HomeMy WebLinkAboutAgenda - 06-17-2014-13 (7)Information Item Memorandum To: Michael Talbert, Interim County Manager From: Craig N. Benedict, Planning Director Subject: Eno Mountain Road / Mayo Street Relocation Feasibility Study Date: June 17, 2014 The Access Management Awareness Project & Report for Orange Grove Road, jointly prepared and adopted by the Town of Hillsborough and Orange County in 2003, focused on methods for a better functioning road corridor in the surrounding Hillsborough area. The Plan included a recommendation that the Town and NCDOT pursue the realignment of Eno Mountain Road to align with the intersection of Mayo Street at Orange Grove Road to resolve traffic conflicts caused by the close proximity of the intersections to two urban major thoroughfares with another urban major thoroughfare. That intersection would potentially warrant a traffic light. Beyond potential capacity constraints, the lack of operational improvements such as designated left and right turn lanes with adequate stacking room or traffic signals at the intersections of Eno Mountain Road and Mayo Street at Orange Grove Road acts as an impediment to traffic flow at these two intersections and along the Eno Mountain Road /Orange Grove Road /Mayo Street corridors. Recent activities impacting the corridor and intersection include a development proposal for a 4 -phase 118 -unit townhome development on a 23.67 -acre site on property located at the intersection of Orange Grove Road and Eno Mountain Road. The property is located in unincorporated Orange County, but within the Town of Hillsborough's Extraterritorial Zoning Jurisdiction (ETJ). While the property is subject to Hillsborough's development regulations, Orange County provided courtesy review of the site plan. The road connection that has been prioritized in the Access Management Awareness Project & Report for Orange Grove Road would realign these intersections and provide operational modifications that would improve traffic flow and safety. No preferred alignment for the project has been established but very broad preliminary feasibility analytics indicate that the preferred approach may be to realign Eno Mountain Road with Mayo Street as opposed to realigning Mayo Street with Eno Mountain Road. While it is not likely for this project to be implemented in the very near future, planning and potential reservation of right -of -way should be immediate. The traffic study prepared for the proposed townhome development did not warrant improvements to be borne by the developer. The implementation of the project could have long -term impacts on site access from Eno Mountain Road. The recommended road connection would provide a more direct route to Eno Mountain Road, and could potentially serve as an important link in a future