Loading...
HomeMy WebLinkAbout2014-101 Planning - J. F. Wilkerson Contracting Co., Inc. for Buckhorn Mebane Utilities Phase 2 Change Order #1 ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Administration (919) 245-2575 131 W. Margaret Ln. (919) 644-3002 (FAX) 52 P. O. Box 8181 www.co.orange.nc.us Hillsborough, NC 27278 6°t° 0h: a aw MEMORANDUM To: Michael Talbert, Interim County Manager Through: Craig Benedict, Planning Director Ok From: Kevin Lindley, PE, Staff Engineer -' L- 1� Date: December 31, 2013 RE: Buckhorn Mebane Phase 2 Utility Project Change Order#1 This change order to the project is mainly due to some unexpected underground utility issues encountered in the early stages of the project. The change order represents no net change in the contract price, even though there were costs and extra work involved. The costs of the change order have been taken from Line 1.60 of the contract pay application, which is the water line rock contingency. The remaining amount in this line item should be sufficient to cover any additional rock excavation on the remaining 25-30% of the water line construction. To summarize: Original Contract Price: $490169545.74 - Original rock contingency for water line: $ 67,500.00 (included) CO#1 $ 151,328.00 - Extra work to avoid an unmarked 16" force main - Reroute a 4" water main - Delays due to easement dispute - Revised rock contingency for water line: $ 52,172.00 Net Contract Price Change: $ 0.00 Revised Contract Price after Change Order: $490169545.74 The project start date was 4/16/2013. Based on the original schedule the allowed substantial completion date would have been 4/16/2014, or 365 days. This change order requests an additional 57 days due to delays in obtaining easements and the time to complete the extra work. The addition of 57 days will extend the contractually allowed substantial completion date to 6/12/2014. Please call or email with any questions. Change Order No. 1 Date of Issuance: 8-23-13 Effective Date: August 23,2013 Project:Buckhorn-Mebane EDD Water and owner: Orange County Owner's Contract No.: Sewer Improvements Contract: Date of Contract: contractor JF Wilkerson Contracting Co., Inc. Engineer's Project No.: OC1001 The Contract Documents are modified as follows upon execution of this Change Order: Description: Additional day for easement delays, Working around an existing 16"force main. Delay in clearing due to obtaining an easement,and conflict of an existing 4"water line and the new 16"water main. The cost value of this change order is$15,328, the amount was deducted from the line 1.60 of the contract. All quantities will be balanced on the final adjusting change order. Attachments: (List documents supporting change): See supporting information in attachment CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days X Calendar days Substantial completion(days or date):355 $4,016,545.74 Ready for final payment(days or date):395 [Increase][Decrease]from previously approved Change [Increase][Decrease] from previously approved Change Orders Orders No. to No. No. to No. Substantial completion(days):365 $0.00 Ready for final payment(days):395 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or date):365 $4,016.545.74 Ready for final payment(days or date):395 Increase [Decrease]of this Change Order: rincrease [Decrease]of this Change Order: Substantial completion(days or date):57 $0.00 Ready for final payment(days or date):57 Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion(days or date):422 $4016,545.74 Ready for final payment(days or date):452 RECOMM DE ' ACCEPT CCEPTED: By: By. Engineer(Authorized Signature) Owner( oriz igna re) Conoctor Authorized Signature) Date: �2 // Date: / Date: Approved by Funding Agency(if applicable): Date: EJCDC No.C-941(2002 Edition) Page 1 of 2 Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. Change Order Instructions A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. EJCDC