HomeMy WebLinkAboutORD-2013-039 Ordinance approving Budget Amendment #2-D and Bid Award for McGowan Creek Sewer Interceptor Project 1 ORD-2013-039 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 5, 2013 Action Agenda Item No. 5-h SUBJECT: Bid Award — McGowan Creek Sewer Interceptor Project and Approve Budget Amendment#2-D DEPARTMENT: County Manager, Planning, PUBLIC HEARING: (Y/N) No Finance, Asset Management Services (AMS) ATTACHMENT(S): INFORMATION CONTACT: 1) Certified Bid Tabulation Michael Talbert, Manager's Office, (919) 2) Award Recommendation Letter from 245-2300 McGill Associates John Roberts, Attorney, (919) 245-2318 3) Map of Project Area Craig Benedict, Planning, (919) 245- 4) Resolution of Tentative Award 2592 Clarence Grier, Manager's Office/ Finance, (919) 245-2453 Kevin Lindley, Planning, (919) 245-2583 Jeff Thompson, AMS, (919) 245-2658 David Cannell, Finance, (919) 245-2651 PURPOSE: To consider: • Awarding the bid and approving a construction contract (pending State approval) to Park Construction of North Carolina, Inc. of Morrisville, NC in the amount of $597,813.13 for the construction of the McGowan Creek Sewer Interceptor; • Approve Budget Amendment #2-D for $107,814 (bids received were in excess of the originally budgeted project construction cost) consisting of: • Authorizing staff to request an additional $50,000 in SRF loan funding from the State; • Approving funding of$57,814 from Article 46 Sales Tax proceeds; • Approve and authorize the Chair to sign the Resolution of Tentative Award for this project, as required by the State Revolving Fund Loan; • Approve and authorize the Chair to sign the contract on behalf of the Board of County Commissioners, subject to final review by the County Attorney and the State; and • Authorize the Manager to execute individual change orders within the limit of his authority ($250,000) up to the extent of the project budget. BACKGROUND: On March 13, 2012 the BOCC authorized staff to proceed with applying for a State Revolving Fund (SRF) Loan to provide funding for this project. Orange County had originally approached the State about paying for this project with proceeds from the SRF loan used to pay for the Central Efland/North Buckhorn Sewer Project. However, the State 2 requested that the County apply for the McGowan project funding separately. Orange County applied for a separate SRF loan in March 2012 and the unused money from the Central Efland/North Buckhorn SRF loan that would have been used for this project was returned to the State. This project will allow the County to eliminate the McGowan Creek pump station by installing a gravity sewer line to replace it. The new gravity sewer line will convey the wastewater that previously flowed into the McGowan Creek pump station to the newly completed Brookhollow pump station, which was designed to handle this future flow. Eliminating the McGowan Creek pump station will lower the annual maintenance costs of the Efland Sewer System and take out of service a 25 year-old pump station that would otherwise need refurbishing at an estimated cost of over$450,000. BID INFORMATION The design, permitting, and bidding phase has been completed. The project was advertised for competitive bid in early September and bids were opened on October 15, 2013. There