November 2006: This document provides updated information to the 2005
County Space Needs Report, as presented to the Board of County
Commissioners in March 2005. The updates will appear in dark blue (or in the
case of black and white copies in bold italics).
Purpose
The purpose of this report is:
1. To identify departmental changes that may. impact the recommendations or
implementation of the 2000 , Space Needs Task Force Report; and
2. To -modify Study recommendations to reflect changing conditions and Board
direction received since the original report; and
3. To create a fundable roadmap for developing adequate space to meet the
operational needs of county departments through 2020; and
4. To identify facility needs which require additional study and/or may fall outside of
the study period.
Assumptions and Principles
Overarching principles used to formulate study recommendations include:
1. Co-location. Co-locating departments that serve the same customer base with
similar services promotes greater efficiency and creates a more desirable level of
customer service.
2. Consolidation. The findings in this report will support the consolidation of County
operations to as few sites as may be practicable.
The recommendations contained in this study do not support the expansion of
existing facilities for the most part, but rather advocate for the development of an
alternative county campus to be sited ' in central Orange County in or around the
Hillsborough area. The property on Homestead Road in Chapel Hill serves as
the County's main service delivery location for the southern part of the county
and has proven to be a wise investment. As the Hillsborough area continues to
develop, it seems prudent to replicate that effort and establish a new campus
While the availability of land is still somewhat reasonable.
3. Ownership. The findings contained in the report continue to support owned
space vs. leased space to house permanent County offices. In 2000 the County
paid $349,000 per year for nine leases as opposed to 2004, which carries lease
costs of approximately $349,000 for five leases. The bulk of the lease costs
reside with the Senior Centers. Within two years, both Centers should be
operational, thereby eliminating the need for leased space. The County's annual
commitment for leased space at that point will be approximately $200,000.
4. Re- assignment of Space to Courts Function. The planned 25,000 square foot
expansion of the existing courthouse is slated for completion in late 2007.
County offices in downtown Hillsborough would systematically be assigned to
court functions as needs dictate and as new county facilities are brought on line,
in order to provide future court operation needs.
5. Green Building Practices. The County has for several years integrated green
building practices into new construction and renovations alike. A basic premise
of the recommendations of this report is that green - building practices will
continue to be integrated as appropriate. Further, a policy will be brought
forward for Board consideration that would further institutionalize the practices.
The Board approved the Environmental Responsibility Goal, which
incorporates green building practices into all County construction projects,
to the extent practicable. Each of the facilities designed for the County
within the past several years, including the Durham Technical Community
College campus building and the recently approved expanded County
campus project, has included a significant number of sustainable design
features in the project. .
6. Cost estimates. Project recommendations within this report are accompanied by
a cost estimate that utilizes cost guidance from recently designed buildings for
Orange County. Projects nearing the commencement of their development
timeline should be thoroughly assessed for accuracy of the cost estimate in order
to avoid budget shock at such time bids are solicited.
Criteria for Tier Level Placement
As was the case with the 2000 study, the following criteria were observed when placing
projects within a designated Tier level:
1. Overcrowded facility. The present facility is significantly overcrowded.
2. Growth and no recent new space. The Department has been allocated no
additional space to accommodate significant employee growth or increases in
service demands.
3. Improved service and /or collaboration. Carrying out the recommendation will
provide significant opportunities for improved service delivery and /or
collaboration among like- function departments within County government.
4. Reduced rental costs/ Carrying out the recommendations will provide the
opportunity to significantly reduce the cost of, or eliminate the need for existing
property for which the County currently pays rent.
5a Long- standing need. The initiative is a long- standing need with considerable
pubic support.
MMF
The functional groupings based on related service functions or like client base,
remained fairly consistent with the 2000 report. However, three new categories were
created to reflect the organization changes that have occurred:
1. Parks and Open Space
A new category that has been titled "Parks/Open Space" was created to more
accurately capture the department's evolutionary role. Parks is coupled with the
Environment Resource Conservation Department (ERCD) as one with whom adjacency
would be most beneficial.
Update: ERCD has opted to not be adjacent to the *.Parks function.
Recommendations for location(s) are included with the departmental write ups.
2. Agriculture Services
The Agriculture Services function has also been added to more accurately reflect the
focus of departments who would remain at the current Planning and Agriculture
Building. Agriculture Services departments would include Cooperative Extension and
Soil and Water, as well as USDA Rural Development and the Farm Service Agency, two
non-County programs currently at the Planning and Ag Building.
