Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agenda - 05-27-2014 - C1
3 ORANGE COUNTY BOARD OF COMMISSIONERS AND PLANNING BOARD QUARTERLY PUBLIC HEARING ACTION AGENDA ITEM ABSTRACT Meeting Date: May 27, 2014 Action Agenda Item No. C.1 SUBJECT: Class A Special Use Permit — Solar Array off Mt. Sinai Road in Chapel Hill Township DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) Yes ATTACHMENT(S): 1. Application Packet 2. Property and Vicinity Map 3. Staff Comments 4. Notification Materials and Certification INFORMATION CONTACT: Michael D. Harvey, Planner III (919) 245 -2597 Patrick Mallett, Planner II (919) 245 -2577 Craig Benedict, Director (919) 245 -2575 PURPOSE: To hold a quasi-judicial public hearing and receive comment on a Class A Special Use Permit application in accordance with Section 2.7 Special Use Permits and Section 5.9.6 (C) Solar Array - Public Utility of the Orange County Unified Development Ordinance (UDO). A quasi-judicial hearing means that testimony is sworn and evidence must be competent and substantial. Hearsay or unsubstantiated opinions are not sufficient testimony. Board members are also prohibited from engaging in conversations with anyone on the merits of project outside of the public hearing process. Such conversations, commonly referred to as `ex -parte communications' are prohibited. BACKGROUND: On December 20, 2013 staff received an application proposing the development of a solar array on 2 parcels of property totaling approximately 50 acres in area owned by Shelia Bishop, Michael Bishop, and Annie Nunn. The basic facts of the application are as follows: Applicants: Sunlight Partners LLC, Shelia Bishop, Michael Bishop, and Annie Nunn Owners: Shelia Bishop, Michael Bishop, and Annie Nunn Agent(s)- Sunlight Partners 4215 East McDowell Road Suite 212 Mesa, AZ 85215 0 Michael S. Fox (Project Attorney) Tuggle Duggins P.A. 100 N. Greene Street Suite 600 Greensboro, NC 27401 Location: Off of Mt. Sinai Road with access via Cascade Drive. Please refer to Attachment 2 for a vicinity map of the project. Parcel Information: a. PIN(s): 9881 -38 -8874 and 9881 -49 -3072. b. Size of parcel(s): Approximately 50 acres. i. PIN 9881 -38 -8874 is approximately 44 acres in area. ii. PIN 9881 -49 -3072 is approximately 5.4 acres in area. Approximately 19.93 acres of properties will be encumbered by the proposed solar facility as denoted on the submitted site plan. c. Township: Chapel Hill. d. Zoning: Rural Buffer (RB). The properties are not located within a Watershed Protection Overlay District. e. Future Land Use Map Designation: Rural Buffer. f. Growth Management System Designation: Rural. g. Joint Land Use Plan Designation: Rural Buffer — Rural Residential Area h. Existing Conditions /Physical Features: The 5.4 acre parcel has an existing structure located on it, which appears to be used as a residence. Both properties have areas of existing vegetation with trees achieving an average height of anywhere from 20 to 40 feet. The larger parcel has existing vegetation as well as pasture area throughout. There are two streams in the southern portion of the properties that are required to have the natural area on either side of the stream bank preserved in accordance with the provisions of Section 6.13 Stream Buffers of the UDO. i. Roads: The properties have frontage along Mt. Sinai Road. The larger parcel also has frontage along Cascade Drive. Vehicular access for the project is proposed to be off of Cascade Drive. Surrounding Land Uses: a. NORTH: Undeveloped property approximately 128 acres in area, single - family residential lots zoned RB. b. SOUTH: Mt. Sinai Road, Triangle Land Conservancy and Duke Forest Property, and single - family residential lots zoned RB. 5 c. EAST: Single- family residential lots, large undeveloped parcels of property zoned RB. d. WEST: Cascade Drive, single - family residential lots zoned RB. Proposal: The applicant is proposing to develop a Solar Array - Public Utility on the aforementioned properties. As detailed within Attachment 1, the applicant is proposing to erect individual solar array panels on the northern portion of the properties. The Bishop's, who are one of the applicants for this project, will have approximately 1 acre of their 5 acre parcel of property encumbered by individual panels. The array will be approximately 200 feet from an existing structure on the property. A typical array is 6 to 10 feet in height, with approximately 2' to 3' feet of ground clearance depending on the panel angle. The arrays will be screened by existing vegetation and any installed landscaping as depicted on the submitted site plan. An 8 foot high chain link security fence shall enclose the perimeter of the array to prevent access. Gravel paths /drives will be installed around these arrays in order to permit technicians to service the panels. The applicant is indicating they will observe a 50 foot landscaped buffer along the property lines abutting residentially zoned property as required by the UDO. They will also leave the southern portion of the site (outside the security fencing) undeveloped. Vehicular access to the site is restricted by an access gate off of Cascade Drive. The applicant is not proposing to develop a business, habitable structures, or other similar office facilities on the property. Therefore, no septic or well systems are proposed, or required, as part of the project. According to the applicant the New Hope Volunteer Fire Department and Orange County EMS will be provided a key to access the site in the event of an emergency. An overhead, medium voltage, power line will be installed on the west of the identified leased area allowing the proposed facility to tie into the power grid via the existing electrical substation to the west of the property. Ordinance Requirements — Class A Special Use: in accordance with Section 5.9.6 (C) (2) Solar Arrays of the UDO, the project is required to demonstrate compliance with the following standards of evaluation: (a) All on -site utility and transmission lines shall, to the extent feasible, be placed underground. STAFF COMMENT. Based on language provided on the site plan the applicant is proposing to adhere to this requirement. (b) The height of proposed arrays and support structures shall not exceed 40 feet. STAFF COMMENT. Data on the submitted site plan, specifically the typical rack height elevation, indicates the height of the racks will be approximately 6 -10 feet from ground elevation. No other support structures, other than utility poles, are proposed. (c) Individual arrays /solar panels shall be designed and located in order to prevent reflective glare toward any inhabited buildings on adjacent properties as well as adjacent street rights -of -way. STAFF COMMENT. Detail in the application narrative indicates the applicant will comply with this provision. A (d) A clearly visible warning sign concerning voltage must be placed at the base of all pad- mounted transformers and substations. STAFF COMMENT. Note(s) on the site plan indicate warning signs shall be erected as required by the UDO. (e) All mechanical equipment of principal solar energy systems including any structure for batteries or storage cells, shall be completely enclosed by a minimum eight (8) foot high fence with a self - locking gate, and provided with screening in accordance with the provisions of Section 6.8. STAFF COMMENT. The site plan indicates the site shall be enclosed by an 8 foot high security fence around the entire perimeter. A 50' wide Landscape Buffer with screening materials will be provided around the northern, eastern and western property lines of the project (i.e. adjacent to residentially zoned property). The southern property line will be remain undeveloped. (f) The applicant shall submit proof of liability insurance covering bodily injury and property damage demonstrating a minimum coverage limit of $ 500,000.00 per occurrence. STAFF COMMENT. The narrative provides language denoting the applicant's compliance with this provision. (g) A Type D Land Use Buffer shall be provided along any portion of the perimeter of the parcel, easement, or leasehold area located adjacent to property zoned, or otherwise utilized for, residential use except where such property is owned, leased or consists of other utility easements currently used for electrical distribution or transmission purposes. Existing vegetation may be used to satisfy the landscaping requirements. STAFF COMMENT. The site plan provides sufficient information demonstrating land use buffering requirements will be met. In reviewing the request with other County departments, the following comments have been received- 1 . The Sheriff's Department has indicated the proposed development will not require existing patrol patterns to be altered. 2. Orange County Emergency Services (EMS) staff has confirmed the New Hope Volunteer Fire Department will provide fire services and that EMS will provide emergency medical services. They do not believe the request will create a service provision problem for them. 3. There are no septic or well systems proposed for the property. As a result Orange County Environmental Health has indicated they have no concerns. 4. The Planning Department and the Department of Environment, Agriculture, Parks, and Recreation (DEAPR) staff has reviewed the proposal and determined the request, if approved, will have no significant impact to existing habitat area warranting special consideration or protection based on information contained within the Inventory of Natural Areas and Wildlife Habitats for Orange County North Carolina. 5. Orange County Solid Waste has indicated the request, if approved, will not impact service provision to the surrounding area. 7 6. The project has been submitted to the State Clearinghouse for review with no concerns being addressed. Based on these comments, staff has determined a formal Environmental Impact Statement is not required. Please refer to Attachment 3 for additional detail. Analysis: As required under Section 2.7.4 of the UDO, the Planning Director is required to: `cause an analysis to be made of the application' and pass that analysis on to the reviewing body. In analyzing this request, the Planning Director offers the following- 1 . The application has been deemed complete in accordance with the requirements of Section 2.7 of the UDO. 2. The project is classified as a `utility' per Section 5.2 Table of Permitted Uses of the UDO and is a permitted use within the RB zoning district subject to the issuance of a Class A Special Use Permit. 3. Staff has determined that the property is of sufficient size to allow for the development of the project. 4. The proposal is not expected to have a negative impact on existing development in the area. 5. The proposal appears consistent with the various goals outlined within the Comprehensive Plan, including: a. Natural and Cultural Systems Goal 1: Energy conservation, sustainable use of non - polluting renewable energy resources, efficient use of non - renewable energy resources and clean air. b. Objective AE -15: Foster participation in green energy programs such as installation incentives for solar hot water /solar generation /solar tempering in residential or commercial construction. The County should develop programs that will link citizens and businesses with options for alternative and sustainable energy sources. c. Objective AG -8: Encourage the use and production of natural fuel alternatives to petroleum based products and pursue new types of energy sources. 6. The proposal appears consistent with the various goals outlined within the Joint Planning Land Use Plan (hereafter `the Plan'). As previously indicated this operation is classified as a utility land use providing an essential public service, specifically power. More importantly this project will result in the generation of power through environmentally responsible means, which is a major goal of the County. While some could argue there are `commercial' elements to the project, stringently regulated by the aforementioned Plan, the proposed array functions as any other similar utility project providing an essential public service. Such land uses, which have already been developed throughout the area, are not precluded by the Plan. JPA Review: In accordance with the Joint Planning Area Agreement, this project was sent to the Town of Chapel Hill for review and comment. As of this date staff has not received any comments. 0 Notification Requirements: Per Sections 2.7.5 of the UDO, staff has caused a notice of this hearing to be published: `as least twice in a newspaper of public circulation in the County for two (2) successive weeks: ` no less than ten (10) days nor more than twenty -five (25) days' before the public hearing. On May 14, 2014 staff posted a sign on the property providing a notice of the date, time, and location of the public hearing. Staff also sent written notice by certified mail to all adjacent property owners located within 500 feet of the subject property as required by Section 2.7.5 of the UDO. This notice was sent on May 9, 2014 (please see Attachment 4). FINANCIAL IMPACT: This request has been reviewed by various County departments who have determined that the approval or denial of the request would not create the need for additional funding for the provision of County services. RECOMMENDATION(S): The Planning Director recommends that the Board: 1. Receive the application, 2. Conduct the quasi-judicial Public Hearing and accept all evidence and sworn testimony as well as public, BOCC, and Planning Board comments. 3. Refer the matter to the Planning Board with a request that a recommendation be returned to the County Board of Commissioners in time for the September 16, 2014 BOCC regular meeting. 4. Adjourn the public hearing until September 16, 2014 in order to receive and accept the Planning Board's recommendation and any submitted written comments. Attachment 1 Orange County Planning and Inspections Department 7> �anac ' o4�,i it ss APPLICATION FOR x- 3 a CLASS A SPECIAL USE PERMIT APPLICANT INFORMATION: Date: 12/20/13 Applicant: Sunlight Partners Phone: (480) 924 -5519 Address 4215 E. McDowell Rd, Suite 212 Cell Phone: (602) 334 -8148 Mesa, AZ 85215 E -mail Jason .ramscy @sunlightpartners.com Agent. Jason Ramsey Phone: (480)999 -3349 Address: 4215 E. McDowell Rd, Suite 212 Cell phone: (602) 334 -8148 Mesa, Az 85215 _ E -mail: _ j ason .ramsey @sunlightpartners.com Address of subject property: 2911 Mount Sinai Road, Chapel Hill, NC 27514 Parcel Identification Number (PIN): 9881388874, 9881493072 Lot Size. 50.3 acres Zoning Designation: Rural Buffer Watershed Overlay Jordan Lake Unprotected Other Overlay Zoning Districts: N/A Request (include detailed description of proposed land use). Sunlight Partners is requesting a Special Use Permit for a unmanned photovoltaie solar farm. 10 SUBMITTAL INFORMATION Per Section 2.7.3 of the Unified Development Ordinance (UDO), all Class A Special Use Permit applications are required to submit the following: 1) 26 copies of a site plan prepared by a registered North Carolina land surveyor, landscape architect, architect, or engineer containing all required information detailed within Section 2.5 of the UDO. This site plan will also need to contain all relevant information demonstrating that the proposed special use compliance with all general and specific standards governing the proposed special use as detailed within Articles) 5 and 6 of the UDO. 2) A detailed narrative outlining the proposed land use including operational requirements, the location of facility, appearance, etc , 3) Documentation establishing compliance with Section 5.3 2 inclusive of the UDO 4) The names and addresses of the owners involved with the project, 5) A list of property owners within 500 feet of the subject parcel and the name and address of each property owner, as currently listed in the Grange County tax records, 6) Elevations of all structures proposed to be used in the development, 7) 26 copies of the Environmental Assessment and/or Environmental Impact Statement if required by Section 6.16 of the UDO, 8) Statement outlining the anticipated development schedule for the completion of the project, ** NOTE: It should be remembered that the review of all special use permit applications/modifications are carried out in a guusiyudicW format meaning that decisions relating to the approval or denial of an application are based solely on the sworn testimony of all parties involved with the case, both those for and against an application, as well as the review of competent material and substantial evidence submitted during the public hearing. Further the applicant has the burden of establishing, by the submission of competent material and substantial evidence, the existence of facts and conditions that demonstrate the projects compliance with the various requirements and standards detailed within the Unified Development Ordinance. ** I (we), the undersigned, have been made aware of the process for the review and action associated with a Class A Special Use Permit application and understand that only completed applications, containing all information required by the Grange County UDO shall be reviewed and acted upon by the County. I (we) understand that it shall be my (our) responsibility to present evidence to the County in the form of sworn testimony, exhibits, documents, models, plans, and the like support the request for approval of the Class A Special Use Permit Further I (we) understand that any assistance I (we) may receive from County staff in preparing this application in no way guarantees a favorable recommendation by staff on the merits of this proposal nor does it guarantee an approval of the request by the County. Applicant A Date. Date: 11 Binks Solar Project Narrative Sunlight Partners respectfully submits the following as supporting documentation for the affirmation that the Binks Solar meets the requirements for approval of a Special Use within the Rural Buffer zoning district and that the project complies with the following standards (1) The use will maintain or promote the public health, safety and general welfare, if located where proposed and developed and operated according to the plan as submitted, The Binks Solar Project will maintain the public health, safety and general welfare if located where proposed and developed and operated according to the plan submitted The following addresses how the project will not adversely affect health, safety, and general welfare Public Safety- The Binks Solar facility will not adversely affect public safety The solar facility is an unmanned, infrequently visited project site. As such, the project will not increase the existing demand on public safety agencies (police and fire departments) The project site will be enclosed with a fence, preventing access to the general public. Attachment is a ground mounted solar question and answer guide developed jointly by the Massachusetts Department of Energy Resources, Massachusetts Department of Environmental Protection and the Massachusetts Clean Energy Center The attached guide addresses public safety concerns such as Hazardous Materials, Electric and Magnetic Fields (EMF), and Noise Noise- According to the Orange County noise ordinance "A Resolution and Ordinance to Provide for the Control of Noise in Orange County" amended February f, 1988, Sound Levels dB(a) by Receiving Land generally cannot exceed 60 dB(a) during the daytime and 50 dB(a) during the nighttime The Binks Solar Project proposes to use Advanced Energy Soloron 500 inverters. An acoustic analysis was performed on the inverter model (Attachment B) According to the study the inverter will produce 68 dB(o) of sound measured at three (3) meters from the inverter In an open area, sound levels decrease in accordance with the Inverse square law Generally, sound decreases 6 d8 for every doubling in distance from the sound source The sound generated by the Binks Solar project will be less than 38 dB(a) at any point along the property boundary (Far below the noise ordinance threshold) The following table summarizes the sound level generated by the project- Distance (Feet) Distance (Meters) Sound level (a- weighted) 3.28 1 68 dB(a) 6.56 2 62 dB(a) 1312 4 56 dB(a) 2625 8 50 dB(a) 5249 16 44 dB(a) 10499 32 38 dB(a) 209.97 64 32 dB(a) 41995 128 26 dB(a) 83990 256 20 dB(a) 12 The following map shows the areas within the project where the sound exceeds 38 de(o) 13 (2) The use will maintain or enhance the value of contiguous property (unless the use is a public necessity, in which case the use need not maintain or enhance the value of contiguous property), Because the Binks Solar project will have landscaping and natural buffers shielding the project from view, the project will not impact the value of contiguous property. In 2013, David Massey was commissioned to perform an analysis on solar farm impacts on adjacent property values within Guilford County Mr Massey is a State Certified General Real Estate Appraiser by the State of North Carolina and a Licensed Real Estate Broker Mr Massey's practice consists of residential and commercial appraisals in Guilford, Alamance, Orange, Durham, Randolph, Chatham and Caswell Counties of North Carohna Mr Massey's study was performed to address the impact on adjacent property values related to two similar sized solar projects that Sunlight Partners was permitting in Guilford County In the study (Attachment C) Mr. Massey concludes that, "My professional and expert opinion is that the two proposed Solar Farms that will not be visible will have no impact on the market values of the surrounding properties The Solar Farms with the proposed landscaping buffers and natural buffers will not create a negative externality for the surrounding properties as they will not be visible " (c) The location and character of the use, if developed according to the plan submitted, will be in harmony with the area in which it is to be located and the use is in compliance with the plan for the physical development of the County as embodied in these regulations or in the Comprehensive Plan, or portion thereof, adopted by the Board of County Commissioners The proposed location for the Binks Solar project is designated as Rural Buffer According to the Land Use Element of the Comprehensive Plan, Rural Buffer is defined as "Land adjacent to an urban or transition area which is rural in character and which should remain rural, contain very low - density residential uses, and not require urban services during the plan period." The Binks Solar project will be in harmony with the area and will be in compliance with the plan for the physical development of the County due to the fact that project will not increase the population density within the Rural Buffer area, will not require urban services, will not decrease the level of service on existing roads, and views of the Binks Solar project will be shielded by natural and landscape buffers Specific Standards In addition to the general standards stated in Section 5 3 2(A), the following specific standards shall be addressed by the applicant before the issuance of a Special Use Permit (1) Method and adequacy of provision of sewage disposal facilities, solid waste, and water a. Sewage Disposal Facilities- The Binks Solar project is an unmanned facility, with no regular employees located on -site Because the site is unmanned, not sewage disposal facilities will be required 14 b Solid Waste- The solar facility does not generate any solid waste during normal operation. Service crews will access the site periodically to perform routine grounds keeping. Any solid waste collected during grounds keeping will be disposed of off -site in appropriate solid waste facilities c Water- The Binks Solar project does not consume water during normal operation Water will be used semi - annually to clean the solar panels Water for panel cleaning will be obtained off -site from an appropriate water company (2) Method and adequacy of police, fire and rescue squad protection a Police- The Binks Solar project is an unmanned solar facility The project site will be fenced to prevent public access Because the site will not increase the general population of the county, the project will not increase demand on existing law- enforcement agencies b Fire and Rescue- The project site will be accessed from Cascade Drive The perimeter allows vehicle access to the entire site, with two Interior North /South access corridors All rows of panels are unobstructed and provide two points of entry As such, the design of the project site provides adequate access for fire and rescue protection The project site will not require additional fire and rescue personnel (3) Method and adequacy of vehicular access to the site and traffic conditions around the site The Binks Solar facility will be accessed from Cascade Drive Because the site will not be frequently accessed, Cascade Drive will provide adequate access to the site and Cascade Drive's traffic conditions will not be adversely impacted The frequency and nature of site access is described below. The Binks Solar project is an unmanned facility, with no regular employees located on -site A maintenance /service crew will be on -site for limited periods of time to service the equipment, clean the PV panels, and to ensure that on -site vegetation is kept at appropriate levels Routine maintenance generally will occur on a bi- monthly basis 15 Attachment A 16 CLEAN ENERGYRESULTS Questions & Answers Ground - Mounted Solar Photovoltaic Systems Westford Solar Park, photo courtesy of EEA December 2012 Massachusetts Department of Energy Resources Massachusetts Department of Environmental Protection Massachusetts Clean Energy Center Table of Contents Background ............. ............................... Hazardous Materials End -of- Life /Decommissioning Ambient Temperature ( "Heat Island ") Electric and Magnetic Fields (EMF) Property Values Public Safety (including fires) Historic Preservation Noise ................... Water - Related Impacts Glare ..................... Endangered Species and Natural Heritage 3 5 7 9 10 13 14 16 18 20 22 23 17 Background Solar photovoltaic (PV) technology, which converts sunlight directly into electricity, is a key priority for the state of Massachusetts' clean energy efforts The environmental benefits of solar PV abound Unlike conventional fossil fuel power generation (such as coal, gas and oil), generating electricity with solar PV involves no moving parts, uses no water, and generates electricity without emitting climate- warming greenhouse gases or other pollutants. Solar PV's environmental and energy benefits, combined with strong incentives, have significantly increased the use of this technology The Commonwealth's vibrant solar industry has a variety of ownership and financing options for Massachusetts residents and businesses looking to install solar PV systems Purchasing a solar PV system generally involves upfront installation and equipment costs, but there are significant incentives'. As the Massachusetts clean energy sector grows, the Patrick- Murray Administration is working to ensure that solar PV and other clean energy technologies are sited in a way that best protects human health and the environment, and minimizes impacts on scenic, natural, and historic resources Purpose of Guide This guide is intended to help local decision- makers and community members answer common questions about ground- mounted solar PV development Ground - mounted solar PV has many proven advantages and there has been a steady growth of well received projects in the Commonwealth However, these systems are still relatively new and unfamiliar additions to our physical landscape This guide focuses on questions that have been raised concerning the installation and operation of ground- mounted solar PV projects It provides summaries and links to existing research and studies that can help people understand solar PV technology in general, and ground- mounted solar in particular Solar PV panels can and are of course also installed on buildings2, car ports or light poles This guide focuses on ground- mounted systems since most questions relate to this type of solar installations Developed through the partnership of the Massachusetts Department of Energy Resources (DOER), the Massachusetts Department of Environmental Protection (MassDEP), and the Massachusetts Clean Energy Center (MassCEC), this guide draws from existing, recent literature in the United States and abroad and is not the result of new original scientific studies The text was reviewed by the National Renewable Energy Laboratory (NREL) As new information becomes available, the guide will be updated and expanded 1 For a comprehensive overview, start at http / /masscec com /index cfm /page /Solar- PV /pid/12584 and http / /www dsireusa org /solar/ Z For an overview of the multiple options for siting PV and buildings in the same footprint, see the Solar Ready Buildings Planning Guide, NREL, 2009 Solar PV Projects Are Sited Locally 19 The siting authority for solar PV projects resides at the local — not the state — level One purpose of this guide is to inform and facilitate local efforts to expand clean energy generation in a sustainable way, and provide a consolidated source of existing research and information that addresses common questions faced by communities. As part of the Green Communities Act of 2008, DOER and the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA) developed a model zoning by -law /ordinance called "as -of -right siting" that does not require a special permit. It is designed to help communities considering adoption of zoning for siting of large -scale solar This model zoning by -law /ordinance provides standards for the placement, design, construction, operation, monitoring, modification and removal of new large -scale ground- mounted solar PV installations The latest version of the model by -law was published in March 20123 It provides useful information that will not be repeated extensively in this guide Consider Impacts of Other Possible Developments at Site Use of land for the purpose of solar photovoltaic power generation should be compatible with most other types of land usage However DOER strongly discourages designating locations that require significant tree cutting, because of the important water management, cooling and climate benefits trees have DOER encourages designating locations in industrial and commercial districts, or on vacant, disturbed land When assessing the impact of new ground- mounted solar arrays, communities and other stakeholders should carefully consider other types of development that might take place in a particular location if there was no solar installation Stakeholders should bear in mind the higher or lower impacts that those alternatives might have in terms of noise, air pollution or landscape These alternative impacts fall outside the scope of this guide, but are relevant when looking at individual projects 3http / /www mass gov /eea /docs/ doer /green- communities /grant- program /solar - model - bylaw- mar -2012 pdf 4 W1 Hazardous Materials Question. What, if any, health risks do chemicals used in solar panels and other devices used in solar PV arrays pose if they are released into the environment? Bottom Line Because PV panel materials are enclosed, and don't mix with water or vaporize into the air, there is little, if any, risk of chemical releases to the environment during normal use The most common type of PV panels is made of tempered glass, which is quite strong They pass hail tests, and are regularly installed in Arctic and Antarctic conditions only in the unlikely event of a sufficiently hot fire is there a slight chance that chemicals could be released. This is unlikely because most residential fires are not hot enough to melt PV components and PV systems must conform to state and federal fire safety, electrical and building codes. Transformers used at PV installations, that are similar to the ones used throughout the electricity distribution system in cities and towns, have the potential to release chemicals if they leak or catch fire Transformer coolants containing halogens have some potential for toxic releases to the air if combusted However, modern transformers typically use non -toxic coolants, such as mineral oils Potential releases from transformers using these coolants at PV installations are not expected to present a risk to human health More Information. Ground - mounted PV solar arrays are typically made up of panels of silicon solar cells covered by a thin layer of protective glass attached to an inert solid underlying substance (or "substrate ") While the vast majority ofPV panels currently in use are made of silicon, certain types of solar cells may contain cadmium telluride (CdTe), copper indium diselenide (CIS), and gallium arsenide (GaAs) All solar panel materials, including the chemicals noted above, are contained in a solid matrix, insoluble and non - volatile at ambient conditions, and enclosed Therefore, releases to the ground from leaching, to the air from volatilization during use, or from panel breakage, are not a concern Particulate emissions could only occur if the materials were ground to a fine dust, but there is no realistic scenario for this. Panels exposed to extremely high heat could emit vapors and particulates from PV panel components to the air However, researchers have concluded that the potential for emissions derived from PV components during typical fires is limited given the relatively short - duration of most fires and the high melting point ( >1000 degrees Celsius) of PV materials compared to the roof level temperatures typically observed during residential fires (800 -900 degrees Celsius). In the rare instance where a solar panel might be subject to higher temperatures, the silicon and other chemicals that comprise the solar panel would likely bind to the glass that covers the PV cells and be retained there Release of any toxic materials from solid state inverters is also unlikely provided appropriate electrical and installation requirements are followed For more information on public safety and fire, see the Public Safety section of this document We should also note that usually the rain is sufficient to keep the panels clean, so no extra cleaning in which cleaning products might be used, is necessary. 5 Resources- 21 Energy Information Administration (EIA), 2002 Renewable Energy Annual 2001 with Preliminary Data for 2001, ftp. / /ftp.eia.doe.gov /renewables /060301.pdf Electric Power Research Institute (2003) "Potential Health and Environmental Impacts Associated with the Manufacture and Use of Photovoltaic Cells " Report to the California Energy Commission, Palo Alto, CA http- / /mydocs epri com /docs /public /000000000001000095 pdf Fthenakis, V M , Overview of Potential Hazards in Practical Handbook of Photovoltaics Fundamentals and Applications, General editors T Markvart and L Castaner, Elsevier, 2003 Fthenakis, V M Life cycle impact analysis of cadmium in CdTe PV production Renewable and Sustainable Energy Reviews 8, 303 -334, 2004 Fthenakis V M , Kim H C , Colli A, and Kirchsteiger C , Evaluation of Risks in the Life Cycle of Photovoltaics in a Comparative Context, 21st European Photovoltaic Solar Energy Conference, Dresden, Germany, 4 -8 September 2006 Moskowitz P. and Fthenakis V, Toxic materials released from photovoltaic modules during fires, health risks, Solar Cells, 29, 63 -71, 1990 Sherwani, A.F., Usmani, J.A , &Varun Life cycle assessment of solar PV based electricity generation systems- A review Renewable and Sustainable Energy Reviews 14, 540 -544, 2010 Zayed, J, Philippe, S (2009 -08) "Acute Oral and Inhalation Toxicities in Rats With Cadmium Telluride" (PDF) International journal of toxicology (International Journal of Toxicology) 28 (4) 259 -65 A 22 End -of- Life /Decommissioning Question. What happens after solar panels are no longer used and are being decommissioned? Do hazardous waste disposal requirements apply? Bottom Line- The interest in recycling of solar panels has increased in Europe and the U S as more panels are decommissioned State regulations are in place to ensure proper disposal and recycling of panels with components that constitute solid or hazardous waste under state regulations More information. The average life of solar PV panels can be 20 -30 years (or longer) after initial installation PV cells typically lose about 0 5% of their energy production capacity per year At their time of decommissioning, panels may be disposed, recycled or reused Since widespread use of solar PV is recent in Massachusetts, only a small percentage of solar panels in use in the state have reached the end of their useful lifetime A significant increase in the amount of end -of -life PV modules is expected over the next few decades When solar panels are decommissioned, state rules require that panel disposal be "properly managed" pursuant to Massachusetts hazardous waste regulations There are many different types of solar panels used in ground- mounted solar PV systems, some of these panels have components that may, by state regulation, require special hazardous waste disposal or recycling Solar module manufacturers typically provide a list of materials used in the manufacturing of their product, which is used to determine the proper disposal at the time of decommissioning People who lease land for solar projects are encouraged to include end -of -life panel management as part of the lease In cases where panels are purchased, owners need to determine whether the end -of- life panels are a solid or hazardous waste and dispose of the panels appropriately Massachusetts regulations require testing of waste before disposal Because of the various materials used to produce solar panels (such as metal and glass), interest in recycling of solar modules has grown Throughout Europe, a not - for - profit association (PV Cycle) is managing a voluntary collection and recycling program for end -of -life PV modules. The American photovoltaic industry is not required by state or federal regulation to recycle its products, but several solar companies are starting to recycle on a voluntary basis Some manufacturers are offering end -of -life recycling options and independent companies looking to recycle solar modules are growing This allows for the recycling of the PV panels and prevents issues with the hazardous materials Currently, the California Department of Toxic Substances Control is considering standards for the management of solar PV panels at the end of their use DOER'S model zoning provides language on requirements for abandonment and decommissioning of solar panels for use by local officials considering local approvals for these projects Resources End -of -life PV then what? - Recycling solar PV panels http . / /www.renewableenergVfocus.com /view /3005 /end -of- life -pv -then- what - recycling - solar -pv- panels/ 23 MassDEP Hazardous Waste Regulations 310 CMR 30 http•/ /www mass gov /dep /service /regulations /310cmr30 pdf PV Cycle, Europe http. / /www.pvcycle.org/ California Department of Toxic Substances Control, Proposed Standards for the Management of Hazardous Waste Solar Modules, http-/ /www dtsc ca gov /LawsRegsPolicies /Reps /Reg Exempt HW Solar Panels cfm 24 Ambient Temperature ( "Heat Island ") Question -Does the presence of ground- mounted solar PV arrays cause higher ambient temperatures in the surrounding neighborhood (i e , the "heat island" effect)? Bottom Line All available evidence indicates that there is no solar "heat island" effect caused by the functioning of solar arrays. Cutting shade trees for solar PV might increase the need for cooling if those trees were shading buildings This is primarily a concern in town centers and residential areas (locations where large ground- mounted PV is not encouraged) and is a potential impact of any development activity that requires tree - cutting More Information- All available evidence indicates that there is no solar "heat island" effect caused by the functioning of solar arrays. Solar panels absorb photons from direct sunlight and convert it to electricity This minimizes the likelihood of substantially changing temperatures at the site or the surrounding neighborhood For an area with no PV system, solar energy impacting the ground is either reflected or absorbed. There is no research to support heat production from the solar panels themselves Sunpower, a private solar manufacturer, conducted a study on the impact of solar PV on the local temperature and concluded that a solar PV array can absorb a higher percentage of ambient heat than could a forested parcel of land without an array. The study points out that while solar PV modules can reach operating temperatures up to 120 degrees Fahrenheit, they are thin and lightweight and therefore do not store a large amount of heat. Because of this, and the fact that panels are also shown to cool to ambient air temperature shortly after the sun sets, the Sunpower study concludes that the area surrounding a large -scale solar array is unlikely to experience a net heating change from the panels If trees are removed that were previously shading a building, that building could get warmer in full sunshine than when the trees were shading it The June 1, 2011 tornado that ripped through Western Massachusetts created an opportunity to empirically measure the affects of the loss of neighborhood trees on temperatures and air humidity in the streets A report by the U S Department of Agriculture Forest Service concluded that in the tornado - impacted neighborhood in Springfield, Massachusetts, daily mean morning and afternoon temperatures were typically greater than in the unaffected neighborhood and forest sites, but were similar at night Residents noted increased use of air - conditioning units and an overall increase in energy costs in July and August of 2011. Resources• SUNPOWER, Impact of PV Systems on Local Temperature, July 2010 USDA Forest Services report- http://www.regreenspringfield.com/wp- content /uploads/ 2011 /11 /tornado %20climate %20report %203 pdf Electric and Magnetic Fields (EMF) 25 Question- What, if any, health risks do the electric and magnetic fields (EMF) from solar panels and other components of solar PV arrays pose? Bottom Line- Electric and magnetic fields are a normal part of life in the modern world PV arrays generate EMF in the same extremely low frequency (ELF) range as electrical appliances and wiring found in most homes and buildings The average daily background exposure to magnetic fields is estimated to be around one mG (milligauss — the unit used to measure magnetic field strength), but can vary considerably depending on a person's exposure to EMF from household electrical devices and wiring The lowest exposure level that has been potentially associated with a health effect is three mG. Measurements at three commercial PV arrays in Massachusetts demonstrated that their contributions to off -site EMF exposures were low (less than 0 5 mG at the site boundary), which is consistent with the drop off of EMF strength based on distance from the source More Information. Solar PV panels, inverters and other components that make up solar PV arrays produce extremely low frequency EMF when generating and transmitting electricity. The extremely low frequency EMF from PV arrays is the same as the EMF people are exposed to from household electrical appliances, wiring in buildings, and power transmission lines (all at the power frequency of 60 hertz) EMF produced by cell phones, radios and microwaves is at much higher frequencies (30,000 hertz and above) Electric fields are present when a device is connected to a power source, and are shielded or blocked by common materials, resulting in low potential for exposure On the other hand, magnetic fields, which are only generated when a device is turned on, are not easily shielded and pass through most objects, resulting in greater potential for exposure Both types of fields are strongest at the source and their strength decreases rapidly as the distance from the source increases For example, the magnetic field from a vacuum cleaner six inches away from the motor is 300 mG and decreases to two mG three feet away People are exposed to EMF during normal use of electricity and exposure varies greatly over time, depending on the distance to various household appliances and the length of time they are on The daily average background level of magnetic fields for U S residents is one mG EMF from PV Arrays- Solar PV panels produce low levels of extremely low frequency EMF, with measured field strengths of less than one mG three inches from the panel Solar PV power inverters, transformers and conduits generate higher levels of ELF -EMF The amount of ELF -EMF is proportional to the electrical capacity of the inverter and is greater when more current (electricity) is flowing through a power line In a study of two PV arrays (using 10 -20kW invertors) in Kerman and Davis, California, the magnetic field was highest at the inverters and transformers, but decreased rapidly to less than one mG within 50 feet of the units, well within the boundary of the PV array (Chang and Jennings 1994) This data indicates that extremely low frequency EMF field strengths at residences near systems of this size would be below the typical levels experienced by most people at home The highest extremely low frequency EMF (up to 1,050 mG) was found next to an inverter unit at the point of entry to the electrical conduits Even this 10 W value is less than the ELF -EMF reported for some common household devices, such as an electric can opener with a maximum of 1500 mG at 6 inches. In a recent study of 3 ground mounted PV arrays in Massachusetts, the above results were confirmed The PV arrays had a capacity range of 1 to 3 5 MW Magnetic field levels along the PV array site boundary were in the very low range of 0 2 to 0 4 mG Magnetic fields at 3 to 7 feet from the inverters ranged from 500 to 150 mG At a distance of 150 feet from the inverters, these fields dropped back to very low levels of 0.5 mG or less, and in many cases to much less than background levels ( <0 2 mG) Potential Health Effects- Four research studies have reported an association between three to four mG EMF exposure and childhood leukemia, while 11 other studies have not. These studies are inconsistent and do not demonstrate a causal link that would trigger a World Health Organization (WHO) designation of EMF as a possible carcinogen Studies looking at other cancers in humans and animals have not found evidence of a link to residential ELF -EMF exposure Reference Exposure Levels- To protect the general public from health effects from short -term high level magnetic fields, the International Commission on Non - Ionizing Radiation Protection (ICNIRP, 2010) advised an exposure limit for extremely low frequency magnetic fields at 2000mG. ICNIRP determined that the evidence on the impact of long -term exposure to low level magnetic fields was too uncertain to use to set a guideline Guidelines for the magnetic field allowed at the edge of transmission line right -of- ways have been set at 200 mG by Florida and New York Exposure to magnetic fields greater than 1000 mG is not recommended for people with pacemakers or defibrillators (ACGIH, 2001) ELF -EMF does not appear to interfere with hearing aids, though interference from higher frequency EMF associated with cell phones has been reported Resources* American Conference of Government Industrial Hygienist (ACGIH) 2001 as cited in NIEHS 2002 California Department of Health Services (CA DHS) 2000 Electric and Magnetic Fields, measurements and possible effect on human health — what we know and what we don't know in 2000 This factsheet has a moderate level of technical detail and is intended for those with an interest in science For more information,see http / /www.dhs.ca gov /ps /deodc /ehib /. California Electric and Magnetic Fields Program, A Project of the California Department of Health Services and the Public Health Institute Chang, GJ and Jennings, C 1994 Magnetic field survey at PG &E photovoltaic sites PG &E R &D Report 007 5 -94 -6 Available 4 WHO has designated ELF -EMF as a possible carcinogen The use of the label "possible carcinogen" indicates that there is not enough evidence to designate ELF -EMF as a "probable carcinogen "or "human carcinogen," the two indicators of higher potential for being carcinogenic in humans 11 27 Electric Power Research Institute (EPRI) 2012 EMF and your health Available http• / /my.epri com /portal /server.pt ?Abstract id= 000000000001023105 International Commission on Non - Ionizing Radiation Protection ( ICNIRP) 2010. ICNIRP Guidelines for limiting exposure to time - varying electric and magnetic fields (1 Hz — 100kHz) Health Physics 99(6) 818- 836 National Cancer Institute (NCI) 2005 Magnetic Field Exposure and Cancer Questions and Answers U S Department of Health and Human Services, National Institutes of Health Available http•//www.cancer gov /cancertopics /factsheet /Risk /magnetic- fields accessed May 14, 2012 National Institute of Environmental Health Science (NIEHS) 2002 Electric and Magnetic Fields Associated with the Use of Electric Power Questions and Answers Available http./ /www niehs nih gov /health /assets /docs P z /results of emf research emf questions answers b ooklet pdf, accessed May 11, 2012 National Institute of Environmental Health Science (NIEHS) web page on EMF Available http•//www.niehs.nih gov /health /topics /agents /emf/ accessed May 11, 2012 Oregon Department of Transportation (Oregon DOT) Scaling public concerns of electromagnetic fields produced by solar photovoltaic arrays Produced by Good Company for ODOT for the West Linn Solar Highway Project Available www Oregon gov/ODOT/HWY/OIPP/`docs/emfconcerns.pdf. World Health Organization (WHO) 2007. Electromagnetic fields and public health Exposure to extremely low frequency fields. Fact sheet N °322 June 2007. Available http• / /www.who int /mediacentre /factsheets /fs322 /en /index html accessed May 16, 2012 This fact sheet provides a short summary of the in -depth review documented in the WHO 2007, Environmental Health Criteria 238 Available http: / /www.who int /peh- emf /publications /elf ehc /en /index html EMF in Your Environment, Magnetic Field Measurements of Everyday Electrical Devices (USEPA, 1992) Tech Environmental, Study of Acoustic and EMF levels from Solar Photovoltaic Projects, Prepared for the Massachusetts Clean Energy Center, December 2012 12 NK Property Values Question. How do ground- mounted solar PV arrays adjacent to residential neighborhoods influence the property values in those neighborhoods? Bottom Line. No research was found specific to ground- mounted solar PV and property values Residential property value research on roof - mounted solar PV and wind turbines illustrates no evidence of devaluation of homes in the area. Municipalities that adopt zoning for solar facilities may want to consider encouraging project developers to include screening vegetation along site borders to minimize visual impacts on surrounding neighborhoods More Information- A review of literature nationwide shows little evidence that solar arrays influence nearby property values An analysis focused on roof- mounted solar PV panels done by the U S Department of Energy Lawrence Berkeley National Laboratory concludes that household solar installation actually increases home property values. This research analyzes a large dataset of California homes that sold from 2000 through mid -2009 with PV installed. Across a large number of repeat sales model specifications and robustness tests, the analysis finds strong