were six bids received and after a period of review by County staff and the County's engineering consultant, McGill Associates, Park Construction was determined to have the lowest responsible, responsive bid with a total bid of$597,813.13. (See Attachments 1 and 2.) As stated above, the funding for this project was intended to come from an SRF loan. The loan application was submitted in March 2012, along with an estimate of the cost for construction of the project. Though the projected construction cost was considered reasonable at the time, the low bid from Park Construction was approximately 22% higher than the estimated construction cost of $490,000. The economic recovery can also bring higher costs in a competitive bid market. The following timeline represents the project delivery and completion: TASK PROPOSED END BY BEGINNING DATE DATE BOCC Action: Approve bid award to Park Construction 11/5/13 11/5/13 BOCC Action: Approve Resolution of Tentative Award 11/5/13 11/5/13 Construction Period est. 7 months 1/15/14 8/15/14 System Commissioning, Completion of As-Built Drawings 8/15/14 10/30/14 RESOLUTION OF TENTATIVE AWARD The next milestone in the SRF loan process is for the State to issue the Authority to Award this project by December 2, 2013. The results of the competitive bid, along with other documents, must be presented to the State as soon as possible. One of the required documents is the Resolution of Tentative Award, which must be approved by the BOCC (see Attachment 5). Once the County receives the Authority to Award from the State, the construction contract must be signed and returned to the State for final review by January 2, 2014. FINANCIAL IMPACT: Funding of $755,450 is available as part of the FY2013-14 Capital Improvement Project budget, which includes $94,200 in professional services funds for McGill Associates related to design, construction administration, bidding, and easement documentation. This project is being funded by a State Revolving Fund Loan, which will be 3 paid over a 20 year term from the General Fund. Existing funds for general contingency, property easement procurement and loan origination are $63,437. Due to the competitive bids received, staff estimates an additional $107,814 will need to be appropriated to cover the cost of the project. The amount of the loan can be increased up to 10% of the original value of the loan based on the competitive bids without going back to the Local Government Commission. The proposed budget amendment would take a portion of the increased costs from a loan increase and a portion from the Article 46 Sales Tax proceeds. The loan cannot be used to pay for the origination fee on the loan (2% of the loan amount) or the cost of the easements. Therefore, the budget amendment would assign a portion of the cost of the project from the use of Article 46 Sales Tax proceeds to cover these costs and other incidental costs that may be incurred as shown below. This will provide adequate funding for all known costs as well as a 10% construction contingency fund. Budget Amendment#2-D below illustrates this in detail: Revenues for this project FY 2013-14 Nov 5, 2013 FY 2013-14 Amendments Amendment Revised SRF Loan $755,450 $50,000 $805,450 Article 46 Sales Tax $0 $57,814 $57,814 Proceeds Total Project Revenues $755,450 $107,814 $863,264 A ppropriated for this i3roiect., FY 2013-14 Nov 5, 2013 FY 2013-14 Amendments Amendment Revised Professional Services $92,400 $0 $92,400 Construction $490,000 $107,814 $597,814 Contingency, Easements, $173,050 $0 $173,050 Legal, Origination, Other Total Project Appropriation $755,450 $107,814 $863,264 RECOMMENDATION(S): The Interim Manager recommends that the Board: 1.) Award the bid and approve a construction contract to Park Construction of North Carolina, of Morrisville, NC, in the amount of $597,813.13 for the construction of the McGowan Creek Sewer Interceptor project, pending State approval; 2.) Approve Budget Amendment#2-D for$107,814 consisting of: a. Authorizing staff to request an additional $50,000 in SRF loan funding from the State; b. Approving funding of$57,814 from Article 46 Sales Tax proceeds; 3.) Approve and authorize the Chair to sign the Resolution of Tentative Award required by the State as part of the SRF loan milestones; 4.) Approve and authorize the Chair to sign the contract on behalf of the Board of County Commissioners, subject to final review by the County Attorney and the State; and 5.) Authorize the Manager to execute individual change orders within the limit of his authority ($250,000) up to the extent of the project budget. ' . Attachment 1 4 CEFiT'I�IED BI[�TABtlU4T10N RAcGowan fnterceptnr ', Orange Cou Nnrtit Carolina v._.....___. _ .-.�....- _ ..�_..k__ - __ ._ CENTURION NAREN JF WILKEFtSQN pqpFFAT PIP� PARK CONSTRUCTIUN SULLIVAN EAS7ERN CC}N3TRUCTION CQN57RUCTION CONi'RACTINCi No Deacriptl� Unk qty Price Exta�aion Price Extens#on Frlcs F�ctar►slwt Pr�e Extensbn Prlce ExbemlMn Prlce FSRanrlon 1 1u�6111zatlon LS i Z 19.888.38 S 19 888.38 8 2b.00Q.00 S 25 000.00 i i 5,006.00 ; 15 00a_OQ :25 000.00 S 25 000.00 � 17 OOO.qO f 17 000.00 =28 500.� t 28,500.00 2 12'Clesa 350 DI G►avR Sswere 0-8 Ft I.F 74 S &1.32 S 4 T59.68 $ 80.00 S 5 920A0 S 8Q.20 3 8 674.80 S 82,00 S 4 586<OQ S 25,� i 1702.00 8b.� 8 90.00 S 12'Clasa 35Q DI Gr Savrets&8 Ff. LF 100 i 8833 S 6 823.Op S 94.00 S S 600,00 E 92.30 S 9 90.00 $ 87.� 3 8 7W.00 S 23.00 t 2 3�;OQ S 87.00 S 8 700.OD 4 12"C�s 350 DI t�aWty Sewere 810 Ff.Deptl� I.F 38 5 78.72 S 2,833.82 S 100.00 $ 3.800.00 # 84.85 S 3,407.�4D S 72.00 S 2.592.00 i 23.00 $ SZ8.00 8 �.O(! S 3,204.00 $ t2"C�s 350 DI GraV SaYV��eero 10-12 Ft DepEh LF 108 S 83.78 S 8,888.08 $ 10b.00 S 17,340.00 S 97.2E1 $ 1U.497.80 S 77.06 S 8,316.00 i �.� 5 2,4B4.OU S 92.0(1 5 9,938.00 ; Sa 6 12"Ci�s 350 D!Gravd 3avtere 12-9A FC D h LF i20 S 71.20 S 8.544,U0 $ 110.00 S 15,200.OQ E 100.20 $ 12.Q24.00 i 82.OQ 5 6.B40.D0 a 23.00 f 2.780.� S 95,tl0 i 11,AOO.Oa 7 4Y Clese 350 D! 3ewer61418 Ft LF i2$ S 72.13 S 8,292.84 $ 750.00 S 19,2Ef0.00 S 103.55 S 18 254.40 S 87.OD S 41,138.00 $ 30.00 8 4 352.00 � 125.00 i 18,400.00 ' B t2"Class 350 Dt OraV& 5ervets 16•18 FL De I.F 2fi7 $ 74.04 S 19 T68.66 S 18fY.00 3 42 726.OD $ 116,9Q S 31 212.30 S 97.00 $ 25 899.04 S 44.�0 S 11,7b8.40 S 15p.pt1 S 40,05�.� 8 tY Cl�sa 3S0 DE QraWt Sevners 1&20 Ft.Do h ' LF 393 $ 74.08 S 28117.37 S 180.00 i 70 7d0.00 $ 13020 S 51 788.60 5 107.Q0 S 42.051 O(} � 5#.00 S 21,222.00 S 1TO.btl $ 86 910.00 10 42'CIa,4s 350 Dt Grevit Sewers 20-22 Ft.D lF 384 S 73.78 S 26.929.70 x_ 245.00 S 78.475.00 S 7 5Q.20 S 54 823:OU S 727.OU S 48,555.00 S 64.Ofl � 7_3.380.00 $ 180.00 5 65.70Q.Q0 i t 12"CI�s 350 Df Grevk Sewers 22-24 Ft.Depth w LF 840 S 72.85 # 48,496.00 i 225.00 $ 144.Otl�:00 S 1&''i2d i 116.528.00 a i60.W S 1U2.400.OD f 88.t10 S 43.52Q.00 � 2�.00 ¢ 728.000.00 12 12"Clase 350 DI GraWt 3ewera 3426 Ft.De .��LF $2 � 113:93 S 9,293.08 S 24D.00 � 19 880.00 f 275.00 i 2�B50.IX1 i 250.00 b 20,506.00 i 90.00 ; �3�.00 S 22U.00 ; t 8,040.00 26`x tl.25`WaN Thidcness Sfeel EnoaseEr�erd 13 Pipe.Bore end Jeck�x!Cnmptete e�Ui 12't.k�.as LF 2W g 738.75 S 147.7S2.Q0 S S10.OD $ 1l32,OIXt:f)f! $ 7W.00 E t90,000.00 $ 81D.D0 $ 1(i2.00D.t10 $ 715.06 $ 1RS.OW.60 $ 1,�.00 S 200,qW.0U 350 DuctNe kon Grav� .�i�wver CartE�r Pi - 14 �'Ofarrteter Stand�d Manhde t2-14 Ft.D EA 2 S 2,834.98 S 5.H89.92 i 3,�.� $ .,6 800.U0 S S p00.00 S 8,�0.� $ g�.� S 12,OQO.OQ S 3 OOQ.UO S 8 000.00 7 400:00 S 14 000.00 15 4'Olameler StarMsttl MaNIWa 74-18'Ft �A 3 3 3.595.59 g 10 606.77 S 3,500.00 $ 10 50i�.U0 $ 3 200.E�Q $ 9 6p0.� S 6 2511.W S 18,750.00 $ 3.200.00 $ 9 600.00 S 8 Q00.00 S 24(100.00 ; 1fi 4'Dfamater Stanclard ME+nhde 18-18 Ft be U� ER 1 � 3 714.33 5 3,714.3.3 � 3 754.OQ S 3.750.(1Q $ 9,500.00 S 3.5�.40 3 8.750.00 $ 8.75D.U0 ; 3.8QSI.QO L 3,80Q.00 S 8.�0.00 S 9.000.60 � 1i 4'Diemeter Sterdard Manlro�e 2p•22 Ft.De tlt FA 'E 3 5 847.$2 S 5,847.E2 E 4,UOQ.00 S 4.OUi}.00 $ 0 0�.00 S g,�00.0� �13 50tl.q0 S 13,5�.Q0 E 4,000,00 3 4 000 06 � 10 Q00:00 E 1tl,dOf1.W 18 4'Dlametasr 5tm�dard t�ntals 22-?A Ft.Deptli EA 3 $ 8,139.28 S 1S,A17.84 $ 4,�0.00 i 43.50A.00 $ 6,8�.00 3 2fl.400.� i 20.Of�7.D0 $ B0.00o.00 3 4.10D.00 $ 12.300.00 S 71:5W1.1f0 S 34.500.00 I 19 5'DYamefer5tandaMA9anhole 24-28Ff.Deptli EA 2 $ 7.529.04 S f5.058.08 $ 5,800.00 S 1t�800.tlp $ B,BOU.00 S 17.80D.00 S 21.Op0.00 $ �2,OOD.OQ $ 6.100.D0 � W12,200.00 S 12,500.� $ 25.t�10.00 _�___........ _--- .._... � �._, w......��,� __ 20 Tie in to Exi9tNig Manhde w Bodat Conrredion EA 1 � 4,527.53 S � a,527.b3 $ r8,00U.b0 $ 9,004.00 $7 5,U00.00 3 16,Q�.W S 2,6W.17(1 S 2,bOD.00 i 3,75q.00 S __ 3,750.(MI S 10,D00.00 S id,OD0.00 ; 21 lie intd F�dsting 8ewet EA 1 � 4,091.43 $ �,051.43 $1 S.00O.IX1 S 11,�tt.00 i 10,000.4� S 10,000.00 $ 5,OOO.W S 5,�0.00 S 1.8p7.13 $ 1,80T.13 S 5,000.00 x 5,000.00 ' ,... .. _.. � .e E 22 erdon Existlng Pu Statkm �� I.S �1 � 14,628.75 $ 14,828.75 S 10,DOO.OU ffi 10,OQ0.00 ; 3,50Q.00 $ 3,SWA10 S 3;000.00 8 3,EJOO.W S 8,Oq0.00 S 8,Op0.Op S 27,100.00 S 27,100.00 ' 23 Gravel Drive end Pa R ir SYD 15D Z 18.19 $ 2,876.50 3 1400 Y 1.5�.06 S 30,00 ¢ 4.5tl0.00 3 5.00 S 750.W S 12.00 $ 1,8D0.00 $ 20.00 S 8,000.00 2A Cor�wctlon F�trance CA 3 S �.700.OB 3 11.100.18 S z,f�.Oq S B.000.00 S 1,200.Un S 3.800.00 t 1.6tlD.W S 4,SOD.00 3 1.200.00 3 3,8Q0.00 i 3.000.0� S 9.006.00 25 Rodc ExcavaUon w Select ESt�lcfil ae Necessary CY 20� ; tZO.� 5 240,W0.00 S t20.00 $ 2AO.OW.00 S 120.130 S 240.0�.00 S 120.00 S 2A0.0�.80 $ 726.00 i 24D,0�1.� S 120.00 S 240,OOf}.fl0 OD 7 6D6.00 00 5 d�.00 i 3s00 $ 7.SOO.OD S 9. S 28 Silt Fence Insiailed per fletails LF 2500 t 2.98 S 5.900.OU ; 2.5Q i 8,250.00 S 3.00 S 7,500.00 S 2 S � � TUTAI.. 