Loading...
HomeMy WebLinkAboutAgenda - 05-20-2014 - 7cORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 20, 2014 Action Agenda Item No. 7 -c 1 SUBJECT: Orange Unified Transportation Board Request to Authorize the Planning Staff to Review Private Road Standards, Access Standards, and Trail System Standards of the Unified Development Ordinance; Amendment Outline DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) No ATTACHMENTS: Amendment Outline Form INFORMATION CONTACT: Abigaile Pittman, Transportation /Land Use Planner, 245 -2567 Tom Altieri, Comprehensive Planning Supervisor, 245 -2579 Michael Harvey, Current Planning Supervisor, 245 -2597 Craig Benedict, Director, 245 -2585 PURPOSE: To consider instructing Planning staff to review the private road, access and trail system standards, and develop recommended amendments to the Unified Development Ordinance (UDO) for consideration. BACKGROUND: In its accepted 2014 Work Plan, the following activity was identified for the Orange Unified Transportation Board (OUTBoard): • Begin examination of UDO Section 7.8 Access and Roadways with respect to the goals and objectives of the Transportation Element of the Comprehensive Plan to determine consistency, and seek BOCC authorization to develop recommendations of applicable amendments to the UDO to take to the Planning Board. Likewise, in its accepted 2014 Work Plan, the Planning Board identified the following activity as a concern /emerging issue: • Emergency Access: Work with appropriate staff /departments to better ensure properties can be reached by emergency personnel (e.g., driveway width and clearance, bridge weight limit signage and sufficiency to allow a fire truck to pass, gate width, and curve radii sufficient for emergency vehicles). This Work Plan activity relates to the following Comprehensive Plan goals and objectives: • 2030 Comprehensive Plan Transportation Goal 2, Objective T -2.3. Increase countywide access for emergency vehicles, including ways to improve response times, both for existing and new developments; and • 2030 Comprehensive Plan Services and Community Facilities Goal 7, Objective PS -T -3 Establish and maintain an appropriate level of service for law enforcement and emergency services and ensure the provision of adequate public safety protection standards for residential, commercial, and industrial development throughout the County. The impetus for this work plan task stems primarily from issues relating to the County's private road regulations found in Sections 7.8.4 and 7.8.5 of the UDO. The County's two - tiered approach to regulating private roads was originally intended to allow an affordable development option for small subdivisions of no more than 5 lots. However, problems have been reported by the County's Emergency Services Department and the Volunteer Fire Departments regarding the 12 -foot travel -way width permitted by the Class B private road. The narrow width of the Class B road has presented public safety issues because it does not provide adequate access for emergency services vehicles, and thus impacts response times for emergency services. Additionally, the UDO does not have a requirement that all newly created lots have access to a complying road, including those in statutorily exempt subdivisions (lots greater than 10 acres). Because of the exempt nature of these subdivisions, County staff cannot guarantee viable access to created lots. Like the situation with Class B private roads, the creation of land- locked properties presents public safety access issues for emergency services vehicles. Further, long -term maintenance costs of private roads have led to many requests for the North Carolina Department of Transportation ( NCDOT) to accept these roads into the State - maintained system. The construction standards for NCDOT acceptance are higher than the County's Class B private road standards, and are typically prohibitively expensive to overcome. Subdivision roads with a right -of -way dedicated, recorded, or with preliminary approval from a county planning board dated after September 30, 1975 will not be added to the State system unless the road is built to the minimum construction standards of the Division of Highways. The minimum State construction standard is 18 feet of pavement within a 50 -foot right -of -way. The OUTBoard also noted potential public safety concerns with providing access for emergency service vehicles on trail systems. The OUTBoard discussed the need for staging areas for vehicles to access trail users in times of emergency. On April 16, 2014 the OUTBoard reviewed and discussed these issues relating to selected private road and access standards of the UDO. The Board is recommending that the BOCC direct the Planning staff to review these standards, and also trail system standards, and develop amendments to the UDO for consideration. In the review of these standards the