Loading...
HomeMy WebLinkAboutAgenda - 11-02-2006-5iORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 2, 2006 Action Agenda Item No. 5 -- ~ SUBJECT: Housing Rehabilitation Contract Awards DEPARTMENT: Housing/Comm. Development PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Bid Results; Work Specifications Tara L. Fikes, 245-2490 PURPOSE: To award three housing rehabilitation contracts for the CDBG Housing Rehabilitation Program administered by the County for the Town of Chapel Hill. BACKGROUND: The Housing and Community Development Department solicited bids .from qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation Program for the general repair portion of the work specifications. Bids were also solicited from lead based paint abatement contractors for items containing lead based paint as required by federal regulation. The informal bidding process is governed by the North Carolina General Statues §143-131 and does not require a minimum number of bids. Additionally, present program procedures provide that housing rehabilitation contracts be awarded to the lowest responsible bidder. Additionally, all contractors participating in the County's Rehabilitation Program are required to utilize current deconstruction and material recycling methods during the repair process. Sealed bids were solicited from participating contractors on August 24, 2006 and August 31, 2006 with a bid opening on September 7, 2006 with three bids received for 500 Gomains Street. For the 314 Lindsay Street property, sealed bids were solicited on September 13,.2006 with a bid opening on September 28, 2006 for the rehab portion of the work specifications. Bids for the lead portion were solicited on September 26, 2006 with a bid opening of October 4, 2006. Bid results are attached. FINANCIAL IMPACT: The Town of Chapel Hill CDBG Program provides grant funding for this repair project. RECOMMENDATION(S): The Manager recommends that the Board award the following housing rehabilitation contracts: Dwelling Unit Bid Amount Contractor 500 Gomains Street, Chapel Hill $30,380 Triple J Construction Co. 314 Lindsay Street, Chapel Hill $43,510 William Long Construction Co. $13,541 Eastern Environmental 2 RESULTS OF BID OPENING OWNER:_Robert Edwards APPLICATION NUMBER: CH-CDBG ADDRESS:_500 Gomains Ave. COST ESTIMATE:_$32,285 Chapel Hill, NC 27514 PERCENTAGE OF BID OVER UNDER 6o COST ESTIMATE CHECK ONE:JOB BID X JOB NEGOTIATED COMPANY 1. Triple J Construction Co. 2. Harmony Homes LLC 3. Diamond Builders 4. 5. 6. BID OPENED BY: David Saconn TIME -0F BID OPENING: BID AMOUNT $30,380 $30,628 $31,795 3:00 PM DATE OF BID OPENING: September 7,.2006 WITNESSED BY: Felecia Mack Lowest Acceptable Bid: $30,380 Negotiated Amount: N/A Contractor: Triple J Construction Co. NAME 1808 Pinecrest St. Burlington, NC .27215 ADDRESS 336-227-6125 TELEPHONE N[TMBER COMMENTS: Submitted by: David Saconn Date_09-07-06 Bid Approval Date Proceed Order Issued 3 ORANGE COUNTY HOUSING REHABILITATION PROGRAM ' SPECIFICATIONS FOR Robert Edwards FOR 500 Gomains ,A.vee PHONE: 942-6186 DATE: July 21, 2006 BY: David Saconn REHAB SPECIALIST NOTE. TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY ' REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANUAL, AND ORANGE COUNTY lV1IlVIlVIUM HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WRITER TO DIlZECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE'COUN1'Y HOUSING REHABILTIATION PROGRAM. 4 Name: Robert Edwards Address: 500 Gomains Ave. City: Chapel Hi11, N.C. 27516 Phone: 942-6186 Date: July 21, 2006 Exterior: 1. Repair approximately two (2) sheets of damaged siding and two hound ears with matching thickness plywood. Note: All damaged trim and siding shall be inspected by the Rehabilitation Specialist before new vinyl siding and trim is installed. 2. Install fan fold insulation and Double Five (D-5) vinyl siding on all exterior siding. Install all necessary vinyl corners, J-channel and utility trim. Note: Vinyl siding to be properly installed. _ 3. Prepare the soffit and trim for aluminum coil stock and vented soffit. Remove a 12 inch section of soffit along the rear, front and front porch overhangs. Install vented soffit in the overhangs. Install solid soffit in the gable overhangs and aluminum coil stock onall exposed exterior trim including door and window brick molding. Install solid soffit over the gable vents and on front porch ceiling. Note: All vinyl soffit and aluminum coil stock to be properly installed. Side Porch Slab & Door: 1. Remove