Loading...
HomeMy WebLinkAboutAgenda - 03-18-2014 - 6dORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: March 18, 2014 Action Agenda Item No. 6 -d SUBJECT: Schools Adequate Public Facilities Ordinance ( SAPFO) — Receipt and Transmittal of 2014 Annual Technical Advisory Committee Report DEPARTMENT: Planning & Inspections ATTACHMENT(S): 1. SAPFO Partners Transmittal Letter 2. Draft 2014 SAPFOTAC Annual Report & Larger Scale Projection Worksheets PUBLIC HEARING: (Y /N) No INFORMATION CONTACT: Ashley Moncado, 919 - 245 -2589 Perdita Holtz, 919 - 245 -2578 Craig Benedict, 919 - 245 -2592 1 PURPOSE: To receive the 2014 Annual Report of the SAPFO Technical Advisory Committee ( SAPFOTAC) and transmit it to the SAPFO partners for comments before certification in May. BACKGROUND: 1. Annual Report Each year the SAPFOTAC Report is updated to reflect actual changing conditions of student membership and school capacity. This information is analyzed and used to project future school construction needs based on adopted levels of service standards. There are two steps to the full report. The first part (Student Membership and Capacity) is certified in the fall and then this full report, in the following spring, is to keep the SAPFO system calibrated. At the December 2, 2013 Board of County Commissioners meeting, the Board approved the November 15, 2013 actual membership and capacity numbers (i.e. first part) for both Orange County Schools and Chapel Hill- Canrboro City Schools. A draft of the full annual SAPFOTAC Report is complete and has been reviewed by the SAPFOTAC members. 2. SAPFOTAC The SAPFOTAC, comprised of representatives of both school systems and the Planning Directors of the County and Towns, is tasked to produce an annual report for the governing boards of each SAPFO partner outlining changes in actual membership, capacity, student projections, and their collective impacts on the Capital Investment Program (CIP) and the future issuance of Certificates of Adequate Public Schools (CAPS). Orange County's Planning Staff compiles the report, holds a meeting discussing the various aspects, and then prepares a draft report, which is reviewed by the SAPFO Technical Advisory Committee. 3. Membership Data CHCCS total increase from the previous year: 52 students 11 Elementary School 73 Middle School I (32) High School OCS total increase from the previous year: 199 students 30 Elementary School 63 Middle School 106 High School ( ) denotes decrease 4. Capacity Data Capacity for Chapel Hill /Carrboro City Schools was increased by 585 students as a result of the opening of Northside Elementary School. There were no changes to school capacities this year for Orange County Schools. 5. Capacity Issues SAPFO vs. DPI The SAPFO is a local ordinance, independent of State Department of Public Instruction (DPI) projections and rules regarding class size. The SAPFO, for instance, does not count temporary modular classrooms as fulfilling the capacity level of service outlined in the SAPFO interlocal Memorandum of Understanding (MOU). The MOU requires `bricks and mortar' instead of temporary facilities and also requires its own set of future student projections to identify long -term capital school construction needs. However, the County did phase in the smaller class size in previous years that decreased capacity. Decisions will have to be made if new discussions at the state level create any class size changes that should or shouldn't be reflected in the County's SAPFO. This year, CHCCS does not exceed the adopted levels of service established in the SAPFO. Projections do show potential needs at the elementary, middle, and high school levels within the 10 -year planning period. Projected needs are noted below. Additionally, OCS does not exceed the adopted levels of service established in the SAPFO at this time nor do projections show potential needs at the middle school level within the 10 -year planning period. However, projections do show a potential need at the elementary and high school level within the 10 -year planning period. Projected needs are noted below. 6. Student Projection Analysis Student membership projections show an increase at all levels in both school systems, except for a small projected decrease in 2014 -15 at the high school level for OCS. The projections are shown on pages 37 -38 of the report. 7. Orange County Schoi CHCCS Projected needs: New Elementary #12 New Middle School #5 High School As Systems; CIP Needs Analysis 2020 -2021 (projected overage of 45 students; 105.8% LOS 2020 -2021 (projected overage of 39 students; 108.3% LOS 2023 -2024 (projected overage of 6 students; 110.1% LOS) OCS Projected needs: New Elementary # 8 2023 -2024 (projected overage of 28 students; 105.7% LOS) Middle School projections show no needs in the next 10 years High School 2022 -23 (projected overage of 59 students; 112.4% LOS) The SAPFOTAC report notes that there are a significant number of approved, but undeveloped lots within the portion of the City of Mebane that lies within Orange County. t However, new construction activity has slowed in recent years due to the economic downturn. Because the City of Mebane is not a party to the SAPFO at this time, CAPS are not required by the local government to be issued prior to development approvals. However, once students generated from Mebane development actually enter the school system, faster enrollment increases would affect projections and may identify CIP needs within 10 years, unless enrollment is balanced by slower growth in other areas of the district. 8. Student Generation Rates and New Study On October 6, 2009, the Orange County Board of Commissioners approved the updated Student Generation Rates, as recommended by the SAPFOTAC. The updated Student Generation Rates became effective with the November 15, 2010 CAPS system update. Both Orange County Schools and Chapel Hill - Carrboro City Schools report having observed an even larger increase in students generated from new developments in both districts. The SAPFOTAC discussed the increased number of students generated in both districts and proposed multi - family projects that may continue to have an effect on student membership numbers. While this may be a short term trend caused by the current economic climate or other factors, the SAPFOTAC recommended further evaluation of the adopted Student Generation Rates and the impacts different types of housing may have on student membership rates. As a result, Orange County will be entering into a contract with Tischler -Bise to study student generation rates for newer housing in the Orange County and Chapel Hill - Carrboro City School Districts. 9. Access to Full Report The draft SAPFOTAC report will be posted on the Orange County Planning Department's web site. A letter and the Executive Summary of the report will be sent to all SAPFO partners after this BOCC meeting advising them of the availability of the draft report and inviting comment. It is anticipated the draft 2014 SAPFOTAC report will be brought back to the BOCC for certification at the May 8, 2014 regular meeting. FINANCIAL IMPACT: Current 10 -year student growth projections show future needs for additional schools in the CHCCS District. Elementary School #12 is projected to be needed in 2020 -21, Middle School #5 is projected to be needed in 2020 -21, and additional High School level capacity in the CHCCS District is projected to be needed in 2023 -24. In the OCS District, Elementary School #8 is projected to be needed in 2023 -24 and additional High School level capacity in the OCS District is projected to be needed in 2022 -23. Section 7 of the Schools Adequate Public Facilities Memorandum of Understanding (MOU) states, "Orange County will use its best efforts to provide the funding to carry out the Capital Improvement Plan referenced in Section 1 above." RECOMMENDATION(S): The Manager recommends the Board: 1. Receive the 2014 SAPFOTAC Annual Report; and 2. Authorize the Chair to sign the transmittal letter to SAPFO partners contained in Attachment 1. BARRYJACOBS, CHAIR EARL MCKEE, VICE CHAIR MARK DOROS /N AL.ICEM GORDON BERNADETTE PELISSIER RENEE PRICE PENNYRICH March 19, 2014 Attachment 1 ORANGE COUNTY BOARD OF COMMISSIONERS POST OFFICE BOX 81 81 200 SOUTH CAMERON STREET HILLSBOROUGH, NORTH CAROLINA 27278 Mark Kleinschmidt, Mayor Town of Chapel Hill 405 Martin Luther King Jr. Blvd. Chapel Hill, NC 27514 Lydia Lavelle, Mayor Town of Carrboro 301 W. Main Street Carrboro, NC 27510 Tom Stevens, Mayor Town of Hillsborough P.O. Box 429 Hillsborough, NC 27278 Donna Coffey, Chair Orange County Board of Education 200 E. King Street Hillsborough, NC 27278 4 Jamezetta Bedford, Chair Chapel Hill - Carrboro Board of Education 750 Merritt Mill Road Chapel Hill, NC 27516 Subject: Schools Adequate Public Facilities Ordinance Technical Advisory Committee ( SAPFOTAC) Annual Report Dear Sir or Madam: This letter is to update you on the status of the 2014 Annual SAPFOTAC Report. In accordance with the SAPFO Memoranda of Understanding (MOU), the Board of County Commissioners (BOCC) approved the November 15, 2013 actual membership and capacity numbers for Orange County Schools and Chapel Hill — Carrboro City Schools at its meeting on December 2, 2013. The SAPFOTAC, comprised of representatives of both school systems and the Planning Directors of the County and Towns has produced the 2014 Annual Report. As per the SAPFO MOU, the annual technical report contains information on Level of Service, Building Capacity, Membership Date, Capital Investment Plan, Student Membership Projection Methodology, Student Membership Projections, Student Membership Growth Rate, Student/Housing Generation Rate, and the SAPFO Process. Enclosed for your use are copies of the 2014 Executive Summary and the March 18, 2014 BOCC meeting agenda item abstract when the BOCC received the draft report. WWW. CO. ORANGE NC. US PROTECTING AND PRESERVING -PEOPLE, RESOURCES, QUALITY OF LIFE ORANGE COUNTY, NORTH CAROLINA - YOU COUNT.I (9 19) 245 -2130 • FAX (919) 644 -0246 The full draft SAPFOTAC report is available on the Orange County Planning Department website in the Current Interest Projects section htlp://www.Co.orange.nc.us/planning/SpecialProjects.asp The 2014 Annual SAPFOTAC Report is scheduled to be certified by the BOCC at a regular meeting in May 2014. Therefore, if you have any comments pertaining to the report, please forward them to Craig N. Benedict, Planning Director, no later than 5:00 p.m. on April 21, 2014. Mr. Benedict can be reached by phone at (919) 245 -2592 by e -mail at cbenedict(ae,oran eg countync.gov, or by fax at (919) 644 -3002. Any comments received will be part of our agenda package in May. Please share this information and the 2014 SAPFOTAC report with your respective boards. Sincerely, Barry Jacobs Chair Enclosures cc: Board of County Commissioners Michael Talbert, Interim Orange County Manager Roger L. Stancil, Manager, Town of Chapel Hill David Andrews, Manager, Town of Carrboro Eric Peterson, Manager, Town of Hillsborough Tom