evidence that California homes with PV systems have sold for a premium over comparable homes without PV systems While neither of these reports focused on ground- mounted solar PV, this information may be relevant to this discussion Resources* The Impact of Wind Power Projects on Residential Property Values in the United States. A Multi -Site Hedonic Analysis http / /eetd Ibl gov /ea /ems /reports /Ibnl -2829e Pdf An Analysis of the Effects of Residential Photovoltaic Energy Systems on Home Sales Prices in California http• / /eetd Ibl gov /ea /emp /reports /Ibnl -4476e pdf 13 Public Safety (including fires) 29 Question What public safety issues arise from people's (including children) access areas where the solar arrays are installed? Can electrical and other equipment associated with solar projects cause electrical fires? Bottom Line. Large -scale ground- mounted arrays are typically enclosed by fencing This prevents children and the general public from coming into contact with the installations, thus preventing unsafe situations. The National Electric Code has mandatory requirements to promote the electrical safety of solar PV arrays The solar industry and firefighters provide training and education for emergency personnel to ensure that the proper safety precautions are taken More Information The National Electric Code has mandatory requirements for the electrical safety of solar PV arrays To protect intruders, Article 690 of the National Electric Code covers the safety standards for solar PV installation and requires that conductors installed as part of solar PV be "not readily accessible " With a large -scale ground- mounted array, a fence is typically installed around the system to prevent intruders Some communities have solar PV or signage by -laws that require identification of the system owner and 24 -hour emergency contact information DOER'S model by- law /ordinance requires owners of solar PV facilities to provide a copy of the project summary, electrical schematic, and site plan to the local fire chief, who can then work with the owner and local emergency services to develop an emergency response plan These measures can be combined with products to prevent theft of the panels. Some are very low cost options (fastener type) while there are other options that are more expensive (alarm system type) but also more effective The biggest potential risk associated with solar PV systems is the risk of shock or electrocution for firefighters and other emergency responders who could come in contact with high voltage conductors A 2010 study on firefighter safety and emergency response for solar PV systems by the Fire Protection Research Foundation, based in Quincy, Massachusetts, recommended steps firefighters can take when dealing with wiring and other components that may be energized The Solar Energy Business Association of New England (SEBANE) has been working to provide training and education to first - responders to identify and avoid potential hazards when responding to a solar PV fire For more information about toxics /fires, see the Hazardous Materials Section. Resources- "Moskowitz, P D and Fthenakis, V.M., Toxic Materials Released from Photovoltaic Modules During Fires Health Risks, Solar Cells, 29, 63 -71, 1990 21 " Solar America Board for Codes and Standards http / /www solarabcs org/ about /publications/ reports /blindspot /pdfs /BlindSpot.pdf "Fire Fighter Safety and Emergency Response for Solar Power Systems- Final Report" May 2010 Prepared by The Fire Protection Research Foundation 14 30 National Electric Code Article 250 Grounding and Bonding, Article 300• Wiring Methods, Article 690 Solar PV Systems, Article 705 Interconnected Electric Power Production Sources 15 Historic Preservation 31 Question- What are the appropriate standards when land with certain historical or archaeological significance is developed for large -scale solar PV arrays? Bottom Line- Parties undertaking solar PV projects with state or federal agency involvement must provide the Massachusetts Historical Commission (MHC) with complete project information as early as possible in the planning stage, by mail, to the MHC's office (see Resources) Parties should also contact local planning, historical or historic district commissions to learn about any required local approvals Municipalities should also take the presence of historic resources into account when establishing zoning regulations for solar energy facilities in order to avoid or minimize impacts More Information- Land being evaluated for the siting large -scale solar PV may have historical or archaeological significance, including properties listed in the National or State Registers of Historic Places and /or the Inventory of Historic and Archaeological Assets of the Commonwealth Federal and state laws require that any new construction, demolition or rehabilitation projects (including new construction of solar PV) that propose to use funding, licenses or permits from federal or state government agencies must be reviewed by the MHC so that feasible alternatives are developed and implemented to avoid or mitigate any adverse affects to historic and archaeological properties Projects receiving federal funding, licenses or permits are reviewed by the involved federal agency in consultation with the MHC and other parties in compliance with Section 106 of the National Historic Preservation Act of 1966 (16 U S C 470f) and the implementing regulations (36 CFR 800) in order to reach agreement to resolve any adverse effects Projects receiving state funding, licenses or permits must notify the MHC in compliance with M G L c 9, ss 26 -27C and the implementing regulations 950 CMR 71 If the MHC determines that the project will have an adverse effect, the involved state agency, the project proponent, the local historical preservation agencies, and other interested parties consult to reach an agreement that outlines measures to be implemented to avoid, minimize, or mitigate adverse effects For projects with both federal and state agency involvement, the Section 106 process is used Some communities have local preservation ordinances or established historic districts that require local approval for new construction visible from a public way Local historic district commissions have adopted design guidelines for new construction within their historic districts and historic neighborhoods. However, these guidelines must account for Chapter 40C Section 7 of the General Laws, which requires a historic district commission to consider the policy of the Commonwealth to encourage the use of solar energy systems and to protect solar access Resources. Federal Agency Assisted Projects Section 106 review information and federal regulations 36 CFR 800 are available at the Advisory Council on Historic Preservation (ACHP) web site- www.achp.gov. Check with the involved federal agency for how they propose to initiate the MHC notification required by 36 CFR 800 3 16 32 State Agency Assisted Projects Massachusetts General Laws Chapter 9, sections 26 -27C http./ /www malegislature gov /Laws /GeneralLaws /Search MHC Regulations 950 CMR 71 (available from the State House Bookstore) MHC Review & Compliance FAQs http //www sec state ma us /mhc /mhcrevcom /revcomidx htm MHC Project Notification Form (PNF) & Guidance for Completing the PNF and required attachments (USGS locus map, project plans, current photographs keyed to the plan) Mail or deliver the complete project information to the MHC's office http / /www.sec.state ma us /mhc /mhcform /formidx htm General Guidance about Designing Solar PV Projects on Historic Buildings and in Historic Areas http / /www.nrel.gov /docs /fyllosti /51297 pdf 17 Noise 33 Question. Do the inverters, transformers or other equipment used as part of ground- mounted solar PV create noise that will impact the surrounding neighborhood? Bottom Line. Ground - mounted solar PV array inverters and transformers make a humming noise during daytime, when the array generates electricity At 50 to 150 feet from the boundary of the arrays, any sound from the inverters is inaudible Parties that are planning and designing ground- mounted solar PV can explore options to minimize noise impacts to surrounding areas even more These could include conducting pre - construction sound studies, evaluating where to place transformers, and undertaking appropriate noise mitigation measures More Information. Most typically, the source of noise associated with ground- mounted solar PV comes from inverters and transformers There also may be some minimal noise from switching gear associated with power substations. The crackling or hissing sound caused by high - voltage transmission lines (the "Corona effect ") is not a concern in the case of solar PV, which uses lower voltage lines Parties siting ground- mounted solar PV projects should consult equipment manufacturers to obtain information about sound that can be expected from electrical equipment, which can vary For example, according to manufacturer's information, a SatConPowergate Plus 1 MW Commercial Solar PV Inverter has an unshielded noise rating of 65 decibels (dBA) at five feet This is approximately the sound equivalent of having a normal conversation with someone three feet away Another source of information is the National Electrical Manufacturers Association (NEMA) standards, which will provide maximum sound levels from various equipment arrays From NEMA, a large dry -type transformer (2001- 3333 kVA) that is forced air cooled and ventilated has an average sound level of 71 dBA, which is approximately the sound level one would expect from a vacuum cleaner at ten feet There may be several such units on a substantially sized PV site, which would increase the sound level to some degree Sound impacts from electrical equipment can be modeled to the property line or nearest sensitive receptor (residence) Sound impacts can be mitigated with the use of enclosures, shielding and placement of the sound - generating equipment on -site The rule of thumb for siting noise - generating equipment is that the sound impact can be reduced by half by doubling the distance to the receptor In some areas both in the U S and Canada, sound impact analysis is required as part of the permitting process for large PV systems For example, in the Province of Ontario, Canada, any project greater than 12 MW is required to perform a sound impact analysis (Ontario 359/09). California also requires a sound impact analysis for Large PV projects Massachusetts currently has no such requirement, but the reader should note that ground mounted systems in Massachusetts very rarely go over 6 MW, which is half the size of the 12 MW that triggers a sound analysis in Ontario A recent study measured noise levels at set distances from the inverters and from the outer boundary of three ground mounted PV arrays in Massachusetts with a capacity range of 1 to 3 5 MW Close to the inverters (10 feet), sound levels varied from an average of 55 dBA to 65 dBA Sound levels along the fenced boundary of the PV arrays were generally at background levels, though a faint inverter hum could be heard at some locations Any sound from the PV array and equipment was inaudible and sound 18 34 levels were at background levels at setback distances of 50 to 150 feet from the boundary Project developers should consult with local planning and zoning officials to determine if local noise ordinances may be applicable Many local noise ordinances establish absolute limits on project impact noise (such as a 40 dBA nighttime limit) In these communities, a noise impact assessment may be required Resources. NEMA Standards Publication No TR= 1- 1993(R2000), Transformers, Regulators and Reactors Noise Assessment Borrego 1 Solar Project, MUP 3300 -10 -26 Prepared by Ldn Consulting, Inc, Fallbrook, CA January 14, 2011 Ontario Regulation 359/09 Renewable Energy Approval (REA) Regulation, Ontario Ministry of the Environment, Canada Tech Environmental, Study of Acoustic and EMF levels from Solar Photovoltaic Projects, Prepared for the Massachusetts Clean Energy Center, December 2012 19 Water - Related Impacts 35 Question- Can chemicals that might be contained in solar PV threaten public drinking water systems? Will flooding occur in cases where trees must be removed in order to install the solar arrays? How do we ensure that wetland resources are protected? Bottom Line. Rules are in place to ensure that ground- mounted solar arrays are installed in ways that protect of public water supply, wetlands, and other water resource areas. All solar panels are contained in a solid matrix, are insoluble and are enclosed Therefore releases are not a concern More Information- Because trees offer multiple water management, cooling and climate benefits, clear cutting of trees for the installation of ground- mounted solar PV is discouraged For projects that do propose to alter trees, the Massachusetts Environmental Policy Act (MEPA) has thresholds for the proposed alteration of a certain number of acres of land, the size of electrical facilities, and other criteria that trigger state review of proposed projects Clear cutting of trees and other aspects of proposed projects would be reviewed through an Environmental Notification Form /Environmental Impact Statement if thresholds are triggered MassDEP has determined that the installation of solar arrays can be compatible with the operation and protection of public drinking water systems This includes the installation of solar arrays within Zone I, which is a 400 -foot protective radius around a public ground water well Solar projects proposed on lands owned by public water systems outside Zone I may be approved subject to standard best management practices, such as proper labeling, storage, use, and disposal of products MassDEP has a guidance /review process in place to ensure that the installation of ground- mounted solar PV in these areas protects public water supplies Installing solar arrays on undeveloped land can preserve the permeable nature of the land surface provided the project design minimizes disturbance to natural vegetative cover, avoids concentrated runoff, and precipitation is otherwise recharged into the ground to the greatest extent practicable Storm water flow, as well as information about site- specific soils and slope, is taken into account during the design and installation of solar arrays MassDEP discourages installation of ground- mounted solar PV systems in wetland areas, including riverfront locations Solar projects within wetland areas are unlikely to comply with the performance standards in the Wetlands Protection Act regulations If a solar installation is proposed in a wetland, a riverfront area, a floodplain, or within 100 feet of certain wetlands, the project proponent must file a notice of intent (or application to work in wetland areas) with the local Conservation Commission, which administers the Wetlands Protection Act at the municipal level Copies should also go to MassDEP Solar installations may be sited near, but outside of wetlands, in a manner that protects the functions of wetlands and that minimizes impacts from associated activities such as access and maintenance Ancillary structures related to construction of a solar installation or transmission of power may be permitted to cross rivers and streams using best design and management practices 20 36 Resources. More information about the Wetlands Protection Act requirements may be found in the implementing regulations at 310 CMR 10 00 http //www. mass. gov /dep /service /regulations /310cmr10a Pdf More information about Environmental Notification Form /Environmental Impact Statement* http //www env state .ma.us /mepa /reps /11- 03.aspx. MassDEP Policy for Siting Solar Projects in Zone I http / /www.mass.gov /dep /water /laws /1101 htm MassDEP Guidance for Siting Wind and Solar in Public Water Supply Land http / /www mass gov /dep /water /laws /wseppws htm MassDEP Chapter 91 Guidance for Renewable Energy Projects http //www mass gov /dep /water /priorities /ene 91 htm 21 Glare 37 Question. How important is reflectivity and potential visual impacts from solar projects, especially near airports? Bottom Line. Solar panels are designed to reflect only about 2 percent of incoming light, so issues with glare from PV panels are rare Pre - construction modeling can ensure that the placement of solar panels prevents glare More Information- Solar panels are designed to absorb solar energy and convert it into electricity. Most are designed with anti - reflective glass front surfaces to capture and retain as much of the solar spectrum as possible Solar module glass has less reflectivity than water or window glass Typical panels are designed to reflect only about 2 percent of incoming sunlight Reflected light from solar panels will have a significantly lower intensity than glare from direct sunlight An analysis of a proposed 25- degree fixed -tilt flat -plate polycrystalline PV system located outside of Las Vegas, Nevada showed that the potential for hazardous glare from flat -plate PV systems is similar to that of smooth water and is not expected to be a hazard to air navigation Many projects throughout the U S and the world have been installed near airports with no impact on flight operations United Kingdom and U S aircraft accident databases contain no cases of accidents in which glare caused by a solar energy facility was cited as a factor When siting solar PV arrays pre - construction modeling can ensure the panels are placed in a way that minimizes any potential glare to surrounding areas Resources- Technical Guidance for Evaluating Selected Solar Technologies on Airports, Federal Aviation Administration, November 2010 (currently under review) http: / /www.faa gov /airports /environmental /policy guidance /media /airport solar guide.pdf A Study of the Hazardous Glare Potential to Aviators from Utility -Scale Flat -Plate Photovoltaic Systems, Black & Veatch Corporation, August 2011 http / /www.isrn.com /journals /re/2011/651857/ Solar Photovoltaic Energy Facilities, Assessment of Potential Impact on Aviation, Spaven Consulting, January 2011• http•/ /plan scambs gov uk/ swiftlg /MediaTemp/1121414- 374831.pdf 22 Endangered Species and Natural Heritage Question- Who ensures that rare animal and plant species and their habitats are not displaced or destroyed during the construction of ground- mounted solar PV? Bottom Line- Rules are in place to ensure that the installation of ground mounted solar arrays protects state - listed rare species and animals and plants. Project proponents can check with the local Conservation Commission to determine if the footprint of the solar PV project lies within a rare species habitat. More Information. The Massachusetts Natural Heritage and Endangered Species Program ( NEHSP) was created under the Massachusetts Endangered Species Act (MESA) and is responsible for protecting rare animal and plant species and their habitats from being displaced or destroyed. Specifically, NEHSP reviews projects proposed for Priority Habitats- These are areas known to be populated by state - listed rare species of animals or plants Any project that could result in the alteration of more than two acres of Priority Habitat is subject to NHESP regulatory review Projects will need to file a MESA Information Request Form, along with a project plan, a U S Geological Service (USGS) topographical map of the site, and a $50 processing fee NHESP will let project administrators know within 30 days if the filing is complete, then will determine within the next 60 days whether the project, as proposed, would result in a "take" of state - listed rare species that might require the project to redesign, scale down, or abandon its plan. Estimated Habitats. These are a sub -set of Priority Habitats that are based on the geographical range of state - listed rare wildlife — particularly animals that live in and around wetlands If the project is proposed for one of these areas and the local Conservation Commission requires filing a Notice of Intent (NOI) under the Wetlands Protection Act, the project will need to submit copies of the NO], project plans and a U S Geological Service (USGS) topographical map to NHESP Within 30 days of receiving this information, NHESP will send its comments to the Conservation Commission, with copies to the project administrator, project consultants, and the Department of Environmental Protection (MassDEP) Projects can check with the Conservation Commission in your town or city to find out if its footprint lies within an Estimated Habitat for rare species Each Commission has a large -scale map of its community available for public inspection. Each map NHESP develops to delineate a Priority Habitat or Estimated Habitat is based on at least 25 years of local rare animal and plant observation, and the best scientific evidence available It is important to note that to ensure adequate protection of rare species, NHESP does not disclose detailed site - specific information about them. Resources. To learn more about the NHESP review process and download a MESA Information Request Form, visit http / /www mass gov /dfwele /dfw /nhesp /regulatory review /mesa /mesa project review htm For lists of rare animal and plant species in Massachusetts, visit http•/ /www mass gov /dfwele /dfw /nhesp /species info /mesa list /mesa list htm 23 24 MASSACHUSETTS LEI'S ENERGY 'c CENTER 39 40 Attachment B 41 VACC Iwc D&A VIBR0-ACOUSTIC CONSULTANTS Inverter Sound Power Level Testing 490 POST STREET • SUITE 1427 S.,�N FRArTCISCo • CA • 94102 • USA TEL / FAX ( +1) 415 -693 -0424 / 1398 http / /www va- consult com Advanced Energy Industries, Fort Collins, CO Prepared by: Tyler Rynberg, PE Vibro- Acoustic Consultants tvlerkva- consult.com Date- 14 April 2010 V* \Projects \VAC - 00570 -AIE InverterPWL \OS Outgoing\20100414 -AEI PWLTesting.doc • TJR • 15 April 2010 42 Table of Contents 1 Background p.1 2 Description of Inverter p 1 3 General Methodology p.1 4 Data Collection p 2 4.1 Measurement System Parameters p. 2 4.2 Measurement Locations and Site p. 2 Conditions 43 Qualification of Acoustical p 3 Environment 44 Data Presentation p 3 5 Discussion p 4 Figures 1 -7 Measurement Data Plots p 5 VIBRO- ACOUSTIC CONSULTANTS • 490 POST STREET, SUITE 1427 • SAN FRANCISCO, CA • 94102 • USA PHONE ( +1) 415- 693 -0424 • FAX ( +1) 415- 693 -1398 • INTERNET http / /www.va- consult.com 43 - 1 - 1 Background Advanced Energy Industries (AEI) wishes to document the sound power levels generated by the Solaron 500, a 500 kW inverter AEI has requested that the testing of the fuel cell be performed per the ISO 3744 -1994 Standard We visited the AEI facility on Thursday, 1 April 2010, to perform the testing Since sound power is a property of the source being tested (rather than the cumulative result of multiple sources interacting with the environment), these data are applicable to many different installation conditions In this document, we report the measured sound power levels and sound pressure levels and provide commentary on how we would insert this source into computer -based noise propagation models 2 Description of Inverter The device under test was designated as Solaron 500 model number 3159500 -0000 Al (with 311 enclosure), a 500 kW inverter, manufactured by AEI in March 2010. The inverter had a serial number of 750385 F/R Al The inverter was 1 83m wide x 0 97m deep x 2m high The inverter was mounted on a rigid wood platform constructed using 2x4 studs and rigid foam The platform raised the inverter 0 2m off the floor The reference box established for the inverter had the following dimensions L1 = 1 83m, L2 = 0 97m, L3 = 2 21m The inverter was supplied DC input voltage by power generation equipment located in an adjacent room 3. General Methodology We measured the sound pressure levels generated by the inverter per the ISO 3744 -1994 Standard During the measurements, we collected the overall un- weighted equivalent continuous sound level (LEO), as well as the un- weighted 1/3- octave band spectra from both the inverter and ambient conditions The measurement duration at each microphone position was 60 seconds To measure the inverter, we established a parallelepiped measurement surface 1 meter from the reference box The resultant measurement surface had the following dimensions L1 = 3 83m, L2 = 2 97m, L3 = 3 21m, and totaled 55 01 square meters We used 9 microphone positions, per Figure C2 of the ISO 3744 -1994 Standard For all 9 positions, the fixed microphone position technique was used VIBRO ACOUSTIC CONSULTANTS • 490 POST STREET, SUITE 1427 • SAN FRANCISCO, CA • 94102 • USA PHONE ( +1) 415 693 -0424 • FAX ( +1) 415- 693 -1398 • INTERNET http • / /www va- consult com 44 -2- We tested four operating configurations of the inverter As an exploratory test, we also measured a fifth configuration at only one microphone position The tested configurations are shown in the following table Configuration Input Voltage Output Power Blower Setting 1 790V 100% (500kW) Maximum 2 850V 100% (500kW) Maximum 3 730 -745V' 100% (500k1At) Maximum 4 790V 50% (250k11V) Maximum 5 850V 50% (250kM Maximum 'During this measurement, the voltage regulator was not operating properly The input voltage was observed to oscillate between 730V and 745V We understand from our discussions with AEI personnel that the operating conditions tested are representative of a real -world installation 4 Data Collection 41 Measurement System Parameters We measured the sound power levels using our standard testing suite Instrument Make / Model Identification Microphone Calibrator Bruel & Kjaer 4231 SIN 2292439 Noise Meter Norsonic N -140 SIN 1403581 Microphone Preamplifier Norsonic N -1209 SIN 12749 Microphone Norsonic N -1225 SIN 96063 The noise meter was calibrated to 94 dB at 1 kHz before and after the measurements The n-ncrophone windscreen was used The Norsonic N -140 has