HomeMy WebLinkAbout2014-173 Planning - J F Wilkerson Contracting Company for Buckhorn Mebane Utilities Phase 2 Change Order #4 $421,500 lala,..rjylly/ Change Order No. 4 Date of Issuance: 12/02/2013 Effective Date: 12/03/2013 Project:Buckhorn-Mebane EDD Water and owner: Orange County Owner's Contract No.: Sewer Improvements Contract: Date of Contract: Contractor:JF Wilkerson Contracting Co., Inc. Engineers Project No.: OC1001 The Contract Documents are modified as follows upon execution of this Change Order: Description:Additional rock allowance added to project budget for Sewer Line S-3 Adjusting change order. Attachments: (List documents supporting change): See supporting information in attachment CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days X Calendar days Substantial completion(days or date):365 $4,016,545.74 Ready for final payment(days or date):395 [Increase][Decrease]from previously approved Change [Increase][Decrease] from previously approved Change Orders Orders No. 01 to No. 03 No. 01 to No._03 Substantial completion(days): 141 $2,242.50 Ready for final payment(days): 141 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or date):506 $4,018,788.24 Ready for final payment(days or date):536 Increase [Decrease]of this Change Order: rincrease [Decrease]of this Change Order: Substantial completion(days or date):0 s421,500.00 Ready for final payment(days or date):0 Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion(days or date):506 $4,440,288.24.24 Ready for final payment(days or date):536 RECD EN ED- ACCEPT ACCEPTED: , p B By: By: rl- Engineer(Authorized ignature) O (Aut rized Signature) Contractor(Authorized Signature) Date: r� �` Date: 6 / Date: 2 I I Approved by Funding Agency(if applicable): Date: This instrument has been pre-audited in the manner required by the Local Government EJCDC No.C-941(2002 Edition) Budget and q Fis Cahip" u Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the �?,,�` ICJL Associated General Contractors of America and the Construction Specifications Institute. Clarence G Grier nccictanr CO. hAanager& CFO Change Order Instructions A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work. Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. EJCDC No.C-941(2002 Edition) Page 2 of 2 Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. Kevin Lindley From: David Townsend <dtownsend @hobbsupchurch.com> Sent: Friday, November 08, 2013 12:47 PM To: Kevin Lindley Subject: DDDDDDDRAFT please call before I finish Kevin,following several discussions, I am determining best"ESTIMATE" of the rock for the sewer lines S-3 &S-1. I have made these two assumptions to accomplish this:first,the existing soil conditions on Lines S-1 V S-3 will be the same for all work.They appear to be the same however the rock is buried therefore they seem to be very consistent. Secondly, the actual ratio of rock encountered during excavation of the recently constructed line and the future line work will be consistent.The topography of the two lines appear similar supporting this fact. The contractor has install sewer line from Sta 0+00 to MH#53 (approx.4600 Lin. Ft.)and "hit" 6350 Cu.Yds. of rock. Based on the above statements, 4500 Cu.Yds.of rock will be needed to complete Line S-3.Also the construction of Line S-1 will need approximately 6000 CU.Yds.of rock.This could result in amount totallingf 17,000 Cu.Yds.of rock for the entire project.The original Construction Bids included 6338 Cu.Yds. of rock @ $60.00 per Cu.Yd.Therefore,there is a possible change order amount of 10,662 Cu.Yds. of rock for the entire Project. David Townsend III, PE Hobbs, Upchurch &Associates, P.A. PO Box 1737 135 W. Connecticut Ave. Southern Pines, NC 28388 Office:910.692.5616 Fax:910.692.7342 Mobile:336.257.0274 dtownsend @hobbsupchurch.com dtownsend55 @triad.rr.com 1 ORD-2013-047 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 2, 2013 Action Agenda Item No. 7-a SUBJECT: Buckhorn Mebane Phase 2 Utilities — Request for Additional Rock Allowance and Approval of Budget Amendment#3-B DEPARTMENT: Planning, Financial