Forcella, Superintendent, Chapel Hill - Carrboro City Schools Gerri Martin, Superintendent, Orange County Schools Todd LoFrese, Assistant Superintendent for Support Services, Chapel Hill — Carrboro City Schools Catherine Mau, Coordinator for Student Enrollment, Chapel Hill - Carrboro City Schools Craig Benedict, Planning Director, Orange County J.B. Culpepper, Planning Director, Town of Chapel Hill Margaret Hauth, Planning Director, Town of Hillsborough Trish McGuire, Planning Director, Town of Carrboro WWW. CO. ORANGE. NC. US PROTECTING AND PRESERU/NG - PEOPLE, RESOURCES, QUALITY OF LIFE ORANGE COUNTY, NORTH CAROL /NA - YOU COUNT! (9 19) 245-2130 • FAX (9 19) 644 -0246 u Attachment 2 ORANGE COUNTY, NC SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PREPARED BY A STAFF COMMITTEE: PLANNING DIRECTORS, SCHOOL REPRESENTATIVES, TECHNICAL ADVISORY COMMITTEE (SAPFOTAC) (PURSUANT TO PROVISIONS OF A MEMORANDUM OF UNDERSTANDING ADOPTED IN 2002 & 2003) (ORDINANCES ADOPTED IN JULY 2003) Annual Report 2014 (BASED ON NOVEMBER 2013 DATA) CERTIFIED BY THE BOCC ON MAY X, 2014 Table of Contents Page 7 ExecutiveSummary ........................................................................... ............................... i Introduction...................................................................................................................................... ............................... iv Schools Adequate Public Facilities Ordinance Partners ................................. ............................... V Planning Directors, School Representatives, Technical Advisory Committee (SAPFOTAC) members ................................................ ............................... Vi I. Base Memorandum of Understanding A. Level of Service ........................................................................ ............................... 1 B. Building Capacity .................................................................... ............................... 2 Attachment: IB.1. - Orange County School Capacity (Elementary, Middle & High) ( 2012- 13 ) .............................. 5 Attachment: IB.2. - Chapel Hill /Carrboro School Capacity (Elementary, Middle & High) (2012 -13) ................... 8 C. Attachment: IB.3. - Orange County School Capacity (Elementary, Middle & High) ( 2013- 14 ) .............................. 11 Attachment: IB.4. - Chapel Hill /Carrboro School Capacity (Elementary, Middle & High) (2013 -14) ................... 14 C. Membership Date ..................................................................... ............................... 17 II. Annual Update to Schools Adequate Public Facilities Ordinance System A. Capital Investment Plan (CIP) ............................................... ............................... 18 B. Student Membership Projection Methodology ....................... .............................19 Attachment: IIB.1. — Student Membership Projection Descriptions ........................................... ............................... 20 Attachment: II B.2. Student Membership Projection Models Performance Analysis for 2012 -13 .......................... 21 Attachment: II B.3. Student Membership Projection Models Performance Analysis for 2013 -14 .......................... 25 C. Student Membership Projections ........................................... ............................... 29 Attachment: II C.1. Orange County Student Projections (Elementary, Middle & High) (2012 -13) .................... 34 Attachment: II C.2. Chapel Hill /Carrboro Student Projections (Elementary, Middle & High) (2012 -13) .......... 35 Attachment: II C.3. Orange County Student Projections (Elementary, Middle & High) (2013 -14) .................... 36 Attachment: II C. 4. Chapel Hill /Carrboro Student Projections (Elementary, Middle & High) (2013 -14) .......... 37 D. Student Membership Growth Rate ................................................................... ............................... 38 Attachment: IID.1. Orange County & Chapel Hill /Carrboro Student Growth Rates Chart dates from 2013 -2023 based on 11/15/12 membership numbers ( 2012- 13) .................... ............................... 39 Attachment: IID.2. Orange County & Chapel Hill /Carrboro Student Growth Rates Chart dates from 2014 -2024 based on 11/15/13 membership numbers ( 2013- 14) .................... ............................... 40 E. Student / Housing Generation Rate ....................................... ............................... 41 Attachment: IIE.1. — Current Student Generation Rates (2007) .................................................. ............................... 43 III. Flowchart of Schools Adequate Public Facilities Ordinance Process A. Process 1 - Capital Investment Plan .............................................................. ............................... 44 Attachment: III A.1. — Process 1 Capital Investment Plan ......................................................... ............................... 45 B. Process 2 - Schools Adequate Public Facilities Ordinance; Certificate of Adequate Public Schools (CAPS) System ...... ............................... 46 Attachment: III B.1. Process 2 Certificate of Adequate Public Schools (CAPS) Allocation .... ............................... 48 2014 SAPFOTAC Executive Summary I. Base Memorandum of Understanding A. Level of Service .................................... ............................(No Change) .............. Pg. 1 B. Building Capacity and Membership .............................. (Change) .................... Pg. 2 Chapel Hill/Carrboro School District Orange County School District Elementa 105% 105% Middle 107% 107% High 110% 110% B. Building Capacity and Membership .............................. (Change) .................... Pg. 2 C. Membership Date — November 15 ... ............................... (No Change) ..............Pg.17 II. Annual Update to SAPFO System A. Capital Investment Plan ( CIP) ........... ............................(No Change) .............. Pg. 18 B. Student Membership Projection Methodology .............(No Change) .............. Pg. 19 The average of 3, S, and 10 year history /cohort survival, linear and arithmetic projection models. C. Student Membership Projections .................................. (Change) .................... Pg. 29 Analysis of 5 Years of Projections for 2013 -14 School Year — Chapel Hill Carrboro City Schools Chapel HiltlCarrboro School District Orange County School District projection was high compared to the actual.) Capacity Membership Increase from Prior Year Capacity Membership Increase from Prior Year Elementary 5829 5554 11 3694 3433 30 Middle 2840 2858 73 1 2166 1747 63 High 3875 3764 (32) 1 2439 2421 106 C. Membership Date — November 15 ... ............................... (No Change) ..............Pg.17 II. Annual Update to SAPFO System A. Capital Investment Plan ( CIP) ........... ............................(No Change) .............. Pg. 18 B. Student Membership Projection Methodology .............(No Change) .............. Pg. 19 The average of 3, S, and 10 year history /cohort survival, linear and arithmetic projection models. C. Student Membership Projections .................................. (Change) .................... Pg. 29 Analysis of 5 Years of Projections for 2013 -14 School Year — Chapel Hill Carrboro City Schools (The number in brackets [n] is the number of students the projection was off compared to actual membership. A number in parenthesis within the brackets [(n)] indicates the projection was low compared to the actual whereas a number not in parenthesis indicates the projection was high compared to the actual.) Year Projection Made for 2013 -14 Membership Actual 2013 Membership 2008 -2009 2009 -2010 2010 -2011 2011 -2012 2012 -2013 Elementary 5554 5703 160 5604 61 5489 54 5572 29 5612 58 Middle 2858 2960 [177] 2848 [65] 2795 [12] 2796 [13] 2862 [4] High 3764 3930 [134] 3792 [(4)] 3733 [(63)] 3783 [(13)] 3828 [64] 1 9 Analysis of 5 Years of Projections for 2013 -14 School Year — Orange County Schools (The number in brackets [n] is the number of students the projection was off compared to actual membership. A number in parenthesis within the brackets [(n)] indicates the projection was low compared to the actual whereas a number not in parenthesis indicates the projection was high compared to the actual.) Year Projection Made: Year Projection Made for 2013 -14 Membership 10 -11 Actual 2013 2012 -13 2013 -14 2009 -10 2010 -11 2011 -12 2012 -13 Membership 2008 -2009 2009 -2010 2010 -2011 2011 -2012 2012 -2013 Elementary 3433 3337 [(166)] 3355 [(48)] 3435 [32] 3438 [35] 3433 [0] Middle 1747 1708 24 1751 67 1732 48 1716 32 1733 14 High 2421 2254 [(61)] 2298 [(17)] 2258 [)57)] 2278 [(37)] 2355[(66)] D. Student Growth Rate ...................................................... (Change) .................... Pg. 39 Projected Average Annual Growth Rate over Next 10 Years Chapel Hill/Carrboro School District Orange County School District Year Projection Made: 10 -11 2011 -12 2012 -13 2013 -14 2009 -10 2010 -11 2011 -12 2012 -13 2013 -14 Elementary 91-57% 44% 1.59% 1.18% 1.44% 1.34% 1.57% 1.6% 1.31% 1.30% Middle 67% 1.94% 1.59% 1.58% 1.53% 1.84% 2.01% 1.64% 1.42% High 1 1.73% 1 1.600/. 1.27% 1 1.38% 1 1.59% 1 1.61% 1 1.43% 1 1.35% E. Student / Housing Generation Rate ... ............................(No Change) .............. Pg. 42 SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE STATUS (based on future year Student Membership Projections) CHAPEL HILLICARRBORO SCHOOL DISTRICT Elementary School Level A. Does not currently exceed 105% LOS standard (current LOS is 95.3 %). B. The projected growth rate at this level is expected to decrease over the next 10 years but remain positive (average —1.4% per year compared to 2.0% over the past 10 years). C. Capacity has increased by 585 students due to the opening of Northside Elementary School. Projections show that Chapel Hill /Carrboro Elementary School 412 will be needed in 2020 -21. This is one year earlier than last year's projections. Middle School Level A. Does not currently exceed 107% LOS standard (current LOS is 100.6 %). B. The projected growth rate at this level is expected to increase at a greater rate over the next 10 years than it has in the previous 10 years (average —1 .6% compared to an average of 0.67% over the past 10 years). C. The planned addition to Culbreth Middle School for the 2014 -15 school year is proposed to increase capacity with the addition of 104 seats. As a result, projections show that Chapel Hill /Carrboro Middle School 45 is projected to be needed in 2020 -21. This is three years later than last year's projections ii High School Level A. Does not currently exceed the 110% LOS standard (current LOS is 97.1 %). B. The projected growth rate at this level is expected to decrease, but remain positive over the next 10 years (average -1.3% compared to 1.86% over the past 10 years). C. Expansion of Carrboro High School from the initial capacity of 800 students to the ultimate capacity of 1,200 students is projected to be needed in 2023- 24.This is three years later than last year's projections which showed a need in 2020 -21. ORANGE COUNTY SCHOOL DISTRICT Elementary School Level A. Does not currently exceed 105% LOS standard (current LOS is 92.9 %). B. The projected growth rate at this level is expected decrease but remain positive over the next 10 years (average —1.3% compared to 1.6% over the past 10 years). C. Orange County Elementary School 4 8 is projected to be needed in 2023 -24. This is a change from last year's projections which did not show a need for a new Elementary School in the 10 year projection period. 