3. Animal Services
The Animal Services functional group was added in order to acknowledge the County's
new and expanded role in this area. While the Animal Shelter building has always been
a County facility, the County also assumed operation of the Shelter in July 2004. This
group includes the Animal Shelter, Animal Control and the Animal Services Director.
unctions Not Included In Study
Jail and Court functions.
,Expansion of approximately 25,000 square feet to the Courthouse is currently under
design pursuant to the recommendations included in the Justice Facilities Reports,.as
written in 1995 and updated in 1998. The new addition will house both court offices and
the Sheriff's Department. Additional future expansion of the Courthouse is not
contemplated, however, long term space needs of the court system may be met through
reallocation of County office space in downtown Hillsborough as court needs dictate and
as new County facilities are brought on line. The first such step will occur when space
vacated by the Sheriff's office is reallocated to accommodate court-related functions.
Update: Since the Justice Facilities Expansion will be limited to a single addition
and since the addition of 25,000 square feet would not support the long-term
need of the Sheriff's office and the ' Court system, the Board approved the project
for approximately 38,000 square feet, a 13,000 square foot increase over the
original project
On November 1, 2006 the Hillsborough Historic District Commission approved the
project's Certificate of Appropriateness. This allows the project to move forward
to the Hillsborough Board of Adjustment for consideration during their November
8, 2006 meeting.
Assuming expedient approval by the Board of Adjustment, the project
specifications will be solicited for bids by the end of December 2006, with receipt
of bids slated for mid January 2007. Construction is likely to begin by April 2007,
with completion anticipated Fall 2009.
The District Attorney, Jim Woodall, has requested that his department be allowed
to relocate from the Courthouse to the current Sheriff's building after the new
construction is completed. The DA's offices were scheduled to expand into
offices being vacated by the Clerk of Court on the first level of the New
Courthouse, however, with several new positions funded during this fiscal year,
coupled with the promise of at least one new attorney and support staff funded
for FY 2007 -2008, available space within the courthouse is not sufficient to meet
the DA's long -term space requirements. An area will remain in the New
Courthouse for use by the District Attorney and staff as staging area on court
days, but in general, all District Attorney operations will be based in the 144 E.
Margaret Lane facility.
Further, out of concern for his long -term expansion needs, the Sheriff has
expressed a desire to have space in the old portion of the Courthouse allocated
to his department, in addition to the approximately 15,000 square feet of new
space in the new addition. It is likely that some of the space made available by
the DA move will be allocated to the Sheriff's Office.
Chapel Hill Coin Facilities
Two additional facilities are utilized in order to deliver court services in Chapel Hill: the
Old Post Office, owned by the Town of Chapel Hill and located on Franklin Street and
the Moody Building in Carrboro, which has been leased by the County for ancillary court
services since 1987. Additional study regarding the long -term accommodations for
court services in southern Orange should be initiated. However, cost implications of
providing adequate school and county facilities, in addition to funding the expansion of
the Hillsborough court facility dictate that construction of court facilities in southern
Orange be considered beyond the scope of this study period.
Update: The Board has recently requested that staff pursue discussions with the
Town of Chapel Hill to determine the long -term viability of Court facilities in the
Old Post Office on Franklin Street; and to further to explore opportunities at that
site to develop the required court-related services for which the County is
mandated to provide. Should permanent options to providing the space be made
available at the downtown site, the County may be able to consider alternative
uses of the building footprint previously discussed as the area for future court
expansion at the Homestead Road campus.
IV
Likewise, an independent study is recommended at some point in the future to identify
and assess options for providing Jail space to meet the County's long -term detention
facility needs.
Update: Despite the S`heriff's best efforts, the current capacity of the ,Jail is
frequently exceeded with State and Federal inmates. The current CIP includes
$1.2 million to develop additional beds for "weekenders" and female inmates; and
to develop expanded visitation facilities for inmates and attorneys, etc. Staff
have investigated options regarding the use of modular cells either within the
confines of the current facility or a modular jail unit that would be located
somewhere outside of the current facility. No conclusions have been reached
However, options for the Sheriff's consideration are being prepared by the
Construction Manager with whom the County contracts.
Non - Departmental Agencies
Agencies that may reside in County facilities, but for which the County is not mandated
to provide space, were also not included in the current space analysis. Examples of
such include day care activities that are located in the Northern Human Services
Center, Cedar Grove as well at the Northside Center in Chapel Hill.
While recommendations will include adaptive reuse of existing buildings in some
instances, the space needed to accommodate the predictable growth cannot be found
on property.currently owned by Orange County. For this reason, a primary focus of the
study is the development of an alternative County campus at a site yet to be
determined.
