Loading...
HomeMy WebLinkAboutAgenda - 06-16-2008- 0ORANGE COUNTY BOARD OF COMMISSIONERS AC1`ION AGENDA ITEM ABSTRACT Meeting Date: June 16, 2008 Action Agenda Item No. SUBJECT: Adoption of Technical and Community-Specific Criteria in the Transfer Station Siting Process DEPARTMENT: PUBLIC HEARING: (Y/N) No County Manager's Office Solid Waste Department ATTACHMENT(S): 1. Technical Criteria A. Olver Inc Recommendation B. Preliminary -Working Document C. Evaluation Example D. Joint Memorandum -Towns 2. Community-Specific Criteria A. Olver, Inc. Recommendation B. Preliminary -Working Document 3. Draft Minutes -May 20, 2008 INFORMATION CONTACT: Laura Blackmon, County Manager, 245- 2306 Gwen Harvey, Assistant Manager, 245- 2307 Gayle Wilson, Solid Waste Director, 968-2285 PURPOSE: To request BOCC receive presentation and background reports from Olver, Inc. on Preliminary Technical and Community-Specific Criteria, receive public comment and input, and consider formal adoption of Final Technical and Final Community-Specific Criteria, incorporating any additional modifications as may be desired: BACKGROUND: The purpose of the work session is to receive presentations, consider public comment, and reach agreement on final Technical and Community-Specific Criteria that will define the Transfer Station Siting process. The BOCC adopted the Final Exclusionary Criteria at its meeting on May 20, 2008. Olver, Inc. will be responsible. for applying the Final Exclusionary, Technical, and Community-Specific Criteria during field exploration for qualifying sites. Provided the BOCC adopts the Technical and Community-Specific Criteria ideally before or by June 24, 2008, Olver, Inc. can initiate its active field investigation during the BOCC summer break. Otherwise, active field investigation will need to remain pending until a BOCC decision is made on September 16, 2008 -the first BOCC Transfer Station Siting Work, Session after the summer break. Note: The current BOCC calendar includes a Transfer Station Siting Work Session beginning at 5:30 PM before the regularly scheduled BOCC meeting. This meeting may not be necessary and could be cancelled if the BOCC is able to address and approve the Technical and Community-Specific Criteria at its Work Session on June 16t .) 2 County management and consultants deem the County h'as reached a critical juncture in the decisions required to site and develop a transfer station on a timeline compatible with a projected landfill capacity of early 2011. Final adoption of the Technical and Comrnunity- Specific Criteria -with any desired modifications - on June 16 or June 24 are essential to moving the overall process forward in a conscientious and expeditious manner. FiNANCI~-L IN1iP~4C1': There is no direct financial impact associated with the BOCC discussion and formal adoption of final Technical or Community-Specific Criteria to apply in the identification and evaluation of potential Transfer Station .sites within. Orange County. There will likely be substantial costs to the County (Solid Waste Enterprise Fund) in the overall design and development of the proposed site and the permitting and construction of the actual facility and any ancillary features. B2ECONIMEN®~-TIOiN(S): The Manager recommends that the Board review and discuss the presentation and background reports/documentation from Olver, Inc. on the Preliminary Technical and Community-Specific Criteria, receive public comment and input, and adopt Final Technical and Community-Specific incorporating any modifications as may be necessary or desired.