Loading...
HomeMy WebLinkAbout2014-225 Planning - Volkert Inc. for Transportation Best Practices Investigation $4,500 Aeo� [Departmental Use Only] TITLE FY - NORTH CAROLINA SERVICES AGREEMENT UNDER$90,000.00 ORANGE COUNTY This Services Agreement(herinafter"Agreement"), made and entered into this�day of May, 2014, ("Effective Date") by and between Orange County, North Carolina a body politic and corporate of the State of North Carolina (hereinafter, the "County") and Volkert, Inc., (hereinafter, the "Provider"). WITNESSETH: That the County and Provider, for the consideration herein named, do hereby agree as follows: 1. Services a. Scope of Work. i) This Agreement is for services to be rendered by Provider to County with respect to (insert type of project): Transportation Best Practices Investigations. ii) By executing this Agreement, the Provider represents and agrees that Provider is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. iii) Time is of the essence with respect to this Agreement. iv) The services to be performed under this Agreement consist of Basic Services, as described and designated in Section 3 hereof. Compensation to the Provider for Basic Services under this Agreement shall be as set forth herein. 2. Responsibilities of the Provider a. Services to be provided. The Provider shall provide the County with all services required in Section 3 to satisfactorily complete the Project within the time limitations set forth herein and in accordance with the highest professional standards. b. Standard of Care. i) The Provider shall exercise reasonable care and diligence in performing services under this Agreement in accordance with the highest generally accepted standards of this type of Provider practice throughout the United States and in accordance with applicable federal, state and local laws and regulations applicable to the performance of these services. Provider is solely responsible for the professional quality, accuracy and timely completion and/or submission of all work related to the Basic Services. Revised 9/13 1 ii) Provider shall be responsible for all errors or omissions, in the performance of the Agreement. Provider shall correct any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional cost to the County. iii) The Provider shall not, except as otherwise provided for in this Agreement, subcontract the performance of any work under this Agreement without prior written permission of the County. No permission for subcontracting shall create, between the County and the subcontractor, any contract or any other relationship. iv) Provider is an independent contractor of County. Any and all employees of the Provider engaged by the Provider in the performance of any work or services required of the Provider under this Agreement, shall be considered employees or agents of the Provider only and not of the County, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Provider. v) Provider agrees that Provider, its employees, agents and its subcontractors, if any, shall be required to comply with all federal, state and local antidiscrimination laws, regulations and policies that relate to the performance of Provider's services under this Agreement. vi) If activities related to the performance of this Agreement require specific licenses, certifications, or related credentials Provider represents that it and/or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. vii) In determining the basic services to be provided, should any documents be referenced in this Agreement, the terms of this Agreement shall have priority in any conflict between the terms of referenced documents and the terms of this Agreement. Should a request for proposals and a proposal be referenced the terms of the request for proposals shall have priority over the terms of any proposal. 3. Basic Services a. Basic Services. The Services to be rendered pursuant to this Agreement are as follows (fully describe services to be provided): Transportation Best Practices Investigations relative to how other counties in North Carolina and other states deal with traffic impact, transportation infrastructure requirements, and implementation practices in economic development districts. See Attachment 1: Proposal with Scope of Services included. See Attachment 2: Firm Profile and Project Team Resumes. 4. Duration of Services a. Term. The term of this Agreement shall be from May 15 to July 31, 2014. b. Schedulinfz of Services. Revised 9113 2 i) The Provider shall schedule and perform its activities in a timely manner. ii) Should the County determine that the Provider is behind schedule, it may require the Provider to expedite and accelerate its efforts, including providing additional resources and working overtime, as necessary, to perform its services in accordance with the approved project schedule at no additional cost to the County. iii) The Commencement Date for the Provider's Basic Services shall be May 15, 2014.. 5. Compensation a. Compensation for Basic Services. Compensation for Basic Services shall include all compensation due the Provider from the County for all services under this Agreement except for any authorized Reimbursable Expenses which are defined herein. The maximum amount payable for Basic Services shall not exceed four thousand five hundred Dollars ($4,500). Payment for Basic Services shall become due and payable within thirty (30) days of Provider properly invoicing County. Payment shall be subject to provisions of Section 5(b). b. Disputes. In the event the amount stated on an invoice is disputed by the County, the County may withhold payment of all or a portion of the amount stated on an invoice until the parties resolve the dispute. Should Provider fail to perform its duties under the terms of this Agreement, County may, without fault or penalty, withhold any payment associated with the work to be performed until such time as said work is completed. c. Additional Services. County shall not be responsible for costs related to any services in addition to the Basic Services performed by Provider unless County requests such additional services in writing and such additional services are evidenced by a written amendment to this Agreement. 6. Responsibilities of the County a. Cooperation and Coordination. The County has designated (Craig Benedict, Planning Director) to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager and/or the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. 7. Insurance a. General Requirements. Provider shall obtain, at its sole expense, Commercial General Liability Insurance, Automobile Insurance, Workers' Compensation Insurance, and any additional insurance as may be required by Owner's Risk Manager as such insurance requirements are described in the Orange County Risk Transfer Policy and Orange County Minimum Insurance Coverage Requirements (each document is incorporated herein by reference and may be viewed at http://oran eg countync.gov/purchasing/contracts.asy). If Owner's Risk Manager Revised 9/13 3 determines additional insurance coverage is required such additional insurance shall consist of N/A (if no additional insurance required mark N/A as being not applicable). Provider shall not commence work until such insurance is in effect and certification thereof has been received by the Owner's Risk Manager. 8. Indemnity a. Indemnity. The Provider agrees to defend, indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Provider except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Provider to indemnify the County to the fullest extent permitted under North Carolina law. 9. Amendments to the Agreement a. Changes in Basic Services. Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the County and the Provider. The Provider shall proceed to perform the Services required by the Amendment only after receiving a fully executed Amendment from the County. 10. Termination a. Termination for Convenience of the County. This Agreement may be terminated without cause by the County and for its convenience upon seven (7) days' prior written notice to the Provider. b. Other Termination. The Provider may terminate this Agreement based upon the County's material breach of this Agreement; provided, the County has not taken all reasonable actions to remedy the breach. The Provider shall give the County seven (7) days' prior written notice of its intent to terminate this Agreement for cause. c. Compensation After Termination. i) In the event of termination, the Provider shall be paid that portion of the fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the County due to errors or omissions of the Provider. ii) Should this Agreement be terminated, the Provider shall deliver to the County within seven (7) days, at no additional cost, all deliverables including any electronic data or files relating to the Project. d. Waiver. The payment of any sums by the County under this Agreement or the failure of the County to require compliance by the Provider with any provisions of this Agreement or the waiver by the County of any breach of this Agreement shall not constitute a Revised 9/13 4 waiver of any claim for damages by the County for any breach of this Agreement or a waiver of any other required compliance with this Agreement. 11. Additional Provisions a. Limitation and Assignment. The County and the Provider each bind themselves, their successors, assigns and legal representatives to the terms of this Agreement. Neither the County nor the Provider shall assign or transfer its interest in this Agreement without the written consent of the other. b. Governing Law. This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. c. Compliance with Laws. Provider shall at all times remain in compliance with all applicable local, state, and federal laws, rules, and regulations including but not limited to all anti-discrimination laws. Pursuant to the terms of North Carolina General Statute 153A-449(b) no county may enter into a contract with a contractor unless the contractor and the contractor's subcontractors comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Where applicable, failure to maintain compliance with the requirements of Article 2 of Chapter 64 of the General Statutes constitutes Provider's breach of this Agreement. By executing this Agreement Provider affirms Provider is in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. d. Dispute Resolution. Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non-performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County,North Carolina. It is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. The Parties may agree to nonbinding mediation of any dispute prior to the bringing of such suit or action. e. Entire Agreement. This Agreement represents the entire and integrated agreement between the County and the Provider and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. f. Severability. If any provision of this Agreement is held as a matter of law to be unenforceable, the remainder of this Agreement shall be valid and binding upon the Parties. g. Ownership of Work Product. Should Provider's performance of this Agreement generate documents, items or things that are specific to this Project such documents, items or things shall become the property of the County and may be used on any other project without additional compensation to the Provider. The use of the documents, items or things by the County or by any person or entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. Revised 9/13 5 h. Non-Appropriation. Provider acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable and not appropriated for the performance of County's obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Provider of the unavailability and non-appropriation of public funds. It is expressly agreed that County shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County's statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects County's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Provider of such limitation or change in County's legal authority. i. Notices. Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Provider's Name Attention: Craig Benedict David Allsbrook, Jr. PE, P.O. Box 8181 Senior Vice President Hillsborough,NC 27278 Volkert, Inc. 5540 Centerview Drive Raleigh,NC 27606 [SIGNATURE PAGE TO FOLLOW] Revised 9/13 6 IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal, all as of the day and year first above written. ORANGE C;a;nger Y PROVIDER�°u" unty 09 5eniar ylcl Yas;caen�' Printed Name and Title This ins ent been app ed as to technical content. raig Berpdict,Department Director This instrument has been pre-audited in the manner required by the Local Government Budget and FW Control Act. O ce of the Chief Financial Officer This ' t 7 has approved as to form and legal sufficiency. oPle of the ounty Attorney Revised 8/13 7 Attachment 1 Volkert, Inc. VOLKERT 5540 Centerview Drive,Ste 305 Raleigh,NC 27606 Office:919.854.0344 Fax: 919.854.0355 www.volkert.com May 2,2014 TO: Abigaile Pittman,AICP Transportation/Land Use Planner Orange County Planning&Inspections Department 131 W.Margaret Lane,Suite 201,Hillsborough,NC 27278 FROM: Terry Snow,PE J SUBJECT: Proposal for c o vel ment District—Task A:Best Practices Investigations PROPOSAL NO.: 4R 8 INTRODUCTION Pursuant to our conversation on April 241h,our meeting on April 281h,and following conversation today,Volkert is pleased to submit this proposal to provide Task A:Best Practices Investigations relative to how other counties in North Carolina and other states deal with traffic impact,transportation infrastructure requirements,and implementation practices in economic development districts. The following services will be provided by Volkert for Task A:Best Practices Investigations. SCOPE OF SERVICES Volkert will undertake the following sees,*s t-of Task A:Best Practices Investigations • Investigate through internet research,telephone calls,and emails other counties in North Carolina and in other states to determine how these counties deal with traffic impact,transportation infrastructure requirements,and implementation practices for development projects in their counties,particularly in economic development districts or similar economic development zones. Counties in North Carolina who will be researched include, but not limited to, Mecklenburg County and Brunswick County. Volkert will investigate up to four(4)counties in order to get an acceptable sample set. • Volkert will prepare a brief DRAFT Technical Memorandum outlining the investigation process, methodologies, counties analyzed,findings of these investigations,and recommendations to Orange County. Volkert will submit this DRAFT Technical Memorandum via email in pdf format to Orange County for review and comment. • Volkert will attend up to one(1)meeting with Orange County staff to review the findings and the DRAFT Technical Memorandum. • Upon receipt of Orange County's review comments,Volkert will make the appropriate modifications to address Orange County's review comments and submit final,sealed Technical Memorandum via email in pdf format to Orange County. SCHEDULE &FEE Volkert will undertake the aforementioned scope of services for a lump sum fee of$4,500. Volkert will begin work after receipt of a fully executed Agreement and will submit the DRAFT Technical Memorandum within 14 calendar days following receipt of Notice to Proceed. Upon receipt of Orange County's review comments,Volkert will make the necessary changes and submit the final,sealed Technical Memorandum within 5 calendar days. On behalf of Volkert,I want to personally thank you for the opportunity to submit this Proposal. If you find this Proposal acceptable,we will be happy to enter into an agreement with Orange County. We can use our standard Owner-Engineer Agreement or use an agreement developed by Orange County. If desirable,we will be happy to provide scope of services for Task B.Corridor Conceptual Planning-Roadway Classifications/Cross Sections and Task C.Legal Ordinance Review/Recommendations. If you have any questions or if we can provide additional information,please contact me or Will Letchworth,PE at 919.854.0344 or terry snow( volkert com /will Ietchworthgvolkert.com. cc: Proposal File &-2 Office Locations:Birmingham,Foley,Mobile,Montgomery,Alabama • Chipley,Ft.Myers,Gainesville,Pensacola,Tampa,Florida Atlanta,Columbus,Georgia • Collinsville,Wheaton,Illinois • Baton Rouge,New Orleans,Slidell,Louisiana Jackson,Mississippi • Jefferson City,Missouri • Raleigh,North Carolina • Harrisburg,Pennsylvania Chattanooga,Nashville,Tennessee • Alexandria,Chesapeake,Virginia • Washington,D.C. VOLKERT A`°R °® CERTIFICATE OF LIABILITY INSURANCE F5ATE 9(2014 ' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Kristen Davidson Greyling Insurance Brokerage PHONE (']70)552-4225 NC Na:(866)550-4082 AIC. 450 Northridge Parkway E-MAIL no ola@ re lin ADDRESS: err Y• Y g Y g.com Suite 102 INSURERS AFFORDING COVERAGE NAIC# Atlanta GA 30350 INSURERA.Valley Forge Insurance Company 0508 INSURED INSURER B:TranS ortation Insurance Co. 20494 Volkert, Inc. INSURERC:Catlin Insurance Company - 19518 3809 Moffett Road INSURER D: P.O. BOX 7434 INSURER E: Mobile AL 36607 INSURERF: COVERAGES CERTIFICATE NUMBER:*13-14 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUB POLICY EFF POLICY EXP LTR POLICY NUMBER MM/DD/YYYY MM/DD/YYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 AMAGE TO RENTED X COMMERCIAL GENERAL LIABILITY P DREMISES Ea occurrence $ 300,000 A CLAIMS-MADE a OCCUR 5084967879 11/1/2013 11/1/2014 MED EXP(Any one person) $ 15,000 X Contractual Liability PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,000 POLICY X PRO LOC $ AUTOMOBILE LIABILITY Ea COMBINED SINGLE LIMIT 1,000,000 A X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED 084967817 11/1/2013 11/1/2014 BODILY INJURY Per accident $ AUTOS AUTOS ( ) X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE $ AUTOS Per accident $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000,000 B EXCESS LIAB CLAIMS-MADE AGGREGATE $ 10,000,000 DED I X I RETENTION$ C 5084967770 11/1/2013 1/1/2014 $ B WORKERS COMPENSATION X WC STATU- OTH- AND EMPLOYERS'LIABILITY Y/N ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 500,000 OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) 084967722 1/1/2013 11/1/2014 E.L.DISEASE-EA EMPLOYE $ 500,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 500,000 C Professional Liability D 196314-0714 7/28/2013 7/28/2014 per Claim $10,000,000 Aggregate $10,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) Re: Project #431512.16 - Transportation Best Practices Investigations CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Orange County ACCORDANCE WITH THE POLICY PROVISIONS. Abigaile Pittman 131 W. Margaret Lane AUTHORIZED REPRESENTATIVE Hillsborough, NC 27278 Gregg Bundschuh/JERRY ACORD 25(2010/05) (D 1988-2010 ACORD CORPORATION. All rights reserved. INS025 i9olons)ni Tha Ar npin n-and Inn^pro rcnicfcrarl marirc of Arinp 1 COMMENTS/REMARKS Complete Named Insured: Volkert, Inc. David Volkert & Associates, Inc. Volkert Construction Services, Inc. David Volkert & Associates Engineering, P.C. Volkert Environmental Group, Inc. Volkert Management Services, Inc. Volkert, P.C. Allied Engineering & Testing, Inc. Volkert Engineering, PC OFREMARK COPYRIGHT 2000, AMS SERVICES INC. Attachment 2 VOLKERT X 1 93q? j NORTH CAROLINA ENGINEERING, PLANNING, CONSTRUCTION, INSPECTION & ENVIRONMENTAL CONSULTING p i 3 .� VOLKERT Volkert Vision vblkert Inc,founded in 1925,is a multi-disciplinarK fu0-service engineering and envirorvnental firm M are committed to respomfbly Improve the Mhestruch", that provides services to state departments of emironment and our stakeholden'gwery of lie through our legacy tramportation,fedora)agencies,local and of sustainable growth and employee owneah4L municipal governments. Volkert Mission Volkert h rated as one of the top engineering, planning,and environmental contuhkg firms In the • 7b rave the public In a prolasiorol arid treks)manner United States--ranking in the upper 7%of engineering . To saw our clients with qualRSt Innovation and honest wive design firms In the reran.The IO7J Engineering Alews- • 7b serve our empkryees through sustainable corporate gmwtk Record ranks Valkert It 18 of the Top S00 Design firms empayae ownoah4 and pasonaidevelopment in the United States. • 1b saw ourprohndon by prom ft the highest standards e/prxtke . lb save our neighbors through canomu ft swvke The companyr permanent staff of more than SW employees includes experienced civil,mucturat Volkert Cam Values mechanical and electrical engineers environmental scientists planners real estate services spedalishl CADD resigners surveyor;programkonsbuction managers Ethics carkv Rewons"tr and construction inspection personnel. 01,111 ft 8vpect Rdle618tY Safety Taamwork kldu+henen Headquartered in Mobile.Alabama,Volkert has additkmal offices located throughout the southeastern United states.Since opening our North caroAno office In 200X volkert has prowided exemplary engineering,planning,construction management asset management and bridge inspection services to the North Carolina Department of Tnnsportatimn,local governments,and private sector clients. 2 1 VOLKERT NORTH CAROLINA VOLKERT NORTH CAROLINA 3 OUR PEOPLE a i DaVid A.ANibrookr A RE M( Moysrs,RE. Lacy D.Low,RE. Mlarron Walk*r,RE. Twy fnov4 RE. WIN LaU wrorthr RE. Senior Vke President We Wesldent We PYesiderlt C9 m&ww Tw4wruWw Manager Trsn*wWbn EngkKw �t Mr.Albbmak swwdwMr de Mc Mnyars rrrwespas tbK�erts Norer Mc Lore has ow 3e lem a hk WArw has mer 30 Yom a We SnewM am lS Yaws d Ak.4KhworthhaavloyGm North Cambo Dwararma d CaNbes OMae opwadorb wd apNYKa to de Rampa Wiw' eq�are I.mot way ConfYa[4an aspw4Ke N Rwnbpfition a WelMno in emme ^e Trwspormhos to as.Yom Prior ereriwiq al whim a he ovemn AdtL w hu I=mJltplt iuKbn a Manumnn,we has senM ins elrEYwaArpyaN6rp,traMcsiYnal wd ion dwdne. in m*ft septw i w zm DMirp waleck for dM M dents I rdtrD whin NCDOTiKA&V mector whq of mw WHO Ncoo[rem ded0nbwdles raked OMda w t�b eb/icYryact fit yen asaMce.ne twW wdora Ike Nw&Caroms DroweneM a d Axel Mwxpwxa.State NOW nobly as a KoadwayConanKion ocwire shdrim aaridiererrrrtal aKdba,raft wmdwbn endrb L lwgmnmdon,are North Camife Mek nom Ergoeec Dk*W Engine KesdrK Enp.W and dwxno rkM kn~ ktwtectbn e0eratbm wrAees. C�MNM aEnonw. Torepke Aulhoft rwbrb Nardi Mink-ow D'iSM cols"Mmu—&V01w. tarilorsWka,balFCiwPad sipaal drrk0 wd dedgL Cii Dhkict Dg da DMim Er4WW CmK&s dhe and Mom FE%k amob tewIMPma kywice W&,warrer*ieadeWiwI% were,beds oalWoiyaswsmt ellawk Msycla and pedxeiw &JKKh WMW DeWitt Chkf wd wwxrow pkwm dmo.Prior faPwYdeodamL hk Lao Wood CEI practice in Nord CAMIAS Md"Pbrb.forrctianal rodeorrr obns.famillift a drL Rd* E;n' w4chief owoo.me w I*"Wke2 to wmd t 1 pat Wiewt in 2012 and cwkrrlk *Mn he awsew M mrwiruaO t, . ,.