HomeMy WebLinkAbout2014-117 Planning - J. F. Wilkerson Contracting Co., Inc. for Buckhorn Mebane Utilities Phase 2 Change Order #3 o2L ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration ®`s (919) 245-2575 131 W. Margaret Ln. u sz (919) 644-3002 (FAX) °' P. O. Box 8181 Hillsborough, NC 27278 www.co.orange.nc.us • �"to Cato S 1 AM MEMORANDUM To: Michael Talbert, Interim County Manager Through: Craig Benedict, Planning Director From: Kevin Lindley, PE, Staff Engineer Date: January 10, 2014 RE: Buckhorn Mebane Phase 2 Utility Project Change Order#3 This change order is based on a request for a time extension submitted by the Contractor on October 17, 2013. The request for time extension was due to two unrelated delays. One was a delay in acquiring the finalized easement across a large portion of property near the western end of line S-1. This easement had to be redone when the archaeological survey discovered a potentially sensitive area along the originally designed path of the sewer line. The sewer line route had to be redesigned and the easement redone. Several complications arose with this,most prominently that the land had been redistributed amongst several out-of-state heirs after the original easement was signed, which made contacting and acquiring signatures difficult. The second delay was related to the original sewer line design around a pond at the eastern end of sewer line S-1. Because of the topography,the sewer line was going to be in the toe of the pond dam as designed, even though it was far enough away from the water's edge to satisfy State buffer requirements. The Contractor raised the question and the decision was made to change the route so the sewer line passed the pond on the opposite side to avoid the dam. While this new design was being worked out,the Contractor submitted this request as an open ended time request. Hobbs Upchurch has made a determination that this request ends on December 1, 2013, which set the number of days requested as part of this request at 76. The contractor has since been given permission to begin at Manhole#5 along line S-1, so as not to delay them any longer. While this is not ideal, it does allow the Contractor to commit a crew to the job and not prolong construction of line S-1. The costs of the change orders have been summarized below, along with the summary for Change Order#I and#2. Going forward,new change orders can be added to this summary so that all the change order information will be available in one document for easy review. Original Contract Price: $4,016,545.74 - Original rock contingency for water line: $ 67,500.00 (included) C0#1 $ 15,328.00 - Extra work to avoid an unmarked 16" force main - Reroute a 4"water main - Delays due to easement dispute - Revised rock contingency for water line: $ 52,172.00 Net Contract Price Change for CO#1: $ 0.00 CO#2 $ 2,242.50 - Cost due to resurveying/relayout of sewer S-1 - Done to avoid a potentially significant cultural/archaeological site on the Rohl property CO#3 $ 0.00 - This change order is for time delays only - Related to weather and realignment delays at the start of line S-1 Revised Contract Price after Change Orders:$4,018,788.24 SCHEDULE The project start date was 4/16/2013. Based on the original schedule the allowed substantial completion date would have been 4/16/2014, or 365 days. CO#1 added an additional 57 days due to delays in obtaining easements and the time to complete the extra work. This extended the contractually allowed substantial completion date to 6/12/2014. CO#2 added an additional 8 days due to inclement weather, which pushed the allowed substantial completion date out to 6/20/2014. CO#3 requests an additional 76 days due to delays in easement acquisition on the Rohl property along line S-1 and delays associated with realignment of the beginning section of line S-1. Adding these 76 days would reset the allowed substantial completion date to 9/4/2014. Please call or email with any questions. Change Order No. 3 Date of Issuance: 12/17/13 Effective Date: 12/18/13 Project:Buckhorn-Mebane EDD Water and owner: Orange County Owner's Contract No.: Sewer Improvements Contract: Date of Contract: Contractor:JF Wilkerson Contracting Co., Inc. Engineer's Project No.: OC1001 The Contract Documents are modified as follows upon execution of this Change Order: Description: Additional time for easement delays and weather conditions- Due to realignment of S-1 to remove sewer line out of wetlands. Attachments: (List documents supporting change): See supporting information in attachment CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days X Calendar days Substantial completion(days or date): 365 $4,016,545.74 Ready for final payment(days or date):395 [Increase][Decrease]from previously approved Change [Increase][Decrease] from previously approved Change Orders Orders No. 01 to No. 02 No. to No. Substantial completion(days):430 $2,242.50 Ready for final payment(days):460 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or date):430 $4,018,788.24 Ready for final payment(days or date):460 Increase [Decrease]of this Change Order: Fincrease [Decrease]of this Change Order: Substantial completion(days or date):76 $ 0.00 Ready for final payment(days or date):76 Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion(days or date):506 $4,018,788.24 Ready for final payment(days or date):536 RECOMMENDE . CEP ACCEPTED: BY By: By: L.J Engineer(Authorized Signature) Ow r(Author d Si ture) Contra r(Authorized Signature) Date: / ���/ Date: / Date: is instru as n e-au i e in e Approved by Funding Agency(if applicable anner required by the L cal Government Date: EJCDC No.C-941(2002 Edition) Clarence G. Grier,Assistant Co. Man er& Page 1 oft Prepared by the Engineers'Joint C�e� Documents Committee and endorsedT,the Associated General Contractors of Ame ca and the Construction Specifications Institute. EJCDC No.C-941(2002 Edition) Page 2 of 2 Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. Change Order Instructions A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. EJCDC No.C-941(2002 Edition) Page 3 of 2 Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. J.F. Wilkerson Contracting Co., Inc. PO Box 183 Morrisville,NC 27560 CHANGE ORDER REQUEST Engineer: Hobbs Upchurch Associates Owner: Orange County Contractor: J.F. Wilkerson Contracting Job: Buckhorn—Mebane EDD Phase 2 Project Manager: Michael Coates Request number: 6 Date: October 17,2013 Description of extra work: No extra work associated with this change order request Request for compensation: No extra compensation requested Days added to the contract: Delay associated with easement acquisition(Rohl Property) Delay associated with re-alignment at the pond near the Gravely lift station Request for additional Days: Beginning September 15,2013 and continuing until all Easement and Re-alignment issues have been resolved,and Man Holes for Sewer Line S-1 have been released, built,and delivered to the project. PW I Hobbs Upchurch Associates January 3,2014 Orange County-Planning&Inspections ATTN: Mr. Kevin Lindley, P.E. 131 W. Margaret Lane Hillsborough,NC 27278 RE: Buckhorn-Mebane EDD Water and Sewer Extension Project—Phase II SUBJECT: Justification for Change Order#3(dated December 17,2013) HUA No.: OC 1001 Dear Mr. Lindley: For Hobbs, Upchurch & Associates' (HUA)Change Order#3 (dated December 17, 2013),attached is the J.F. Wilkerson Contracting Co. (JFW)Change Order Request#6(dated October 17, 2013), as submitted to HUA by JFW. This Change Order/ Change Order Request were for the original cost of the realignment of Line S1 and for the time involved in the delay. We all know the realignment was shifted again. However, as per discussion with Mike Coates, he wanted to document the time through December 1,2013. Therefore, HUA Change Order #3 includes the time of 76 days from September 15, 2013 to December 1, 2013. The cost total will be determined in the future. If you have any questions,then please call me at(910)692-5616 or(336)257-0274. Sincerely, HOBBS,UPCHURC &ASSOC IA S, P.A. David Townsend III,PE Enclosures CC Mike Coates,J.F. Wilkerson Contracting Co. T'910.692.5616 F:910.692.7342 1 300 sw BROAD STREET ( SOUTHERN PINES.NC 28387 NNW.HOBBSUPCHURCH.COM SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN