Loading...
HomeMy WebLinkAboutRES-2014-039 Resolution Approving the Reconfiguration of Orange County's Priority Transportation Projects for TARPO Regional Priority List for 2016-2022 Statewide Trans Imp Program �- 3- i� RES-2014-039 7<J ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION APPROVING THE RECONFIGURATION OF ORANGE COUNTY'S PRIORITY TRANSPORTATION PROJECTS FOR THE TRIANGLE AREA RURAL PLANNING ORGANIZATION (TARPO) REGIONAL PRIORITY LIST FOR THE 2016 — 2022 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide Transportation Improvement Program (STIP) that identifies transportation projects to be implemented over the next seven years with State and Federal funding; and WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and regional importance to be included in the FY 2016-2022 STIP; and WHEREAS, North Carolina has established Rural Planning Organizations (RPOs) to coordinate regional transportation planning in rural areas in cooperation with the North Carolina Department of Transportation (NCDOT); WHEREAS, Orange County is a member of the Triangle Area Rural Planning Organization (TARPO) charged with developing and prioritizing proposed transportation projects that the RPO believes should be included in the STIP; WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the County's designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the NCDOT to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; and WHEREAS, Orange County previously outlined its transportation needs within the TARPO planning area on November 19, 2013; and WHEREAS, Orange County has reconfigured its transportation project priorities in ranked order within the TARPO planning area in an attachment to this resolution; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board endorses the following prioritized list of transportation projects in the TARPO planning area to supersede the transportation project priority list for the TARPO planning area previously approved by the Orange County Board of Commissioners on November 19, 2013, for consideration in the the FY 2016-2022 TARPO regional priority list: 1 NC 54 Wideninq: Widen NC 54 from Orange Grove Road (SR 1006) to Old Fayetteville Road (SR 1937/1107) from a two (2)-lane undivided thoroughfare to a four (4)-lane divided boulevard type thoroughfare. RES-2014-039 This project was submitted and scored as a new highway project to be considered for inclusion in the TARPO regional priority list as well as the 2016-2022 STIP. 2 Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities. This project was previously submitted as a highway project and was reprioritized, submitted and scored as a highway project for consideration of inclusion in both the TARPO regional priority list and the BGMPO Metropolitan Transportation Improvement Program (MTIP) as well as the 2016-2022 STIP. 3 Old Greensboro Road Paved Shoulders: Widen Old Greensboro Road (SR 1005) from Carrboro's extra-territorial jurisdiction (ETJ) (near Sturbridge Lane) to the Orange/Alamance County line to include four (4)-foot paved shoulders. This project was submitted and scored as a highway project to be considered for inclusion in the TARPO regional priority list as well as the 2016-2022 STIP. 4 Efland-Cedar Grove Road Improvements: Widen Efland-Cedar Grove Road (SR 1004) from Highland Farm Road (SR 1332) to the northern property line of the U.S. Post Office north of Carr Store Road (SR 1352) from a two (2)-lane, 20-foot cross section to a 24-foot cross section with straightening of the roadway where needed, improvements to turn lanes, and the incorporation of bicycle facilities. This project was submitted and scored as a reprioritized highway project to be considered for inclusion in the TARPO regional priority list as well as the 2016-2022 STIP. 5 Orange Grove Road/Buckhorn Road Paved Shoulders: Widen Orange Grove Road (SR 1006) from Dairyland Road (SR 1177) to Buckhorn Road (SR 1114) and Buckhorn Road (SR 1114) from Orange Grove Road (SR 1006) to West Ten Road (SR 1144) to include four (4)-foot paved shoulders. This project was submitted and scored as a highway project to be considered for inclusion in the TARPO regional priority list as well as the 2016-2022 STIP. 6 Orange Grove Road Paved Shoulders (From NC 54 to Arthur Minnis Road): Widen Orange Grove Road (SR 1006) from NC 54 to Arthur Minnis Road to include four (4)-foot paved shoulders. This project was submitted and scored as a new bike project to be considered for inclusion in the TARPO regional priority list as well as the 2016-2022 STIP if the County commits the required 20% local match. 7 Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4)-foot paved shoulders. This project was submitted and scored as a new bike project to be considered for inclusion in the TARPO regional priority list as well as the 2016-2022 STIP if the County commits the required 20% local match. 8 Orange Grove Road/Dodsons Crossroads: Widen Orange Grove Road (SR 1006) from I-40 to Dodsons Crossroads (SR 1102) and Dodsons Crossroads (SR 1102) from Orange Grove Road (SR 1006) to Dairyland Road (SR 1177) to include four (4)-foot paved shoulders. RES-2014-039 This project was submitted and scored as a new bike project to be considered for inclusion in the TARPO regional priority list as well as the 2016-2022 STIP if the County commits the required 20% local match. Upon motion of Commissioner econded by Commissioner the foregoing resolution was adopted this the 3`d day of June, 2014. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on June 3, 2014, as relates in any way to the adopf of the foregoing and that said proceedings are recorded in the minutes of said Board. WITNESS my hand and the seal of said County, this day 6V 2014. g Clerk o ioners 17 sz dr th �