Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
[Departmental Use Only] TITLE Wilson Industrial Park FY 2013-14 NORTH CAROLINA SERVICES AGREEMENT OVER $90,000.00 RFP — NO REIMBURSABLE EXPENSES ORANGE COUNTY This Services Agreement (hereinafter"Agreement"), made and entered into this 15th day of October, 2013, ("Effective Date") by and between Orange County, North Carolina a body politic and corporate of the State of North Carolina (hereinafter, the "County") and McGill Associates, (hereinafter,the "Provider"). WITNESSETH: That the County and Provider, for the consideration herein named, do hereby agree as follows: 1. Services a. Scope of Work. i) This Services Agreement ("Agreement") is for professional services to be rendered by Provider to County with respect to (insert type of project): Water, Sewer, Design Services, Surveying/Environmental, and Water/Sewer Construction Oversight ii) By executing this Agreement, the Provider represents and agrees that Provider is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. iii) Time is of the essence with respect to this Agreement. iv) The services to be performed under this Agreement consist of Basic Services, as described and designated in Section 3 hereof. Compensation to the Provider for Basic Services under this Agreement shall be as set forth herein. 2. Responsibilities of the Provider a. Services to be provided. The Provider shall provide the County with all services required in Section 3 to satisfactorily complete the Project within the time limitations set forth herein and in accordance with the highest professional standards. b. Standard of Care. i) The Provider shall exercise reasonable care and diligence in performing services under this Agreement in accordance with the highest generally accepted standards of this type of Provider practice.throughout the United States and in accordance Revised July 2010 1 with applicable federal, state and local laws and regulations applicable to the performance of these services. Provider is solely responsible for the professional quality, accuracy and timely completion and/or submission of all work related to the Basic Services. ii) Provider shall be responsible for all errors or omissions, in the performance of the Agreement. Provider shall correct any and all errors, omissions, discrepancies, ambiguities,mistakes or conflicts at no additional cost to the County. iii) The Provider shall not, except as otherwise provided for in this Agreement, subcontract the performance of any work under this Agreement without prior written permission of the County. No permission for subcontracting shall create, between the County and the subcontractor, any contract or any other relationship. iv) Provider is an independent contractor of County. Any and all employees of the Provider engaged by the Provider in the performance of any work or services required of the Provider under this Agreement, shall be considered employees or agents of the Provider only and not of the County, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Provider. v) Provider agrees that Provider, its employees, agents and its subcontractors, if any, shall be required to comply with all federal, state and local antidiscrimination laws, regulations and policies that relate to the performance of Provider's services under this Agreement. vi) If activities related to the performance of this Agreement require specific licenses, certifications, or related credentials Provider represents that it and/or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. 3. Basic Services a. Basic Services. i) The Provider shall perform as Basic Services the work and services described herein and as specified in the County's Request for Proposals (the "RFP") "REP Number 367-5176 for "Request for Qualifications (RFQ) general engineering qualifications and services described in Central Efland/Northern Buckhorn Sewer Extension Services" issued August 26, 2011; more specifically, and the Provider's proposal, which are fully incorporated and integrated herein by reference together with Attachments (more specifically Exhibits A, B & C) (designate all attachments). In the event a term or condition in any document or attachment conflicts with a term or condition of this Agreement the term or condition in this Agreement shall control. Should such conflict arise the priority of documents shall be as follows: This Agreement, the County's REP together with attachments, Provider's Proposal together with attachments. Revised July 2010 2 ii) The Basic Services will be performed by the Provider in accordance with the following schedule: (Insert task list and milestone dates) Task Milestone Date 1. Surveying 50% - 11/16/13 2. Environmental Report 50% - 11/16/13 3. GeoTechnical 50% - 11/16/13 4. Water System Design 75% - 11/16/13 5. Sewer System Design 50%- 12/1/13 6. Surveying/Enviromental 100% - 12/15/13 7. GeoTechnical 100% - 12/15/13 8. Water System Design 100% - 12/15/13 Permits Submitted 9. Sewer System Design 100% - 1/15/14 Permits Submitted 10. Bid Administration 100% - 4/1/14 Bids Received iii) Should County reasonably determine that Provider has not met the Milestone Dates established in Section 3(a)(ii), County shall notify Provider of the failure to meet the Milestone Date. The County, at its discretion may provide the Provider seven (7) days to cure the breach. County may withhold the accompanying payment without penalty until such time as Provider cures the breach. In the alternative, upon Provider's failure to meet any Milestone Date the County may modify the Milestone Date schedule. Should Provider or its representatives fail to cure the breach within seven(7) days, or fail to reasonably agree to such modified schedule, County may immediately terminate this Agreement in writing, without penalty or incurring further obligation to Provider. This section shall not be interpreted to limit the definition of breach to the failure to meet Milestone Dates. 4. Duration of Services a. Term. The term of this Agreement shall be from October 16, 2013 to November 16, 2014. b. Scheduling of Services i) The Provider shall schedule and perform his activities in a timely manner so as to meet the Milestone Dates listed in Section 3. ii) Should the County determine that the Provider is behind schedule, it may require the Provider to expedite and accelerate his efforts, including providing additional resources and working overtime, as necessary, to perform his services in accordance with the approved project schedule at no additional cost to the County. iii) The Commencement Date for the Provider's Basic Services shall be October 16, 2013. 5. Compensation Revised July 2010 3 a. Compensation for Basic Services. Compensation for Basic Services shall include all compensation due the Provider from the County for all services under this Agreement. The maximum amount payable for Basic Services is One Hundred Forty Two Thousand Dollars ($142,000). In the event the amount stated on an invoice is disputed by the County, the County may withhold payment of all or a portion of the amount stated on an invoice until the parties resolve the dispute. Payment for Basic Services shall become due and payable in direct proportion to satisfactory services performed and work accomplished. Payments will be made as percentages of the whole as Project milestones as set out in Section 3(a)(ii) are achieved. (For example, if there are 10 Project Tasks with Milestone Dates then Provider may invoice for the first 10% of the whole upon County's acknowledgement of the satisfactory completion of Task one. Upon the County's acknowledgement that the second Task has been satisfactorily completed Provider may invoice for the next 10%of the whole.) b. Additional Services. County shall not be responsible for costs related to any services in addition to the Basic Services performed by Provider unless County requests such additional services in writing and such additional services are evidenced by a written amendment to this Agreement. 6. Responsibilities of the County a. Cooperation and Coordination. The County has designated the (Planning & Inspections Director of Orange County, Craig N. Benedict) to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager and/or the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. 7. Insurance a. General Requirements. The Provider shall purchase and maintain and shall cause each of his subcontractors to purchase and maintain, during the period of performance of this Agreement: i) Worker's Compensation Insurance for protection from claims under workers' or workmen's compensation acts; ii) Comprehensive General Liability Insurance covering claims arising out of or relating to bodily injury, including bodily injury, sickness, disease or death of any of the Provider's employees or any other person and to real and personal property including loss of use resulting thereof; iii) Comprehensive Automobile Liability Insurance, including hired and non-owned vehicles, if any, covering personal injury or death, and property damage; and iv) Professional Liability Insurance, covering personal injury, bodily injury and property damage and claims arising out of or related to the performance under this Agreement by the Provider or his agents, Providers and employees. Revised July 2010 4 b. Insurance Rating. The minimum insurance rating for any company insuring the Provider shall be Best's A. If 0 P� r ' M*M81101wolat totoo o010111 A! C. Limits of Coverage. Minimum limits of insurance coverage shall be as follows: INSURANCE DESCRIPTION MINIMUM REQUIRED COVERAGE • Worker's Compensation Limits for Coverage A- Statutory State of N.C. Coverage B -Employers Liability $500,000 each accident and policy limit and disease each employee • Commercial General Liability $1,000,000 Each Occurrence; $2,000,000 Aggregate. • Automobile Liability Combined Single Limit$500,000 • Professional Liability :,hoo wa=v Hisift x*** if *". $1,000,000 Per Occurrence d. Additional Insured. All insurance policies (with the exception of Worker's Compensation and Professional Liability) required under this Agreement shall name the County as an additional insured party. Evidence of such insurance shall be furnished to the County, together with evidence that each policy provides the County with not less than thirty (30) days prior written notice of any cancellation, non-renewal or reduction of coverage. 8. Indemnity a. Indemnity. The Provider agrees to defend, indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Provider except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Provider to indemnify the County to the fullest extent permitted under North Carolina law. 9. Amendments to the Agreement a. Changes in Basic Services. Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the County and the Provider. The Provider shall proceed to perform the Services required by the Amendment only after receiving a fully executed Amendment from the County. Revised July 2010 5 10. Termination a. Termination for Convenience of the County. This Agreement may be terminated without cause by the County and for its convenience upon seven (7) days prior written notice to the Provider. b. Other Termination. The Provider may terminate this Agreement based upon the County's material breach of this Agreement; provided, the County has not taken all reasonable actions to remedy the breach. The Provider shall give the County seven (7) days' prior written notice of its intent to terminate this Agreement for cause. c. Compensation After Termination. i) In the event of termination, the Provider shall be paid that portion of the fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the County due to errors or omissions of the Provider. ii) Should this Agreement be terminated, the Provider shall deliver to the County within seven (7) days, at no additional cost, all deliverables including any electronic data or files relating to the Project. d. Waiver. The payment of any sums by the County under this Agreement or the failure of the County to require compliance by the Provider with any provisions of this Agreement or the waiver by the County of any breach of this Agreement shall not constitute a waiver of any claim for damages by the County for any breach of this Agreement or a waiver of any other required compliance with this Agreement. 11. Additional Provisions a. Limitation and Assignment. The County and the Provider each bind themselves, their successors, assigns and legal representatives to the terms of this Agreement. Neither the County nor the Provider shall assign or transfer its interest in this Agreement without the written consent of the other. b. Governing. This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. c. Dispute Resolution. Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non-performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina. It is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. The Parties may agree to nonbinding mediation of any dispute prior to the bringing of such suit or action. d. Entire Agreement. This Agreement, together with the RFP and its attachments and the Proposal and its attachments, represents the entire and integrated agreement between the County and the Provider and supersedes all prior negotiations, representations or Revised July 2010 6 agreements, either written or oral. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. e. Severability. If any provision of this Agreement is held as a matter of law to be unenforceable, the remainder of this Agreement shall be valid and binding upon the Parties. f. Ownership of Work Product. Should Provider's performance of this Agreement generate documents, items or things that are specific to this Project such documents, items or things shall become the property of the County and may be used on any other project without additional compensation to the Provider. The use of the documents, items or things by the County or by any person or entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. g. Non-Appropriation. Provider acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable and not appropriated for the performance of County's obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Provider of the unavailability and non-appropriation of public funds. It is expressly agreed that County shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County's statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects County's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Provider of such limitation or change in County's legal authority. h. Notices. Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Provider's Name &Address Attention: Craig N. Benedict McGill Associates P.O. Box 8181 Doug Chapman, P.E. 131 W. Margaret Lane, Suite 201 1240 19th Street, Lane NW Hillsborough,NC 27278 Hickory,NC 28603 Engineer of Record referenced in Exhibits A, B and C. Revised July 2010 7 IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal,all as of the day and year first above written. ORANGE COUNTY: PROVi i R: / By: By: Barry Jacobs air Andy Lovingood,PE-Vice President Orange Co of Co missioners Printed Name and Title Attest: ,b�'i,ij�,114— Dor&a lGaker, Clerk to the Board [SEAL] '+ lr s 52 5 f- This ins ent has been 4 nical content. Craig N.Prenedict,Depa ment Director This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act. 'Li, A, . � Office of the Finance Director This instrument has been approved as to form and legal sufficiency. Offic of PKe County Attorney Revised July 2010 8 EXHIBIT "A" PROJECT UNDERSTANDING for "WILSON INDUSTRIAL PARKWAY" SURVEYING AND ENVIRONMENTAL SCOPE of SERVICES Surveying 1. Prepare a 200 foot wide by approximately 2,500 foot long topographic route survey for the proposed roadway with one (1) foot contours tied to North Carolina State Plane coordinate system. 