the side storm door, door unit and porch slab to the ground. Repair the damaged foundation band and sill. (Approximately 4 ft) Install pressure treated matching lumber. _ 2. Install a Oft x Oft pressure treated landing and steps. Install a 2x10 band with 2x6 floor joists. Insta115/4" decking for porch floor. Install aft wide steps heading toward back of unit. Install a handrail on one side of the steps. Install all necessary flashing, galvanized bolts and nails. A permit is required. All work shall pass inspectian with the Chapel Hill Inspection Department. ~ ~ _ 3. Install a new nine lite exterior door unit on side porch. Install anew keyed lockset and double cylinder deadbolt keyed alike. Install matching casing on the interior. Prime casing with an oil based primer. Paint casing with semi-gloss latex paint. New door to open, close and lock properly. 5 Name: Robert Edwards Address: 500 Gomains Ave. City: Chapel Hill, N.C. 27516 Phone: 942-6186 Date: July 21, 2006 Side Porch Slab & Door: 4. Install a new vinyl-clad self- storing storm door on the side porch. Storm door shall be complete with lock, door sweep and closure. The new storm door to be of Larson quality orpre-approved equal. Storm door to open, close and lock properly. Foundation: 1. Install foundation drain file starting from the left front porch to the rear right corner. (Approximately 100 feet) Refer to Rehabilitation Specialist for proper location. Dig to footing, prepare footing and foundation wall for water-proofing. Apply a foundation water-proofing to within two inches of ground level. Install a minimum of two inches of # 57 or #67 rock on footing. Install slotted drain file from front porch to rear right corner: Cover drain file with a minimum of 12 inches of rock, apply landscape fabric over rock and backfill. Seed and straw exposed area. Note: Drain file shall termite not less than ten (10) feet from foundation wall. Rehabilitation Specialist to inspect drain file before back filled. Page 2 2. Add 24 yds (2 Tandem Loads) of soil along the foundation walls to divert water away from unit. Soil shall be added along the front, left side and rear of unit. Landscape soil sloping away from foundation. Seed and straw exposed area. 3. Install three foundation vents along the front foundation wall. Install automatic foundation vents. 4. Install two large vent wells to the front left and left side foundation vents. 5. Install a large vent well around the front water spigot. 6 Name: Robert Edwards Address: 500 Gomains Ave. City: Chapel Hill, N.C. 27516 Phone: 942-6186 Date: July 21, 2006 Foundation: 6 Install a new crawlspace door and frame. Install a 2x6 pressure treated frame and 3/a inch pressure treated plywood door. Install 2 x 4 cross bracing to support door. Install new pressure treated 1x4 trim around opening. Install new galvanized hinges and locking hasp. New door to open, close and lock properly. _ Roof /Gutters: 1. Remove the shingles and felt paper to the sheathing. Note: Rehabilitation Specialist to inspect roof sheathing before new felt paper is installed. Prepare sheathing for felt paper. Check.roof decking for exposed nails-and damaged sheathing. Install 151b felt paper, new vent boots, white eve starter, galvanized chimney flashing and 25 year shingles. Patch area around existing electric riser/mast. Note: Shingles to be installed with proper fasteners and too manufacturer specs. . 2. Install continuous aluminum gutters and downspouts on all fascias. Color of gutters and downspouts to match. coil trim. Note: Attach solid drain the to all downspouts. The front and rear left downspout drain file can run beside the foundation drain tile. The front right downspout drain tle shall run toward the right rear away from the foundation. Check the locating service for under- ground utlites before digging. Windows: 1, Install ten (10) vinyl construction windows with built in J=channel and nailing flange. Install all necessary,trim to properly install new windows. (jamb extensions and matching casing) New windows to be complete with screen, lock and openable sash. Windows to open, close and lock properly. Apply all caullc necessary to seal off air leaks. Page 3 Name: Robert Edwards Page 4 Address: 500 Gomains Ave. City: Chapel Hill, N.C. 27516 Phone: 942-6186 Date: July 21, 2006 Electrical: 1. Install a 200 amp service breaker panel and meter base. Remove existing mast and riser from roof. Install under- ground service from pole to unit per Chapel Hill Inspection Dept. Price to include all breakers, switches and extra circuits necessary to pass the Current Electric Code. 2. Install hard-wired smoke detectors in all sleeping rooms, hallway and living room. Install a total of five (S) smoke detectors to code. 3. Install GFI protected receptacles in the kitchen and bathroom. Install three in the kitchen and one in the bathroom. 