Loading...
HomeMy WebLinkAboutAgenda - 11-02-2006-9bORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 2, 2006 Action AgendaQ ~_ - Item No. 1 ~ SUBJECT: Contract Approval: Animal Services Facility Design Services DEPARTMENT: Purchasing and Central PUBLIC HEARING: (YIN) No Services, Animal Services ATTACHMENT(S): INFORMATION CONTACT: . Pam Jones (919) 245-2652 Cost Proposal Bob Marotto (919) 968-2287 PURPOSE: To consider authorizing a contract with Dixon Weinstein Architects for services associated with the design of the new Animal Services Facility on Eubanks Road, Chapel Hill and services associated with the regulatory approvals required for the project, at a cost not to exceed $623,375, plus reimbursable costs. BACKGROUND: The County has recently concluded aqualifications-based selection process for design services associated with the proposed 19,000-24,000 square foot Animal Services Facility, in which to consolidate all divisions of the Animal Services Department. Of the six firms that responded, four were interviewed. While each of the firms is qualified, the design team led by Dixon Weinstein is recommended for the Board's consideration. The selection group focused not only on the design capabilities needed for a quality facility, but also the ability of the consultant to shepherd the project effectively through the 12-15 month regulatory review process that is required. The design team recommended is strong in both areas. Dixon Weinstein's work is well known to the County through the design work associated with the Skills Development Center on Franklin Street, Chapel Hill; and mare recently through the design of the Solid Waste Administration Building that will be built on Eubanks Road. The firm can bring an innovative design approach to the project that incorporates elements that are important to the success of the. project, -such as incorporating sustainable design elements into the building and the development of the site; beginning the project with familiarity with the Eubanks Road area because of on-going work with the Solid Waste Administrative offices; and a having awell-developed working knowledge of the Chapel Hill regulatory process. Dixon Weinstein chose to partner with a firm that excels in animal services/sheltering design: Animal Arts/Gates Hafen Cochrane. The firm, located in Boulder, Colorado, has designed numerous shelters across the nation ranging in size from an 80,000 square foot Denver Dumb Friends League shelter in Denver to the 5,800 foot facility built by the Animal Protection Society of Orange County on Nicks Road, Mebane. The information presented during the interview reflects a strong design sensitivity to the animals, the public and the employees who work in the facility. Other consultants included on the design team include: 1. Civil Consultants, Durham, Civil Engineering 2. Spring Stoops McCullen Engineering, Durham, Mechanical Engineering 3. Neville Engineering; Chapel Hill, Structural Engineering Following Board approval of this item, the design team will kick-off the design process by holding workshops with the Board-appointed design committee and County staff. This will provide an opportunity to exchange ideas, clarify project expectations and solidify the project direction early in the project. Construction of the project is anticipated to begin late-Spring 2008, with completion by Fall 2009. FINANCIAL IMPACT: The budget for all elements of the project, as stated in the Capital Investment Plan, is $5.7 million. The design services are quoted at $623,375, including approximately $71,000 for work associated with the Chapel Hill/Orange County regulatory approval process. Based on a $4.5 million construction budget, the fees represent about 13.9% of the construction cost. The fees paid to municipalities and utility providers for the Special Use Permit, Zoning Permit, Zoning Compliance Permit, OWASA and Duke Power permits are estimated at $74,000 and are not included in the stated design fee. The detailed cost elements are included on the attached cost proposal. RECOMMENDATION(S): The Manager recommends that the Board approve the terms as cited herein as the basis for a contract that will be prepared and reviewed by the County Attorney and staff; and authorize the Chair to sign the contract on behalf of the Board. Orange County -Animal Services Building Overall Project Budget Assumptions: DRAFT 1 Design services fora 19,000 - 24,000 square-foot animal services facility housing an animal shelter, animal control and administrative offices. 