10 Middle School Level A. Does not currently exceed 107% LOS standard (current LOS is 80.7 %). B. The projected growth rate at this level is expected to increase at a greater rate over the next 10 years (average -1.4% compared to 0.35% over the past 10 years). C. Projections are not showing a need for an additional Middle School in the 10 year projection period. Staff continues to monitor new development activity in the Orange County portion of Mebane, which is not a party to the Schools APFO MOU at this time. High School Level A. Does not currently exceed 110% LOS standard (current LOS is 99.3 %). B. The projected growth rate at this level is expected to decrease but remain positive over the next 10 years (average —1.4% compared to 2.4% over the past 10 years). C. Expansion of Cedar Ridge High School from the initial capacity of 500 students to the 1,500 students is projected to be needed in 2022 -23. This is a change from last year's projections which did not show a need for additional capacity in the 10 -year projection period. Changes in CAPS (Certificate of Adequate Public Schools) System As a result of a North Carolina Supreme Court ruling in August 2012, the local governments that are party to the SAPFO considered modification of their development regulations as they pertain to CAPS in 2013. However, at this time the local governments have not pursued revisions to existing standards contained within the CAPS system or SAPFO MOUs. iii Orange County, NC School Adequate Public Facilities Ordinance INTRODUCTION 11 The Schools Adequate Public Facilities Ordinance and its Memorandum of Understanding are ordinances and agreements, respectively. Supporting documents are anticipated to be dynamic to incorporate the annual changing conditions of membership, capacity and student projections that may affect School Capital Investment Plan (CIP) timing. This formal annual report will be forthcoming to all of the Schools Adequate Public Facilities Ordinance partners each year as new information is available. This updated information is used in the schools capital needs process of the Capital Investment Plan (Process 1) and within elements of the Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) spreadsheet system (Process 2). This report and any comments from the Schools Adequate Public Facilities Ordinance partners will be considered in the first half of each year by the Board of County Commissioners at a regular or special meeting. The various elements of the report are then "certified" and formally considered in the process of the upcoming Capital Investment Plan. The Certificate of Adequate Public Schools system is updated after November 15 when data is received from the school districts with actual membership and pre - certified capacity (i.e. CIP capacity or prior "joint action" capacity changes). The Schools Adequate Public Facilities Ordinance and Memorandum of Understanding have dynamic aspects. The derivation of the baseline and update to the variables will continue in the future as a variety of school related issues are fine -tuned by technical and policy groups. The primary facet of this report includes the creation of mathematical projections for student memberships by school levels (Elementary, Middle and High) and by School Districts (Chapel Hill /Carrboro and Orange County). This information is found in Section II, Subsections B, C, D, and E. In summary, this report serves as an update to the dynamic conditions of student membership and school capacity which affect future projected needs considered in Capital Investment Planning. Interested parties may make their comments known to the Board of County Commissioners prior to their review of the report and school CIP completion or ask questions of the SAPFOTAC members. 1v ANNUAL REPORT AS OUTLINED IN 12 Schools Adequate Public Facilities Ordinance Memorandum of Understanding (Schools APFO MOU) SECTION Id RESPECTFULLY SUBMITTED TO SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PARTNERS Chapel Hill/Carrboro School District School APFO Orange County School District School APFO i Board of County Commissioners Board of County Commissioners Carrboro Board of Aldermen Hillsborough Town Council Chapel Hill Town Council Chapel Hill / Carrboro School Board Orange County School Board v Planninp- Directors /School Representatives Technical Advisory Committee (aka SAPFOTAC) Town of Carrboro Trish McGuire, Planning Director 301 West Main Street Carrboro, NC 27510 Town of Chapel Hill J.B. Culpepper, Planning Director 405 Martin Luther King, Jr. Blvd. Chapel Hill, North Carolina 27514 Town of Hillsborough Margaret Hauth, Planning Director P.O. Box 429 Hillsborough, NC 27278 Orange County Planning Department Craig Benedict, Planning Director and Ashley Moncado, Special Projects Planner and Paul Laughton, Deputy Director of Finance and Administrative Services 131 W. Margaret Lane P.O. Box 8181 Hillsborough, NC 27278 Orange County School District Gerri Martin, Superintendent 200 E. King Street Hillsborough, NC 27278 Chapel Hill- Carrboro School District Todd LoFrese, Assistant Superintendent for Support Services and Catherine Mau, Coordinator of Student Enrollment 750 Merritt Mill Road Chapel Hill, NC 27516 V1 13 I. BASE MEMORANDUM OF UNDERSTANDING A. Level of Service 1. Responsible Entity for Suggesting Change — Change can only be effectuated by amendment to Memorandum of Understanding (MOU) by all School APFO partners. 2. Definition — Level of Service (LOS) means the amount (level) of students that can be accommodated (serviced) at a certain school system grade group [i.e., Elementary level (K -5), Middle Level (6 -8), High School Level (9 -12)]. 3. Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District Elementary Middle High School Elementary Middle High School 105% 107% 110% 105% 107% 110% 4. Analysis of Existing Conditions Chapel Hill Carrboro School District These standards are acceptable at this time. S. Recommendation — No change from above standard Analysis of Existing Conditions Orange County School District These standards are acceptable at this time. Recommendation — No change from above standard 1 14 15 Section I 2 3 B. Building Capacity Responsible Entity for Suggesting Change — The Planning Directors, School Representatives, and Technical Advisory Committee ( SAPFOTAC) will receive requested changes that are CIP related and adopted in the prior year. CIP capacity changes will be updated along with actual membership received in November of each year. Other changes will be sent to a `Joint Action Committee' of the BOCC and Board of Education, as noted in the MOU, who will make recommendations and forward changes (on the specific forms with justification) to the full Board of County Commissioners for review and action. These non -CIP changes would be updated in the upcoming November CAPS system recalibration and included in the SAPFOTAC report. Definition — "For purposes of this Memorandum, "building capacity" will be determined by reference to State guidelines and the School District guidelines (consistent with CIP School Construction Guidelines /policies developed by the School District and the Board of County Commissioners) and will be determined by a joint action of the School Board and the Orange County Board of Commissioners. As used herein the term "building capacity" refers to permanent buildings. Mobile classrooms and other temporary student accommodating classroom spaces are not permanent buildings and may not be counted in determining the school districts building capacity." Standard for: Chapel Hill Carrboro School District The original certified capacity for each of the schools was certified by the respective Standard for: Orange County School District The original certified capacity for each of the schools was certified by the respective superintendent and incorporated in the initialization superintendent and incorporated in the of the CAPS system (Chapel Hill Carrboro School initialization of the CAPS system (Orange District April 29, 2002 - Base) Capacity changes were made each year as follows: 2003: Increase of 619 at Rashkis Elementary. 2004: No changes at Elementary, Middle, or High School levels. County School District April 30, 2002 - Base) Capacity changes were made each year as follows: 2003: No net increase in capacity at Elementary level. No changes at Middle W 16 Section I 2005: No changes at Elementary, Middle, or High School level. Increase of 1,000 at Cedar Ridge School levels. 2006: No changes at Elementary, Middle, or High School levels. 2007: An increase of 800 at the High School level with the opening of Carrboro High School. 2008: An increase of 323 at the Elementary School level due to the opening of Morris Grove Elementary School and the implementation of the 1:21 class size ratio in grades K -3 2009: No changes at Elementary, Middle, or High School levels. 2010: An increase in capacity of 40 students at the High School level with Phoenix Academy High School becoming official high school within the district 2011: No changes at Elementary, Middle, or High School levels. 2012: No changes at Elementary, Middle, or High School levels. 2013: An increase in capacity of 585 students due to the opening of Northside Elementary School. High School. 2004: No net increase in capacity at Elementary level. No changes at Middle or High School levels. 2005: An increase in capacity of 100 at Hillsborough Elementary with the completion of renovations. 2006: An increase in capacity of 700 at the Middle School level with the completion of Gravelly Hill Middle School and an increase of 15 at the High School level with the temporary location of Partnership Academy Alternative School. An increase of 2 at the Elementary level due to a change in the capacity calculation for each grade at each school. 2007: No changes at Elementary, Middle, or High School levels. 2008: A decrease of 228 at the Elementary School level due to the implementation of the 1:21 class size ratio in grades K -3 and an increase of 25 at the High School level with the completion of the new Partnership Academy Alternative School. 2009: No changes at Elementary, Middle, or High School levels. 2010: No changes at Elementary, Middle, or High School levels. 2011: No changes at Elementary, Middle, or High School levels. 