 BOCC Work Session - 06/16/08
Attachment 1A
.a.[~ ,,~ ~ , _~
, ~~ ~ ~~~ ~
- r, 1 =
q
~~ SI Yy,
1 f P ~ wn..
~
~4~~~` 4 n - r ~
y.w..L
i ...,... ~~,s _ C 1 i ~~;:' u .....,
" .. ~rW,~.-~r ..~.
i
Z CITC CI7C
t DCnI IIRCAACAITC
3. PARCEL SIZE AND AVAILABILITY Very Important 10
Consideration, The area required for specific transfer stations varies significantly, depending on the volume of Single parcel, freely offered, sites will be
waste to be transferred, rates at which waste will be delivered, the functions to be carried out at the ranketl'highest,
site, and the types of customers the facility is intended fo serve. Locating a site of sufficient size is
critical to operating efficiencies and minimizing impacts on the surrounding community,
Definition: The minimum site size to be initially considered will be 25 acres as established under the
Exclusionary Criteria. Co-location sites with other municipal facilities or operations of less than 25
acres will be considered provided that transportation. access, buffers, and preliminary transfer
e mlcclrlcAl station layout and roadway configurations demonstrate, the adequacy of a smaller site,
T conrc eno nAl CITC onnnurnve nI IcnlAlr nAln onaulnlr
~ 1
' ers:
f
4. SUFFICIENT SPACE FOR ON~SITE ROADWAYS, QUEUING, AND PARKING Important 5
Consideration, Transfer stations typically have on-site roadways to move vehicles around various parts of the The site that lends itself to the most efficient
transfer Site. Waste collection, Uucks can be up to 40 feet Ieng. Transfer trailers that move waste design in terms of roadway geometry and
to a disposal facility are typically 5D to 70 feet long. These vehicles need wide roadways with layout will be ranked highest; Roadway ,
gradual slopes and curves to maneuver efficiently and safely. Also, the site will need space for widths, maximum slopes, number of laces,
parking transfer vehicles and to allow incoming and outgoing traffic to form lines without backing up turning radius, and traffic flow pattern will be
onto public roads. considered.
Definition: On-site roadways and maneuvering areas will meet the fallowing minimum requirements: down
slope vehicle ramps must be less than 10%; upward sloped ramps must be less than 6%; roadway
widths for collection vehicle and Transfer vehicle traffic must be 24 feet; inbound and outbound
collection vehicle queuing (in front of scale) must accommodate 4 vehicles with provisions fora
tloublestack using bypass or outbound lanes (i.e., stage 8 inbound collection vehicles); queuing for
4 transfer vehicles including trailers positioned under load-out hoppers; staff parking fot 5 vehicles
. plus 2 visitors; and trailer storage for 4 to$ units.
Attachment 1A
Page 2 BOCC Work Session - 06/16/08
Attachment 1A
f
5. TRUCKAND TRAFFIC COMPATIBILITY
Consideration. Transfer stations often receive urges of traffic when collection vehicles have. finished theicroutes.
Transfer stators traffic varies locally but tends to peak twice a day. The first peak is often near the
middle of the day or shift, end the second at the end of the day or shift,.. Therefore, the best sites
for transfer stations are located away from areas hat have midday. traffic peaks antlfor school bus
and pedestrian traffic,
Definition: Cornpafibility of projected transferstation traffic volume and'vehicle types with existing traffic mix
and flow patterns in the immediate area of the site,
R ARII ITV Cf1D CYDAhIQIf1Al
6. ABILITY FOR EXPANSION
Consideration, When selecting a site, consider the potential for subsequent increase, in the daily tonnage of waste
that the facility will be required to manage, or added processing capabilities for recycling and
diversion. It is often less expensive to expand an existing transfer station than to develop a new
site due to the:ability to use existing operations staff, ublity connection, traffic control systems,
office space; aril tiuiltlings,
Def nifion: Adaptability of proposed transfer station site layout (transfer building and on-site roadways) to
accommodate future expansion or changes in waste transfer and processing.
Sites with street or roadway,connector
access that do riot currently,or are not
projected in the future to eztiibit significant
midday traffic peaks and school bus or
pedestrian traffic shall be ranked highest.
land use and development within one half
mile radius of proposed site will be used to
assess potential compatibility issues related
to connector streets and roads.
A site that is the most adaptable with
respect to expansion of the transfer building
with concurrent use of buffers, roadways,
parking areas, scale facilities, and other
required site improvements will be ranked
the highesk
Page 3
Fn .4
} ~ a~~
Very Important
Important
10
5
Attachment 1A
BOCC Work Session - 06!16!08
i i
t
7, SPAGE FOR RECYCLING, COMPOSTING, AND PUBLIC EDUCATION
Consideration: A transfer station could be sited in areas also conducive to recycling or composting activities.
Many transfer stations are designed to enable residents and businesses to drop of(recyclables and
yard waste in addition to trash: Some Transfer stations incorporate education centers or
interpretive trails focusing on waste prevention, These types of facilities offer increased utility to
the community,
Definition: . Availability of undeveloped on-site area to accommodate future expansion or changes including
additional waste handling, transfer, processing, and/or administrative support functions.
t
'I I
i~ness; ets~:
¢-M+mme+~5it-feet:
8. BUFFER SPACE
Consideration: To mitigate the impact onthe surrounding community, a transfer station should be located in an
area that provides separation from sensitive adjoining land uses and/or residences. Buffers can be
natural or constructed and can take many forms, including open spaces, fences, sound walls,
trees, berms, and landscaping.
