Loading...
HomeMy WebLinkAboutAgenda - 02-24-2014 - C13 ORANGE COUNTY BOARD OF COMMISSIONERS AND PLANNING BOARD QUARTERLY PUBLIC HEARING ACTION AGENDA ITEM ABSTRACT Meeting Date: February 24, 2014 Action Agenda Item No. C.1 SUBJECT: Class A Special Use Permit — Solar Array off Redman Road in Cheeks Township DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) Yes ATTACHMENT(S): 1. Application Packet 2. Property and Vicinity Map 3. Staff Comments 4. Notification Materials and Certification INFORMATION CONTACT: Michael D. Harvey, Planner III (919) 245 -2597 Craig Benedict, Director (919) 245 -2575 PURPOSE: To hold a quasi-judicial public hearing and receive comment on a Class A Special Use Permit application in accordance with Section 2.7 Special Use Permits and Section 5.9.6 (C) Solar Array - Public Utility of the Orange County Unified Development Ordinance (UDO). A quasi-judicial hearing means that testimony is sworn and evidence must be competent and substantial. Hearsay or unsubstantiated opinions are not sufficient testimony. BACKGROUND: On December 20, 2013 staff received an application proposing the development of a solar array on 2 parcels of property totaling 52 acres in area owned by Stout Farm LLC off of Redman Road. The basic facts of the application are as follows: Applicant: Strata Solar Stout Farm LLC 1119 US 15 -501 Hwy South 1513 Crepe Myrtle Dr. Suite 101 Sanford, NC 27330 Chapel Hill, NC 27516 Agent(s)- Strata Solar Location: Redman Road (Please refer to Attachment 2 for a vicinity map of the project) Parcel Information: a. PIN(s): 9844 -06 -5971 and 9844 -17 -2687. b. Size of parcel(s): 52 acres. Strata Solar is proposing to lease the entire 52 acres to support the proposed utility operation. 0 c. Zoning of parcel(s): Rural Residential (R -1), Upper Eno Protected Watershed Protection Overlay District, and Major Transportation Corridor (MTC) Overlay District. d. Township: Cheeks. e. Future Land Use Map Designation: Commercial Industrial Transition Activity Node (CITAN). f. Growth Management System Designation: Urban. g. Existing Conditions /Physical Features: Both properties are undeveloped and wooded. There are streams towards the southern portion of the property, adjacent to Interstate 85/40 and a pocket of wetlands as denoted on the submitted site plan. There is an existing power line easement running through the property. h. Roads: Vehicular access to the parcel is off of Redman Road. Surrounding Land Uses: a. NORTH: Southern Railroad line, Single- family residential zoned R- 1 and Efland Cheeks Highway 70 Corridor (ECOD) Overlay District. b. SOUTH: Interstate 85/40. c. EAST: Single- family residential, large undeveloped parcels of property, zoned R -1. d. WEST: Non - residential land use (furniture manufacturing), large undeveloped parcels of property, and a utility substation owned and maintained by Duke Energy, zoned Economic Development Buckhorn High Intensity (EDB -2). Proposal: As detailed within Attachment 1, the applicant is proposing to erect individual solar array panels on the properties. A typical array is 7 to 8 feet in height, with approximately 2 to 3 feet of ground clearance depending on its angle, and is approximately 63 feet in length. The arrays will be screened by existing vegetation and a 6 foot high chain link security fence, topped with 3 strand barbed wire, shall enclose the perimeter of the array to prevent access. Gravel paths /drives will be installed around these arrays in order to permit access by Strata Solar technicians to service the panels. The applicant is indicating they will observe a 50 foot landscaped buffer along the property lines abutting residentially zoned property to the east of the project as required by the UDO. Vehicular access to the site is restricted by a 24 foot access gate off of Redman Road. According to the applicant the Eno Volunteer Fire Department and Orange County EMS shall be provided a key to access the site in the event of an emergency. An overhead, medium voltage, power line will be installed on the west of the identified leased area allowing the proposed facility to tie into the power grid via the existing electrical substation to the west of the property. The applicant is not proposing to develop a business or other similar office facilities on the property. As a result there is no septic or well system proposed, or required, as part of the project. 5 Ordinance Requirements — Class A Special Use: in accordance with Section 5.9.6 (C) (2) Solar Arrays of the UDO, the project is required to demonstrate compliance with the following standards of evaluation: (a) All on -site utility and transmission lines shall, to the extent feasible, be placed underground. STAFF COMMENT. Based on language provided on the site plan the applicant is proposing to adhere to this requirement. (b) The height of proposed arrays and support structures shall not exceed 40 feet. STAFF COMMENT. Data on the submitted site plan, specifically the typical rack height elevation, indicates the height of the racks will be approximately 8 feet from ground elevation. No other support structures, other than utility poles, are proposed. (c) Individual arrays /solar panels shall be designed and located in order to prevent reflective glare toward any inhabited buildings on adjacent properties as well as adjacent street rights -of -way. STAFF COMMENT. Detail in the application narrative indicates the applicant will comply with this provision. (d) A clearly visible warning sign concerning voltage must be placed at the base of all pad- mounted transformers and substations. STAFF COMMENT. Note(s) on the site plan indicate warning signs shall be erected as required by the UDO. (e) All mechanical equipment of principal solar energy systems including any structure for batteries or storage cells, shall be completely enclosed by a minimum eight (8) foot high fence with a self - locking gate, and provided with screening in accordance with the provisions of Section 6.8. STAFF COMMENT. The site plan indicates the site shall be enclosed by a 8 foot high security fence and there will be screening around the eastern perimeter of the project (i.e. adjacent to residentially zoned property). As previously indicated a 50 foot wide buffer shall be preserved /installed along the eastern property line. (f) The applicant shall submit proof of liability insurance covering bodily injury and property damage demonstrating a minimum coverage limit of $ 500,000.00 per occurrence. STAFF COMMENT. The narrative provides language denoting the applicants compliance with this provision. (g) A Type D Land Use Buffer shall be provided along any portion of the perimeter of the parcel, easement, or leasehold area located adjacent to property zoned, or otherwise utilized for, residential use except where such property is owned, leased or consists of other utility easements currently used for electrical distribution or transmission purposes. Existing vegetation may be used to satisfy the landscaping requirements. STAFF COMMENT. The site plan indicates land use buffering requirements are met. A In reviewing the request with other County departments, the following comments have been received: 1. The Sheriff's Department has indicated the proposed development will not require existing patrol patterns to be altered. 2. EMS staff has indicated that Eno Volunteer Fire Department will provide fire services and that Orange County EMS will provide emergency medical services. They do not believe the request will create a service provision problem for them. 3. There are no septic or well systems proposed for the property. 4. The Planning Department and the Department of Environment, Agriculture, Parks, and Recreation ( DEAPR) staff has reviewed the proposal and determined the request, if approved, will have no significant impact to existing habitat area warranting special consideration or protection based on information contained within the Inventory of Natural Areas and Wildlife Habitats for Orange County North Carolina DEAPR staff has indicated there is a historically significant property immediately to the east of the project, specifically the Efland Home for Girls, built in the 1920s, at 201 Redman Road (PIN 9844 -17- 5959). The main school /residence hall building still stands and is largely intact. It does not presently have any special local, state or federal historic designation but has been flagged by the Orange County Historic Preservation Commission as being historic and potentially eligible for historic designation. DEAPR staff has further indicated the proposed 50 foot buffer ought to be sufficient to address any impacts and has expressed no concerns with respect to the project moving forward. (STAFF NOTE: The property is labeled on the vicinity map contained in Attachment 2). 