- r-de%WL PVW&air si1Ms.Oak b ailk JIM Iard Vam mt a Vice PmW m in with the Nord Cwoirx DePwtmrK swew a de lke hem'm for woewiry ow impection Prtdecb quaky,*sk now anabtk. wwapoelstlar plans for both 0Raber2Mwdopwk4Wkmt% alw0porktknkawdaga A"m naPwnM wM a loco for de NCDM 1ocsl gmw&wnb. a riprA6ciwowemitproYrwm. iw9e npYirnor4araswWfmO North cuvM&dsm N Mwdr roleskdrdkp WyM+ray Enpixw on mm awwpmwK Widpa and Prkek Scow doom Mr.brow wrr *prK dean dk fwwlllniym Mr.teK4eod1 IWO.he amip w the poebioe Of Aawdat Asshtwit KbidwK kepecddtK Parakm POOMWA ce oxmpkladw p mwft wddad" and Mwbpw MWWO syeW Imd Senior Ulm lv d Fewom" Enpinewin DMtbn y,KeddvK rwwprnwK Mtktwwce p ac&e b Norih Caroina with a Wgects iKiskV(wry Ka IMUdix, tar nkdretiap snd opwathm b the Eegbrear k DMsim S,and Stm mwkpwmmwdapwalbm. Fow$w qudw wmm ta sate awwpwesdon krpKb on dk oWrpwys waratrpiea,taasiuinP KoediwpeorWrucdon Enbirew. wd bd powrrerrentand prh'+ta fradd"kdm%ad ewrnmk d linrksee,Gewde.Horde After b^"NCDK Mr..Moyn sector d wft We m4mmilt"m dewlepnwd pffli- CwokwKnokmdefrwrrt. eerwdss,prgtttnwnpwfa iKide bMikw deealoprawK dent Kee Comracrk0 Kwepwworr WVW-Ikw prakct niwl,0wrxrrc 4 1 VOLKERT NORTH CAROLINA VOLKERT NORTH CAROLINA 1 6 OUR SERVICES TRAFFIC ENGINEERING ENVIRONMENTAL PLANNING Clients Wve relied n Voken far yeas to pmnde same rte aswmled tokens NEM espenenca nclodn pmwawn ef com9areai E,ukt unc Ipp otccha as complicated tramportadon motility&AL Q s Our (CIL Envwrmmental Anewrens(EA0.indvps d No Sgmkam knpact ta9k ergloaas ete kntoam for tlaetr kclatcel esprisa,l+actKa ptWet FoNse.Fmkontnta ktiPap Statements QtA.and Records of Decnork enentatiwo,and nt"aiman W dent needs.ihey art p 11I n 91OD).We arc.a:vetarted m prondrq ttnveaunenta services ka liege nit studies and dd9ms tan¢my bum slopk tnaf&ktp+ct and kanbiy studies smell trakpnaboa and ecology infrasonic twe projects under memo fine to canpba inekgent trandponaionm srslam fa m.jw Iteetwyi.lose constraints anti addms%such topics as wdvntand"tack trafk ad Vampalabo t wimm etem payvcl has wmnmt implications tat most ft eso dw faciibawE day Th"cow. S000-ec000nac stun •Emotommonas Rsom protect manages and adw staff focus sp.cial attention m tecaacal and •Comra no aacas •lodkect and eumJ.t"impacts community condnies and"pommitls.lbket staff hoe nKCMh* •Ecological to nwca •Naeammn mt&iab caepkted inowu and Wdoped snag xortYq rWeaod+ps With •Now and ak impacts •Riic iroaMnrnt • • J almmens SK IYSectia+69NCOW.local 9om em ms, wplenran9 oripamatlam,and Ses"W 110 MOAOIAOIl lanwits,dwekge, .ti t.,t •Section 9 V&wt maintains it core 91 of traffic enpewas spdaFrsq in opwbond - e nays.Walk control degyn.trampauenrgmaamenladadUhm REAL ESTATE SERVICES patiq st di s,acara runt studies.salty senam.and ITS and a e pond cape-We ham dtaaparbee dr,*W Orwgh handi**-MM As pan of our m,44bcgYned.fail wvtce appm.d le mudrq our acne' . both In the ofilm all in dw bald to investigate.evekete,and*O mot needs,Va9wrt ptoades mat awe seMces wlaN ncktdn Nlocation studio. etkcbu trallpormw mvmvemos sppree k apprised mviii negotiations,cosmos.Moatin&sill~ TRANSPORTATION PLANNING andcandastmdies,Vdklon aca and Sadedi tegdWM and his provided ppinalosay s WAS to etas. Nicant Raac ay9ntws and trampredet plums bow the capal iq depanumnts of tramporummi,ooames,munfrip+Nies.and pinata"dim. and topmost,a anst a moe rage of awes vAth sma9 and Wig area trampo11emn plan.III a mnMmddeE locta wr mpines and pkmws ASSET MANAGEMENT hive the c.p.6ity to pat Ion all modes of mororized and normotordd tried rib Iwo*panbrs0r dlrebpinq tiompdtemive brydt aid podebim Vnkel s a national leader n Alm Ntana9amn6 wO a vasty,of esiomar a IN municipal and stale dill gam,mulwrmd.l vanpaYbm pins for ens all age am congestion VokMS*pmt staff can provide me"suwcas n the co#Kwn and asntmmt of bamposation Aws rnaugaeent pas,and V"dwwd modekq.On on coaridor k A vw inckndkq the tandtion al mods,Mod9as,etawwk me,and roadside(tutu s to anise nmNcilositie,KOO$. have da ability ro polo ones Iucalloro mrdiey feesibiy puce,and exist ad stale agences to masons;info mad locations n akncamp scam teroraces.bales omp fu dhg nbtities wRh daft w th negating dw NM pacer mobkgr meads,smblic w4wistiore,and co mm*itl kPANhE and smi onunanW conddetabots.Vekms Math too—su f In significant woomoa n awe Management,pufumumov mamilam i.Wipe and TRANSPORTATION DESIGN asme m condomm,-vw^tiff-,cooing aid madow aawdsitp.and paadnprombonalwallmm At tw hart of Vokens twomy is our deign and tnginaadnp>«vins IN CONSTRUCTION ENGINEERING INSPECTION tra sportimn nfasvusae.our staff am fay capabb of developing tlnagn plat,spwk.n,end bid doaan me;kor Mgt and anal popcss M"ng %dun ofbrs a hA rwW of Contract Engewarng and nepecttm WWAS.Our staff ands,ftdi NODOT structtun,roadwag.hou walks.and gmammys for municipal and AM."s. tellKadonw end s erpebncad in dike impec9aL tedrq and record management for ma#AwA smidu ea, Key to ota pampdrteion design success Is 9e nst9mtiorn W comnKaBiy and wokin associated with pubic all pwate cawwckn work tbi.ct tededcom a*um plm,st ndads Militias thmtdmw dw deign pman kbddple stiff n the itakaplt cow and pMryca9n p,,,y„„anca by ksPetng woke It 0001111-WO twaaa.ravbw and nab*tnatukb diet ham construction epenance whh NCOOT and untied contractors,wleb ate iicappaeb into the work w men It"have been papacy tested par to ifKWW tips We retold 911 helps lo towee that the design plus fit the Ynotest ante the prajeta coo bat amount of wok arnpWd fa Ida n caaamr paymesb,n dal soap in mewing don mwwJPAWH tnmtruced in a safe.finely matmr and with a minimum of dww o den ate wimMutd 11w traspMabon work.Vakn staff ham a van pntdm of CE,eperknce rangkq ham sma1 murk pal pdewak old strut taaWmcrion Pmlacs n lingo vie wY pmpch. 6 1 VOLKERT NORTH CAROLINA VOLK E RI NORTH CAROLINA 1 7 OUR PROJECTS INSPECTION SERVICES FOR THE MUNICIPAL ON-CALL NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SERVICES TRANSPORTATION Vb*rt caaandy sass as an III tramorwtmn conbbam for semal tkekad fiaralns'Aa Narded"tadpactahh Savka teammate Ohaemd cites and towns In North Car*m Our pmA11001a beraca range from ; and o/trerlity swbn toadatown arkpnwtedndopmanu SWW It k%gun fteucwre4 pert'Docks.and Waffle Attatatebre rd m W desissmiiy fo ui on pm wdmg W and a fa+dia and madwsy located tlsospbuc the State 000541M" ad stand design.io Lxa on pv&v*rata and esttriaht II bus usmponadon dekawbtkh kackNde welrktbc Reedaatrwh,bicTda.bus Wftart has campmmd owe 70 task orders be data alder an anal a transit.and pannlger rate omdes to mahance the gusky of bete lo the needed cwncsfa fridge knmum"TWa it the North Crol ne comawnmes ate awe. Department of Taeaporlatran.We Aare held the contract since 2005.Our Or*of Wkern most hey h sppmaere Include the paean. contract coves the aspecorr,of bilges of WqM eke,vpet and locaons d a sense"CFI a4rem an the been to preside casvuctaWitp mews themoout do state and sporting the amuls uwV the VAGNS System Thk during the pWnmV and deals phew of the pmlects Haug a conswction work soctwas the ate at an aMesbrdw rtpKeon cram banoped,with pwwecdye aakq the ady papal stages when key dreseru rat made talks owhad and boat wok W.toummy part—badge dads ewakntmn ,lows the WAert mean and oat stems t0 make betlar clamed deoaont and WW path aspeekorm show the study ahanauas and pa"mal mgfeaedadah aoideam in Wduer,In the pate fond took.Vaal deploys apt camera and arearmorion,ca4.49mon neaaaa. mpWp computes b pefow our aspartias.VaAW cows a Rat Thermal The WAes tam moogniza that egagahg the pubic iNaso" krmgetrnaawlticb,a send to raw m sNwamiw4 mean d dammeraon dmlenglog.and Nwerdirg an as the acme Orm Whh the keen awmarms n concrete salvo¢caps,and decks Ow bridge ksprctiun meets am that some crezrs w more me ankWidy admncad than ahem oat public equipped with tagged.much screen canton compuws v1s&nt uses ow eagageovent technqua sad to be bath high Nch and high touch We eaperenae and tachnoloW te limn to anmwd of"he we wta read 10 dose Moss of traffic b perform our walk. and be awe b cosy d Wk effecteey ehoo emMn beta ands.such a. a nssom ur t aasad apps.TwaW,and IS-m my rank *0l OK. f face too as lean must W personal ad awtate magraatli that ha b lam ddcrsvohm an asentia 10 h"eflaGee LVIMYIdOf10m when tram k WESTERN WAKE EXPRESSWAY earmeb7 On asps and paaKryguuhbt Ow tsmwtrdemads that pubic mosport"is es WW to gar mg the Russ Of the cR¢tra we serve. W4et wen a nernber of a daipn buad tan do dmWed and mrapucted tw,Western Wkke EsprmNb North Casolawt tat modrn Rd bed. Wkart p9Nded the quality mard and around WAM on behalf ofthe WESTGATE ROAD DESIGN bat taatwe 'Dwhart MadM.ldrd Our gwbV control and nwtermk mataq VouP beaded Rw(9 angaaers,three(21 ol8oe pertonuel, Wiwi has been retekmd by Mum Marotta Mavek b owners and 35 teAviktbs.Ito Props,constructed IN 00 North C0001ftVIC" dengn plan and construction docuaam for tw relocation of Wafgae Authaef amrumd appamunmtdy 125 tram a Wgth,aKWed concrete Road ban V"9ae park Ddwe b Ebahee Church Road.a Rdegh. paaeamM,and at new brk"Ow CEigu f m w#itara Wakes EeDrenway North Cmins The project is appto>drawmy one(1)n le a 11-0 and waked as a pars at dm drips bad nee but perforated this dams of the include madway dmgn.Witlge dms�admak and Mhe tam deign, typical NCOW mspKton IRA On this pmoct.the adauca rag nsrser s hydraukc dm^sedamntatia and etaian canhof two W aloes wee n tithed by des sapid design and mr+atarman pace of the maka9ons.,uat k mated pbm ptraaamnt sum"pmaa.owman. pmalan.The project took ter 1Mn 3 Kos to bald and was coo Posted on and opkdon of pmo Ale construction ma Wlfam monsged sunconwiter s tow Mokert is pmhdent with wgkag m a fa-wad:onm Ise and who provided location surveys and geaecMiral tatkq tb*wt sal also prow aV wfwtnr resources and amence an needed to complete prepare the contractspeclfiotira and bid documents. a proJut on tour and wwafmh buffet 8 I VOLKER7 NORTM CAROLINA VOLKERT NOR7M CAROLINA I 9 OUR PROJECTS GUILFORD TECHNICAL COMMUNITY NCWTaaarin'sumg that,protect under a Owned ingemanueon COLLEGE TRANSPORTATION SERVICES '°fr°"h,Whisk wkw ttr`hniciamannaan:nemoymdpmroan legal and iega9 within a 66 aswooaerht using laptop msputars to Retard Mused istribum,dais viol ding digital piastres end GPS caadnatat.. ybitrt has been retained M GTCC m pNfam profesROnN trabporutksn Technicians are abo reviewing new ODA perm requests before WPMW by plefafahg and traffic ernpneerbg fervhcef for tM apamion of inter NCDOL titan bhelmg•Omf eupectpn mta de ODA sign b Is Due b the Pamadseah nmpn.Services proyiJed M taker[ahckded a fvnc�tbf W new federal krgaktbn,MAP-27,a dgnNwm number of mks of hghways underpin aid smea design which comuca the main assrom edt the new have ben added to Ma States NeoorW ltiglw"Systm and require NCDOT 6012 High Point Road centrist.The muldm oda!Street.network indhded b tagubu the bilb0ads on dose fauns Since this contract wits in ptat. iwa new accesses to GWkfd Cottage Mad.,rigts�n any aces stung NCDOT was able to khwage the b assign the adAdofel uak of invnnryitg siding High Point Mad,bro(2)Walk dries,tideswlia,maltase pads,and die falhmrds on the new rows.This mfwat has a two year win with a deoourtke halderpan bnthtents. am year re—S. Ybiaraimain sem us,design solution wan compkkd wth the goal of par d"a&ad elkient mmism"W466yarouhd M~w vdhle plamkg for the tubas omphs aapentios."wing a wdvbnned surest mawak was deemed artlW for impkmaeing GTCCk inner pion NCOOT ODA PROGRAM TECHNICAL i ADMINISTRATIVE ASSISTANCE taken lus prorikd sb tedatitiimsinte h*2012 ro assist NCDDT with ,��� the abatetraeon of the Ohsdw Adartisahrnt Pmgrm throughout the I:CAiAiie'a' more Control of ad—edwfating sgns aRe ntprad n mordna with nKa-0Are.tiN the fednat t4lr'Mr Beautification Am NCDOT has rWded tha stars,it"sac ragor Vales whno m am baud st Mpcdy thrm*mut tom and are aspo smle for ask"the NCDOT ODA Program Manager m order to coaply.Ah State and Federal law Sinn this was a new ouaohacmg am fa NCOOL Vokeft staff Recessed inat d 4avuhg by the DepaOnnt on the apeaatbs of the prograrrh wharf,trades:1)Measure,i tuarr ary of ODA condoled roues and Sink