5680,733.84 $856.67G.00 �E:6,67'0.10 �883�127.00 3697,813.13 51,42Q,730.00 71gs is to ce�tify thal Ihe bicfs taMalated here�were�anted l�Y a 576 bid bond ar certifled ch�ck tvKl�xiblicty npamed�d rtsad�laud a12:00 pm lacc�t lima on tlie 15th day d October,2013.in ttw lowe�Ievei ot qw CJrt�nge Gou�y Wes1 Carr�us Offlca E3uNcfing, Roan IXS4,131 W�t Margaret Lene,Hf�borough,North C�olina 27278. DCfUGLAS G.CHAPMAN,P.E. �,,,�;�=��+,r,ar ��1 ����� Apparent meUiematical+error does not affect award of ax�tract. ��,4`�[H CAI�p���r VJ.. - _ ca"��� �9 �w� n s s � c� j n -r � s � yslAEeAse�. � ENOFNeENINK7�1'I..ANNtPlC-F�IN�1Nt�(i �y ivvF,� ,"�i. � 124018th 5treet Lane,NW Qf �` ' Nickory,Morth Caralfna 28643 `•+*� � , Flrcn License No.C-0459 ` JD-Z�'i Attachment 2 5 ,JMcGffl A S S O C I A T E S October 23,2013 Mr. Kevin Lindley,PE Staff Engineer PIanning&Inspections Department Orange County Post Office Box 8181 Hillsborough,North Carolina 27278 RE: Award Recommendation McGowan Interceptor Orange County,North Carolina Dear Mr. Lindley: A total of six (6) bids were received on October 15, 2013. for the McGowan Interceptor project. Park Construction of North Carolina, Inc. of Morrisville, North Carolina, submitted the lowest bid with a total bid amount of$597,813.13. Park Construction of North Carolina, Inc. is appropriately licensed with the North Carolina General Contractor Board, and is qualified to perform this project. Following final review and acceptance of all DBE outreach documentation, we recommend award of the McGowan Interceptor project to Park.Construction of North Carolina Inc. in the amount of$597,813.13. The award should be made contingent upon approval by NC DENR Infrastructure Finance Section. Enclosed for your use are the certified bid tabulation and project cost summary. If you have any questions or comments,please do not hesitate to contact us at(828)328-2024. Sincerely, Mrs,GILL ASSOCIAT P.A. 'DO AS G. MAN,PE Seni roject M ager DC:mgp Enclosures Cc: Craig Benedict,Orange County David Cannell,Orange County E n g i n e e r i n g P I a n n i n g F i n a n c e McGill Associates,P.A. • P.O.Box 1136,Hickory,NC 28603 • 1240 19th St.Lane NW,Hickory,NC 28601 828-328-2024 • Fax.828-328-3870 McGowan Creek Sewer lnterceptor - Easements Needed (8/15I2013) 6 ATTACHMENT 3 ��o �o o� �� o° �� � Z 0 � v n ' � � � � 0 < m r o Y a 0 z c >p�: �� o' J J n�t+ � _� �`� Pump Station Y� 0 Proposed McGowan � � � Creek Sewer Interceptor 00 �.� Existing Sewer Water Bodies �� 1 in=300 feet o ioo Streams �°Fee' Orange Canty Ranning and Inspections - Easement Parcels &ian Carson(8/i6Q013) 7 RES-2013-086 Attachment 4 ORANGE COUNTY BOARD OF COMMISSIONERS RESOLUTION OF TENTATIVE AWARD WHEREAS, Orange County, North Carolina has received bids, pursuant to duly advertised notice therefore,for construction of the McGowan Creek Interceptor, Project No. CS370884-02, and WHEREAS,the McGill Associates Consulting Engineers have reviewed the bids; and WHEREAS, Park Construction of North Carolina, Inc,was the lowest bidder for the McGowan Creek Interceptor, in the total bid amount of$597,813.13, and WHEREAS, the consulting Engineers recommend TENTATIVE AWARD to the lowest bidder(s). NOW,THEREFORE, BE IT RESOLVED that TENTATIVE AWARD is made to the lowest bidder(s) in the Total Bid Amount of$597,813.13. Name of Contractor Amount 1. Park Construction of North Carolina, Inc. $597,813.13 BE IT FURTHER RESOLVED that such TENTATIVE AWARD be contingent upon the approval of the North Carolina Department of Environment and Natural Resources. Upon motion of_ ,seconded