5. Orange County Solid Waste has indicated the request, if approved, will not impact service provision to the surrounding area. 6. The project has been submitted to the State Clearinghouse for review. Based on these comments, staff has determined a formal Environmental Impact Statement is not required. Please refer to Attachment 3 for additional detail. Analysis: As required under Section 2.7.4 of the UDO, the Planning Director is required to: `cause an analysis to be made of the application' and pass that analysis on to the reviewing body. In analyzing this request, the Planning Director offers the following- 1 . The application has been deemed complete in accordance with the requirements of Section 2.7 of the UDO. 2. Staff has determined that the property is of sufficient size to allow for the development of the project. 3. The proposal is not expected to have a negative impact on existing development in the area. 4. The proposal appears consistent with the various goals outlined within the Comprehensive Plan concerning development, including: 7 a. Natural and Cultural Systems Goal 1: Energy conservation, sustainable use of non - polluting renewable energy resources, efficient use of non - renewable energy resources and clean air. b. Objective AE -15: Foster participation in green energy programs such as installation incentives for solar hot water /solar generation /solar tempering in residential or commercial construction. The County should develop programs that will link citizens and businesses with options for alternative and sustainable energy sources. c. Objective AG -8: Encourage the use and production of natural fuel alternatives to petroleum based products and pursue new types of energy sources. Notification Requirements: Per Sections 2.7.5 of the UDO, staff has caused a notice of this hearing to be published: `as least twice in a newspaper of public circulation in the County for two (2) successive weeks: ` no less than ten (10) days nor more than twenty -five (25) days' before the public hearing. On February 12, 2014 staff posted a sign on the property providing a notice of the date, time, and location of the public hearing. Staff also sent written notice by certified mail to all adjacent property owners located within 500 feet of the subject property as required by Section 2.7.5 of the UDO. This notice was sent on February 7, 2014 (see Attachment 4). FINANCIAL IMPACT: This request has been reviewed by various County departments who have determined that the approval or denial of the request would not create the need for additional funding for the provision of County services. RECOMMENDATION(S): The Planning Director recommends that the Board: 1. Receive the application, 2. Conduct the quasi-judicial Public Hearing and accept all evidence and sworn testimony as well as public, BOCC, and Planning Board comments. 3. Refer the matter to the Planning Board with a request that a recommendation be returned to the County Board of Commissioners in time for the May 8, 2014 BOCC regular meeting. 4. Adjourn the public hearing until May 8, 2014 in order to receive and accept the Planning Board's recommendation and any submitted written comments. Attachment 1 Orange County Plang n� and Inspections Department 1= APPLICATION FOR • CLASS A SPECIAL USE PERMIT APPLICANT INFORMATION: Date: Applicant: Stout Farm, LLC Phone: 919- 960 -6015 Address: 50101 Governors Drive, Suite 280 Cell Phone: Chapel Hill, NC 27517 E -mail: info @stratasolar.com Agent: Elizabeth C. Trahos, Attorney Phone; 919 - 755 -8760 Address: Smith Moore Leatherwood Cell Phone: 919 - 306 -1394 434 Fayettev' e Street, Suife 2800 Raleigh, NC 27601 E -mail: beth.trahos @smithmoorelaw.com Address of subject property: SR 1311, Mebane, NC 27302 Parcel Identification Number (PIN): 9844 -06 -5971 8c 9844 -17 -2687 Lot Size: 52.66 acres (both parcels) Zoning Designation: Residential -1 Watershed Overlay: Upper Eno Protected Other Overlay Zoning Districts: _ Request (include detailed description of proposed land use): See attached "Statement of justification in Support of the Special Use Permit Application." 0 SUBMITTAL INFORMATION Per Section 2.7.3 of the Unified Development Ordinance (UDO), all Class A Special Use Permit applications are required to submit the following: 1) 26 copies of a site plan prepared by a registered North Carolina land surveyor, landscape architect, architect, or engineer containing all required information detailed within Section 2.5 of the UDO. This site plan will also need to contain all relevant information demonstrating that the proposed special use compliance with all general and specific standards governing the proposed special use as detailed within Article(s) 5 and 6 of the UDO. 2) A detailed narrative outlining the proposed land use including operational requirements, the location of facility, appearance, etc., 3) Docu nentation establishing compliance with Section 5.3.2 inclusive of the UDO. 4) The names and addresses of the owners involved with the project, 5) A list of property owners within 500 feet of the subject parcel and the name and address of each property owner, as currently listed in the Orange County tax records, 6) Elevations of all structures proposed to be used in the development, 7) 26 copies of the Environmental Assessment and /or Environmental Impact Statement if required by Section 6.16 of the UDO, 8) Statement outlining the anticipated development schedule for the completion of the project, NOTE: It should be remembered that the review of all special use permit applications /modifications are carried out in a quasi-judicial format meaning that decisions relating to the approval or denial of an application are based solely on the sworn testimony of all parties involved with the case, both those for and against an application, as well as the review of competent material and substantial evidence submitted during the public hearing. Further the applicant has the burden of establishing, by the submission of competent material and substantial evidence, the existence of facts and conditions that demonstrate the projects compliance with the various requirements and standards detailed within the Unified Development Ordinance. I (we), the undersigned, have been made aware of-' the process for the review and action associated with a Class A Special Use Permit application and understand that only completed applications, containing all information required by the Orange County UDO shall be reviewed and acted upon by the County. I (we) understand that it shall be my (our) responsibility to present evidence to the County in the form of sworn testimony, exhibits, documents, models, plans, and the like support the request for approval of the Class A Special Use Permit. Further I (we) understand that any assistance I (we) may receive from County staff in preparing this application in no way guarantees a favorable recommendation by staff on the merits of this proposal nor does it guarantee an approval of the request by the County. —5 s Applicant Date: f _ Applicant Date: SUBMITTAL INFORMATION Per Section 2.7.3 of the Unified Development Ordinance (UDO), all Class A Special Use Permit applications are required to submit the following: 1) 26 copies of a site plan prepared by a registered North Carolina land surveyor, landscape architect, architect, or engineer containing all required information detailed within Section 2S of the UDO. This site plan will also geed to contain all relevant information demonstrating that the proposed special use compliance with all general and specific standards governing the proposed special use as detailed within Article(s) 5 and 6 of the MO. 2) A detailed narrative outlining the proposed land use including operational requirements, the location of facility, appearance, etc., 3) Documentation establishing compliance with Section 5.3.2 inclusive of the UDO. 4) The names and addresses of the owners involved with the pr(�ect, 5) A list of property owners within: 500 feet of the subject parcel and the name and address of each property owner, as currently listed in the Orange County tax records, 6) Elevations of all structures proposed to be used in the development, 7) 26 copies of the Environmental Assessment andtor Environmental hnpact Statement if required by Section 6_ t6 of the TJD0, 8) Statement outlining the anticipated development schedule for ibe completion of the project, ** NOTE: It should be remembered that the review of ail special use permit applirationsfmodittrations are carried out in a quasiyudiciat format meaning that decisions relating to the approval or denial of an application