Ideally the site would be in or around Hillsborough and offer sufficient acreage, to
develop a campus, conceptually similar to the County's campus on Homestead Road.
The campus would offer the opportunity to locate most County operations currently
located in Hillsborough to the site when growth at their present location could no longer
be accommodated. Build out of the campus would be a lengthy process, but would
afford the county the opportunity to create a master planned site that allowed rational
and sustainable growth for decades to come. In addition, a well located campus might
allow the county to promote collaboration with other partners as facilities are developed,
encourage mass transportation initiatives, create open space areas and implement
other initiatives valued by the County.
Update: County Commissioners approved a $23.4 Million project on November 2,
2006 that will provide an additional approximately 93,000 square feet of space in
three different buildings. The Gateway Center Building will contain approximately
22,800 square feet and is scheduled for completion in November 2007. The office
building, containing approximately 46,700 square feet, plus the new Main library
building, containing approximately 23,450 square feet will be completed around
May 2008. Allocation of departmental space is discussed further in this update.
V
Project Development Phases
The commencement of project construction or renovation, as may be the case in some
of the interim measures suggested, has been segmented into five-year development
increments beginning in 2005 and categorized as Tier 1, Tier 2 or Tier 3 projects.
Therefore:
® Tier 1 projects would begin construction during the period 2005-2010;
® Tier 2 projects would begin construction between 2011 and 2015; and
® Tier 3 projects would begin construction between 2016 and 2020.
Additionally, each Tier has been subdivided into 2 1/2 year increments so that projects
may be categorized to more accurately reflect the priority of the project. For example, a
project that is Tier 1A would begin construction during the period 2005 through mid
2008 and a project designated as Tier 313 would begin construction during the period
beginning mid 2018 through 2020.
Many of the projects listed will require a pre-construction period of up to two years.
During this period, designers would be selected, planning groups consulted, regulatory
approvals obtained, bids solicited, etc. in preparation for the construction to begin during
the specified project development phase. Funding in the Capital Improvements Plan is
likely to reflect planning/design money two years prior to the construction period
specified.
M �
Land Services—Tier 1A
A new building at the campus is proposed for "Land Services Departments". The
building would ultimately house all land services departments including: Planning and
Inspections, Health Department's Environmental Health, Land Records, Register of
Deeds, County Engineer, Revenue Department and the Tax Assessor. The county
could choose to construct it in ' phases, with priority being given to the Planning and
Health Department's Environmental Health functions.
Update: The Land Services Departments cited above are recommended for
inclusion in the recently approved expanded county campus buildings. There are
two office facilities included in the expanded campus, the Gateway Center and
the Office Building. The breakdown of potential resident departments for each,
as well as potential options to backfilling the space being vacated is listed below.
VI
The Gateway Center is scheduled for completion in, November 2007. The study
group recommends that the register of Deeds and Land records be relocated to
this facility.
Gateway Center
Gross Building Area 22,846
Circulation factor (30 %) 6,854
Net Space Available for
Use by Departments 15,992
New Facility
Resident Department Current S.F. Desired S.F. Allocation
Land Records 3,800 5,930 5930
Register of Deeds 5,263 9,000 9000
Total De t'I Allocation 9,063 14,930
Back —fill location: John M. Link, Jr. &overnment Services Gen 'rer
Department
Budget Office
Finance Office
New Facility
Current S.F. Desired S.F. Allocation
700 1,740 tbd
1,000. 2,350 tbd
AND One of the following depts:
Personnel Department 1,350
OR
Information
1,900
1,240 1,690
The Office Building is scheduled for completion around May 2008. The study group
recommends that the following departments be relocated to this facility: planning
and inspections, Environmental Health, revenue Department, Tax Assessor,
Economic Development and the County Engineer.
One of three other, departments may also be a candidate -for the facility: the
Personnel Department, Information Systems or /-lousing and Community
Development. Each of these departments has space requirements that would fit
within the square footage available for allocation.
Recommendations for backfilling the vacated space:
o Planning and Agriculture Building: Vacated space would be allocated to
Cooperative Extension, Soil and Water and ErCD, pursuant to
recommendations of the original space study. Farm Services, a Federal
Agency with offices in the Planning and Ag Center may also receive additional
space, based on availability.
Vll
o John M. Link Jr. Government Services Center (The Lints Center): Both the
County Manager's office and the Board of Commissioners office would be
allocated additional space within this building following completion of the
office building.
In addition, the Budget, Finance and Information Systems offices would be
relocated from the Government Services Center Annex to the Link Center.
