HomeMy WebLinkAbout2014-150 AMS - Lomax Construction Company Inc for Proposed change Order 1 carpet in lieu of VCT additional de-construction scope $5,331 T11
=1 Document G701 2001
�ocu
Change Order
PROJECT:(Naune crud address) CHANGE ORDER NUMBER: 1 OWNER❑
list Floor Renovation
R.E.Whitted Building A DATE: February 3,2014 ARCHITECT❑
300 West Tryon Street
Hillsborough, NC CONTRACTOR❑
TO CONTRACTOR:(Name and address) ARCHITECT'S PROJECT NUMBER: 1218 FIELD ❑
Lomax Construction, Inc.
PO Box 35169 CONTRACT DATE: January 15,2014 OTHER ❑
Greensboro, NC 27425-5169 CONTRACT FOR: General Construction
The ConlTact is changed as follows;
(Include, where applicable,any undisputed amount attributable to pr•evionsly executed Construction Change Directives.)
COP#1 See attached for descriptions and details
COP#2 for each approved COP. Add: $5,331.00
The original(Contract Surat)(Guaranteed Maximum Price)was $ 880,400.00
The net change by previously authorized Change Orders $ 0
The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was $ 880,440.00
The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased)(unchanged)
by this Change Order in the amount of
$ 5,331.00 ✓
The new(Contract Sum)(Guaranteed Maximum Price), including this Change Order,will be $ 885,731.000 d �
«D y
The Contract Time will-be(increased)(decreased)(unchanged)by ( )days. > >
The date of Substantial Completion as of the date of this Change Order,therefore,is n
t�o��.3
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maxbnunt Price °.
that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in tl-hich case a Change Order is executed to supersede the Construction Change Directive, N
e. fD
NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER,
Corley Redfoot Architect Lomax Construction,Inc. Orange County 0 ° rn
ARCHITECT(Fir nr name) CONTRACTOR(Firm name) OWNER(First name) Q o a
222 Cloister Court PO Box 35169 PO Box 8181 y<
Chapel Hill, NC 2751 _ Greensboro,NC 27425-5169 HillsborouWl,AC 2F T8 3
ADD SS ADDRESS ADDRE
m
8 �rtcthr --- BY ignatur•e) - ----- — Y(Signal are)
v1>D ek Richard Taylor,Controller
(1)=ped nanw) (Typed name) (Tt)red name)u
&1
E L q 1_4
DAT
CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED,An original assures that
changes will not be obscured.
AIA Document G701 T1-2001.Copyright 9 1979.1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This
AIAa Document is protected by U.S.Copyright taw and International Treaties.Unauthorized reproduction or distributlon of this AIA°Document,or
any portion of it,may result In severe civil and criminal penalties,and will be prosecuted Lo the maximum extent possible under the law.
Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents.e-mail
The American Institute of Architects'leeal counsel,convriohhn),tia nrn """"-
voff b
o
,
` N \ \ cO \ \
�U�
�► A t MN ° \
�� a \ mw
ol
d
v
p °► v \ V
U
_ 1 ,
{3o \U �dip
two
O�
aG,o
CD
` x
�► `� 1 � Z�ct�' � ,Z ` 7, ',od U`. a Q. �Ct Qy�U1
,'uI O_ O �•Z U
An"
0,
m 00 v, eC
_ca
TA x �.o � x o
` o °c, `j � 70 cn
EATMANS CARPETS & INTERIORS
P.O.Box 30639*Raleigh,NC 27622*(919)782-6010*Fax(919)782-9414
CHANGE ORDER REQUEST
January 29,2014
TO: LOMAX CONSTRUCTION
PROJECT:RICHARD E WHITTED BUILDING
REQUEST: EC-01-1
Delete VCT and install Carpet-lin the east and west ends of corridor 200. room 236,
241 & 242.
Delete Armstrong VCT -$1369.50
Labor -$943.00
Total -$2312.50
Add Bloyu Carpet#1 +$4639.00
Labor +$613.00
Total +$5252.00
Net Change +$2939.50
Total add this change order $2939.50
Pricing good for 60 days.