an internal correction filter to correct for the effects of the windscreen 4.2 Measurement Locations and Site Conditions We collected data in the Solaron testing lab adjacent to the main fabrication area at the AEI facility in Fort Collins, CO The testing lab measured approximately 13 41m x 19 51m x 3 35m The floor is an exposed concrete slab, three of the walls are constructed using vinyl -faced gypsum board on stud - framing, the remaining wall was open to the main fabrication area, the ceiling is a suspended grid containing vinyl -faced gypsum board panels The testing area contains several workstations and other inverters The inverter was placed near the center of the testing lab space, at least 5.5m from any of the lab walls No workstations or other inverters were located within 4m of the inverter However, the top of the inverter was only 1 14m below the suspended gypsum board ceiling In an effort to reduce the effects of the ceiling on the measurements, several ceiling tiles above the VIBRO ACOUSTIC CONSULTANTS • 490 POST STREET, SUITE 1427 • SAN FRANCISCO, CA • 94102 • USA PHONE ( +1) 415 -693 0424 • FAX (+1) 415 693 1398 • INTERNET http • / /www va- consult com 45 -3- inverter were removed This roof deck is approximately 2 8m above the suspended ceiling, providing a vertical clearance of 3 9m The temperature in the fabrication area was estimated to be 22 °C The relative humidity was typical of an indoor air - conditioned environment 4.3 Qualification of Acoustical Environment Ambient Noise Correction Factor K1 In the majority of 1/3 octave bands, the ambient noise levels were greater than 6 dB below the test conditions In the 50-80Hz, 630Hz, and 2 -6 3kHz 1/3 octave bands, the ambient noise was frequently only 1 -4 dB below the test conditions Generally, the "middle" four measurement positions had a greater signal -to -noise ratio than the "top" five positions Acoustical Correction Factor K� The reflecting plane extended a minimum of 4 5m from the measurement surface in all directions, which meets the ISO -3744 Standard for the 50 Hz lower boundary of the presented data The reflecting plane was concrete slab -on -grade and was estimated to have an absorption coefficient of 0 05 or less in the frequency bands of interest The Approximate Method was used to determine the environmental correction factor, K2 Our calculations show that the highest value for K2 is 9 6 dB and occurs in the 500Hz octave band The environment does not meet the ISO -3744 Standard requirement of K2 < 2 dB The following table presents the calculated octave band K2 values Calculated 63 Hz 125 Hz 250 Hz 500 Hz 1 kHz 2 kHz 4 kHz 8 kHz K2 52dB 46dB 68dB 96dB 93dB 86dB 71 dB 62dB While the values for K2 exceed the ISO Standard in all octave bands, the Standard allows for compliance by using a maximum correction factor of 2 dB Values for which the correction factor is limited to 2 dB therefore represent a "worst- case" or upper boundary for the actual performance of the device under test 4.4 Data Presentation Data are presented in Tables 1-7 For each configuration, we present the overall A- weighted (LwA) and the un- weighted 1/3 octave band sound power levels in decibels referenced to 1x1012 W We also present the overall A- weighted (dBA) and the un- weighted 1/3 octave band sound pressure levels in decibels referenced to 20 µPa for each configuration VIBRO- ACOUSTIC CONSULTANTS • 490 POST STREET, SUITE 1427 • SAN FRANCISCO, CA • 94102 • USA PHONE ( +1) 415 - 693 -0424 • FAX ( +1) 415 - 693 -1398 • INTERNET http. / /www.va- consult com 46 WE 5 Discussion Non- Co=hance Sound Pressure Levels The noise generated in the 50 -80Hz, 630Hz, and 2-6 3kHz 1/3 octave bands do not exceed the ambient conditions by the minimum 6 dB required by the ISO -3744 Standard The published levels in these bands should be considered to be the upper boundary of the exact level — the true level is likely to be lower in level than the calculated values The overall sound power level, LwA, does meet the requirements of the ISO -3744 Standard, in terms of ambient noise However, the acoustical environment does not meet the ISO -3744 Standard in any of the 1/3 octave bands Therefore, the published levels in all of the bands, including the overall LwA, should be considered as the upper boundary of the actual level Configurations There was no significant difference in sound power level between the configurations The only statistically important variation was the amplitude of a 9kHz tone, which was highest with Configuration 2 This tone could be a sub - harmonic of the switching circuitry, which runs at 18kHz Noise Modeling In all of the configurations tested, the relatively broadband noise from the blower dominated the noise character There is also significant tonality at the 160 Hz band from the blower The directionality in the noise generation appears to be modest, with all four sides fitting within a 2 dB window The relatively uniform directivity is due to the presence of air inlets or outlets on all four sides as well as at the bottom of the inverter As there are no openings in the top of the inverter, the levels at the top typically measured 7 dB lower than the sides of the unit With the configurations tested, we would model the unit as a box with uniform directivity at an elevation of approximately 1m Please feel free to call if you have any questions, we may be reached in our San Francisco office by telephone at ( +1) 415 - 693 -0424 or via email at Mler@yg-constilt.co Sincerely, 7� �4/� Tyler Rynberg, PE Vibro - Acoustic Consultants VIBRO- ACOUSTIC CONSULTANTS • 490 POST STREET, SUITE 1427 • SAN FRANCISCO, CA • 94102 USA PHONE ( +1) 415 - 693 -0424 • FAX ( +1) 415 -693 1398 • INTERNET http / /www va- consult.com -5- Table 1: AEI Solaron 500 Sound Power Measurements - Calculated Sound Power Levels in dB, re 1x10 "12 W Configuration LwA 50 Hz 63 Hz 80 Hz 100 Hz 125 Hz 160 Hz 200 Hz 250 Hz 315 Hz 400 Hz 500 Hz 630 Hz 800 Hz 1 kHz 1 25 kHz 1.6 kHz 2 kHz 2.5 kHz 3.15 kHz 4 kHz 5 kHz 6.3 kHz 8 kHz 10 kHz 1 835 775 81 0 77 0 800 840 87.5 790 755 770 760 775 730 740 740 71 0 70 0 68 0 65.0 64 5 645 630 58 5 675 665 2 840 775 80 5 770 800 840 87.5 78.5 755 765 760 78.0 735 740 74.0 71 0 700 680 66.0 66.0 65.5 650 625 72.0 72.0 3 835 77.0 805 76 5. 80.0 835 875 78.5 75 5 76 5 775 78.0 73 5 745 740 71 5 720 69 5 66.5 65.5 64.5 63 0 58 0 630 61 5 4 83 0 1 770 1 770 765 1 80.0 1 835 1 875 1 78.5 1 73 5 1 765 1 760 77 5 73 5 74 0 74 0 1 71 0 70 0 67 5 1 65.0 64.5 645 630 580 61 5 61 5 "The testing environment did not meet the requirements in the ISO -3744 Standard. The presented data in all 1/3 octave bands should be considered as the upper boundary of the exact sound power levels. Table 2 AEI Solaron 500 Configuration 1 -Measured Sound Pressure Level at 1 m in dB, re: 20pPa Mic Position dBA 5D Hz 63 Hz 80 Hz 100 Hz 125 Hz 160 Hz 200 Hz 250 Hz 315 Hz 400 Hz 500 Hz 630 Hz 800 Hz 1 kHz 1.25 kHz 1.6 kHz 2 kHz 2.5 kHz 3 15 kHz 4 kHz 5 kHz 6.3 kHz 8 kHz 10 kHz Front 677 61 0 690 61 0 63 9 684 75.2 61 7 572 59.5 58.5 597 559 58 1 577 56 1 545 51 3 495 495 489 48.1 43.6 52.2 51 1 Left 66 1 59 0 61 1 61 9 650 674 66.0 59 1 61 0 604 61.5 61 9 57 3 567 56.4 53.2 52.5 503 47 9 466 45.8 42.8 39.3 493 485 Rear 67 8 61 0 655 60 1 62.4 659 68.3 644 59 9 594 59.3 59 9 573 589 60 1 56.3 55.4 522 1 507 49 5 49.6 48.7 440 543 547 Right 677 58.2 656 571 63 1 687 75.0 1 666 58 9 63 5 58.2 608 57 0 567 571 54 1 526 50 2 475 469 46.9 470 41 5 51 9 51 3 Front Top 643 60.6 594 59.2 61 2 667 67.9 567 562 569 577 595 543 55 3 545 51 9 51.2 493 467 45.8 45.5 1 43.0 39 1 48.2 437 Left Top 639 607 606 596 598 63 0 626 55.7 542 58 3 56 9 59.7 552 558 560 523 504 493 46.2 1 45.1 45.0 42.5 380 467 429 Rear Top 648 59.5 601 574 62.5 658 625 55.8 56.8 589 593 607 559 55 1 56.5 527 522 507 46.6 45.9 468 45 1 397 472 433 Right Top 649 598 60.3 56 9 63.4 67 5 675 594 543 56 8 563 60 1 550 554 561 527 527 51 0 47 9 472 470 461 40 9 455 438 Top 62.3 606 59.6 1 58 3 60.9 643 677 1 59 1 57 5 55 8 566 564 1 52.5 52.3 1 523 49 9 484 49 5 444 43.3 1 46 3 427 35 8 413 1 38 5 'The testing environment did not meet the requirements in the ISO -3744 Standard. The presented data in all 1/3 octave bands should be considered as the upper boundary of the exact sound power levels. V I B R O - A CO U S T I C C O N S U L T A N T S • 49 0 P O S T S T R E E T S U I T E 1 4 2 7 • S 4,,i FRANCISCO, CA • 9 4 1 0 2 • U S A P H O N E (+1) 4 1 5 - 6 9 3 - 0 4 2 4 • F A X (+1) 41 5 - 6 9 3 - 1 3 9 8 • INTERNET h t t p // w w w v a- c o n s u l t c o m v s - 6 - Table 3 AEI Solaron 500 Configuration 2 - Measured Sound Pressure Level at 1m in dB, re 20pPa Mic Position dBA 50 Hz 63 Hz 80 Hz 100 Hz 125 Hz 160 Hz 200 Hz 250 Hz 315 Hz 400 Hz 500 Hz 630 Hz 800 Hz 1 kHz 1 25 kH 1.6 kHz 2 kHz 2.5 kHz 3.15 kHz 4 kHz 5 kHz 6.3 kHz 8 kHz 10 kHz Front 683 60.9 673 61 5 642 68.2 747 61 9 574 59 1 588 614 567 587 57.8 558 548 51 6 507 506 498 494 475 574 576 Left 667 587 61 1 62.0 650 675 657 588 62.6 595 621 621 569 573 567 53.3 52.3 503 489 484 ' 474 454 446 53.9 48.5 Rear 68 1 61 0 651 602 623 647 674 631 582 590 1 598 60 1 577 59 1 59.9 559 55.2 521 51 3 51 1 503 506 484 571 59.5 Right 681 583 655 570 630 68.5 746 66.5 596 633 58.2 61 0 569 566 56.8 540 52.6 50.3 49 1 492 48 3 489 466 56.9 571 Front Top 647 608 59.2 588 61.2 670 684 56.6 557 566 577 59.9 539 554 55.0 52.6 51.3 496 477 474 462 449 430 51 8 49.3 Left Top 64.6 599 607 593 58.8 622 657 574 560 57.2 574 606 565 547 547 52.4 504 49.5 471 475 470 458 433 530 50.3 Rear Top 651 602 599 572 61 8 654 620 56.9 566 59.2 59.2 60.1 561 56 1 555 52.9 52.4 50.5 48 0 476 478 468 429 502 498 Right Top 651 595 597 568 63.7 671 681 601 542 57.3 56.3 599 55.2 55.5 555 52.7 52.9 504 48.5 484 475 473 442 514 492 Top 62.5 1 601 588 1 582 1 613 1 639 67.6 590 56 3 56.2 56.6 570 525 51 9 1 525 503 488 1 493 45 11 44 3 1 46 4 1 435 1 388 LL2 447 The testing environment did not meet the requirements in the ISO -3744 Standard The presented data in all 1/3 octave bands should be considered as the upper boundary of the exact sound power levels. Table 4 AEI Solaron 500 Configuration 3 - Measured Sound Pressure Level at 1m in dB, re 20pPa Mic Position dBA 50 Hz 63 Hz 80 Hz 100 Hz 125 Hz 160 Hz 200 Hz 250 Hz 315 Hz 400 Hz 500 Hz 630 Hz 800 Hz 1 kHz 1 25 kHz 16 kHz 2 kHz 2.5 kHz 3.15 kHz 4 kHz 5 kHz 6.3 kHz 8 kHz 10 kHz Front 680 60.8 676 61 4 640 68.3 748 620 572 587 584 609 570 587 581 562 575 524 509 50.2 48.9 476 43.0 486 461 Left 670 58.5 61 2 61 6 647 671 66.3 590 62.3 607 639 635 56.6 565 567 537 548 525 493 476 45.8 42.8 387 452 437 Rear 679 61 2 658 602 623 64.4 674 63 1 587 586 60 0 604 58.0 602 599 564 562 553 51 3 50.6 495 490 43.8 494 490 Right 673 58.6 66 1 575 623 68.2 741 1 662 59.6 62.8 587 595 57 1 57 1 570 541 537 51 5 501 48.4 46.9 470 41 5 480 470 Front Top 651 602 587 590 61 5 673 685 566 55.8 577 594 599 55.0 555 551 539 536 509 482 46.5 45.3 431 38.2 429 397 Left Top 648 597 603 589 581 61 9 654 580 55.6 581 585 598 553 559 55.2 533 554 51 0 473 46.1 45.6 42.9 375 426 396 Rear Top 655 58.5 589 553 613 642 61 1 553 58.4 590 600 61 5 56.6 568 56.5 533 54 1 51 8 483 46.5 472 45.5 39.3 425 393 Right Top 65 6 59 0 604 566 1 631 66.4 676 589 52.9 58 4 58 9 61.2 55.2 561 56.2 543 543 52 1 488 475 47 0 46.1 409 432 401 Top 62 7 59 5 58.5 577 61 3 64'6 676 588 56 1 56 3 56 8 57.2 53.2 525 531 503 497 50 1 45 1 43.7 4577T42.4 35.0 1 371 337 `The testing environment did not meet the requirements in the ISO -3744 Standard. The presented data in all 1/3 octave bands should be considered as the upper boundary of the exact sound power levels oa V I B R O - A C O U S T I C C O N S U L T A N T S • 4 9 0 P O S T STREET, S U I T E 1 4 2 7 • S a N FRANCISCO, CA • 9 4 1 0 2 • U S A PHONE ( +1) 415 -693 -0424 • FAX ( +1) 415- 693 -1398 • INTERNET It ttp / /www va- consult c o m a -7- Table 5 AEI Solaron 500 Configuration 4- Measured Sound Pressure Level at 1 m in dB, re: 20pPa Mic Position dBA 50 Hz 63 Hz 80 Hz 100 Hz 125 Hz 160 Hz 200 Hz 250 Hz 315 Hz 400 Hz 500 Hz 630 Hz 800 Hz 1 kHz 1.25 kHz 1 6 kHz 2 kHz 2.5 kHz 3 15 kHz 4 kHz 5 kHz 6.3 kHz 8 kHz 10 kHz Front 675 596 62.3 61 0 640 68.2 752 61 9 556 58 9 58 2 60 3 56.0 58.0 579 55 8 547 51 2 49 1 492 49 1 478 431 46 9 475 Left 65 6 57 9 59.9 61 9 649 671 663 58.2 56.8 594 61 2 61.3 56 9 56.7 56 1 532 52.5 50.2 47.5 464 458 42.4 387 45.5 43 8 Rear 670 60 3 61 2 60 0 620 644 676 638 593 582 59 1 59 8 56.8 58.8 597 559 55 0 51 6 50.1 494 494 48 5 43.5 47.2 48 8 Right 66 8 564 59.8 566 62.2 676 73 8 65.8 577 637 58 8 58.8 57 1 56.1 570 538 52.3 49.7 467 46 9 468 466 41 1 46.3 46.2 Front Top 641 608 587 587 61 1 655 68 1 560 1 547 57 0 578 59.5 54.8 56.1 547 51 8 502 49 1 46 1 457 1 453 42.7 378 41 4 39.5 Left Top 640 592 58.6 59 1 58.3 1 62 1 1 656 579 557 576 1 57 3 60 1 55.5 556 547 52 1 50 8 49.0 457 45 1 457 429 376 427 400 Rear Top 648 598 59.0 580 631 65 3 634 567 54 3 572 58 1 60.8 1 56 1 555 568 53 9 51 8 502 46.6 457 470 460 394 40.5 38.9 Right Top 65 0 59 8 579 576 644 674 68 1 60.3 534 572 554 59 9 57 1 556 559 542 52 9 50.2 476 470 46 8 46 1 405 41 7 40.9 Top 62.3 603 58.4 584 61 1 630 671 587 53 3 561 56 8 575 53.0 52.8 530 496 476 49 5 44.2 430 45 9 42 3 34 9 35.3 1 343 'The testing environment did not meet the requirements in the ISO -3744 Standard. The presented data in all 1/3 octave bands should be considered as the upper boundary of the exact sound power levels. Table 6. AEI Solaron 500 Configuration 5 - Measured Sound Pressure Level at 1rn in dB, re: 20pPa Mic Position dBA 50 Hz 63 Hz 80 Hz 100 Hz 125 Hz 160 Hz 200 Hz 250 Hz 315 Hz 400 Hz 500 Hz 630 Hz 800 Hz 1 kHz 1 25 kHz 1 6 kHz 2 kHz 2.5 kHz 3.15 kHz 4 kHz 5 kHz 6.3 kHz 8 kHz 10 kHz Front 67 4 60 5 63 3 61 3 63.9 68 1 74 6 61 9 56 2 58 9 58 5 61 2 56 1 58 2 57 4 1 55 8 1 54 8 51 5 49 2 1 48.8 1 48 6 1 47.5 1 42 6 45 6 1 45 3 'The testing environment did not meet the requirements in the ISO -3744 Standard The presented data in all 113 octave bands should be considered as the upper boundary of the exact sound power levels. VIBRO- ACOUSTIC CONSULTANTS 490 POST STREET, SUITE 1 427 S %N FRANCISCO, CA 941 02 USA P H O N r (+1) 41 5 - 6 9 3 - 0 4 2 4 • F A X ( + 1 ) 4 1 5- 6 9 3 - 1 3 9 8 • INTERNET h t t p // w w w v a- c o n s u l t c o m CD 100 90 80 p 70 N 0 60 X T L Z 50 Qi J 3 40 0 d c 0 30 co 20 10 0 10 -8- Table 7 AEI Solaron 500 —1/3 Octave Band Sound Power Levels in dB, re: 1x10 "12 W 1 I I I 1 1 I I 1 I i I I II I I I I I I I I I 1 I I I 1 1 1 I I i I 1 I I I I I I 1 I I I I I I I 1 I I I I 1 1 I I I I 1 I I I I I I i 1 I I I 1 I r I I I I 1 I I I I I I I I I I 1 I I I I I I I I I I I 1 I I 1 I I I I I I I I I I I I I I I I I I I I 1 I 1 I i I I I I I 1 I t I I I 1 1 1 1 I I I I I 1 I I 1 I I I I I I I I I I I I i I 1 1 I I I I I I I I I I I I I I I I I ������,,,,,,____ I I I 1 I I I 'wM 1 1 1 1 I I I I I I I I I I I I I I 1 i I I i I I I I i f I 1 I I I I I I I I I I I I I I I I I I 1 I I I 1 I I I I I 1 I I I 1 I I I I ! ,a3' .,, — Configuration 1 I I I ITT — Configuration 2 I I I I I 1 I I I I I I I - Configuration 3` I 11 I I I I I I P I I II I I I 1 I I I I 1 I L. I C I I I - Configuration 4 I I 1 1 I I 11 - TT -TiTTT I' I I I I I I I I I I I 100 1/3 Octave Band Frequency [Hz] 1000 10000 VIBRO- ACOUSTIC CONSULTANTS 490 POST STREET, S U ITE 1 427 • S NN FRANCISCO CA 94102 USA PI-I ONE ( +1) 41 5- 693 -0424 • FAQ ( +1) 415 -693 1398 • INTERNET ht t / / w w w va - c o n s u 1 t c o m cn 0 51 Attachment C 52 David S. Massey, Inc. Real Estate Appraisers and Consultants Commercial and Residential 1629 South Church Street Burlington, NC 27216 -1438 Telephone (336) 226 -9374 Fax (336) 228 -0621 Websites. www.MasseyAppraisals.com / www.MasseyRe.com Email- david @masseyre com February 20, 2013 Mr Michael Fox, Esquire Tuggle Duggins P A 100 N Greene Street, Suite 600 Greensboro, N.C. 27401 Dear Mr Fox This letter is in response to Tuggle Duggms, P A. request to retrain me as an Expert Witness My scope of retention is to provide consulting and expert witness services, opinions and testimony regarding the impact of solar farms on adjacent property values My detailed qualifications are attached to this report Briefly, I am a State Certified General Real Estate Appraiser by the State of North Carolina and a Licensed Real Estate Broker. My company David S Massey, Inc was started in 1990 In 1982 I went to work for my father as a Real Estate Salesperson and did all the appraisals for his company This was before Certification of Appraisers became law In total I have 31 years of experience in Real Estate Appraisals and Brokerage My work is focused 99% on real estate appraisals and the brokerage is handled by my sales force of 18 Independent Contractors The State Certified General Real Estate Appraiser certification is the highest level of certification earned in the State of North Carolina This certification allows me to appraise all types of properties My practice consists of residential and commercial appraisals in Guilford, Alamance, Orange, Durham, Randolph, Chatham and Caswell Counties of North Carolina My primary counties are Alamance and Guilford Counties My office is located in Alamance County and my primary residence is a horse farm located in Southeastern Guilford County 53 Page 2 Your engagement letter is for me to study the impact of solar farms on adjoining property values This study falls under the appraisal definition of External Depreciation or External Obsolescence Simply put, this is the influence of a feature outside of the subject property. The influence may or may not exist. External obsolescence is a key consideration in appraisal work and results from diminished value to improvements. It is also one of the most difficult concepts to understand It is implicit in all three basic approaches to value but is most often specifically addressed in the cost approach It is separately addressed because it is independent of physical deterioration and functional problems. External obsolescence can be categorized into locational, environmental, and economic The loss itself results from tangible influences such as traffic, odor, view, and neighborhood, as well as intangible influences such as economy and effective demand influences. The basic premise is the principle of externalities, as stated in The Appraisal of Real Estate, tenth edition "Economies outside a property have a positive effect on its value while diseconomies outside a property have a negative effect on its value " Two methods can be used to measure external obsolescence The procedure best supported by market evidence should be selected An appraiser can either capitalize the income or rent loss attributable to the negative influence, or compare sales of similar properties that are subject to the negative influence with other properties that do not have the negative influence In my research regarding Solar Farms, I found no sales of properties next to or near to a solar farm I contacted several appraisal peers and none had any sales of properties near solar farms This is understandable as Solar Farms are relatively new to the American Real Estate market No direct market data was found to determine if any Economic Depreciation or Obsolesce does or does not exist due to a Solar Farm I then determined that the best course of action would be to determine Economic Depreciation from externalities that can be measured with market data Two market studies I performed are a part of this report One, I measured the market reaction to a High Voltage Power Line Tower being in the rear yard of a house, the side yard of another and across the street from another house in the same development. I compared these three sales with a similar house in the development that does not have a view of the HVPL Tower This study shows a market derived depreciation rate of 5% due to the unsightly tower 54 Page 3 Next, I measured the impact of an Industrial Plant and a large Manufactured Home Park located across the street from a development These externalities are both clearly visible to the development. I compared three homes in this development to a similar house in a similar development that does not have the Industrial Plant and Mobile Home development influence This study yielded a market derived external depreciation rate of 3% From these two studies I performed, one can see that visible externalities create between 3% and 5% external depreciation based on the market derived data I found an additional study regarding Wind Farms and the impact on surrounding property values This 164 page study can be found at http / /eetd Ibl.gov/EA/EMP This study was performed by Berkley Labs The work described in this report was funded by the Office of Energy Efficiency and Renewable Energy (Wind & Hydropower Technologies Program) of the U S Department of Energy in December of 2009 An abstract of the above study follows. "The present research collected data on almost 7,500 sales of single family homes situated within 10 miles of 24 existing wind facilities in nine different U S states The conclusions of the study are drawn from eight different hedomc pricing models, as well as both repeat sales and sales volume models The various analyses are strongly consistent in that none of the models uncovers conclusive evidence of the existence of any widespread property value impacts that might be present in communities surrounding wind energy facilities. Specifically, neither the view of the wind facilities nor the distance of the home to those facilities is found to have any consistent, measurable, and statistically significant effect on home sales prices " From my two studies in neighboring Alamance County and the with support from the Wind Farm Study, my professional and expert opinion is that the two proposed Solar Farms that will not be visible will have no impact on the market values of the surrounding properties. The Solar Farms with the proposed landscaping buffers and natural buffers will not create a negative externality for the surrounding properties as they will not be visible As a horse farm owner in Southwest Guilford County and as a professional real estate appraiser, I would welcome a solar farm next door to my farm There are certainly much worse uses of land that would harm property values such a Swine Farms, Poultry Farms and other noxious uses that unlike a solar farm can be seen, smelled and heard. 55 Respectfully submitted, David S Massey State Certified General Appraiser #A2912 Attachments Appraiser Credentials Market Studies of External Depreciation 56 RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: ) Sunlight Partners ) 4215 East McDowell Road ) Suite 212 ) Mesa, Arizona 85215 ) (Space Above For Recorder's Use) MEMORANDUM OF LEASE ==RANDUM OF LEASE (this "Memorandum ") is made and entered into as of % , 201, by and between Sheila N. Bishop, Michael L. Bishop and Annie Virginia Nunn ( "Landlord "), and Sunlight Partners, LLC, a Nevada limited liability company or assigns ( "Tenant "); WITNESSETH: WHEREAS, Landlord and Tenant have entered into that certain Ground Lease dated December 13, 2012, (the "Lease "), relating to all or a portion of the "Property" commonly known as County of Orange, A.P.N. 9881388874 and 9881493072. The leased "Premises" are more particularly described in Exhibit "1" attached to this Memorandum and incorporated by this reference; and WHEREAS, Landlord and Tenant desire to enter into this Memorandum to provide notice of Tenant's interest in the Premises. WHEREAS, Landlord and Tenant desire to enter into this Memorandum for the purpose of providing record notice of the Lease and certain of the terms and conditions thereof. NOW, THEREFORE, for and in consideration of the payments and covenants to be paid and performed by Tenant under the terms of the Lease, the receipt and sufficiency of which are hereby acknowledged, the parties hereto do hereby covenant and agree as follows: 1. TERM, The "Approval Period" of the Lease shall commence on January 1, 2013, and expires on December 31, 2014. Unless otherwise agreed in writing between Landlord and Tenant, the "Term" of the Lease shall commence on the "Rent Commencement Date," as defined Page 1 Landlord Tenant 57 in the Lease, which date may be selected by Tenant in its sole discretion, but in no event later than the expiration of the Approval Period. The Term of the Lease shall expire on its fifteenth anniversary (the "Expiration Date "), except as extended as provided below. 2. RENEWAL TERMS. Tenant has the right to renew the Lease for three (3) additional periods of five (5) years (the "Renewal Terms) ") from the expiration of the original Term of the Lease or the then current Renewal Tenn. In the event that Tenant elects not to exercise any or all of the Renewal Terms, Tenant shall have the right to continue the Lease for a period of between one (1) and twelve (12) months after the end of the then - current Term (also a "Renewal Term "). 3. LEASED PREMISES. The Premises is described in Exhibit "1 ". The Premises is leased together with, and includes all of Landlord's air rights, water rights and any easements, rights -of- way or other interests appurtenant to the Property, including in, on, under or to any land, highway, alley, street or right -of -way abutting or adjoining the Property, as necessary for Tenants "Intended Use ". 4. TENANT'S EXCLUSIVE USE. During the 'Perm of the Lease and any Renewal Term(s), Landlord covenants that it will not (a) use or lease or (b) permit any tenant to use or lease or (c) permit any occupant or subtenant or assignee of a tenant or occupant to use any of the Property outside of the Premises, or any other property located within a radius of one (1) mile of the Property in which Landlord has an interest, for the purpose of conducting a business that is engaged in the solar power generation business and/or a use similar to the Intended Use. 5. RIGHT OF FIRST REFUSAL. During the Term of the Lease and any Renewal Term(s) thereto, Tenant shall have a right of first refusal, as detailed in the Lease, with respect to sales or leases of the Property or the Premises. 