A large meeting room, similar in size to the Board Boom at the Southern
Human Services Center is envisioned for the Link Center. The room could be
set up for a variety of functions including, but not limited to: televised
meetings for County Commissioners, Town of Hillsborough and the Orange
County School Board. The Hillsborough Town Manager has expressed
enthusiasm for this alternative, which might enable the Town to limit the size
of its new facility at Fairview and therefore eliminate the need to intrude upon
an adjacent significant stand of hardwood trees. The study group also
discussed possibilities of designing the space such that it could also be used
for community performances. Such a development would be a partnership
activity with a variety of groups that would likely be called upon to provide
assistance with capital funding, should the plan be implemented.
Funding to upfit this and other vacated spaces could be provided through the
County's CIP during the time appropriate for the work. However, additional
funding will likely be required, depending upon the extent of construction for
the meeting room /performance space. Partnership funding to support this
expense would be pursued as previously referenced.
Space vacated in the Government Services Center Annex would be reallocated
for Court-related use, consistent with the original Study recommendations.
viii
Individual space assignments for new and vacated space:
Office Building
Gross Building Area 46,716
Circulation factor (30%) 14,015
Net Space Available for
Use by Departments 32,701
Backtilling space in: John M. UnK, Jr. Government services c;enTer
Current S.F.
Desired S.F.
New Facility
Department
Current S.F.
Desired S.F.
Allocation
Revenue
1,400
2,100
2,100
Tax Assessor
3,500
3,500
30500
Planning and Inspections
4,800
13,150
13,150
County Engineer
300
700
700
Environmental Health
2,000
7,030
7,630
Economic Development
741
1,020
1020
Sub total
27,500
AND ONE OF THE FOLLOWING DEPTS
Personnel
1,350
1,900
tbd
Information Systems
1,240
1,690
tbd
Backtilling space in: John M. UnK, Jr. Government services c;enTer
Backf illing space in: Planning and Agriculture
Building
Department
Current S.F.
Desired S.F.
New Facility
Department
Current S.F.
Desired S.F.
Allocation
County Manager
1562
2,570
tbd
County Commissioners
1,200
2,900
tbd
Board Room
0
5,000
tbd
Backf illing space in: Planning and Agriculture
Building
Department
Current S.F.
Desired S.F.
Cooperative Extension
5,892
10,250
Soil and Water
1,436
1,970
ERCD
960
1,600
Farm Services
Total Dept'l Allocation
IX
New Facility
Allocation
10,250
1,970
1,600
tbd
13,820
Animal Services Building-Tier 1A
New construction at a location yet to be designated would
function, which the County assumed in 2004, the Animal
recently created department that will be responsible for
Services activities and the Animal Control offices, whict
Hillsborough at the Planning and Agriculture Building.
house the Animal Shelter
Services Administration, a
supervision of all Animal
are currently located in
Update: The County has acquired property adjacent to the south face of the
Landfill on Eubanks Road, upon which to situate the new County Animal Services
Facility/.
Dixon Weinstein Architects, Chapel mill was approved by the BOCC as the
architect of record for the Animal Services Facility design. Dixon Weinstein opted
to partner with Gates Hafen Cochraine, a Boulder Colorado firm with extensive
national experience in the design of animal shelters and animal support services.
The property falls within the jurisdiction of both the Town of Chapel Hill and the
County. The timeline for acquisition of the needed approvals (Special Use Permit
and re- zoning) is estimated to take at least 95 months and potentially up to two
full years. The facility -is planned for a September 2009 completion. However, as
noted below, the University of North Carolina is expressing a desire to relocate
the facility prior to that time. The Town did grant expedited review, as requested.
In December, the BOCC will be asked to consider a lease with the University of
North Carolina for the University owned property upon which the present shelter
is located. The present site is part of Carolina North, a new campus being
planned by the University. The County has requested a three year term to the
lease, through 2009, in order to complete the new facility. The University has
expressed concern that the three -year term may impede their development of the
new campus; however, they are working with the County to develop a lease term
that may be mutually satisfactory to all parties.
The timeline for the funding of this project remains as a 9A project, which
provides funding during FY 2006, FY 2007 or FY 2008.
Solid Waste Operations Center -Tier 1A
This structure is- needed prior to the Town of Chapel Hill vacating the existing site at the
expiration of their lease on December 31, 2007.
In addition to offices for the Solid Waste Management staff, the building would also
contain a sizeable training room that could accommodate the busloads of school
children that routinely visit to learn more about recycling and other related topics.
An architect to design the building will be recommended to the Board in the near future.
'Funding for this facility would be provided by the Landfill Enterprise Fund.