are bared solely on the sworn testimony of all patties involved with the case, both those for and against an application, as well as the review of competent material and substantial evidence submitted during the public hearing. Further the applicant has the burden of establishing, by the subntMon of competent material and substantial cvidence, the existence of facts and conditions that demonstrate the projects compliance with the various requirements and standards detailed within the Unifiled Development Ordinanee. ** I (we), the undersigned, have been made aware of the procxss for the review and action associated with a Class A Special Use Permit application and understand that only completed applications, containing all information required by the Orange County UDO shall be reviewed and acted upon by the County. I (we) understand that it shall be. niy (our) responsibility to present evidence to the County in the form of sworn testimony, exhibits, documents, models, plans, and the like support the recluest for approval of the Class A Special Use Permit, Further I (we) understand that any assistance I (we) may receive from County staff in preparing this application in no way guarantees a favorable recommenclation by staff on the merits of this proposal nor does it gtwantee an I cif a reytrest by the County. Applicant hare; Date- 10 SUBMITTAL INFORMATI; " Per Section 2.7.3 of the Unified D lopment Ordinance (UDO), all Class A Special Use Permit applications are required to submit the following: 1) 26 copies of a site plan prepared by a registered North Carolina land surveyor, Iandscape architect, architect, or engineer containing all required information detailed within Section 2.5 of the UDO. This site plan will also need to contain all relevant information demonstrating that the proposed special use compliance with all general and specific standards governing the proposed special use as detailed within Article(s) 5 and 6 of the UDO. 2) A detailed narrative outlining the proposed land use including operational requirements, the location of facility, appearance, etc., 3) Documentation establishing compliance with Section 5.3.2 inclusive of the UDO. 4) The names and addresses of the owners involved with the project, 5) A list of property owners within 500 feet of the subject parcel and the name and address of each property owner, as currently listed in the Orange County tax records, 6) Elevations of all structures proposed to be used in the development., 7) 26 copies of the Environmental Assessment and/or Environmental Impact Statement if required by Section 6.16 of the UDO, 8) Statement outlining the anticipated development schedule for the completion of the project, ** NOTE: It should be remembered that the review of all specW use permit applications /modifications are carried out in a quasi-judicial format meaning that decisions relating to the approval or denial of an application are based solely on the sworn testimony of all parties involved with the case, both those for and against an application, as well as the review of competent material and substantial evidence submitted during the public hearing. Further the applicant has the burden of establishing, by the submission of competent material and substantial evidence, the existence of facts and conditions that demonstrate the projects compliance with the various requirements and standards detailed within the Unified Development Ordinance. ** I (we), the undersigned, have been made aware of the process for the review and action associated with a Class A Special Use Permit application and understand that only completed applications, containing all information required by the Orange County UDO shall be reviewed and acted upon by the County. I (we) understand that it shall be my (our) responsibility to present evidence to the County in the form of sworn testimony, exhibits, documents, models, plans, and the like support the request for approval of the Class A Special Use Permit. Further I (we) understand that any assistance I (we) may receive from County staff in preparing this application in no way guarantees a favorable recommendation by staff on the merits of this proposal nor does it guarantee an approval of the request by the County. v cr Applicant Date: Applicant Date. 12 STATE OF NORTH CAROLINA BEFORE THE BOARD OF COMMISSIONERS AND PLANNING BOARD COUNTY OF ORANGE IN RE: Stout Farm, LLC, Solar Array — Public Utility Orange County PINs: 9844 -06 -5971 and 9844 -17 -2687 Address: SR 1311, Mebane, North Carolina STATEMENT OF JUSTIFICATION IN SUPPORT OF THE SPECIAL USE PERMIT APPLICATION NOW COMES THE PETITIONER, by and through counsel of record, and respectfully requests approval of their application for a special use permit to operate a solar array — public utility. In support of this request, Petitioner provides the following information: I. Introduction Stout Farm, LLC proposes to construct a solar array — public utility on 52.66± acres of land owned by David Stout, Sr. and Stephen Stout. The property is located just west of the Efland community off US 70W, with access from Redman Crossing Road onto SR 1311. This short section of state road provides access to the Stout properties and adjacent Redmanrhino property. The property is currently zoned Residential -1 (R -1) within the Upper Eno Protected Watershed Overlay District. Adjacent properties are developed as a single- family home, Duke Energy substation, and warehouse /light industrial. The site is bordered by the I- 40/I -85 Highway corridor to the south and on the north (on the other side of SR 1311) by the Norfolk Southern/North Carolina Railroad. Adjacent properties are also zoned R -1 and Economic Development Buckhorn Higher Intensity (EDB -2). The site on the Future Land Use Plan is designated as Commercial - Industrial Transition. An overarching theme of the Orange County Comprehensive Plan is a desire to create a sustainable future. In Chapter 1, the Plan Overview, the Orange County Comprehensive Plan states that "...we must seek to develop a community that meets the needs of the present generation without compromising the ability of future generations to meet their needs." This solar array — public utility fulfills the County's goal to reduce dependence on fossil fuels and nuclear power and turn to a sustainable form of energy generation. The solar array — public utility will contain rows of Photovoltaic (PV) cells mounted on posts set in the ground by hand. The posts are set individually in an effort to minimize the amount of grading on site. These rows of PV cells are referred to as "solar arrays." The solar arrays will be fixed in place facing south in order to receive the maximum amount of solar energy. This configuration contains no moving parts. The power generated from the solar array — public utility will be sold to Duke Power Company for 13 use by Orange County and consumers in place of power produced by non - sustainable means. II. Statement in Support of Application This Class A Special Use Permit application for a Solar Array - Public Utility meets all general standards for approval as required by Section 5.3.2 (A), and those specific standards required by Section 5.3.2 (B). This Statement addresses both general and specific standards as required by Orange County Ordinance. A. The use will maintain or promote the public health safety general welfare if located where proposed and developed and operated according to the plan as submitted The proposed solar array — public utility will not materially affect the public health or safety. Access to the site will be from unpaved Secondary Road 1311 to Redman Crossing Road, then onto US 70W. The site will generate virtually no traffic. The solar array — public utility will not be staffed daily. Employees are expected to visit the property weekly or less frequently to check and maintain the equipment, mow the grass and make repairs. Two gravel parking spaces will be provided for employee use. The active area of the solar array — public utility will be enclosed by an eight foot (8') high fence and gated for security purposes. Access codes to the gate will be provided to local police, fire, and emergency service providers. Vehicular access to the site is adequate for the use proposed and for emergency services. There will be no buildings or employees on the property so there is no need for sewage disposal facilities, solid waste, and water on the site. The proposed solar array — public utility will protect against soil erosion and sedimentation. Care is taken to minimize grading on the site by hand setting poles to support the solar cells. The areas beneath the solar panels will be planted with grass or alfalfa to stabilize