Services, PUBLIC HEARING: (Y/N) No Asset Management Services (AMS) ATTACHMENT(S): INFORMATION CONTACT: 1) Project Map Craig Benedict, Planning, (919) 245- 2) Photos Showing Rock Excavation 2592 Clarence Grier, Manager's. Office/Financial Services, (919) 245- 2453 Kevin Lindley, Planning, (919) 245-2583 Jeff Thompson, AMS, (919) 245-2658 PURPOSE: To consider approving Budget Amendment #3-B adding additional rock contingency to the Buckhorn Mebane Phase 2 Utilities Capital project budget. BACKGROUND: This project has been underway since the Spring of this year. The overall project is more than 50% complete and consists of three distinct parts: 9,000 linear feet of 18" gravity sewer line, 14,000 linear feet of 16" water line, and 5,700 linear feet of 8" and 12" gravity sewer line. These water and sewer lines will serve the areas designated for economic development and growth near Mebane and along the Interstate corridor in the western portion of Orange County (see Attachment 1). The original estimated rock quantity for the 18" sewer line was 3,825 cubic yards. However, after constructing approximately 4,600 linear feet (51%) of this line,_ the Contractor has excavated 6,350 cubic yards of rock as of November 8, 2013. In Attachment 2, there are two photographs which give an indication of the jobsite conditions and rock quantities encountered so far. Because of the large quantity of rocky material, the Contractor has brought in a mobile rock crusher which can be seen in one of the photographs. The contractor has been crushing the excavated rock and returning it to the upper portion of the trench as fill. This avoids having to haul the rock out by the truckload for disposal and having to purchase and haul in select fill to replace the rock that was removed. The County's engineering s en ineerin consultant, Hobbs, Upchurch and Associates, is estimating that if conditions stay consistent with the first segment of this line, there could be an additional 4,500 cubic yards of rock left to be excavated to finish this line. If the consultant's estimate proves 2 true, the total rock excavated for this 18" sewer line would be 10,850 cubic yards. When compared to the original estimate of 3,825 cubic yards, the difference is 7,025 cubic yards. The rock excavation line item is paid at $60 per cubic yard of rock excavated, so adding an additional rock contingency of 7,025 cubic yards could potentially increase the construction costs by $421,500. However, the request is only to add rock contingency to the project budget. If the Contractor excavates less rock than estimated, this money will not be spent. The other parts of the project each have their own rock allowance included in the original project budget. The water line is approximately 75% complete and has used only a fraction of its rock contingency. Construction of the 8"-12" sewer line has not yet begun, but it has its own rock allowance, as mentioned above, and can use any remaining rock allowance not used on the construction of the 18" sewer line, if necessary. FINANCIAL IMPACT: This project currently has a construction budget of $4,016,546. Adding the rock allowance contingency as outlined above would increase the construction budget by $421,500. These extra funds would come from money generated by the Article 46 Sales Tax and earmarked for infrastructure development. As a result of the additional money that would be allocated towards this project, other Capital Investment Plan (CIP) projects which are to be funded in the future by the Article 46 Sales Tax Revenue will have to be delayed or have their scope, reduced. Staff will be making proposals Pn next year's CIP budget and will suggest specific project budget modification changes at that time. Budget Amendment #3-B provides for the additional funds of $421,500 from Article 46 Sales Tax proceeds, and amends the Capital Project ordinance as follows: Buckhorn Mebane Phase 2($421,500)—Project#30040 Revenues for this project: FY 2013-14 Dec 2,2013 FY 2013-14 Current Amendment Revised Budget Budget Alternative Financing $4,256,046 $0 $4,256,046 Appropriated Fund Balance $200,000 $0 $200,000 From General Fund $135,500 $0 $135,500 Article 46 Sales Tax Proceeds $0 $421,500 $421,500 Total Project Funding $4,591,546 $421,500 $5,013,046 Appropriations for this P ro"ect: FY 2013-14 Dec 2, 2013 FY 2013-14 Current Amendment Revised Budget Budget Professional Services $475,000 $0 $475,000 Construction $4,016,546 $421,500 $4,438,046 Easements, CMT, C&A Study, $100,000 $0 $100,000 Wetlands Mitigation Total Costs $4,591,546 $421,500 $5,013,046 RECOMMENDATION(S): The Manager recommends that the Board approve Budget Amendment #3-B by adding $421,500 in rock contingency to the Buckhorn Mebane Phase 2 Utilities project construction budget. iii ANN = : I ■ �• I : ���71 '•���=� � 1111 ■���� .. Mill 1►���1111 111111��.��:�I_ `►=��1 �� 111111 ►�►►��= .C•►t ''� I , N N / :■. III �'=-�. � ` �. LO co � ' -`:• =Maw■ 0i un111e'= 1111111��.����. � `.� =-11111► ,�® `►1111 � ' ����11111 ■ IIIIII� Malmo , 1\111111 i O`��♦ X11 �1= ��AV';_ �fp 4 Attachment 2 Buckhorn Mebane Phase 2 Utilities Project Photos — Sewer Line S-3 ?�A Ao }. a, v � �/ t s 4 k vj. ro` i4 4'yt ff s :F u ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration (919) 245-2575 131 W. Margaret Ln. (919) 644-3002 (FAX) 17 52 P. O. Box 8181� www.co.orange.nc.us Hillsborough, NC 27278 �° �n cat., Ewa MEMORANDUM To: Michael Talbert, Interim County Manager Through: Craig Benedict, Planning Director From: Kevin Lindley, PE, Staff Engineer Date: February 20, 2014 RE: Buckhorn Mebane Phase 2 Utility Project Change Order#4 This change order was precipitated by the large amounts of rock encountered during the construction of sewer line S-3, north of Bowman Road. The majority of the original rock allowance had been used up before the line was even 50%complete. Based on the excavation remaining and using the same relative percentage of rock encountered so far, an estimated increase in the rock allowance for this section was proposed to the BOCC and approved on 12/2/2013. This was approved as a budget amendment for the project, so the money has been available since then to pay for the continued excavation. This change order will document this change in rock quantities relative to the original contract documents for the project. The cost of this change order has been summarized below, along with the summary for Change Order#1, #2 and#3. Going forward, new change orders can be added to this summary so that all the change order information will be available in one document for easy review. Original Contract Price: $4,016,545.74 - Original rock contingency for water line: $ 67,500.00 (included) CO#1 $ 15,328.00 - Extra work to avoid an unmarked 16" force main - Reroute a 4" water main - Delays due to easement dispute - Revised rock contingency for water line: $ 52,172.00 Net Contract Price Change for CO#1: $ 0.00 CO#2 $ 2,242.50 - Cost due to resurveying/relayout of sewer S-1 - Done to avoid a potentially significant cultural/archaeological site on the Rohl property CO#3 $ 0.00 - This change order is for time delays only - Related to weather and realignment delays at the start of line S-1 CO#4 $ 421,500.00 - Additional rock allowance approved for sewer line S-3 Revised Contract Price after Change Orders:$4,440,288.24 SCHEDULE The project start date was 4/16/2013. Based on the original schedule the allowed substantial completion date would have been 4/16/2014, or 365 days. C0#1 added an additional 57 days due to delays in obtaining easements and the time to complete the extra work. This extended the contractually allowed substantial completion date to 6/12/2014. CO#2 added an additional 8 days due to inclement weather, which pushed the allowed substantial completion date out to 6/20/2014. CO#3 requests an additional 76 days due to delays in easement acquisition on the Rohl property along line S-1 and delays associated with realignment of the beginning section of line S-1. Adding these 76 days would reset the allowed substantial completion date to 9/4/2014. CO#4 adds no additional time. Please call or email with any questions.