6. COUNTERPARTS. This agreement may be executed in two or more counterparts, each of which together shall be deemed an original, but all of which together shall constitute one and the same instrument SIGNATURES TO FOLLOW w� � Page 2 Lat dlord Tenant �58 IN WITNESS WHEREOF LANDLORD: By: By: SHEILA N BISHOP ANNIE VIRGINIA NUNN TENANT: SUNLIGHT PARTNERS, LLC a I i a Nevad c d liliblili ty company L'W' JAS E'LSWORTH PRESIDENT / 3� [a —nd I er—d Page 3 -/ p f7�M" O'j Tenant I IN WITNESS WHEREOF LANDLORD: SHEILA N. BISHOP ANNIE VIRGINIA NUNN TENANT: SUNLIGHT PARTNERS, LLC a Nevada limited liability company BY: JASON ELLSWORTH PRESIDENT 7 Landlord t Page 3 By: Nom' preseln+ MICHAEL L. BISHOP Tenant. 59 % LANDLORD ACKNOWLEDGMENT STATE OF NORTH CAROLINA ) ss. COUNTY OF ©! -a- 0, e— ) On Jan -th 2D13 before me 3-olq-ni e- -T1A Vy ]�a y) S , Notary Public, personally appeared c he i 1 aal.$ts1-t� wnd flnr to V tr" I who proved to me on the basis of satisfactory evidence to be th6 person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he /she /they executed the same in his/her /their authorized capacity( es), and that by his/her /their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY of PERJURY under the laws of the State of North Carolina that the foregoing paragraph is true and correct. WITNESS my hand and official seal. ��`••���� I tHR'b�. IAOTA p y MY SignatuT ES ON EXPIRES MO/2o» U9 p C TENANT ACKNOWLEDGMENT STATE OF ARIZONA } ) ss. COUNTY OF MARICOPA ) On 0'&). ( (o,2013 , before me Notary Public, personally appeared JASON ELLSWORTH, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he /she /they executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY of PERJURY under the laws of the State of Arizona that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Landlord Oe Page 4 OFICIAL KCAL ltai iES MM. HEMPHILL PUBLic . state of Arizona MARICOPA COUNTY (SEAL) rAy Camm Expitee3 July 31.2013 IM Tenant 61 LANDLORD ACKNOWLEDGMENT STATE OF NORTH CAROLINA ) ss. COUNTY OF /ham Co, / Gd. 117C005t d On Notary Public, personally appeared t1 /V7 �,5 , who proved to me on the basis of satisfactory evidence to be the person(sl whose name(s) is /are subscribed to the within instrument and acknowledged to me that lie /she /they executed the same in his/her /their authorized capacity(ies), and that by his /her /their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) .acted, executed the instrument. I certify under PENALTY of PERJURY under the laws ott* of rth Carolina that the foregoing paragraph is true and correct. , >`� �'r''•N" �'�+,. . Y z WITNESS my hand and official seal,a�� cp Signature GLGx V 1776.&,6 (S1'AIVQE /fij CUmm Lss,GA ArPX6 10491is TENANT ACKNOWLEDGMENT STATE OF ARIZONA ) ss. COUNTY OF MARfCOPA On , before me , Notary Public, personally appeared JASON ELLSWORTH, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within Instrument and acknowledged to me that he /she /they executed the same In his authorized capacity, and that by his signature on the Instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY of PERJURY under the laws cif tlit State of Arizona that the forgoing paragraph is true and correct. WITNESS my hand and official seal. Signature _ (SEAL) Page Q Lai�d►orcl Tenant 62 EXHIBIT 1 To Memorandum of Lease dated , 2013 amon Sheila N. Bishop, Michael L. Bishop and Annie Virginia Nunn, as "Landlord" and Sunlight Partners, LLC as "Tenant" Description of the Premises Real property in the County of Orange, State of North Carolina, described as follows: All or a portion of Assessor's lax Parcel Numbers 9881388874 and 9881493072, to be further defined upon receipt of a valid Title RopoM slyewl... 4vl�, Landlord • Page 5 Tenant N 63 PIN OWNERI LAST OWNERI_FIRST OWNER2_LAST 9881393407 SPAINHOUR JAMES E OLIVER 9881298619 THOMANN WAYNE R THOMANN 9881380433 RYAN SHARON 9882304441 OLSON TIMOTHY K OLSON 9882301239 YOUNG DAVID R YOUNG 9881289994 GEWALT SALLY LYNN PETRANKA 9881298334 RADCLIFFE MARK BLAKLEY RADCLIFFE 9882407620 KIRKLAND ALFRED S 9881493072 BISHOP MICHAEL L BISHOP 9881371405 MARCHMAN ROBERT LEE IV MARCHMAN 9881393660 MATTINGLY DANIEL E CHERNEY 9881380749 MAUPIN MELANIE JO 9881487800 NOLAN DANIEL DONALDSON 9881384515 WEGMAN LYDIA NAN CANTWELL 9881375457 VEGA CYNTHIA L null 9881390566 PASCHALL GINA 9882304127 LANGHAM LAURI LANGHAM 9881485059 NUNN ANNIE VIRGINIA 9881185784 FALLS OF NEW HOPE ASSOCIATION INC 9881297458 BANKS DONALD WILLIAM 9881390238 TRUEBLOOD THOMAS L TRUEBLOOD 9881289280 FINDLAY JOHN W A null 9881373411 BURNS ANDREW C III BURNS 9881390127 STEVENS HARRIETTLU 9881298298 RADCLIFFE MARK BLAKLEY RADCLIFFE 9881496159 NOLAN DANIEL DONALDSON 9881278954 FOURQUREAN FRED T FOURQUREAN 9881289039 KELLUM DONALD KELLUM 9881485626 BISHOP SHEILA N NUNN 9881585392 KIRKLAND ALFRED S 9881296151 FALLS OF NEW HOPE ASSOCIATION INC 9881187348 PENDER MARGARET PENDER 9881471110 TRIANGLE LAND CONSERVANCY 9881471110 TRIANGLE LAND CONSERVANCY 9881394717 SMITH PATRICIA CAROLE 9881383237 WEGMAN LYDIA NAN CANTWELL 9881383013 CANTWELL ROBERT S WEGMAN 9881390743 MCKINNEY ROSS E JR MCKINNEY 9881378448 MERCER LARRY MERCER 9881391828 PARKIN JEFFREY S HOERCHER 9881288779 FALLS OF NEW HOPE ASSOCIATION INC 9881279738 JACKSON I DAVID B 1JACKSON 9881381606 LINDROOS IPAMELA MARIE ICHINCHAR 64 9881370603 KATZ BARRY NOVIK 9882302007 HOMEGUY INC null 9882209004 WALTER MELISSA null 9881380331 JOHNSON BLAKE A JOHNSON 9881374242 BURNS ANDREW C III BURNS 9881388874 BISHOP ISHEILA N NUNN 9881394917 SMITH I PATRICIA CAROLE 65 OWNER2 FIRST ADDRESSI ADDRESS2 CITY STATE IZIPCODE PATRICIA A 5502 CASCADE DR CHAPEL HILL NC 27514 CHARLOTTE H 2521 CHARLOCK CT CHAPEL HILL NC 275149609 5701 CASCADE DR CHAPEL HILL NC 27514 ROBIN M 5312 CASCADE DR CHAPEL HILL NC 27514 MILLY S 5317 CASCADE DR CHAPEL HILL NC 275149547 JOHN GUNTER 2531 FALLS DR CHAPEL HILL NC 1275149695 CONSTANZA J DE 2520 FALLS DR CHAPEL HILL NC 275149695 3111 MT SANAI RD CHAPEL HILL NC 27514 SHEILA N 2916 MT SINAI CHAPEL HILL NC 275149685 SUSAN S 5805 CASCADE DR CHAPEL HILL NC 27514 MARY SUE 5420 CASCADE DR CHAPEL HILL NC 275149690 5609 CASCADE DR CHAPEL HILL NC 27514 KIM A 3004 MT SINAI RD CHAPEL HILL NC 27514 ROBERT SEWELL 5704 CASCADE DR CHAPEL HILL NC 275149535 null 5821 CASCADE DR null CHAPEL HILL NC 27514 5505 CASCADE DR CHAPEL HILL NC 275149691 DAVID 5320 CASCADE DR CHAPEL HILL NC 275149547 2911 MOUNT SINAI RD CHAPEL HILL NC 275149685 5830 BRISBANE DR CHAPEL HILL NC 27514 600 COMMERCE DR DECATUR GA 300302610 NANCY T 5511 CASCADE DR CHAPEL HILL NC 27514 null 2829 CONNESTEE TRL null BREVARD NC 28712 JULIA W 5809 CASCADE DR null Chapel Hill NC 27514 5517 CASCADE DR CHAPEL HILL NC 27514 CONSTANZA J DE 2520 FALLS DR CHAPEL HILL NC 275149695 KIM A 3004 MT SINAI RD CHAPEL HILL NC 27514 ELLEN G 5719 CASCADE DR CHAPEL HILL NC 275149535 SALLY 5715 CASCADE DR CHAPEL HILL NC 275149535 ANNIE VIRGINIA 2916 MT SINAI RD CHAPEL HILL NC 275149685 3111 MT SINAI RD CHAPEL HILL NC 27514 5830 BRISBANE DR CHAPEL HILL NC 27514 DAVID 2509 CAPREA CT null Chapel Hill NC 27516 SUITE 205 1101 HAYNES STREET RALEIGH NC 27604 SUITE 205 1101 HAYNES STREET RALEIGH NC 27604 5408 CASCADE DR CHAPEL HILL NC 27514 ROBERT SEWELL 5704 CASCADE DR CHAPEL HILL NC 275149535 LYDIA N 5704 CASCADE DR CHAPEL HILL NC 27514 HOLLY B 2523 CHARLOCK CT CHAPEL HILL NC 275149609 LINDA 111 BROOK LANE DURHAM NC 27712 SUSAN J 2522 CHARLOCK CT CHAPEL HILL NC 1275149609 5830 BRISBANE DRIVE CHAPEL HILL NC 27514 LAEL W 5721 CASCADE DR CHAPEL HILL NC 275149535 CHRIS -ANN 73 CRYSTAL OAKS CT DURHAM NC 27707 •. BELINDA 5801 CASCADE DR CHAPEL HILL NC 275149620 null 109 RIVER WALK LN null Carrboro NC 27510 null 2518 CHARLOCK CT null CHAPEL HILL NC 275149609 JENNIFER M 5705 CASCADE DR CHAPEL HILL NC 275149535 JULIA W 5809 CASCADE DR null Chapel Hill INC 1 27514 ANNIE VIRGINIA 2911 MOUNT SINAI RD CHAPEL HILL NC 1275149685 5408 CASCADE DR CHAPEL HILL INC 1 27514 67 PIN OWNER-1-LAST OWNERI FIRST OWNER2 LAST OWNER2 FIRST 9881496159 NOLAN DANIEL DONALDSON KIM A 9881487800 NOLAN DANIEL DONALDSON KIM A 9881485059 NUNN ANNIE VIRGINIA 9881388874 BISHOP SHEILA N NUNN ANNIE VIRGINIA 9881485626 BISHOP SHEILA N NUNN ANNIE VIRGINIA 9881585392 KIRKLAND ALFRED S 9882407620 KIRKLAND ALFRED S 98814930721 BISHOP MICHAEL L BISHOP SHEILA N M., ADDRESSI ADDRESS2 CITY STATE ZIPCODE 3004 MT SINAI RD CHAPEL HILL NC 27514 3004 MT SINAI RD CHAPEL HILL NC 27514 2911 MOUNT SINAI RD CHAPEL HILL NC 275149685 2911 MOUNT SINAI RD CHAPEL HILL NC 275149685 2916 MT SINAI RD CHAPEL HILL NC 275149685 3111 MT SINAI RD CHAPEL HILL NC 27514 3111 MT SANAI RD CHAPEL HILL NC 27514 2916 MT SINAI CHAPEL HILL NC 1275149685 .• APPLICATION FOR ENVIRONMENTAL ASSESSMENT Project Name Binks Solar Applicant Sunlight Partners, LLC Address 4215 E. McDowell Road Suite 212 Mesa, AZ 85215 Phone (480) 999 -3349 Owner Sheila Bishop & Anne Nunn Address 2916 Mount Sinai Road Chapel Hill, NC 27514 Phone (919) 942 -9202 Location of Property 2911 Mount Sinai Road Chapel Hill, NC 27514 Acreage 21.5 Acres Township Chapel Hill (7) Tax Map Reference PIN(s) 9881388874,9881493072 Zoning District RB Land Use Plan Category Rural Buffer Rural Buffer 70 �. GENERAL SITE INFORMATION TO RE COMPLETED BY APPLICANT, WITH ASSISTANCE FROM PLANNING DEPARTMENT AS NEEDED A. Zoning and use of adjacent property. North Rural Buffer South Rural Buffer East Rural Buffer West Rural Buffer D. Topography: highest elevation, 503 ft. 465 ft (Please refer to attached lowest elevation topographic map) general direction of slope Varies (Please reference attached slope map) Estimate of property with 0 - 5% slope 60.4 %. 5 - 15% slope 39.2% 15 - 25% slope 0.4% more than 25% slope 0.0% (97% of project site is less than 101/q slope 1Required only for the portion of the site associate with or impacted by the proposed activity) C. Drainage Are there any streams or drainage easements located on the property? Yes, Please reference attached hydrology map Is any of the site located within a: Watersupply Watershed No Water Quality Critical Area No Floodplain No Describe The property contains two intermittent streams. Howeyer.the reject will not impact the streams. By desi n. the nroiect avoids the streams and allows for a minimum 100 -foot buffer of the streams. Please see the attached hydrology map for more details_ i D. Does the property contain any of the following Inventory Natural or Cultural Resources? (As identified in the "Inventory of Sites of Cultural, Historical, Recreational, Biological, and Geological Significance in the Unincorporated Portions of Orange County" or the "Inventory of Natural Areas and Wildlife Habitats of Orange County, North Carolina ".) yes no a. cemeteries x b. archaeological sites x C. historic sites x d. areas of geological significance x e. designated natural areas x f. designated habitat x g. other x Please see attached Cultural Resource map. For each "yes" answer above, please indicate location on site plan and complete the following, with the assistance of the Orange County Environmental Planner. Also complete Attachment A. (1) Type of resource Inventory reference no. or page Description of Resource (2) Type of resource Inventory reference no. or page Description of resource (Attach additional sheets if needed) 71 72" II. TO RE COMPLETED BY APPLICANT A. PROJECT DESCRIPTI ®N I. Describe proposed use of property The proposed use of the property is the operation of a un- manned photovoltaic solar facilit The project will interconnect into the existing electrical distributioi .grid All electricity produced from the project will be purchased by Duke Energy. 2. Number of lots 2 3. Number of structures 0 4. Estimated square footage of area to be graded for development of attached residential units (excluding roads, but including parking areas) 0 square feet. 5. Estimated square footage of area to be graded for n -resid tial use excludingq roads} -30 000 s ware feet rading win occur on area >10% with slope within the project boundary.) 6. Estimated area to be graded for roads 0 square feet 7. Road Type: Public Private Class A Class H Class C Total road length 0. Hours of operation for commercial or industrial use The solar facility will produce power from sunrise to sunset. B. STATE PERMITS REQUIRED 1, Does the project involve the mining of earth products? No If so, how many cubic feet of material are expected to be excavated? Has an application for a Mining Permit been submitted to NCDRCD? Please attach map indicating expected extent of proposed activity. 2. Does the project involve generation or storage of hazardous or toxic wastes, as identified by the Environmental Protection Agency? (A listing of all hazardous materials is available from the Planning Department) No Describe the wastes to be generated. How much material is expected to be generated per month? Will any material be treated onsite? Volume? Will any material be stored onsite? Volume? Where will disposal of the material take place? How will materials be transported to the disposal site? What measures are proposed to protect water quality and air quality in case of spills? 73 74° 3. Mill the project involve a land application system for treatment of wastewater? No If yes, describe Has an application for a non - discharge permit been submitted to the NC Department of Environmental Management or Orange County Department of Environmental Health? 4. Is a septic tank system proposed which has a design capacity of more than 3900 gallons per day? No If yes, describe Has an application submitted to the Management or Orange Health? S. Does the activity in, If yes, where is the for a non - discharge permit been NC Department of Environmental County Department of Environmental volve sludge disposal? No source of the sludge? Describe where and. how the sludge is being disposed. Has a NPDES permit from the NC Division of Environmental. Management been issued? �. Water Usage a. Estimated no. of employees 0 x 25 gpd = 0 gpd b. Estimated grater use for climate control 0 gpd C. Process water 0 gpd 0 % consumed 0 % discharged to septic system 0 discharged to surface (including storm sewers) (describe; ) 0 evaporated 0 reclaimed /reused 0 % other 100 75 d. Water used for cooling, heating, etc., in association with production or manufacturing 0 % reused 0 % consumed 0 % discharged (describe: ) 0 % other 100 % 0 and Total Water Usage e. Describe source of water N/A ATTACHMENT A TO BE COMPLETED ONLY IF INVENTORY SITES) IS/ARE IDENTIFIED IN I.E. (ATTACH ADDITIONAL SHEETS IF NECESSARY) (1) a. impact on Resource from Proposed Development b. Proposed Mitigation (2) a. Impact on Resource from Proposed Development b. Proposed Mitigation 77 78 Historic sites 2007 Upatie Binks Solar Cultural Resource Ma • • � �' ivy • � • 4 •, • • M� . � �eforN�6eYR�ppirr arES`,eD . . `s —��.� 5'* E1Y�"ElSFIEb(CVla oarrke�y� •, • � f••4� �rl066 i � ��� • *A�rt�p -. f/ $ • • "� A, • � + / �` • °° AM jM( / /jam, 1 r 4 O • S • �- ` • y ! [ Y ,�+, • � .Ups • ` !ia Banks Solar Project Site r A9 ' C • r.' -- v°"� -•-'" per. RD . Historic sites Historic District • Historic Sites National Register Study Lrst Historic District It National Register — _ Main roads National Register Local Landmark. Lakes N4onal Register Study List Cities :i� �Rss�iarc�• cant�+vtlla� �b+a 79 FLOOD PLAIN DATA THIS PROPERTY IS LOCATED WITHIN FLOOD PLAIN ZONE `X' AS INDICATED ON THE FEDERAL EMERGENCY MANAGEMENT AGENCY, NATIONAL FLOOD INSURANCE RATE MAP ORANGE gQUNTY, NORTH CAROLINA, I3]111980100J, EFFECTIVE FEBRUARY G2, MT. ZONE'OC IS DEFINED BY THE FEDERAL EMERGENCY MANAGEMENTNX YAS:AREASDETERMINEDTOBE OUTSIDE THE 0.2 %ANNUAL CHANCE FLOOD PLANE. THE PROPERTY IS NOT ENCUMBERED BY IDENTIFIED FLOODPLNNS AND IS NOT SUBJECT TO THE PROVISIONS OF THE SPECIALFLOODOVERLAY DISTRICT EN WENEER'S NOTE TO THE LOW TRAFFIC VOW ME, MINIMAL PARKING Wi MFRWIGEDUPONBUILOOUT OFTHIS DEVELOPMENT TEMPORARYMAIMENANCECREW SHALL UTILIZE THE GRAVEL ACCESSWAY FOR PARKING. 2 THE ONLY UTILITY PROPOSED FOR THIS SITE SHALL BE DUKE. NO OTHER UTILITIES SHALL BE EMPLOYED OR PROPOSED FOR THIS PROJECT 3. MINIMAL S OS AGE SHALL BE PROPOSED AT THIS TIME 4. NO EMERIOR LIGHTING IS PROPOSED AT THIS TIME 5. DURING GRADING AND CONSTRUCTION. DUST CONTROL WUL BE MGVIGFO BY WATERING AND CONTROLJED VEHICULAR SPEEDS. AFTER CONSTRUCTION, DUST CONTROL YVILL BE IMPLEMENTED BY INSTALLING GRAVEL ROADS AS WELL AS REDUCING THE VEHICULAR SPEEDS, THE SOLAR PANELS'MLL ACT AS WIND SR KS. THE PERIMETER FENCINRWALL ACT AS A WIND &REM. 8. WEED AND NOXIOUS PLANTS SHALL BE ROUTINELY REMOVED FROM THE SITE IT IS THE RESPONSIBUTY OF THE DEVELOPER TO REGULARLY PROVIDE THIS SERVICE TOTHE BITE LANDSCAPE NOTES 1 QUARTERLY INSPECTION AND MAINTENANCE OF LANDSCAPING AND VEGETATIONTO SE COMPLETED AS REQURED. 2 SEEBC0 FORLANDSCAPINGMOTESANDOIRAWWGB GEOTECHNICAL NOTES 1 AGEOTECHNCALREF ORTVALLBEPRCDUCED FOU. M SUPAPPROVALREPORTVALLBEA SUBSURFACE EXPLORATION UTILIZING SCILTEST SOPNGS PERFORMED WTH A DRLL R.. ACCORDANCE WITH ASTM D 1586IJTLIZBNG HOLLOW STEM AUGER ORL GENERAL NOTES 1. THE NUMBER OFAVERAGETRIPS TOTHE SITE PER MONTH WILL BE APPROXIMATELY TWICE A MONTH. 2 THERE ME NO UTILITY EASEMENTS Yv INTHEUMITS OF THE PROJECT (FENCE LINE). 3.THE PROJECTMEETSCRI CEEDSTHESETSMK REQUREMENTSOFSECTION3.3 BASE ZGM_ DISTRICTS RIARALBUFFEROFTHEUDO.THESETBACK REQUIREMENTS ME a FRONTYMD: 40 FEET SIDEYARD: 20 FEET REAR YARD: 20 FEET � �uYoo an m� oLna u. CHAIN LINK FENCE DETAIL NOT TO SCALE 4. THE PROJECT MEETS OR EXCEEDS THE DIMENSIONAL AND RATIO STANDARDS REQUIREMENTS OF SECTION 3.3 BASEZONINGORIMCTS RURALBUFFEROFTHEUM, THE DIMENSIONAL AND RATIO STANDARDS ARE .1 AREA RATIO: REFER TO NOTE S. 4 PEDESTRIAN AND LANDSCAPE RATIO: O.34 (754458.2 SF) C OPEN SPACE RATIO: 0.94(2.=,M8 SF) • THERE VAL. BE NO BUILDINGS ON THE PROPERTY • TOTAL AMOUNT OF LAND DISTURBANCE TO SE NO MORE THAN LTACRM • ALL MSITE UTILITY AND TRANSMISSION UNES SHALL BE PLACED, TO THE EXTENT FEASIBLE. UNDERGROUND EXCEPT MERE TRANSMISSION LINE TRANSITIONS ABOVE GROUND AT INTERCONNECTION POINT • THE TALLESTSTRUCTURESHA LLBELESSTHAN191N HEIGHT 9. ARRAYS ME DESIGNED TO CAPTURE SUNLIGHT RATHER THAN PRODUCEOR GENERATE GLARE. THE ARRAYS FRCP09ED FOR THE SITE ME CONSTRUCTED OUT OF ANTMEFLECTIVE GLASS SURFACES TO AVOID PRODUCTION OF GLARE. IN ADDITION, THE INDIVIDUAL ARRAYS SHALL BE MRANGEOORIENTEO TO PREVENT TO THE FULLEST WENT POSSIBLE, GLME OR THE REFLECTION OF SUNLIGHT ON ADJACENT PROPERTIES ANOIOR ADJACENT RIGHTSA .WAY 1O. PER SECTKIN S.D.S (C)(2)(d) OFTHE UDO CLEMLY VISIBLE WARNING SIGNS CONCERNING VOLTAGE SHALL BE "CEO AT THE BASE OF ALL PADMOUNTED TRMSFORMERB AND SUBSTATIONS. WARNING SIGNS AND NOTRESPASS SIGNS SHALL ALSO BE ERECTED ALONG THE PROPOSED PERI METER FENCE SURROUNDING THE PROTECT 11. PER SECTION 5.9.6 (C)(2)141 OF THE UM THE PROJECT SHALL BE ENCLOSED BY AN FEET HIGH CHAIN LWK FENCE. PLEASE REFER TO THE ELEVATION DETAIL OF THE PROPOSED FENCE FOR ADDITIONAL DUAL, 12 ELECTRIC AND MAGNETIC FIELDS ARE A NORMAL PART OF LIFE IN THE MODERN WORLD. W ARRAYS GENERATE ELECTRIC & MAGNETIC FIELDS (EMF) IN THE SAME E MMELY LOW FREQUENCY (ELF) RANGE AS ELECTRICAL APPLIANCES AND WRING FOUND IN MOST HOMES AND BUILDINGS. THE AVERAGE DALY BACKGROUND EXPOSURE TO MAGNETIC ""E"M ESTIMATED TO SE AROUND ONE MG (MILUGAUSS THE UNIT USED TO MEASURE MAGNETIC FIELD STRENGTH), BLITCAN VARY C IDERASI DEPENDING ON PERSONS EXPOSURE TO EMF FROM HOUSPNOULD ELECTRICAL DEVICES AND MIND. THE LOWEST EXPOSURE LEVEL THAT HAS BEEN POTENTIALLY ASSOCIATED WITH A HEALTH EFFECT ISTHREE MG MEASUREMENTS AT THREE COM MERCIAL W ARRAYS DEMONSTRATEDTHATTHEIR CONTRIBUTIONS TO OFF4ITE EMF EXPOSURES WERE LOIN (LESS THAN 0.5 MG AT THE SITE BOUNOMY), NMICH IS CONSISTENT WITH THE CROP OFF OF EMF STRENGTH BASED ON DISTANCE FROM THE SOURCE 13. THE APPLICANTACKNAM EDGES THAT PER SECTION 5.9.6 (C)(2)(D OF THE UDC, LIABILITY INSURANCE IS REQUIRED TO HAVE A MINIMUM COVERAGE LIMIT OF UM.OMW PER OCCURRENCE 14. APPLICANT AGREES TO ALL APPLICABLE STANDARDS CONTAINED WITHIN 59.61C) (3) INCLUSIVE LATH RESPECT TO DECOMMISSIONING TO THE SITE. PARKING DATA PARKING REQUIREMENTS: NO VEHICLES WILL BE STORED ON SITE NOTE: THE PROPOSED GRAVEL ACCESS DRIVE WILL BE SUFFICIENT TO MEET THE NEEDS OF VEHICLES SERVICING THE PROPERTY SS TYPICAL RACK SIDE ELEVATION NOT TO SCALE FRONT TYPICAL RACK • NQTTQSCAUE N W SunD E /L AW /At =1Y INVERTERS AND TRANSFORMER � LSOA. 27ACCESS ROAD _T TEMPORARY — CONSTRUCTION TRAILER LOCATION e STAGING AREA INTERCONNECTION J POINT TO GRID SD STREAM BUFFER TYP AREA WITHIN FENCE LINE DELINEATES AREA BEING SUBMITTED FOR SUP SEE BD-02 FOR LANDSCAPING NOTES TYP b � IS EOF SOUR VICINITY MAP ARRAY SCALE: N.TS. TREES TO BE REMOVED SURVEYOR SACKS SURVEYING & MAPPING, P.C. 33068 EDGEFIELD ROAD GREENSBORO, NO 274D3 PHONE: (336) 831 -0558 FAX MS) 931 4558 DEVELOPER BIN" SOLAR. L. 4215 E. - DOWELL ROAD 0212 MESA,AZ 55214 CONTACT' KEITH COLSON (48M 1244519 PARCELADDRESS 2911 MOUNT SINAI ROAD, ORANGE COUNTY NC27514 PROJECTADDRESS (NOTASSIGNED APPROXIMATELY) CHAPEL HILL, NO 27514 PROPERTY OWNERS ANNIE VIRGINIA NUNN & SHE— N BISHOP 2911 MOUNT SINAI RCAD CHAPEL HILL. NO 27514 MICHAEL L BISHOP & WIFE, SHEILA N. BISHOP 2811 MOUNT SINAI ROAD CHAPEL HILL, NO 27514 SITE SUMMARY TABLE TOTALSITEMEA: SU ACRES UNITS OF SUPISITE PLAN: 19.93! ACRES PMCEL NOR: Mill M55]4&- 1'Mn DEED BOOWPAGE. DB 944 PG 167 PROPOSED USE: De MM241 UNMANNEDSOIAR ACCESS ROAD: 1A35LF GENERATION FACILITY PLANNING JDRISDICTK)N' ORANGE COUNTY ZONING OF PROPERTY' ADJACENT PROPERTY RURAL BUFFER IRS) RURAL BUFFER IRS) LEGEND ..,. BOUNDARY LINE - - -- SET BACK LINE Q SOUR PANEL — — — — EX ROADWAY ESMT — — — — ABOVE GROUND ELECTRIC LINE 22.56W AC ® 1S0DKW INVERTER STATION EXISITING CONTOURS 1av 4 SCALE; V-107 3ov e SUNDURAN£E ; °„; ENERGYS:lam 2045 LINCOLN HWY EDISON NJ 08817 NOTES. 1. 5 5S7.7M DC I 4 AC GROUND MOUNTEDPVSYSTEM: Z 1616 —i JA SOLAR 3DSW PV MODULES OR EQUIVALENT 966 STRINGS, 19 MODULES PER STRING. AC TRENCH: MIX LF ACCESS ROAD: 1A35LF FENCE 5,200 LF 2D' TILT ISO AZIMUTH a�e14 PRELIMINARY • DO NOT USE FOR CONSTRUCTION 200 MACKENAN DR CARY NC 27511 2614 MALVERN AVE P O. BOX 1399 HOT SPRINGS, AR 71901 �Sunllght PARTNEIIS 4215 EAST MCDOWELL RD. MESA, AZ 85215 BINKS SOLAR, LLC CHAPEL HILL, NC 27514 Rm� PHOTOVOLTAIC GROUND MOUNT SITE PLAN 7' EN CHEE RICK BRADY BD -01 ,U3l2U2014 �N4AS NOTED LB F�Aia ✓pa "Jv t P,. Lea !6a Fla DIY �i}AY ScTa s F8 Lc6a v�A `Tp .JAG • �tZy 4jLy .Ji� PTA LL FLUORESCENT - ORANGE HIGH DENSITY CONSTRUCTIO N FENCE OR APPROVED EQUAL V LONG LACOOD OR STEEL FENCE POSTS. POSTS SHALLBESPACED HORIZONTALLY&ON CENTER MM. — AREA OF SITE LANDSCAPE NOTES 1. PER SECTION 8A4 (B) (1) OF THE LOC. MOVING TREES, REGARDLESS OF SIZE, SHALL NOT BE CUT OR OTHERWISE DAMAGED OR DESTROYED WTHIN A PRIMARY TREE PROTECTION AREA EXCEPT AS SHOAM ON AN APPROVED LANDSCAPE AND TREE MESERVATION PLAN, PLOT PLAN, OR SITE PLAN 2. SECTION 6.6A (B) (3) OF THE UDO, DURING CONSTRUCTION ACTMTIES, ADEQUATE PROTECTIVE MEASURES SHALL BE PROVIDED TO MINIMIZE DAMAGE TO EXISTING TREES AND OTHER VEGETATION. 3. SECTION 5.8.4 (5) M OF THE UDO, SIGNS SHALL BE —TEO IDENTIFYING THE TREE PROTECTION/ AREAS AND SHALL STATE THE AREA S NOT TO BE DISTURBED. SUCH PROTECTIVE DEVICES SHALL EFFECTIVELY PROTECT THE CRITICAL HOOT ZONES, TRUNKS. AND TOPS OF TREES TO BE RETAINED AND SHALL BE MAINTAINED UNTIL ALL WORK HAS BEEN COMPLETED. 4. NATIVE, NON4NVASIVE, AND DROUGHT TOLERANT SPECIES SMALL BE USED WHERE ADDITIONAL LANDSCAPEAREAS ARE PROPOSED. 5. IN AREAS MERE EXISTING TREES DO NOT ADEQUATELY ACT AS A VISUAL BUFFER FOR NEIGHBORING PROPERTIES ADDITIONAL TYPE D: OPTION 3 LANDSCAPING VALL BE PLANTED. SAN AREAS WHERE EXISTING TREES DO NOT ADEQUATELY ACT AS A VISUAL BUFFER FOR NEIGHBORING PROPERTIES ADDITIONAL TYPE D: OPTION 3 LANDSCAPING WILL BE PLANTED. S. EXSTING VEGETATION ON SITE INCLUDES 30% CANOPY TREES. 70% UNDERSTORY TREES AND VARIOUS OTHER DECIDUOUS GROUND COVER RANGING IN HEIGHT APPROXIMATELY W-M APPROVAL GENERAL NOTES 1. A TREE SURVEY SHALL BE CONDUCTED AND PROVIDED TO THE COUNTY PRIOR TO ISSUANCE OF THE GRAOMG PERMIT 2. AN APPROVED EROSION CONTROL PLAN AND LAND DISTURBING PERMIT IS REQUIRED. 3. OF TREE PROTECTION 15 REQUIRED BY THE COUNTY PUNNING DEPARTMENT, TREE PROTECTION CERTIFICATION MUST BE SUBMITTED TO THE COUNTY EROSION CONTROL DIVISION, AND TREE PROTECTION INSPECTION COMPLETED PRIOR TO THE ISSUANCE OF A LAND DISTURBANCE PERMIT 4.11F MORE THAN FIVE ACRES IS DISTURBED, A SURETY BOND MALL BE REWIRED, 5. APPROVED COS AND COUNTY OPERATIONS AND MAINTENANCE PERMIT WLL BE REWIRED. OTHER GENERAL NOTES 1. NO MASS GRADING IS PROPOSED FOR THIS SITE US SEGMENT & LENGTH PLANT MATERIAL QUANTITY EVERGREEN TREES OPTION 3:7 EVERGREEN TREES, IS EVERGREEN UNDERSTORY, SO SHRUBS NORTH SEGMENT TOTALS: 73 EVERGREEN TREES. 