No.C-941(2002 Edition) Page 2 of 2 Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. Buckhorn-Mebane EDD Phase 2 Water&Sewer Improvements H Wilkerson Contracting Co.,Inc. Change Order#1-Summary of Changes v Line Item Additions and Deletions CO-1 :Additional Days for easement delays €Additional work performed to work around 16"forcemain 0 0 1.00 1.00 LS : $9,959.00 :Delays in clearing do to obtaining an easement 0 0 1.00 1.00 LS $1,961.00 :Conflict of an existing 4"waterline and the new 16"water main 0 0 1.00 1.00 LS : $3,408.00 $15,328.00 Subtotal $15,328.00 Summary of Change Orders CO#1 Page 1 of 1 -JFWILKERSON CONTRACTING CO., INC. June 7, 2013 Robert Bernard Hobbs Upchurch Associates 300 SW Broad Street Southern Pines,NC 28387 RE: Buckhorn-Mebane EDD Phase 2 Water and Sewer Improvements Dear Mr. Bernard: We are requesting a time extension on the subject project for delays associated with Orange County obtaining all easements on the project. We currently do not have access to the entire project due to outstanding easement issues between Orange County and local property owners. Based on the purchase order date of 4/16/13 being the project start we are currently requesting a 52 day time extension. Once all easements are procured we will request additional time for the additional easement delays. If you have any questions or concerns please contact me at 422-0570. Sincerely, r Brian Wilkerson Vice President Ei07UG N P.O. Box 183 • Morrisville,NC 27560 • (919) 467-1829 • Fax (919) 467-6269 Scottie Scott From: Wilkerson (wilkersoncontracting @ yahoo.com] Sent: Monday, July 08, 2013 3:09 PM To: Scottie Scott Subject: Buckhorn-Mebane EDD Attachments: Buckhorn CO 1.doc Buckhorn CO l.doc (28 KB) Scottie, Please see the attached change order request for extra work associated with the discovery of a 16" force main in close proximity to the existing Man Hole 26 near the Mebane - Alamance County lift station. The additional compensation request is for 2 additional days spent working under and around the force main as explained on the request. Note: The force main is not shown on the bid plan or the construction plan, and was not mentioned at the pre construction meeting or progress meeting. Respectfully, Michael R. Coates Safety / Project Manager J.F. Wilkerson Contracting cell: 919-464-1708 wilkersoncontracting @yahoo.com I 1 J.F. Wilkerson Contracting Co., Inc. PO Box 183 Morrisville, NC 27560 CHANGE ORDER REQUEST Engineer: Hobbs Upchurch Associates Owner: Orange County Contractor: J.F. Wilkerson Job: Buckhorn—Mebane EDD Phase 2 Project Manager: Michael Coates Description of extra work/materials: On Tuesday June 25, 2013 Wilkerson crew encountered a 16"DIP force main on two sides of Man Hole 26 (existing) located near the Mebane lift station in Alamance County. The Force main is not shown on the bid plans, nor the construction plans. Change order request is for extra work,materials, and time lost due to excavating under and around the force main located in very close proximity to existing Man Hole#26. Tuesday June 25: Found the 16"Force Main 5 feet south& 5 feet east of MH 26 Wednesday June 26: Transport additional trench box,pumps, generator, stone to site. Penhall Core 24"hole in MH 26, extra time and up charge for working in cramped area between 167M and MH 26. Thursday June 27: Additional day spent excavating under force main,pumps, etc. Friday June 28: Lay one joint 18"DIP sewer under the 16"force main through the two trench boxes/ shields Equipment& Materials: Excavator: Cat 330 or equal @$700 per day(2 days) 1400 Loader: Cat 928 or equal @$300 per day(2 days) 600 Rammax: $85 per day(2 days) 170 Truck and trailer: $150 per day(1 day) 150 Pickup for crew: $75 per day(2 days) 150 Tool trailer: $150 per day(2 days) 300 Electric pump &25 KW generator(4 days inc. weekend) $150 per day 600 Stone: 40 tons approx. #57 washed stone a,$30 per ton 1200 Total Equipment& materials: $4570 Labor: Project Manager