2012: No changes at Elementary or Middle 3 9 I Section I 4. Analysis of Existing Conditions Chapel Hill Carrboro School District The Schools Facilities Task Force developed a system to calculate capacity. Any changes year to year will be monitored, reviewed, and recorded by the SAPFOTAC on approved forms distributed to SAPFO partners and certified upon approval by the Board of County Commissioners each year. The requested 2013 -14 capacity is noted on Attachment I.B.4 5. Recommendation — Accept school capacities at all levels, as reported by CHCCS and shown in Attachment I.B.4. 17 School levels. A decrease of 119 at High School level as a result of a N.C. Department of Public Instruction (DPI) study. 2013: No changes at Elementary, Middle, or High School levels. Analysis of Existing Conditions Orange County School District The Schools Facilities Task Force developed a system to calculate capacity. Any changes year to year will be monitored, reviewed, and recorded by the SAPFOTAC on approved forms distributed to SAPFO partners and certified upon approval by the Board of County Commissioners each year. The requested 2013 -14 capacity is noted on Attachment I.B.3 Recommendation — Accept school capacities at all levels, as reported by OCS and shown in Attachment I.B.3. 4 Section I School District: Orange County Schools SAPFO CAPS Year: November 15, 2012 - November 14, 2013 Capacity and Membership Submittal Date: November 15, 2012 Attachment I.B.1 (page 1 of 3) 2012 -13 Special Note(s): I. for the November 15, 2002 base year the board accepted the superintendent-certi tied capacities as part of me scnoot racemes Task Porcc review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain erfective until changed by (1) the School CIP or (2) an amended version of this form that is ccrtiried by the BOCC. Justification: Capacity Certific U-20-11- Superintendent I Date Membership Certification: Superintendent Date BOCC Chair Date BOrC Chair Date W ta(-1111- 111 qj /7) 5 Section I School District: Orange County Schools SAPFO CAPS Year: November 15, 2012 - November 14, 2013 Capacity and Membership Submittal Date: November 15, 2012 Attachment LB.1 (page 2 of 3) 2012 -13 Special Nofe(s): I. For the November 15, 2002 base year the board accepted the supenmenuenrcenrricu eapacn,cb vl Nu:: x::1.1 • .1•••1111 Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by (I ) the School CIP or (2) an amended version of this fort that is ccrtificd by the BOCC Justification: Capacity Certification: /� • IaL Oil (t --20 -11— Superintendent Date Membership Certification: -(<'). t X0'1 Superintendent Date i 6erCC Chair ' Date I f BOCC Chair Date 19 20 Section I School District: Orange County Schools SAPFO CAPS Year: November 15, 2012 - November 14, 2013 Capacity and Membership Submittal Date: November 15, 2012 Attachment I.B.1 (page 3 of 3) 2012 -13 Special Note(s): t. For the November 15, 2002 base year the board accepted the superintendent-certified capacities as part of the School Facilities Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by (1) the School CIP or (2) an amended version of this form that is certified by the 130CC. Justification: 1. The new capacity requested for Orange High School (1,399) is based on a capacity analysis and facilities study completed by the Department of Public Instruction in August 2012. Section I Attachment I.B.2 (page I of 3) 2012-13 Special Note(s): 1. For the November 15, 2002 bnse year the board accepted ilie,,;tjperintendciii-cerlified capacities as part of tht School Facilities 'I ask Force review and 2003 Planners and School Advisory Committee Report. These capacities will remain effec6ve onail changed by (1) the School CEP or (2) an amended version of this form that is certified by the BOCC. Justification: Ca city C Superintendent Date M inbershl ific ion: Superintendent Date 4 BOCC C it Date 600C Ch�' C1ate 21 Section I School District: Chapel Hill -C an-boro City Schools §APFO CAPS Year: November 15, 2012 - November 14, 2013 Capacity and MemSersglp Submittal Date: November l5, 2012 Attachment I.B.2 (page 2 of 3) 2012-13 Special Not l For the Nowamer l5, 2002 base year the board accepted the stmerintendent-certified capacifies as pin of the School Fudifics Task Force reviov and 2003 Planners and School Representa6ve Technical Advisory CommMee Report These capacities vOl remoot of until changed by (l ) the School CIP or (2) an amended version of lon; torto that is cerfified by the B()CC Justification: Ca city Ce ➢fi �tlow Superintendent Date 7 M tership )CFeVificat Superintendent Date 7—OCC their Date r�I< BOM Chair Date 22 I Section I Attachment I.B.2 (page 3 of 3) 2012-13 Special Note(s): S. For the November 15, 2002 base year the hoard accepted the superimendem-ettfified capactfies as part dthe Selwal Pacififies Task Force review sud 2003 Manners and Schoot Represenuifive,reehnical Advisory Committee Report ]'best capamies wjH reirtar" effective until charged by (1) the School CIP or (2) art amended versirm of this f6roi that is certified by the BOCC. Justification-. Ca city C i , 6171 Superintendent Date 6n: Superintendent Date BOCC Chai Date' A10 E30CC Chair Date �-j (�,L hL 23 10 Section I Attachment I.B.3 (page I of 3) 2013-14 Special Note(s): I . For the Novetriber 15, 2002 base your the board accepted the sup erintendent-cerfified capacity as part of the School Facilities Task Force review and 20�03 Planners and School Repre.sentative'redurical Advisory Committee Rrporl, These tapacilies will rernant effective snail changed by (l i, the Schooli CIP or 12) an aincirded version of this finrat that is certified by the BOCV, M 9111 11 Section I School District: orange County Schools SAPIFOCAPSYear: November 15,2013 -November 14,2(114 Capacity and Membership Submittal Date: November 15, 2013 Attachment I.B.3 (page 2 of 3) 2013-14 Special Hotels)-. L ror this November 15, 2002 base year the board! accepted the superimardent-ceriffied capacities as pan of the School Facilities Task Force review and 2003 Pianners and School Representative'rechnicat Advisory Committee Report. These capacities will remain effieclive until Ountpol by (1) the School CIP or (2) an amended version of this form that is certified by the BOCC. Justification-. 0 Men)borship C rtification: W44p= L & 4 Lis ai - Superintende D61te 13M 25 12 Section I School District: Orange County Sellools IAPFO CIP9 Year- November 15, 2013 - November 14, 2014 Capacity and Membership Submittal Date. November 15,20B Attachment I.B.3 (page 3 of 3) 2013-14 special Note(s). 1. For the November 15, 2002 base year the board accupicd the capacities as pail of the School Facilities Task Force review and 2003 Planners and School ReprrsorhativeTechnical Ads,hiory Committee Report. ']]test capaicifieN will remain effective until changed by ( I) the Scher] ClPor (2) an amended version of this bIrru Ghat is certified by thr BOCC 2. The 2012-21013 capacity nurnbers for orange High School (1,3,99,) is based on a capacity analysis and facilities study cornplocil by the Department of Public Instruction in Augum 2012 Justlificatiom Capagity Cortific-9tion: a M 13 Section I Attachment I.B.4 (page I of 3) 2013-14 Special Note(s): 1, For the November 13, 2002 base year the board accepted Ow superintendent - certified capacifics as part ofthe School Facilities Task Forcoroviciv aml 2003 Phroncrs and School ReprcsontafiveTeclinical Advisory Corrunifte Report. These capacities will remain effective until ehanged by ( 1) the School OP or (2) an amended version ofthis form that is certified by the B(X,'C. Justification: Capacity Certific Lion: V up nden Date Me bershl Certification-. 7,77 S6liedntendenf Date, 27 14 Section I School District: Chapel Hill-Carrboro City Schools SAPFO CAPS Year. November 15,2013 - Novenitter 14, 2014 Capacity and Membership Submittal Date. Noverriber 15, 2013 Attachment I.B.4 (page 2 of 3) 2013-14 Special Note(s): 1. For the November 15,12002 hase, year the board accepted the superintendent- certified capacities as part of the School Facilities Task Force review and 20Y01 Planners and School Reprewinative Technical Advisory Coniondoe Report. These capacities will remain eflective until changed by (1) the School CIP or (2) an amended version of this form that is ccAified by the BOC-C. Justification: C pacity e ficatiog: TSup�ennitendent Date M b 7 ertifiatio 0)" or 'c,,n- Superintendent Date ,3,t3 3-0 NE; 15 Section I Scho,ol Di8 tr1cf: Chapel MI-Carrboro City Schools SAPFO CAPS Year. November 15, 2013 • Novernber 14, 2014 Capacity and MemSersAlp §MmMal Date: November 15, 20113 Attachment I.B.4 (page 3 of 3) 2013-14 Spectol Noto(s). I. Forithe November 15,2002 buw yea the board accepted the superintendern-terttfied capacities as pan or the SiAtow Facilities 'Nsk Force irevacvw and 2003 Platmicts and 150ioal Reprew-niative'lechnical Advisory Committee Report. Ptuse capacities will remain offectisv unad changed by l 1 the,khool CIP or (2) an arnended version ofthis farrn that is curufled by the BOCC, Justification- Pacity 0 Aficati Superintendent Date M lb7i C rtifi ationi: Superintendent Date CO 16 Section II 1 2 3 C. Membership Date Responsible Entity for Suggesting Change — Change can be effectuated only by amendment to Memorandum of Understanding (MOU) by all School APFO partners. The Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) may advise if a change in date would improve the reporting or timeliness of the report. Definition — The date at which student membership is calculated. This date is updated each year and also serves as the basis for projections along with the history from previous years. "For purposes of this Memorandum, the term "school membership" means the actual number of students attending school as of November 15 of each year. The figure is determined by considering the number of students enrolled (i.e. registered, regardless of whether a student is no longer attending school) and making adjustments for withdrawals, dropouts, deaths, retentions and promotions. Students who are merely absent from class on the date membership is determined as a result of sickness or some other temporary reason are included in school membership figures. Each year the School District shall transmit its school membership to the parties to this agreement no later than five (5) school days after November 15. Standard for: Chapel Hill Carrboro School District November 15 of each year 4. Analysis of Existing Conditions Standard for: Orange County School District November 15 of each year This will be analyzed in the future years to determine if it is an exemplary date. 4. Recommendation — No change at this time Recommendation — No change at this time 17 30 Section II II. 1 2 3 11 5 Q ANNUAL UPDATE TO SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE SYSTEM Capital Investment Plan (CIP) Responsible Entity for Suggesting Change — The updating of this section will be conducted by the Board of County Commissioners (BOCC) after review of the CIP requests from the School Districts. Action regarding CIP programs usually occurs during the BOCC budget Public Hearing process in the winter and spring of each year. The development of the CIP considers the conditions noted in the SAPFOTAC report released in the same CIP development year including LOS (level of service), capacity, and membership projections. Definition — The process and resultant program to determine school needs and provide funding for new school facilities through a variety of funding mechanisms. Standard for: Chapel Hill- Carrboro School District Not Applicable Analysis of Existing Conditions Standard for: Orange County School District Not Applicable The MOU outlines a system of implementing the SAPFO, including issuing Certificates of Adequate Public Schools (CAPS) to new development if capacity is available. The Requests for CAPS will be evaluated using the most recently adopted Capital Investment Plan. A new Capital Investment Plan is currently under development for approval prior to June 30, 2014. Recommendation — Not subject to staff review W. 31 Section II B. Student Projection Methodology 2 3 11 32 Responsible Entity for Suggesting Change — This section is reviewed and recommended by the Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) to the BOCC for change, if necessary. Definition — The method(s) by which student memberships are calculated for future years to determine total membership at each combined school level (Elementary, Middle, and High School) which take into consideration historical membership totals at a specific time (November 15) in the school year. These methods are also known as `models'. Standard for: Chapel Hill Carrboro School District Standard for: Orange County School District Presently, the average of five models is being used: namely 3, 5, and 10 year history /cohort survival methods, Orange County Planning Department Linear Wave, and Tischler Linear methods. Attachment II.B.1 includes a description of each model. Analysis of Existing Conditions Performance of the models is monitored each year. The value of a projection model is in its prediction of school level capacities at least three years in advance of capacity shortfalls so the annual Capital Investment Plan (CIP) updates can respond proactively with siting, design, and construction. Attachment ILB.1 includes a description of each model. Attachment ILB.3 shows the performance of the models for the 2013 -14 school year from the prior year projection. 5. Recommendation — More than ten years of projection results are now available. Analysis on the accuracy of the results is showing that some models have better results in one district while others have better results in the other district. The historic growth rate is recorded by the models, but projected future growth is more difficult to accurately quantify. In all areas of the county, proposed growth is not included in the SAPFO projection system until actual students begin enrollment. The system is updated in November of each year, becoming part of the historical projection base. This is especially pertinent in the Orange County School District which serves students living within the Orange County portion of the City of Mebane which have had little historic enrollment impact. The significant proposed residential growth occurring within Mebane's jurisdiction has yet to be fully entered into the historically based projection methods. Although construction activity in this portion of the county has slowed, there are still a substantial number of approved, but undeveloped residential lots. 19 N O STUDENT MEMBERSHIP PROJECTIONS PROJECTION TYPE DESCRIPTION I CHARACTERISTICS FORMULA ASSUMPTIONS Tischler Linear (OCS & CHCCS) Mathematical formula; straight line projection y= ((c*b) *x) +b y--projected population; c= historical annual change, b =base year; x= projection years Historical growth is reflected in projected growth BYM + (BYI + 5(n)) = EYM EYM * %SL =EYMISL Baseyeargrowth reflect 10- yearaverage; OCP Linear Wave Mathematical linear with percent variation among school BYM= base year 2nd month membership; BYI =year student membership increment increase increase in BYI of 5 every other year reflects (OCS) levels; reflects progressing waves of membership o o base; EYM = ensuing year membership; n= projection year; /oSL =/o of total in housing growth; reflects buildout membership per school level (i.e. elementary, middle, high); EYMISL= ensuing year constraints member by school level BYM + (BYI - 15(n)) = EYM EYM * %SL = EYMISL Base year growth reflects 10 -year average; OCP Linear Wave Mathematical linear with percent variation among school BYM= base year 2nd month membership; BYI -year student membership inclement decrease in BY] of 15 until school year 2010 -2011 (CHCCS) CHCCS levels; reflects progressing waves of membership p g g p u c base; EYM = ensuing year membership; n= projection year; /oSL= /o of total reflects decreases in housing growth; reflects membership per school level (i.e. elementary, middle, high); EYM /SL= ensuing year buildout constraints member by school level K„ =k,,.r +(kn.r *0.01) Mathematical formula that computes the average n =1 advancement rate over the previous 3 years for each a =(Y G„ I g,,) 13 Assumes a 1 % annual growth rate for the 3 -Year Cohort (OCS & grade level and then uses each rate to calculate n =3 kindergarten grade level; assumes the same CHCCS) projected membership by school level; an assumed b=g mr (a) percentage of students in each grade level kindergarten membership is based on birth records K= kindergarten membership; n =given school year; G =given grade's graduate to the next level each year and/or historical growth rates membership(other than kindergarten); g= previous grade's membership; a =ave €age advancement rate; b= projected membership K„= k„- 1+(k„1 *0.01) Mathematical formula that computes the average n =1 advancement rate over the previous 5 years for each a =(Y G„ 1 g,,.r)15 Assumes a 1 % annual growth rate for the 5 year Cohort (OCS & grade level and then uses each rate to calculate n =5 kindergarten grade level; assumes the same CHCCS) projected membership by school level; an assumed b =g .,r (a) percentage of students in each grade level kindergarten membership is based on birth records K= kindergarten membership; n =given school year; G =given grade's graduate to the next level each year andlor historical growth rates membership(other than kindergarten); g= previous grade's membership; a= average advancement rate; b= projected membership K„ =k,,.1 + Ilk, *0.01) Mathematical formula that computes the average n =1 advancement rate over the previous 10 years for each a =(Y G„ 1 9„.1) 110 Assumes a 1% annual growth rate for the 1 D year Cohort (OCS & grade level and then uses each rate to calculate n =10 kindergarten grade level; assumes the same CHCCS) projected membership by school level; an assumed b =g n.1 (a) percentage of students in each grade level kindergarten membership is based on birth records K= kindergarten membership; n =given school year; G=given grade's graduate to the next level each year andlor historical growth rates membership(other than kindergarten); g= previous grade's membership; a= average advancement rate; b= projected membership n O' W W 34 Section II Attachment ILB.2 (page 1 of 4) Orange County School District School Membership 2012 -13 School Year (November 15, 2012) H means High L means Low 21 11/15/11 Actual 2011 -12 2012 Report Projection for 2012 -13 11/15/12 Actual 2012 -13 Change between actual Nov 2011 - Nov 2012 Elementary 3348 3403 +55 Model Projection is T 3407 H4 OCP 3407 H4 10C 3455 H52 5C 3447 H44 3C 3472 H69 AVG 3438 H35 11/15/2012 Middle 1704 1684 -20 Model Projection is T 1734 H50 OCP 1759 H75 10C 1691 H7 5C 1700 H16 3CI 1697 H13 AVG 1716 H32 11/15/2012 High 2283 2315 +32 Model Projection is T 2323 H8 OCP 2289 L26 10C 2248 L67 5CI 2265 L50 3C 2264 L51 AVG 2278 L37 11/15/2012 Totals Elementary 3348 3403 Middle 1704 1684 High 2283 2315 7335 7402 +67 Model Projection is T 7464 H62 OCP 7455 H53 10C 7394 L8 5C 7412 H10 3C 7433 H31 AVGI 7432 H30 H means High L means Low 21 Section II Attachment ILB.2 (page 2 of 4) Orange County School District School Membership 2012 -2013 School Year (November 15, 2012) Statistical Findings PROJECTION TYPE ABBREVIATIONS `TISCHLER' LINEAR (T) 10 -YEAR COHORT (10C) ORANGE COUNTY PLANNING (OCP) 5 -YEAR COHORT (5C) 3 -YEAR COHORT (3C) Elementary School Level Projections were all high, ranging from 4 students to 69 students high. The average of the projections was 35 students higher than actual student membership. • The membership actually increased by 55 students between November 15, 2011 and November 15, 2012. Middle School Level Projections were all high, ranging from 7 students to 75 students high. On average, the projections were 32 students higher than the actual membership. • The membership actually decreased by 20 students between November 15, 2011 and November 15, 2012. High School Level • Projections were primarily low ranging from being low by 67 students to 8 students high. On average, the projections were 37 students lower than the actual membership. • The membership actually increased by 32 students between November 15, 2011 and November 15, 2012. TOTAL • The totals of all school level projections were primarily high, ranging from 8 below actual membership to 62 above actual membership. On average, the projections were high by 30 students. • The membership increased in total by 67 students, which is the sum of +55 at Elementary, -20 at Middle and +67 at High. 22 35 Section II 36 Attachment ILB.2 (page 3 of 4) Chapel Hill /Carrboro School District School Membership 2012 -2013 School Year (November 15, 2012) H means High L means Low 23 11/15/11 Actual 2011 -12 2012 Report Projection for 2012 -13 11/15/12 Actual 2012 -13 Change between actual Nov 2011- Nov 2012 Elementary 5464 5543 +79 Model Projection is T 5563 H2O OCP 5531 L12 10C 5609 H66 5CI 5594 H51 3C 5565 H22 AVG 5572 H29 11/15/2012 Middle 2753 2785 +32 Model Projection is T 2803 H18 OCP 2796 H11 10C 2807 H22 5C 2802 L17 3CI 2774 L11 AVG 2796 1-111 11/15/2012 High 3617 3796 +82 Model Projection is T 3781 L15 OCP 3829 H33 10C 3774 L22 5CI 3765 L31 3C 3766 L30 AVG 3783 L13 Totals 11/15/2012 Elementary 5464 5543 Middle 2753 2785 High 3714 3796 11931 12124 +193 Model Projection is T 12147 H23 OCP 12156 H32 10C 12190 H66 5C 12161 H37 3C 12105 L19 AVG 12151 H27 H means High L means Low 23 37 Section II Attachment ILB.2 (page 4 of 4) Chapel Hill /Carrboro School District School Membership 2012 -2013 School Year (November 15, 2012) Statistical Findings PROJECTION TYPE ABBREVIATIONS `TISCHLER' LINEAR (T) 10 -YEAR COHORT (10C) ORANGE COUNTY PLANNING (OCP) 5 -YEAR COHORT (5C) 3 -YEAR COHORT (3C) Elementary School Level • Projections were primarily high, ranging from 12 students low to 66 students high. On average, the projections were 29 students higher than the actual membership. • The actual membership increased by 79 students between November 15, 2011 and November 15, 2012. Middle School Level • Projections were mixed low and high, ranging from 17 students low to 22 students high. On average, the projections were 11 students higher