HomeMy WebLinkAbout2014-199 AMS - Owens Roofing for Change Order #1 Court Street Annex/Battle Courtroom for roof replacement $3,390 CHANGE ORDER PROJECT: Roof Replacement CHANGE ORDER NO. 1 Court Sheet Annex DATE: January 8,2014 Battle Court Hillsborough,NC PROJECT NO. 12-58 CONTRACT DATE: October 14,2013 TO: Owens Roofing,Inc. CONTRAC FOR: Roof replacement 301 W.Cabarrus Street Raleigh,NC 27601 The Contract is changed as follows: F ITEM NO. Description a 1. Furnish and install four scuppers to include conductor heads and downspouts At Battle Court Add $ 3,390 New scupper and conductor heads needed for rework of roof drainage due to hidden deck conditions—concrete deck was found to be sloped away from existing internal roof drains. The original Contract Sum was $129,592 Net change by previously authorized Change Orders $ -0- The Contract Sum prior to this Change Order was $129,592 .� The Contract Sum will be INCREASED by this Change Order in the amount of $ 3,390 �q The new Contract Sum including this Change order will be $132,982 t i The Contract Time will remain unchanged by this Change Order Accepted By: Owens Roofing,Inc Oran e C ft (sset a e 5thWa11 CONTRA R OWN OTHER 4zoi�z JLS IF By: y: By: Date: Date: Date: 10814 This instrument has been pre-audited in the manner required by the L Government ,$udget and Fit�al C rol Act Clarence G. Grier,Assistant Co. Manager& CFO Nancy Finnell From: Wayne Fenton Sent: Tuesday,April 22, 2014 8:22 AM To: Nancy Finnell Cc: Jeff Thompson Subject: FW: Owens Roofing - change order request Nancy, As discussed. Thanks, Wayne From: Michael Talbert Sent: Thursday, March 06, 2014 5:03 PM To: Wayne Fenton Subject: RE: Owens Roofing - change order request Process the change order and I will sign,thanks. From: Wayne Fenton Sent: Thursday, March 06, 2014 4:11 PM To: Michael Talbert Subject: RE: Owens Roofing - change order request Michael, Although the original change order request was dated January 8,the signed copies did not make it to us until some time later, then I will confess it spent a few days on my desk during budget preparation time. Wayne From: Michael Talbert Sent: Thursday, March 06, 2014 11:40 AM To: Wayne Fenton Subject: RE: Owens Roofing - change order request Wayne, This is fine,why 2 months after the date it was requested? Michael From: Wayne Fenton Sent:Thursday, March 06, 2014 10:16 AM To: Michael Talbert Cc: Jeff Thompson Subject: Owens Roofing - change order request 1 Good morning Michael, Attached is an endorsed change order request in the amount of$3,390 for Owens Roofing with regard to the F. Gordon Battle Courtroom roof replacement project. The scope involves: 1. $3,390 for supply and installation of four(4)scuppers to include conductor heads and downspouts. This request is necessary, reasonable, and is covered by the unforeseen conditions contingency within the capital project. The need for this work became apparent only after removal of the existing roofing system. With your approval, I will forward the requested change order to you for execution and subsequent generation of the necessary contract document amendments. If you have questions or require additional information, don't hesitate to contact me. Thanks, Wayne Wayne Fenton Asset Management Services Assistant Director Orange County Government Box 8181 131 West Margaret Lane Third Floor Hillsborough, NC 27278 (919) 245-2628 1g (919) 644-3001 ® wfenton @orangecountync.gov z