2. Provide topographic survey of Ben Wilson Road 200 foot to the west and south of the proposed intersection with the new roadway. 3. Prepare a topographic survey of Ben Wilson Road west to Connolly Trace for preparing water line plans and profiles. 4. Prepare a topographic survey of the proposed 1,500 linear feet sewer line route for preparing sewer line plans and profiles. 5. Locate existing property boundaries (three parcels) and NCDOT right-of-ways on the map. 6. Survey will show existing utilities as located by NC One Call. 7. Locate and show on the survey, delineated streams and wetlands along the proposed roadway route, sewer line route, and along the south side of the proposed industrial site, and prepare a metes and bounds survey. 8. Prepare Right-of-Way plats for the new roadway for recordation with Orange County as necessary. 9. Prepare easement maps for the proposed sewer line for acquisition of easements by Orange County. 10.Set required property pins for the new right-of-way plat. Geo-Technical Testing 1. Conduct soil investigations, including drilling and testing soil borings based on NCDOT standards spaced at 200 feet, minimum with 2 borings in cut locations. 2. Install piezometers in cut area borings for 24 hour ground water readings. 3. Provide recommendations for design and construction of the proposed roadway. 4. Prepare engineering reports, in NCDOT format and issued as an Inventory Report and Recommendations Report. Environmental Report 1. The environmental reporting includes stream and wetland delineations, threatened and endangered species and contacting the offices of State Historic Preservation Office (SHPO). 2. The environmental reporting includes the property bounded by Ben Wilson Road on the west and extending 2,500 feet to the east, extending approximately 200 feet south of Interstate 85 right of way. The report will also include the corridors for the water line and sewer line routes. 3. Conduct field delineation for jurisdictional waters/wetlands on site. 4. Mark all features that exhibit characteristics of waters/wetlands with plastic surveyor's flagging, to be located by the surveyor. 5. Upon completion of the delineation, prepare and submit required necessary documentation for verification by U.S. Army Corps of Engineers (USACE) and N.C. Division of Water Quality (NCDWQ). Included is a one day site verification visit with USACE and NCDWQ. 6. Prepare a report that contains the findings, conclusions and permitting requirements for the project. 7. Prepare a preliminary Threatened and Endangered (T & E) Survey through the North Carolina Natural Heritage Database and summarize in a letter report. If species of concern are identified, a detailed survey of the area may be required. A detailed study for Threatened and Endangered Species are not included in this scope of work. 8. Submit necessary site information to SHPO for review and comment about potential historic properties/structures within the project site boundaries. 9. Prepare environmental report to accompany CDBG funding application. EXHIBIT "B" PROJECT UNDERSTANDING for "WILSON INDUSTRIAL PARKWAY" WATER AND SEWER DESIGN AND ENGINEERING SCOPE of SERVICES 1. Meet with the Owner, Mebane and all relevant parties to fully determine scope and requirements for the project. 2. Prepare preliminary route map of approximately 3,700 feet of water line along Ben Wilson Road from Connolly Trace to the proposed roadway and then along the proposed roadway, along with approximately 1,500 feet of gravity sewer line overland from a sewer line currently under construction to the proposed development site for approval by the Owner and Mebane. 3. Prepare preliminary engineering report to accompany Community Development Block Grant (CDBG) funding application as required by NC Department of Commerce. 4. Prepare construction drawings per Mebane and Orange County standards for the proposed water and sewer line extensions. 5. Construction plans will include plans, profiles, sediment and erosion control and construction details. 6. Review construction plans with the Owner and Mebane, and make revisions as necessary. 7. Prepare water line extension application, fast-track sewer extension application, and sediment and soil erosion permit application for submittal to N.C. Department of Environment and Natural Resources (NCDENR) for approval. 8. Prepare bid package per Owner and CDBG standards including all contract provisions, special provisions and drawings. 9. Assist Owner with advertising the project for bid, conducting a Prebid meeting, issue addenda as necessary, and reply to any request for information from the contractors during the bid process. 10.Attend project bid opening and prepare a tabulation of bids received. 11.Consult with, and advise the Owner as to the acceptability of contractors and subcontractors and make recommendations as to the lowest, responsive, responsible bidder. 12.Assist the Owner in the final preparation and execution of construction contracts and checking performance and payment bonds and insurance certificates for compliance. EXHIBIT "C" PROJECT UNDERSTANDING for "WILSON INDUSTRIAL PARKWAY" WATER AND SEWER CONSTRUCTION ADMINISTRATION AND OBSERVATION SCOPE of SERVICES 1. Schedule a Pre-Construction Conference with the Owner, Mebane, Contractor, Engineer and all other applicable parties to assure discussion of all matters related to the Project. Prepare and distribute minutes of the Pre-Construction Conference to all parties. 2. Provide General Administration of Construction Contract. Consult with Owner and act as Owner's representative as provided in the General Conditions. The extent and limitations of the duties, responsibilities, and authority of Engineer as assigned in the General Conditions shall not be modified, except as Engineer may otherwise agree in writing. All of Owner's instructions to Contractor will be issued through Engineer, which shall have authority to act on behalf of Owner in dealings with Contractor to the extent provided in this Agreement and the General Conditions except as otherwise provided in writing. Engineer shall not be responsible for the acts or omissions of any Contractor, or of any subcontractors, suppliers, or other individuals or entities performing or furnishing any of the Work. Engineer shall not be responsible for the failure of any Contractor to perform or furnish the Work in accordance with the Contract Documents. 3. Provide a Construction Field Representative (CFR) to periodically observe the progress and quality of the executed work and to determine in general if the work is proceeding in accordance with the Contract Documents. During such visits and on the basis of on-site observations as an experienced and qualified design professional, keep the Owner informed of the progress of the work, and endeavor to guard the Owner against defects and deficiencies in the work of the Contractor. The total construction contract time is assumed to be five (5) months. As part of this contract, field observation will be provided by a CFR on a limited, part-time basis during active work. Additional requested CFR time will be considered Additional Services. 4. Based on Engineer's observations as an experienced and qualified design professional and on review of Applications for Payment and accompanying supporting documentation, make recommendation for amounts to be paid to the Contractor. 5. Recommend to Owner that Contractor's Work be rejected while it is in progress if, on the basis of Engineer's observations, Engineer believes that such Work will not produce a completed Project that conforms generally to the Contract Documents or that it will threaten the integrity of the design concept of the completed Project as a functioning whole as indicated in the Contract Documents. 6. Recommend Change Orders and Work Change Directives to Owner, as appropriate, and prepare Change Orders and Work Change Directives as required. 7. Review and take action in respect to Shop Drawings and Samples and other data which Contractor is required to submit, but only for conformance with the information given in the Contract Documents and compatibility with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. Such reviews and any approvals or other action will not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions and programs incident thereto. Review of Shop Drawings and Samples identified as frivolous in the General Conditions of the construction contract documents, or review of substitute materials as defined in the same, shall be deemed as Additional Services. 8. Promptly after notice that Contractor considers the entire Work ready for its intended use, in company with Owner, Mebane, and Contractor, conduct a pre-final observation visit to determine if the Work is substantially complete. If after considering any objections of Owner and Mebane, Engineer considers the Work substantially complete, Engineer shall deliver a certificate of Substantial Completion to Owner, Mebane, and Contractor. 9. In company with Owner's and Mebane's representatives, conduct a final observation visit to determine if the completed Work of Contractor is acceptable so that Engineer may recommend, in writing, final payment to Contractor. Accompanying the recommendation for final payment, Engineer shall also provide a notice that the Work is acceptable to the best of Engineer's knowledge, information, and belief and based on the extent of the services provided by Engineer under this Agreement. 10.Issue instructions to the Contractor from the Owner as to interpretations and clarifications to the project design plans, specifications and contract documents. 11.Prepare information required to resolve problems due to actual field conditions and to respond to Requests for Information (RFI) from the Contractor. 12.Coordinate and track the testing of pipelines and placing same into service for the project. Additional visits required due to work not being ready for testing, retesting, or Contractor scheduling conflicts shall be considered Additional Services. 13.Assist the Owner in the selection and coordination of an independent geotechnical and materials testing laboratory to be provided at the Owner's expense as necessary. 14.Review and determine the acceptability of any schedules that Contractor is required to submit to Engineer, including Progress Schedule, Schedule of Submittals and Schedule of Values. 15.Prepare certifications of completion for submission to NCDENR Division of Infrastructure for final approvals, as necessary. 16.Prepare for the Owner record drawings showing those changes made during the construction process, based on the marked-up prints, drawings and other data furnished. Provide to Owner and Mebane two (2) printed copies and one (1) electronic PDF copies of record drawings. 17.Provide or make available all Project files and information to effect project closeout. Client#:1170972 30MCGILASS ACORM CERTIFICATE OF LIABILITY INSURANCE DATE(MM(ODNYYY) 1/24/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder Is an ADDITIONAL INSURED,the policy((es)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such ondorsement(s). PRODUCER Susan Stephenson BB&T-Wright Dobbins - �:828 277-3930 888-827-9875 PO Box 5318 EiIAIL NO Asheville,NC 28813 ADDRESS: INSURER(S)AFFORDING COVERAGE NAICX 828 2773930 INSURERA:Pennsylvania National Mutual Ca 14990 INSURED INSURERS: McGill Associates PA P.O.Box 2259 INSURER C: Asheville,NC 28802 INSURER D: INSURER E: INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN 18 SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR US" POU EF POLL��CC LT TYPE OF INSURANCE 1 8R POLICY NUMBER MMID MMIDD LIMITS A GENERAL LIABILITY X BX90652915 1/23/2013 01/231201 EACH OCCURRENCE $1.000.000 X COMMERCIAL GENERAL LIABILITY � EN � $50,000 CLAIMS-MADE �OCCUR MED EXP one person) $5,0()o PERSONAL aADVINJURY $1,000000 GENERAL AGGREGATE s2,000.000 GEN L AGGREGATE LIMB APPLIES PER PRODUCTS-COMPIOP AGO $2,000,000 POLICY PRO- LOC $ A AUTOMOBILE LIABILITY X AX90652915 j112312013 011231201 COMBINED SINGLE LIMIT .nI 1,000,000 X ANY AUTO ALL OWNED SCHEDULED BODILY INJURY(Par person) $ AUTOS AUTOS BODILY INJURY(Per accident) $ X HIRED AUTOS X AUTO PROPERTY DAMAGE Per aoci t $ S A X UMBRELLA LIAR X OCCUR X UL90652915 1/23/2013 01/23/201 EACH OCCURRENCE $3 000 000 EXCESS LIAB CLAIMS-MADE AGGREGATE s3,000,000 DED I X1 RETENTION 10000 $ A WORKERS YERe'LBATpN WP9065291503 1/23/2013 01/23/201 X we sT JT OTH- AND EMPLOYERS'LIABILITY ANY PROPRIETORIPARTNER/EXECUTIVE YIN W' OFFICERIMEMBER EXCLUDED? � NIA E.L.EACH ACCIDENT $500000 If In Nnd E.L DISEASE-EA EMPLOYEE $500,000 Ityee deuxibaunder DESCRIPTION OF OPERATIONS below EL DISEASE-POLICY LIMIT 1$500,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(AMach ACORD 101,Additional Remarks Schedule,it more space is required) Orange County is named as Additional Insured with respects all policies listed above with the exception of Worker's Comp.We will provide 30 days prior written notice of any cancellation,non-renewal or reduction of coverage. CERTIFICATE HOLDER CANCELLATION Orange County SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 200 South Cameron Street ACCORDANCE WITH THE POLICY PROVISIONS. Hillsborough,NC 27278 AUTHORIZED REPRESENTATIVE ®1888-2010 ACORD CORPORATION.All rights reserved. ACORD 25(2010105) 1 of 1 The ACORD name and logo are registered marks of ACORD #39857859/M9836469 SIS AC40 °R ° CERTIFICATE OF LIABILITY INSURANCE DATE 10/222/20120/YYYY) 13 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Phone: (336)475-9762 Fax: (336)475-9764 "AMEACT insurance Service Corp.of America INSURANCE SERVICE CORP.OF AMERICA PHONE FA t (336)475-9764 P.O.BOX 2399 E-MAILO Ext: 336 475-9762 AIC No THOMASVILLE NC 27361 as, JANET@ISCOFA.COM INSURER(S)AFFORDING COVERAGE NAIC# INSURER :Hanover Insurance Group 22292 INSURED INSURER B MCGILL ASSOCIATES,PA 55 BROAD STREET INSURERC ASHEVILLE NC 28801 INSURER D: INSURER E INSURERF COVERAGES CERTIFICATE NUMBER: 9233 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH P LICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE INSR SUER POLICY NUMBER MMOILDDDY EFF M�DY EXP LIMITS LTR INSR WVD GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE TO RENTED COMMERCIAL GENERAL LIABILITY PREMISES(Ea occurance) $ CLAIMS-MADE I-1 OCCUR MED.EXP(Any one person) $ PERSONAL&ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ POLICY PRO- LOC $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) $ ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS HIRED AUTOS NON-OWNED PROPERTYDAMAGE $ UTOS (per accident) $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED I RETENTION$ $ WORKERS COMPENSATION WC STATU- OTH AND EMPLOYERS' LIABILITY TORY LIMITS ER $ ANY PROPRIETORIPARTNERIEXECUTIVE YIN E.L.EACH ACCIDENT $ OFFICERIMEMBER EXCLUDED? N/A (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ R yes, under E.L.DISEASE-POLICY LIMIT $ DESCRIPTION RIPTION OF OPERATIONS babes A PROFESSIONAL LIABILITY LH6 9434119-01 01/23/13 01/23/14 $3,000,000 Each Claim $3,000,000 Annual Aggregate DESCRIPTION OF OPERATIONS it LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space Is required) CERTIFICATE HOLDER CANCELLATION Orange County SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 200 South Cameron Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Hillsborough NC 27278 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Attention: Candice H.Tickle ACORD 25(2010105) ©1988-2010 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD ORANGE COUNTY FINANCIAL SERVICES 200 South Cameron Street, Post Office