than the actual membership. • The actual membership increased by 32 students between November 15, 2011 and November 15, 2012. High School Level • Projections were primarily low, ranging from 31 students low to 33 students high. On average, the projections were 13 students lower than the actual membership. • The actual membership increased by 82 students between November 15, 2011 and November 15, 2012. TOTAL • The total of all school level projections were primarily high, ranging from 19 below actual membership to 66 student above actual membership. On average the projections were high by 27 students. • The membership increased in total by 193 students, which is the sum of +79 at Elementary, +32 at Middle, and +82 at High. 24 L(pa chment ILB.3 Section II e I of 4) Orange County School District School Membership 2013 -14 School Year (November 15, 2013) H means High L means Low 25 11/15/12 Actual 2012 -13 2013 Report Projection for 2013 -14 11/15/13 Actual 2013 -14 Change between actual Nov 2012 - Nov 2013 Elementary 3403 3433 +30 Model Projection is T 3460 H27 OCP 3462 H29 10C 3416 L17 5C 3415 L18 3C 3411 L22 AVG 3433 11/15/2013 Middle 1684 1747 +63 Model Projection is T 1712 L35 OCP 1709 L38 10C 1750 H3 5C 1755 H8 3CI 1740 L7 AVG 1733 L14 11/15/2013 High 2315 2421 +106 Model Projection is T 2354 L67 OCP 2356 L65 10C 2334 L87 5C 2362 L59 3CI 2367 L54 AVG 2355 L66 11/15/2013 Totals Elementary 3403 3433 Middle 1684 1747 High 2315 2421 7402 7601 +199 Model Projection is T 7526 L75 OCP 7527 L74 10C 7500 L101 5C 7532 L69 3C 7518 L83 AVG 7521 L80 H means High L means Low 25 Section II Attachment ILB.3 (page 2 of 4) Orange County School District School Membership 2013 -2014 School Year (November 15, 2013) Statistical Findings PROJECTION TYPE ABBREVIATIONS `TISCHLER' LINEAR (T) 10 -YEAR COHORT (10C) ORANGE COUNTY PLANNING (OCP) 5 -YEAR COHORT (5C) 3 -YEAR COHORT 3C Elementary School Level Projections were mixed low and high, ranging from 22 students low to 29 students high. The average of the projections equaled actual student membership. • The membership actually increased by 30 students between November 15, 2012 and November 15, 2013. Middle School Level Projections were mixed low and high, ranging from 38 students low to 8 students high. On average, the projections were 14 students lower than the actual membership. • The membership actually increased by 63 students between November 15, 2012 and November 15, 2013. High School Level • Projections were all low ranging from 54 students to 87 students low. On average, the projections were 66 students lower than the actual membership. • The membership actually increased by 106 students between November 15, 2012 and November 15, 2013. TOTAL • The totals of all school level projections were low, ranging from 69 to 101 below actual membership. On average, the projections were low by 80 students. The membership increased in total by 199 students, which is the sum of +30 at Elementary, +63 at Middle, and +106 at High. 26 39 Section II M Attachment ILB.3 (page 3 of 4) Chapel Hill /Carrboro School District School Membership 2013 -14 School Year (November 15, 2013) H means High L means Low 27 11/15/12 Actual 2012 -13 2013 Report Projection for 2013 -14 11/15/13 Actual 2013 -14 Change between actual Nov 2012- Nov 2013 Elementary 5543 5554 +11 Model Projection is T 5643 H89 OCP 5643 H89 10C 5603 H49 5C 5583 H29 3C 5589 H35 AVG 5612 H58 11/15/2013 Middle 2785 2858 +73 Model Projection is T 2835 L23 OCP 2840 L18 10C 2888 H30 5C 2873 H15 3CI 2872 H14 AVG 2862 H4 11/15/2013 High 3796 3764 -32 Model Projection is T 3864 H100 OCP 3890 H126 10C 3794 H30 5CI 3782 H18 3C 3810 H46 AVG 3828 H64 Totals 11/15/2013 Elementary 5543 5554 Middle 2785 2858 High 3796 3764 12,124 12,176 +52 Model Proiection is T 12,342 H166 OCP 12,373 H197 10C 12,285 H109 5C 12,238 H62 3C 12,271 H95 AVG 12,302 H126 H means High L means Low 27 41 Section II Attachment ILB.3 (page 4 of 4) Chapel Hill /Carrboro School District School Membership 2013 -2014 School Year (November 15, 2013) Statistical Findings PROJECTION TYPE ABBREVIATIONS `TISCHLER' LINEAR (T) 10 -YEAR COHORT (10C) ORANGE COUNTY PLANNING (OCP) 5 -YEAR COHORT (5C) 3 -YEAR COHORT (3C) Elementary School Level • Projections were all high, ranging from 29 students to 89 students high. On average, the projections were 58 students higher than the actual membership. • The actual membership increased by 11 students between November 15, 2012 and November 15, 2013. Middle School Level • Projections were mixed low and high, ranging from 23 students low to 30 students high. On average, the projections were 4 students higher than the actual membership. • The actual membership increased by 73 students between November 15, 2012 and November 15, 2013. High School Level • Projections were all high, ranging from 18 students to 126 students high. On average, the projections were 64 students higher than the actual membership. • The actual membership decreased by 32 students between November 15, 2012 and November 15, 2013. TOTAL • The total of all school level projections were all high, ranging from 62 students to 197 students above actual membership. On average, the projections were high by 126 students. • The membership increased in total by 52 students, which is the sum of +11 at Elementary, +73 at Middle, and -32 at High. Section II 2 3 C. Student Projections Responsible Entity for Suggesting Change — The updating of this section will be conducted by the Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) and referred to the BOCC for annual report certifications. Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. Definition — The result of the average of the five student projection models represented by 10 year numerical membership projections by school level (Elementary, Middle, and High) for each school district (Chapel Hill /Carrboro School District and Orange County School District). Standard for: Chapel Hill Carrboro School District Standard for: Orange County School District The 5 model average discussed in Section ILB The 5 model average discussed in Section ILB (Student Projection Methodology) See Attachment ILC.4 4. Analysis of Existing Conditions (Student Projection Methodology) See Attachment ILC.3 The membership figures and percentage growth on the attachments show continued growth in both systems. Average projected growth rates in the next 10 years for both school systems are quite similar and follow the same growth pattern for each individual school year. Both school systems are showing a projected decrease in the increase, but are still showing positive growth at the Elementary and Middle School levels. Orange County High School is projected to experience a negative growth rate in 2014 -15 followed by positive growth rates for the remaining 10 year projections. Chapel Hill /Carrboro High School is showing varying positive growth rates over the next ten years. Year -by -year percent growth is shown on the attached table as well as the projected LOS. The projection models were updated using current (November 15, 2013) memberships. Ten years of student membership were projected thereafter. 29 42 Section II 43 Chapel Hill Carrboro School District Elementary The previous year (2012 -13) projections for November 2013 at this level were overestimated by 58 students. The actual membership increased by 11 students. Over the previous ten years, this level has shown varying increases in growth rates including a decrease in actual membership in 2009 -10 which was most likely due to the shorter enrollment period caused by the institution of the new date requiring kindergarteners to be five years old. Following that dip, membership numbers are again increasing, with a significant jump (168 students) in 2011 -12. This large increase was followed by smaller increases in 2012 -13 of 79 students and in 2013 -14 of only 11 students. Growth rates during the past ten years have ranged from -1.57% to +3.92 %. Elementary School 411 (Northside Elementary) opened for the 2013 -14 school year with a capacity of 585 seats. The projections this year are showing the need for Elementary School 412 in 2020 -21, which is one year earlier than last year's projections. Although not included in SAPFO school capacity or membership numbers, Pre -K programs continue to impact operations at District elementary schools where Pre -K programs exist. Specific impacts of Pre -K programs at the elementary school level will continue to be reviewed and discussed in the coming year. Middle The previous year (2012 -13) projections for November 2013 for this level were overestimated by 4 students. The actual membership increased by 73. Over the previous ten years, growth has been quite variable and included a decrease in actual membership in 2004 -05. Following this decrease, membership and growth rates have experienced increases every school year since. Growth rates during this time period have ranged from -1.99% to +2.86 percent with most years showing a growth rate of around 1% or less. The planned addition to Culbreth Middle School for the 2014 -15 school year is proposed to increase capacity with the addition of 104 seats. As a result, projections show that Chapel Hill /Carrboro Middle School 45 is projected to be needed in 2020 -21. This is three years later than last year's projections. The proposed addition to Culbreth Middle School was approved in the 2013 -14 CIP for the 2014 -15 school year. Although capacity was projected to be available, a decision was made to fund the expansion and increase capacity. 