Loading...
HomeMy WebLinkAboutRES-2013-101 Resolution Endorsing Priority Transportation Projects for DCHC MPO Regional Priority List for 2016-2022 Transportation Improvement Program e9 - _z RES-2013-101 ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS A RESOLUTION ENDORSING ORANGE COUNTY'S PRIORITY TRANSPORTATION PROJECTS FOR THE DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHC MPO) REGIONAL PRIORITY LIST FOR THE 2016 — 2022 TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide Transportation Improvement Program (STIP) that identifies transportation projects to be implemented over the next seven years with State and Federal funding; and WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and regional importance to be included in the FY 2016-2022 STIP; and WHEREAS, the DCHC MPO Transportation Advisory Committee is charged with the development of a regional priority list and Metropolitan Transportation Improvement Program (MTIP); and WHEREAS, Orange County is a member jurisdiction of the DCHC MPO; and WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to transportation projects that encourage alternatives to automobile travel, to projects that minimize adverse impacts on the natural environment and cultural sites, and to those projects that foster economic development in the County's designated Economic Development Districts; and WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation (NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of transportation that may result in reduced automobile traffic and related air and water impacts; and WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along any existing or planned trail-system connectors; and WHEREAS, Orange County has outlined its transportation needs within the DCHC MPO planning area in an attachment to this resolution; NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the Board endorses the following prioritized list of transportation projects to be considered for the FY 2016-2022 DCHC MPO regional priority list and MTIP, and the Board may reprioritize the following list of transportation projects as more information becomes available in the following months. 1 Orange Grove Road/1-40 Pedestrian Bridge: Construct a pedestrian bridge over 1-40 alongside Orange Grove Road (SR 1006), construct a sidewalk along the north side of Orange Grove Road (SR 1006) from the pedestrian bridge to Timbers Drive, construct sidewalks along both sides of New Grady Brown School Road with a midblock crossing, and construct a sidewalk along one side of Oakdale Drive from Cheshire Drive to Orange Grove Road. This project will be submitted as a new pedestrian project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The project will be submitted as a Safe Routes to School (SRTS)-eligible project; however, if it is not funded as an SRTS project, the County will be required to commit a 20% local match. 2 Orange Public Transportation Expansion Vehicles: Request/purchase up to six (6), 25-foot, 18-passenger cutaway bus vehicles to accommodate bus service expansion as recommended in the Orange County Bus and Rail Investment Plan (OCBRIP) and the draft Five-Year Orange County Bus Service Expansion Program currently under development. This project will be submitted as a new transit project to be considered for inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The project will also be submitted for consideration of Surface Transportation Program-Direct Apportionment (STP-DA) funding to be determined internally by the MPO. 3 Park-and-Ride Improvements in Efland (Conceptual): Implement park-and-ride improvements in the Efland area for cross-county, fixed-route service between Mebane and Durham. This project will be submitted as a new transit project to the DCHC MPO for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The project will also be submitted for consideration of STP-DA funding to be determined internally by the MPO. 4 Orange High School Road/Harold Latta Road Sidewalk Improvements: Construct a sidewalk along the west side of Orange High School Road from Harold Latta Road to U.S. 70, construct a sidewalk along the south side of Harold Latta Road from Cloverfield Drive to Orange Grove Road, install high visibility crosswalks and in-road signage at school entrances and exits on Orange Grove Road, and construct a sidewalk along entrance roads to CW Stanford Middle School. This project will be submitted as a new pedestrian project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The project will be submitted as a Safe Routes to School (SRTS)-eligible project; however, if it is not funded as an SRTS project, the County will be required to commit a 20% local match. 5 South Churton Street (Old NC 86) Improvements: Widen South Churton Street (SR 1009) from 1-40 to U.S. 70 Business to multiple lanes with congestion management, limited access, bicycle and pedestrian, and aesthetic improvements. This project will be submitted as a reprioritized highway project to be considered for inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 6 U.S. 70 East/1-85 Connector: Modify the 1-85 Connector (SR 1239) interchange at U.S. 70 to provide access from all directions. This project will be submitted as a reprioritized highway project to be considered for inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 7 Orange Grove Road Extension: Extend Orange Grove Road (SR 1006) from the east side of South Churton Street (SR 1009) to U.S. 70 Business. This project will be submitted as a reprioritized highway project to be considered for inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 8 NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC 57 to four(4) lanes with intersection improvements at U.S. 70 Bypass and NC 57. This project will be submitted as a reprioritized highway project to be considered for inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 9 Park-and-Ride Improvements in Hillsborough (Conceptual): Implement park-and-ride vic improvements in Hillsborough for cross-county, fixed-route sere between Mebane and Durham. This project will be submitted as a new transit project to the DCHC MPO for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The project's official submission must be made by Triangle Transit. 10 Hillsborough Train Station: Construct a train station in Hillsborough and implement AMTRAK service. This project will be submitted as a new transit/rail project by Triangle Transit for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 11 Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) and make safety improvements. This project will be submitted as a reprioritized highway project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 12 Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor where they do not exist. This project will be submitted as a reprioritized highway project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 13 Buckhorn Economic Development District (EDD) Park-and-Ride: Construct a park-and-ride facility to be located in the 1-85/Buckhorn Road EDD. This project will be submitted as a new transit project by Triangle Transit or the Piedmont Authority for Regional Transportation (PART) for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 14 1-40 Widening: Widen 1-40 from four (4) lanes to six (6) lanes from the 1-40/1-85 interchange to the Durham County line. This project will be submitted as a reprioritized highway project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 15 1-85 Widening: Widen 1-85 from four (4) lanes to six (6) lanes from the 1-40/1-85 interchange to the Durham County line. This project will be submitted as a reprioritized highway project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. 16 Trail Connection from Patriot's Pointe to Timbers Drive: Construct a multi-use path connecting the southwest corner of Patriots Pointe to Timbers Drive to shorten walking distances for pedestrians. This project will be submitted as a new pedestrian project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The project will be submitted as a Safe Routes to School (SRTS)-eligible project; however, if it is not funded as an SRTS project, the County will be required to commit a 20% local match. 17 Trail Connection from English Hill Lane to Buttonwood Drive Construct a multi-use path connecting English Hill Lane to Buttonwood Drive. This project will be submitted as a new pedestrian project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The project will be submitted as a Safe Routes to School (SRTS)-eligible project; however, if it is not funded as an SRTS project, the County will be required to commit a 20% local match. 18 Eubanks Road Bike Lanes: Construct bicycle lanes on Eubanks Road (SR 1727) from Old NC 86 (SR 1009) to NC 86. This project will be submitted as a new bike project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP if the County commits the required 20% local match. The project will be submitted for consideration of STP-DA funding to be determined internally by the MPO. 19 Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4)-foot paved shoulders. This project will be submitted as a new bike project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP if the County commits the required 20% local match. The project will be submitted for consideration of STP-DA funding to be determined internally by the MPO. 20 Mt. Carmel Church Road Bike/Pedestrian Improvements: Construct bike lanes and sidewalks from US 15/501 to Bennett Road and bike lanes from Bennett Road to the Chatham County line. This project will be submitted as a new bike project for consideration of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP if the County commits the required 20% local match. The project will be submitted for consideration of STP-DA funding to be determined internally by th MPO. c� Upon motion of Commissioner seconded by Commissioner i- fC , the foregoing resolution was adopted this the 19t'' day of November, 2013. I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a meeting held on November 19, 2013 . n any way to the adoption of the foregoing and that said proceedings are recorded in t B oard WITNESS my hand and the seal f day of 13. �� sz �e Clerk to the Board of Commissioners rf� �acu�%