2. Project includes site design for the 5.5 acre parcel of land on Eubanks Road. 3 Regulatory processes and approvals required by Town of Chapel Hill, Orange County and other regulatory agencies. 4 Total project cost (hard and soft) is established at $5,700,000. Project Budget Building/Site Construction Budget 4,250,000 Equipment/Caging 250,000 4,500,000 4,500,000 Office Furnishings 150,000 150,000 Design Services Basic Services 414,375 Additional Services - Architectural/Engineering 138,000 Chapel Hill and Orange Cty Approval Process 71,000 623,375 623,375 Reimbursables Travel 10,000 Printing Regulatory approvals 5,000 Reviews/Bidding/Awarding 4,000 19,000 19,000 Application Fees SUP 15,000 Zoning 2,000 Zoning Compliance 8,000 OWASA - assume 2" line water and sewer availability fee 38,000 . misc 10,000 Duke 1.000 74,000 74,000 Testing/Surveys Site Survey 10,000 Archeological 10,000 Geotechnical 12,000 Construction 20,000 52,000 52,000 Commissioning CM at Risk? Sub-Total 5,418,375 Contingency (5.2%) 281,625 Total 5,700,000 Dixon Weinstein Architects October 23, 2006 Orange Countv -Animal Services Building Architectural and Engineering Fees Drift A. Basic Services -Architectural and Engineering Dixon Weinstein Architects, Architect of Record Animal Arts, Consultants Spring Stoops McCullen Engineering, PME Engineers Neville Engineering, Structural Engineers Assume $4,250,000. construction budget @ 9.75% fee Schematic Design 15% 62,156. Design Development 20% 82,875. Construction Documents 35% 145,032. Bidding/Awarding 5% 20,718. Construction Administration 25% 103 594. $414,375. $414,375. B. Additional Services -Architecture and Engineering Not to Exceed Architect -Dixon Weinstein Architects, Chapel Hill, NC Pre-Design Needs Assessment Workshop & Report 10,000 Site Inventory and Analysis 2,500. Master Planning with.alternatives 5,000. Initial meetings with Town 1,500. Overall project budget and schedule ,500. Pre-Design presentation .500. $20,000. $20,000. Peer Review - 2 to 4 meetings $2,500. 2. Consultant -Animal Arts, Boulder, CO Needs Assessment Workshop and Report 8,000. Equipment and caging design and specifications 24,500. Design Services included in basic services list Part A $32,500. $32,500. 3.Consul taut -Civil Consultants, .Durham, NC Pre-Design 5,000. Schematic/Master Planning. 6,000. Design Development 15,000. Construction Documents 32,000. Off-site Utilities 12,000 Bidding/Construction 13.000. $83,000. $83,000. Dixon Weinstein Architects October 23, 2006 5 Orange County -Animal Services Building Architectural and Engineering Fees Q I"aff C. Additional Services -Planning approvals, Town of Chapel and Orange County 1. Architect -Dixon Weinstein Architects, Chapel Hill, NC Special Use Permit 10,000. Zoning Compliance Permit 8,000. Meetings (8 mee#ings) 3.000 $21,000. $21,000. 2. Consultant -Civil Consultants, Durham, NC Rezoning Request 4,000. Special Use Permit 17,000. Zoning Compliance Permit 16,000. . Meetings (8 meetings) 3,000. Close-out ~ 4 000. 44,000. $44,000. 3. Consultant -Landscape Architect Special Use Permit 2,000. Zoning Compliance Permit 4.000. $6,000. $6,000. 4. Consultant - as required for Chapel Hill Approvals, ie. Traffic Studies Water Flow/Hydrant Environmental/Wetlands/RCD D. Reimbursables Allowances 1. Consultants, cost +10% 2. Printing, cost + 5% 9,000. 3. Travel, lodging, car rental and meals for travel by out-of--town consultants, 8 (2 night) trip allowance. Addi#ional trips billed at $1,200 each trip. 10,000. E. Items Provided by Owner 1. Property survey with topo, trees, boundary, site easements, legal encumbrances provided in both hard-copy and electronic format. 2. Surveys as needed for design and approval of any offsite work or adjacent roadway improvements, right-of-way dedication, etc 3. Wetlands/stream determination 4. Regulatory fees, application fees, permit fees, etc. F. Item excluded from this contract 1. Design of crematoria 2. Turn lane on Eubanks Road 3.This prop osal assumes that both sewer and water are available north of the site on Eubanks Road. Dixon Weinstein Architects October 23, 2006