X
Update: Project designers, Dixon- Weinstein met recently with County staff to
finalize design plans for the building. The project is expected to go out to bid
within the next few weeks. Construction completion is anticipated by Fall 2007.
The aforementioned lease extension for the University owned property upon
which the Animal Shelter is built, will also affect the location of the current Solid
Waste Administration offices. The lease will include this area and will be of a
sufficient term to complete the Solid Waste administrative offices on Eubanks
Road.
The timeline for the funding of this project remains as a 9A project, which
provides funding during FY 2006, FY 2007 or FY 2008.
Library —Tier I
In accordance with the Library Task Force Report and to provide sufficient expansion
space for other Human Services Departments at the Whitted Building, a new main
Library building is proposed. Approximately 45,000 square feet of Library space is
proposed plus a Heritage Center of approximately 10,000 square feet, for a total of
55,000 square feet of new space. The Library could be located on the new county
campus, assuming the site met criteria agreed to by the County Commissioners and
others as may be appropriate.
A cybrary/branch library will remain at the Whitted campus.
Update: A new 23,454 square foot main Library will be constructed on the
recently approved expanded County Campus in downtown Hillsborough. The
County will select a library space planner within the next few weeks to assist with
the development of the interior of the building, which is scheduled for completion
no later than May 2008.
The study group recommends that approximately. 90,000 square feet of the
existing Library on Tryon Street be reallocated for use as a Heritage Center. As a
reminder, the following information regarding the Heritage Center was included in
the Library Task Force report:
Orange County has many valuable, even irreplaceable, historical records.
Currently these records are scattered and poorly maintained To preserve
and consolidate these records and make them available for citizen use, an
Orange County Heritage Center is proposed
Currently, collections exist in the North Carolina Room (a part of the
Orange County Public Library), the Burwell School (records of the Historic
Hillsborough Historical Society), and the Orange County Historical
Museum. Most of the records held by the last three organizations are not
cataloged nor are they readily accessible to researchers. In addition,
standard conservation practices are not in place.
XI
The types of materials already identified include books, periodicals,
various types of primary and secondary historic documents, maps,
photographs, and organizational records. Other possible resources include
video and audio recordings, including collections of oral history. In
addition to housing the resources, the facility will require staff and
materials processing space, space for researchers, gathering spaces for
symposiums and speakers, display areas, and security including lockers
for visitors' bags. Environmental concerns must be addressed and the
facility will be renovated to be conducive to the preservation of archival
materials.
Agriculture Services Building —Tier I
This project allows renovation of the building being vacated by the Land Services
Departments mentioned earlier. Cooperative Extension, Soil and Water and two non -
county agencies will occupy the Agriculture Services Building.
Update: These recommendations remain intact and would be carried out
following relocation of the Planning and Inspections, Environmental Health and
potentially ERCD to their various new locations. Square footage allocations by
department are listed in the table included in the Land Services — Office Building
Section above.
The timeline for the funding of this project remains as a 1B project, which
provides funding during FY 2009, FY 2010 or FY 2011.
Southern Human Services Center —Pier 2A
Original plans for the Southern Human Services Center included expansion area to the
east end of the building. The Health Department has recently begun primary care at the
Whitted Clinic. Staffing constraints preclude the service being implemented at the
Southern Human Services Clinic at this time. The Health Director indicates that clinic
patients could double within the next five years. As a Tier 2A project, construction of
this facility would begin in the timeframe 2011 -mid 2013, six years hence.
Social Services functions at this facility continue to expand. The Department added six
new employees within the past three years to existing Child Welfare units. Further, in
response.to increased service demands on the southern side of the County, an intake
unit with seven employees was also relocated to the facility in 2004. Food stamp cases
handled by DSS have increased approximately 60% since 2000.
A Dental Clinic is, proposed for development contemporaneously with the expansion of
the Southern Human Services Center. The current lease, which includes the space for
both the Dental Clinic and the Public Defender, expires in June 30, 2008 and has an
annual cost of approximately $105,000.
Update: The SHSC can expand per the plan cited above. However, the long -term
sufficiency of the expansion may be questionable if service delivery for Health
services is modified pursuant to current discussions. The Orange County Health
Department is exploring long -term service delivery options that would meet the
XII
rising demand for expanded health care through public health departments. The
demand for primary care and refugee services has already outstripped the
physical space available.
If a large single service location option is fully developed, basic or triage public
health services would likely be offered through smaller clinics staffed by one or
two persons located strategically throughout the County. Should that service
delivery method be employed, it is possible that a smaller clinic would remain at
the Whitted Building, with the main clinic located at the Homestead Load
Campus. Should this come to fruition, expansion of the SHSC greater than what
was originally contemplated is likely.