Definition:. Presence of natural areas, trees, topographic relief, or other features that provide separation from
adjoining land use or residences.
A site with the largest available undeveloped
footprint (acres) not including a minimum
100-foot buffer around the perimeter of the
site and dedicated transfer station area ,
(station, roadways, parking areas, scale
facilities, and other required site
improvements for transfer operations) will be
ranked the highest.
A site that provides the most buffer width in
terms of wooded area or other natural
screening feature(s) (i.e., streams, hills, etc.)
around the perimeter of the property will be
ranked the highest,.
Page 4
Important
Very Important
Attachment 1A
10
Attachment 1A
BOCC Work Session - 06/16/08
f I 1 1 t ~° E o f u r ~. ~ 1 1 l l~ '~ ~~ ,,.,~
- ` v~ -~~ :, s t ~ ~ ~ ~~~ a r ~ ° a a , ,y - -
Attachment 1A
ssess-te-apper-~ve4-tipping-area:
9..GENTLY SLOPING TOPOGRAPHY
Consideration: Transfer stations often are multi-level buildings that need to have vehicle access at several levels,
Completely flat sites need ramps or bridges constructed to allow vehicle access to upper levels (or
areas excavated to allow access to lower levels); Sites with. moderately sloping terrain can use
topography to their advantage, allowing, access to the upper levels from the higher parts of the:.
natural terrain and access to lower levels from the lower parts, Sites with steep slopes might
require extra costs associated with earthmoving and retaining walls.
Definition: Moderately sloping terrain for access to the upper level of the transfer station (tipping floor) from
higher natural elevations and access to lower level of the transfer station (transfer drive-through)
from lowernatural elevatiohs
A0_ ACACCCTf1IITII ITICC
~. Clenfrinifir we}erenrlmlerer -
i
.:,.# -. ,
1 i
10. ACCESS TO UTILITIES
Consideration Transfer stations generally require electricity to operate equipment, such as ventilation fans;
lighting; water for facility cleaning, restrooms, and drinking; and sanitary sewer systems for
wastewater disposal. Some transfer. stations use,wells for water supply, and some, especially in
more. rural settings, use. septic systems or truck their wastewater for off site treatment,,
Definition: Availability of electrical, water, and sewer service at the site,
A site that has a moderate naturally sloping
topography it the range of 4% to 6% (from
the back of transfer building) will be ranked
the highest,
A site that has electrical, water aril sewer
service of sufficient capacity for transfer
operations within the immediate vicinity
(10D0 feet of the site) will be ranked the.
highest;
Page 5
Important 5
Important 5
Attachment 1A
BOCC Work Session - 06/16/08
Attachment 1A
t~;
~ ~ ~ ~ ~~
~~~ ~; r
3 ~
a ~.
y I imi{ cifinn nnFinnc
t
11. ZONING DESIGNATIONS AND REQUIREMENTS
Consideration The County has adopted a Zoning Ordinance in order to protect and promote the health, safety,
and general welfare of the County and its residents. The Zoning Ordinance regulates and restricts
uses of land within the County, including such things as the height, size of buildings, and other
structures; the percentage of a lot that may be occupied; the size of yards, courts, and other open
spaces; the density of populations; and the location of Governmental Facilities such as aCounty-
ownetlTransfer Station. If the selected transfer station site is not located within an area that is
within the County's exclusive planning jurisdiction then other units of government may be involved
in the permitting and approval of the proposed transfer station site.
Definition: A Trarisfer station can be located in all Zoning Districts in the exclusive planning jurisdiction of the
County where Governmental Facilities and Office Buildings are permitted pursuant to Article 4.3
Permitted Use Table (Line P24) of the County's Zoning Ordinance, including those areas of the
Rural Buffer not located in protected watershed critical areas and including anywhere in any of the
EDDs where Governmental Facilities and Office Buildings are permitted pursuant fo the Permitted
Use Tables contained within the EDD Manuals, subject to all Site Plan requirements contained
within Article 14 of the Zoning Ordinance, EDD Manual requirements, permits and approval
.processes as applicable.
t ''-o,e~ mau?e-gas-em+ss~e~
s
-Aufernebiie--l-psuntl-SOi~le~~rEVen
12. CARBON FOOTPRINT
Consideration Refuse trucks provide an invaluable service, improving the quality of life as they haul away thou-
sands ofpounds ofgarbage every day, However, the refuse trucks also contribute to air and noise
pollution. Nearly 99 percent of these vehicles run on diesel fuel, and the emissions from these
diesel engines contain particulate matter, hydrocarbons, carbon monoxide, and nitrogen oxides,
Definition Impact of waste hauling activities on the environment measured in terms of the greenhouse gas
(measured in units of carbon dioxide) emissions.
Important
Sites will be ranked in accordance with the
following hierarchy: A site that is located
within the Orange County Planning
jurisdiction, excluding the Rural Buffer
portion of the Joint Planning Area and
excluding the Transition area, will be ranked
the highest followed respectively by sites
located. in the Rural Buffer, Transition, ETJ,
with those sites located within a municipality
ranked the lowest.
Important
The site with the lowest environmental
impact will be ranked the highest.
Environmental impact will be assessed on
the basis of carbon dioxide emissions
(megagrams per year) from collection
vehicles for the increased travel distance
from the cenfroid of waste generation to the
proposed transfer station site,