Box 8181 • Hillsborough, NC 27278 Phone: 919-245-2651 • Fax: 919-644-3324 Request for Qualifications (RFQ), Professional Engineering Services - Central Efland/Northern Buckhorn Sewer Extension —Construction Phase Services RFQ NO. 367-5176 PROPOSALS DUE 5:00 PM EST, Thursday June 30, 2011 Ladies and Gentlemen: Orange County is seeking proposals from qualified consultants to provide professional services for the above referenced project. A selection panel will review and evaluate proposals and submit a recommendation for a single consulting firm for this project to the Board of County Commissioners. PROJECT DESCRIPTION PROJECT: Central Efland and Northern Buckhorn Sewer Extensions—Construction Phase ESTIMATED CONSTRUCTION COST: $4,350,000 SCOPE OF PROJECT: This project will be to provide construction phase engineering services, as outlined below, for sewer extension projects in both the Buckhorn Community and the Efland Community. The sewer extensions have already been designed, reviewed by both the State Construction Grants and Loans division (CG&L) of NCDENR and the EPA's Atlanta Regional office, and permitted through CG&L. This construction project is being funded by an EPA Special Appropriations grant. In addition, Orange County is applying for a State Revolving Fund (SRF) loan to pay for the remainder of the construction costs. As such, it is subject to a number of specific provisions and protocols required by both State and Federal law. The anticipated construction time for this project is a maximum of 15 months. Due to requirements of the SRF loan, the construction contract must be approved no later than the first day in September. Therefore, the construction phase of the project will begin on September 1, 2011. Actual construction should end on or before December 1, 2012. Section I: SCOPE OF SERVICES: 1. Analysis Phase: Prior to the beginning of the construction phase, the successful Consultant will • Review the existing, permitted design and specifications. • Conduct site visits or other reconnaissance necessary at the two construction sites to develop sufficient understanding of the particular demands or concerns related to this construction project. • Bring any issues with the approved design to the attention of the County's project manager as soon as possible. • Correct or amend any design issues discovered during the review • Certify the adequacy of the design prior to the beginning of construction, i.e. the Consultant will indemnify the County and the original design engineer for the design and take responsibility for the design of the system going forward • Conduct the preconstruction conference and present, as necessary, any particular relevant findings based on the analysis phase. • Review and approve product submittals and shop drawings from the contractor. • Review project schedule and phasing plan and provide comments, if necessary, on the feasibility or practicality of the schedule 2. Construction Phase: The Consultant will perform/be responsible for the following duties and tasks during the construction phase of the project: • Revise drawings as necessary to reflect specific minor details prior to beginning of construction, e.g. minor manhole location shifts and addition, deletion or shifting of service lateral locations • Conduct progress meetings at the site • Verify that the Contractor is conforming with the intent of the plans and specifications. • Provide clarification and answer Contractor questions when necessary regarding the intent of the plans and specifications, i.e. Requests for Information (RFIs) • Inform the County of any issues and potential additional costs or time delays that may come up during construction • Review Contractor change order requests • Review and verify Contractor's monthly pay requests for work completed • Assist County with any construction issues that may arise • Perform substantial completion and final completion inspections. Create a punch list of items necessary to complete the project • Review and advise County on any necessary deviations from the approved plans, due to unforeseen field conditions or other issues that may arise. This may include additional professional surveying, subsurface investigation, environmental review or other related services. • Review any County requested deviations from the plans and advise on permit compliance. Design and certify the best way to accommodate these requests. • Be present for and approve all testing and pump station start-up done on the new system • Compile testing data and submit as required to the appropriate State or Federal agencies 3. Post-Construction Phase: The Consultant, following the completion of construction of the project will: • Compile project inspector logs and site inspection notes for submission to the County • Compile all operator's manuals and material information for the project to submit to the County • Assist and advise County on release of retainage and the final project reconciliation change order • Create and seal a set of as-built drawings of the newly completed sewer extension for submission to the State, City of Mebane, Orange County and the Federal government. • Provide final certification of the sewer construction as required by the various local, State and Federal organizations involved with this project. 4. Other Ennineerinq Related Activities The Consultant will perform other engineering related activities, as necessary, during the project on a per hour basis using agreed upon rates, including but not limited to 2 • Revise drawings as necessary to reflect specific minor details prior to beginning of construction or during construction, e.g. minor manhole location shifts and additions, deletion or shifting of service lateral locations, etc. • Major re-design work caused by unforeseen field conditions or other factors, e.g. rerouting entire sewer lines In addition to the above duties, Consultant will attend public meetings, Board of County Commissioners meetings, public hearings and information sessions as may be necessary during the course of the project. OWNER'S RESPONSIBILITIES: The County shall provide or perform the following: 1. Access to and reproduction of all pertinent records maintained by the County; 2. Direction with regard to fundamental project objectives; 3. General review of all materials submitted; 4. Designate an owner's representative to interface with citizens and press and deal with public relation issues 5. Provide timely responses to questions from consultant 6. Submit all completed permit applications and regulatory review packages; PROJECT TIME: 1. Analysis Phase: Complete prior to beginning of construction phase. 2. Construction Phase: The construction phase shall be a maximum of 450 days from the Notice to Proceed date, which is anticipated to be September 30th. 3. Post-Construction Phase: As-built drawings and other post-construction engineering activities shall be completed within 30 days of the end of the Construction Phase. Specific items to be addressed are listed below: Submittal Information All respondents are requested to provide the information cited below, as well as any supplemental information that provides a comprehensive view of the firm, the proposed project team and the approach to this project. However, information should be presented in a clear and concise manner. Section II - Information About the Firm • General overview of the firm and its experience relative to this project; • Specifically address the firm's experience in working with stakeholders and speak to the composition of those groups (staff, citizens, customer, elected officials, etc.) • Note specifically experience with similar projects, by providing a list of completed projects (similar in areas including but not limited to, size and budget for each), minimum of five (5), providing for each: • Location and description (incl., initial budget, cost, facilities) • References • Project team involved with specific responsibilities • References from ten projects completed within the past five years. 3 o Provide names and contact numbers for owner's representatives of each. • Complete list of subcontractors and their anticipated role in this project. • Current projects of the firm and status of each; • Specifically note projects currently being undertaken by members of the proposed design team; • Address the firm's workload and how this project would fit within the firm's existing work. • This design project will be funded by both an EPA Special Appropriations grant and a Clean Water State Revolving Loan. Please specifically verify that your firm is in compliance with guidelines established by Federal and State governments for companies receiving these funds. Section III - Information About the Proposed Project Design Team • List the proposed design team and, at a minimum, the following information for each: • Role/project responsibility on this project team; • Qualifications; • Education; • Relative experience, with specific note of any governmental projects. • Length of service with present firm. If less than two years, cite name of previous firm • List relative projects completed by each team member during the past five (5) years, complete with Project Name, Location, project components, project budget, completed cost and contact name and phone number of Owner's representative. Denote any of the listed projects that were completed when team members were employed by other than current firm. • Specifically address each team member's experience working with municipalities on similar projects. • Provide listing of project workload elements with the time/duration for each of the proposed project team members • Subcontractors o Respondents are expected to present their complete project team in the response, including all subcontractors that may be proposed. Since subcontractor qualifications will be evaluated similarly to the proposing firm's own design team, please ensure that complete information is included. • A description of the plan to involve MBE/WBE firms, including previous teaming experience. • Computer Aided Design (CAD) and Mapping capabilities: • Topographic data in North Carolina State plane coordinates, NAD 83 and NAVD 88, units-feet. • All drawings must be viewable in Orange County's current version of AutoCAD; currently AutoCAD Release 2010. • Consultant to provide a version of drawings in ESRI shape file format suitable for ArcMap version 9.3 or current version used by the County. 4 Section IV: Project Manaaement Approach • Provide a detailed narrative statement of the firm's perception of the project requirements, outlining any unique features or conditions that appear to need special attention and that the firm and proposed project team may be particularly well qualified to address. • Verify that your firm can begin services as soon as the construction contract for the project has been signed and approved by the Orange County Board of County Commissioners. • Include in your proposal the estimated amount of time needed for your firm to Certify the adequacy of the design prior to the beginning of construction, i.e. the Consultant will indemnify the County and the original design engineer for the design and take responsibility for the design of the system going forward • Include a proposed timeline including estimated Construction Administration hours to successfully supervise the project as detailed in this RFP. The Owner will be responsible for all property owner and media liaison responsibilities. Section V: SUBMISSION OF PROPOSALS 1. Proposals must be submitted no later than 5:OOPM—local time, Thursday June 30, 2011 to: David E Cannell, Purchasing Agent Financial Services 200 South Cameron Street PO Box 8181 Hillsborough, NC 27278 2. Proposals shall include statements of interest, ability to complete the work within the required time, experience, and qualifications. All qualified firms are invited to submit proposals; two (2) copies on either thumb drives or CD's and two (2) hard copies are required (one clearly marked "ORIGINAL"). Hard copies must be bound with printing on both sides of sheet on recycled paper with the exception of tab or divider pages. The electronic file shall be in pdf format and shall be a single file. 3. Proposals received after the set time for receipt shall not be considered and shall be returned unopened to the proposer. 4. Orange County reserves the right to accept or reject any or all proposals, to waive irregularities, and to reissue any request for proposals. 5 5. Any questions concerning the technical aspects of this project should be directed to: Mr. David Cannell Purchasing Agent PO Box 8181 Hillsborough, NC 27278 (919) 245-2651 Email: dcannell @co.orange.nc.us 6. By submitting a proposal response, the offeror agrees that it shall not be withdrawn for a period of 90 days following the due date for proposal responses. 7. Attached is a copy of Orange County's standard contract. This document will be utilized to execute the final agreement between Orange County and the successful Engineering firm. 6 [Departmental Use Only] Title FY NORTH CAROLINA CONSULTING SERVICES AGREEMENT -RFP- OVER $90,000 OR BOARD CONSULTANT ORANGE COUNTY This Agreement, made and entered into this day of 20 ("Effective Date") by and between Orange County, North Carolina a body politic and corporate of the State of North Carolina(hereinafter,the "County") and , (hereinafter,the "Consultant"). WITNESSETH: That the County and Consultant, for the consideration herein named, do hereby agree as follows: ARTICLE 1 SCOPE OF WORK 1.1 Scope of Work 1.1.1 This Services Agreement ("Agreement") is for professional consulting services to be rendered by Consultant to County with respect to: (insert type of project) 1.1.2 By executing this Agreement, the Consultant represents and agrees that Consultant is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. 1.1.3 Time is of the essence with respect to this Agreement. 1.1.4 The services to be performed under this Agreement consist of Basic Services, as described and designated in Article 3 hereof. Compensation to the Consultant for Basic Services under this Agreement shall be as set forth herein. ARTICLE 2 RESPONSIBILITIES OF THE CONSULTANT 2.1 Services to be Provided. The Consultant shall provide the County with all services required in Article 3 to satisfactorily complete the Project within the time limitations set forth herein and in accordance with the highest professional standards. 2.2. Standard of Care 2.2.1 The Consultant shall exercise reasonable care and diligence in performing services under this Agreement in accordance with the highest generally accepted standards of this type of Consultant practice throughout the United States and in accordance with applicable federal, state and local laws and regulations applicable to the performance of these services. Consultant is solely responsible for the professional quality, accuracy and timely completion and submission Revised July 2010 1 of all reports, drawings, specifications, plans, documents and services (hereinafter "Deliverables")related to the Basic Services. 2.2.2 The Consultant shall be responsible for all errors or omissions, in the deliverables prepared by the Consultant. 2.2.3 The Consultant shall correct at no additional cost to the County any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts in any Deliverables prepared by the Consultant. 2.2.4 The Consultant shall assure that all Deliverables prepared by it hereunder are in accordance with applicable laws, statutes, and that any necessary or appropriate applications for approvals are submitted to federal, state and local governments or agencies in a timely manner so as not to delay the Project. 