30 Section II MA The additional capacity resulting from the approved addition has been included in the student projections. High School The previous year (2012 -13) projections for November 2013 for this level were overestimated by 64 students. The actual membership decreased by 32 students. Over the previous ten years, change has been variable with decreases in membership in 2008 -09 and in 2009 -10. Following these decreases, membership and growth rates began increasing again within the last three years before experiencing another decrease this year (2013 -14). Growth rates during this time period have ranged from -0.84% to +5.31 %. This year's projections show that additional capacity is needed in 2023 -24, which is three years later than last year's projection. Additional High School capacity is expected to be achieved by expanding Carrboro High School from 800 students to 1,200 students, which was included in the construction plans for the high school. Additional Information for Chapel Hill Carrboro School District Currently, one Charter School, PACE Academy, serves high school students residing in the Chapel Hill /Carrboro School District. This school is not included as part of the SAPFO Annual Report and, as a result, its membership and capacity is not monitored or included in future projections. On February 6, 2014 PACE Academy had their charter revoked for the 2014 -2015 school year. Administrators are currently exploring the appeal process with the State Board of Education. However, CHCCS student membership may experience an increase in 2014 -15 due to the influx of students from PACE Academy becoming part of the Chapel Hill/Carrboro School District if the school's charter is not renewed through the appeals process. Orange County School District Elementary The previous year (2012 -13) projections for November 2013 at this level were equal to student membership. Actual membership increased by 30 students. Over the previous ten years, this level has experienced varying growth rates including a decrease in membership in 2005 -06. Following this decrease, membership and growth rates have experienced increases every school year since. Growth rates during this period have ranged from -0.33% to +2.80 %. In the Orange County school system, historic growth is more closely related to new residential development than in the Chapel Hill /Carrboro School District, which has a sizeable number of new families in 31 Section II 45 older, existing housing stock. Projections this year are showing the need for Elementary School 48 in 2023 -24 when the LOS is expected to be 105.7% Although not included in SAPFO school capacity or membership numbers, Pre -K programs continue to impact operations at District elementary schools where Pre -K programs exist. Specific impacts of Pre -K programs at the elementary school level will continue to be reviewed and discussed in the coming year. Middle The previous year (2012 -13) projections for November 2013 for this level were underestimated by 14 students. The actual membership increased by 63. Over the previous ten years, growth has varied widely and includes decreases in student membership in five of the ten years. Growth rates during this period have ranged from -4.67% to +4.00 %. The district's third Middle School, Gravelly Hill Middle School, opened in October 2006. The need for an additional Middle School is not anticipated in the 10 -year projection period. However, staff is closely monitoring new sizeable residential projects in the Orange County portion of Mebane and Hillsborough. High School The previous year (2012 -13) projections for November 2013 for this level were underestimated by 66 students. The actual membership increased by 106. Over the previous ten years, growth varied considerably and included a decrease in membership in 2009 -10. Following this decrease, membership and growth rates have experienced increases every school year since. Growth rates during this period ranged from -1.12% to 9.01 %. In 2011 -12 student membership increased by 32 while capacity decreased by 199 at Orange County High School as a result of a N.C. Department of Public Instruction (DPI) study. This year's projections show that additional capacity is needed in 2022 -23. This is different from last year's projections which did not show a need for additional capacity in the 10 -year projection period. Additional High School capacity is expected to be achieved by expanding Cedar Ridge High School from 1,000 students to 1,500 students. This addition is currently included in the five year CIP as a request for funding. At this time, a decision has not been made approving the proposed addition. Once a funding decision is made and approved, the increased capacity from the proposed addition may be included in the student projections. 32 Section II Additional Information for Orange County School District The City of Mebane lies partially within Orange County and students within the Orange County portion of Mebane attend Orange County schools. However, the City of Mebane is not a party to the SAPFO agreement and therefore does not require that CAPS (Certificate of Adequate Public Schools) be issued prior to development approvals. In previous years, development activity and platting of new subdivisions increased within the Orange County portion of Mebane. However, changed economic conditions have curbed new platting and new construction in the past few years. An uptick in residential activity is likely as the country emerges from "The Great Recession." Increased coordination with the City of Mebane regarding development issues may be necessary in the future. OCS currently has capacity to serve additional growth, but it is possible that development in the Orange County portion of Mebane could quickly encumber available capacity. Following the economic downtown, there has been an increase in multi - family residential development which has added to increasing student memberships in both districts. The ongoing future demand for multi - family housing is evident throughout the county, but especially within the Town of Hillsborough which is facing the proposed development of 700 multi - family units in the near future. Staff will need to continue monitoring and evaluating the demand and growth of the multi - family market in Hillsborough and the entire county as well as its effect on student membership rates. Currently, one charter school is located in the Town of Hillsborough and serves students that reside in the Orange County School District. This school is not included as part of the SAPFO Annual Report and as a result its membership and capacity is not monitored or included in future projections. An additional charter school is being proposed in the Town of Hillsborough for the 2014 -15 school year. As a result, OCS student memberships may experience a decrease in 2014- 15 due to a loss of students enrolling in the new charter school. 5. Recommendation Use statistics as noted in 3 above 33 W. Section II 51 A Student Membership Growth Rate 1. Responsible Entity for Suggesting Change — The updating of this section will be conducted by the Planning Directors, School Representatives, and Technical Advisory Committee (SAPFOTAC) each year and referred to the BOCC for annual report certification. Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. 2. Definition — The annual percentage growth rate calculated from the projections resulting from the average of the five models represented by 10 year numerical membership projections by school level for each school district. This does not represent the year -by- year growth rate that may be positive or negative, but rather the average of the annual anticipated growth rates over the next ten (10) years. 3. Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District See Attachment II.D.2 See Attachment II.D.2 4. Analysis of Existing Conditions Analysis of Existing Conditions The membership figures and percentage growth on the attachments show continued growth at each school level within the system. Projected Average Annual Growth Rate over next ten years: Year Projection Made: 2009- 2010 2010- 2011 2011- 2012 2012- 2013 2013 - 2014 Elementary 1.72% 1.44% 1.59% 1.18% 1.44% Middle 1.93% 1.67% 1.94% 1.59% 1.58% High 1.8% 1.57% 1.73% 1.60% 1.27% The membership figures and percentage growth on the attachments show continued growth at each school level within the system. Projected Average Annual Growth Rate over next ten years: Year Projection Made: 2009- 2010 2010- 2011 2011- 2012 2012- 2013 2013 2014 Elementary 1.34% 1.57% 1.6% 1.31% 1.30% Middle 1.53% 1.84% 2.01% 1.64% 1.42% High 1.38% 1.59% 1.61% 1.43% 1.35% S. Recommendation - Use statistics as noted. Recommendation - Use statistics as noted 38 K 2012 -2013 0' Orange County Student Projections Elementary School Year 2012-2013 2013 -2014 2014 -2015 2015.2016 2016.2017 2017 -2018 2(118.2019 2019 -2020 20211 -2021 2021 -2022 2022 -23 JCIU'1 \4 -nlLlc hi 3.403 3,433 3,479 3,574 3,622 3,654 3,698 3,742 3,786 3,830 3 875 Average °h/o increase 1 0.88% 1.35% 2 72% 1.34% 0.88% 1.21% 1 19% 1 18% 1.17% 1 1 16% Middle School Year 2012 -2013 2013.2014 2014 -2015 2015 -2016 2016.2017 2017 -2018 2018 -2019 2019 -2020 2020.2021 2021 -2022 2022 -23 (actual) .Membership 1 684 1.733 1,772 1, 777 1, 785 1.824 1,903 1,930 1,939 1,959 1,979 Average ° o Increase 1 2.92% 2.22% 030% 0.48% 218% 432% 1,41% 047% 1.04% 102% Hiah School School Year 21112 -21113 2013.2014 2014 -2015 2015.2016 2016.2017 21117.2018 2018 -2019 2019- 2020 2020 -2021 2021 -2022 21122.23 actual Membemht. 2,315 2.355 2,366 2,359 2,429 2,472 2,460 2,520 2,555 2,591 2,667 Avcra e %Increase 1 171% 0.48% -0.29% 2.97% 1.77% -Ul% 2.45% 1.39% 1.41% 2.93% Chapel Hill /Carrboro Student Projections Elementary School Year 2012-2013 2013.2014 2014 -2015 21115.2616 21116.21117 2017 -2018 2018.2019 2019 -2020 2020.21121 2021 -2022 2021 -23 (aqua Members-hi 5,543 5,612 5,676 5,764 5,837 5,875 1 5,945 6,014 6,084 6,160 6,236 Average % Increase 1 1 25% 1.15% 1.55% 1 26% 065% 1 1.18% 117% 1.16% 1 24% 1.23% Middle School Year 21112-2013 2013.2014 2014 -2015 2015 -2016 21116-2017 2017 -2018 2018 -2019 2019 -2020 2020 -2021 2021 -2022 2022 -23 aMual Membership 2,785 2,862 2 934 2 972 3,004 3.072 3,133 3,179 3,188 3,225 3,261 Average % Increase 2.75% 2.53% 130% 107% 226% 1 200% 1 1.46% 1 028% 1 1.15% 114% Hiah School SCIIUUI Year 21112-261] 21113-21114 2014 -2615 21115-20% 201( 2017 2017 -2018 21118.2019 2019 - 2020 2020 -2021 2021 -2022 21122 -23 1CIUa1 Membershi 3,796-1 3.828 1 3,866 3,910 4,016 4,108 4.167 4,235 4,324 1 4,374 1 4,447 .4'.e c °.-b Increase 0 84% 0 98% 1.15% 2.72% 2.28% 143% 1 63% 2.09% 1 1.17% 1 1.67% O � >v n w CD d N T n h 2013 -2014 0' Orange County Student Projections Elementary School Year 2013-2014 2014.21115 20152016 2"16.2117 2017 -2U18 2018 -2019 2019-2020 2020-2021 2021 -2022 2022 -23 2021 -24 School Year actull 1 1 1 1 IvIcmbetshl p 3 433 3,472 3 555 3,597 1 3,627 1 3,668 1 3,716 1 3,764 3,812 1 3,861 3,906 Averse °f Increase 1 1.14% 2.39% 1.18% 1 0.84% 1 1.13% 1 1.30% 1 1.29% 1.28% 1 128% 1 1 17% Middle Hinh School School Year 2013 -2014 2014 -2015 2015-2016 2016.2017 2017 -2018 2018 -2019 2019 -2020 2020 -2021 2021 -21122 2022-23 2123 -24 School Year (actual) 1 1 Membcrshl 1,747 1789 1.805 1824 1,862 1,933 1,951 1,953 1,967 1,987 2,010 Averse °S Increase 1 2 38 o 694 % 1.03% 2.07% 385% 090% 0 12% 0.71% 1.04% 1 12% Hinh School School Year 2013 -2014 2011.2015 211152016 21116 -21117 2017 -2018 2018 -2019 2019- 2020 211211 -21121 2021 -2022 2022-23 2023 -24 actual Membership 2,421 2,406 2,411 2,468 2,533 2,534 2,600 2,642 2,67 2 742 2.767 Average %Increase 1 -0.61% 0.18% 2.40% 2.63% 0.03% 259% 1.62% 1 39% 2.36% 0.93% Chapel Hill /Carrboro Student Projections Elementary School Year 2013 -2014 21114 -2015 2015 -2016 2016 -2017 2017 -2018 2018 -2019 2019 - 2020 2020.2021 21121 -2022 2112b23 2023 -2d actual Membcrshl 5,554 5,635 5,748 5 845 5,927 6,021 6 090 6 166 6 241 61323 6.405 Acerac %Increase 1 1.47% 2.00% 1.69% 1 41% 1.57% 1,15% 1.24% 1 23% 1 31% 1.30% Middle School Year 21113.2014 2014 -2015 2015 -2016 21116-21117 2017 -2018 2018 -2019 2019 -2020 2020 -2021 2021 -2022 21122-23 21123 -24 actual Membersh 2,858 2,925 2.947 2,962 2,999 3,063 3,134 3,190 3,257 3,299 3.342 Avera e "fu Increase 1 2 35% 0.76% 0.50% 124% 2.13% 2 32% 178% 2.11% 1.30% 1 1 30% Hiah School School Year 2013 -2014 2014 -2015 201.1,2"16 21116 -2017 11117 -2018 2018 -21119 2019 -2020 211211.2021 2021 -2022 21122-23 2(23 -24 actual Membership 3,764 1 3,805 3,825 3,893 3,982 1 4,011 1 4,050 4,086 4,112 4,199 1 4,268 Averse %Increase 1 1.08% 0 54% 1.78% 2.27% 1 075% 1 096% 0.88% 1 0.65% 1 2.10% 1 165% O w w � d N UI W Section II 2 E. Student / Housing Generation Rate Responsible Entity for Suggesting Change — The updating of this section will be conducted by Planning Directors, School Representatives, and Technical Advisory Committee ( SAPFOTAC) and referred to the BOCC for certification. 