HomeMy WebLinkAboutRES-2013-068 Resolution Endorsing Priority Transportation Projects for the Burlington-Graham MPO Regional Priority List for 2016-2022 Transportation Improvement Program ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION ENDORSING ORANGE COUNTY'S PRIORITY TRANSPORTATION PROJECTS FOR THE BURLINGTON-GRAHAM METROPOLITAN PLANNING ORGANIZATION (BGMPO) REGIONAL PRIORITY LIST FOR THE 2016 — 2022 TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide Transportation Improvement Program (STIP) that identifies transportation projects to be implemented over the next seven years with State and Federal funding; and WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and regional importance to be included in the FY 2016-2022 STIP; and WHEREAS, the BGMPO Transportation Advisory Committee is charged with the development of a Metropolitan Transportation Improvement Program (MTIP); and WHEREAS, Orange County is a member jurisdiction of the BGMPO; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the County's designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; and WHEREAS, Orange County has outlined its transportation needs within the BGMPO planning area in an attachment to this resolution; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board endorses the following prioritized list of transportation projects to be considered for the FY 2016-2022 BGMPO MTIP. 1 New 1-85 Frontage Road: Construct a two (2)-lane frontage road on the south side of 1-85 from Ben Wilson Road to Mattress Factory/West Ten Road. This project will be submitted as a new highway project to be considered for inclusion in the BGMPO long-range transportation plan (LRTP) and MTIP as well as the 2016-2022 STIP. 2 Mattress Factory Road Interchange: Construct a new interchange at the existing grade- separated crossing of Mattress Factory Road and 1-40/1-85. This project was previously submitted by the City of Mebane for prioritization as a Highway Mobility project and will be submitted by Orange County for reprioritization and consideration for inclusion the BGMPO MTIP and 2016-2022 STIP. 3 Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 and close the existing railroad crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East Washington Street. This project will be submitted as a new highway project to be considered for inclusion in the BGMPO LRTP and MTIP as well as the 2016-2022 STIP. 4 Park-and-Ride Lot in the Buckhorn Economic Development District (EDD)/Mebane area: Construct a park-and-ride facility to be located in the Buckhorn EDD/Mebane area to serve a cross-county bus route from Mebane to Durham to collect ridership in eastern Alamance and western Orange Counties as indicated in the Orange County Bus and Rail Investment Plan (OCBRIP). This project will be submitted as a new transit project for consideration of inclusion in the BGMPO LRTP and MTIP as well as the 2016-2022 STIP. The project was previously submitted through the Durham-Chapel Hill-Carrboro (DCHC) MPO as a park-and-ride facility to be specifically located in the Buckhorn EDD. 5 Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road (SR1144) to multiple lanes with bicycle and pedestrian facilities. This project was previously submitted as a highway project and will be reprioritized and submitted as a highway project for consideration of inclusion in the BGMPO LRTP and MTIP as well as the 2016-2022 STIP. 6 Lebanon Road bicycle and pedestrian improvements: Construct four (4)-foot bicycle lanes from N. Frazier Road to Stagecoach Road with pedestrian/sidewalk facilities from Saddle Club Road to Stagecoach Road. This project will be submitted as a new highway project for consideration of inclusion in the BGMPO LRTP and MTIP as well as the 2016-2022 STIP. t, Upon motion of Commissioner 1,"A`,�l'�--I_ , seconded by Commissioner the foregoing resolution was ado ted this the 117 th day of September, 2013. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on September 17, 2013, as relates in any way to the adoption of the foregoing and that said proceedings are recorded in t i' s of said Board. -2 e�i( WITNESS my hand and the se ti this /) e day of , 20t3- _ ..� 17 52 Clerk Co ,e Board of Commissioners e �fi