165 EVERGREEN UNDERSTORY 701 SHRUBS EVERGREEN TREES (ET) SHALL BE A MIN. OF 6' TALL AT PLANTRN ;M %(1) SPECIE; MIN. 7 SPECIES 1030 FT EVERGREEN UNDERSTORY (EU) SHALL BE A MIN. OF & TALL AT PLANTIN: 20%(1) SPECIE; MIN.7 SPECIES UNDERSTORY(EU) SHRUBS MIN. OF 15' AT PUNTING; MIN. T DISTANCE ON CENTER, 211 %(1) SPECIE: MIN. 10 SPECIES OPTION 3:7 EVERGREEN TREES, 16 EVERGREEN VNDERSTORY, 66 SHRUBS EASTSEGMENT TOTALS: 35 EVERGR EEN TREES, SO EVERGR EEN UNDERSTORY 340 SHRUBS EVERGREEN TREES(ET)SHALL BE A MIN. OF&TALL AT PLANTING: 20%(1) SPECIE; MIN. 7 SPECIES FT EVERGREEN UNDERSTORY (EU) SHALL SE A NN.OF 6 TALL AT PUNTIN; M %(1) SPECIE: MIN. 7 SPECIES SHRUBS MIN. OF 15' AT PLANTING; MIN.3 DISTANCE ON CENTER, 20%(1) SPECIE: MIN. 10 SPECIES ON TREES, 16 EVERGREEN UNDERSTORY,66SHRUBS WEST SEGMENT TOTALS: 5I EVERGREEN TREES, 115 EVERGREEN UNDERSTORY 480 SHRUBS EVERGREEN TREES KM SHALL BE MIN. Of V TALL AT RANTING; 20%(1) SPECIE; MM. 7 SPECIES Fr EVERGREEN UN DERSTORY (EN SHALL BE A MIN. OF 6 TALL AT PLANTIN; 20 %(1) SPECIE; MIN. ] SPECIES SHRUBS MM.OF 1S AT RANTING: MIN. T DISTANCE ON CENTER. N %(1) SPECIE; MM. 10 SPECIES 3:7 EVERGREEN TREES, 11 EVERGREEN UNDERSTORY 6S SMRUSS SOUTH SEGMENT �OFTRON TOTALS: WEVERGREENTREES ,64EVERGREENUNDERSTORY 272SHRUBS EVERGREEN TREES(ET)SHALL BE A MIN. OF8'TALL AT PLANTING: 20% (1) SPECIE; MIN, 7 SPECIES 'T EVERGREEN UNDERSTORY (EU) SHALL BE A MIN. Of 6 TALL AT PLANTIN; 20 %(1) SPECIE; MIN.7 SPECIES SHRUBS MIN. OF 15' AT PLANTING; MM. T DISTANCE ON CENTER, 20 %0) SPECIE; MIN. 10 SPECIES TREEISHRUB PUNT LIST EVERGREEN TREES DEOOAR CE DAR, BURFORD HOLY HYBRID HOLY BRODIE JUNIPER, SOUTHERN MAGNOLIA, MERRILL (ET) MAGNOLIA, LOBLOLLY PINE EVERGREEN OALARFBURFORDHWLY ANN MANGNOLIA, ALTA MAGNOLIA, BALLERINA MAGNOLIA, BETTY MAGNOLIA, UNDERSTORY(EU) YAUPON HOLY LITTLE OEM MAGNOLIA CENTURY PLANT, CAST IRON PLANT WARTY BARBERRY CHENAULT BARBERRY, ENGLISH BOXKOOD. SHRUBS COMMON SNEETSHRUB, BUTTONSUSH, PARNEYSREO CLUSTERSERRY COTO$EASTER ,SLENDER DEUTZIA ELAEAGNUS CONTRACTOR HALL USE LISTED TREES AND SHRUBS OR EOUNALENT FROM THE COUNTYAPPROVED USTAND AS APPROVED BYTHE COUNTY AREA VNTHIN TREE PROTECTIONZCNE TO REMAIN UNDISTURBED DURING CONSTRUCTION TREE PROTECTION FENCE DETAIL NOTES: 1, TREE PROTECTION FENCE SHALL BE INSTALLED 1& FROM THE EXISTING VEGETATION IN ACCORDANCE TO SECT" 6.8.4 OF THE UDO. 2. CONSTRUCTION VEHICLES TO STAY AS FAR AS POSSIBLE FROM TREE PROTECTION FENCE TO PREVENT COMPACTION OF TREE ROOTS. N W —0 E t c '\ S FKLAg1. PER COUNT/ UDO ...''.STREET TREES SHALL BE REQUIRED 1 ` CANOPY11UNDERSTORY I- ^4D8 PER 95LFSPECIES •TYP FROM LIST OR EQUIVALENT �- I j 03 I STING 1 STREAM SD STREAM BUFFER TYP EXISTINGTREEUME TO ACT AS LANDSCAPE BUFFER NORTH SEGMENT 1030 FT US BUFFER' PER UDO SECT.BA OPTION 3: EVERGREEN SUM EXISTING TREELINE TO BE REMOVED WITHIN PROPERTY. REMAINING SOUTH SEGMENT 400 FT US SUFFER' PER UDO SECT. BA OPTION 3: EVERGREEN \I Z� \' 1j 4D SETBACK TYP. NOTES TOTAL SITE AREA: 50.301 ACRES SOUR PROJECT' M.ACRES TOTAL AM W NT OF DISTURBEOLAND; 8.7x ACRES 1 "?Qe°... V.... SETBACK TYP it EASTSEGMENT E US F II M BUFFER' PER UDO SECT. 62 ORR)N IIEVERGREEN PROPOSED - ^- - FENCE TYPICAL 11 �A EXISTING STREAM T / O — O 'W STREAM BUFFER TYP LEGEND -- BOUNBARYLINE - - - - SET BACK LINE 0 SOAR PANEL - - -- EX. ROADNMY ESW - - - - ABOVE GROUND ELECTRIC LINE 22. VAC ® iS00KYV INIVERTER STATION - 546 - EXSITINGCONTWRS SCALE:1 - 100' SUNDURANCE ENERGY» ;+ 2045 LINCOLN HWY EDISON NJ 08817 / WEST 3EGMENTTN FT US SUFFER' Z � 1� PER UDO SECT BA OPTION 3: EVERGREEN , FKLAg1. PER COUNT/ UDO ...''.STREET TREES SHALL BE REQUIRED 1 ` CANOPY11UNDERSTORY I- ^4D8 PER 95LFSPECIES •TYP FROM LIST OR EQUIVALENT �- I j 03 I STING 1 STREAM SD STREAM BUFFER TYP EXISTINGTREEUME TO ACT AS LANDSCAPE BUFFER NORTH SEGMENT 1030 FT US BUFFER' PER UDO SECT.BA OPTION 3: EVERGREEN SUM EXISTING TREELINE TO BE REMOVED WITHIN PROPERTY. REMAINING SOUTH SEGMENT 400 FT US SUFFER' PER UDO SECT. BA OPTION 3: EVERGREEN \I Z� \' 1j 4D SETBACK TYP. NOTES TOTAL SITE AREA: 50.301 ACRES SOUR PROJECT' M.ACRES TOTAL AM W NT OF DISTURBEOLAND; 8.7x ACRES 1 "?Qe°... V.... SETBACK TYP it EASTSEGMENT E US F II M BUFFER' PER UDO SECT. 62 ORR)N IIEVERGREEN PROPOSED - ^- - FENCE TYPICAL 11 �A EXISTING STREAM T / O — O 'W STREAM BUFFER TYP LEGEND -- BOUNBARYLINE - - - - SET BACK LINE 0 SOAR PANEL - - -- EX. ROADNMY ESW - - - - ABOVE GROUND ELECTRIC LINE 22. VAC ® iS00KYV INIVERTER STATION - 546 - EXSITINGCONTWRS SCALE:1 - 100' SUNDURANCE ENERGY» ;+ 2045 LINCOLN HWY EDISON NJ 08817 onugN., PRELIMINARY DO NOT USE FOR CONSTRUCTION 6\0, ) 200 MACKENAN DR. ��:..% CARY NC 27511 2814 MALVERN AVE P.O. BOX 1399 HOT SPRINGS, AR 71901 �Sunli ht PARTNERS 4215 EAST MCDOWELL RD. MESA, AZ 85215 SINKS SOLAR, LLC ORANGE COUNTY NC 27514 LANDSCAPE PLAN -EKEN CHEE Q RICK BRADY BD -02 p�0321/2014 AS NOTED 9 VPNITY MAP - SUNLIGHT PARTNERS LLC r A CC A CDGrIA I I ICC DCDIIAIT DC/1I ICCT Attachment 2 ] RGB ® Red Band-1 =Green Band-2 = Blue Band-3 N 1 inch= 400 feet 0 s �b c Orange County Planning and Inspections Department 01/10/2014 *' Attachment 3 A( ORANGE COUNTY HEALTH DEPARTMENT Improving health Inspiring change Date. May 13, 2014 To Michael Harvey Orange County Planning & Inspections Department Current Planning Supervisor From: Alan Clapp Orange County Health Department Environmental Health Director RE: Sunlight Partners LLC Solar Facility — Mt. Sinai Road PIN: 9881 -38 -8874 Michael, Environmental Health will not have any involvement in this solar project. It is my understanding that well and septic systems will not be required or utilized for the facility If you need well or septic information on the adjacent properties, Environmental Health will be glad to provide the records we have Let me know if you require anything further Alan 919 245 2360 )0- 131 West Margaret Lane, Suite 100 > Hillsborough, NC 27278 30- orangecountync.gov :MI M ORANGE COUNTY Department of Environment, Agriculture, Parks & Recreation MEMORANDUM To- Michael Harvey, Current PlanningSupervrsor From, Rich Shaw, Land Conservation Manager Peter Sandbeck, Cultural Resources Coordinator Date. February 10, 2014 Re. Proposed 4- Kilowatt Solar Generating Facility – Kinetix Engineering Binks Solar (Cascade Drive / Mt. Sinai Road) Thank you the opportunity to review and comment on this application for constructing solar generating facilities DEAPR comments on such developments are generally to address any concerns with respect to potential impacts on important natural or cultural resources This application is for developing a four - megawatt solar facility on two land parcels (PINs. 9881 -38 -8874 and 9881 -49 -3072) with access from Mt Sinai Road in Chapel Hill Township Both parcels are zoned Rural Buffer Cultural Resources Review Comments There are no known identified or mapped cultural resources within the project parcel or on any of the surrounding adjoining parcels. The site plan as now presented appears to locate the majority of the solar panels at the north end of the property, thereby preserving the open fields and rural character visible from the Mt Sinai Rd The project appears to be consistent with the historic preservation goals in the Orange County Comprehensive Plan, Goal 4• 'Preservation of historic, cultural, architectural and archaeological resources, and their associated landscapes " Natural Resources Review Comments There are no known identified or mapped natural resource areas of significance (e g , natural heritage sites, proposed wildlife corridors, prime forest) located on this property, however, there are two streams that originate on the property and drain to the nearby New Hope Creek. The New Hope Creek corridor is an important natural and recreational area, and is host to a variety of significant plant and wildlife species —both terrestrial and aquatic The solar arrays are contained well outside of the stream corridors, therefore the plan appears consistent with the County's desire to minimize adverse environmental impacts on wetlands, natural areas and wildlife habitat. The project is also consistent with policies in the Orange County Comprehensive Plan, such as the goal of "Energy conservation, sustainable use of non - polluting renewable energy resources, efficient use of non - renewable energy resources and clean air " [Natural and Cultural Systems Goal 1, Page 6 -34] and the County's objective of "Foster[ing] participation in green energy programs such as installation incentives for solar hot water /solar generation /solar tempering in residential and commercial construction " [Objective AE -15] If you have questions please contact Peter at x -2517 or Rich at x -2514 wn Michael Harvey From: Jason Shepherd Sent- Monday, May 12, 2014 12 47 PM To. Michael Harvey, David Sykes Cc. Patrick R Mallett Subject- RE Bmks Solar Facility Okay to proceed No issues from FMD From: Michael Harvey Sent: Monday, May 12, 2014 12 04 PM To. David Sykes; Jason Shepherd Cc. Patrick R Mallett Subject: Binks Solar Facility While we have talked about this project we need something in writing from you all indicating there are no issues with the review /approval of the project (memo, e -mail, etc ) Need by the end of the week to go to the BOCC Thanks Michael D Harvey AICP, CFO, CZO Current Planning Supervisor — Planner III Orange County Planning Department 131 West Margaret Lane PO Box 8181 (919) 245 -2597 (phone) (919) 644 -3002 (fax) O Michael Kelly From. Jeff Scouten Sent. Friday, April 04, 2014 9 36 AM To Michael Kelly Subject- Binks Solar LLC - Kinetix Solar Site Plan Follow Up Flag. Follow up Flag Status. Flagged Michael I have completed my review of the subject Binks Solar LLC - Kinetix Solar site plan Please direct them to add our standard notes as indicated below to the site plan (plan sheet BD -01) Construction Waste 1 By Orange County Ordinance, clean wood waste, scrap metal and corrugated cardboard, all present in construction waste, must be recycled 2 By Orange County Ordinance, all haulers of construction waste must be properly licensed 3 Prior to any demolition or construction activity on the site the applicant shall hold a pre- demolition /pre- construction conference with the County's Solid Waste staff This may be the same meeting held with other development officials 4 The presence of any asbestos containing material (`ACM') or other hazardous materials in construction and demolition waste shall be handled in accordance with any and all local, state, and federal regulations and guidelines Once they have made that change I ask that you provide me with a copy of the plan for my records Thanks and let me know if you have any questions or wish to discuss this matter further. Jeff Scouten Environmental Enforcement Supervisor Orange County Solid Waste Management P O Box 17177 Chapel Hill, NC 27516 -7177 919 - 968 -2788 x 107 (Office) 919 - 932 -2900 (Facsimile) iscouten@orangecountync gov http• / /orangecountync.gov /recycling /candd asp RANGEQ COUNTY From. Michael Kelly Sent: Thursday, April 03, 2014 4 03 PM To. Jeff Scouten Cc. Christine D Dodd Subject: RE. Kinetix Solar Site Plan Importance• High Jeff & Christine See attached... A V Pat McCrory, Governor North Carolina OFFICIAL COPY Department of Administration June 6 2013 Bill Daughtridge, Jr., Secretary Ms Gail Mount FILED North Carolina Department of Commerce Utilities Commission JUN 0 6 2013 4325 Mail Service Center Clews Office Raleigh, North Carolina 27699 -4325 N.0 UtilbesCot loft Re: SCH File # 13- E- 4600 -0417; Application of Binks Solar, LLC for Certificate to construct a 4 MAW Solar Photovoltaic Electric Generatmg Facility in Orange Co. Docket 4SP -2679, Sub 0. Dear Ms Mount. The above referenced environmental impact information has been reviewed through the State Clearinghouse under the provisions of the North Carolina Environmental Policy Act. Attached to this letter are comments made in the review of this document Because of the nature of the comments, it has been determined that no further State Clearinghouse review action on your part is needed for compliance with the North Carolina Environmental Policy Act The attached comments should be taken into consideration in pro.ject development Sincerely, Crystal Best State Environmental Review Clearinghouse. Attachments cc: Region l Mailing Address Telephone (919)907-242-; 1301 Mail Service Center Fax (919)733 917 i Raleigh NC 27699 -1301 slate Courier 93 1 -0 1 -00 —mail siate.ctearinghouserkfon.ne gov Afr Equal Gpportuni4i,'Afirrmai ve Action Employer i Location Addrevs- 1 16 West !ones Street Raleigh North Carolina .. .K .VA* MCDENk North Carolina Department of Environment and Natural Resources Pat McCrory Governor MEMORANDUM TO Crystal Best State Clearinghouse FROM Lyn Hardison Division of Envir nmental Assistance and Outreach Permit Assistance & Project Review Coordinator John E Skvaria, III Secretary RE' 13 -0417 Environmental Review Application of Binks Solar, LLC for Certificate to construct a 4 MW Solar Photovoltaic Electric Generating Facility Orange County Date May 32, 2013 The Department of Environment and Natural Resources has reviewed the proposal for the referenced project. Based on the information provided, our agencies have identified permits that may be required and the NC Wildlife Resources Commission has provided some general recommendations to the applicant to minimize impacts to aquatic and terrestrial wildlife resources for the referenced project prior to its construction. These comments are attached for the applicant review If the applicant needs further guidance on addressing secondary and cumulative impact, please refer the applicant to the Department's guidance manual entitled 'Guidance for Preparing SEPA Documents and Addressing Secondary and Cumulative impacts'. The purpose of the manual is to assist applicants in preparing tneir environmental documentation, which leads to better decision- making. The guidance manual can be found on the Department's web page http / /portal ncdenr org /web /guest /rules- policies- laws- and - regulations or a copy can be provided at no cost to the applicant To better understand NCDENR permitting processes, please suggest to the applicant to contact David Lee, Permit Assistance Coordinator, in the Department's Raleigh Regional Office, (919) 791 -4200 The proposed project is located within their geographic working territory Thank you for the opportunity to respond Attachment 1601 Mall Service Center, Releigh, Nortii Carolina 27699 -1601 Phone-919.1107-8600k Internet viww.ncdenr,gov F.0 Eoual oppatumrytAi:;m+nuve Accu;n Emplavrr 5D% Recycled 1 SOy Pull Consunxx Paper r-1 on � Forth Carolina Wildlife Resources Commission 0 Gordon Myers, Executive Director MEMORANDUM TO Lyn Hardison, Environmental Assistance Coordinator NCDENR Division of Environmental Assistance and Outreach FROM Shari L Bryant, Piedmont Region Coordinator Habitat Conservation Program DATE 28 May 2013 SUBJECT Application of Binks Solar, LLC for a Certificate of Public Convenience and Necessity to Construct a 4 MW Solar Array, Orange County Docket No SP -2679, Sub 0 DENR Project No 13 -0417 Biologists with the North Carolina Wildlife Resources Commission (NCWRC) have reviewed the subject document and we are familiar with the habitat values of the area. Our comments are provided in accordance with provisions of the Fish and Wildlife Coordination Act (48 Stat 401, as amended, 16 U.S C 661- 667e), and North Carolina General Statutes (G.S 113 -131 et seq ) The applicant proposes to construct a photovoltaic solar facility. The facility will consist of four, 1,0 MW solar photovoltaic arrays and eight, 500 kW inverters The facihty will interconnect to an existing electrical distribution line and electricity will be sold to Duke Energy Carolinas The facility will be fenced and located on Cascade Drive in Chapel Hill. The site drains to an unnamed tributary to New Hope Creek in the Cape Fear River basin There are records for the federal species of concern and state endangered brook floater (Alasmidonia varicosa) and Carolina creekshell (Villora vaughaniana), the state special concern notched rainbow (Villosa constricta), and the state significantly rare Eastern creeksheil (Pillosa dalumbis) and Chameleon lampmussel (Lampsihs sn ) in New Hope Creek We offer the following general recommendations to minimize impacts to aquatic and terrestrial wildlife resources Maintain or establish a minimum I00 -foot undisturbed, native forested buffer along each side of perennial streams and 50 -foot undisturbed, native forested buffer along each side of mtermittent streams and wetlands Forested riparian buffers provide habitat areas for aquane and terrestrial wildlife species and travel corridors for terrestrial wildlife. In addition, forested riparian buff rs protect water quality by stabilizing stream banxs and filtering stormwater runoff Mailing Address: Division of Inland Fisheries • 1721 Mail Service Center • Raleigh, NC 27699 -1121 Telephone: (919) 707 -0220 • Fax: (919) 707 -0029 VAUM Page 2 28 May 2013 Burks Solar Array DENR Pro)ect No_ 13 -0417 2. Avoid or minimize impacts to wetlands during construction In addition to providing wildlife habitat, wetland areas perform important functions of flood control and water quality protection U S. Army Corps of Engineers Section 404 permits and N C Division of Water Quality Section 401 Certifications are needed for any impacts to jurisdictional streams or wetlands. Temporarily disturbed wetland areas should be returned to original soils and contours, and reseeded with annual small grains appropriate for the season (e g oats, millet, rye, wheat, or rye grass) and should be allowed to revert to natural wetland vegetation 3 If additional overhead transmission lines will be installed, then measures to minimize impacts to birds should be implemented These can include increasing line visibility, insulating wires to cover exposed connections, and increasing the distance between wires so no contact with ground or other energized wire can be made For more information see h4 -flwww fws.gov/birds/documentslPowerlmes 12d 4 Consider establishing vegetative cover on the site that is beneficial to wildlife such as native warm season grasses We refer the applicant to Jason Allen, District Wildlife Biologist, at (336) 524 -9801 orlason alloriRticwildlife orb for information on developing a site - specific vegetation plan Although a site - specific plan is preferred, for general information on developing vegetative cover on disturbed soils, please see the attached Seed Mixes for Re- vegetating Disturbed Sites Note it is important to use all of the components of the Basic Mix. Also, we encourage adding one or more of the native species (found in the table at the end) to the Basic Mix to improve habitat for wildlife species 5 Mature stands of the Basic Mix are short- statured and will not require mowing. The Basic Mix should persist for many years, but eventually will yield to developing successional species in the seed bank If site and/or transmission line maintenance is needed, avoid mowing between April I and October I to minimize impacts to nesting wildlife We suggest a maintenance schedule that incorporates a portion of the area (e g one -third of the area) each year. Pesticides, fertilizers, and other chemicals should not be used in wetland areas or near streams. 6 Where feasible, consider establishing grassland habitats on the site These are drought tolerant and require minimal mowing maintenance once established. Grasslands provide habitat for migratory and resident birds and small mammals particularly if mowing is done only in late winterlearly spring after winter cover needs are reduced and before nesting occurs For more information on grassland habitats and establishment, please contact Laura. Fogo, U S Fish and Wildlife Service, at (910) 695 -3323 or iaura foeo@fws Roy 7 if pesticides or chemicals will be used for site maintenance, then stormwater runoff from the site should be directed to bio- retention areas prior to discharge to streams or wetlands to provide additional protection for water quality and aquatic and terrestrial wildlife habitats. S Sediment and erosion control measures should be installed prior to any land clearing or construction These measures should be routinely inspected and properly maintained Excessive slit and sediment loads can have numerous detrimental effects on aquatic resources including destruction of spawning habitat, suffocation of eggs, and clogging of gills of aquatic species 9 Measures to mitigate secondary and cumulative impacts can be found in NCWRC's Guidance Memorandum to Address and Mitigate Secondary and Cumulative Impacts to Aquatic and Terrestrial Wildlife Resources and Water Quality (August 2002, htto / /www ncwrldlife or , /Por'tals/0 /Conservin documents /2002 GurdanceMemorandumfo,-Secondar yandCumulativeimpacts pd f}. m Page 3 28 May 2013 Binks Solar Array DENR Project No 13 -0417 Thank you for the opportunity to comment on this project. If we can be of further assistance, please contact our office at (336) 449 -7625 or sham bryanT tyncwildltfe.org cc Kathy Matthews, USFWS Laura Fogo, USFWS Jason Allen, NCWRC Attachment Seed Mixes for Re- vegetating Disturbed Sites SIM Page 4 2$ May 2013 Binks Solar Array DENR Project No 13 -0417 Seed Mixes for Re- vegetating Disturbed Sites Basic Mix Oats (Mar -Jun), Wheat (Jul -Nov), or Rye Grain (Dec -Feb) 1 -2 bags / acre $ 5 -10 bag Red Clover Trifokum pratense 10 lbs / acre S 3 / lb Creeping Red Fescue Festuca rabra 20 lbs 1 acre $ 2 -3 / Ib The Banc Mix can be sown on disturbed sites in the mountains and upper piedmont _year round but spring or fall seeding will result in a better stand. It is important to use all of the components of the Basic Mix. The cover crop grain and legume provide rapid green -up while the creeping red fescue is developing These components can be obtained locally Grains like oats, wheat, and rye may be sold by weight (pounds) or by volume (bushels), To snnphfy things, this mix recommends 1 -2 BAGS of grain rather than pounds or bushels With this mix, 1 bag or about 50 — 60 lbs per acre should be adequate for most sites, but where slope or soil conditions warrant, increase grain amounts to 100 — 120 lbs (use 2 bags) Tne perennial grass will establish within the first year and is the key to good site stabilization Creeping red fescue has a wide range of adaptation when used for erosion control along roads and highways; cuts, fills, and other disturbed areas, and for stream and charnel bank stabilization It thrives in sun or shade, and is relatively drought - resistant after establishment. For permanent seeding of harsh dry sites, Hard Fescue Festuca 10 ibs /acre breviprla (svn trachvphylla) or Sheep Fescue Festuca ovina can be added to the Basic Mix I Application Motes • Distufned sites with loose soils can usually be sown without extensive seedbed preparation if seeded as soon as the other work is completed • Where necessary, prepare seedbed with conventional farm equipment (tractor and disk), or the soil surface can be bladed and then tracked with a bulldozer Hydro - seeding can be used with the Basic Mix for slopes where equipment access is difficult, • Red fescue is adapted to sandy and acid soils so extensive soil amendments are usually not needed On poor and subsoil sites, a low nitrogen fertilizer such as 5 -10 -10 may be required • If required, apply any necessary soil amendments, then drill or broadcast the seed mix . • The Iarger cover crop grains can be sown separately first and covered lightly to prevent loss of seed from wildlife such as turkeys and doves. • The rest of the seed mix should then be sown, but not coverers with soil It is better to firm the small seed into the soil than to try to cover it. • Culti -pack conventional seedbeds to ensure good seed -to -soil contact Tracked sites will fill in on their own from rainfall • Apply straw mulch at a minimum of 15 bales per acre to help enhance soil moisture as well as hold the soil in place until the seed germinates Use higner rates as site conditions warrant, Page 5 28 May 2013 Binks Solar Array DENR Proj6ct No 13 -0417 If the site calls for it, biodegradable natural fiber matting is recommended over plastic matting or matting that contains strands of plastic that can entrap small animals Install last, over the seed and straw Monitor the site until the perennial grass component is fully established Mature stands of the Basic Mix are short- statured and will not require mowing The seeded mix should persist for many years, but will eventually yield to developing successional species in the seed bank- Adding Native Species • Some projects specify a preference for native plant species or actually require their use Native wildflowers and grasses can be added to the Basic Mix to beautify and diversify the site, and provide food and cover for wildlife such as wild turkey, bobwhite quail, and songbirds • The following table contains native species that are easy, proven performers that have been used successfully on stream restoration areas as well as drier upland sites The four wildflowers will come on well the first yeas, the three grasses may take two to three years to develop good sized clumps. • These seeds arc reasonably priced as natives go and can be ordered from a reputable seed dealer. Using all seven will provide maximum diversity as well as added site stabilization but any additions will be beneficial For a list of sources, please contact Shari Bryant at (336) 449 -7625 or Shari brvant(aincwildlife or • Mixes with native seed can be culti- packed or tracked in with a bulldozer, native seeds will not germinate if suspended in hydro -mulch therefore hydro-seeding is not recommended Note - when adding native .Panzcum grass seed, sow the mix in late fall, winter, or early spring to subject the seed to cool, moist soil conditions necessary to break seed dormancy, Sowing during the wanner months may delay Panicum germination until the following year, and some seed may be lost in the interim Mixes with mainly wildflowers can be sown in early fall. • For information on each native species listed here, visit httn !