Planning staff would seek input from the Department of Environment, Agriculture, Parks and Recreation (DEAPR), and the Emergency Services Department. FINANCIAL IMPACT: Other than staff time, there is no financial impact associated with receiving, considering and authorizing the staff to proceed with reviewing the County's private road, access and trail systems standards. K RECOMMENDATION(S): The Manager recommends the Board move forward with the OUTBoard's recommendation to- 1 . Authorize the Planning staff to review the private road standards, access standards, and trail system standards of the UDO; 2. Authorize the Planning Board to provide review comments to the Planning staff; 3. Authorize the Planning staff to solicit comments from Department of Environment, Agriculture, Parks and Recreation staff and the Commission for the Environment and /or Parks and Recreation Council; 4. Authorize the Planning staff to solicit comments from the Emergency Services staff and the Fire Chief's Council; and 5. Return to the BOCC in the Fall of 2014 with an update and request to proceed with text amendment(s). ATTACHMENT 1 COMPREHENSIVE PLAN / FUTURE LAND USE MAP AND UNIFIED DEVELOPMENT ORDINANCE (UDO) AMENDMENT OUTLINE UDO / Zoning- 2014 -11 Private road standards, access standards, and trail system standards of the Unified Development Ordinance (UDO) A. AMENDMENT TYPE Map Amendments ❑ Future Land Use Map- From- To: ❑ Zoning Map: From To ❑ Other: Text Amendments ❑ Comprehensive Plan Text: Section(s). ❑ UDO Text: ❑UDO General Text Changes (Pending further BOCC authorization) ❑UDO Development Standards (Pending further BOCC authorization) ❑UDO Development Approval Processes n(s): To include (but may not be limited to): 1. Section 7.8 Access and Roadways, and 2. Section 6.2 Lot Standards of the UDO to review the private road, access and trail system standards and develop amendments for consideration. ❑ Other: M 1 B. RATIONALE 1. Purpose /Mission In its accepted 2014 Work Plan, the following activity was identified for the OUTBoard: • Begin examination of UDO Section 7.8 Access and Roadways with respect to the goals and objectives of the Comprehensive Plan to determine consistency, and seek BOCC authorization to develop recommendations of applicable amendments to the UDO to take to the Planning Board. On April 16, 2014 the OUTBoard reviewed and discussed selected private road and access standards of the UDO with respect to Comprehensive Plan Goals and Objectives. The Board recommended requesting the BOCC to instruct the Planning staff to review the private road, access and trail system standards, and develop amendments for consideration. 2. Analysis Additional analysis will be part of the subsequent evaluation. 3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) a. Transportation Goal 2, Objective T -2.3: Increase countywide access for emergency vehicles, including ways to improve response times, both for existing and new developments. b. Services and Community Facilities Goal 7, Objective PS -T -3: Establish and maintain an appropriate level of service for law enforcement and emergency services and ensure the provision of adequate public safety protection standards for residential, commercial, and industrial development throughout the County. 4. New Statutes and Rules N /A_ C. PROCESS 1. TIMEFRAME /MILESTONES /DEADLINES a. BOCC Authorization to Proceed May 20, 2014 b. Quarterly Public Hearin 2 c. BOCC Updates /Checkpoints Fall of 2014 - BOCC Update and request for authorization to proceed with text amendment(s) d. Other N/A 2. PUBLIC INVOLVEMENT PROGRAM Mission /Scope: To review existing private road, access standards, and trail system standards with respect to providing an appropriate level of service for emergency services vehicles and ensuring the provision of adequate public safety protection standards for development, and within this framework providing a reasonable and affordable development option for small subdivisions. a. Planning Board Review: August 6, 2014 September 3, 2014 b. Advisory Boards: N/A (at this time c. Local Government Review DEAPR staff; and boards to include Emergency Services staff; and the the Commission for the Environment Fire Council — from May to August, and /or the Parks and Recreation 2014. Council - from May to August, 2014. d. Notice Requirements At this time, only notice for advisory board meetings as required. e. Outreach: ❑ General Public: N/A ❑ Small Area Plan Workgroup: N/A ❑ Other: N/A 3. FISCAL IMPACT Other than staff time, there is no financial impact associated with receiving, considering and authorizing the staff to proceed with adoption steps for reviewing the County's private road standards, access and trail systems standards. 3 D. AMENDMENT IMPLICATIONS N/A E. SPECIFIC AMENDMENT LANGUAGE N/A Primary Staff Contact: Abigaile Pittman, AICP Planning Department 919- 245 -2567 abipittman @orangecountync.gov