4. Install two service lights in the.crawlspace controlled_by a switch within 3feet of the crawlspace opening. All work to meet the current Electric Code. 5. Install a service receptacle for the furnace to -code. 6. Install a vented exhaust hood for the oven. Vent exhaust to out- side air to code. Make all electrical connections. New exhaust hood to be complete with light and filter. Consult owner for color of exhaust hood. 7. Install a dryer vent located in the kitchen. Consult Rehabilitation Specialist for proper location. New vent to extend to outside air. Use proper aluminum vent per code. 8. Install a GFI protected receptacle and circuit on the front porch. Install new weather-proof cover. 8 Name: Robert Edwards Address: 500 Gomains Ave. City: Chapel Hill, N.C. 27516 Phone: 942-6186 Date: July 21, 2006 Plumbing: 1. 2. Install a new 4" PVC Schedule 40 sewer line from rear foundation wall to the property line. Install a proper cleanout per code. Make proper plumbing connections at unit and property line to code. Seed and straw the exposed area. NOTE: Install two (2) cleanouts- one beside unit and one at property line. _ Extend the existing 3/4 inch drainage line on the right side foundation wall. Add a 4 ft section of pipe and trap as necessary per code. _ 3. Install a main water cut-off within a closet or within 3 feet of the crawlspace opening. Extend water line as necessary to install cut-off. Mechanical: 1. Remove all un-insulated hard ductwork from the crawlspace. Install insulated flex ductwork to all registers. Support new flex duct with proper supports per code. Check all return and trunk line insulation and reattach as necessary. 2. Install a proper vent cover for the furnace exhaust on the right side foundation wall. Vent cover shall be approved by Code. Insulation: 1. Remove existing R-13 insulation from the crawlspace. Install R-19 faced insulation per code. 2. Add matching insulation in the attic to achieve an R-30 rating. Install baffles as needed per code. 3. Install 6-mil poly in the crawlspace. Remove all debris from ground before poly is installed. Page 5 Name: Robert Edwards Address: 500 Gomains Ave. City: Chapel Hill, N.C. 27516 Phone: 942-6186 Date: July 21, 2006 Miscellaneous: 1. Repair three loose brick on the front porch. roll-lock. Apply mortar to loose brick. Fill joint where concrete meets brick around porch with caullc type mortar. 2. 3 Install new insulation wrap for the water heater. Secure the insulation wrap with large return straps. Caulk all cracks between back-splash and countertop in kitchen and bathroom. Use 100% silicone caullc. _ Termite Treatment: Provide a termite inspection and treatment. A licensed Pest Control Company must perform this work. Note: Active termites noted in crawlspace at side door location. All chemicals to be sprayed after exterior landscape is complete. Price to include all drilling and trench work. Provide Orange County Housing/CD with inspection report and treatment. _ Page 6 Total 41' 6" \:' BEDROOM # 3 9' x 12' KITCHEN 12' x 12' ° ~ LL /' JO 5'x8' HALLWAY 10 25' x 46" 6" Total Sq. Ft. = 1,040 BEDROOM # 2 9' 5" x 11' ~.-~ -~- LIVING ROOM BEDROOM # 1 -I ~ N 11' 4" x 29' 11' x 12' FRONT PORCH 500' Gomains Ave. Chapel Hill, N.C. 27516 TOTAL SQ FT. = 1,040 25 ft 11 RESULTS OF BID OPENING OWNER:_Kathy Atwater APPLICATION NUMBER: CH-CDBG ADDRESS:_314 Lindsay St. COST ESTIMATE: $45,000 Chapel Hill, NC _ 27514 PERCENTAGE OF BID OVER UNDER 4% COST ESTIMATE CHECK ONE:JOB BID X JOB NEGOTIATED COMPANY BID AMOUNT 1. Triple J Constructio n Co. $56,950 2. Harmony Homes LLC $53,739 3. Incline Construction Co. $71,635 4. William Long Constru ction Co. $43,510 5. 6. BID OPENED BY: David Saconn TIME OF BID OPENING: 3:00 PM DATE OF BID OPENING: September 28, 2006 WITNESSED BY: Sharkita Torain Lowest Acceptable Bid: $43,510.00 Negotiated Amount: N/A Contractor: William Long Construction Co. NAME _3761 Phillips Chapel Rd. Haw River, NC ADDRESS 336-376-0170 TELEPHONE NUMBER COMMENTS: Submitted by: Bid Approval Date _ Proceed Order Issued Date 09-29-06 David Saconn 27258 _ 12 ORANGE COUNTY MOUSING REHABILITATION PROGRAM SPECIFICATIONS FOR Kathy Atwater AT 314 Lindsay St. PHONE: 966-4321 DATE: September 5, 2006 BY: David Saconn REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BUILDING CODES MANiTAL, AND ORANGE COUNTY M7NMIJM HOUSING CODE DOCUMENTS. TT IS NOT 'THE INTENT OF THE WRITER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COUNTY HOUSING REHABILITATION PROGRAM. 