/plants usda gov /, type in the scientific name in the search box Note - adding natives will increase the height of the resulting stands, providing good wildlife habitat Frequent mowing destroys food and cover and is not recommended Mow once every few years, in late winter, only if absolutely necessary to remove encroaching woody vegetation Native species — add to Basic Mix at 1 -2 Ibs / acre Lanced- leaved Coreopsis Coi eopsis lanceolata — height 8" to 3' V $ 14 / lb Deertongue Dicanthehum (Panicum) clandestmuni `Tioga' — height I to 3' $ 12 / lb Black Eyed Susan Rudbeckta hirta— height 1 to 3' —$ 16/lb Showy Partridge Pea Chamaecrista (Cassia) fasiculara -- height 2 to 3' $ 14 / lb Showy Tickseed Bidens arisroso — height 3 to 4' - $ 16 / lb Switchgrass Panicum virgatum `BlackwelI', `Cave -in- hock', `Kanlow' — height 4 to 6' j —$ 8/lb Big BIuestem Anaropogon gerardii -- height 4 to 6' _ J NCWRC/2010 Rev 5/12 I I Department of Environment and Natural Resources Project Review Form Project Number: 13 -0417 County: Grange Date Received: 05/091 013 Due Date: 513112013 Project Desdription: Environmental Review -Application of Binks Solar, LLC for Certificate to construct a 4 MW Solar Photovoltaic Electric Generating Facility in Orange Co. Docket #SP -2679, Sub 0. View document at http:l/n cuc -commerce state nc.usidocksrch.htmi; type SP -2679, Sub 0 liew document at http:llncuc. comm. erce .state.nc:tisidocksrch.html, type SP -2679, Sub 0 - Tliis Project is being reviewed ss indicated below Regional Office Regional Office Area In- AouseReview Asheville ✓ Air Air Quality Coastal Management _ Fayetteville ./ Wet., marine Fisheries Military Affairs Mooresville Aquifer Protection ✓ Parks & Recreaiion _ Water Quality Raleigh v/ band Quality E gine Waste Mgmt Water Quality -DOT Washington ✓ l lST Water Resources Mgmt f Wildlife, Shari Bryant Wilmington ✓ Water Supply Section Wildhfe -DOT Winston -Salem Mane er Sign - Off /pxgion " - S 44 Date In -house Reviewer /Agency Response (check all applicable) MAY 10?p No objecttori to project as proposed No Comment Insufficient information to complete review Other (specify or attach comments) rf you have any questions, please contact. Lyn Hardison at lyn.hardisonnu,.ncdenr.gov or (232) 948 -3842 943 Washington Square Mall Washington NC 27889 Courier No 16 -04 -01 95 State of North Carolina Department of Environment and Natural Resources Reviewing Office INTERGOVERNMENTAL REVIEW - PROJECT COMMENTS Project Number, 13 ^ z9Y'1 Due Dale After ravltw of NS project it lies bc:n determined that the ENR perm0(s) and/or approvals Indicated may need to be obtained to order far this project to comply with Norlh Carolina Law Qucstions regarding these permits should be addressed to the Regional Office indicated on the reverse of ]he form. All applications, information and guidehnas reledirc to these plans and permits arc available, from the same Regional Office k Normal Process Time PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS (statutory lime limit) Permil to construct & operate wastewater trestrien, Application 90 days befam begin construction or award of conatnnnon 30 days i f-1 Facilities, server system exicrmons & sewer systems not discharging Into state surface waters. contracts. On -sne impecuen Post application technical conference USUAL (90 days) WIRES - perrnii to discharge into surface watts arid/of Application 180 days before begin atlivity. On site inspection Pro- apphcatron (� permit to operate and c=truet wasmwaier facilities conference usual Additionally obtain permit to construct wastewater o 90 -120 days discharging into stab surface waters treatment facility granted after NPDES Reply time 30 days after receipt of (N/Alf plans or Issue of NPDES permit whichever is later t; ] Water Use Permit Pre - application technical conFerence usually necessary ! 30 days (NtA) f 1 Wd{ Construction Permit Complete application must be received and permit issued prior to the 7 days instadphon of a well (15 days) Apphcabon copy must be served on etch adjacent nparsan property owner �l Dredge and Fill Permit On -site inspection. Pre - application conference usual Filling shay, require 55 days t Easement to Fill from N C Department ofAdministmtion and Federal (90 days) Dredge And Fill Pernit. Permit to construct & oaenue Arr Pollution Abatement Application must be submitted find permit recerved prior to tau I(ues antVo, Emission Sources as per l5 A NCAC construction end operation nfthe source. If a permit is required in an 90 days (2Q OI00 thru 2Q0300) area without local toning, then there are additional reauirements and umchnes (2Q.0113) i 1 Permit to construct &. optntt Transportation facility as Application must be submitted at least % days prior to construction or 90 days per I S A NCAC (2D.0800, 3Q.0601) modification of the source Any open burning associated with subject proposal must be in compliance with t5 A NCAC 20 1900 r Demot(tion or re novations ofstructures Containing ..besws material must be to eompliancc with 15 A 40 days n "CAC 20 I 1 10 (a) (I ) which requires notification and _ N/A (90 days) t "'novel prior to demolition Contact Asbestos Control - I soup 91 9 707 -5950 l Complex Source Permit required under 15A NCAC 2D,0800 The Sedimentation pollution Control Act of 1973 ]Trust be prop•riv addressed for any kind disturbing activity. An trosron sedimentation control plan will be required iforie ear more Letts to be disturbed. Plan filed with proper Regional Office (Land Quality t 20 days l Section) At taut 30 days before beginning Acunty A tea of SG$ for the Gar acre or any pan of an Acre An express review action is (30 days) available with additional fees ISedimeniation F l and erosion control must be addressed in accordance with NCDOT's approved program Particular aneation should be given to design ono mSUIl aeon of appropriate perimeter sediment trapping devrces as well As stable stormwater conveyances end outlets. (30 days) On -sift inspection usual Surety bond filed with ENR Bond amount vuries Fm Mining Permit with type mine and number of acres ornfftcted land Any arc mmcd greater 30 days iraut one acre must be permitted, 7'hc appropriate bond must be received (60 lays) before the permit can be issued. North Carolina Burning permit On -site inspection by N.0 Division Forest Resources if permit exceeds 4 days I day t I (NIA) Special Ground Clearance Burning Ptm7ii -Z2 On -sne inspection by H C. 0rviston Forest Resources required Yin are than I day n counties in coastal N,C with organic soils five acres ofground clewing activities are involved, lnspecuoru should be (NIA) requested at least ten days before caul bum is plirined" fj F-1 psi Refining Factiitic5 WA 90 t'lO days II (NIA) If permit required application 60 days before begin construction. Applicant must hire N.0 qualified enginterto- prepare plans inspeci construction �permit certify construction is according to ENR approved plans. May Also require C Dam Safety under mosquito eontro) program, And a 404 pernut,from Corps of 30 days Permit Engineers. An Inspection of site is necessary so verify Harard Classification A (60 days) minimum fee ofS200.00 must accompany the application An additional processing let based on a percentage or the total project east will be required upon completion. REGIONAL OFFICES Questions regarding these permits should be addressed to the Regional Office marked below, 7 Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 (828) 296 -4500 II Fayetteville Regional Office 225 North Green Street, Suite 714 Fayetteville, NC 28301 -5043 (910) 433 -3300 7 Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 (704) 663 -1699 7 Raleigh Regional Office 3800 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 791 -4200 7 Washington Regional Office 943 Washington Square Mall Washington, NC 27889 (252) 916 -6481 7 Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 -7215 ;1 Winston -Salem Regional Office 585 Waughtown Street Winston - Salem, NC 27107 (336) 771 -5000 Normal Process Time (statutory lime limit) PERMITS SPECIAL APPLICATION PROCEDURES ar REQUIREMENTS File surely bond o(55,000 with ENR running to State of NC condit(onal that I Odoys (� Permit to drill exploratory oil or gas well any well opened by drill operator shall, upon abandonment he plugged NIA according to ENR rules and regulations t j otoithysicel 6ploradon Permit Application riled with ENR at lent 10 days prior to issue of permit. Application by letter. No standard application form. 10 days NIA Application fees based on structure size is charged Must include descriptions l5 20 days (—) Slate LakesConstruclionPermit & drawings of structure & proof of ownership or riparian N(A I ro city s ` ! ('I 401 Water Quality Certification NIA (1130 30 days) 55 days rl CAMA Pemit for MAJOR development 5250.00 Fee must accompany application f 150 days) Ln CAMA Permit for MINOR development 550.00 fee must accompany application 27 days (25 days) Several geodetic monuments are located in or near the project area. irany monument needs to be moved or destroyed plesse nolify n N.0 Geodetic Survey Box 27687 Ralwgh NC 27611 l-) Abandonment of any wells rf regtured mist be in accordance with Title i 5A Subchapter 2C 0100 I Notification or the proper regional office is requested if'orphan' underground storage tanks (LISTS) are discovered during any excavation operation. I ; 45 days rl Compliance with t5A NCAC 2H 1000 (Coastal Stormwater Rules) is required. (NIA) } Tar Pamlico or Neuse Riparian Buffor Rules mqutrec other comments (alrach additional pages ns necessary, being certain to stilt comment authority) r Cj ,- ��� �it�k�J �77��' ,r.i ���- ►`�`.'a'"1G j AI � L w f L G. �r� ���'jt,.SS.�'�J' "c�- REGIONAL OFFICES Questions regarding these permits should be addressed to the Regional Office marked below, 7 Asheville Regional Office 2090 US Highway 70 Swannanoa, NC 28778 (828) 296 -4500 II Fayetteville Regional Office 225 North Green Street, Suite 714 Fayetteville, NC 28301 -5043 (910) 433 -3300 7 Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 (704) 663 -1699 7 Raleigh Regional Office 3800 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 791 -4200 7 Washington Regional Office 943 Washington Square Mall Washington, NC 27889 (252) 916 -6481 7 Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 -7215 ;1 Winston -Salem Regional Office 585 Waughtown Street Winston - Salem, NC 27107 (336) 771 -5000 L�7 NORTH CAROLINA STATE CLEARINGHOUSE --f�+- 7,�}Q07 DEPARTMENT OF ADMINISTRATION 7„ (���� �'�� INTERGOVERNMENTAL REVIEW ..yj COUNTY ORANGE H11•ENERGY RELATED STATE NUMBER 13 -E -460 0-0417 PACILITI=S /ACTIVITIES DATE RECEIVED 05/06/2013 AGENCY RESPONSE 05/31/2013 REVIEW CLOSED* 06/05/2013 MS CARRIE AT::INSON CLEARINGWOUSE COORDINATOR DEPT OF TRANSPORTATION _ STATEWIDE PLANNING - MSC $1554 ,ALEIGY NC REVIEW DISTRIBUTION CC &PS - DIV OF EMERGENCY MANAGEMENT fly' DENR LEGISLATIVE AFFAIRS DEPT OF AGRICULTURE .M �►� DEPT OF CULTURAL RESOURCES f�- DEPT OF TRANSPORTATION •. TRIANGLE J COG PROJECT INFORMATIONL L " APPLICANT N C Dept. of Commerce TYPE State Environmeni.al Policy Act Environmental Review DESC. Application of Sinks Solar, LLC for Certificate to construct a 4 MW Solar. Photovol:taJc Electric Generating Facility in Orange Co Docket #-QP -2679, Sub 0 View document at http / /nGuc.commerce.state nc us /docYsrch html, type SP -2679, Sub 0 - Located at 5609 Cascade Drive, Chapel Hill, NC The attached project has peen submitted to the N C State Clearinghouse for intergovernmental rev_ew Please review and subr:it your resporse by the above indicateo date to 1301 Mail Service Center, Rale_gh NC 27699 -1301 If additional review time is needed., please contact this of;iice at (919)807 -2425 AS A RESULT OF THIS REVIEW �(Ek-O�L•OWING .eS SUBMIT'T'ED SIGNED BY NO COMMENT ❑ COMMENTS ATTACHED DATE r r� ..yj iiryr s;��•�:I• NO COMMENT ❑ COMMENTS ATTACHED DATE ME NORTH CAROLINA STATE CLEARINGHOUSE DEPARTMENT OF ADMINISTRATION INTERGOVERNMENTAL REVIEW COUNTY• ORANGE H11•ENERGY RELATED STATE NUMBER' FACILITIES /ACTIVITIES DATE RECEIVED AGENCY RESPONSE REVIEW CLOSED MS CAROLYN PENNY CLEARINGHOUSE COORDINATOR CC&PS - DIV OF EMERGENCY MANAGEMENT FLOODPLAIN MANAGEMENT PROGRAM MSC # 4719 RALEIGH NC REVIEW DISTRIBUTION :.- CC &PS - DIV OF EMERGENCY MANAGFMFNT <,�i 4 #�s DENR LEGISLATIVE AFFAIRS r-•• r' DEPT Or' AGRICULTURE -st.� H', DEPT OF CULTURAL RESOURCES ?_ DEPT OF TRANSPORTPTION TRIANGLE J COG PROJECT INFORMATION APPLICANT N C Dept. of Commerce TYPE State Environmental Policy Act Environmental Review Y 13- E- 4600 -0A17 05/06/2013 05/31/2013 06/05/2013 Dr-SC. Application of Binks Solar, LLC for Certificate to construct a 4 MF7 Solar Phozovol.aiG E�ectric Generating rac__ity in Orange Co Docket #SP -2679, Sub 0. View document at http / /ncuc commerce state nc us /docksrch html, type SP -2679, Sub 0. - Located at 5609 Cascacae D -rive, Chanel Hill, NC The attached project has been subm_tted to the N C State Clear- nahouse `Or intergovernmental review Please review and submit yot.r response by the above indicated date to 1301 Mail Service Center, Raleigh NC 27699 -1301 If additional review time is needed, please contact th ,,.s o € €2ce at (919)807 -2425 AS A RESULT OF 7hIS EVIEW THE' FOLLOWING IS SUBMITTED' ) f NO COMMENT n COMMENTS ATTACHED SIGNED BY L DATE '70- ,t-W4 -710 � �y Y u COUNTY ORANGE NORTH CAROLINA STATE CLEARINGHOUSE DEPARTMENT OF ADMINISTRATION INTERGOVERNMENTAL REVIEW H11 ENERGY PEELA"_`EJ CF1Ca.� s MS RENEE GLEDHILL- EARLIEY 1 CLEARINGHOUSE COORDINATOR DEPT OF CULTURAL RESOURCES STATE EISTORIC PRESERVATION OFFICE MSC 4617 - ARCH71VES BUILDING RALEIGH NC REVIEW DISTRIBUTION CC &PS - DIV OF EMERGENCY MANAGEMENT DENR LEGISLATIVE AFFAIRS DEPT OF AGRICJLTURE DEPT OF CULTURAL RESOURCES DEPT OF TRANSPORTATION TRIANGLE J COG PROJECT INFORMATION APPLICANT N C Dept o- Corraiterce TYPE State Environmental Policy Act Environmental Reaiew Of 0�2. 1 STATE NUMBER DATE RECEIVED AGENCY RESPONSE REVIEW CLOSED• (3918 cj t l S��K Sie$il'] 13 -E- 4600 -0417 05/06/2013 05/31/2013 06/05/201:) DESC: Application of Binks Solar, LLC for Certificate to construct a 4 MW Solar Photovoltaic Electr,c Generating Fac}l-ty In Oranae Co. Docket &SP- 267.9, Sub 0 View document at http / /ncuc commerce state nc us /docksrch htmi, type SP -2679, Sub 0 - Located at 5609 Cascade Drive, Cnapel Hill, NC The attached project has been suwmitted to the N. C State Clearin•.house for i,-atergovernmental rev:.e4 Please review and submit your response by t7e above indicated date to 1301 Mail Service Centex, Raleigh NC 27699 -130', If additional review time is needed, please contact. this office at (919)807 --2425 AS A. RESULT OF THIS REVIEW THE FOLLOWING -IS SUBMI T_rD � NO 1.1011N:ENT [-] COMM.ENTS ATTT'ChED SIGNED By "-�"�" ^ !�-'" DA -_ ^E. IV 1� ti..ti[• fi .�i��� MAY 1 0 2013 100 Attachment 4 ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration 131 W. Margaret Lane (919) 245 -2575 ,7 �z Suite 201 (919) 644 -3002 (FAX) P O Box 8181 vvww.co.oranae.nc.us '�h C °`` Hillsborough, NC 27278 CERTIFICATION OF MAILING ZONING ATLAS AMENDMENT ORANGE COUNTY, NORTH CAROLINA I, Michael D Harvey, Current Planning Supervisor with Orange County, North Carolina, DO HEREBY CERTIFY that in accordance with the provisions of Section 2 7.5 of the Orange County Unified Development Ordinance (UDO) I have mailed, or have caused to be mailed, a Notice of Public Hearing to be held regarding the processing of a Class A Special Use Permit application submitted by Sunlight Partners LLC and Shelia Bishop, Michael Bishop, and Annie Nunn to allow for the development of a Public Utility Facility — Solar Array on 2 parcels of property, further identified utilizing Orange County Parcel Identification Numbers of 9881 -38 -8874 and 9881 -49 -3072, off of Mt Sinai Road within the Chapel Hill Township of Orange County The owners were identified according to the Tax Records and as required by Section 2 7.5 of the UDO The mailed notice specified the date, time, place and subject of the Public Hearing WITNESS my hand, this 9th day of May, 2014. ichael Z[Di—F arvey, AICP Current Planni g Supervisor 101 ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Current Planning (919) 245 -2575 (919) 644 -3002 (FAX) www.co.orange.nc.us 131 West Margaret Lane P O Box 8181 Hillsborough, North Carolina, 27278 May 9, 2014 Subject REVIEW of a Class A Special Use Permit application submitted by Sunlight Partners LLC and Shelia Bishop, Michael Bishop, and Annie Nunn to allow for the development of a Solar Array /Public Utility Station on 2 parcels of property located off of Mt. Sinai Road and Cascade Drive (PIN) 9881 -38 -8874 and 9881- 49- 3072). To Whom It May Concern- This letter is being sent to inform you that the Orange County Board of Commissioners and the Planning Board have scheduled a joint PUBLIC HEARING to review a Class A Special Use Permit request, submitted by Sunlight Partners LLC and Shelia Bishop, Michael Bishop, and Annie Nunn (hereafter `the applicant') to allow for the development of a Public Utility Facility — Solar Array on 2 parcels of property totaling approximately 50 acres in area off of Mt. Sinai Road and Cascade Drive in the Chapel Hill Township of Orange County. The parcels are further identified utilizing Orange County Parcel Identification Numbers (PIN) 9881 -38 -8874 and 9881 -49 -3072 (please see attached vicinity map for additional detail). As detailed within the application, the applicants are proposing to erect individual solar array panels on the aforementioned parcels A typical array is 6 to 8 feet in height, with approximately 2 to 4 feet of ground clearance. According to the submitted site plan there shall be no structure erected on the property over 10 feet iii height, The arrays shall be screened by existing, and proposed, vegetation and an 8 foot high chain link security fence enclosing the perimeter of the actual leased site to prevent access Vehicular access to the site shall be restricted to driveway off of Cascade Drive. The applicant is not proposing to develop a business or other similar office facilities on the property. As a result there is no septic or well system proposed, or required, as part of the project. Staff has included an 8 %2 x 11 scale site plan providing additional detail on the proposed project The properties in question are zoned Rural Buffet (RB) and are located within the Rural Buffer land use category as denoted on the Future Land Use Map of the Comprehensive Plan and the Rural Designated Area as denoted on the Growth Management System Map. 102 As an adjacent property owner you have the right to address the Board(s) concerning this request The meeting to review this case is scheduled foi Tuesday May 27, 2014 at 7.00 p m. in the Department of Social Services, Hillsborough Commons, 113 Mayo St, Hillsborough, North Carolina It should be remembered that the review of all special use permit applications are carried out in a quasi - judicial format meaning that decisions relating to the approval or denial of a application are based solely on the sworn testimony of all parties involved with the case, both those for and against an application, as well as the review of competent material and substantial evidence submitted during the public hearing While County regulations and State law do not require that parties be represented by an attorney, it may be in your best interests to secure legal council to represent your interests at the hearing Further the applicant has the burden of establishing, by the submission of competent material and substantial evidence, the existence of facts and conditions that demonstrate the projects compliance with the various requirements and standards detailed within the Unified Development Ordinance. Those opposing approval of the application shall have the burden of establishing, also through the submission of competent material and substantial evidence, the specific manner in which the proposal does not satisfy the requirements for approval of the application As previously indicated, the Board shall render a decision only on the sworn testimony of all parties and on the competent material and substantial evidence submitted during the hearing. The full text of the application and staff report for this item may be obtained no later than May 16, 2014 at the County website www co oran eg nc.us at the Meeting Agendas link If you have any questions concerning this request, please contact staff at (919) 245 -2575 Sincerely, Miclikel Iar , ` , CFM, CZO Current Planning Supervisor Planner III Orange County O { • „ 1 e c co AIM A SUBJECT PARCEL a ■ ■ 988 , RURAL BUFFER (RB) ZONING al t 4; { r t '■ ,_ �. it .�j � t � ; �•. ` e . , t ' r. Fri r % �r�a/ f •, low jr ROOD PLAIN DATA THIS PROPERTY IS LOCATED WITM4 FLOGS PLAN SONSW AS NCICAIFD ON THE FEDEML EMERGENCY MANAGSNOW COUNTY, NATIONALFLOOD IN TIMO1ERATEME➢.DANCE COUNTY. NORTH:HCAROUNA. N3i10116100,4 EFFECINE Fe9RUAtroszw7 ZONE '%' IS OUVED BY WE PECERAL EMFAGERCY MANAGEMENTAGENCY AS! ARM DETERMINED TO BE OUTSIDETHE BA% ANNUAL CHANCE FLOOD —r THE PROPERTY IS NOTENCUMBERED BY MEMIFIEO FLOOOPLMNCAND IS NOTTUEJECTTOTHE P0.0WSION30F THE SPECIAL FLOOD OVERLAY DISTRICT ENGINEER'S NOTE 1,DU .69 PANLOWD UPON V IDNE, C'THIS PARKING WiLL BE PPOVWED WON BUROOVf OF THIS DEVELOPMEM,TE GRAVEL CCESSNANCECREW SWW. Vi1L¢E THE GRAVELACCESSWAY FOR PAWING. Z THE ONLY VYAR! PROPOSED FOR THIS STE SNA L lE UUNF. NO OTHER UTILITIES SRAL BE EMPLOYED DR PROPOSED FOR TINS PPOJ - .IAN0.NL SIGNAGE SNALL BE PROPOSED ATTI#S TIME 4, NO 07CRIOR LIGHTING IS PROPOSED AT THIS TIME S.OW WG ORAOwc ANO CONSTRUrnON, l9JSTCONIROL .U.0E PRDADEO SY WATERING AND CONTROLLED VEHCL ARSPEEDS.AFTERCONST @JONON,DUST CONTRD.WILL8EIMPLBAAWD BYwSTAULHNG GRAVEL ROADS AS WELLA3 REDDGNG THE VEMCIMR os. THE SOLAR PANELS WILLAGTAS WEND BRCAICS. THE PEWMETER FENCING WLL ACTAS A WINO' BREAC G. WEeo ANO NO%IW3PUNiB SFMlL 3EROtfI'INELY RHEA GUDPETHESOEYRTHERESPONass.tY OF THE OCVLLOPFJITO REODIAaT PROVIOETHIS SERVCE TOTHESRE LANDSCAPE NOTES 1. CWRTERLY INSPECTION AND MAINTENANCE OF LANOSCAPNG ANG VEGETATON TOSE COMPLEIEOAS REQUIRED, 2. SEEBOY2 MRLANDSCAPINGNOWS AND OMWNGS. GEOTECHNICAL NOTES 1 A GEOTECHFIICALREPORTWLLBEFRODUCED FOLLOWING SLPAPPROVAL REPORT HILL BE 51RSURFACE EXROMTION UTLIZNG SOB. TEST BORMIGS PEFFGLt1ED W ITN A DRILL NO N ACGORGNCE WITH ASTM O 1510 MIN SING HOLLOYJ STEMAUGERORILLNM GENERAL NOTES 1, TIE NUMBER OFAVEMGETRIPS TOTMESRE PER MON17i WRL eE APPROJe4ATELY TWICEA MOAN. I TIa_INEARe NO UTLRY EASeMfi11T3 VtIT19N TNEUMfTS GF MME PROJECT (FEATS UNEJ. 3. THE PROJECT MEETS OR EACEEDS THe SETOAIX REDMREMENTSOF BECTON S] BASEZONWG REGUIICTS NTS McLYFEROFTHfi V00.1ME9Ef1ACK PEOt11REMENTS ARE A. FRONF YARD: 40 FEET 0. ME YARD: SO FEET a REARYMO: 2S FEET CHAIN LINK FENCE DETAIL NOT TO SCALE 4. TH. FICU CTMEETSOREACEEDBTNEGMENSIONAL AND RATIO STANDARDS REQUIREMENTS OF SECTION 3.3 BASE ZO.NNG 01=TS • itt MNL BUFFER OF T HE U- THEC MENSIOMAAND "TOSTA14DAROCARE: a FLOOR AREA MTO: REFORTO NOTES. B. PEDESTRIAN AND LUDSCAPE RATA: O.3A (TW= an a OPCN SPACE RATNk O.M (2.0.0,33E SF) 5.7 WLL BE NO BVLOINGS ONTME PROPERTY. 9. TOYAL AMOUNT OF LAND DISTURBANCE TO BE NO MORE 'THAN 0.7 ACRES. 7, ALL N UTIL"ANO TPANSMSSION LINES SHALL BE PLACED, TO THE EMENT FEASIBLE. UNDERGROUND MIEFTVMERETRNNSMISSION UNETRANSHIGNS ABOVE GROUND ATINTERCONNECTION POW. L TMETALEST STItUCNRESMALL BE LESS THAN trcIN XEIGHT 9. APAA YSAREGESIONEOTDCMTURESUNUGHTMTNIR TMN PRODUCE DR GEN EMTE GLAIE THE MAAYS PROPOSED FGFITH18 SMEARS CONSTRUCTED OUT OF ANTFREFLLC'11VE CIA53 SW FACET TO AYOp FROOUGTION CF OLAM IN AOOrrM.TNE 91DMWAL 3 SNAL BE ARRANDEDA7RIENlED TO PREVENT TO THE FULLEST E%TEM PO351ELE, GLARE OR ID REFLECTION OF SUNLIDW ON ADJACENT PROPERTIES AOIOR ADJACENT RKTNTSOFAYAY. 1 D. PER SE M 19.0 (C)CC(B OF THE U00 CLEACY VISIBLE WARNING CRWS CONCERNING VOLTAGESNA. BEPLACEDATTHEBASE OFALLPA MOUNTED MNSFORMERS ANG SUBSTATONS, WAPMNG 310413 AND NO TPESPASS SANS 3MLLALSO GE ERECTED ALO.NGTNEPROPOSEDPE FENDS 3UMOUNDiNOTHD PROJECT, CT, !1. PER 3ECRON E9..IL1I21fA) OFTHC 1HIGH.N PROJECT OFENCLOSEDBYANFFELEVATI DRAIN LI4( FENCE. PL SEDREFE0.T0 THE ELEYAT iOCTALOF ME PPOPOSEG FENCE FDRADDITpFNALOETAI.. 13. TN.D (CXI CPATACIW OWLEDGES TNAT, PERSECRON 5.EO IRA TOHAVE LIDO, WBMCO INSURANCE IS REGUIREO TO R"QuRIMNUM COVERAGE IMITOf 5350,Wp.03 PEROCCURHtENCE 14, MRICANTAGREES TO Al AAALICAEUE STAHUAOS CGNTANED VATHN S9A (C)13) NCLUSN'E WITH RESPECT TO DECOMMIS SIONNC TO THE 3RE PARKING DATA PAFOUNG REQUIREMENTS: NO VEHIG.ES WLL BE STONED ON SITE NOTE: THE PROPOSED GRAVEL ACCESS OFM WLL BE SUFFICIENTTO MEET THE NEEDS OF VEHICLES I ERVICYIGTHE PROPERTY l' 5'S TYPICAL RACK SIDE ELEVATION NQTTOSCAE FRONT N ya *r W e SURD E 5 / / l �vy5j_ k`, TR ANSFORMER 1, ". p__ TAALLrB, �I a� §rA;: SACKS SURVEYINGa MAPPING, P,G 2P ACCESS Q L ROAD TEMPORARY V 10 LOfATKKia • —•_• STAGING AREA astARa' DEVELOPER INTERCONNECTION ;�+s$'1 POINTTOGRID I a 4Y5 AP �— TYP J F gQI ^ It t!6'.Im ($ tl y AREA WR 111 FENCE UNB DELINEATES AREA BEING SUBMITTED FORSUP SEEED42FOR LWOSCAPING NOTES TYP. O'FENCE :—D:!." �'J_ (SEE NOTES) pA iel 4YSETBACK TTP. e0 STREAM BUFFERTYP ,ITSETBACKTYP. 27J11t PITCH TYP. RATER NOW SPAGINS TYP. R B 5 E �;• SUNDURANCE ENERGY -0, 2045 LINCOLN HWY V, EDISON NJ 08817 SITEOF SOUR V101NOYMAP ARRAY SLUE: N.T.S. MmvN• LEGEND ... BOUNDARY LINE SET'BACKLNE Q SOLHLPANEL -- EXROADINAYESM7. ---- ABWEOROUNDEXCIRIDLMINESYNAC ® 150MlWNVERTERBMTM EX13RN0 CGNIOUR3 1W !U 3 mP 748 SCALE;V-107 5,5ATPN OC/M SROUND MODMES PV SYSTEM: 19.354 JA SOLAR 305W PV MODULES ON EOUNALENT. 999 STRMGS, I9. AIOOULES PIT2 STR24G. ACTRUSHCH0.370 LF ACCESS ROAD:IROSLF FENCE: 5,2W LF W 7LT PREMANARY OONOTUSEFOR CONSTRUCTON 200.MACKENAN DR. CARY NC27511 2814 MALVERN AVE P.0 BOX 1399 HOT SPRINGS, AR 71901 Sunlight PARTNERS 4215 EAST MCDOWELL RD MESA, AZ 85215 SINKS SOLAR, LLC 5609 CASCADE DRIVE CHAPEL HILL, NO 27514 nwnA PHOTOVOLTAIC GROUND MOUNT SITE PUN KEN CHEE RICK BRADY 7071118014 BD-01 W -M SURVEYOR a� §rA;: SACKS SURVEYINGa MAPPING, P,G Q L GREENSBORO, SBORO, LO ROAD GREENSBORO.NC27409 $ T FAX(3T17W1- 055585 PAX: 1733) W7-0S5. DEVELOPER SINKS SO UUC AP 4215EMDDOWELLROADRIZ MESA.AZ IV14 J F Ar CONTACT' KEITH COLSON (4K)924 519 /� PARCELADDRESS ty 3911 MOUNT SINAI ROAD, !T ORANGE COUNTY. NO 27514 PROJECTADDRESS (NOTASSIGNED APPROXIMATELY) SEW CASCADE DRIVE / CHAPEL HILL.. NC 27514 PROPERTY OWNERS ANNIEVBiGIMA NUNN a SHEKA N. - 2911 MOUNT SIM ROAD CHAPELHI.I.NCUS14 WHARL,I. BISIfOP a yme. e" N. BISHOP it iy i 2811 MOUNT SMN ROAD GNAPELHa.L,1,1027514 SITE'SVMMARY TABLE TOTAL SRE AEA: 56]96 ACRES LIARS OF 3U PLAN: t"9 .C.ZE PARCELIDN, 9967305074 a 0851497072 EXIsnNG DEED DOOIUPAGC DO 944 PC 147 OB 390 PG 241 STREAM TYP PROPOSED USE UNMANNED 50LAR GENERATION FACILITY PLANNING JURISDICTION: ORANGE COUNTY ZONING OF PROPERTY: RUM DUFFER (RS) ADJACENT PROPERTY' RURALSUPFERt") LEGEND ... BOUNDARY LINE SET'BACKLNE Q SOLHLPANEL -- EXROADINAYESM7. ---- ABWEOROUNDEXCIRIDLMINESYNAC ® 150MlWNVERTERBMTM EX13RN0 CGNIOUR3 1W !U 3 mP 748 SCALE;V-107 5,5ATPN OC/M SROUND MODMES PV SYSTEM: 19.354 JA SOLAR 305W PV MODULES ON EOUNALENT. 