The modified health service delivery plan is only in discussion stages at this
point. Implementation would be several years hence and predicated upon reliable
public transportation within all parts of the County. It is raised here, however, to
acknowledge the possibility that the SHSC may require a footprint significantly
larger than previously discussed, or that a second human services building on
the Homestead road Campus may be needed
In the meantime, planning for re- location of the Dental Clinic, currently operating
from leased space at the Carr (Mill /Mall, should begin within the near-term. If
fiscally possible, it is recommended that funding for project planning of the new
dental clinic be appropriated in the 2007 -2008 CiP. This would allow the County
to move forward with a modification to the SHSC SUP permit and be ready for
construction as funding becomes available.
The lease at Carr (Mill /Mall covers both the area occupied by the Dental Clinic and
that occupied by the Public Defender. The Public Defender could be relocated to
County -owned property in Hillsborough upon completion of the Justice Facilities
Project, thereby vacating the entire leased premises at Carr (Mill (Mall. Although
the County will need a three-year renewal of the lease at Carr (Mill /Mall to ensure
sufficient space is available for both the public Defender and the Dental Clinic,
the end is in sight for the over $105,000 annual lease cost.
As a point of reference, $105,000 would support debt service of approximately
$1 million. The last cost estimate for a dental clinic, now in need of updating, was
$2 Million.
The timeline for the funding of this project remains as a 2A project, which
provides funding during FY 2011,. FY 2012 or FY 2013.
Update: SHSC Residence
This little house was designated in the original space study (2000) as .a
"conference center ", which essentially consisted of two meeting areas, a
kitchenette and an outside deck area that could be used for a variety of fair-
weather activities. The house backs up to a park -like area that was envisioned to
be "blankets -on- the - ground" seating area for performers that may have used the
XIII
deck area as performance space. Approximately $150,000 was allocated to the
project to fund upfitting the house for handicapped access, developing restroom
facilities to meet public building standards, constructing the deck and basically
getting the house stabilized to usable condition. This concept was not endorsed
during the study deliberations by the Board.
Human Services Departments have submitted a proposal to develop the house
for use as Family Life Center that would provide family-friendly meeting or
counseling space for human services clients. Although their proposal identified
uses for the kitchen in the residence, the study group recommends that kitchen
requirements be met by collaborating with the Department on Aging for use of the
commercial kitchen with demonstration area, in the Seymour Senior Center,
almost directly across the street from the house. - No cost estimate was provided
for the upfit of the facility for this purpose.
As recently as October 17, 2006 the Board discussed the possibility of allowing
the residence to be.moved to another location, where it could be used to provide
affordable housing or renovating the house to serve as an office for lFC should a
men's residential shelter be located at the homestead site. Removing the house
would allow a bigger building footprint for future development.
A brief analysis of the condition of the structure is forth- coming in a report
prepared by a team of employees from Public Works, Building Inspections and
the County Engineering office.
Options include any one of those previously mentioned.
The Parks and Recreation administrative staff, parks operations base staff and the
Environment Resource Conservation Department may locate to a County -owned
building on Valley Forge Road during an interim period. However, the long term plans,
as defined in the Parks Strategic Plan, would construct the necessary facilities at the
Blackwood Farm on Highway 86 and New Hope Church Road between Hillsborough
and Chapel Hill. This site is also proposed for the long -term site of the Arts Commission
offices and studio space.
Update: Recommendations have been modified to no longer co- locate either
ERCD or the Arts Commission with the Recreation and Parks function.
ERCD has previously indicated a desire to re- locate departmental operations to
the Julia Blackwood property on Millhouse Road. Mrs. Blackwood is in the
process of vacating the house so the house has not been fully investigated for
needed upgrades for use as office space. That work can be accomplished within
the next several weeks.
XIV
A second option for ERCD has recently become available as well. With the
approval of the expanded County Campus project, which will provide the
expansion space needed for Planning and Environmental Health functions, the
need to provide additional space at the Planning and Agriculture Building is less
critical. ERCD could, therefore, maintain offices at their present location.
The Arts Commission location is recommended for the Graham Building in
Hillsborough, pursuant to earlier studies.
The Recreation and Parks Administrative offices, and any part of the Parks
Operations Base that is conducive to the site is recommended for the current site
of the Emergency Management Offices on New Hope Church Road. As will be
indicated further in this document, Emergency Management (EM) operations are
recommended for relocation to the Meadowlands facility in Hillsborough. EM
desires to fulfill a long -term goal by maintaining a limited amount of space at the
current building in order to provide redundant communications capabilities.