2.2.5 The Consultant shall not, except as otherwise provided for in this Agreement, subcontract the performance of any work under this Agreement without prior written permission of the County. No permission for subcontracting shall create, between the County and the subcontractor, any contract or any other relationship. 2.2.6 Any and all employees of the Consultant engaged by the Consultant in the performance of any work or services required of the Consultant under this Agreement, shall be considered employees or agents of the Consultant only and not of the County, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Consultant. 2.2.7 Consultant agrees that Consultant and its subcontractors, if any, shall be required to comply with all federal, state and local antidiscrimination laws, regulations and policies that relate to the performance of Consultant's services under this Agreement. 2.2.8 If activities related to the performance of this agreement require specific licenses, certifications, or related credentials Consultant represents that it and/or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. ARTICLE 3 BASIC SERVICES 3.1 Basic Services 3.1.1 The Consultant shall perform as Basic Services the work and services described herein and as specified in the County's "RFP Number for (the "RFP")" issued , 20 , which is fully incorporated and integrated herein by reference together with Attachments (designate all attachments). 3.1.2 The Basic Services will be performed by the Consultant in accordance with the following schedule: (Insert task list and milestone dates) Task Milestone Date Revised July 2010 2 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 3.1.3 Should County reasonably determine that Consultant has not met the Milestone Dates established in Section 3.1.2 of this Article, County shall notify Consultant of the failure to meet the Milestone Date. The County, at its discretion may provide the Consultant seven (7) days to cure the breach. County may withhold the accompanying payment without penalty until such time as Consultant cures the Breach. In the alternative, upon Consultant's failure to meet any Milestone Date the County may modify the Milestone Date schedule. Should Consultant or its representatives fail to cure the breach within seven (7) days, or fail to reasonably agree to such modified schedule County may immediately terminate this Agreement in writing without penalty or incurring further obligation to Consultant. This section shall not be interpreted to limit the definition of breach to the failure to meet Milestone Dates. (Insert N/A if Milestones do not apply). ARTICLE 4 DURATION OF SERVICES 4.1 Scheduling; of Services 4.1.1 The Consultant shall schedule and perform his activities in a timely manner so as to meet the Milestone Dates listed in Article 3. 4.1.2 Should the County determine that the Consultant is behind schedule, it may require the Consultant to expedite and accelerate his efforts, including providing additional resources and working overtime, as necessary, to perform his services in accordance with the approved project schedule at no additional cost to the County. 4.1.3 The Commencement Date for the Consultant's Basic Services shall be ARTICLE 5 COMPENSATION 5.1 Compensation for Basic Services 5.1.1 Compensation for Basic Services shall include all compensation due the Consultant from the County for all services under this Agreement except for any authorized Reimbursable Expenses which are defined herein. The maximum amount payable for Basic Services is Dollars ($ ). Payment for Basic Services shall become due and payable in direct proportion to satisfactory services performed and work accomplished. 5.1.2 Payments will be made as percentages of the whole as Project milestones as set out in Section 3.1.2 are achieved. (For example, if there are 10 Project Tasks with Milestone Dates Revised July 2010 3 then Consultant may invoice for the first 10% of the whole upon County's acknowledgement of the satisfactory completion of Task one. Upon the County's acknowledgement that the second Task has been satisfactorily completed Consultant may invoice for the next 10% of the whole. Insert N/A if Milestone Dates do not apply). 5.1.3 In the event the amount stated on an invoice is disputed by the County, the County may withhold payment of all or a portion of the amount stated on an invoice until the parties resolve the dispute. Should Consultant fail to perform its duties under the terms of this Agreement, County may, without fault or penalty, withhold any payment associated with the work to be performed until such time as said work is completed. 5.2 Reimbursable Expenses 5.2.1 Reimbursable expenses are in addition to the fees for Basic Services and are for the following expenditures to the extent reasonable and actually incurred by the Consultant with respect to the Project (insert list of reimbursable expenses): 5.2.2 Actual expenditures for postage, reproductions, photography, and long distance telephone charges directly attributable to this Project. 5.2.3 The actual cost of reproduction of reports, plans and specifications excluding documents for exclusive use by the Consultant. 5.2.4 The Consultant shall not be entitled to any mark-up on actual expenses which are incurred. Reimbursable expenses shall be compensated by the County along with invoices for Basic Services provided by Consultant. Payment of Reimbursable Expenses shall be subject to Consultant's timely submission of valid receipts for any such expenses and approval by the County. Any additional charges not specified herein, must be mutually agreed to in advance by County and Consultant and documented in writing with a letter signed by authorized representatives for County and Consultant and, subject to budgeted funds. ARTICLE 6 RESPONSIBILITIES OF THE COUNTY 6.1 Cooperation and Coordination 6.1.1 The County has designated to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager and the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. 6.1.2 The County shall be solely responsible for determining whether Consultant as satisfactorily completed Tasks associated with Milestone Dates. Upon County's written determination to Consultant that a Task has been satisfactorily completed by its accompanying Milestone Date Consultant may submit an invoice for payment. It is agreed that County shall not unreasonably withhold its determination of satisfactory completion of any Task. In the event,the amount of an invoice is disputed, County may withhold payment until the dispute is resolved by Revised July 2010 4 the parties. County may also withhold payment on an invoice until the satisfactory completion of a Task by Consultant. ARTICLE 7 INSURANCE 7.1 General Requirements 7.1.1 The Consultant shall purchase and maintain and shall cause each of his Consultants to purchase and maintain, during the period of performance of this Agreement, insurance for protection from claims under workers' or workmen's compensation acts; Comprehensive General Liability Insurance covering claims arising out of or relating to bodily injury, including bodily injury, sickness, disease or death of any of the Consultant's employees or any other person and to real and personal property including loss of use resulting thereof; Comprehensive Automobile Liability Insurance, including hired and non-owned vehicles, if any, covering personal injury or death, and property damage; and Professional Liability Insurance, covering personal injury, bodily injury and property damage and claims arising out of or related to the performance under this Agreement by the Consultant or his agents, Consultants and employees. 7.1.2 The minimum insurance rating for any company insuring the Consultant shall be Best's A-. If the Consultant does not meet the insurance requirements, it is suggested that the County's Risk Manager be consulted prior to finalizing this Agreement. 7.2 Limits of Covera;e 7.2.1 Minimum limits of insurance coverage shall be as follows: INSURANCE DESCRIPTION MINIMUM REQUIRED COVERAGE • Worker's Compensation Limits for Coverage A- Statutory State of N.C. Coverage B - Employers Liability $500,000 each accident and policy limit and disease each employee • Commercial General Liability $1,000,000 Each Occurrence; $2,000,000 Aggregate. • Automobile Liability Combined Single Limit $500,000 • Professional Liability NOTE: Insert coverage limits required by Risk Manager if applicable. $1,000,000 7.2.2 All insurance policies (with the exception of Worker's Compensation and Professional Liability) required under this Agreement shall name the County as an additional insured party. Evidence of such insurance shall be furnished to the County, together with evidence that each policy provides that the County shall receive not less than thirty (30) days prior written notice of any cancellation, non-renewal or reduction of coverage. 7.3 Indemnity Revised July 2010 5 7.3.1 The Consultant agrees to indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Consultant except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Consultant to indemnify the County to the fullest extent permitted under North Carolina law. ARTICLE 8 AMENDMENTS TO THE AGREEMENT 8.1 Chan{zes in Basic Services 8.1.1 Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the County and the Consultant. The Consultant shall proceed to perform the Services required by the Amendment only after receiving a fully executed Amendment from the County. ARTICLE 9 TERMINATION 9.1 Termination for Convenience of the County 9.1.1 This Agreement may be terminated without cause by the County and for its convenience upon seven (7) days prior written notice to the Consultant. 9.2 Other Termination 9.2.1 The Consultant may terminate this Agreement based upon the County's material breach of this Agreement; provided, the County has not taken all reasonable actions to remedy the breach. The Consultant shall give the County seven (7) days' prior written notice of its intent to terminate this Agreement for cause. 9.3 Compensation After Termination 9.3.1 In the event of termination, the Consultant shall be paid that portion of the fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the County due to errors or omissions of the Consultant. 9.3.2 Should this Agreement be terminated, the Consultant shall deliver to the County within seven(7) days, at no additional cost, all Deliverables including any electronic data or files relating to the Project. 9.4 Waiver 9.4.1 The payment of any sums by the County under this Agreement or the failure of the County to require compliance by the Consultant with any provisions of this Agreement or the waiver by the County of any breach of this Agreement shall not constitute a waiver of any claim for damages by the County for any breach of this Agreement or a waiver of any other required compliance with this Agreement. Revised July 2010 6 ARTICLE 10 ADDITIONAL PROVISIONS 10.1 Relationship of Parties 10.1.1 Consultant is an independent contractor of the County. Neither Consultant nor any employee of the Consultant shall be deemed an officer, employee or agent of the County. Consultant's personnel shall not be employees of, or have any contractual relationship with the County. 10.2 Limitation and Assignment 10.2.1 The County and the Consultant each bind themselves, their successors, assigns and legal representatives to the terms of this Agreement. Neither the County nor the Consultant shall assign or transfer its interest in this Agreement without the written consent of the other. 10.3 Governing Law 10.3.1 This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. 10.4 Dispute Resolution 10.4.1 Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non-performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina and it is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. The Parties may agree to nonbinding mediation of any dispute prior to the bringing of such suit or action. 10.5 Extent of Agreement 10.5.1 This Agreement, together with the Request for Proposals together with attachments distributed by the County and the Consultant's submitted Proposal, all of which constitute the Contract Documents, represents the entire and integrated agreement between the County and the Consultant and supersedes all prior negotiations, representations or agreements, either written or oral. In the event of a conflict among the terms of the Contract Documents, the priority of documents shall be This Agreement, the County's Request for Proposals, attachments to the County's Request for Proposals, and the Consultant's Proposal. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. 10.6 Severability 10.6.1 If any provision of this Agreement is held as a matter of law to be unenforceable, the remainder of this Agreement shall be valid and binding upon the Parties. 10.7 Ownership of Deliverables Revised July 2010 7 10.7.1 All Deliverables, together with all supporting materials, source documentation, data collected, field notes, and working drafts, developed in the performance of this Agreement shall become the property of the County and may be used on any other project without additional compensation to the Consultant. The use of the Deliverables by the County or by any person or entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. 10.8 Non-Appropriation 10.8.1 Consultant acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable and not appropriated for the performance of County's obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Consultant of the unavailability and non-appropriation of public funds. It is expressly agreed that County shall not activate this non-appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County's statutory authority, mandate and/or mandated functions, by state and/or federal legislative or regulatory action, which adversely affects County's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Consultant of such limitation or change in County's legal authority. 10.9 Notices 10.9.1 Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Consultant's Name &Address Attention: P.O. Box 8181 Hillsborough, NC 27278 IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal, all as of the day and year first above written. COUNTY: Orange County CONSULTANT: , Chair Signature Board of County Commissioners Revised July 2010 8 Attest: Donna Baker, Clerk to the Board [SEAL] This instrument has been approved as to technical content. , Department Director This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act. Office of the Finance Director This instrument has been approved as to form and legal sufficiency. Office of the County Attorney Revised July 2010 9 ..: y:�• � x S, y: ra'" � � Y v �� rr - �k�b'.y �. �� '� �, z x ;��3..w -,` �{'��"� {�. �^3 � �^ �k � r rzk3 3.:Ak�'�" t,. ��.' .�t' .,irtriw��'kA4.