13 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone. Number: 966-4321 Date: September 5, 2006 Exterio~°: Remove the brick curtain walls from the left front steps to the right side of the back door steps. (Refer to Rehab. Specialist for location) Dig footings per Code for new brick curtain walls. (Refer to Specs) Install brick curtain walls with matching brick.. Note: New curtain wall shall be attached to the brick pier with proper straps approved by the Chapel Hill Inspection Dept. All brick shall be properly laid and all joints struck. Install all necessary fill dirt to landscape against wall. All soil shall slope away from foundation wall. Seed and straw exposed area. 2. .Add eight (8) automatic foundation vents in the foundation walls. The new foundation vents maybe installed in the new curtain walls. 4. Remove and replace six (6) stone/brick piers with brick piers. Install proper footings approved by the Chapel Hill Inspections Dept. Install new brick piers per Code. Note: Contractor shall pull sfxing- line for proper pier height. (Refer. to Specification Sheet) _ Add eight (8) brick piers to the floor system girders. Refer to Rehab. Specialist for proper location. Install footings for piers per Code. Note: Contractor shall run string lines for proper pier height. ; All work shall pass the Building Code with Chapel Hill Inspection Dept. (Refer to Specification Sheet) _ 5. Install three (3) pressure treated dropped girders along the entire width of the unit. Refer to Rehab. Specialist for proper location. Install concrete piers approved by the Chapel Hill Inspection Dept. Pier spacing shall be 78" OC. Install adjustable post jacks to support a pressure treated triple 2x8 dropped girder. Note: Contractor shall run string lines for proper floor height. (Refer to Specification Sheet) _ 6. Re-screen the front porch with black vinyl screen. Install new lattice strips at all necessary locations. Prime and paint lattice with semi-gloss latex paint. 14 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 966-4321 Date: September 5, 2006 Exterior: 7. Replace approximately 60 ft of damaged vinyl siding. Note: Area includes where electric service was removed. Install matching siding. 8. Replace Oft of damaged vertical soffit on the front right corner. Install matching soffit. 9. Install one large vent well on the right foundation wall. 10. Install drain file along the right foundation wall. The drain file shall extend from the front corner of the unit to the back yard. The drain file shall terminate not less than 30 feet from the unit. The ditch shall be 1$" deep and 24" out from foundation. Install 6 inches of # 67 gravel in the ditch then install drain tile. Cover the drain file with a minimum of 8" of gravel. The drain file along the foundation wall shall be slotted. The drain file in the rear yard shall be solid. Add 6 yards of top soil along the foundation wall. Slope soil away from foundation. Seed and straw the exposed area. Note: Rehabilitation Specialist to inspect ditch before gravel is installed. 11 Roof: Water-proof the right foundation wall. Clean and brush wall using water. Apply two coats ofwater-proofing to the brick. before drain- tile is installed. . 1. Remove all shingles to the sheathing. Prepare sheathing for new felt paper. Check sheathing for exposed nails and damaged roof sheathing. Install new white eve starter, vent boots and chimney flashing. Install 301b felt paper and 25 year shingles. Install shingles per manufacture specifications. Replace all damaged sections of flashing in all locations. Caulk all nail heads with silicone caulk. Page 2 2. Install a new turbine vent located on the rear section of the roof. 15 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 966-4321 Date: September 5, 2006 Roof: 3. Remove and replace 1 sheet of damaged plywood on the front porch roof. Install matching plywood. Trim existing plywood on both eves back to coil trim. (Approx. 3") The new eve starter shall cover the exposed edge of plywood. 