fed+'^2)inquits roman wontd)t 1)Proses end nvestgeting few ODA so pama nequems.a)Proms and amestpau ikga will,S)mmmih erd update NCOOT Dbtrkt OI&e 8M 6)Kop Sate ODA Coordinator bdormad of all ODA issrur.2)Bemnhe fafriiier with burl aodrg ordinances and burl mus hobrs.6)CsoNinu with NCDOT ROW dpatmnt an projects with ODA sign.91 Assist work the Selective Npeute furthoval Pemltt Appkada0.IM Asan in the adhldnbtratron of ant mrklyd Control Act 11)lanaigmts, vegetate cubing.and 12)Omer adrhnatraiat dudes as)6ntMied ley"COOT. 10 1 VOLKERT NORTH CAROLINA VOLKERT NORTH CAROLINA I it f 1 r ,`t 5 540 Centerview Drive Suite 305 27606 Rai eg54-.034R�355 {fax} (919} p (919} 854 ralei volkert-com WWW,volkert.com � c w VOLKERT Terry M. Snow, P.E. Professional Qualifications Education: B.S. Civil Engineering, N.C. State University Professional Registrations: NC P.E. #019838 Significant Experience: Mr. Snow has over 25 years of experience in transportation engineering/planning, traffic signal design/studies, railroad grade crossing studies, environmental documentations, feasibility/corridor studies, traffic impact analysis, traffic control/pavement marking plans, functional roadway/interchange design, parking, air quality analysis, noise analysis, and public involvement programs. Volkert, Inc., Transportation Manger: Manages the transportation planning and design practice in North Carolina focusing on quality services to state and local government and private sector clients. Responsibilities include business development, client relationships, financial performance and transportation engineering/planning project management. Wilbur Smith Associates/CDM Smith: Served as Vice President and Area Manager for the North Carolina, South Carolina, and Tennessee Region where he led the transportation sales, business development, financial management, and client service for transportation projects. He managed NEPA, bridge design, roadway design, transportation planning, and traffic engineering projects for NCDOT, local governments, and private clients. Neel-Schaffer: Served as Office Manager and Principal-in-Charge for Neel-Schaffer's operations in North Carolina where he was responsible for business development, financial management, project management, and project delivery for traffic engineering, transportation planning, roadway design, and structure design projects. Kubilins Transportation Group: Served as Office Manager and Principal-in-Charge for Kubilins Transportation Group's operations in North Carolina where he was responsible for business development, financial management, project management, and project delivery for traffic engineering and transportation planning projects. Wilbur Smith Associates, Senior Transportation Engineer/Marketing Director: Served as Senior Transportation Engineer where he managed NEPA, traffic engineering, l VOLKERT transportation planning, roadway design, and bridge design projects. He also managed business development and marketing activities for the southeastern US. Frank Coleman&Associates/BAKK Engineers/RUST Environment&Infrastructure: Served as Project Engineer for NEPA, traffic engineering, transportation planning, roadway design, bridge design, air quality, and noise analysis projects in North Carolina, South Carolina, and Virginia. Prolect Experience-Pedestrian and Bicvcle Plans Waynesville Pedestrian Plan, Waynesville, North Carolina (2008 —2010): Mr. Snow served as the project manager on the project.This comprehensive pedestrian plan for the Town of Waynesville included date collection and assessment, review of existing facilities/conditions, evaluation of existing plans, policies and procedures, pedestrian survey, development of a pedestrian system, facility standards and guidelines project development, ancillary facilities and programs and implementation plan, pedestrian plan mapping, and public meetings and workshops. City of Salisbury Comprehensive Bicycle Plan Salisbury, North Carolina (2007 — 2008): Mr. Snow served as principal-in-charge responsible for oversight of the project. This project involved the data collection and mapping of the proposed sidewalks, bike routes, and multiuse paths as part of the bicycle plan for the town. The needs of the bicycle plan were created by digitizing the linkages and routes that were addressed by the residents, visitors, local bike clubs, and the Bicycle Steering Committee. The purpose of the plan is to develop a dynamic and comprehensive planning tool which will focus on the city's growth strategies and facility needs and assist in the expansion, promotion, and funding of safe and efficient bicycle facilities, programs, and initiatives throughout the city. Prolect Experience-Transit& Rail Studies/Desidn East Guilford Track Separation Study, Guilford County, North Carolina (2004): Mr. Snow served as the project manager on this project. This analysis covers the 25 at-grade rail crossings along the proposed high speed rail corridor that will pass through Guilford County. Each at-grade crossing was analyzed relative to existing and projected vehicular traffic; existing and projected freight, commuter, and passenger rail service; existing and projected pedestrian and bicyclist traffic; accident history; and existing and projected land uses. Recommendations for closure, upgrading, and grade separating were provided for each location. 2 VOLKERT Commuter Rail Corridor Crossing Study, Research Triangle Park, North Carolina (2003): Mr. Snow served as the project manager on this project. This analysis of 26 at- grade rail crossings along the proposed commuter speed rail corridor in Wake, Durham, and Orange counties. Each at-grade crossing was analyzed in relation to existing and projected vehicular traffic; existing and projected freight, commuter, and passenger rail service; existing and projected pedestrian and bicyclist traffic; accident history; and existing and projected land uses. Recommendations for closure, upgrading, and grade separating were provided for each of the 26 locations. This information was Included in the environmental impact statement required for the entire commuter rail project. Project Experience-Malor Land/Economic Development Studies Caleb's Creek Transportation Study, Forsyth County, North Carolina (2011 —2013): Mr. Snow served as the principal-in-charge responsible for comprehensive traffic capacity analysis and the development of a transportation assessment of a proposed 1,800-acre mixed-use development. The project involved the collection of traffic data;distribution and assignment of projected traffic; assessment of levels of service using both Synchro and High Capacity Software, coordination with local government, state government, and private developers; and establishment of design concepts for both traditional and non- traditional design guidelines. NOAA PacMc Region Master Plan, Honolulu, Hawaii (2006): Mr. Snow served as the project manager on the project. The transportation study is for the development of a master plan for the NOAA Pacific Region on Ford Island in Pearl Harbor. Access to the secured facility was a key issue in the study. Other transportation study elements included transit plans, bicycle and pedestrian access and mobility, parking supply and demand, parking lot layout, access design recommendations, and signage. Soltis Site Selection Services, North Carolina,Florida,and Illinois(2005—2006): Mr. Snow served as the project manager on the project. The project involved zoning data collection, geo-referencing, digitizing, and mapping North Carolina, Illinois, and Florida (Tampa and Orlando Region). CDM Smith created a zoning GIS database for all zoning types that would support Soltis' target development. The database was created by compiling and digitizing the municipal and county zoning maps for selected cities and counties in those states. Hampton Pointe (NC 86) Improvements, Hillsborough, North Carolina (2002): Mr. Snow served as the project manager on the project. The project was a traffic capacity analysis report, preparation of signal warrant analyses for three intersections, roadway design plans, and traffic signal designs for a 0.25-mile section of NC 86 for the 1-85 interchange to the Hampton Pointe Shopping Center Driveway. 3 VOLKERT Protect Experience- Transportation Feasibility Studies/Corridor Studies Lewisville Williams Road Traffic Study, Forsyth County, NC (2007-2008): Project Director who participated in detailed traffic analyses and conceptual design of the western portion of a 1-way loop in the downtown area of Lewisville. This analysis also considered the future operations of the Williams Road/US 421 interchange and recommended future alternatives to handle the projected 20-year traffic. A series of roundabouts and new location street was selected as the preferred alternative. Dow Road Corridor Study, Carolina Beach and Kure Beach, North Carolina (2008— 2009): Mr. Snow served as the project manager on the project. The project involved a corridor feasibility study for the widening of a 3-mile section of an existing 2-lane Dow Road, as well as a 2-mile extension on new alignment. The project also included pedestrian and bicycle facilities including sidewalks and a multiuse path along the entire corridor. The majority of the project study area was within the Military Ocean Terminal Sunny Point Blast Buffer. There are extensive cultural resources, as well as various unique natural habitats in the project area. Coordination with the Department of Defense (Air Force and Navy)was significant to getting the project on track. The stimulus for this project was to provide an alternative north-south through traffic route to U.S. 421 (Lake Park Boulevard), which traverses the heart of Carolina Beach and Kure Beach. It was desired to make U.S. 421 more of a pedestrian-friendly downgraded facility rather than a high-speed U.S. highway. Specific services provided include traffic data collection, traffic diversion studies, and corridor capacity analysis using Synchro, environmental screening, public and agency involvement plans, and conceptual designs. High Point One-Way Conversion Feasibility Study, High Point, North Carolina(2008 — 2009): Mr. Snow served as the principal-in-charge on the project, responsible for oversight. This project involved investigating the feasibility of converting the English Road/Kivett Drive and Green Drive/Russell Avenue one-way pair roadways to two-way operations, and applying identified road diet alternatives that retain the one-way patterns with enhanced parking, pedestrian use, and local access options without a substantial negative impact on traffic operations. Russ Avenue Corridor Study, Waynesville, North Carolina (2008—2009): Mr. Snow served as the project director for this project. This highly congested corridor with high crash rates caused by numerous driveway accesses. To enhance the traffic mobility, pedestrian safety, and aesthetics of the area, the project included data collection of existing conditions, base mapping, data verification and collection, capacity analysis, traffic modeling/simulation, identification of practical alternatives, access management strategies, alternatives presentation and selection, conceptual design plans, streetscape designs, cost estimates, and several public meetings and workshops. 