by ,the above RESOLUTION was unanimously adopted. This the 5th day of November, 2013. Barry Jacobs, Chair, Orange County Board of County Commissioners (Seal) Attest: Donna Baker, Clerk to the Board h. Bid Award— McGowan Creek Sewer Interceptor Project and Approve Budget Amendment#2-D The Board: • Awarded the bid and approved a construction contract (pending State approval) to Park Construction of North Carolina, Inc. of Morrisville, NC in the amount of$597,813.13 for the construction of the McGowan Creek Sewer Interceptor; • Approved Budget Amendment#2-D for$107,814 (bids received were in excess of the originally budgeted project construction cost) consisting of: • Authorizing staff to request an additional $50,000 in SRF loan funding from the State; • Approving funding of$57,814 from Article 46 Sales Tax proceeds; • Approved and authorized the Chair to sign the Resolution of Tentative Award for this project, as required by the State Revolving Fund Loan; • Approved and authorized the Chair to sign the contract on behalf of the Board of County Commissioners, subject to final review by the County Attorney and the State; and • Authorized the Manager to execute individual change orders within the limit of his authority ($250,000) up to the extent of the project budget. I. Approval of Contract with Saringsted, Incorporated The Board approved a contract for the purpose of conducting an executive search for a County Manager, and authorized the Chair to execute the contract. j. Change in BOCC Regular Meeting Schedule for 2013 The Board considered one change in the County Commissioners' regular meeting calendar for 2013, as follows: - Moving the location of the Monday, December 2, 2013 BOCC meeting FROM Central Orange Senior Center TO the DSS Meeting Room, Hillsborough Commons, Hillsborough, due to the availability now of the DSS meeting room (the Toy Chest program is not scheduled to start until a later date). 6. Public Hearings a. Zoning Atlas Amendment—Keizer Rezoning of 2.7 Acre Parcel —3604 Southern Drive—Public Hearing Closure and Action (No Additional Comments Accepted) The Board received the Planning Board recommendation, considered closing the public hearing, and considered a decision on an owner-initiated Zoning Atlas Amendment to rezone a 2.7 acre parcel of property located at 3604 Southern Drive (PIN 9844-86-5155) from Rural Residential (R-1) and Light Industrial (1-1) to Light Industrial (1-1) in accordance with the provisions of the Unified Development Ordinance (UDO). Michael Harvey said the purpose is to re-convene a public hearing on the Keizer re- zoning. He said the property is currently split zoned light industrial and residential; Keizer is seeking to have the entire property zoned light industrial. He said the applicants have expressed concern over their continued ability to have septic and parking to support the existing industrial operation on the residentially zoned portion of the property. He said Keizer is seeking to rectify the problem by extending the existing industrial zoning over the entire property to ensure their perpetual ability to maintain existing infrastructure necessary for the business. He said there were no comments during the previous public hearing and only one comment, in favor of the applicant, in the intervening period.