4. Install a.shingle type ridge vent on the main ridge and dormer ridge. Remove a 3" section of sheathing before installing the ridge vent. 5. Install new galvanized flashing on the chimney. Use a grinder to cut groove for new flashing. Install step and counter flashing. Caulk all areas to prevent water intrusion with silicone caulk. _ 6. Install approximately 40 ft of solid drain tle to the rear down- spout. Refer to Rehab. Specialist for proper locators. Drain the shall be below grade and drain to rear yard. Windows: 1. Remove all loose glazing and paint on the sunroom casement window. Re-glaze and paint the exterior window with proper paint. Mechanical: Page 3 Remove the existing HVAC unit and ductwork. Install a new HVAC split system. Unit to be sized in accordance with ASHRAE/Manual "J" specifications. and ductwork design to be in accordance with ASFIRAEEIManual "D" specificatons. New heat/air system shall be a complete operational system. Air conditon to be at least a 13 seer. All duct work to be insulated. ~ Both electrical and mechanical permits are required. All work must pass the inspections from the Chapel Hill Inspections Dept. Price to include new floor registers and return duct. The existing gas piping maybe used provided in good working condition. Note: Mechanical contractor shall furnish paperwork to certify meeting the above requirements. _ 16 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 966-4321 Date: September 5, 2006 Electrical: Page 4 1. ,Rewire unit to new electrical code. Electrical to include underground service per Chapel Hill Inspection Dept. Work to include Arc-.fault . brealcers, GFI receptacles, hardwired smoke detectors. Install 200 amp service and new meter base. Install new switches, receptacles and cover plates. All fixtures to be wired to new electric code. All work to pass Current Electric Code. 2.. Re-install all existing interior ceiling/wall light fixtures in unit. 3. Install new exterior light fixtures at both doors. Light. fixtures shall be.approved for exterior use. Fixtures allowance is $ 25.00 per fixture. 4. Remove existing sump pump. Remove all water from sump hole. Clean hole of all debris and apply a water proof coating to the outer lining. 5. Install a new sump pump of matching hp. Make all plumbing and .electrical connections. Support discharge line through crawlspace. Provide homeowner with owner's manual and literature. 6. Install service lights in the crawlspace and attic. The lights to be controlled by a wall switch within aft of the opening. Install two (2) lights in the attic and crawlspace. 1~ Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 966-4321 Date: September 5, 2006 Plumbing: 1. Page 5 Remove all existing drain lines from the unit. Install schedule 40 PVC drain lines from the foundation wall to all fixtures. All plumbing work shall meet the new Plumbing Code. All fixtures are to be properly vented. Install a four (4) inch cleanout within aft ofthe foundation wall per code. 2. Install' a new washing machine box on the back porch. Refer to rehab. Specialist for proper location. All plumbing work to meet plumbing code. 3. Remove all existing supply lines from the unit. Install ~/a" pex line from the foundation wall to a cut-off within aft of the crawlspace opening. Install new supply lines to all fixtures. Install new cut- offs to all fixtures. Note: ,Install %Z inch copper supply lines to the bathroom sink. 4. Install a new combination tub/shower valve in the bathroom. Install supply line to shower head. Install new trip-lever and drain line assembly for the tub. Make all plumbing connections. Install a faucet access cover on the kitchen wall to access faucet. 5. Install afreeze-proof water spigot located on the rear of the unit. Make all plumbing connections. Spigot shall be secure. 6. Install an expansion tank on the existing water heater to code. 7. Install .anew PVC commode flange. Re-set commode with new wax seal and supply line & cut-off. 8. Install pipe insulation on all supply lines. Pipe insulation to be properly installed and: taped. 9. Install a proper wire connector where wire enters water heater. 10. Install a new drain line assembly and mechanical vent for the kitchen sink. Make all plumbing connections. 18 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N:C. 27514 .Phone Number: 966-4321 Date: September S, 2006 Insulation: 1 Bathroom: Page 6 1. Install a new hollow core bathroom door. New door shall open out. Refer to Rehab. Specialist for installation. Install new hinges and privacy lockset. Install new door stop. Stain door and trim to match. Kitchen: 1. Remove the metal wall cabinets located above the kitchen sink. Install a dropped soffit for new cabinets. Frame and finish soffit with %z" sheetrock. Finish smooth, prime and paint. 