Approximately 4,500 square feet of space is available for reallocation to
Recreation and Parks.
This location is in close proximity(less than one mile) to the Blackwood Farm on
Highway 86, which was presented as the preferred location of parks operations in
the Parks. Strategic Plan.
The Parks Operations base currently occupies 4,000 square feet of leased space
in the vicinity of Highway 86170A. This level of development, combined with the
administrative space requirements, will be challenging to accommodate at the
New Hope Church Road site. Additional facilities for a parks operations base
could be considered during the development of the Blackwood Farm master plan.
The timeline for the funding of this project remains as a 2A project, which
provides funding during FY 2011, FY 2012 or FY 2013.
XV
Emergency Management/9-1 -1 Center -Tier 2
Emergency Management was classified as one of the higher priority needs in the 2000
study. The Department has since absorbed the emergency medical transport function,
adding around 30 new employees. While the full complement of medical transport staff
is not based from this facility, office space as well as sleeping space for one unit has
been created. from a portion of the training room at the facility. The operations at
Emergency Management have significantly out -grown the existing space and cramped
conditions impair the daily efficiency of operations. The long -term solution, proposed as
a Tier 2B project (2013 - 2015) would consolidate the administrative, communications,
emergency medical and fire marshal divisions at the new county campus. However,
County Commissioners have recently authorized staff to consider acquisition of a
building that, among other uses, may serve as an interim location for the administrative
and other staff of Emergency Management.
The County Campus project approval allows additional space in the downtown
area to accommodate the EDC and Information Systems Department, both of
whom were scheduled to move to the building recently purchased by the County
in the Meadowlands, along with the administrative and Fire Marshal units of
Emergency Management. The available space at the Meadowlands facility is
sufficiently sized and conducive in design to Emergency Management operations.
Therefore it is recommended that the totality of EM operations be relocated to the
Meadowlands site.
New consoles acquired via a homeland Security Grant are currently under
construction and would be delivered to the Meadowlands site in time for
installation by March 31, 2007, which is the grant deadline.
Further, an emergency generator for the existing Emergency Management
building, also provided through grant funds, is being retooled for installation at
the Meadowlands facility.
The current Capital Investment Plan includes $400,000 for the upfit of this
building. /approximately $150,000 is allocated for the upfit of the previous
Orange Enterprises site on Valley Forge Road. This study recommends that
these funds be re- allocated to the EM project, which will begin upon approval by
the Board of Commissioners. Further, the Capital Investment Plan included $6
Million in FY for construction of a new 911 .Center, which may now be
reallocated within the CIP projects to address building upfits that are prompted
by the implementation of this Study.
Public Works Administration and OPT Building —Tier 2
The State of North Carolina has leased a modular office building for use by OPT
through 2008. This study recommends that.the lease be renewed, or contingent upon
funding from the State a new facility be constructed in conjunction with the Public Works
Administrative Building expansion.
XV I
Update: No change in the. overall recommendations is recommended. However,
a master plan of the Public Works site should be completed in an expeditious
manner, following decisions regarding the land swap between the County and the
Town of Hillsborough. A vehicle compound of sufficient size to accommodate all
"off duty County vehicles is to be included in the master plan.
Public Works —Motor Pool —Tier 2
Since the Motor Pool was constructed in 1996, the County's fleet has grown by 25% (60
vehicles). Should this growth continue at a similar rate, expanding the six repair bays to
at least ten repair bays should be considered in the 2013 -2015 timeframe. Absence of
available repair areas will increase the overall cost of contracts to outside repair shops.
Update: There is no change in this recommendation.
Whitted Human Services Center —Tier 3A
The Whitted site can accommodate only minimal expansion of the building. The
recommendations of the report assume the relocation of the current Library and the
reallocation of the approximately 12,500 square feet to Health and Social Services.
One of the primary areas of focus at this building must be in the Health Department —
Health clinic. The clinic, already heavily scheduled, began as a primary care facility on
January 4, 2005. Already the clinic has seen over 50 new patients, with many more
expected as the service becomes more widely known. The current clinic area includes
the entire first floor of Building B and has no expansion capability within the current
confines. While expansion to an upper floor is within the realm of possibility, the current
building configuration would require patients to go outside to access an elevator that
would take them the upper levels. In order to avoid this unacceptable practice, the
study suggests that additional square footage be added to join the two buildings,
thereby creating additional waiting /reception area, program space, meeting rooms., etc.