4 VOLKERT Forum Parkway Connector, Rural Hall, North Carolina (2006): Mr. Snow served as a project engineer on the project. The project involved capacity analysis, environmental screening,functional roadway and bridge designs, and development of a feasibility study to address the possibility of constructing a connector road from Bethania-Rural Hall Road to University Parkway in Rural Hall. This facility will provide a connecting road from Bethania-Rural Hall Road to University Parkway. Extensive public involvement was also a part of this study. NC 150 Relocation, Summerfield, North Carolina (2006): Mr. Snow served as the project director on the project. The project involved traffic data collection, traffic capacity analysis using Synchro, environmental screening, conceptual design, and a feasibility study to provide a direct east-west extension of NC 150 to eliminate the dog-leg route in the U.S. 220 area in Summerfield. North Church Street Widening Feasibility Study,Greensboro, North Carolina(2005): Mr.Snow served as the project manager on the project. This corridor feasibility study was for the widening of North Church Street from West Wendover Avenue to East Cone Boulevard in Greensboro. This 1.8-mile-long section of North Church Street has experienced significant traffic increase in recent years and the numerous curb cuts have created accidents. The stimulus for this project was to improve vehicular safety and mobility, enhance pedestrian and bicycle mobility and safety,and to provide more efficient access management along the corridor. Specific services provided by CDM Smith included traffic data collection, corridor capacity analysis using Synchro and SimTraffic, functional designs, crash analysis, environmental screening, and an extensive public involvement program. U.S. 311 Connector Feasibility Study, Winston-Salem, North Carolina (2005): Mr. Snow served as the project manager on the project. The project was the development of a feasibility study to connect U.S. 311 from 1-40 to 1-40 Business Interstate, a distance of approximately 2.5 miles. This facility is extremely important to serve as a north-south connector for southeast Winston-Salem. However, the construction of this facility will impact an established residential community. Specific services provided by CDM Smith Include traffic data collection, corridor capacity analysis using Synchro and SimTraffic, environmental screening, crash analysis, access management analysis, conceptual design, and construction cost estimates. Parallel Road Traffic Capacity Analysis, Lewisville,North Carolina(2005): Mr. Snow served as the project manager on the project. The project involved helping the Town of Lewisville determine the viability of a 1-way loop in their downtown area. Tasks included a 20-year traffic forecast, performing capacity analysis on the existing network with current and projected traffic, assigning traffic to the one-way loop configuration, performing traffic 5 VOLKERT analysis on the one-way loop configuration, and presenting preliminary and final results and recommendations to residents of the town. South Elm-Eugene Street Widening Feasibility Study, Greensboro, North Carolina (2002 — 2003): Mr. Snow served as the project manager on the project. The project involved traffic capacity analysis and the development of a feasibility study for Improvements to Elm-Eugene Street from Vandalia Road to proposed Elmsley Drive in Greensboro. This project included widening Elm-Eugene Street into a 4-lane divided facility with landscaped medians and sidewalks along both sides. Specific traffic engineering services included access management, intersection analysis, and accident analysis. An extensive public involvement process was also an integral part of this project's success. Martin Luther King Jr. Drive Extension Traffic Operations and Feasibility Study, Winston-Salem, North Carolina(2002): Mr. Snow served as the project manager on the project. The project involved traffic capacity analysis and the preparation of a feasibility study for improvements to MLK Drive from Reynolds Park Road to 1-40 Business. MLK Drive, an existing 4-lane undivided facility, bisects the Winston-Salem State University campus. As a result of the WSSU Master Plan Update, which Neel-Schaffer, Inc. served as the transportation consultant, MLK Drive was recommended to be downgraded to a 2- lane divided facility with a landscaped median and parallel parking along each side. Decorative crosswalks,enhanced street lighting,wide sidewalks,and additional turn lanes at key intersections were key components of this important project. These changes enhance pedestrian safety and promote multimodal travel. Specific traffic engineering services provided include access management,coordinated signal progression study,and intersection analysis. Martin Luther King Drive Extension Feasibility Study, Winston Salem, NC (2008- 2012): Project Manager responsible for the feasibility study of examining the possibility of extending Martin Luther King, Jr. Drive in the northern part of downtown Winston-Salem to provide a northern gateway to the downtown area. Issues that were evaluated included wetlands, hazardous waste, surface waters, protected species, cultural resources, and significant impact on existing properties in the South End Historic District. Functional designs were completed and a comprehensive public involvement process was undertaken. Matthews/Stallings Comprehensive Transportation Plan, Matthews/Stallings, NC (2011-2012): Project Director for the development of a Comprehensive Transportation Plan for the Towns of Matthews and Stallings. This plan was prepared in response to the tremendous growth in the region and the expected future changes of the Monroe Bypass, which will dramatically affect the transportation system in these communities. 6 VOLKERT Dow Road Corridor Study, Towns of Carolina and Kure Beach, NC (200 8-2009): Project Director who participated In conducting a corridor feasibility study for the widening of a 3-mile section of the existing 2-lane Dow Road, as well as a 2-mile extension on new alignment. The project also included pedestrian and bicycle facilities including sidewalks and a multiuse path along the entire corridor. The majority of the project study area was within the Military Ocean Terminal Sunny Point Blast Buffer. There are extensive cultural resources,as well as various unique natural habitats in the project area. Coordination with the Department of Defense(Air Force and Navy)was significant to getting the project on track. The stimulus for this project was to provide an alternative north-south through traffic route to U.S.421 (Lake Park Boulevard),which traverses the heart of Carolina Beach and Kure Beach. It was desired to make U.S. 421 more of a pedestrian-friendly downgraded facility rather than a high-speed U.S. highway. Specific services provided include traffic data collection, traffic diversion studies, and corridor capacity analysis using Synchro, environmental screening, public and agency involvement plans, and conceptual designs. NC 96 Corridor Study,Zebulon, NC(2009): Project Director responsible for determining the number of lanes and type of access required to meet anticipated 2030 traffic volumes and to develop an access management plan that would provide reasonable access to both big box and smaller developments while maintaining safe and efficient traffic flow. The NC 96 corridor is a main corridor that provides access to northeastern Wake County and southwestern Franklin County; both experiencing significant residential development and increases in traffic flows and congestion. Lake Jeanette Road Widening Feasibility Study, Greensboro, North Carolina (2000 —2001): Mr. Snow served as the project manager responsible for traffic capacity analysis and the development of a feasibility study for widening Lake Jeanette Road from Lawndale Drive to North Elm Street. This project, initiated in December 2000, required the development of future year traffic projections using a regional traffic model,environmental screening of potential environmental constraints, projecting levels-of-service at intersections, developing functional designs, developing alternative alignments, establishing project cost estimates, and managing a public involvement process. In addition, the Lake Jeanette Road project required the development of streetscape treatments, including a roundabout and a traffic circle, which may serve as traffic calming measures. Extensive computer enhancement services used to develop renderings use in the public involvement process. Project Experience-Environmental Studies River Arts District Transportation Project-a Section of the Wilma Dykeman Riverway,Asheville, NC (2012-2013): Mr. Snow served as the project director for the EA/FONSI and preliminary engineering designs a 2.2 mile section of roadway that includes portions of Riverside Drive and all of Lyman Street. The project also includes 7 VOLKERT an extensive and comprehensive public involvement program with over 80 public engagement meetings. The was a complete streets project which including street widening, streetscapes,transit stops, river access,greenways, railroad crossings, pedestrian bridge, roundabouts, bike lanes,on-street parking,and utility upgrade. Piedmont Authority for Regional Transportation Park and Ride Lots, Triad Area, North Carolina (2008—2009): Mr. Snow served as the project manager on the project. The project involved client coordination, development of environmental documentation (categorical exclusions), construction administration, and Federal Transit Administration coordination for four park and ride lots in Lexington,Greensboro,Thomasville, Mount Airy, and Burlington. R-2514 U.S. 17 Jacksonville to New Bern, Onslow and Jones Counties, North Carolina (1995 — 2012): Mr. Snow served as the project director on the project. The project involves the design of roadway alternatives, alternative comparisons, the preparation of an environmental impact statement (EIS)/Section 4(f), and preliminary roadway designs for the widening of U.S. 17 from north of Jacksonville to south of New Bern in Onslow and Jones counties (approximately 22 miles). The project included the widening of existing segments along with numerous bypass alternatives around the towns of Belgrade, Maysville, and Pollocksville. The facility is planned as a 4-lane, divided high- speed roadway with full and partial control of access. The project also involved environmental justice, community impacts, noise, air quality, hydraulic analysis, archaeology, historical properties,water quality,erosion control,wetlands,and preliminary roadway designs, as well as an extensive public involvement program, which includes a toll-free hotline,newsletter,numerous small citizen group meetings,and public workshops. Additional Environmental Documents (1988 — 2002): Mr. Snow served as Project Manager or Project Engineer on the following projects where he authored environmental documentation: • US 64 EIS,Tarboro to Robersonville, Edgecombe and Martin Counties, NC • US 78 EA/FONSI,Aiken to Bamberg,Aiken, Barnwell,and Bamberg Counties, SC • US 78 Aiken Bypass EA/FONSI,Aiken County, SC • North Rhett Avenue Widening EA/FONSI, Berkeley County, SC • US 21 Widening EA/FONSI,Talladega County,AL Prolect Experience - Roadway, Sfdnin_g, Traffic Control, and Pavement Marking Desh n 8 VOLKERT Roadway, Signing, Traffic Control, and Pavement Marking Design, S.R. 1449, Cope Creek Road,Jackson County, North Carolina (2004—2006): Mr. Snow served as the principal-in-charge on this project. The project consisted of widening and realigning the existing road to improve geometry and enhance safety.Services included public meetings, preliminary design, right-of-way plans, and final design. U-4428 U.S. 64 Widening, Hendersonville, North Carolina (2004 — 2005): Mr. Snow served as the project manager on this project.The project involved traffic data collection, traffic operational analysis, Synchro/SIMTRAFFIC simulation modeling, and alternatives evaluation for the proposed improvements to U.S. 64 from Blythe Street to U.S. 25. The alternatives studied include widening of U.S. 64 to a 3-lane facility and an unbalanced couplet with Fifth Street.This project also included an environmental screening,functional designs, surveying, public involvement process, and report preparation. Final design plans were developed for the preferred alternative. Final designs included roadway design, drainage design, erosion and sedimentation plans, and signing and pavement marking plans. Carl Winner Drive Widening,Carolina Beach,North Carolina(2008—2009): Mr. Snow served as Project Manager for widening of Carl Winner Drive from Canal Drive to US 421. The designs included roadway widening plans, drainage design, sidewalks, signing, pavement marking plans, and traffic control plans. Burke Mill Road Realignment, Winston-Salem, North Carolina (2003 — 2006): Mr. Snow served as the principal-in-charge on this project.The project consisted of relocating the existing road from U.S. 158 to east of Griffith Street. Typical section varied from three lanes to a 5-lane curb and gutter section. Final design included two traffic signals and a Norfolk Southern Railroad Crossing. U.S. 15-501 Improvements, Durham County, North Carolina (2002): This project consisted of widening the existing U.S. 15-501 business including acceleration/deceleration lanes and a new leftover at Weymouth Street in Division Five. Project Experience-Traffic Impact Studies Project Manager or Project Engineer, Traffic Impact Studies, Various Locations, North Carolina, South Carolina, Hawaii (1994-2014): Mr. Snow served as either the project manager or project engineer for more than 500 traffic impact studies for varied developments ranging from small apartment complexes to major multiuse, phased developments with millions of square feet of commercial and industrial space and thousands of dwelling units. As part of these studies,Mr.Snow has performed intersection analysis using Highway Capacity Software, Synchro, and SimTraffic. Capacity and safety improvements are recommended, involving traffic analysis, traffic distribution, trip 9 VOLKERT generation, development of report, traffic counts, roadway geometrics, traffic signals, access management, model splits consideration, and transportation demand management techniques. Agency and client coordination is a valued-added service Mr. Snow offers to gain approval for the developments and meet governmental agency needs of safety and efficiency. Currently serves as on-call traffic engineer for the towns of Lewisville,Zebulon, Hillsborough, and Wake Forest. Professional Leadershin/Activides Fellow, Institute of Transportation Engineers Member, Southern District Institute of Transportation Engineers—Section Director (2000-2004) Members, North Carolina Section Institute of Transportation Engineers—President 1999, Board of Directors 1993-2004,Administrative Council Chair, 2014 Member, Raleigh Engineers Club—President 1997, Board of Directors 1994-1997 Member, American Society of Highway Engineers, National Conference Local Arrangements Chair 1999 Member, North Carolina Economic Developers Association Member, American Consulting Engineering Council — Transportation and Legislative Committees Publications/Presentations Snow,T."Wilma Dykeman Riverway River Arts District Transportation Project—A Success Story", Southern District Institute of Transportation Engineers, Charlotte, North Carolina, April 2013. Snow,T."Wilma Dykeman Riverway RiverArts District Transportation Project—Integrating Public Art in a Complete Streets Project", North Carolina Section Institute of Transportation Engineers, Raleigh, North Carolina, October 2012. Snow,T."Wilma Dykeman Riverway RiverArts District Transportation Project—Integrating Public Art in a Complete Streets Project", American Society of Civil Engineers, Asheville, North Carolina, October 2011. Snow, T. "Transportation Engineering —A Career To Consider", Riverside High School, National Engineers Week, Durham, North Carolina, February 2011. Snow, T. "Order of the Engineer Keynote Address —What It Means to be an Engineer, North Carolina Agricultural and Technical State University, Greensboro, North Carolina, February 2009. 10 VOLKERT Snow, T. "Successful Interviewing...Leading The Pack." North Carolina Agricultural and Technical State University Institute of Transportation Engineers Student Chapter, Greensboro, North Carolina,April 2004. Snow, T. "Successful Interviewing...Leading The Pack." North Carolina Agricultural and Technical State University Institute of Transportation Engineers Student Chapter, Greensboro, North Carolina,April 2004. Snow, T. "Successful Interviewing...Leading The Pack." North Carolina Section Institute of Transportation Engineers Student Chapter, Raleigh, North Carolina,April 2003. Snow, T. "Resumes and Interviews—A Focus on College Graduates." presented at North Carolina State University, Raleigh, North Carolina, May 1999. Snow, T. "Networking=Success." North Carolina Section Institute of Transportation Engineers Newsletter,April 1999. Snow, T. "Innovative Public Involvement Programs — A Fresh Perspective." Southern District Institute of Transportation Engineers Annual Conference, Memphis, Tennessee, June 1998. Civic and Community Leadershi"ctivides International Special Olympics —Basketball and Swimming Transportation Venue Coordinator—1999 Bull City Little League—President 2011-2012, Board of Directors 1994-2012 District 6 Little League—Board of Directors 2011-2012 11 VOLKERT William E. Letchworth, P.E. Professional Qualifications EDUCATION: M.S. Civil Engineering, N.C. State University 2004 PROFESSIONAL REGISTRATIONS: NC P.E. #033718 SC P.E.#26823 Hl P.E. #13232 FL P.E. #76764 WORK EXPERIENCE: Volkert, Inc., Transportation Planner: July 2013—Current Transportation planning and design practice in North Carolina focusing on quality services to state and local government and private sector clients. Responsibilities include business development, client relationships, financial performance and transportation engineering/planning project management. CDM Smith: 2004-2013 Client Services Manager for North Carolina, responsible for business development, project financial performance, project quality and client satisfaction. Specialized in traffic impact studies, traffic simulation modeling, intersection operations analyses, signal timing and design, GIS analysis, bicycle and pedestrian plans and parking studies. PROFESSIONAL AFFILIATIONS: Institute of Transportation Engineers Transportation Research Board North Carolina State University Civil Engineering Departmental Fellow AWARDS: North Carolina Section of ITE Young Professionals Award 2006 North Carolina Section of ITE Presidents Award 2010 Letchworth,William E. Page 1 of 11 VOLKERT PROJECT EXPERIENCE —TRANSPOTATION IMPACT STUDIES: Project manager and/or engineer; Mr. Letchworth has been responsible for performing more than 100 transportation impact studies for varied developments ranging from small apartment complexes to major multiuse, phased developments with millions of square feet of commercial and industrial space and thousands of dwelling units. Intersection analysis is conducted using Highway Capacity Software, Synchro, and SimTraffic. Capacity and safety improvements are recommended, involving traffic analysis, traffic distribution, trip generation, development of report, traffic counts, roadway geometrics, traffic signals, access management, model splits consideration, and transportation demand management techniques. Agency and client coordination is a value-added service offered by Volkert to gain approval for the developments and meet governmental agency needs of safety and efficiency. Developments for which Mr. Letchworth has performed Transportation Impact Studies include: • Apex Rock Climbing Facility, Apex, NC • Arcadian Shores, Myrtle Beach, SC • Bishops Landing, Wake Forest, NC • Battleground Avenue/Horse Pen Creek Road Development, Greensboro, NC • Belgreen Development, Durham, NC • Bradford Prepatory Academy, Mecklenburg County, NC • Buffaloe Road/Forestville Road TIA, Raleigh, NC • Buffaloe Road Shopping Center, Raleigh, NC • Burlington Marketplace, Burlington, NC • Calebs Creek, Kernersville, NC • Cardinal State Bank, Hillsborough, NC • Cary Quick Serve, Cary, NC • C.E. Perry Middle School, Sampson County, NC • Colleton County Coal Ash Landfill, Colleton County, SC • Cone Maple Street, Raleigh, NC Cree Expansion, Durham NC • Davie County Medical Center, Davie County, NC • Dillard Drive, Cary, NC • Ellis Road Apartments, Durham, NC • Empire Street and Regency Drive, High Point, NC • Endeavor Charter School, Wake Forest, NC • Eno River Townes, Hillsboro, NC • EWA Industrial Park, Oahu, HI • Forest Ridge, Wake Forest, NC • Goose Creek, Brunswick County, NC • Guilford Technical Community College, Guilford County, NC • Harris Teeter Willowdale, Durham, NC • High Point Road, Greensboro, NC • Kamilonui Residential Development, Hawaii Kai, HI • Kapolei West, Kapolei, HI Letchworth,William E. Page 2 of 11 VOLKERT • Kapolei Commons, Kapolei, HI • Kapolei Commercial Development, Kapolei, HI • Kapolei Spectrum Center, Kapolei, HI • Kidds Hill TIA, Raleigh, NC • Kitt Creek Commons, Durham, NC • Kohea Loa, Honolulu, HI • Lawndale Mixed-use Development, Greensboro, NC • Lions Gate Subdivision, Clayton, NC • Maple Medical Complex, Greensboro, NC • Martin-Marietta Jamestown Quarry, Jamestown, NC • Mattingly Subdivision, Rolesville, NC • McCrimmon Comers, Cary, NC • McIntyre Site, Wake Forest, NC • Mimosa Bay, Onslow County, NC • NC 55 Site, Durham, NC • NC 55 Daycare, Durham, NC • NC 68-150, Greensboro, NC • Northwood High School, Pittsboro, NC • Ocean Plaza, Carolina Beach, NC • Ocean Isle Palms, Ocean Isle, NC • Okatie Crossing, Beaufort County, SC • Old Apex Road Apartments, Durham, NC • Oxford Road Family Fare, Durham, NC • Paradise Surfside, Carolina Beach, NC • Park Place Development, Carolina Beach, NC • Pilot at Sedgefield, Greensboro, NC • Pine Hollow Commons, Clayton, NC • Ramsey Office Complex, Fayetteville, NC • Randolph County Landfill, Randolph County NC Regency Development, High Point, NC • Seascape at Wrightsville Beach, NC • Sea Wynde Development, Brunswick County, NC • Shotwell Road Development, Clayton, NC • Shotwell Road/U.S. 70, Clayton, NC • Siler City Elementary, Siler City, NC • Singh Development, Cary, NC • Summit Church, Durham, NC • SYSCO Facility, Selma, NC • Villages at Turtle Creek, Pender County, NC • Waikikian Development, Honolulu, HI Wake Med Heart Bed Tower, Raleigh, NC • Wake Union Place, Wake Forest, NC • Washington Terrace, Durham, NC • Wayne Prepatory Academy, Wayne County, NC Letchworth,William E. Page 3 of 11 VOLKERT Mr. Letchworth has also served as project manager responsible for the review of traffic impact studies for various municipalities in North Carolina, including the Town of Knightdale, Town of Mebane, Town of Waxhaw, Town of Hillsborough, and Town of Zebulon PROEJCT EXPERIENCE — PEDESTRIAN AND BICYCLE PLANS North Wilkesboro Pedestrian Plan, North Wilkesboro, NC (2007-2008)— Project manager responsible for the development of a pedestrian plan for the Town of North Wilkesboro. This project was funded as part of a grant from the North Carolina Department of Transportation Bicycle and Pedestrian Planning Grant Initiative. Town of Leland Comprehensive Bicycle Plan, Leland, NC (2007-2008) — Assistant project manager responsible for the development of an areawide bicycle plan. Focus of the plan was identification of feasible on-and off-road improvements to make cycling safer in Leland. Bikeway