999 STRMGS, I9. AIOOULES PIT2 STR24G. ACTRUSHCH0.370 LF ACCESS ROAD:IROSLF FENCE: 5,2W LF W 7LT PREMANARY OONOTUSEFOR CONSTRUCTON 200.MACKENAN DR. CARY NC27511 2814 MALVERN AVE P.0 BOX 1399 HOT SPRINGS, AR 71901 Sunlight PARTNERS 4215 EAST MCDOWELL RD MESA, AZ 85215 SINKS SOLAR, LLC 5609 CASCADE DRIVE CHAPEL HILL, NO 27514 nwnA PHOTOVOLTAIC GROUND MOUNT SITE PUN KEN CHEE RICK BRADY 7071118014 BD-01 TYPICAL 100' LANDSCAPE SEGMENT 7(ET) 1S(EU) OGSHRUIIS 0 3-MN ®sl-r °° ®� °° °° °° e° ® ® °° °o °° ° °® °° __ 12'Aw (ET) (EU) SHIT S SP PROTECTION 'PTALLFLUOITESCENT -) ORANGE.HIGHDENSITY DONSTFUCTION PENCE OR APPROVED EQUAL P LONG WOOD OR STEEL FENCE POSTS. POSTS SHALLBESPACED HORwVTALLYTON. CENTER MIN. — ARFAOF SITE LANDSCAPE NCTES 1. PER SECTION O.OA (B) (1) OF THE UDO, EXISTING TREES, REGARDLESS OF SQL SHALL NOT BE CUT OR OTNERWISE DAMAGED OR DESTROYED WITHN A PRIMARY TREE PRDTECTION AREA EXCEPT AS SHOWN ON AN APPROVED LANDSCAPEANO TREE PRESERVATION PUN, PLOT PLAN, OR SITE PUN Z. SECTION 6.15.4 (B) (S) OF THE U00, DURING CONSTRUCTION ACTIVITIES, AOEOUATE PROTECTIVE MEASURES SHALL SEPROVIDED TO MNIMIZE DAMAGETO EXISTING TREES AND OTHER VEGETATION. 9. SECTION G.6.4 MT (7) OFTHE UDO, SIGNS SHALL BE IDENTIFYING IDENTIFYG THE TREE PROTECTION AREAS AND SHALL STATE THE AREA IS NOTTO BE DISTURBED, SUCH PROTECTIVE DEVICES SHALL EFFECTIVELY PROTCCT THE CRITICAL ROOT ZONES, TRUNKS, AND TOPS OF TREES TO BE RETAINED AND SHALL BE MAINTAINEO UNTIL ALL WORK HAS BEEN COMPLETED. CNATNE, NON•INVASNE. AND DROUGHTTOLERANT SPECIES SHALL BE USED WHERE ADDITIONAL LANDSCAPE AREAS ARE PROPOSED, S. IN AREAS WHERE EXISTINCTREES OC NOT ADEQUATELY A—A VISUAL BUFFER FOR NEIGHBORING PROPERTIES ADDITIONAL TYPE C: OPTION D LANDSCAPING WILL BE PUNTED. S. M AREAS WHERE EXISTING TREES 00 NOT ADEQUATELY ACT AS A VISUAL .BUFFER FOR NEIGHBCRTNG PROPERTIES APORIONAL TYPE O: OPTION 9 LANDSCAPING WILL BE PLANTEM O, EXISTING VEGETATION ON SITE INCLUDES 301L CANOPY TREES, 70% UNDERSTORY TREES AM ABIOUopI,H�j-I .QF, UOUSG y RANGING N HEIGHTAPPROXIMATELY SO.70 AP VALGENERA NOTES 1 ATREE SURVEYSHALL BE PRIOR TO ISSUANCE OF THE GMOING P MT. 2 AN APPROVED EROSION CONTROL PUN AND LAND DISTURBING PERMIT IS RFOU1RED. 3. IF TREE PROTECTION IS REQUIRED BY THE COUNTY PLANNING DEPARTMENT, TREE PROTECTION CERTIFICATION MUST EE SUBMITTED TO THE COUNTY EROSION CONTROL DNTSICN, AND TREE PROTECT" INSPECTION COMPLETED PRIORTO THE ISSUANCE Of A LAND DISTURBANCE PERMIT. *IF MORE THAN FIVE ACRES 15 DISTURBED, A SURETY BOND WILL BE REQUIRED. 5. APPROVED CDS AND COUNTY OPERATIONS AND MAINTENANCE PERMIT WILL BE REQUIRED, O ENE NOTES 1. MASSGR _L PROPOSED FOR TNI59RE. LIS SEGMENT& LENGTH PLANT MATERIALQUANTITY EVERGREEN TREES OPTKN 3:7 EVERGREEN TREES, 16 EVERGREEN UNDERSTORY,615 SHRUBS NORTH SEGMENT TOTALS - ."EVERGREEN TREES. 105 EVERGREEN UNOFRSTORY 701 SHRUBS 1090 FT EVERGREEN TREES(ET)SHALL BE MN. OF F TAIL AT PUNTING; 20% 111 SPECIE; MN. 7 SPECIES EVERGREEN UNOERSTORY (EU) SHALL BE A MIN, OF TTALL AT PLANT" 20% (1) SPECIE; MIN.7 SPECIES LMOERSTORY(EUI SHRUBS MIN. OF I AT PLANTING; MIN. T DISTANCE ON CENTER, 20%(1) SPECIE; MIN. 10 SPECIES OPTION 0:7 EVERGREEN TREES, 16 EVERGREEN UNOERSTORY, 60 SHRUBS EASTSEGMENT TOTAIS'35EVERGREEN TREES. 50 EVERGREEN UNOERSTDRY, SAO SHRUBS ,AFT EVERGREEN TREES(ET)SHALL BE MIN. OF E TALL AT PLANTING; 20X(1) SPECIE; MIN, 7 SPECIES EVERGREEN UNDERSTORY (EU) SHALL BE AWN. OF 0' TALL AT PLANTIN20 %(1) SPECIE; MIN.7 SPECIES SHRUBS MIN. OF I V AT PLANTING; MIN, T DISTANCE ON CENTER. 20%(1) SPEGIC MIN. 10 SPECIES OPTION 17 EVERGREEN TREES, 16 EVERGREEN UNOERSTORY, 10 SHRUBS WESTSEGMENT TOTALS: 51 EVERGREEN TREES, 110 EVERGREEN.UNDERSTORY, 490 SHRUBS 72D EVERGREEN TREES (En SHALL BE A MIN. OF T TALL AT PUNTING; 20%(1) SPECIE: MN. T SPECIES EVERGREEN UNDERSTORY RU) SHALL BE A MIN. OF 4 TALL AT PUNTN; 29Y. (1) SPECIE: MIN.7 SPECIES SHRUBS MN. OF 1S AT PUNTING; MN. T DISTANCE ON CENTER, 20 %(1) SPECIE: MIN. 10 SPECIES OPTION 2:1 EVERGREEN TREES, 16 EVERGREEN UNDERSTORY, 10 SHRUBS SOUTH SEGMENT TOTALS: 20 EVERGREEN TREES, M EVERGREEN UNDERSTORY, 272 SHRUBS AWR EVERGREEN TREES(ETISHALL BEA MIN.OFO'TALLATPIANTWG'LM %(1) SPECr4MN.7SPECIES EVERGREEN UNOERSTORY (EU) SHALL BE A.MIN. OF 1' TALLATPLANTW :20% (I) SPECIE; MIN.7 SPECIES SHRUBS MIN.OF 15' AT PLANTING; MIN:2' DISTANCE ON CENTER. A %(1) SPECIE; MM. 10 SPECIES TREEISHRUB PU ' EVERGREEN TREES DEODARCEDAR .OURFORDHOLLY,HYBRICHOLL 6ROOIEJUN R. SOUTHERN MAGNOLIA, MERRILL fm MAGNOLIA, LOBLOLLY PINE EVERGREEN DWARF BURFORD HOLLY, AN NANONq. Ih ALTA 1MONOlIA, BALU121NA MAGNOUIy BETTY MADNOLYI, LMOERSTORY(EUI YAUPON HOLLY, LITTUd DEMMAONOLIA CENTURY PUNT CAST NON PUNT. WARTY BARBERRY CNENAULT BARBERRY ENGLISH EOXW000, SHRUDS" COMMON SWEET SHRUB, BUTTONDUSH, PARNEY'S REG CLIJMRSERRY COTONEASTER ,BLENDER OEUrAk, EUEAGNUS CONTRACTOR WILLUSE LISTED TREES AM SHRUBS OR ECUNALENT FROM THE COUNTYAPPROVEDLIST AND AS APPROVED. BYTE COUNTY a'12l TREE PROTECTION FENCE DETAIL —.11 NOTES: 1. TREEPROMCTIONFENCESHALLOE INSTALLED IO' FROM THE EXISTING —T VEGETATION IN ACCORDANCE TO SECTION SA.' OF THE LIDO. !— Z CONSTRUCTION VEHICLES TO STAY AS FAR AS POSSIBLE FROM TREE PROTECTION FENCETD PREVENT COMPACTION OFTREC ROOM N W E EAST SEGMENT 500 FT. I/S BUFFER' PER UDO SECT, E OPTIONS: EVERGREEN LEGEND --- BOUNDARYUNE - -- SET DACK LINE �] SOUR PANEL - - -� EX. ROADWAY ESMT. (� 9 ABOVE GROUND ELECTRIC LINE 226NNAC 1500RW INVERTER STAVON —566— EXISITING CONTOURS �!L1S SuNDuRANcE tz ENERGY2:;;� 2045 LINCOLN HWY EDISON, NJ 08817 AS NOTED PRELIMINARY- CO NOT USE: CONSTRLILTON FOR -' (j 2DO MACKENAN DR. CARY NC 27511 2814 MALVERN AVE P 0. BOX 1399 HOT SPRINGS, AR 71901 Sunlight PARTNERS 4215 EAST MCDOWELL RD. MESA, AZ 85215 DINKS SOLAR, LLC 5604 CASCADE DRIVE ORANGE COUNTY, NC 27514 ..P m. LANDSCAPE PLAN KEN CHEE RICK BRADY BD -02 P.. 072112014 AS NOTED 0 CA 1. JAMES E SPAINHOUR WAYNE R THOMANN SHARON RYAN PATRICIA A OLIVER CHARLOTTE H THOMANN 5701 CASCADE DR 5502 CASCADE DR 2521 CHARLOCK CT CHAPEL HILL, NC27514 CHAPEL HILL, NC27514 CHAPEL HILL, NC275149609 TIMOTHY K OLSON DAVID R YOUNG SALLY LYNN GEWALT ROBIN M OLSON MILLY S YOUNG JOHN GUNTER PETRANKA 5312 CASCADE DR 5317 CASCADE DR 2531 FALLS DR CHAPEL HILL, NC27514 CHAPEL HILL, NC275149547 CHAPEL HILL, NC275149695 MARK BLAKLEY RADCLIFFE ALFRED S KIRKLAND MICHAEL L BISHOP CONSTANZAJ DE RADCLIFFE 3111 MTSANAI RD SHEILA N BISHOP 2520 FALLS DR CHAPEL HILL, NC27514 2916 MT SINAI CHAPEL HILL, NC275149695 CHAPEL HILL, NC275149685 ROBERT LEE MARCHMAN IV DANIEL E MATTINGLY MELANIE JO MAUPIN SUSAN S MARCHMAN MARY SUE CHERNEY 5609 CASCADE DR 5805 CASCADE DR 5420 CASCADE DR CHAPEL HILL, NC27514 CHAPEL HILL, NC27514 CHAPEL HILL, NC275149690 DANIEL NOLAN LYDIA NAN WEGMAN CYNTHIA L VEGA KIM A DONALDSON ROBERT SEWELL CANTWELL 5821 CASCADE DR 3004 MT SINAI RD 5704 CASCADE DR CHAPEL HILL, NC27514 CHAPEL HILL, NC27514 CHAPEL HILL, NC275149535 GINA PASCHALL LAURI LANGHAM ANNIE VIRGINIA NUNN 5505 CASCADE DR DAVID LANGHAM 2911 MOUNT SINAI RD CHAPEL HILL, NC275149691 5320 CASCADE DR CHAPEL HILL, NC275149685 CHAPEL HILL, NC275149547 FALLS OF NEW HOPE ASSOCIATION DONALD WILLIAM BANKS THOMAS L TRUEBLOOD 5830 BRISBANE DR 600 COMMERCE DR NANCYTTRUEBLOOD CHAPEL HILL, NC27514 DECATUR, GA300302610 5511 CASCADE DR CHAPEL HILL, NC27514 JOHN W A FINDLAY ANDREW C BURNS III HARRIETT LU STEVENS 2829 CONNESTEE TRL JULIA W BURNS 5517 CASCADE DR BREVARD, NC28712 5809 CASCADE DR CHAPEL HILL, NC27514 Chapel Hill, NC27514 MARK BLAKLEY RADCLIFFE DANIEL NOLAN FRED T FOURQUREAN CONSTANZAJ DE RADCLIFFE KIM A DONALDSON ELLEN G FOURQUREAN 2520 FALLS DR 3004 MT SINAI RD 5719 CASCADE DR CHAPEL HILL, NC275149695 CHAPEL HILL, NC27514 CHAPEL HILL, NC275149535 DONALD KELLUM SHEILA N BISHOP ALFRED S KIRKLAND SALLY KELLUM ANNIE VIRGINIA NUNN 3111 MT SINAI RD 5715 CASCADE DR 2916 MT SINAI RD CHAPEL HILL, NC27514 CHAPEL HILL, NC275149535 CHAPEL HILL, NC275149685 FALLS OF NEW HOPE ASSOCIATION 5830 BRISBANE DR CHAPEL HILL, NC27514 TRIANGLE LAND CONSERVANCY 1101 HAYNES STREET SUITE 205 RALEIGH, NC27604 ROBERT S CANTWELL LYDIA N WEGMAN 5704 CASCADE DR CHAPEL HILL, NC27514 JEFFREY S PARKIN SUSAN J HOERCHER 2522 CHARLOCK CT CHAPEL HILL, NC275149609 PAMELA MARIE LINDROOS CHRIS -ANN CHINCHAR 73 CRYSTAL OAKS CT DURHAM, NC27707 MELISSA WALTER 2518 CHARLOCK CT CHAPEL HILL, NC275149609 SHEILA N BISHOP ANNIE VIRGINIA NUNN 2911 MOUNT SINAI RD CHAPEL HILL, NC275149685 MARGARET PENDER DAVID PENDER 2509 CAPREA CT Chapel Hill, NC27516 PATRICIA CAROLE SMITH 5408 CASCADE DR CHAPEL HILL, NC27514 ROSS E MCKINNEYJR HOLLY B MCKINNEY 2523 CHARLOCK CT CHAPEL HILL, NC275149609 FALLS OF NEW HOPE ASSOCIATION 5830 BRISBANE DRIVE CHAPEL HILL, NC27514 BARRY KATZ BELINDA NOVIK 5801 CASCADE DR CHAPEL HILL, NC275149620 BLAKE A JOHNSON JENNIFER M JOHNSON 5705 CASCADE DR CHAPEL HILL, NC275149535 PATRICIA CAROLE SMITH 5408 CASCADE DR CHAPEL HILL, NC27514 TRIANGLE LAND CONSERVANCY 1101 HAYNES STREET SUITE 205 RALEIGH, NC27604 LYDIA NAN WEGMAN ROBERT SEWELL CANTWELL 5704 CASCADE DR CHAPEL HILL, NC275149535 LARRY MERCER LINDA MERCER 111 BROOK LANE DURHAM, NC27712 DAVID B JACKSON LAEL W JACKSON 5721 CASCADE DR CHAPEL HILL, NC275149535 HOMEGUY INC 109 RIVER WALK LN Carrboro, NC27510 ANDREW C BURNS III JULIA W BURNS 5809 CASCADE DR Chapel Hill, NC27514 107 1: DANIEL NOLAN KIM A DONALDSON 3004 MT SINAI RD CHAPEL HILL, NC27514 SHEILA N BISHOP ANNIE VIRGINIA NUNN 2911 MOUNT SINAI RD CHAPEL HILL, NC275149685 ALFRED S KIRKLAND 3111 MT SANAI RD CHAPEL HILL, NC27514 DANIEL NOLAN KIM A DONALDSON 3004 MT SINAI RD CHAPEL HILL, NC27514 SHEILA N BISHOP ANNIE VIRGINIA NUNN 2916 MT SINAI RD CHAPEL HILL, NC275149685 MICHAEL L BISHOP SHEILA N BISHOP 2916 MT SINAI CHAPEL HILL, NC275149685 ANNIE VIRGINIA NUNN 2911 MOUNT SINAI RD CHAPEL HILL, NC275149685 ALFRED S KIRKLAND 3111 MTSINAI RD CHAPEL HILL, NC27514 0 e r[. ii, F• 71[® lrllrliCr .9Lt- 9rrr- rrr.lLRrJ��r%1! — - - • • • - C7 Er s e r r ca ?' 3 7 r ! t o \, 11 A6 P, Tz, � �— 7 Postage $ Postage n Postage $ Certified Fee C:l Certified Fee ) 1 Return Receipt Fes I (Endorsement Required) Q E3 Q 0 !, �j C (E ' !: b C3 lip . � — C3 Postage $ ``.� `fY 2 �'�78 _,;,�,�_..� -:; Certified Fee ` 7� j' r j uc Postmari f (e re ? (EndorseRetmm enRet Requieipt reFee d) 4 � Restricted Delivery Fee (Endorsement Required) 3 I F a Total Postage & Fees CHAPEL HILL, NC275149690 MELANIE JO MAUPIN / 3 5609 CASCADE DR 3- CHAPEL HILL, NC27514 'e rj I. - 0 .,- r•r F F" C P, —0 '110 -, L,-7- 7, 0-11 rPostage $ t Certified Fee 3 3 3 Retum Receipt Fee (Endorsement Required) c PosnaiR if } Here �� • n,G Restricted Delivery Fee J'V r (Endorsement Required) U n ALFRED S KIRKLAND 3111 MT SANAI RD- 3 ; CHAPEL HILL, NC27514 h..y��..- is... <f i 0 e r[. ii, F• 71[® lrllrliCr .9Lt- 9rrr- rrr.lLRrJ��r%1! — - - • • • - C7 Er •• r r r ca ?' 3 7 r ! t o \, 11 A6 P, Tz, � �— 7 Postage $ Postage $ Postage $ Certified Fee C:l Certified Fee ) 1 Return Receipt Fes I (Endorsement Required) Q E3 Q Postmark A ire I Restricted Delivery Fee (Endorsement Required) t C3 Restricted Delivery Fee (Endorsement Required) C3 I ALFRED S•KIRKLAND 3111 MTSANAI RD 2 �'�78 _,;,�,�_..� -:; CHAPEL HILL, NC27514 `7 7 _U z r[. ii, F• 71[® lrllrliCr .9Lt- 9rrr- rrr.lLRrJ��r%1! — - - • • • - C7 Er •• r r r ca ?' j� �- �{• U b1% Ley r- 117 Postage $ r `+• Er Postage $ 441demark C:l Certified Fee }Jere n Q E3 Q ReturmRecelpt Fee (Endorsement Required) Postitf�dt '- g Here G C3 Restricted Delivery Fee (Endorsement Required) C3 NTotal m Pncfann c ❑m. `7 7 DANIEL E MATTINGLY '- MARY SUE CH ERN EY - C3 5420 CASCADE DR CHAPEL HILL, NC275149690 M . G] Er •• r r r ca ?' j� �- �{• U b1% Ley r- 117 Postage $ r `+• C3 E Certified Fee 441demark 0 E3 Retum Flecelpl Fee (Endorsement Required) }Jere n C3 Restricted Delivery Fee (Endorsement Required) °i r a M TIMOTHY K OLSON �'Tg ROBIN M OLSON� C3 0 5312 CASCADE DR N CHAPEL HILL, NC27514 Er" tJ3 ro r.. . G] Postage Er in Certified Fee r3 Return Receipt Fee (Endorsement Required) r' O Restricted Delivery Fee (Endorsement Required) M IT! ru M u3 » 0 P-- MICHAEL L BISHOP SHEILA N BISHOP 2916 MT SINAI CHAPEL HILL, NC275149685 � | � CERTIFIED 1mML,,,,,',RECEIPT , m Lrl 0 | rq U.S. Postal Service,(A ' ru C3 rr Postage El CERTIFIED MAIL,, RECEWT __ | Certified Fee Return Receipt Fee (Endorsement Required) �__m o` ED E3 Return Receipt Fee (Endorsement Required) � ro P..tNk He,. 0 P_ o m�" � o Postage [NARGAKETPEND[R (Endorsement Required) ! o o Restricted Delivery Fee o Certified m° cz Certified roe Postmadc M �� - - o Return Receipt Fee doRequired) Hard cz o Required) F-3 `^ o C3 cz ---ment C3 cz x, rn Postage p" n n*.~~~, " 2916yWT SINAI RD M M SALLY LYNN GEWA[T ------- ro "o o ]OHNGUNTERPETRANKA E3 M ' ' - �z 2531 FALLS DR '- '~~^'~''-- ' CHAPEL H\ULNC27S1496OS DURHA�,m��//o/ � | � CERTIFIED 1mML,,,,,',RECEIPT � m Lrl 'R-1 7, 0 1A ' rq F-3 ' ru C3 rr Postage El Certified Fee 17� o o Certified Fee Return Receipt Fee (Endorsement Required) Ir ED E3 Return Receipt Fee (Endorsement Required) Restr1cled De Fee livery � ) P..tNk He,. 0 C3 Restricted Delivery Fee (Endorsement Required) _1 ''' [NARGAKETPEND[R (Endorsement Required) cz D/V|DPENDER o Restricted Delivery Fee c'|ZSUyCAPREACT M BLAKE A JOHNSON (Endorsement Required) JENNIFER M JOHNSON ru o 5705 CASCADE DR M DAN|ELNOU\N CHAPEL HILL, NC275149535 � � CERTIFIED 1mML,,,,,',RECEIPT 1:3 Er m � 'R-1 7, 0 1A Coverage � F-3 ' ru C3 rr Postage El Certified Fee 17� o o M C3 o Return Receipt Fee (Endorsement Required) Ir o------- E:3 Restr1cled De Fee livery � ) 1:3 E:3 cz ru-----~~—'^ _1 ''' [NARGAKETPEND[R (Endorsement Required) cz D/V|DPENDER o Restricted Delivery Fee c'|ZSUyCAPREACT | ="�^_,~_/� (Endorsement Required) Chapel Hill, NC27516 CHAPEL HILL, NC27S1406Q5 ^ CERTIFIED 1mML,,,,,',RECEIPT 1:3 Er Postage fpomeao� 1�surance Coverage r- F-3 ' ru El Certified Fee 17� o o Return Receipt Fee Ir o------- 1:3 E:3 Restricted Delivery Fee _1 C3 o Return Receipt Fee (Endorsement Required) 1% Postmark n Here o Restricted Delivery Fee M ="�^_,~_/� (Endorsement Required) ru o M DAN|ELNOU\N ro Total Postage a Fees |$ C3 C3 3004 MT SINAI RD r CHAPEL HILL, NC27514 CHAPEL HILL, NC27S1406Q5 ^ CERTIFIED 1mML,,,,,',RECEIPT Ln fpomeao� 1�surance Coverage r- � ' ru Er 17� o Postage Ir 1:3 Certified Fee _1 C3 o Return Receipt Fee 1% Postmark n Here E3 Restricted Delivery Fee (Endorsement Required) o m ru Total Postage a Fees |$ SHEILA BISHOP 78 ANNIE VIRGINIA NUNN C3 2916yWT SINAI RD CHAPEL HILL, NC27S1406Q5 ^ . r I I Postage $ I Certified Fee I Postmark Retum Receipt Fee ! ft ( F.� (Endorsement Required) ry� ere I Restricted Defive Fee J 44, i (Endorsement Required) I i Total Postage & Fees ti i t THOMAS LTRUEBLOOD NANCYTTRUEBLOOD ?$ _ 5511 CASCADE DR CHAPEL HILL, NC27514 =a ► . o M rg ,li MAIL. CERTIFIED Ir IFF IFF �n ',, rv, O Er Postage $ C3 `c\ M Certified Fee Certified Fee dReturn M O �) y P Here t r. E:3 M Return Receipt Fee Q M p (Endors_ement Required) N M Restricted Delivery Fee M ! JOHN W A FINDLAY (Endorsement Required) cv O f , M N 1n0-t Pt taae & Fees C3 M FALLS OF NEW HOPE A co 5830 BRISBANE DR 7 .,,r CHAPEL HILL, rM NC27514 � �1 v, �+ f� er {11 IT' rr Postage $ Certfied Fee r O d Return Receipt Fee r-1 (Endorsement Required) Fee (Endorsement Requted) Cl M Total Postage & Fees .$ ru M TRIANGLE LAND CONSERVANCY 0 1101 HAYNES STREET U3 SUITE 205 RALEIGH, NC27604 / b n!!, Pdstmop Here %8 for Instri,Mions r~- I3 R. r a t . . . rg ,li MAIL. CERTIFIED �� Gam'' tttt � '; 0 C ',, rv, ll� -P g l Qom" Postage $ `c\ M Certified Fee $ dReturn M Receipt Fee (Endorsement Required) �) y P Here t r. E:3 Restricted Delivery Fee (Endorsement Required) ' Q M MReturn \\ N Return Receipt Fee (EndorsementRequtred) Ros arl� } Her M ! JOHN W A FINDLAY ^Ji • , cv 2829 CONNESTEE TRL f Restricted Delivery Fee (Endorsement Required) BREVARD, NC28712 �` � f•� C3 J Ln Postal MAIL. CERTIFIED r-q N (Domestic Man • No Insurance Coverage Provided) a Jill � F 11' A L Postage $ `R Cr Postage $ o Certified Fee MReturn \\ E p Return Receipt Fee (EndorsementRequtred) Ros arl� } Her � /p1 ark er&, t 3 n a f Restricted Delivery Fee (Endorsement Required) Restricted Delivery Fee �` � f•� C3 J M ru M 7 .,,r DONALD WILLIAM BANKS M o 600 COMMERCE DR I M N , -- -_ 4 DECATUR, GA300302610 M PATRICIA CAROLE SMIT'N Ln ' II ff � 1j, W.c"/ O Postage $ t - >y Q Certified Fee if MReturn Receipt Fee ,� Ros arl� } Her E:3 (Endorsement Required) f � Restricted Delivery Fee J (Endorsement Required) M , M N M PATRICIA CAROLE SMIT'N Fa 5408 CASCADE DR .�., ..'Z•S CHAPEL HILL, NC27514 T - 7 Return Receipt Fee ' .f Post ark (Endorsement Required) ^, Here I. r • �• ,g Restricted Delivery Fee to (Endorsement Required) ir 7 Er n _ 0) F, F �; JEFFREYS PARKIN Postage Postage o SUSAN J.HOERCHER ~`8 3 2522 CHARLOCK CT CHAPEL HILL, NC275149609 - 'a ^- ■ I. r • �• m d to ir Er 4y 1I lid 41 \Cav 0) F, F �; r` Postage Postage Q ,y d tr Postage $ Return Receipt Fee Certified Fee � Certified Fee (Endorsement Required) f• Restricted Delivery Fee E3 Q Return Receipt Fee 1 r� Pos mark 9 ^ 1„ Here ni M (Endorsement Required) Q M ; 4v j o Q Restricted Delivery Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) Q Q T�•si o..w.,.e a rm., ru Q: M .S HOMEGUY INC ?,7R m 109 RIVER WALK LN M E3 o.. Carrboro, NC27510 C3 tt 4 .... , r- I. r • �• m d to ir , ,i� E 0) F, F �; Q Er Postage Postage Q Certified Fee M p Return Receipt Fee Certified Fee Q (Endorsement Required) E3 Restricted Delivery Fee Return Receipt Fee (Endorsement Required) Q ni T:fal P ¢lane &Fees Q M ROSS E MCKINNEYJR o HOLLY B MCKINNEY Restricted Delivery Fee (Endorsement Required) 2523 CHARLOCK CT Q CHAPEL HILL, NC275149609 Q I, r • r. ru d j ir , ,i� E 0) F, F �; y U-. Postage $ Q Certified Fee Postage Q M Return Receipt Fee M p Q (Endorsement Required) Q Q Restricted Delivery Fee tad Q Restricted Delivery Fee (Endorsement Required) Q rr' M ru Total Postage & Fees m LARRY MERCER M LINDA MERCER C3 C3 Q 111 BROOK LANE rl- DURHAM, NC27712 •.n d ru , , ,i� E 0) F, F �; 11 t Ir Postage Q Certified Fee M p Return Recelp(Fee Q (Endorsement Required) tad Q Restricted Delivery Fee (Endorsement Required) M ru Total Postage & Fees M DAVID B JACKSON C3 ' LAEL W JACKSON 3 5721 CASCADE DR CHAPEL HILL, NC275149535 � t v� 0 ggyPostmark ,tf Postmark ?•� }f .,, () ,Here R ? �78� �r , Poi} erk �, 4or tnstructiem ^ ~ U.S. Postal Servicew CERTIFIED MAIL-n, RECEIPT ,",(Domestic Mail Only, No Insurance Coverage Provided) y=� F IF H e I, Ane . Postage - / Certified Fee / � Return Receipt Fee 011* I (Endorsement ___—Required) 3 Restricted Delivery Fee (Endorsement — 3 � � Total P_-"— Fees - VVAYNERTHO&1ANN --- z CHARLOTTE HTH0K8ANN z 2521CHARLOCKCT CHAPEL H|LLNCZ75149609 �w�� U.S. Postal ServiceT11 Postage $ CERTIFIED MAIL,, RECEIPT | Certified Fee V | Relu(n Receipt Fee (Endorsement Required) Here | Restricted DerIver Fee (Endorsement Recityilred) Postage C) | Total Postacle & Fees / Certified Fee � o (Endorsement Required) F-1 E3 EZI Return Receipt Fee (Endorsement Required) Restricted Delivery Fee ~8^^...~.~^~.` '~~^ge Restricted Delivery Fee CHAPEL ._,'_—_-4 ` o � Certified Fee "o SHEILA BISHOP c, o � U.S. Postal Servicev,, ` ru CERTIFIED MAIL,,, RECEIPT Restricted Delivery Fee (Endorsement Required) (Domestic Mail Only; No insurance Coverage Provided) y=� F IF H e I, Ane . Postage - / Certified Fee / � Return Receipt Fee 011* I (Endorsement ___—Required) 3 Restricted Delivery Fee (Endorsement — 3 � � Total P_-"— Fees - VVAYNERTHO&1ANN --- z CHARLOTTE HTH0K8ANN z 2521CHARLOCKCT CHAPEL H|LLNCZ75149609 �w�� M U.S. Postal ServiceT11 m 1$�For CERTIFIED MAIL,, RECEIPT our welosite at www.usps.coma a- (Domestic Mail Only; No Insurance ru � M Postage C) � Return Reoe'p' Fee Certified Fee � o (Endorsement Required) F-1 E3 EZI Return Receipt Fee (Endorsement Required) Restricted Delivery Fee u- '~~^ge Restricted Delivery Fee cz m m o � Certified Fee "o SHEILA BISHOP c, o � (Endorsement Required) ` ru | 2916K�T8NA| E:3 Restricted Delivery Fee (Endorsement Required) , -�--__'- � / / cz � m n_j m "~^^ � �°��=|� // _---___-_ ~' "o cz ANNIE VIRGINIA NUNN 2911 MOUNT SINAI RD ~`, ' ----- l cz CHAPEL HILL, NC275l49685 CHAPEL HILL, NC275149535 JIM __-------- M m 1$�For delivery information visit our welosite at www.usps.coma Er � p o o � Postage C) o M Return Reoe'p' Fee Certified Fee E3 (Endorsement Required) F-1 E3 EZI Return Receipt Fee (Endorsement Required) Restricted Delivery Fee o Restricted Delivery Fee cz m m MICHAEL LBISHOP "o SHEILA BISHOP c, o� ` ru | 2916K�T8NA| .- , -�--__'- / / cz � // _---___-_ ~' � CHAPEL HILL, NC275149535 JIM Postal Service-rr.1 RTIFIEDtAI;L,,, RECEIPT ED (Domestic Mail Only; No Insurance Coverage Provided) � � � � o Postage ED Certified Fee � o cz (Endorsement 'aqured) Postmark Here Rest (Endorsement Required) 0 o ru nn SHARON RYAN =u S70l CASCADE DK cz CHAPEL r- ru � m 1$�For delivery information visit our welosite at www.usps.coma Er � o U- =age Certified Fee C) o M Return Reoe'p' Fee Here E3 (Endorsement Required) 14AY 9 20111 C3 Restricted Delivery Fee (Endorseme red) cz m m MICHAEL LBISHOP "o SHEILA BISHOP o� C3 | 2916K�T8NA| .- , -�--__'- LCHAPEL HILL, NC275149685 n,FF 0 A L Postage $ Certified Fee Return Receipt Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) BARRY KATZ m BELINDA NOVIK 5801 CASCADE DR CHAPEL HILL, NC275149620 Postal EIPT i CERTIFIED MAILT,, RECEIPT werage Provided) ,, , a 7: rrt '`,� rt,• ru C3 postage $ ro i Certified Fee Postmark ra Postmark �iP �6 t� �(��(� M Return Receipt Fee (le2014 6 ` a O (Endorsement Required) AY iJ Restricted Delivery Fee ED (Endorsement Required) j m ru Total Postage &Fees Sent To r (� ....,,_. r� rn IQ�a�dan. lur_- - - 9t. - - O Street, Apt No.; �/ �t {� - - r, o"PO Box No. 8 0 � ... . 114.1 City, State, ZIP +4 O ` U mbUS ' b I4 � 2 `� I • • w i 3 r l IF F c� 1 !I A Postage $ Certified Fee I \ Return fl Req Pbstmar u Fee Here tt (Endorsement Required) e y qq/ Restricted Delivery Fee (Endorsement Required) Total Postaae & Fees $ f ANDREW C BURNS III JULIA W BURNS 27278 z „_ 5809 CASCADE DR Chapel Hill, NC27514 G' 117 ro r_t C7 C3 C] Return Receipt fee (Endorsement Required) En Restdcted Delivery Fee (Endorsement Required) Certified Fee m rn . r_IMA PASCHALI 16. � x.'(LlOI)►eS(ICtMBR Uplj; IVD.IgS r .m �i .. L,i 4 delivery into rmetioltvisitou Q Postage $ \� t a- Certified Fee C E3 Return Receipt Fee (Endorsement Required) ' Talk Restricted Delivery Fee f (Endorsement Required) O / 7 tar P—t— A Foam Q: a' tM M DONALD KELLUM, J °O SALLY KELLUM C3 0 5715 CASCADE DR CHAPEL HILL, NC275149535 Postal (Domestic Mail Only; mo insurance Coverage Provided) R' air ra '$ A 1 ^1 S CC' Postage $ 10 E3 Certified Fee M Postmark Re turn Recelpt Fee q' H E3(Endorsement Required) M ,;/ 20 O Restricted Delivery Fee (Endorsement Requrred) rm Tow Poetaoe & Fees M HARRIETT LU STEVENS 7278 ' � 5517 CASCADE DR C3 CHAPEL HILL, NC27514 Postage $ Certified Fee A Postmark Return Receipt Fee Here (Endorsement ftequlred) � Restricted Delivery Fee (Endorsement Required) Postal `SerwiceTht :ITIFIFD MAII _. R1=rF c (uomesfic mail vnry; fvu tn�urauc Por delivery, information visit our web a Postage $ Postmark Certified Fee AAq 2014 Return Receipt Fee "' Postmark Here (Endorsement Required) C3 Restricted Delivery Fee (Endorsement Required) ' - - 27278, j r ANNIE VIRGINIA NUNN E:3 2911 MOUNT SINAI RD CHAPEL HILL, NC275149685 Restricted Delivery Fee (Endorsement Required) Postal `SerwiceTht :ITIFIFD MAII _. R1=rF c (uomesfic mail vnry; fvu tn�urauc Por delivery, information visit our web ..n tr ., Firf���''4�i Postmark 1� Return Receipt Fee (Endorsement ftdqulred) , 9 H1014 C3 Certified Fee ' C3 Restricted Delivery Fee (Endorsement Required) �osiij{{r(Q� I H E:3 (Endorsement Required) Q Restricted Delivery Fee (Endorsement Required) 1m1.1 Total Postage & Fees Total PdGt2aa R Fnac j/ M FRED T FOURQUREAN 27278 o ELLEN G FOURQUREAN -- p LAURI LANGHAM ta 5719 CASCADE DR - ------ -- CHAPEL HILL, NC275149535 ..n tr ., Firf���''4�i r- � Postage $ E `` p Cenilled Fee C3 Certified Fee �Af OCT (o l p Return Receipt Fee �osiij{{r(Q� I H E:3 (Endorsement Required) Q Restricted Delivery Fee (Endorsement Required) p M N Total PdGt2aa R Fnac j/ M JAMES E SPAINHOUR 27272- -- ` o PATRICIA A OLIVER M LAURI LANGHAM C3 5502 CASCADE DR - ------ -- CHAPEL HILL, NC27514 Is LEI go ., Firf���''4�i [t p a- Postage $. 4 p Cenilled Fee p Return flecelpi Fee �Af OCT (o l p (Endorsement Required) O p Restricted Delivery Fee (Endorsement Required) p M ru Total Postage & Fees M LAURI LANGHAM p DAVID LANGHAM - ------ -- 5320 CASCADE DR r3 CHAPEL HILL, NC275149547 ctal Postage & Fees $ t. ` LARK BLAKLEY RADCLIFFE ONSTANZA J DE RADCLIFFE -18 520 FALLS DR HAPEL HILL, NC275149695 rr Postage $ �+ g I ' g dal I, I� u c If ; 1 ► ��- , Certified fee , +' Q ostm c a- Postage $ Return Receipt Here Fee 4 O k (Endorsement Required) Certified Fee , (Endorse eCnt Required) p Return Receipt Fee �� P Wra� M (Endorsement Required) v Fee n +•i o �+a e e ce�a d ��72 ~F (Endorsement O uRequired!) DAVID R YOUNG r+i �p ' MILLYSYOUNG RJ "' F " m SHEILA N BISHOP 5317 CASCADE DR - CHAPEL HILL, NC275149547 n I ANNIE VIRGINIA NUNN Q 2916 MTSINAI RD CHAPEL HILL, NC275149685 � n Postal CERTIFIED mAIL,, RECEIPT ru (Domestic mail only; No Insurance Coverage Provided) N Imam Er F F g (mil A L M Postage Ir Q Certified Fee L7 Postmark C3 Return Receipt Fee (Endorsement Required) M� Fier ), 2014 M C3 Restricted Delivery Fee (Endorsement Required) ; M rU Total Poslaae & Fees 9, m ; DANIEL NOLAN KIM A DONALDSON -------- r 3004 MT SINAI RD CHAPEL HILL. NC27514 rr Postage $ �+ g I ' g dal I, I� u c If ; 1 ► ��- , Certified fee , +' Q ostm c a- Postage $ Return Receipt Here Fee 4 O k (Endorsement Required) Certified Fee , (Endorse eCnt Required) p Return Receipt Fee �� P Wra� M (Endorsement Required) v Fee n +•i o �+a e e ce�a d ��72 ~F (Endorsement O uRequired!) DAVID R YOUNG r+i �p ' MILLYSYOUNG RJ "' F " m SHEILA N BISHOP 5317 CASCADE DR - CHAPEL HILL, NC275149547 n I ANNIE VIRGINIA NUNN Q 2916 MTSINAI RD CHAPEL HILL, NC275149685 � n