The most important result however, may be the incorporation of the elevator into the
interior of the building, which would significantly improve the flow of traffic between
Buildings A, and B.
a Update: The recently approved expanded county campus will address
essentially all of the long -term space needs identified in this report, with the
exception of those of the Human Services departments, whose long -term plan
for growth beyond the Whitted Building included relocation to an expanded
campus. There are ways in which the space needs for these departments may
still be met in an orderly and rational manner, however.
As discussed in the section regarding the Southern.Human Services Center
expansion, new service delivery methods being explored by the Health
Department could minimize the amount of additional space needed at the
Whitted Building. Expansion possibilities for the facility are constrained by the
availability of parking (although the Library re- location will help in this regard);
and expansion must also be sensitive to the residential community that
surrounds the facility.
XVI I
While the reallocation of current Library space will be carried out upon
completion of the new Main Library on the expanded county campus in 20 08, it
seems prudent to make decisions regarding expansion of the Whiffed Building
in consideration of decisions yet to be made regarding the preferred method of
health services delivery.
The Whitted Building expansion is scheduled as a 3A project (funded FY 2016,
2017 or 2018).
Heritage Center. The Study recommends that the Heritage Center be located in
the Whiffed Building, generally in the high ceiling area of the Library where. the
current stacks are located; and the area currently designated as the Carolina
Room.
The current Library occupies approximately 12,500 square feet of space.
Under this plan for reallocation of space, the Heritage Center would occupy
approximately 10,000 square feet, with the remaining area reallocated for use
by the Departments of Social Services, Health and Housing and Community
Development. Areas available for reallocation to Human Services Departments
include the current administrative offices on the first level of the building, the
children's reading room, the current library conference room and the area
currently used as offices for library staff.
Significant funding for development of the Heritage Center would be provided
through money provided several years ago by a patron.
Recreation and Parks Department. As noted earlier in this document, the
Recreation and Parks Administrative offices currently located in the gym on
-the Whined Building site, are recommended for relocation to the current
Emergency /Management Building on New Hope Church Road. This
recommendation assumes that some Recreation staff would remain at the
Tryon Street facility for oversight of programs that would be available at the
facility. While some of the vacated space could be available for program use,
such as after school programs, summer children's programs and others, this
study recommends the that a much needed break area for the 100+ employees
in the Whitted complex he developed in an area yet to be determined.
Administrative Building —Tier 3B
The last of the buildings recommended for construction in this plan is a facility to co-
locate all administrative functions, including: County Manager, County Commissioners,
Finance, Budget, Personnel, Board of Elections, Human Rights and Relations,
Purchasing and Central. Services, and perhaps the Information Systems Department.
At such time the Court needs dictated use of the Government Services Center, the
Administrative building would be constructed at the County Campus and the
aforementioned departments relocated to that site.
XVIII
Interim measures are recommended in order to accommodate the inevitable growth of
these departments prior to the new facility's construction, however. Following
relocation of the Register of Deeds, Land Records, Tax Assessor and Revenue office to
the new campus facility, the Manager and Commissioner offices will be allocated
additional space within the existing building. In addition, the Finance, Budget and
Personnel offices, currently located at the Government Services Center Annex, will
relocate to the Government Service Center. The Government Services Center Annex
would then be available for reallocation to the Court system.
Update: The Board of Elections will not relocate to the Link Center, but will rather
remain in the expanded space made available at their existing site by the
relocation of the EDC to the expanded county campus.
This study recommends that the Human Rights and Relations Department remain
at its current location at 503 W. Franklin Street, Chapel Hill, rather than being
incorporated into the Administrative Building.
Consistent with earlier recommendations, the Government Services Annex will be
reallocated for use by Court offices, such as Juvenile Services and
Probation /Parole. Staff will be working with the court officers to determine the
most efficient use of the space in their operations.
Other elements of the Administrative Building project have been discussed
elsewhere in this report and are, therefore, not repeated here.
Next Steps/Recommendations
1. The report will be modified to reflect any changes agreed to by the Board.
2. Placeholders in the appropriate funding years will be incorporated into the 2005-
2015 Capital Improvements Plan to be presented in April 2005. update: 2007-2017
Capital Improvements Plan, to be presented in Spring 2007.
3. The report will be kept current by updating it periodically to 'reflect decisions made
regarding space, such as the Library Task Force Report and the unadopted Parks
Strategic Plan.
4. The space needs assessment team, along with other departmental representatives
as may be appropriate, will review park properties and buildings contained thereon
to determine potential uses that may be recommended.
5. In tandem with the formulation of the annual Capital Plan, cost projections will be
updated by credible means for all projects within a two-year development window to
ensure accuracy within current conditions.
W.