54 Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. Definition — A projected number of students that are generated from four different types of housing, "single- family detached ", "single- family attached ", "multifamily ", and "manufactured homes ", as defined in Appendix C to the 2007 TischlerBise School Impact Fee Report. 3. Standard for: Chapel Hill Carrboro School District See Attachment II.E.I 4. Analysis of Existing Conditions Standard for: Orange County School District See Attachment II.E.1 On October 6, 2009, the Orange County Board of Commissioners approved the updated Student Generation Rates as recommended by the SAPFOTAC. The newly adopted Student Generation Rates became effective the 2010 -11 school year with the November 15, 2010 CAPS system update. The current standards are shown in Attachment II.E.1. Both Orange County Schools and Chapel Hill - Carrboro City Schools have recognized a larger increase in students generated from developments in both districts, particularly the multi - family housing. The SAPFOTAC discussed the increased number of students generated in both districts and proposed multi - family projects that may continue to have an effect on student membership numbers. While this may be a short term trend caused by the current economic climate or other factors, the SAPFOTAC recommends further evaluation of the adopted Student Generation Rates and the impacts different types of housing may have on student membership rates. Orange County Planning staff has contacted the consultant used to do this type of work in the past to obtain a cost estimate. It is expected that a new study to update only student generation rates would cost 41 Section II 55 between $12,000 to $20,000 with the lower end of the range being more probable, given knowledge of the types of data Orange County has ready access to. Also, it should be noted that students are generated from new housing as well as from existing housing where new families have moved in. The CAPS system estimates new development impacts and associated student generation, but it is important to understand that student increases are a composite of both of these factors. This effect can be dramatic and can vary greatly between areas and districts where either new housing is dominant or new families move into a large inventory of existing housing stock. 5. Recommendation —No Change The SAPFOTAC does not recommend a change at this time. However, the SAPFOTAC continues to recommend further evaluation of the Student Generation Rates to determine whether a change is warranted. The last impact fee level study (which includes the calculation of student generation rates) was conducted in 2007 so it may be time to initiate another study to ensure up -to -date data is used for both SAPFO purposes and impact fee purposes. Alternatively, a study to analyze only student generation rates, separate from any study regarding school impact fees, can be completed. The cost for such a study is estimated at between $12,000 to $20,000. 42 TischlerBise Student Generation Rates - 2007 Chapel Hill - Carrboro Schools Elementary Middle High All Grades Single - Family Detached 0.263 0.143 0.197 0.603 Single - Family Attached 0.158 0.077 0.115 0.350 Multifamily 0.038 0.015 0.017 0.070 Manufactured Homes 0.141 0.066 0.061 0.268 All Housing Types 0.149 0.078 0.105 0.332 Orange County Schools Elementary Middle High All Grades 0.168 0.090 0.126 0.384 Single - Family Detached Single- Family Attached / Multifamily 0.066 0.022 0.034 0.122 Manufactured Homes 0.096 0.041 0.049 0,186 All Housing Types 0.145 0.074 0.102 0.321 o' wSource: School Impact Fees - Orange County Schools, TischlerBise, December 31, 2007 (1 CF) Section III III. FLOWCHART OF SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PROCESS Abstract: The Schools Adequate Public Facilities Ordinance process has two distinct components: A. Capital Investment Plan (CIP) (Process 1) Timeframe: In November of each year, Student Membership and Building Capacity is transmitted from the school districts to the Orange County Board of Commissioners for consideration and approval and used in the following years CIP (e.g. November 15, 2013 membership numbers used to develop a CIP to be considered for adoption in June 2014). Process Framework 1. SAPFOTAC projects future student membership from historical data, current membership and hypothetical growth rates from established methodologies. 2. School Districts and BOCC compare projections to existing capacity and proposed Capital Investment Plan. 3. SAPFOTAC forwards data and projections to all Schools APFO partners. 4. School Districts develop Capital Investment Plan Needs Assessment during this process 5. The Capital Investment Plan work sessions and Public Hearings are conducted by the BOCC in the spring of each year. 6. The adoption of CIP that sets forth monies and timeframe for school construction (future capacity) by BOCC. I 57 99 Section III School Adequate Public Facilities Ordinance Process 1 - Capital Investment Planning (CIP) Projection Method (Historical Membership' plus Hypothetical Growth Rate T CIP Approval (Proposed New Construction i.e. School Capacity Added by number seats & yeai Actual Adjustments (Current Year Actual Replaces Past Year Membership Projection) CAPS System2 (Certificate of Adequate Public Schools) 'Historical Membership is a product of students generated from: (1) pre- existing /approved undeveloped lots where new housing is built, (2) existing housing stock with new families /children, and (3) newly approved housing development (in the future this component will be known as CAPS approved development) 2The only part of the CAPS System (i.e., computer spreadsheet subdivision tracking) that receives data from the Process 1 CIP includes the actual membership (November 15 of preceding CIP year) and new school capacity amount (seats) in a specific year pursuant to the CIP. 45 Section III B. Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) Update (Process 2) 59 Timeframe: The CAPS system is updated approximately November 15 of each year when the school districts report actual membership and `pre - certified' capacity, whether it is CIP associated or prior `joint action' agreement. `Joint action' determinations of changes in capacity due to State rules or other non - construction related items are anticipated to be done prior to the November 15 capacity and membership reporting date. This update may reflect the Board of County Commissioners action on the earlier year Capital Investment Plan (CIP) as it affects capacity and addition of new actual fall membership. The Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) stays in effect until the following year — (e.g.: November 15, 2005 to November 14, 2006). New development is originally logged for a certain year. As the CAPS system is updated, each CAPS projection year is `absorbed' by the actual estimate of a given year. Later year CAPS projections of the same development remain in the future year CAPS system accordingly. For example, if a 50 -lot subdivision is issued a CAPS, 15 lots may be assigned to "Year 1," 10 lots to "Year 2," 10 lots to "Year 3," 10 lots to "Year 4," and 5 lots to "Year 5." When "Year 1" is updated, the students generated from the 15 lots are absorbed by the actual estimate. The students generated in "Years 2, 3, 4, and 5" are held in the CAPS system and added to the appropriate year when the CAPS system is updated. As was discussed in Section II.C, The City of Mebane is not a party to the SAPFO and does not require that CAPS be issued prior to approving development activities. However, residential development within the Orange County portion of Mebane has increased dramatically prior to 2009, but has slowed considerably due to the current economic climate. Currently, there are approximately 1,000 approved undeveloped residential lots in the portion of Mebane that lies within Orange County. Increasing development within this area of the county has the potential to encumber a significant portion of the available capacity within the Orange County School we Section III District. Although the SAPFO system is not formally regulated in Mebane, staff monitors development activity and when students enter the school system their enrollment is calculated and used in future school projection needs. Please note that the two processes (CIP and CAPS) are on separate, but parallel tracks. However, the CIP does create a crossover of capacity information between the two processes. For example, the Schools APFO system for both school districts that will be established / initiated / certified each year in November and is based on prior year created and /or planned CIP capacity and current school year membership. The SAPFOTAC report including new current year membership and projections are to be used for upcoming CIP development as noted in Process 1. CIP Process 1 (for CIP 2014 - 2024) November 2013 — June 2014 (using 2014 SAPFOTAC Report) Schools APFO CAPS Process 2 (for Schools APFO System 2014— 2015) November 2013 - November 2014 47 M-11 61 School Adequate Public Facilities Ordinance Process 2 - Certificate of Adequate Public Schools (CAPS) Allocation 2014 CAPS system is effective November 15, 2013 through November 14, 2014. The system is updated with new membership, CIP capacity changes, and any other BOCC /School District joint action approved capacity prior to November 15, 2013. This information is received within 5 days of November 15 and posted within the next 15 days. This CAPS system recalibration is retroactive to November 15, 2013 . CAPS Allocation System 1. Certified Capacity 2 LOS Capacity 3. Actual Membership 4. Year Start Available Capacity 5. Ongoing Current Available Capacity (includes available capacity decreases from approved CAPS development by year) 6. CAPS approved development a. Total units b. Single Family c. Other Housings CAPS System AC2 =SC2 - (ADM2 +ND 12 +ND22 +... ) AC >_0 - Issue CAPS ACO - Defer CAPS to later date 'Student Generation Rates from CAPS housing type create future membership estimate. Please note that this CAPS membership future estimate is different than the projection based on historical data and projection models used in the CIP process 1. This estimate only captures new development impact, which is the component that the SAPFO can regulate. 2 A - Available Capacity - Starts at Annual Update Capacity and reduces as CAPS approved development is entered into the system. SC - Certified School Level Capacity ADM - Average Daily Membership ND - New Development; ND1 means first approved CAPS approved development 48