on site: 2 additional days 1000 Project Manager weekend: 1/2 additional day @ $500 250 Penhall extra charge for time and cramped area between MH 26 & 16"FM TBD Truck driver: 8 additional hours @$25 200 Foreman with 4 man crew: 16 additional regular time hours A $165 2,640 Total labor: $4,090 Total equipment,materials, and labor: 8,660 15%Fee 1,299 Total additional compensation request: $9,959 J.F. Wilkerson Contracting Co., Inc. PO Box 183 Morrisville, NC 27560 CHANGE ORDER REQUEST Engineer: Hobbs Upchurch Associates Owner: Orange County Contractor: J.F. Wilkerson Job: Buckhorn—Mebane EDD Phase 2 Project Manager: Michael Coates Request number: 3 Date: August 7, 2013 Description of extra work: Wilkerson crew has encountered a 4 inch waterline (shown 2") at the bore pit area at Buckhorn Rd. The existing waterline is shown to be 18 inches above the new 16" DIP. However, the actual site condition is that the existing 4 inch PVC waterline is on the same grade as the new 16" waterline. Wilkerson crew has installed a by- pass system (in place 8/6/13) for the existing 4" line during construction. The existing 4" line will need to be lowered by the use of 4 - 45 degree bends with concrete blocking to accommodate the new 16" DIP line under construction. Request for compensation: Labor Boring crew: Foreman, welder, pipelayer, two laborers. 8 Hours @ $163 1,304 EquiRment Cat 330 Excavator Daily cost $540 540 Cat 420 Backhoe Daily cost$195 195 Rammax tamper Daily cost $105 105 Trucks, supplies Daily cost $120 120 Materials PVC 4" assume 2010 Joint @ $151f. 300 45 degree bends 4@ $25 100 Concrete assume 2 cu. Yd 150 300 Total of all labor, equipment,and materials $2,964 15% Overhead/profit allowed -444 Total Change Order this request $3,408 Request for additional Days: 1 day Scottie Scott From: Wilkerson [wilkersoncontracting @yahoo.com] Sent: Thursday, July 11, 2013 2'42 PM To: Scottie Scott Subject: Project delay and Change order2 request Attachments: Buckhorn CO 2.doc; ATT00074.txt J Buckhorn CO 2.doc ATT00074.bct(190 (23 KB) B) Scottie, The JF Wilkerson clearing crew has encountered a delay and added expense on sewer line S-3, near Man Hole 57 - 61. On July 9, 2013 Mr. Blaine Pope stopped the clearing crew from crossing his property, or his brother Michael Pope's property. I discussed the delay and problem with Kevin Lindley at Orange County, and these landowners have historically been very difficult to deal with. The County has condemned these properties, and apparently, the brothers have not or will not sign the required documents and pick up their payment for the easement. Please see the attached change order request for moving in and out due to the unforeseen delay. Wilkerson also request additional days added to the contract from July 9 to whenever the issue is resolved and crews can resume clearing. Thanks, Mike 1 J.F. Wilkerson Contracting Co., Inc. PO Box 183 Morrisville, NC 27560 CHANGE ORDER REQUEST Engineer: Hobbs Upchurch Associates Owner: Orange County Contractor: J.F. Wilkerson Job: Buckhorn—Mebane EDD Phase 2 Project Manager: Michael Coates Request number 2 Date: July 11, 2011 Description of extra work/materials: July 9, 2013 Move in equipment off Bowman Road near Man Hole 57 - 61 July 10, 2013 Move out equipment off Bowman Road same location Equipment& Materials: Excavator: Hitachi 350 with Denis Grinder Head 4 hours @$200/hour 800 LoBoy Truck and trailer: 4 hours @$150 per hour 600 Picku p for crew: $75 per day(1 day) 75 Total Equipment& materials: $1475 Labor: Project Manager on site: 1/2 day @1000 500 Truck driver: 4 additional hours @ $65 260 Foreman with 1 man crew: 4 additional regular time hours A $85 340 Total labor: $1,100 Total equipment,materials, and labor: 2,575 15%Fee 386 Total additional compensation request: $29961 Discount agreed upon by Wilkerson and Engineer (1,000) New Total compensation request: $1,961 Total additional days requested added to the contract: 2 days