Woody Eatman
I COI I 10 O Ce)
O', 1 101 04
Lf)! ce)I
C-4 z C4
U) U)!
I F-
co 0 C) C) CO
co! 0 C) 0) C) N
i LO: (Y)!
LO Lo
Q)
N
0 ol
LO
CD co
0 C\l
0
0 CD i
i
CL i M L)
x >
uj >%I D
uj m
C
E i 0
0 U)
0
0
co 0 Fn
C
.2 N
m 0 C) CD W> 6 z
Z 0 C).
0 r 1 0
LU
CL---
- Z
> E S -j
0 0 0 U)
m 0
m
0 CL 2 a.
t LU LU
U- C c
0
ra L)
a7 _
=
0 >
E 0
E 0 C) C)
tz 0
0
U)
0
0
U)
0) Im
C
W!
0
> z to 0
I M 1 1
Im
-0-0
U) 0 0
C4 CY! Lo
41 1
G)l
ol w 1 z
w uj
Im, C3 ui
ol
L W 4)
�Zi U;
E 0
Tj 3: IS ui
z m
1 Cl) z
LL
U) z
U) �0. ice,!
1 0 CD,
0 i El
0 LU
L- 1 : 1 Z CL !0,
F Ix
>
Q �o z
_j
Uj 41 Q,
_j LU
iLu 1 F-
IL
D 0; Uj
Lu
F- z LU
Lu im� uj' z
coi
UY
LL,
U. U) IL U) U) 0! U) O iu): im co, a
00 O O O O 0 O N N N
R O N O N L69
00 CD
CO co IA
F" 6fi 44 69
F
«
E
CD
a
N
p
a
T
o a
E a
❑ N
a0+
O
H
d
Q
w
�o
0
a
0
x
'.3
0
r-
v
a
C
�a
o °o
CL o 0
N O
to IA
69 EA
A
O
Ci F
C
_ dl
C �
C a
as
E c
o �
00 0
"> 0 0 0
e o
w J 04
0 C14 C14
1- CY)
a
d �
U 00 0 0
0 0 O O IA
L;c6l I U�
e
j coo co
r r IA
C
W
a
O
d N
O
tm C U
_D O
m v
•O 7
S'. N N
L C W
O .T,
U L
Ld K 0 + C
C
L Jna .a d =+
C O D 05 O
O 0 o O y 3 K
u Z < d c N m F O d O Q D
.x Y p N O N Z ►- _
O O N r D d d d aR w
O v A d O 10 10 7 > 7 O O
aUao 0 33 � F J 101 <A O U)i I 1F l Z
Page 1 of 1
Denise Holland
From: Harry Jensen [hjensen @corleyredfootarchitects.com]
Sent: Monday, February 03, 2014 8:56 AM
To: Van Reed; Danny Baker
Cc: Jeff Thompson; David Taylor; Dick Drake; Denise Holland
Subject: RE: Whitted Bldg. C.O.P.'s 1 &2
'an:
Your COPs #1 have been reviewed and are acceptable. Due to the immediate need to prevent delay to the construction
chedule,the Owner has requested that you please proceed with this demolition knowing that the paperwork will need to be
,rocessed before payment can be included in your payment application. The Change Order#001 with these(2)COPs will be
ent out by tomorrow PM for your signature. Contact our Office if you have any questions.
larry M.Jensen,Jr.-Const.Adm. �
:orley Redfoot Architects, Inc. C u
22 Cloister Court t"_
:hapel Hill, NC 27514
19.401.8586
19.880.1865 Mobile
iensen @corievredfootarchitects.com
rom: Van Reed [mailto:VReed @lomaxconstruction.com]
ent: Friday, January 31, 2014 3:12 PM
o: Harry Jensen;jethompson @orangecountync.gov
.c: Denise Holland; Danny Baker
�ubject: Whitted Bldg. C.O.P.'s 1 &2
'lease these two C.O.P.'s for the Whitted Building as discussed
L 0 M A X
CONSTRUCTION
an Reed
roject Management
Iffice#336-992-7000 x 105
ax#336-992-7004
lobile#336-215-4217
reed()lomaxconstruction.com
mm.lomaxconstruction.com
12/03/2014