the site. During construction, erosion control measures will be maintained in accordance with the County regulations and the site will comply with County stormwater regulations. All environmental buffers will be maintained and respected. B. The use will maintain and enhance the value of contiguous property (unless the use is a public necessity, in which case the use need not maintain or enhance the value of contiguous property). The proposed use will maintain and enhance the value of contiguous properties. A solar array — public utility is virtually silent. The solar arrays proposed have no moving parts. The only sound is the quiet hum of electrical transformers, invertors and substation that deliver the solar power to the power grid. Similar facilities are located in neighborhoods to deliver power to homes. At night, when the sun is not available, there is no energy being created and no noise on the site. Solar array — public utility generate far fewer 0 14 vehicles trips than one average single - family home. Employees visit the site once a week or even less frequently. Solar panels are designed to absorb light, rather than reflect it. Solar energy is a public necessity. Demand for electricity has increased in recent years and our society is dependent upon conventional sources of power such as coal, gas, nuclear and hydro energy. Conventional sources of electricity are expensive, finite resources that require significant environmental disruption and public safety risk to maintain or extract. Solar energy is a clean, cheap, unlimited resource with little environmental impact. The demand for power will not decline. We must embrace renewable means of power generation. C. The location and character of the use if developed according to the plan submitted will be in harmony with the area in which it is to be located and the use is in compliance with the plan for the physical development of the County as embodied in these regulations or in the Comprehensive Plan or portion thereof, adopted by the Board of County Commissioners. The proposed solar array — public utility is consistent with the land use pattern that exists in the area today. The site of the proposed solar array — public utility is bordered on the north by SR 1311 and the Railroad, and on the south by the I- 40/1 -85 Highway corridor. Located on the west side of the site is a Duke Energy substation, and Redmanrhino, a wood office and store fixture manufacturer. A single- family residence borders the site on the east; however, it is the only residential use close to the property. A Type D Land Use buffer will be provided in accordance with the Orange County Code. The proposed solar array — public utility is consistent with the Orange County Land Use Plan. Throughout the Orange County Land Use Plan references are made to the County's desire to encourage locally - generated alternative energy resources and to promote alternative and sustainable fuels. The Greenhouse Gas Emission Inventory and Reduction Action Plan initiated by Orange County in 2006 suggested that private alternative energy production be encouraged in the County. The Orange County Comprehensive Plan designates this as an area of Commercial- Industrial Transition. Allowing the subject property to develop as a solar array — public utility provides an opportunity for locally generated energy resources in Orange County and creates income for the property owners and tax base for the County. The proposed solar array — public utility will consume practically no county services: no seats in county schools or on school buses, virtually no refuse or recycling needs, no special sheriff protection, no light pollution, no emissions of any kind, no demand for water from depleted aquifers and no sewage disposal. D. The method and provision of sewage disposal facilities solid waste and water is adequate. This facility will be unmanned- there will be no space designed or utilized for human occupancy. Water and sewage disposal facilities are not necessary, and will not be 3 15 provided to the site. Solid waste disposal will be similarly unnecessary. Any refuse generated by landscape maintenance or facility repair will be removed from the site and disposed of by the professional service providers using approved and safe methods. E. Police, fire and rescue squad protection is sufficient to the site There will be little, if any demand for police fire or rescue squad protection at this location. The facility will be unmanned with no space designed or utilized for human occupancy. F. Vehicular access to the site and traffic condition around the site are acceptable The property is located just west of the Efland community off US 70W, with access from Redman Crossing Road onto SR 1311. This short section of state road provides access to the Stout properties and adjacent Redmanrhino property. The proposed Solar Array - Public Utility will generate less traffic than one (1) single family home after construction. G. The proposed Class A Special Use Permit is for a Solar Array - Public Utility subject to the requirements of Section 5.9.6 (C)(2 ) and 3) as follows: (a) All on -site utility and transmission lines shall to the extent feasible be placed underground. Utility and transmission lines shall be placed underground to the extent feasible. (b) The height of proposed arrays and support structures shall not exceed 40 feet. Arrays and support structures do not exceed forty feet (40') in height. (c) Individual arrays /solar panels shall be designed and located in order to prevent reflective Aare toward any inhabited buildings on adjacent properties as well as adjacent street rights -of -wax. Reflective glare is not ordinarily associated with solar panels. Solar panels absorb rather than reflect light. The Federal Aviation Administration has given permission for solar panels to be located at airports where reducing glare is of paramount importance. (d) A clearly visible warning sign concerning voltage must be placed at the base of all pad- mounted transformers and substations. The site will be appropriately signed. 11 16 (e) All mechanical equipment of principal solar energy systems including any structure for batteries or storage cells, shall be completely enclosed by a minimum eight (8) foot high fence with a self - locking gate, and provided with screening in accordance with the provisions of Section 6.8. The site will be enclosed in accordance with this section. (f) The applicant shall submit proof of liability insurance covering bodily injury and property damage demonstrating a minimum coverage limit of $ 500,000.00 per occurrence. Appropriate liability insurance will be provided for the site. (g) A Type D Land Use Buffer shall be provided along any portion of the perimeter of the parcel, easement, or leasehold area located adjacent to property zoned, or otherwise utilized for, residential use except where such property is owned, leased or consists of other utility easements currently used for electrical distribution or transmission purposes. Existing vegetation may be used to satisfy the landscaping requirements. A buffer meeting the Orange County Code, Unified Development Ordinance is shown on the associated site plan and will be maintained on the subject property. (h) Decommissioning The applicant and owners, as appropriate, agree to the following as conditions in case the utility is to be abandoned: (i) The owner /operator of the facility is required to notify the Orange County Planning Director in writing 60 days prior to the planned cessation or abandonment of the facility for any reason. This notice shall provide the exact date when the use of the facility will cease. (ii) Documentation shall be provided indicating that the public utility purchasing the power has been made aware of the decision. (iii) The facility shall be removed within 12 months from the date the applicant ceases use of the facility. (iv) Once the infrastructure is removed the property, the owner shall obtain the necessary Erosion Control permits to re- stabilize the property. The time frame for completion shall be determined by the Orange County Erosion Control Officer. 5 17 (v) The owner shall provide financial security in form and amount acceptable to the County to secure the expense of dismantling and removing said structures. (vi) Upon removal of the facility, the Department shall cause a notice to be recorded within the Orange County Registrar of Deeds office indicating that the Class A Special Use Permit has been revoked. Con im Application For Environmental Assessment Project Name: Stout Farm Solar Electric Power Plant Applicant: Stout Farm, LLC 50101 Governors Drive, Suite 280 Chapel Hill, NC 27517 Phone: (919) 960 -6015 Owner: David Stout Sr.; Stephen Stout Address: David Stout Sr.: 1513 Crepe Myrtle Dr. Sanford NC 27330 Stephen Stout: 1106 Lakeside Dr. NW Wilson, NC 27896 Phone: Location of Property: S.R. 1311 (Redman Road), Mebane, Orange County, NC Acreage: 25.87 Ac; 26.79 Ac Township: Cheeks Tax Map Reference: 3.31.B.5A PIN(s): 9844065971 3.31.B.5 9844172687 For Department Use Only Date Received: Reviewed by: Date Accepted /Rejected: Summary Comments: I. General Site Information: TO BE COMPLETED BY THE APPLICANT, WITH ASSISTANCE FROM PLANNING DEPARTMENT AS NEEDED A. Zoning and use of adjacent property: North: Rl ; Residential South: East: R1; Residential/ West: Wooded land C. Topography: Highest Elevation: 703 ft. ± Lowest Elevation: 660 ft. ± R1; Highway 85 N / 40 E R1 /EDB -2• Industrial/ Wooded land General Direction of Slope: South Estimated % of property with: 0 -5% Slope: 47% (0 to 3% Slopes - Per USDA Soils Map) 5 -15% Slope: 53% (2 to 6% Slopes — Per USDA Soils Map) 15 -25% Slope: 0% More than 25% Slope: 0% (Required only for the portion of the site associated with or impacted by the proposed activity) Drainage: Are there any streams or drainage easements located on the property? Yes, three jurisdictional streams (two perennial and one intermittent) are located on the southern and central portions of the site Wetland areas are located adjacent to the stream channels and drainage swales on site Is any of the site within a: Watersupply Watershed: Yes — Upper Eno Protected Water Quality Critical Area: No Floodplain: No Describe: 19 D. Does the property contain any of the following Inventory of Natural or Cultural Resources? (As identified in the "Inventory of Sites of Cultural, Historical, Recreational, Biological, and Geological Significance in the Unincorporated Portions of Orange County" or the "Inventory of Natural Areas and Wildlife Habitats of Orange County, North Carolina".) For each "yes" answer above, please indicate the location on site plan and complete the following, with the assistance of the Orange County Environmental Planner. Also complete Attachment A. 1. 2 Type of Resource: Inventory reference no. or page: Description of Resource: Type of Resource: Inventory reference no. or page: Description of Resource: (Attach additional sheets if needed) 20 Yes No 1. Cemeteries X 2. Archaeological sites X 3. Historic sites X 4. Areas of geological significance X 5. Designated natural areas X 6. Designated habitat X 7. Other X For each "yes" answer above, please indicate the location on site plan and complete the following, with the assistance of the Orange County Environmental Planner. Also complete Attachment A. 1. 2 Type of Resource: Inventory reference no. or page: Description of Resource: Type of Resource: Inventory reference no. or page: Description of Resource: (Attach additional sheets if needed) 20 21 I1. To Be Completed By Applicant: A. Project Description: 1. Describe proposed use of property: This project proposes the development of a solar electric power plant. The Stout Solar Farm is located on State Road 1311 (Redman Road) in Mebane, Orange County, North Carolina. The project site consists of two contiguous parcels. The property PINs are 9844065971 (25.87 acres) and 9844172687 (26.79 acres). The project area contains 52.66 acres of vacant wooded land. An industrial building and a Duke Energy sub - station are located along the western property boundary. An overhead power line easement is located on the southern and central portions of the site. The existing soils within the project site are Georgeville silt loam "GeB ", Herndon silt loam "HrB, Lignum silt loam "Lg ", and Orange silt loam "Or ". Most of the site (53 %) is in hydrologic soils group "B "; with the remaining being hydrologic soils group "D ". The site surface drainage flows generally south toward an unnamed tributary to Seven Mile Creek. Three jurisdictional streams (two perennial and one intermittent) are located on the southern and central portions of the site. Wetland areas are located adjacent to the stream channels and drainage swales on site. FIRM Panel 3720067400K indicates the project limits do not lie within a special flood hazard area. The site is located in the Neuse River basin. Project site Latitude and Longitude is 36.081677° and - 79.202115 °. The proposed solar farm will consist of fixed solar panels, dual inverter /transformer areas and a chain link fence along the perimeter of the array. The project will also include temporary laydown and parking areas, and a permanent driveway apron along State Road 1311. The installation of the solar panels themselves will not generally create significant land disturbance. The panels will be mounted to racks, which are supported by a series of posts. The posts will be driven directly into the existing ground without excavation or land disturbance and the existing ground cover will be allowed to remain to the extent possible. The project area true disturbance caused by rubber tire vehicles accessing the site to distribute and install above grade material, a dozen or so small trenches (2' wide, 36" deep) for wiring the array and rack posts mechanically driven directly into the ground, is typically about a third of the project limits. All areas downslope of disturbed areas will be protected by silt fence. No change in drainage patterns (site drainage remains as sheet flow) or ponding of water 22 will occur as a result of this project. At the completion of construction, the entire site will be seeded to create a good stand of grass. The typical construction schedule for these standard farms is limited to three months. Energy generated by the farm will be distributed to Duke Energy customers. 2. Number of lots: 3. Number of structures: 4. Estimated square footage of area to be graded for development of attached residential units (excluding roads, but including parking areas): 0 5. Estimated square footage of area to be graded for non - residential use (excluding roads) Approx. 3,270 sf (Inverter Pad areas) 0 Estimated area to be graded for roads 0 7. Road Type: Public N/A Private Class A N/A Class B N/A 8. Hours of operation for commercial or industrial use: The solar farm will operate year round and generate electricity during daylight hours. The facility will be monitored remotely. Security and minimum maintenance are the only periodic activities anticipated Daily operation does not require permanent on -site employees B. State Permits Required: 1. Does the project involve the mining of earth products? If so, how many cubic feet of material are expected to be excavated? No — N/A Has an application for a Mining Permit been submitted to NCDRCD? 23 Please attach map indicating expected extent of proposed activity. N/A 2. Does the project involve generation or storage of hazardous or toxic wastes, as identified by the Environmental Protection Agency? (A listing of all hazardous materials is available from the Planning Department) Describe the wastes to be generated. There will be no hazardous material stored or introduced on site. How much material is expected to be generated per month? N/A Will any material be treated onsite? Volume? Will any material be stored onside? Volume? No Where will disposal of the material take place? N/A How will materials be transported to the disposal site? N/A What measures are proposed to protect water quality and air quality in case of spills? 3. Will the project involve a land application system for treatment of wastewater? No wastewater treatment is proposed for this project. If yes, describe Has an application for a non - discharge permit been submitted to the NC 24 Department of Environmental Management or Orange County Department of Environmental Health? N/A 4. Is a septic tank system proposed which as a design capacity of more than 3000 gallons per day? If yes, describe No septic systems are proposed for this project. Has an application for a non - discharge permit been submitted to the NC Department of Environmental Management or Orange County Department of Environmental Health? N/A 5. Does the activity involve sludge disposal? No If yes, where is the source of the sludge? N/A Describe where and how the sludge is being disposed. Has a NPDES permit from the NC Division of Environmental Management been issued? N/A 6. Water Usage: N/A a. Estimated no. of employees x 25 gpd = gpd b. Estimated water use for climate control = gpd c. Process water: % consumed % discharged to septic system % discharged to surface (including storm sewers) (describe: ) % evaporated % reclaimed /reused % other 100% d. Water used for cooling, heating, etc., in association with production or manufacturing % reused % consumed % discharged (describe: 100% gpd Total Water Usage e. Describe source of water: N/A — No new water connections or changes are proposed with this project. 25 Sf Lvs6 Lp Bhf o6b 26 ATTACHEMENT A TO BE COMPLETED ONLY Ii+ INVENTORY SITES ARE IDENTIFIED IN I.E. 1. (ATTACH ADITIONAL SHEETS IF NECESSARY) a. Impact on Resource from Proposed Development b. Proposed Mitigation 2. a. Impact on Resource from Proposed Development b. Proposed Mitigation Strata Solar, LLC 27 50101 Governors Drive Suite 280 Chapel Hill, NC 27517 n Phone: 919.960.6015 SOLAR Fax: 919.960.7717 December 19, 2013 Statement of Anticipated Development of Stout Solar Farm Strata Solar, David Stout and Stephen Stout have applied for a Special Use Permit to develop a 5MW Solar Farm on 53 acres in Orange County. We understand that we may work through the approval process and potentially receive the Special Use Permit approval in May 2014. Based on an anticipated May, 2014 SUP approval date, Strata would schedule the start of construction in a @y — September, 2014 window, depending on construction drawing review and approval by Orange County. The construction and commissioning process is approximately 4 months in duration, and we would anticipate completion by the end of 2014. Should you have any questions please contact me. Respectfully, Louis A. Iannone Site Development 919 - 9602 -6015 ext. 305 919- 669 -0693 (cell) Liannone @stratasolar.com STRATA rFanwvrwsrarsrcnumxrzn, (1 op-5 J C) z .. ........ 0 O (00 w vi 1-13S T OU T ST., v. 5MMWAG BTN . Rw ....... PANIL—R REVISIONS SPECIAL USE SITE PL4N INVE11— ............ F-c IReturn to Agenda 28 - - - - -- zn6 Rix- - - - - -- soar e,muvaxAU .wny SOUTHEENRAIL ROAD wmxwmew, rzz 200'NM1V renwwvsemvxn x° / 11#4441x4411 'IH4c1a!,}zim# 1z4e1r1�w44, # ii# I# Hllii,; ,-. FpFF:Cfiw_ l » iyi n '1-1Hi—o iH'i11 � k1ii_� 4H11 11'�I AIIiRL}4uiBC11LA1I_ C 1l 1 1H HiOHT # H liDi1'Nl 4eH.b.RN l l Mf4 #O4S1HT iRHA RtlDMAN IH Hii�HIkMF+�M}NHi411 IH#44V✓- HIFi#- 4 GOAD T r ' s . ren°.w° _ -T vrzreo:en,e aaa, "1 ��S TRACT 2 L L — ewvazovnwPrtrn vrt, bd. �\ i 45E VarAV, sw [u[xhx �` Nm z° It �_a: 1 uequn °vsr zxr<nryr �i Y. L _ f f ,S S ccs caxxuucw neranrnr nom ry — scscw¢,xrs «r, nr ±`� % �y Pxxrx,ECa..r " Nos. c ^a' ob' " rvbD ab �I ry zns.zl o a m.mr zw,na x, Xaeacs vncwr �iiornm ua� NOTC9 VARIABLE — TtlN I fVURV L IC E V i ardrt ro,.,- a.lraw STRATA O LARUc �.� -;�r - -s /ry _ _ DES ° b[u vuvxxo rux,usmanv. rasw.w[�zemeros�xuum a�w Pr�iraen'a,axnt�ioswvsv ���� e o w rvnrec wraeex snrwmPvlsus rtsswtx, a,nxs rux 1\ - \ 6 - °.�� uawsosys,avuxrmam . n,cazm °arz°,oxrro,s. (;g \\� ;771 I1 1 ll III =J�71 I IF If=l I i I 'HII ut-7 ur �rau, Pux�u,.xss ec,.° ��rF,+xrw,a,yanxa xwra�.xn ° v I,, ii x' A ila �iililbl HLn 'lir 1. ',1.111, fI�H(luii I'1 '�g Luw°x ...,. t .,�xx °�,aa,a„ra°.n.,rrax °,.w•.rz F ',i �E� a ��„n0,P,�aLx.ar�```axr�a� wnx,rPw�n,cnEwx~„o \ �/\\ ,\`N��. e � n.xn. °axxa6m ,ry a��,n �, rrrEP, x, rn,. nEaPPnDVEDKrx�DTP�a.ox�xxn„a� :m J h Z Z z --A--, W W a w C) LLW d'5 W _{ \� \\ 1 ,�au.E\ xswxnrenxr wxue<wx, r,w,x nxnrwmnwxn,uurwn<a : s. ~ Z m �g T �� ..� \ s wzur+,mw srnmxsowcrwss>E. 00 a !h q -� Z -L / ')T \ wuva PUCtwaxPervw,ex,aecaa,rzexa w,entunu°xvanv,mnvwiwmenxwv. V) (n lOL _� ,� /` � _ snsnwrxs,¢ iartnsanxsxsxr, ,antvsx.u,as,zrnxcmaxswssicxuxss N x - -_S -L / j� 1 \ ° » a° urwrox ,easnxonevos„cewaesioeimuwsmcr. b°I°CUrcuvnax zcurzo DECEMBER19,M S G1- 11S1ODT n\ Z T ] X\ � � wz.,1.... ] \ usE xaaoEn STOItf 6.00 Mw-AC 7 l S 1= 2 r Z J _ _ L BTN L T S -= L ? � z, acceszenre BTN 1 r S _ - -- F/_ xv -] l EL LZ _ = S _LlR 2���L� S —J "S wmmso,e ewc P ED TNIEa� L ��� umua � L vrvExnv __ - -_ -_T N REVISIONS SPECIAL USE SITE PLAN Gr 996.'14 (TOTAL) 'a z 1" =100' � ,w zw In C 2.1 Return ta!Agenda 29 30 VICINITY MAP - STRATA SOLAR Attachment 2 CLASS A SPECIAI 11SF PFRMIT RFIF:-QT i �T RG B ® Red: Band-1 ® Green: Band-2 - Blue: Band-3 1 inch = 400 feet �"a c 0 5 Orange County Planning and Inspections Department 01/10/2014 Attachment _31 ORANGE COUNTY Department of Environment, Agriculture, Parks & Recreation 1/_•►_:�� Ill To: Michael Harvey, Current Planning Supervisor From: Peter Sandbeck, Cultural Resources Coordinator Rich Shaw, Land Conservation Manager Date: February 10, 2014 Re: Proposed 5- Kilowatt Plus Solar Generating Facility — Solar Strata Stout Farm (Redman Road / US 70W) Thank you the opportunity to review and comment on this application for constructing solar generating facilities. DEAPR comments on such developments are generally to address any concerns with respect to potential impacts on important natural or cultural resources. This application is for a five - megawatt plus solar facility on the Stout property, 52.66 acres (PIN 9844 -06 -5971 and PIN 9844 -17 -2687) off US 70W just west of the Efland community. Both parcels are zoned Rural Residential (R -1) Upper Eno Protected Watershed Overlay and Major Transportation Corridor (MTC) Overlay. The site is bordered by the I -40/85 highway corridor to the south and by Norfolk Southern /NC Railroad to the north (across SR 1311). Adjacent properties are a single - family home, Duke Energy substation, and warehouse /light industrial. Cultural Resources Review Comments_ The project site is immediately adjacent to an identified historic property, the Efland Home for Girls, built in the 1920s as the state's first centralized farm residency program for delinquent African American girls. It is located at 201 Redman Road, immediately to the east of PIN 9844 -17 -2687. The Efland Home consisted of a farm of 140 acres with a school /residence hall building, all built through funds raised by the North Carolina Federation of Colored Women's Clubs through statewide donations. The 1920's main school/ residence hall building still stands and is largely intact. It does not presently have any special local, state or federal historic designation but has been flagged by the Orange County Historic Preservation Commission as being historic and potentially eligible for historic designation, either local or via the National Register. Given the historical importance of this structure to the African - American history of the county and state, the site plan for the proposed new solar generating facility should include an appropriately designed and planted buffer, at least as wide as is currently shown on the site plan. The buffer should consist of dense evergreen vegetation tall enough to provide an appropriate level of visual screening. If properly screened, the project appears to be consistent with the historic preservation goals in the Orange County Comprehensive Plan, Goal 4: "Preservation of historic, cultural, architectural and archaeological resources, and their associated landscapes." Natural Resources Review Comments There are no known identified or mapped natural resource areas of significance (e.g., natural heritage sites, proposed wildlife corridors, prime forest) located on this property. There are two wetland areas and two streams documented on the property (Eno River tributaries), but the solar arrays are contained well outside of the 31 32 stream corridors. Therefore, the plan appears consistent with the County's desire to minimize adverse environmental impacts with respect to the protection of floodplains, wetlands, natural areas and wildlife habitat. The project is also consistent with policies in the Orange County Comprehensive Plan, such as the goal of "Energy conservation, sustainable use of non - polluting renewable energy resources, efficient use of non - renewable energy resources and clean air." [Natural and Cultural Systems Goal 1, Page 6 -34] and the County's objective of "Foster[ing] participation in green energy programs such as installation incentives for solar hot water /solar generation/ solar tempering in residential and commercial construction." [Objective AE -15] If you have questions please contact Peter at x -2517 or Rich at x -2514. 33 Michael Harvey From: Kevin Lindley Sent: Tuesday, February 11, 2014 11:19 AM To: Michael Harvey Subject: RE Review of proposed solar farm project off of Redman Road M ichael, I reviewed the submission and r o� Ohink there is anything in the plan that falls within my area. Thanksfor the opportunity to review. Regards, Kevi n 34 Michael Harvey From: Alan Clapp Sent: Monday, February 10, 2014 7:56 PM To: Michael Harvey Subject: RE request for comments- solar facility M ichael, SDrry to be late. Environmental Health has no issues since there is not a well or septic on the property. Alan Alan Capp Env. Health Director P 919 -245 -2360 F. 919- 644 -3006 35 Michael Harvey From: Wesley Poole Sent: Monday, February 10, 2014 6:51 PM To: Michael Harvey; Rich Shaw; Peter Sandbeck; Alan Clapp; Kevin Lindley; Jeff Scouten; Chuck Edwards (cnedwards@dot.state.nc.us); Steve J Kaltenbach; 'Jones, DeAngelo J (djjones1 @ncdot.gov); James Bryan Subject: RE Review of proposed solar farm project off of Redman Road Erosion Control / gormwater Division comments: The overall idea presented in the site plan appears acceptable, however I would like to point out the following concerns: The water features and associated stream buffers shown are 40f§ but not §§A' 04b the field visit by Orange County staff on September 20, 2013. Please verify the site plan accurately reflects the results of the Surface Water Identification. 2. With a proposed land disturbance in excessof 10,000 sf in the Upper Eno Protected Watershed, an Erosion Control Plan will need to be approved and a Land Disturbance Permit will need to be obtained from Orange County. Depending upon the proposed land clearing activities (conventional vs. non - conventional), temporary erosion control measures will be required onsite and since the project is in the Falls Lake Watershed, they will therefore need to be sized for the 25 year storm event. Please verify there is ample space for these temporary measures. 3. In regards to stormwater, there shall be no net increase in peak flow leaving the site from the pre - development conditions for the 1 -year, 24 -hour storm. Please verify there is ample space remaining in the event a post - construction BM Pis required to attenuate peak flow. 4. With a proposed land disturbance in excess of 12,000 sf in the Upper Eno Protected Watershed, a iormwater Management Plan will need to be approved by Orange County. Also keep in mind that the project is subject to new development stormwater regulations for the Falls Lake Watershed, so export limitations are 2.2 pounds/acre /year for nitrogen and 0.33 pounds/acre /year for phosphorus. Please verify there is ample space remaining in the event a post - construction BM Pis required to reduce nutrient loading. Thanks, Wesley Poole Orange County Planning & Inspections Dept. Erosion Control Division (919) 245 -2587 36 Attachment 4 ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director p�gt , Co6gfA Administration ® 131 W. Margaret Lane (919) 245 -2575 12 52 Suite 201 (919) 644 -3002 (FAX) P O Box 8181 www.co.orange.nc.us '`�h ca =� " °� Hillsborough, NC 27278 CERTIFICATION OF MAILING ZONING ATLAS AMENDMENT ORANGE COUNTY, NORTH CAROLINA I, Michael D. Harvey, Current Planning Supervisor with Orange County, North Carolina, DO HEREBY CERTIFY that in accordance with the provisions of Section 2.7.5 of the Orange County Unified Development Ordinance I have mailed, or have caused to be mailed, a Notice of Public Hearing to be held regarding the processing of a Class A Special Use Permit application submitted by Strata Solar and Stout Farms LLC proposing the development of a Solar Array /Public Utility Station on 2 parcels of property located off of Redman Road further identified utilizing the Orange County Parcel Identification Number(s) (PINs) 9844 -06 -5971 and 9844 -17 -2687. The owners were identified according to the Tax Records and as required by Section 2.8.7 of the Orange County Unified Development Ordinance. The mailed notice specified the date, time, place and subject of the Public Hearing. WITNESS my hand, this 12th day of February 2014. arvey, AICP Current Planning Supervisor 37 ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Current Planning (919) 245 -2575 (919) 644 -3002 (FAX) www.co.orange.nc.us 131 West Margaret Lane P O Box 8181 Hillsborough, North Carolina, 27278 February 7, 2014 Subject: REVIEW of a Class A Special Use Permit application submitted by Strata Solar and Stout Farm LLC to allow for the development of a Solar Array/Public Utility Station on 2 parcels of property located off of Redman Road (PINS 9844- 06- 5971 and 9844 -17- 2687). To Whom It May Concern: This letter is being sent to inform you that the Orange County Board of Commissioners and the Planning Board have scheduled a joint PUBLIC HEARING to review a Class A Special Use Permit request, submitted by Strata Solar and Stout Farms LLC (hereafter `the applicant') to allow for the development of of a Public Utility Redman Road between the Solar a railway and Interstate 85/40 in the totaling 52 acres in area of Cheeks Township. As detailed within the application, the applicants are proposing to erect individual solar array panels on the aforementioned parcels. A typical array is 7 to 10 feet in height, with approximately 2 to 5 feet of ground clearance, and 47 feet in length. The arrays shall be, screened by existing, and proposed, vegetation and a 6 foot high chain link security fence enclosing the perimeter of the actual leased site to prevent access. Vehicular access to the site shall be restricted by a 24 foot access gate off of Redman Road. The applicant is not proposing to develop a business or other similar office facilities on the property. As a result there is no septic or well system proposed, or required, as part of the proj ect. The properties in question are zoned Rural Residential (R -1), Upper Eno Protected Watershed Protection and Major Transportation Corridor (MTC) Overlay Districts and are located within the Commercial Industrial Transition Activity Node (CITAN) land use category as denoted on the Future Land Use Map of the Comprehensive Plan and the Urban Designated Area as denoted on the Growth Management System Map. As an adjacent property owner you have the right to address the Board(s) concerning this request. The meeting to review this case is scheduled for Monday February 24, 2014 at 7:00 p.m. in the Department of Social Services, Hillsborough Commons, 113 Mayo St., Hillsborough, North Carolina. . 38 It should be remembered that the review of all special use permit applications are carried out in a quasi-judicial format meaning that decisions relating to the approval or denial of a application are based solely on the sworn testimony of all parties involved with the case, both those for and against an application, as well as the review of competent material and substantial evidence submitted during the public hearing. While County regulations and State law do not require that parties be represented by an attorney, it may be in your best interests to secure legal council to represent your interests at the hearing. Further the applicant -has the burden of establishing, by the submission of competent material and substantial evidence, the existence of facts and conditions that demonstrate the projects compliance with the various requirements and standards detailed within the Unified Development Ordinance. Those opposing approval of the application shall have the burden of establishing, also through the submission of competent material and substantial evidence, the specific manner in which the proposal does not satisfy the requirements for approval of the application. As previously indicated, the Board shall render a decision only on the sworn testimony of all parties and on the competent material and substantial evidence submitted during the hearing. The fall text of the application and staff report for this item may be obtained no later than February 14, 2014 at the County website www.co.oran eg nc.us at the Meeting Agendas link. If you have any questions concerning this request, please contact staff at (919) 245 -2575. Sincerely, Michael D. Harvey, M, CZO Current Planning Supervisor Planner III Orange County VICINITY MAP - STRATA SOLAR s-I ./i1;e A1 . 1.feC_1'f.C.B11AiT.1]rA1.JC_c±T _ RGB ® Red: Band _1 - Green: Band _2 - Blue: Band —3 1 Inch = 400 feet Orange County Planning and Inspections Department 01/10/2014 we Aj FE'i Postage $ Certified Fee Return Receipt Fee j H Endorsement Required) Aaslrlcted Delivery Fee 'Erdorsament Required) x Tbtal Postage & Fees $ JAMES M ENGLISH ei 4914 US 70 W 9j, � P't �;f MEBANE, NC 273028548 struclions r- Er M .:I- C3 Return Receipt Fee Here '(�ddorsdrrent Requl ed)� '6Octe Ddvar" Fee .�;crn.n' red) R I 17-1 (E. Required) M ru Tot., Po-- M sent DAVID ENGLISH JR 5007 US 70 W 0 r, rPOB, MEBANE, NC 27302 ...... City Sia ilostal ServiceTI, ...Postal Service.,,, RTIFIED MAIL,,,, RECEiPT CERTIFIED MAILf.1 RECEIPT (Donlestic Mail Only; No Ins urance Coverage provided) ru Mail Only; No insurance coverage Provided) I — - — — . r-q cm!*1!11011�1 L) 3 0 F F P A L R j 9 Em Postage 117 a an r-3 Certified Fee lfed'Fd'e� F-3 Al. I (Endorsement macelpf Fee Postmark E3 Cl Postmark 11dorsement �equlrdd) 'F Ret rrjPecpfptFe8 6'N 1:3 'If' Here deft 'as Here (Endors rae RestdotedDeflVeryF\ [:3 pt quired) Fee [Endorsement Retquiredy- Restri 6'dbellt ry Feb E:3 (Endors ffibent,E equlred)- i. ru M -60c HAMONY HOMES 0 BARBARA JS DAVID R LLOYD E3 HILLSBOROU H LLC ... ------- ......... 