2. ,Install new wood wall cabinets designed to accommodate a vented exhaust hood for the oven. Homeowner shall choose .finish. Cabinets to have. hardwood fronts and a factory finish. Install matching linear feet of wall cabinets. (8.S linear ft) Note: New cabinets shall be complete with all necessary hardware. 3. Install a vented exhaust hood over the oven. The exhaust hood shall be vented to outside air. (roof) Make all mechanical. and electrical connections to code. Center Hall 1. Install a new disappearing stairway. New stairway to open and close properly. Trim steps to properly open to finish floor. Stain door to match existing stain in hallway. Size- 2S" x S4" _ Install R-19 insulation in the crawlspace. Insulation to be inspected by Chapel Hill Inspection Dept. ,.. ~,~ ~ ~ ( 19 Name: Kathy Atwater Address: 314 Lindsay. St. City: Chapel Hill, N.C. 27514 Phone Number: 966-4321 Date: September 5, 2006. Miscellaneous: 1. Install pressure treated handrails on one side of the rear steps. Facing steps install railings on right side. All work to meet Building Code. New railings to be secure. Plane hand-grip edge of handrail to provide a smooth surface: _ 2. Re-frame back porch floor framing. Remove existing sub-floor and floor joists. (Refer to Rehab. Specialist for location) Install pressure treated floor joists/ girders placed 16" OC. Install 5/8" pressure treated 3. Install ~/a" lauan plywood and a vinyl floor in the laundry room. The vinyl to cost not less than $ 14.00 sq yard. Install metal trim at all door openings. Install painted shoe molding at all wall locations. 4. Install %2" MR sheetrock on the exposed wall framing in the laundry and storage rooms. Install all necessary framing to attach new sheetrock. Finish sheetrock smooth. Prime new sheetrock with a construction primer. Paint wall with semi-gloss latex paint. _ ________, 5. Install matching baseboard in the storage and laundry room where new sheetrock was installed. Prime new baseboard with an oil based primer. Paint baseboard with semi-gloss latex paint. _ Page 7 TOTAL ' { BACK ~ 20 5ft x Eft 29 FT STORAGE ROOM . 32 FT u . STORAGE OO x 13' KITCHEN 29 FT BEDROOM # 12' x 15' (~ 1 .~2°~ LIVING ROOM 13' x 14' FRONT SCREEN PORCH 32 FT LAUNDRY 5'6"x6'6" HALLWAY 7'6" x14' v BEDROOM # 1 13'x14' DEN 7" x 12' 1,024 SQ FT FRONT 314 LINDSAY 5T. 21 FOOTING /PIER NOTE: ALL PIER FOOTINGS SPECIFICATIONS SHALL BE TESTED FOR SOIL COMPACTION3EFORE CONCRETE 1S POURED PIER FOOTING - Brick piers- 16'° x 16" 24'° x 24'° x 14°' FOOTING FOR CURTAIN WALL 14" deep 16'° wide 22 RE. OWNER:uKathy Atwater ADDRESS:_314 Zindsay St. Chapel Hi11, NC PERCENTAGE OF BID: OVER CHECK ONE: JOB BID_ COMPANY 3ULTS 275 11a _X_ OF BID OPENING APPLICATION NUMBER: CH-CDBG _ COST ESTIMATE:_$12;000 14 _ UNDER COST ESTIMATE _ JOB NEGOTIATED BID AMOUNT 1. RGO Enterprises LLC $13,541 2. Eastern Environmental $15,625 3. 4. 5. 6. BID OPENED BY: David Saconn TIME OF BID OPENING: 3:00 PM DATE OF BID OPENING: October 3, 2006 WITNESSED BY: Sharkita Torain Lowest Acceptable Bid: $13,541.00 Negotiated Amount: N/A Contractor: RGO Enterprises LLC NAME _114 Allen Creek Rd. Rougemont, NC 27572 ADDRESS 919-451-7989 TELEPHONE NUMBER COMMENTS: Submitted by: Bid Approval Date _ Proceed Order Issued Date 10-05-06 David Saconn 23 ORANGE COUNTY HOUSING REHABILITATION PROGRAM SPECIFICATIONS LEAD REMEDIATION FOR KATHY ATWAT]E~.2 AT 314 LINDSAY ST. PHONE: 942-8510 DATE: August 22, 2006 BY: David Saconn REHAB SPECIALIST NOTE TO CONTRACTOR CONTRACTOR SHOULD REFER TO THE BASIC SPECIFICATIONS, PROPERTY REHABILITATION STANDARDS, GENERAL CONDITIONS, NORTH CAROLINA BTJILDING CODES MANUAL, AND ORANGE COUNTY MTNIMIT]YI HOUSING CODE DOCUMENTS. IT IS NOT THE INTENT OF THE WR~[TER TO DIRECT ANY CONTRACTOR TO A SPECIFIC SUPPLIER OF MATERIALS CALLED FOR IN THIS WORK WRITE-UP ONLY TO SPECIFY A TYPE THAT WOULD BE ACCEPTABLE TO THE HOMEOWNER AND ORANGE COI:INTY HOUSING REHABILITATION PROGRAM. 24 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number:.942-8510 Date: August 22, 2006. This set of work specifications outlines work items that were found to contain lead in concentrations above acceptable levels as set in the U.S. Department of Housing and Urban Development (]~i.TD) standards. It is recommended, that any lead hazard remediation work be conducted by workers who are certified by the state to perform lead abatement work. Lead hazard remediation work must be preformed in compliance with the regulations issued by the Secretary of Housing and Urban Development set forth in 24 CRF Part 3S, et al and all applicable rulers and any others issued there-under, and all applicable Federal, State and local rules and regulations, regarding notification, evaluation and reduction oflead-based paint hazards in residential structures undergoing Federally- Assisted construction or rehabilitation and require the elimination oflead-based paint hazards. Every contractor or subcontractor, including painting, pursuant to which such Federally-assisted construction of rehabilitation is performed, shall include appropriate provisions complying with requirements for notification, evaluation and reduction of lead-based paint hazards. The contractor shall be allowed to include in the cost of the project the allowable fee for one (1) complete clearance inspection of the remediation work performed. The cost of any additional clearance inspections which may be necessary will be born directly by the contractor. Contractor must submit a copy of training certification with their bid. 25 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 942-8510 Date: August 22, 2006 Note: Prior to conducting Lead-Based Paint Abatement activities, all personnel associated with the project should review and fully understand the requirements of ALL applicable local, state, and federal regulations that may apply to.the worksite. Worccsite Preparation: Ground Containment: 1. Before construction, construct a worlcsite perimeter curb of 2x4 timbers, ten feet from the house exterior. Create an outer barrier of flags and/or plastic tape 3 feet on center and 20 feet from the worlcsite. All warning signs must remain posted until clearance is passed. (Front Porch Area & Dormer) 2. During the period of work on the exterior components, atCach one layer of 6-mil poly to the building exterior with :furring strips, extending 10 feet past the worksite. Wrap the plastic under the perimeter 2x4's. Change the plastic daily. Clearance Examination: 1. After completion of all work that disturbed LBP and any other lead hazard reduction activities, a qualified person shall perform a clearance examination. Worlc disturbing lead-based paint is not considered complete until clearance is achieved. Pre-Clean: Pre-clean all interior locations containing lead paint. (Refer to Risk Assessment /Lead Paint Inspection) HEP.A vacuum all horizontal surfaces, to include all floors, windowsills, troughs, baseboards and casing. ABATEMENT WORK: Windows: Remove both dormer window sashes and frames. Wrap in 6-mil poly and properly dispose at landfill. 26 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 942-8510 Date: August 22, 2006 ABATEMENT WORK: Windows: 2 3. Install two vinyl fixed windows sashes/frames in the dormers. All exposed wood to be wrapped with matching aluminum coil stock. Caullc all seams with 100% white silicone caulk to prevent water intrusion. Contractor to verify all window measurements. _ Install eight (8) vinyl replacement windows. Windows shall be installed from the interior. Remove all necessary wood trim on the interior to install new vinyl windows. Install new window stop as necessary. NOTE: ~ Vinyl replacement windows shall be double-hung tilt (both sash open aa.1d tilt in to clean) Windows to be complete with screen and lock. All new windows to open, close and lock properly. Prime and paint all new trim installed on interior. ABATEMENT WORK: Exterior: Remove the front door and interior casing. Wrap in 6-mil poly and properly dispose of and landfill. Prepare the exterior front door jamb, frame and side frames for lead a lead block primer. Remove all loose chipping /peeling paint. Wet sand and feather edges and prime with a lead block oil primer. NOTE: Abatement Contractor shall use all guideluzes to prevent lead dust from migrating into the unit. _ 2. Prepare the front porch ceiling and trim for vinyl. Remove all loose chipping /peeling paint: Enclose all wood front porch components with tyveclc. Install solid vinyl soffit on the ceiling. Wrap all exposed wood with white aluminum coil stock. Install all necessary J-channel and vinyl trim to properly install vinyl and aluminum. ABATEMENT WORK: Interior: Room # 1 Foyer 1. Remove the door leading to room # 10 (center hall) Wrap in 6-lnil poly and properly dispose of at landfill. Page 2 27 Name: Kathy Atwater Page 3 Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 942-8510 Date: August 22, 2006 ABATEMENT WORK: Interior: Room # 2 Living Room 1. Remove the window stools and apron from both windows. NOTE: Do not damage walls or existing casing when removing trim. Wrap trim in 6-mil poly and properly dispose at landfill. Interior: Room # 3 Left Rear Bedroom 1. Remove all baseboard from walls. Do not damage wall covering when removing baseboard. Wrap in 6-mil poly and properly dispose of at landfill. 