design included conformance to AASHTO guidelines and context sensitive bikeway design. Led bicycle planning and pubic outreach program. The needs of the bicycle plan were created by digitizing the linkages and routes that were addressed by the residents, visitors, local bike clubs, and the Bicycle Steering Committee. PROEJCT EXPERIENCE—TRANSPOTATION PLANNING/FEASIBILITY STUDIES: Nicol Investment Due Diligence Research (2013)— Project manager responsible for the analysis of internal and external circulation patterns, pedestrian networks, parking availability and accessibility, and overall site safety at 6 apartment complexes throughout the United States in support of Nicol Investment's due diligence process prior to purchase of the complexes. Town of Zebulon Comprehensive Transportation Plan Update (2013)-Project manager for the update the of the Town's comprehensive transportation plan in an effort to more closely align the Town's goals and current development patterns with future travel forecasts and required roadway cross sections. FAMPO Southwestern Cumberland County/ Northeastern Hoke County Multi-Modal Congestion Plan (2012)- Project manager for the development of a joint transportation and land use plan that accounts for the future growth anticipated in Cumberland and Hoke Counties Matthews/Stallings Comprehensive Transportation Plan, Matthews/Stallings, NC (2011-2012)—Project manager for the development of a Comprehensive Transportation Plan for the Towns of Matthews and Stallings. This plan was prepared in response to the tremendous growth in the region and Letchworth,William E. Page 4 of 11 VOLKERT the expected future changes of the Monroe Bypass, which will dramatically affect the transportation system in these communities. Pittsboro Comprehensive Transportation Plan, Pittsboro NC (2011)-Project manager for the development of the highway elements of the Comprehensive Transportation Plan for the Town of Pittsboro. As project Manager, Will coordinated all planning, modeling, and public involvement activities with NCDOT and the Town. North Carolina Ferry System Study, Eastern North Carolina (2011)— Project manager for the development of a study for the NCDOT Ferry Division to develop a tolling structure, including pricing for all seven of the NC Ferry System routes. As the project manager,Will served as the point of contact, led the data collection efforts, developed the revenue models, and participated with NCDOT in public meetings and appearences before the NC Legislature's Joint Transportation Oversight Committee to present the options for meeting the legislative revenue mandates. Wendover Avenue Interchange Replacement, Greensboro, NC (2011) Project manager responsible for a traffic analysis to determine the feasibility and the associated traffic operations of eliminating the existing Wendover Avenue/Westover Terrace interchange ramps and constructing an at-grade intersection on Wendover Avenue. As the project manager, Will served as the point of contact, coordinating all communication, scheduling, and product completion for the client. Laurie Ellis Road Extension Feasibility Study,Winterville, NC (2008-2009)— Project manager responsible for conducting a feasibility study for the extension of Laurie Ellis Road to Reedy Branch Road in Winterville. The stimulus for this project was to improve vehicular safety along NC 11 by providing an east-west roadway, thereby reducing turning movements on NC 11. Services being provided include traffic data collection, corridor capacity analysis, conceptual designs, crash analysis, and public involvement. NOAA TIAR Update, Honolulu, HI (2008-2009)— Project manager retained by Fukunaga and Associates to assist in planning for future developments at the NOAA facility on Ford Island. As a continuation of previous work this project involves traffic analysis on the single access point to the Island on Kamehameha Highway, including the planning for an additional right-turn lane, which, if necessary, would require the relocation of several high-tension power lines. Mr. Letchworth was also asked to examine the functionality of the Aiea interchange and the intersection of Kamehameha Highway and Salt Lake Boulevard. Letchworth,William E. Page 5 of 11 VOLKERT Keaau Pahoa Traffic Forecasts, Honolulu, HI (2007-2009)— Project manager responsible for developing a project level traffic forecast, including design data, for 23 intersections along an approximately 10-mile section of Keaau-Pahoa Road on the Big Island of Hawaii. North Carolina Turnpike Authority Project R-3329/11-2559 (Monroe Connector/Bypass), Union and Mecklenburg Counties, NC (2008)—Assistant project manager responsible for the preparation of NEPA-level traffic forecasts for 48 total "Build-Toll" and "Build Non-Toll" scenarios for the planned Monroe Connector/Bypass in Mecklenburg and Union counties. North Carolina Turnpike Authority Project U-4738 (Cape Fear Skyway), Brunswick and New Hanover Counties, NC (2008)—Assistant project manager responsible for the preparation of NEPA-level traffic forecasts for 18 total "No-Build," "Build-Toll," and "Build Non-Toll"scenarios for the planned Cape Fear Skyway in Brunswick and Hanover counties. Town of Leland Parks, Recreation and Open Space Master Plan, Leland, NC (2006-2008)— Project designer responsible for creating a guide for Leland to meet the parks, recreation, and open space needs for the next five years and identify a long-range plan for the next 10 years. Plan included policies and recommendations on ways to preserve and acquire land, establish water access, and create an open space system. Pine Ridge Drive Analysis, Whispering Pines, NC (2007)— Project manager responsible for the analysis of approximately 2.3 miles of roadway to determine ways to improve pedestrian, bicycle, and vehicular operations and safety. This project also involved working with the public and Village Council to educate them on the impacts of two approved residential developments and to aid in the design of the neighborhood access points. Triangle Turnpike Investment Grade Study, Wake and Durham Counties, NC (2006)— Project designer participating in a roadside travel-demand surveys at 12 locations in western Wake County and eastern Durham County. Also responsible for speed-delay surveys and traffic volume data collection in the study area to assist in the development of traffic forecasts for the proposed Triangle Turnpike. Soltis Site Selection Services, North Carolina, Illinois, and Florida (2005- 2006)—Assistant project manager responsible for zoning data collection, geo- referencing, digitizing, and mapping North Carolina, Illinois, and Florida (Tampa & Orlando Region). Project involved creating a zoning GIS database for all zoning types that would support Soltis' target development. The database was created by compiling and digitizing the municipal and county zoning maps for selected cities and counties in those states. Letchworth,William E. Page 6 of 11 VOLKERT North Carolina Toll Authority Preliminary Traffic and Revenue Studies, North Carolina (2005)— Phase manager responsible for data collection in support of eight preliminary traffic and revenue studies for the North Carolina Turnpike Authority. Data collection activities included speed-delay runs, mechanical tube counts, turning movement counts, and roadside travel demand surveys. Penny Road Extension Feasibility Study, High Point, NC (2004-2005)— Project engineer participating in environmental screening, traffic analysis functional design, cost estimating, and facilitation of public involvement meetings for the proposed extension of Penny Road. The stimulus for this project was to establish a parallel collector road to alleviate congestion on NC 68 in northern High Point. PROJECT EXPERIENCE—TRAFFIC ENGINEERING: 1-485 Charlotte Outer Loop Design-Build, Mecklenburg County, NC (2010- 2014)—This 5.1-mile section will extend the northern urban loop around Charlotte and part of Huntersville. The project includes an 8-lane freeway on new alignment from west of NC 115 to west of 1-85. As the lead traffic engineer, Mr. Letchworth was responsible for the traffic capacity analysis, signal design, mergeldiverge analysis, cable routing, and the interchange modification report for the DDI. U-2800 Macy Grove Road Design-Build, Kernersville, NC(2012)—This project involves the widening of Macy Grove Road from Industrial Park Drive to Old Greensboro Road including the construction of an interchange at 1-40 and bridge crossings over the Norfolk Southern Railroad and East Mountain Street. As lead traffic engineer in support of the shortlist proposal development efforts, Will led the development of Alternative Technical Concepts and the development of future lane configurations and traffic control. R-49021-485 Widening Design-Build, Charlotte, NC (2012)—This project involves the widening of 1-485 from 1-77 to Rea Road. As lead traffic engineer in support of the shortlist proposal development efforts, Mr. Letchworth led the development of Alternative Technical Concepts and the development of future lane configurations and traffic control. NCDOT Traffic Data Collection On-Call, NC (2010-2011)—Project manager for the collection of mechanical tube counts in the vicinity of various rail crossings throughout North Carolina. City of Folly Beach Traffic Study, Folly Beach, SC (2009)— Project designer participating in a traffic study of area roadways to develop recommendations Letchworth,William E. Page 7 of 11 VOLKERT aimed at providing safer and more efficient traffic flow and circulation, more clearly delineated bicycle and pedestrian paths, and more efficient and controlled parking. NC 96 Corridor Study, Zebulon, NC (2009)— Project manager responsible for determining the number of lanes and type of access required to meet anticipated 2030 traffic volumes and to develop an access management plan that would provide reasonable access to both big box and smaller developments while maintaining safe and efficient traffic flow. The NC 96 corridor is a main corridor that provides access to northeastern Wake County and southwestern Franklin County; both experiencing significant residential development and increases in traffic flows and congestion. Dow Road Corridor Study, Towns of Carolina and Kure Beach, NC (2008- 2009)— Project engineer who participated in conducting a corridor feasibility study for the widening of a 3-mile section of the existing 2-lane Dow Road, as well as a 2-mile extension on new alignment. The project also included pedestrian and bicycle facilities including sidewalks and a multiuse path along the entire corridor. The majority of the project study area was within the Military Ocean Terminal Sunny Point Blast Buffer. There are extensive cultural resources, as well as various unique natural habitats in the project area. Coordination with the Department of Defense (Air Force and Navy)was significant to getting the project on track. The stimulus for this project was to provide an alternative north-south through traffic route to U.S. 421 (Lake Park Boulevard), which traverses the heart of Carolina Beach and Kure Beach. It was desired to make U.S. 421 more of a pedestrian-friendly downgraded facility rather than a high-speed U.S. highway. Specific services provided Include traffic data collection, traffic diversion studies, corridor capacity analysis using Synchro, environmental screening, public and agency involvement plans, and conceptual designs. South Carolina 30 (James Island Connector) at S-404(Calhoun Street) Intersection and Operation Study, Charleston, SC (2009)— Project designer who participated in a study that served as a follow-up from an original June 2007 study, which addressed SCDOT's comments and determined the need for future mitigation measures. This traffic analysis determined road and operational improvements for three scenarios: 2009 existing conditions, 2009 existing conditions(ultimate), and future 2030 conditions. Intersection, arterial, and operational improvements were developed for each scenario to mitigate the existing and future queuing along Calhoun Street, hazardous weaving movements along Calhoun Street, and the future connectivity of 4t' Street to Calhoun Street. Ala Moana Boulevard Pilot Program, Honolulu, HI (2008-2009)— Project manager, responsible for the development of the state's first Pilot Program to test Letchworth,William E. Page 8 of 11 VOLKERT the efficiency of various improvements along Ala Moana Boulevard. The Pilot Program includes analysis prior to the opening of the new Hilton tower, converting the new access to a right-in/right-out, and then converting the new access to a full movement signalized intersection. Speck services included peak hour turning movement traffic counts at nine intersections, pedestrian volume counts, travel speed and delay using GPS technology, throughput time- space analysis, saturation flow rate determination, control delays, and 95th percentile queue length calculations. A detailed technical report was developed to clearly convey the findings of the study. Mr. Letchworth presented the findings of the 3-phased studies to the City of Honolulu and Hawaii State Department of Transportation. Town of Carolina Beach Traffic Circulation Study and Pavement Marking Plan, Carolina Beach, NC (2008-2009)— Project manager responsible for the townwide traffic circulation study. The goal of the study was to identify operational and roadway improvement recommendations so U.S. 421 (Lake Park Drive) could be reduced from a 4-lane undivided thoroughfare to a 24ane median divided facility. Integrating the recommended land use changes with the transportation improvement plan was essential. Specific services performed included peak hour turning movement traffic counts, capacity analysis using SimTraffic and Synchro 7.0, intersection, roadway, traffic calming, streetscape improvement recommendations, and on-street parking recommendations. Lewisville Williams Road Traffic Study, Forsyth County, NC (2007-2008)— Project manager responsible for detailed traffic analyses and conceptual design of the western portion of a one-way loop in the downtown area of the Town of Lewisville. This analysis also considered the future operations of the Williams Road/U.S. 421 interchange and recommended future alternatives to handle the projected 20-year traffic. Hilton Hawaiian Village Transportation Simulation Study, Honolulu, HI 2005-2006 —Served as project designer responsible for development of ( ) P j 9 Synchro and SIMTRAFFIC simulation model and traffic operation optimization for a 1.5-mile-long section of Ala Moana Boulevard in Waikiki Beach. The study area included numerous unsignalized and signalized intersections along this primary thoroughfare in one of the busiest parts of Honolulu. Other services provided include peak hour traffic counts, travel time, speeds, and delay studies using GPS technology, street widening and turn lane recommendations, context sensitive solution recommendations, pedestrian mobility analysis and recommendations, transit services analysis and recommendations, report preparation, and presentations to HDOT, City of Honolulu, and citizen interest groups. Parallel Road Traffic Study, Lewisville, NC (2005)— Project designer responsible for helping the Town of Lewisville determine the viability of a one- Letchworth, William E. Page 9 of 11 VOLKERT way loop in their downtown area. Tasks included a 20-year traffic forecast, performing capacity analysis on the existing network with current and projected traffic, assigning traffic to the one-way loop configuration, performing traffic analysis on the one-way loop configuration, and presenting preliminary and final results and recommendations to town residents. Downtown Wilmington Traffic Study, Wilmington, NC (2005)—Project designer responsible for determining the traffic impacts of a proposed convention center, marina, hotel, and medical testing facility in downtown Wilmington. Tasks included traffic data collection, the development of a traffic forecast for the area, traffic modeling using SYNCHRO and SIMTraffic, and the development of recommendations pertaining to vehicular and pedestrian traffic in the area. South Dakota Avenue Corridor Study, Washington, DC (2005-2007)—Project designer responsible for the analysis of a 3.5-mile corridor in northeast Washington, DC focusing on improving pedestrian, bicycle, and vehicular mobility and safety. This project involved extensive traffic modeling, conceptual design, and public involvement. Village of Fiat Rock Master Growth Plan, Flat Rock, NC (2004)- Project designer responsible for the traffic data collection, traffic projections, intersection analysis, and a parking accumulation study for the transportation component of the Master Growth Plan. Synchro/SIMTRAFFIC traffic model was used to visually present the transportation plan alternatives for the village center at the public information meetings. Other services provided include traffic data collection, conceptual roadway widening design development, traffic calming design concepts, prioritization and implementation strategies, and cost estimating. PROEJCT EXPERIENCE—ENVIRONMENTAL STUDIES: River Arts District Transportation Project a Section of the Wilma Dykeman Riverway, Asheville, NC (2012-2013)— Mr. Letchworth provided traffic forecasting and analysis and played a major role in the public involvement efforts as part of a team preparing an EA/FONSI and preliminary engineering designs a 2.2 mile section of roadway that includes portions of Riverside Drive and all of Lyman Street. The project also includes an extensive and comprehensive public involvement program. R-4707 U.S. 29/Eckerson Road interchange Reconstruction, Greensboro, NC (2003-2009) - Project designer participating in the NEPA environmental documentation, preliminary design, traffic analysis, and public Involvement process for the reconstruction of the U.S. 29/Eckerson Road interchange. Carey Road Environmental Constraints Analysis, Kinston, NC (2007)— Project manager responsible for performing an Environmental Constraints Analysis for extension of Carey Road in Kinston. This analysis identified and Letchworth,William E. Page 10 of 11 VOLKERT evaluated known and potential environmental constraints to the extending of an existing roadway. Issues that were evaluated included wetlands, hazardous waste, surface waters, protected species, cultural resources, and land use. PROEJCT EXPERIENCE —TRANSIT STUDIES AND DESIGN: CAT Passenger Amenity Design, Raleigh, NC (2011-2013)— Project Manager for the design of passenger amenities at multiple transit stops throughout the City of Raleigh for the Capital Area Transit system. DATA Passenger Amenity Design, Raleigh, NC (2011-2013)— Project manager for the design of passenger amenities at multiple transit stops throughout the City of Durham for the Triangle Transit Authority and Durham Area Transit Authority. TTA Bus Route Design Services, Raleigh, Durham, Apex, and Cary, NC (2005)—Project designer responsible for transit ridership surveys, GIS mapping survey results, GIS mapping route changes, and conducting public involvement programs to assess local needs for transportation and discuss transit alternatives. PROJECT EXPERIENCE—ROADWAY DESIGN: Westgate Road, Raleigh, NC (2013-2014)—Project manager responsible for the development of 100% design plans, construction specification, contract documents, and engineers estimate of probable cost for the realignment of Westgate Road in Raleigh, NC. This facility is planned to be 2-lane facility on 65 foot of right-of-way and is being relocated to allow additional room for the expansion of the Martin Marietta quarry just to the south of the facility. This facility also includes one structure to allow for the crossing of mining vehicles underneath Westgate Road as well as signal modification designs for two traffic signals along Westgate Road. Lewisville Roundabout, Lewisville, NC (2012-2013) — Project manager responsible for the development of 100%design plans, construction specification, contract documents, and engineers estimate of probable cost for a new 2-lane roundabout at the intersection of Shallowford Road and Williams Road in Lewisville, NC. Letchworth,William E. Page 11 of 11 ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245-2575 P O Box 8181 (919) 644-3002 (FAX) a Hillsborough, NC 27278 www.orangecountync.gov °'► c• •`'' -Sam1 INTER-OFFICE MEMORANDUM DATE: May 9, 2014 TO: Michael Talbert, Orange County Manager FROM: Craig Benedict, Planning & Inspections Director RE: Contract for transportation best practices investiga ns ion economic development districts Orange County has adopted access management plans for its economic development districts to address current and future access management strategies. Recent development efforts in the Buckhorn EDD area have revealed the need for revisions to the Buckhorn EDD Access Management Plan (AMP) due to the presence of sensitive environmental areas. Additional work must also be done to ensure that the County's access management strategy is as technically and legally sufficient as possible with respect to requiring dedication and/or reservation and construction, and providing guidance to developers. To this end, revisions will need to be to done to the County's Unified Development Ordinance (UDO), and future roads in the EDD will be required to be incorporated in State and MPO transportation plans to ensure legal implementation and enhance possibilities for State project funding. Monies were planned for these activities in this current year budget. Three key categories of steps have been identified for addressing these issues: 1. Environmental Consulting Services to perform a series of environmental tasks in identified areas of the Buckhorn EDD. The purpose of this would be to assist staff in revising the proposed access routes in these areas with some certainty of viability and to provide legal support for implementation of the Buckhorn EDD AMP. Additionally, the environmental knowledge gained will assist in economic development marketing efforts and provide guidance to developers in these areas. Contract to complete this step was forwarded for routing on 5/2/2014 — FY '13 214 $31,650 2. Transportation Consulting Services to perform a series of tasks to develop legally defensible criteria for requiring dedication and/or reservation and construction of roads in EDD. Task A of these services would be a Transportation Best Practices Investigation; Task B would be Corridor Conceptual Planning — Roadway Classifications/Cross Sections; and Task C would be the Legal Ordinance Recommendation/Review. Contract to complete Task A attached — FY '13 — '14 $4,500 Subsequent contract for Tasks B and C — FY '14 — '15 $23,850 3. Land Use /Access Management Plan Revisions by Staff to the Buckhorn EDD AMP, incorporative future arterial roads in the EDD in State and MPO transportation plans, develop local collector and sub-collector street plans, and complete needed revisions to the UDO to legally link and justify the overall access management strategy. Completed in-house with existing staff. Total cost for consulting services is not expected to exceed $60,000. cc: Clarence Grier, Assistant County Manager/Chief Financial Officer John Roberts, County Attorney