117 REDMAN RD —Q0("j- 2202 SCHLE'Y-RD------' L Mebane, NC 27302 HURDLE MILLS, NC 27541 -Z Ili-( Postal Servicew U.S. Postal Servicew CERTIFIED MAILM RECEIPT CERTIFIED RECEIPT (Domestic Mail Only; No Insurance Coverage Provided) L fDomestic Mail Only; No Insurance Coverage Provided) E3 rD -IM-1-joll 1::' Postage Er Postage $ $'fled Fee Certified Fee Postmark Return R ace 1p' Fee e Return Rd;lpl Fee Here (Endor .'mb. .ule (E orsernentReTilred) Restricted Delivery Fee R strictedDalivery-9be (Endorsement Required) CP (En orsementRequiT) jr I Fit, ru t Post— P.F, X�7,o, a) A I -P ' ANDRA WATSON M 1--'MCCOYS TEMPLE UNITED HOLY 61 POWELL b I To I 1�1 rD 910 US 70 \& OCH INC ,,3 0 �.,3 E3 SC, EBANE, NC 273028548 P0 PO BOX 428 ---------- C Stal EFLAND, NC 27243 4\ (Domestic Mail Only, No insurance Coverage Providec For delivery : information visit our website at www.usps.coms, Er r- 6ti r� l3 Ir C3 Q O M 0 C3 m Iv rn to C3 C3 N ►u f� ,a LINDAT BAILEY 5012 US 70 tW ....:. MEBANE, NC 27302P :--:-.___.--: ..... u u u tt;'! u fols xt ::„7 \,4'J 4"d 111. C3 Ir Postag �1 Ca ca ! Cerllf1ed Fee ' E3 Postmark M set rt))lec iptFee ®' ' C3 (9ndorse OR uired) Here Rest le el ve Fee (Endorse egO'k m p� ('t,J TOtel Pnetana � ! M �l serit7 DAVID LEE UT SR co SiieeL 1513 CREPE MYRTLE DR (° orPO SANFORD, NC 273308251 city, r RJ Cergfle e S C3 Returim Receipt ee (Endorsement Requl ) rk t, P Here 0 i�r,,O�flvpty information visit our website at wm%f.usps.com2 0 Q Restridled Delivery Fee ( Endorsement Required) E3 m rJ ru 'r re! Dnefanc a oe $ to DUKE ENERGY CORPORATION C3 P 0 BOX 16909 r` CHAPEL HILL, NC 27516 _ S�`'r Certified Fee r T !nt DnelonnR Face .`h M C3 0 mfr << Er r- 6ti r� l3 Ir C3 Q O M 0 C3 m Iv rn to C3 C3 N ►u f� ,a LINDAT BAILEY 5012 US 70 tW ....:. MEBANE, NC 27302P :--:-.___.--: ..... u u u tt;'! u fols xt ::„7 \,4'J 4"d 111. C3 Ir Postag �1 Ca ca ! Cerllf1ed Fee ' E3 Postmark M set rt))lec iptFee ®' ' C3 (9ndorse OR uired) Here Rest le el ve Fee (Endorse egO'k m p� ('t,J TOtel Pnetana � ! M �l serit7 DAVID LEE UT SR co SiieeL 1513 CREPE MYRTLE DR (° orPO SANFORD, NC 273308251 city, r RJ •. ► • �. . . • . . •. C3 M i�r,,O�flvpty information visit our website at wm%f.usps.com2 0 Postage $ E3 Certified Fee rJ per-! Postage $ O Restricted Delivery Fee (EndorsementRequired) Certified Fee r T !nt DnelonnR Face .`h M C3 0 Return Receipt Fee ro DAVID B ALDERMAN HRS Postmark Here r3 (Endorsement Required) rL RALEIGH, NC 27602(�� 0 Restricted Delivery Fee 2 [f ` (Endorsement Required) O � Total P-1... R t=op. sent T( DEPARTMENT OF TRANSPORTATION to 331 W MAIN ST SUITE 100 orPOI DURHAM, NC 27701 i Al -g( t--- -, -_ -- c� °V! Postal CERTIFIED MAIL,,,, RECEIPT n .. ° Ll a t C3 a Postage $ L Certified Fee C3 0 Return Receipt Fee Postm Her C3 (Endorsement Requlred) I`ri Here Q Restricted Delivery Fee M (Endorsement Required) M f rLl Total Postage & Fees M go 0 0 f, DAVID ENGLISH JR HELEN B ENGLISH 5008 US 70 W MEBANE, NC 27302 (Domestic . .• 0 Postage $ E3 Certified Fee rJ Return Receipt Fee (Endorsement Required) Aoslmar ore "� O Restricted Delivery Fee (EndorsementRequired) ru r T !nt DnelonnR Face .`h M ro DAVID B ALDERMAN HRS C3 . PO BOX 1776 rL RALEIGH, NC 27602(�� .........: .:. 2 [f ` 42 ul ra a Postal ""CERTIFIED MAIL,, RECIEWT .. .. . C3 Q- Postage a- Postage $ t o P e C3 0 Q Return Receipt Fee (Endorsement Required) Restricted Delivery Fee Er Certified Fee �r , Ca C7 Return Receipt Fee . ). _N 'i'j'}, d Postmark Here O (Endorsement Required) E3 Restricted Delivery ;ea (Endorsement Requi d) ' C3 �lestricted Delivery Fee M Total P--Qt.. R Fina 1-C �.•.,�_. r (Endorsement Required) Gl rn M - CURTIS D WATSON Slre4 rU Total P-1— M STEPHEN EARLY STOUT I 0 1106 LAKESIDE DR NW - -• rC' , WILSON, NC 275961657° 7— r-R m r-a Ln .11 0 tr 0 0 0 0 0 0 M ru m ro E3 0 N m r� 0 ca rr 13 O O Cn m ru m ra Q 0 r� -' m rq _- 0 Ir 0 1— ESTELLE MCADOO 669 MACON ST. BROOKLYN, NY 11233 .St,, I}' �Ir�f ipr Inslr4lctlons M - N Total Posit, —a is rn seri —To SIMPSON EFLAND HRS ���► co • n srre�r,; "q 4918 ANDREA AVE Cam` orPOf3t ANNANDALE, VA 22003 City S'fai ru Postal ""CERTIFIED MAIL,, RECIEWT .. .. . C3 Q- Postage O / ti Ov Cenitled Fee t P e C3 0 Q Return Receipt Fee (Endorsement Required) Restricted Delivery Fee Er Poste $ �r Certified ea [7 Total Postage & Foac - _N 'i'j'}, C1 Return Receipt Fee `� a, (Endorsement Requ red) fT ostmark Here E3 Restricted Delivery ;ea (Endorsement Requi d) ' E3 M Total P--Qt.. R Fina 1-C �.•.,�_. r S ent DW SANDRA W P LL ET M - CURTIS D WATSON Slre4 M afPC 4910 US 70 W cityr MEBANE, NC273028548 r r m r� 0 ca rr 13 O O Cn m ru m ra Q 0 r� -' m rq _- 0 Ir 0 1— ESTELLE MCADOO 669 MACON ST. BROOKLYN, NY 11233 .St,, I}' �Ir�f ipr Inslr4lctlons M - N Total Posit, —a is rn seri —To SIMPSON EFLAND HRS ���► co • n srre�r,; "q 4918 ANDREA AVE Cam` orPOf3t ANNANDALE, VA 22003 City S'fai ru Postal ""CERTIFIED MAIL,, RECIEWT .. .. . C3 Q- Postage O / ti Ov Cenitled Fee t P e C3 0 Q Return Receipt Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) P M rU Total Postage & Foac - _N 'i'j'}, M CAROL WONETTA SHEPARD ETAL a_- o VALDES SNIPES SHEPARD .:. ........:. 400 DANTON DR CARY, NC 275119089 1t y U.S. Postal ServiceTh, CERTIFIED MAILm RECEIPT (Domestic Mail onty, No insurance Coverage Provided) For delivery information visit our website at,www.usps.comv 1 ' o i EVA TATE R ' C/O CARL BENNETfj� 9805 HUXLEY DR LANHAM, MD 20706�� j I j ( Endorsement he u,re6) I J / U i . 200 REDMAN CROSSING fur .____•___.____.. , NC 27302 -z i 1 - - - - -- Postal Service,,,, RTIFIFI7 MAIL., RECEIPT r-9 _I- I r-� ,S, - (`` j jjjj ��' ' F, F �] U (0) (1•''i� Er tr Postag $ 0 Certified se C3 O Return Receipt Be t oslmerk 0 (Endorsement Requ ed) sr 0 Restricted Delivery Be (Endorsement Requ( d) O rLl m MEIMII CURHAkhfl7p� p 1�\ 4812 US 701N 1W ° MEBANE, NC 27302 Ln .n 0 Er 0 0 0 0 C3 (Endorsement R�gfr�edl E3 r m W Tote' m ^ - -- • ° -- sent MARY E GRANT E3 sere 201 REDMAN CROSSING 1..........�. r� °rf ! EFLAND, NC 27243 i _a Ir _13 I - 0 Ir 0 Ce M Return R 0 (Endorsement 0 Restricted Di (Endorsement m Total Posta ru m .. ORANGE COON I Y 0 PO BOX 8181 r0- HILLSBOROUGH, NC 27278 C" 0 7-a1A- 1 i w 1 1 i 44 PIN OWNERI LAST OWNERI_FIRST OWNER2_LAST 9834991049 HARMONY HOMES OF HILLSBOROUGH LLC 9844085877 BAILEY LINDA T 9844087922 ENGLISH DAVID JR ENGLISH 9844180866 ENGLISH JAMES M 9844090010 MITCHELL VALGENE S MITCHELL 9844083922 MCCOYS TEMPLE UNITED HOLY CHURCH INC 9844088875 ENGLISH DAVID JR 9844182862 POWELL SANDRA WATSON 9844181838 POWELL SANDRA W ETAL WATSON 9844172687 STOUT STEPHEN EARLY 9844065971 STOUT DAVID LEE SR 9834977555 REDMANRHINO LLC 9844071440 DUKE ENERGY CORPORATION 9844073762 ALDERMAN DAVID B HRS 9844076833 DEPARTMENT OF TRANSPORTATION 9844157438 ORANGE COUNTY 9844065557 DEPARTMENT OF TRANSPORTATION 9844057652 COUNTY OF ORANGE 9844183748STARBUCK BARBARAJ LLOYD 9834987376 REDMANRHINO ILLC 45 OWN ER2_RRSf ADDFESS1 ADDRESS? CITY STATE 23POODE 2202 SCHLEY RD HURDLE M I LLS NC 27541 5012 US70 M SANE NC 27302 HELEN B 5008 US70 W M SANE NC 27302 4914 US70 W M SANE NC 273028548 CHAR ESSR 400 DANTON DR CARP NC 275119089 PO BOX 428 EFLAN D NC 27243 5007 US70 W M SANE NC 27302 4910 US70 W M SANE NC 273028548 CURTISD 4910 US70 W null M SANE NC 273028548 1106 LAI4B DE DR NW WI LSDN NC 278961657 1513 CF;EPEMYRTLE DR S4NFORD NC 273308251 200 FPM AN CFOS9NG M SANE NC 27302 P O BOX 16909 CHAPEL HI LL NC 27516 PO BOX 1776 RALEIGH NC 27602 331 WMAINSTSJITE100 DUFH NA NC 27701 PO BOX 8181 HILLSBOROUGH NC 27278 331 W M AI N ST SJI TE 100 DUFF - AM NC 27701 PO BOX 8181 HILLSBOROUGH NC 27278 DAM D R 117 FEDMAN RD null M ebane NC 27302 200 FPM AN NG I I M SANE INC 1 27302 m •;.. 1: r r •;•• I :1 :..: ITF7 •;• I F--w MI.- 9 I•• a •:••1: • 0 • • -• •:••1::: F. ITF7 EMMMM me im-M •:� I I ff I : •'T r •• •:, I row . •• • •-� r 47 OWN EFZ2_RRST ADDREM ADDRESS? CITY STATE 23PCODE 5012 US70 M EBANE NC 27302 HELEN B 5008 US70 W M EBANE NC 27302 4914 US70 W M EBANE NC 273028548 669 M ACON ST BR0014YN NY 11233 PO BOX 428 EFLAN D NC 27243 5007 US70 W M EBANE NC 27302 4910 US70 W M EBANE NC 273028548 CURTISD 4910 US70 W null M EBANE NC 273028548 VALDE58VIPES 400 DANTON DR CARY NC 275119089 null 4812 US70 W null M EBANE NC 27302 null 201 F�EDMAN LNG null ERAND NC 27243 4918 ANDRFAAVE ANNANDALE VA 22003 1106 LAI4B DE DR NW WI LSDN NC 278961657 1513 CF;EPE M YRTLE DR S4NF ORD NC 273308251 331 W M AI N ST SATE 100 DURI -WM NC 27701 PO BOX 8181 HI L1XOR000H NC 27278 331 W M AI N ST SATE 100 DURI -WM NC 27701 4918 ANDRFAAVE ANNANDALE VA 22003 PO BOX 8181 HI L1XOR000H NC 27278 DAM D R 117 F�EDMAN RD null M ebane TZ NC 27302 null 9805 HUXLEY DR G O CARL BENNETT LANHAM JIVID 20706 I " ""0 j wt % ve % se, % 1W (0/22 Voll/t/11I.J; 4� //o/O Ik " '///01501 /71 ilm"Of /r A/00/l/