2. .Remove the door casing on the bedroom and closet doors. Remove the front closet door and j amb. Refer to the Lead Paint Inspection / Risk Assessment Report for proper location. Wrap casing, door and jamb in 6-mil poly and properly dispose of and landfill. 3. Remove the window stool and apron. Do not damage existing casing and wall. Wrap window trim in 6-mil poly and properly dispose of at landfill. Interior: Room # 4 Storage 1. Remove all lap siding from walls. Wrap siding in 6-mil poly and properly dispose of at landfill. 2. Remove door and casing. Refer to the Lead Paint Inspection / Risk Assessment Report for proper location. Wrap Door and trim in 6-mil poly alid properly dispose of at landfill. Interior: Room # 5 Laundry 1. Remove all lap siding from walls. Refer to Lead Paint Inspection/ Risk Assessment Report for location. Wrap all siding in 6-mil poly and properly dispose of at landfill. 28 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 942-8510 Date: August 22, 2006 Interior: Room # 5 Laundry 2. Remove two (2) doors in the laundry room. Door leading into kitchen and door leading from laundry to storage room. Remove the door casing on door leading into kitchen. Wrap both doors and casing in 6-mil poly and properly dispose of. Interior: Room # 6 Bathroom Remove the door casing from the bathroom door. (interior) Wrap casing in 6-mil poly and properly dispose of. Interior: Room # 10 Foyer Remove the door casings in room # 10 sides A&D. Refer to Lead Inspection/ Risk Assessment. Wrap casing in 6-mil poly and properly dispose of. New Doors & Trim: 1. Install a solid wood 6 panel exterior door on the front. Install new hinges, keyed loclcset and deadbolt keyed alike. NOTE: Cut/trim new door to fit opening properly. Prime new door with an oil based primer. Install an aluminum threshold with vinyl insert. Trim door properly to seal at bottom. _ 2 histall a 91ite exterior door in the kitchen. Install new hinges, keyed loclcset and double cylinder deadbolt. NOTE: Trim door to fit opening properly. Prime new door with an oil based primer. New door to open, close and lock properly. 3. Ilistall a new door, jamb and casing in bedroom # 3 (Closet Door Unit). Install a 6-panel wood door, jamb with matching casing. New closet door to open, close and latch properly. Install a passage loclcset. Prime new door, jamb and casing with an oil based primer., 4. Install three (3) interior doors removed during Abatement work. Insta116-panel wood doors, new hinges and passage locksets. NOTE: Trim new doors to fit opening properly. Prime new doors with an oil based primer. . Page 4 29 Name: Kathy Atwater Address: 314 Lindsay St. City: Chapel Hill, N.C. 27514 Phone Number: 942-8510 Date: August 22, 2006 New Trim: 1. Re-install all casing, baseboard, window stool, window apron removed during Abatement Work. NOTE: Install matching trim in all areas. Prime new trim with an oil based primer. Painting: 1. Prepare all new trim and doors installed for semi-gloss latex paint. Fill all nail holes with painters putty, caullc all seams in trim with latex caullc. Paint new casing, window stool & apron, baseboard, doors and jambs with semi-gloss latex paint. Cover all lead block primer with semi- gloss latex paint. (Front door unit) All paint to cover completely. Color to match existing trim as close as possible. ( NOTE) 1. The work shall require the coordination and relocation of personal belongings away from the work area. It is the responsibility of the Lead Paint Contractor to contain all lead dust from spreading throughout the unit. 2. All lead paint debris including paint chips and wood shall be double bagged and goose neck tied in 6-mil poly. All debris shall be properly labeled and. disposed of at a Licensed Landfill. 3. A copy of the Lead Abatement Contractor's License shall be submitted to the Orange County Housing/Community Development Office. 4. All permits acid applications shall be acquired before work is to begin. ( Lead Abatement Permit) All work shall comply with the N.C. Department of Health and Human Services- Lead-Based Paint Hazard Management Program Page 5 Total Labor & Material