�N�'�.w���"�4i�A•ki�e`��uv""�i4J#` °' a STATEMENT OF QUALIFICATION (:Onlrfjl Efifind No , . BucR11 116160�� ��"CBNST N PNASE ,. r , s r A M ,Nalh Ca Edina 2WI r� "X024 S `0 C f A s McGill A S S O C I A T E S ENGINEERING • PLANNING • FINANCE July 7,2011 Mr.David E.Cannell,Purchasing Agent Orange County Financial Services Post Office Box 8181 Hillsborough,North Carolina 27278 RE. Central Efland/Northern Buckhorn Sewer Extensions— Construction Phase Services, RFQ 376-5176 Dear Mr.Cannell, In response to your Request for Qualifications(RFQ),McGill Associates is pleased to submit the enclosed copies of our proposal for your review and consideration.We are excited abut the possibility of providing construction phase services to Orange County for this project and welcome the opportunity to discuss our qualifications and experience in greater detail with you. McGill Associates is a leading provider of engineering and construction administration services in North Carolina. Our program of service is founded on our commitment to local government clients and the desire to establish long-term working relationships.McGill Associates would be pleased to assist the County with this most important project.We believe our proposed project team offers unique qualifications and is best positioned to provide you with the superior level of service required for the successful completion of this project.Please consider the following key points: • McGill Associates has more than 27 years of successful history in the construction administration of sewer extensions and other municipal engineering projects throughout North Carolina. • Doug Chapman,PE,will lead our project oversight efforts.He has worked on the design and construction observation for numerous wastewater collection and treatment projects in North Carolina and brings his expert knowledge and experience to this project. • Our Firm has extensive experience and a successful history with state and federal funding services,including State Revolving Funds(SRF) and EPA Special Appropriations, as well as other regulatory agencies. We have worked with this agency for many wastewater projects. • Our project team has visited the project site and reviewed the plans and specifications to fully understand the project and the requirements for completing this challenging job successfully. We understand the importance of constructing this project within a strict deadline to satisfy funding requirements. Finally, and perhaps the most important factor, aside from our qualifications to perform the required services, is our sincere desire to assist Orange County with this important initiative. We would be pleased to discuss this project and our qualifications to provide the proposed professional services at your convenience.If you have any questions,feel free to contact me in our local office at(828)328-2024. Sincerely, McGill Associates,P.A. Andy Lovingood,PE Principal E n g i n e e r i n g P l a n n i n g F i n a n c e McGill Associates,P.A. • P.O.Box 1136,Hickory,NC 28603 • 124019`h St.,Lane NW,Hickory,NC 28601 Phone: 828-328-2024 • Fax: 828-328-3870 e 4 Table of Contents Information About the Firm........................ 2 Similar Projects.................................... 3-6 Project References...................................... 7 Current Projects........................................... 8 w Experience with Funding Agencies........... 9 Project Team................................................ 10-20 Subcontractors / Minority Firms.................. 21 CAD / Mapping / Surveying Capabilities.................................................. 22-23 Project Management Approach.............. 24-31 Addendum Acknowledgement................ 32-35 ter. Confidential and Proprietary Central EFland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 Information about the Firm McGill Associates, PA EXPERIENCE WITH STAKEHOLDERS 1240 19th Street, Lane NW McGill Associates is first and foremost a municipal engineering Firm. Although Hickory, North Carolina 28601 we maintain a strong program of service to the private sector,our principal Phone: (828) 328-2024 direction and commitment is to our governmental clients. Therefore,we Fax: (828) 328-3870 have concentrated our efforts and resources toward the development of a Web: www.mcgillengineers.com very high level of competence in those areas of engineering which are of concern to our public clients. Our objective is to be the best at what we do for these governments. The result is a proven expertise in the most complex Andy Longood d,PE,Principal and sophisticated public engineering issues.Through our years of operation, (828) 28 good,ext.2 lengineers.com we have learned the complexities of any public project involves not only just (828)328-2024,ext.225 the governing body and respective elected officials,but the communities in which those governments serve.We have more than 27 years of experience in Doug Chapman,PE,Senior Project Manager working directly with government and public stakeholders to ensure all entities doug.chapman @mcgillengineers.com are satisfied with the project at hand,maintaining constant communication with (828)328-2024,ext.228 affected stakeholders to ensure a successful project that meets and exceeds the McGill Associates,a professional services client's and the public's needs. organization,was established in 1984 and has CONSTRUCTION PHASE offices in Hickory,Asheville and Pinehurst, North SERVICES Carolina;and Sevierville and Knoxville,Tennessee. Our construction administration, The Firm employs a staff of more than 120 professional observation and inspection and support personnel who have provided construction program is crucial to the administration,civil and environmental engineering, successful completion of our landscape architecture,planning and public finance public projects.We emphasize services to clients in North Carolina,South Carolina, sound training and supervision Tennessee,Georgia and Virginia.In addition,we provide of our construction management services in planning and financial areas,including project staff because we understand the facilitation,assistance in public finance,economic importance of successful and feasibility analysis,real estate services,utility rate responsive construction phase analysis,revenue studies,market analysis,and other services to our clients.McGill related services. Associates maintains a staff LICENSURE totally committed to overseeing • McGill Associates is licensed to practice engineering project construction,ensuring contractors fully comply with the in the states of North Carolina,Tennessee,South project plans and specifications,and projects are completed in accordance with Carolina,Virginia,West Virginia, Kentucky and the prescribed schedules and protocols.No other element of our engineering Georgia. services program is more important to our clients than that of managing the • McGill Associates is licensed to practice surveying in construction process.Our team ensures that the problems that may arise during the states North Carolina and Tennessee. construction are handled with minimal disruptions to schedules and additional • McGill Associates is licensed to practice landscape architecture in the states of North Carolina,South expense,and that the project is completed on schedule,within the budget. Carolina and Tennessee. Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-51760 2 e � wa�NO Similar Projects Northeast Wastewater Treatment Plant City of Hickory, North Carolina Project includes construction administration for 4,500 LF of 30-inch interceptor and 6,140 LF of 24-inch interceptor for a new wastewater treatment plant. Client: Kevin Greer, PE,City Engineer, (828)323-7427 Personnel involvement/Responsibilities: Andy Lovingood-Contract Management Keith Webb-Project Management Wesley Wightman-Construction Administration Date: Under Construction Initial Budget: Prepared by others Value of Project:$21,900,000 Westside Sewer Project City of Shelby, North Carolina Project includes approximately 25,000 LF of 15-inch and 16-inch gravity sewer lines, 13,700 LF 16-inch sewer force main,and a 2.5 MGD wastewater pump station. Client:Rick Howell,City Manager (704)4846801 Personnel involvement/Responsibilities:Keith Webb-Project Management/QA&QC Date:2010 Initial Budget:$5.8 million Value of Project:$5.8 million Highway 18 Sewer Project City of Lenoir, North Carolina Project includes 4,500 LF of 30-inch interceptor and 6,140 LF of 24-inch interceptor. Client:Lane Bailey,City Manager (828)757-2200 Personnel involvement/Responsibilities:Andy Lovingood-Contract Management,Doug Chapman-Project Management, Jerry Bowman-Construction Observation Date:2006 Initial Budget:$1,952,400 Value of Project:$1,940,000 Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-51760 3 a�M, HIM Governors Island Sanitary Sewer System Swain County, North Carolina Project includes 7,450 LF of 8-inch gravity sewer,3750 LF of 6-inch force main and a pump station. Client:Kevin King,County Manager (828)488-9273 Personnel involvement/Responsibilities:Keith Webb-Project Management Date:2010 Initial Budget:$1,200,000 Value of Project:$1,085,000 6th and 7th Avenue Project Town of Catawba, North Carolina Project includes the design and construction administration of approximately 500 LF of 6-inch diameter water main,approximately 2,360 LF of 8-inch diameter sewer line,replacement of an existing wastewater pumping station,and approximately 500 LF of roadway to serve an existing residential area in the Town of Catawba. Client:Brian Barnett,Manager (828)241-2215 Personnel involvement/Responsibilities:Andy Lovingood-Contract Management,Doug Chapman-Project Management,Jerry Bowman- Construction Observation Date:2008-2009 Initial Budget:$312,000(prepared by another engineering firm) Value of Project:$545,000 Eco Industrial Park Sewer Service "� "°•.,r Camden County, North Carolina Project includes the design of approximately 29,500 LF of 10-inch diameter sewer line and 8-inch sewer force mains,and a submersible wastewater pumping station to serve the proposed Eco Industrial Park in Camden County. Client: Randell Woodruff,County Manager (252)338-1919 ' ' Personnel involvement/Responsibilities: Andy Lovingood-Contract Management Doug Chapman-Project Management Wesley Wightman-Construction Administration Date:2010-2011 Initial Budget:$1.4 Million Value of Project:$1.4 Million Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-51760 4 Whittier Sanitary District Whittier, North Carolina Project includes the installation of approximately 22,000 LF of 12-inch and 8-inch gravity sewer lines,five(5)sewage pump stations,and construction of a 0.2 MGD wastewater treatment facility to serve the Whittier area. Client:George Rogers, Director (828)226-2360 Personnel involvement/Responsibilities:Keith Webb-Project Management Date:2009 Initial Budget:$3,333,000 Value of Project:$3,333,000 Long Creek Sewer Interceptor Replacement Town of Robbinsville, North Carolina Project included approximately 6,000 LF of 12-inch gravity sewer interceptor. Client:Bobby Cagle,Jr.,Mayor (828)479-3250 Personnel involvement/Responsibilities:Keith Webb-Project Management Date:2008 Initial Budget: $550,000 Value of Project:$537,000 Bracket Creek Sewer interceptor and Pump Station Improvements Town of Forest City, North Carolina Project included the installation of approximately 3,000 LF of 24-inch and 18-inch gravity sewer lines,approximately 2,500 LF of 18-inch sewer force main,and upgrades to the existing Brackett Creek Pump Station. Client:Charles Summey,Town Manager (828)245-4747 Personnel involvement/Responsibilities:Keith Webb-Project Management Date:2010 Initial Budget:$850,000 Value of Project: $850,000 Blue Ridge Mountain Club (formerly Ginn Resorts) Watauga and Wilkes Counties, NC Project included design of a new wastewater collection and disposal system for the first phase of a 6,000 acre private development. The collection system is a combination of approximately 70,000 LF of pressure sewers,approximately 13,700 LF of gravity sewers,9 submersible sewer pump stations and approximately 33,400 LF of force mains. The disposal system includes a wastewater treatment system and effluent drip irrigation lines for a non-discharge disposal system. Client: Patrick Warren,Development Manager (828)295-8667 Personnel involvement/Responsibilities:Andy Lovingood-Contract Management,Doug Chapman-Project Management,Jerry Bowman- Construction Observation,Curtis Baker-Construction Field Representative Date:2006-2008 Initial Budget:$7,500,000 Value of Project:$7,310,000 Confidential and Proprietary I Central Efland/Northern Buckhom Sewer Extensions-Construction Phase Services,RFQ No.376-51760 5 Mirror Lake Sewer Project Town of Highlands, North Carolina Project includes 12,600 LF of 8-inch sewer lines and a sewer pump station. p Client:Mr.Jim Fatland,Town Manager(828)526-2118 Personnel involvement/Responsibilities:Keith Webb- Project Management Date:2010 Initial Budget:$3,200,000 Value of Project:$2,500,000 § ., Tuckaseigee River Sewer Interceptor Upgrade Town of Bryson City, North Carolina _ Project includes 2,700 LF of 16-inch sewer lines and pump station improvements. Client:Larry Callicutt,Town Manager,(828)488-3335 Personnel involvement/Responsibilities:Keith Webb-Project Management Date:2009 Initial Budget:$425,000 Value of Project:$400,000 Corpening Creek and Catawba River Wastewater System Improvements City of Marion, North Carolina Project includes two(2)sewer pump stations, 12,500 LF of 10-inch force main,300 LF of 12-inch gravity sewer,and wastewater treatment plant improvements. - Client:Mr.Bob Boyette,City Manager(828)652-3551 Personnel involvement/Responsibilities:Keith Webb-Project Management Date:2010 Initial Budget:$4,600,000 Value of Project:$4,200,000 Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-51760 6 l Project References - Past 5 Years PROJECT LOCATION CONTACT Eco-Complex Wastewater System Camden County,North Carolina Randell Woodruff,County Manager (252)338-1919 N.C.150 Sewer Line Catawba County,North Carolina Barry Edwards,Director of Utilities and Engineering (828)465-8261 Governor's Island Sewer System Swain County,North Carolina Kevin King,County Manager (828)488-9273 6th and 7th Avenue Project Town of Catawba,North Carolina Brian Barnett,Town Manager (828)241-2215 Northeast Wastewater Treatment Plant City of Hickory,North Carolina Kevin Greer, PE,City Engineer (828)323-7427 Highway 18 Sewer Project City of Lenoir,North Carolina Lane Bailey,City Manager (828)757-2200 Westside Sewer Project City of Shelby,North Carolina Rick Howell,City Manager (704)484-6800 Whittier Sanitary District Whittier,North Carolina George Rogers, Director (828)226-2360 Long Creek Sewer Interceptor Town of Robbinsville,North Carolina Bobby Cagle,Jr.,Mayor Replacement (828)479-3250 Bracket Creek Sewer Interceptor and Town of Forest City,North Carolina Charles Summey,Town Manager Pump Station Improvements (828)245-4747 Confidential and Proprietary I Central Efiand/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-51760 7 Current Proiects Current projects listed below involve McGill Associates staff that are being proposed for the Central Efland/Northern Buckhorn Sewer Extensions project. CURRENT PROJECT DESIGN TEAM INVOLVED STATUS Northeast WWTP-City of Hickory,NC Andy Lovingood,Keith Webb,Wesley Under construction Wightman NC 150 Sewer Project-Catawba County,NC Andy Lovingood, Doug Chapman, Design 95%complete Forrest Westall,Dallas Gordon,Phil Fisher Bunker Hill Sewer Project-Catawba County,NC Andy Lovingood, Doug Chapman, Currently out to bid Third Creek WWTP Expansion-City of Statesville, NC Andy Lovingood,Doug Chapman, Design and permitting complete Keith Webb,Forrest Westall,Phil Fisher, Dennie Martin Nutbush Creek WWTP Improvements-Henderson,NC Andy Lovingood, Doug Chapman, PER complete,awaiting design Keith Webb, Forrest Westall, Phil authorization Fisher, Dennie Martin Raw Water Intake-City of Lenoir,NC Andy Lovingood, Doug Chapman, Construction nearly complete,equipment Wesley Wightman,Curtis Baker startups underway WORKLOAD McGill Associates will work within Orange County's project time frame to meet the project stated objectives.We are anxious to be involved with this important project,and we are prepared to adjust our work program to accommodate the County's schedule. We understand the importance of completing the proposed project in accordance with the project schedule,as well as within a strict budget. McGill Associates'record of success in completing projects on-time and within the client's established budget is exemplary. In addition,our record for minimal change orders for our large capital projects is excellent. This success in minimizing change orders reflects the quality and accuracy of our plans and specifications,as well as the high quality of our field observation services. SUBCONTRACTORS McGill Associates is able to provide the entire range of professional services necessary to perform the work provided for in the County's Request for Qualifications. Therefore,it is anticipated that our Team will not require subcontractors to perform any of the services that are solicited by the County for this project. Please be assured that in the event we are chosen to assist the County with this project,we will continue to abide by the conditions of the plan and solicit minority business participation for services that are beyond the capabilities of our organization. Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-51760 8 Experience with Funding Agencies McGill Associates has extensive experience with public wastewater systems throughout North Carolina and with procuring state and federal funding,including State Revolving Fund (SRF),Congressional Appropriations(STAG and EPA funds),CDBG funds,Appalachian Regional Commission (ARC), US Economic Development Administration, USDA-Rural Development (RD), and American Recovery and Reinvestment Act (ARRA) funds. We have completed many projects with these funding agencies during the past 27 years of operation. Our experience and success with these funding agencies is unparalleled because we have staff members with public finance education and expertise who are .q specifically dedicated to procuring grants and low-interest loans for our clients. Some of our more recent federal projects that we have administered include: Project Federal Agency Year Amount CantorVCtyde Interconnect EPA-Special Appropriation 2007 $852,000 11 JSD Pump Station Improvements EPA-Special Appropriation 2009 $415,000 Town of Maiden WWTP Upgrase. CWSRF 2007 $1,492,4ft0 Forest City CBD SS 1/1 Reduction CWSRF 2011 $920,754 Town of Robbinsville Tallulah reol Atdah SS Rehab. CWSRF 2010 $318,200 Town of Forest City Mill Street Collection System Rehab CWSRF 2010 $814,350 Town of Bryson City WWTP lmpraiirnnts CWSRF 201f'' $687,756 City of Marion Corpening Creek Sewer Improvements CWSRF 2008 $3,162,000 Town of Maggie Valley 116",600080 CWSRF 2007 Town of Franklin WWTP and Riverview PS Improvements CWSRF 2010 $5,508,211 Confidential and Proprietary I Central Efiand/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 9 Information about the Proposed Project Design Team McGill Associates,P.A.,utilizes the Project Team approach to project management.This approach is particularly appropriate for multiple-task projects,where coordination,scheduling and efficiency are important considerations.A principal goal in assembling the proposed team is matching the individual and team qualifications with the expertise and experience appropriate for the proposed project. McGill Associates has assisted clients with public and private projects throughout the Southeast for 27 years.The team McGill Associates selected for this proposed project is conveniently located in Hickory,North Carolina.The resumes of proposed team members are summarized on the following pages. 850t , C*' 37 iY s Andy Lovingood, Principal • • Chapman, Webb, Senir• Project • • ••` Quality Control Dennie Martin Wesley Dallas • • • Forrest Finance • O Senior • •n Environmental Surveying Services Facilitation Administrator Cmgliance Manaqer manager Director Jerry Bowman Senior Construction Electrical Baker Field Representative Manager Curtis Construction Field Representative Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 10 Andy Lovingood, PE Project Role: Principal-in-Charge Project Responsibilities: Contract management Andy Lovingood is a valued member of McGill Associates' RELATED PROJECT EXPERIENCE: management staff and has been with the Firm for 20 years. 6th and 7th Avenue Project-Catawba,North Carolina He has served as principal for many complex water and • 500 LF of 6-inch diameter water main wastewater projects and he possesses more than 20 years • Approximately 2,360 LF of 8-inch diameter sewer line of design and management experience.Mr.Lovingood has • Replacement of an existing wastewater pumping station developed a substantial expertise in project management, • Approximately 500 LF of roadway treatment plant design,upgrades and expansion,construction Initial Budget:$312,000(prepared by another engineering firm) administration and project oversight,pump station design, Value of Project:$545,000 water and sewer system planning and accurate cost estimating. Client:Brian Barnett,Manager (828)241-2215 He has been formally trained in Construction Management at N.C.State University and is a licensed General Contractor. Eco Industrial Park Sewer Service-Camden County,North Carolina Additionally,he has worked as a municipal engineer and • Approximately 29,500 LF of 10-inch diameter sewer line understands the governmental process. • 8-inch sewer force mains • Submersible wastewater pumping station Mr.Lovingood has a broad working knowledge of the state and Initial Budget:$1.4 Million federal environmental performance standards and regulations, Value of Project:$1.4 Million including North Carolina Construction Grants and Loans(NC Client:Randell Woodruff,County Manager (252)338-1919 CG&L).He continues to serve at the request of NC CG&L at a committee level. Northeast Wastewater Treatment Plant-Hickory,North Carolina • 4,500 LF of 30-inch interceptor and 6,140 LF of 24-inch interceptor In addition to his project management expertise,Mr.Lovingood Initial Budget: Prepared by others previously served in the public sector as a municipal leader, Value of Project:$21,900,000 having formerly been the City Engineer for the City of Concord. Client:Kevin Greer,PE,City Engineer (828)323-7427 He is well-versed in the public process and can aid in gaining public input and public facilitation.He is available whenever Blue Ridge Mountain Club(formerly Ginn Resorts)-Watauga and the project will call for him to engage and discuss any issues or Wilkes Counties,North Carolina concerns related to the project. Approximately 70,000 LF of pressure sewers • Approximately 13,700 LF of gravity sewers EDUCATION: 9 submersible sewer pump stations Bachelor of Science Degree in Civil Engineering with • Approximately 33,400 LF of force mains Construction Management Option • Wastewater treatment system and effluent drip irrigation lines for a non- North Carolina State University,Raleigh,North Carolina discharge disposal system. Initial Budget:$7,500,000 University of North Carolina at Charlotte Value of Project:$7,310,000 Charlotte,North Carolina Client:Patrick Warren,Development Manager (828)295-8667 PROFESSIONAL REGISTRATION: North Carolina Professional Engineer,#023024 North Carolina General Contractor,#47102 Confidential and Proprietary I Central Efiand/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 Doug Chapman, PE Project Role: Senior Project Manager Project Responsibilities: • Current design review,drawing revisions • Serve as facilitator between County and consultant to alert them to changes,problems,concerns or design issues • Conduct site visits and progress updates with design consultant,McGill Associates and County • Oversee and revise any necessary design changes • Attend pre-construction conference • Be present for startups Doug Chapman has more than 19 years of progressive RELATED PROJECT EXPERIENCE: experience in the water and wastewater field and has been 6th and 7th Avenue Project-Catawba,North Carolina with the Firm for 11 years. His work history includes not • 500 LF of 6-inch diameter water main only consulting engineering,but also local government • Approximately 2,360 LF of 8-inch diameter sewer line experience. Not only has Mr.Chapman planned and designed • Replacement of an existing wastewater pumping station complex wastewater systems,he has also managed such • Approximately 500 LF of roadway a system. That wastewater collection system included a Initial Budget:$312,000(prepared by another engineering firm) complex network of pressure sewers,gravity sewers,and Value of Project:$545,000 interconnected pump stations and associated force mains.He Client:Brian Barnett,Manager (828)241-2215 served as the lead planner/designer for a complex wastewater collection,treatment,and disposal system for a 7,000 acre Eco Industrial Park Sewer Service-Camden County,North Carolina resort serving an estimated 1,800 residences.The system • Approximately 29,500 LF of 10-inch diameter sewer line included a combination of gravity and pressure sewers,and • 8-inch sewer force mains numerous pump stations to navigate the rugged mountain • Submersible wastewater pumping station terrain,in addition to an on-site effluent storage and irrigation Initial Budget:$1.4 Million disposal system.With his broad range of experience with local Value of Project:$1.4 Million governments,Doug understands the need to deliver a complete Client:Randell Woodruff,County Manager (252)338-1919 project. Such project delivery not only includes technical planning and design,but also a variety of more subtle items that Northeast Wastewater Treatment Plant-Hickory,North Carolina are equally or more important to the client such as coordination • 4,500 LF of 30-inch interceptor and 6,140 LF of 24-inch interceptor with various stakeholders(residents,developers, regulators, Initial Budget:Prepared by others system operators,elected officials,etc.),educating stakeholders Value of Project:$21,900,000 of the consequences(advantages and disadvantages)of Client:Kevin Greer,PE,City Engineer (828)323-7427 various project paths,financial planning(project funding,grant applications,connection/capacity fees,user rates,etc.)and Blue Ridge Mountain Club(formerly Ginn Resorts)-Watauga and policy/procedure development for long term system operations. Wilkes Counties,North Carolina He works closely with clients to complete projects that meet the • Approximately 70,000 LF of pressure sewers true needs of the client for the future. • Approximately 13,700 LF of gravity sewers • 9 submersible sewer pump stations EDUCATION: Approximately 33,400 LF of force mains Bachelor of Science Degree in Mechanical Engineering Wastewater treatment system and effluent drip irrigation lines for a North Carolina State University,Raleigh,North Carolina non-discharge disposal system Initial Budget:$7,500,000 PROFESSIONAL REGISTRATION: Value of Project:$7,310,000 North Carolina Professional Engineer,#020622 Client:Patrick Warren, Development Manager (828)295-8667 Confidential and Proprietary I Central EFland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 1 2 Keith Webb, PE Project Role: Quality Control / Quality Assurance Project Responsibilities: • Certify design adequacy • Approve engineering design changes,if necessary • Ensure contractor design and scheduling compliance Keith Webb has been with the Firm for 25 years,and has more RELATED PROJECT EXPERIENCE: than 20 years in municipal wastewater planning and is McGill Northeast Wastewater Treatment Plant-Hickory,North Carolina Associates'key wastewater treatment process person.He has • 4,500 LF of 30-inch interceptor and 6,140 LF of 24-inch interceptor worked with various sizes of public and private wastewater Initial Budget:Prepared by others systems across North Carolina and Tennessee.Many of those Value of Project:$21,900,000 projects involved public input,facilitation,and accurate cost- Client:Kevin Greer, PE,City Engineer (828)323-7427 estimating. Governors Island Sanitary Sewer System-Swain County,North Mr.Webb has a proven track record in the management of Carolina engineering projects and personnel,and he is dedicated to • 7,450 LF of 8-inch gravity sewer,3750 LF of 6-inch force main successful project performance. Mr.Webb is adept at providing • Pump station technical support and developing new processes through Initial Budget:$1,200,000 successful evaluation and improvement of project scheduling Value of Project:$1,085,000 and budget performance. He functions effectively in our team Client:Kevin King,County Manager (828)488-9273 approach,and will ensure that the client goals and values are achieved. His experience in all aspects of the Firm's program Westside Sewer Project-Shelby,North Carolina of service has enhanced his expertise and knowledge in project • Approximately 25,000 LF of 15-inch and 16-inch gravity sewer lines design,financing,planning,contract administration and public • 13,700 LF 16-inch sewer force main policy matters.Mr.Webb is also the vice president of the Firm. • 2.5 MGD wastewater pump station Initial Budget:$5.8 million EDUCATION: Value of Project:$5.8 million Bachelor of Science Degree in Civil Engineering Client:Rick Howell,City Manager (704)484-6801 Clemson University,Clemson,South Carolina Whittier Sanitary District -Whittier,North Carolina PROFESSIONAL REGISTRATION: • Approximately 22,000 LF of 12-inch and 8-inch gravity sewer lines North Carolina Professional Engineer,#12809 • Five(5)sewage pump stations Tennessee Professional Engineer,#3107507 • 0.2 mgd wastewater treatment facility to serve the Whittier area South Carolina Professional Engineer,#10359 Initial Budget:$3,333,000 Value of Project:$3,333,000 PROFESSIONAL ASSOCIATIONS: Client:George Rogers, Director (828)226-2360 National Society of Professional Engineers AWWANVEF Long Creek Sewer Interceptor Replacement-Robbinsville,North Carolina • Approximately 6,000 LF of 12-inch gravity sewer interceptor. Initial Budget: $550,000 Value of Project:$537,000 Client:Bobby Cagle,Jr.,Mayor (828)479-3250 Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 1 3 a 1N ) z Wesley Wightman, PE Project Role: Senior Construction Administrator Project Responsibilities: • Conduct pre-construction conference • Review,approve applications for payment • Review,approve change order requests • Respond to necessary design changes or field issues • Be present for startups • Perform detailed final inspection • Submit necessary close-out documents to local,state and federal agencies Wesley Wightman is a valued member of McGill Associates' RELATED PROJECT EXPERIENCE: professional staff with more than 12 years of experience 6th and 7th Avenue Project-Catawba,North Carolina directly related to construction and engineering design • 500 LF of 6-inch diameter water main projects;his engineering background enables him to fully • Approximately 2,360 LF of 8-inch diameter sewer line understand the many construction inspection and oversight • Replacement of an existing wastewater pumping station issues related to infrastructure projects in North Carolina. Mr. • Approximately 500 LF of roadway Wightman began his career with an international construction Initial Budget:$312,000(prepared by another engineering firm) company and understands all facets of the construction Value of Project:$545,000 process.He has been a valuable asset with the Firm for four Client:Brian Barnett,Manager (828)241-2215 years. Eco Industrial Park Sewer Service-Camden County,North Carolina Mr.Wightman has extensive experience in managing large • Approximately 29,500 LF of 10-inch diameter sewer line construction projects,including a keen understanding of • 8-inch sewer force mains design,contract law and project finance.He is a strong • Submersible wastewater pumping station communicator,detailed orientated,well organized and Initial Budget:$1.4 Million thorough.All of this reflects positively for our clients in his Value of Project:$1.4 Million project meetings,processing of applications for payment, Client:Randell Woodruff,County Manager (252)338-1919 reviewing shop drawings,and negotiating change orders.He understands the importance of protecting the Owner's interest Northeast Wastewater Treatment Plant-Hickory,North Carolina during construction,and ensuring that the approved plans and • 4,500 LF of 30-inch interceptor and 6,140 LF of 24-inch interceptor. specifications are followed. Initial Budget:Prepared by others Value of Project:$21,900,004 EDUCATION: Client:Kevin Greer,PE,City Engineer (828)323-7427 Bachelor of Science Degree in Civil Engineering Clemson University,Clemson,South Carolina Blue Ridge Mountain Club(formerly Ginn Resorts)-Watauga and Wilkes Counties,North Carolina PROFESSIONAL REGISTRATION: • Approximately 70,000 LF of pressure sewers North Carolina Professional Engineer,#033587 • Approximately 13,700 LF of gravity sewers South Carolina Professional Engineer,#25828 • 9 submersible sewer pump stations • Approximately 33,400 LF of force mains PROFESSIONAL ASSOCIATION: Wastewater treatment system and effluent drip irrigation lines for a non- AWWAMEF discharge disposal system. Initial Budget:$7,500,000 Value of Project:$7,310,000 Client:Patrick Warren,Development Manager (828)295-8667 Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 1 4 Jerry Bowman Project Role: Senior Construction Field Representative Project Responsibilities: On-site reviews for design compliance Jerry Bowman has more than 33 years of experience RELATED PROJECT EXPERIENCE: directly related to utility construction,and has been with Blue Ridge Mountain Club(formerly Ginn Resorts)-Watauga and the Firm for 10 years. His many years of experience Wilkes Counties,North Carolina earned in this region has enabled him to fully understand • Approximately 70,000 LF of pressure sewers the need for completion of a project that's easy to operate, • Approximately 13,700 LF of gravity sewers maintain, and repair. He is conscious of cost control and • 9 submersible sewer pump stations management, attention to detail,and adherence to plans • Approximately 33,400 LF of force mains and specifications. • Wastewater treatment system and effluent drip irrigation lines for a non- discharge disposal system. Mr. Bowman understands from the Owners'perspective Initial Budget:$7,500,000 what is expected from the contractor. He is aware of the Value of Project:$7,310,000 many construction issues related to coordination between Client: Patrick Warren,Development Manager (828)295-8667 the client and the contractor. Highway 18 Sewer Project-Lenoir,North Carolina Mr. Bowman is widely experienced in the construction • 4,500 LF of 30-inch interceptor industry as equipment operator,foreman,and inspector. • 6,140 LF of 24-inch interceptor He has obtained valuable experience working with Initial Budget:$1,952,400 construction and management for governmental Value of Project:$1,940,000 contracts such as utility infrastructure. Specifically, he is Client:Lane Bailey,City Manager (828)757-2200 experienced with the details of utility installation, including coordination with property owners. Mr. Bowman is also skilled in the areas of project supervision, including overseeing crew/sub-contractors, monitoring materials and cost control. He is knowledgeable of OSHA and DOT regulations. He is well respected by our clients, as well as the many contractors who have worked with him. EDUCATION: GED Received while serving in the United States Army Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 5 1 >ui Curtis Baker Project Role: Construction Field Representative Project Responsibilities: on-site reviews for design compliance Curtis Baker has been with McGill Associates for four years RELATED PROJECT EXPERIENCE: and is experienced in the installation of sewer,water and storm Blue Ridge Mountain Club(formerly Ginn Resorts)-Watauga and drainage and possesses knowledge on proper erosion control Wilkes Counties,NC matters.His experience was earned in this region and it • Approximately 70,000 LF of pressure sewers has enabled him to fully understand the many construction • Approximately 13,700 LF of gravity sewers issues related to infrastructure projects in North Carolina. • 9 submersible sewer pump stations • Approximately 33,400 LF of force mains Mr. Baker is widely experienced and respected in the • Wastewater treatment system and effluent drip irrigation lines for a non- construction industry as worker,foreman and inspector. discharge disposal system. He is skilled in landscaping,asphalt,curbing,grading and Initial Budget:$7,500,000 concrete.He has obtained valuable experience working with Value of Project:$7,310,000 public wastewater and water facilities for utility districts, Client: Patrick Warren,Development Manager (828)295-8667 cities and towns throughout the region. EDUCATION: High School Diploma,1998 West Caldwell High School,Lenoir,NC Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 1 6 w, Dallas Gordon, PLS Project Role: Surveying Services Manager Project Responsibilities: Surveying services Dallas Gordon has been with the Firm for six years and manages McGill Associates'Survey Division.Mr.Gordon has more than 18 years of survey experience. As Surveying Services Manager,he oversees the daily administrative and technical activities associated with the Survey Division. He has extensive experience with boundary retracement surveys,ALTA/ACSM surveys, FEMA flood studies,route surveying, topographic surveys,construction site control and construction staking. Dallas has detailed experience calculating field placement,establishing high order survey control and providing precise layout for new bridge construction. He has completed the 40-hour OSHA HAZWOPER training certification and has performed several large scale site surveys on hazardous material sites. Dallas is innovative in his approach to surveying. He is skilled at adapting current survey methodologies and developing new surveying strategies to efficiently and effectively meet the needs of our clients. EDUCATION: Bachelor of Science Degree in Building Construction Auburn University,Auburn,Alabama PROFESSIONAL REGISTRATION: North Carolina Professional Land Surveyor#4626 Alabama Professional Land Surveyor#24018 Tennessee Professional Land Surveyor#1985 PROFESSIONAL ASSOCIATIONS: North Carolina Society of Surveyors Tennessee Association of Professional Land Surveyors Alabama Society of Professional Land Surveyors Confidential and Proprietary I Central EFland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 1 7 spa Phil Fisher, PE Project Rote: Electrical Services Manager Project Responsibilities: Pump station electrical inspection Phil Fisher has been with McGill Associates for five years.He has more than 24 years of engineering design and field experience including electrical normal and standby (on-site generator) power, lighting, telecommunications, fire alarm, security, and control systems for commercial and industrial facilities;and work which includes wastewater and water treatment plants and pump stations. Phil has strong conceptualizing and problem solving skills,and is able to quickly and efficiently develop several solutions to engineering problems. Mr. Fisher is very effective at leading other members of a design team as well as coordinating with contractors.He is also an excellent writer of technical documentation.He has a working knowledge of National Electrical Code and National Electrical Safety Code,and he is familiar with North Carolina State Building Code and related National Fire Prevention Association standards. EDUCATION: Bachelor of Science Degree in Electrical Engineering North Carolina State University,Raleigh,North Carolina PROFESSIONAL REGISTRATION: North Carolina Professional Engineer,#18684 South Carolina Professional Engineer,#24799 Tennessee Professional Engineer,#105089 Virginia Professional Engineering License,#022959 Kentucky Professional Engineering License,#25245 Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 1 8 �4 Forrest Westall, PE Project Role: Environmental Compliance Manager Project Responsibilities: Permitting review and Environmental review Forrest Westall has been with the Firm for six years and is a valued member of McGill Associates'professional staff. As Environmental Compliance Manager,he is available to guide and coordinate the environmental permitting process on wastewater,water,solid waste,stream and wetlands,as well as stormwater impacts and facility development projects during the creation of Preliminary Engineering Reports and capital improvement projects.Mr.Westall's strong work background in state and federal regulatory programs is invaluable to resolving permit challenges on even the most sensitive environmental issues.Mr.Westall has more than 34 years of professional experience in environmental engineering. He was formerly Water Quality Supervisor for the Asheville Regional office of the North Carolina Department of Environment and Natural Resources(NCDENR). EDUCATION: Master of Science Degree in Civil Engineering North Carolina State University, Raleigh,North Carolina Bachelor of Science Degree in Civil Engineering North Carolina State University,Raleigh,North Carolina PROFESSIONAL REGISTRATION: North Carolina Professional Engineer,#009033 Tennessee Professional Engineer,#109877 PROFESSIONAL ASSOCIATION: American Water Works Association Water Environment Federation North Carolina Water Environment Association Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 19 Dennie R . Martin Project Role: Finance and Facilitation Director Project Responsibilities: Funding compliance for Special Appropriations&SRL Dennie Martin has worked with McGill Associates for 23 years and possesses more than 42 years of closely related experience.Mr.Martin can provide program support in the areas of capital planning,intergovernmental cooperation,project finance,project feasibility analysis,site assessment,private and public project planning,urban land planning,marketing program development,demographic analysis,community participation and project facilitation. Much of his project experience has involved the development of financing solutions for many important public facilities,including utility systems, landfills,public buildings,schools,and projects that support community and economic development programs.In addition,he is experienced in planning for land use,capital improvements,water quality,economic development and market and demographic research. EDUCATION: Master of Science Degree in Planning Bachelor of Science Degree in Business Administration University of Tennessee,Knoxville,Tennessee PROFESSIONAL REGISTRATION: North Carolina Licensed Real Estate Broker North Carolina Licensed General Contractor South Carolina Licensed Real Estate Broker PROFESSIONAL ASSOCIATIONS: Phi Kappa Phi National Honor Society North Carolina Industrial Development Association North Carolina Association of Finance Officers Confidential and Proprietary I Central EFland/Northern Buckhom Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 20 Subcontractors / Minority Business SUBCONTRACTORS McGill Associates is able to provide the entire range of professional services necessary to perform the work provided for in the County's Request for Qualifications. Therefore,it is anticipated that our Team will not require subcontractors to perform any of the services that are solicited by the County for this project. Please be assured that in the event we are chosen to assist the County with this project,we will continue to abide by the conditions of the plan and solicit minority business participation for services that are beyond the capabilities of our organization. MINORITY BUSINESSES McGill Associates is fully committed to using minority and women-owned businesses in subcontractor roles,where such service providers provide essential project services that our Firm does not provide from our own resources.We have assembled a team that addresses all the professional disciplines and experience needed for project success. Confidential and Proprietary I Central Hand/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 21 Q; h CAD / Mapping / Surveying Capabilities GEOGRAPHIC INFORMATION SYSTEM(GiS) McGill Associates has significant experience in . building,maintaining and managing Geographic . Information System(GIS)databases and deliverables for a wide variety of small and large public clients.Our knowledgeable staff ' members are dedicated to providing spatial data in support of the Transportation Legislative Initiatives and can provide analytical GiS support for various transportation,economic and demographic issues.Additionally,we can create and present GIS deliverables in an electronic format and/or hard copy format,as needed. McGill Associates has worked directly with Department of Transportation agencies in creating and maintaining GIS databases. We utilize extensions for ESRI Arclnfo 9.3, including: • Spatial Analyst • 3D Analyst • Survey Analyst • ArcCatalog McGill Associates utilizes GIS offered by Leica Geosystems Mobile Matrix and Environmental Systems Research Institute, Inc. (ESRI)ArcView and ESRI ArcGIS.Deliverable digital data is ESRI GIS compatible as both a shape file and geodatabase format. All digital data deliverables include Federal Geographic Data Committee(FGDC)standard metadata. Leica Mobile Matrix is a GIS application that enables a multisensory GIS. Generally,it combines and controls surveying sensors with GIS software to efficiently capture and maintain spatial data. Benefits of this software include: • Incorporating a variety of sensor types in a mobile GIS platform. • Surveying real-time data collection in the GiS environment. • integrating and graphically rendering quality control management in real-time. • Conducting real-time GIS analyses in the field. • Eliminating the historical bottlenecks of GIS data collection and migration. fn E c y a.- a we Confidential and Proprietary I Central EFlond/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 022 SURVEY CONTROL Survey control for all McGill Associates'projects is established on the NAD83 horizontal datum(North Carolina State Plane adjustment 2007)and the NAVD88 vertical datum by using a combination of static GPS and RTK GPS receivers. We have established customized grid projections for Western North Carolina that allow actual ground distance surveys that are on the NAD83 datum. This allows us to easily provide high precision state plane grid surveys for GIS or other geodetic applications and also provide ground distance surveys on the NAD83 datum for conveyance and recording. Once survey control for the project area is established, conventional traverse loops and networks are surveyed to extend control and locate the site information required to complete the survey. Our static GPS solutions are performed with Topcon Tools software and utilize a least squares adjustment at the 95%confidence level to assess and report positional tolerances for control points. The raw data from traverse loops,RTK GPS vectors and control network observations are imported into Terramodel 10.6 raw data editor,adjusted for atmospheric and geodetic corrections,and then analyzed and adjusted by the least squares method at the 95%confidence level to generate the final coordinates. SURVEY REPORTS, PROPERTY ISSUES & BOUNDARY LINE SURVEYS Reports can be generated for both GPS and conventionally traversed networks that identify positional tolerances for each point surveyed. This ensures high quality positioning and a tangible method of assessing coordinate and survey integrity. Our survey department has detailed experience with a wide array of real property issues and boundary line surveys. We regularly conduct surveys for easement acquisition along public utilities,subdivisions of land and boundary retracements. We have experience with ALTA surveys and their requirements. All projects involving property boundary lines are thoroughly researched including adjacent property owners. Planning boards are consulted on all projects to ensure compliance with planning and zoning rules. Title documents and on-site field evidence are both examined for gaps and overlaps of ownership and encumbrances. If problems are found,these are addressed with adjacent property owners and resolved and/or reported on the final plat of the survey. NCDOT and government officials are contacted for existing right-of-way information and the findings are reported on the final plat. We have thorough knowledge and experience with creating property boundary descriptions that are retraceable in the field by a surveyor and tied to a geodetic system. We feel it is essential that property descriptions be crafted in such a way that they are easily reproducible on the ground. Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 23 i Project Management Approach McGill Associates'construction administration program is experienced and well organized,with a long and successful record of performance. We have served in the past and are currently serving clients with Construction Phase services on projects designed by other engineering firms, including the City of Hickory's$20 million Northeast Wastewater Treatment Plant.We understand the role and responsibilities of the original project design engineer,as well as our role during the remaining phases of the project. Because we have designed numerous similar successful projects in North Carolina over our firm's 27-year history,our design team is fully capable of quickly value engineering the project, reducing the number of potential change orders and claims during construction. We understand that our role is not to redesign the project. We also understand that unforeseen conditions can arise during construction and slight modifications may become necessary. Our design team will respond quickly to those issues reducing the potential for delays in construction. Other considerations that make the McGill Associates team unique and well qualified for this opportunity are the extensive capabilities of our in-house staff. The depth and breadth of qualifications we possess internally is extensive. For projects such as this one,two factors that are critical to project success are the electrical related components and funding/reporting requirements. McGill Associates has experienced electrical engineering professionals on hand to address any electrical concerns that may arise. We also have a team of funding eligibility and grant administration experts on staff to ensure that funding and reporting milestones are not missed and requirements are met on time. The Senior Project Manager we have selected to oversee this project, Doug Chapman, PE,has significant experience with the layout,design, permitting,biding,construction and operation of wastewater collection and conveyance systems.Mr.Chapman's experience uniquely qualifies him for this project,and he has been an asset for our clients on similar projects,throughout the analysis,construction and commissioning phases of their projects. McGill Associates is excited about the opportunity to work with Orange County on this project and is prepared to begin as soon as the contract has been signed and approved by the Orange County Board of Commissioners. Based on our current understanding and knowledge of the project,we anticipate being able to review and certify the design in 30-60 days of authorization to proceed. S F S •- s# Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 24 �!,x . R ,yo a'ual a,aaaa' ii'1' Analysis Phase - Engineering Services At Mr.Chapman's disposal is a host of experts all within our Firm including surveying,permitting specialists and erosion control specialists,as well as electrical engineering,SCADA/instrumentation and control experts. Our contract administration and construction observation staff is well qualified to oversee this important project.No other element of our engineering services program is more important to our client than that of managing the process of project construction.Construction Administration/Management ensures that infrastructure improvements are made in accordance with the approved project plans and specifications;that the problems that may arise during construction are handled with minimal disruptions in schedules and additional expense; and that the project is completed on schedule and within budget. Our contract administration and field observation program for this project will be the responsibility of Wesley Wightman,PE. Mr.Wightman functions in this role full time. He is also a licensed professional engineer and has a history of many successful complex construction projects. He is well known and respected by our clients for his understanding of contract law, his ability to assess and solve difficult field problems,and his skill in managing Contractor-related activities in the best interest of our clients.Mr.Wightman's greatest asset is being detail-minded and a strong communicator.He manages and documents his projects closely and thoroughly. McGill Associates'experience through the years has led us to develop and embrace a standardized approach to managing critical projects, such as this one.This proven approach helps us ensure that no corners are cut and that projects are delivered successfully,on time and within budget. The graphic below represents our high level approach for this initiative. O� QG COMMUNICATION �� O :c N 7 � PROJECT MANAGEMENT 2 Confidential and Proprietary I Central EFland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 25 9u, t P ^e" puke 7 Through execution of our standard approach,we can successfully deliver on all of the detailed approach tasks outlined in the County's Request for Qualifications. At the foundation of our approach is partnership.We continuously focus on partnership throughout the project to achieve the desired results. We foster constructive working relationships with Client employees,associate firms,and the involved regulatory agencies and officials.These relationships are grounded by open,timely and honest communications, regulatory compliance,and consistently meeting commitments. McGill Associates also fosters a customer centric and completion-focused culture,and will continue to seek and deploy innovative strategies with the objective of surpassing client expectations.This can only be realized through the commitment and involvement of the entire team.We rely on each individual member of the team to meet the fundamental requirements of his appointed positions. Recognizing that every project is unique,we assemble a customized team with the skills to match the demands of each project. Our managers provide and direct the resources required to do the job right the first time and meet the project schedule.They oversee the project work through direct observation and communication with the front line associates and take the time to consider and promptly respond to emergent issues and questions raised by any member of the team.The benefits of our structured approach are superior project communication and innovative solutions.Successful projects are those that are well understood and well managed.To ensure we deliver the maximum value for our clients,we take the time to listen and align our approach and project team with the client's goals.Our experience has shown that communication is central to the success of every project. McGill Associates is consistently associated with high standards of service,quality,personal attention to clients and integrity. It is our reputation of technical ability,hard work and honesty that has afforded us the privilege of teaming with our clients on many high profile projects.Our record of performance for these large-scale projects is exemplary as evidenced by the lasting working relationships with our clients.Our Firm has continued to build on those successes,growing our talent and expertise in design,permitting and construction. In the following section,we will highlight several elements of our approach that we feel are paramount to the success of this project. Construction Phase — Engineering Services ; One of the key elements of any large wastewater • - - construction project is the timely review of shop drawings and other submittals for the various mechanical and electrical equipment,as well as pipeline materials to be used to complete the project.While the project's technical specifications form the basis of the bid,a thorough review of shop drawings for all materials and components is required to ensure that equipment proposed by the Contractor complies with the requirements of the technical specifications and E, the project design.At the end of the construction period, the Owner will become responsible for the operation and maintenance of all equipment. Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 26 Often during the construction phase of any project of this size and complexity,engineering decisions must be made to adjust the design to address changes that result from the discovery of underground utilities and other unforeseen conditions that affect the design.McGill Associates and the team assigned to this project have more than 27 years of experience in the construction of large sanitary sewer projects and have the ability to address any construction issues,should they arise,in a timely manner. Ability to Respond in a Timely Fashion Our Firm has a long and positive history of responsive client service. In fact,responsiveness is one of the key elements that has brought success to our Firm.Our philosophy of service is based on continuing relationships with our local government clients.We fully understand that responsive service is the basis of our past successes. The proximity of our key team members aids in our responsiveness to the project.The team will,at all times,be available to the County to discuss issues,progress,and details of design and construction. Cost Control McGill Associates has a long and positive history of working with Owners and Contractors to help anticipate problems before they result in a claim. Construction Claim avoidance is an important cost control. Baseline job costs change for a variety of factors.This Job Cost Variance (JCV)can often be the result of confusion and lack of clarity in adherence • to the approved plans and specifications.This can be managed through proper communication and pre-planning construction activities.Pre-planning often identifies and circumvents problems in lieu of paying for a claim after n the fact. Another JCV that is often overlooked is the cost to the Owner in Construction Claims caused by unnecessary delays,changes,and disputes. In today's litigious construction environment,timely decision making can save headaches and money.We proactively communicate with the Contractor and Owner.We keep very detailed and organized project documentation.We have assembled a full technical and construction team that can adequately and quickly respond to the needs of the project,the Contractor,and the Owner to avoid delays,changes,and disputes. Without exception,some changes will be necessary on a project of the magnitude of the Northeast Wastewater Treatment Plant, regardless of the Contractor selected for the completion of the project.For changes in the work that occur during the course of the project,McGill Associates serves as the Owner's representative and acts on behalf of the Owner to determine the validity of the change and to negotiate the cost or the credit to the contract and to administer the proper payment or reduction. Quality Assurance / Quality Control Similar to all other aspects of construction management,quality control has to be planned.Planning seeks`order,'and a quality control system for a construction project reflects this sense of order: • The quality standard set by the design and required by the client • Planning how to achieve the required quality through construction methods,materials,and workmanship • Adequate on-site supervision of the Contractor's work during all active construction • Build it right the first time Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 2 7 Our on-site Construction Field Representatives(CFR)have vast experience in wastewater infrastructure improvement projects.Their experience enables them to evaluate construction activities and identify potential problems.With their working relationship with the Contractor, our CFRs are able to communicate their concerns and assist in reducing the amount of nonconforming and/or defective work.Furthermore, the CFRs complete daily project reports summarizing daily construction activities and identifying potential obstacles for upcoming construction activities.These reports along with effective communication between the CFR and Construction Administrator assist in supplementing the Contractor's planning in order to achieve a successful,quality project. In order to reduce the amount of nonconforming or defective work and to assist in identifying any that may occur,construction materials testing will be required in accordance with the plans and specifications,equipment manufacturer's recommendations and Regulatory Agency requirements.Thorough and effective testing,along with the monitoring of these tests,provide assurance to the project team that the work has been completed with the level of care required to produce a quality project. Furthermore,we understand the importance of a warranty review after completion of the project.This final review provides added assurance to the Owner of the quality of the finished project. Although we enjoy a good working relationship with many Contractors,we do reject nonconforming and/or defective work. We also have expectations with regard to the timeliness in correcting workmanship and material deficiencies. Schedule Adherence The proposed schedule for completion for the project outlined in the Contract Documents and in the County's RFQ is,in our opinion,certainly adequate for the level of work involved. Starting from that point,we will evaluate the Contractor's proposed schedule,request monthly updates, and identify possible oversights in their scope,logic,sequence,and duration. We fully acknowledge that construction ways and means are specific to the Contractor;however,McGill Associates has vast experience with the construction similar projects. This experience allows us to quickly differentiate between critical vs.non-critical path activities and evaluate resource loading. Subsequently,we can immediately formulate an opinion of the Contractor's position in schedule and completion. Sample Project Schedule ....- aa na c« Via•..•+.-,e fnio rNSfnre.awirwau:glyavw ..,. „yrsir.w�'`. - �'.r3r.fsr rRS.erar.a.s•.� NYMV ,>M� ary�a tyruM 4Nrltrwna4»Mw. : .v Mn , MlpM Sierrra•ur+nnree.v irr w.M+rr°nM .Yra. t»Mmlelrng nw ��M.wiwr+e.�crry rw'Y.i..Agf Jrfv M.rewsY.r'wwa bwwuw�frr•:rarrW M.mg� aia aarawr i.+aea..n-raeM+ lNtx re»:#Mrww+wt-i+►M ur p rx Mr1i.w Mma-Wi4Am : ae •rg � !1101 tiM#w wrw YfrlMCMiMW r...a.rrw we....u+..., w«w» »rt w,nwaw ass» Ewa x,..a.a,.ti x.n ,„.xw �ftartwrt MfMe Ls rt „=,ywew.ecry erN M �am rye ti 4 ♦yta.� lvs*m-rN a-r-o 1a iN '>.m^•M i '.w..snM Ytn fi1nMYr'ea»re� .A.! w a � n�M Mae.rrla a.fe irMa Wew-..n i wMeN a�•feir #M 43�#� .Yp9� NU+nitY eisfOYI MyNMnre ♦�Mw e.Ww r M eeM rw�,tr.fM�M M.wPr pa» w ::� epe or+Mi.[+rR>f.hM Mwtw� w'- � ?-Fr» .rb» A...NfRw MR ♦nMMea%r 1. AY-r�--wsre4 BN/M4.a.. �° M„"YiwYRitW Mii�axt tfXK rnskf� ^N.s� yy :r�+WM+1.ar : aM e.Y�.eae.rrru wwba ar K sairel msw'r Y.sr K16e N iMe+WM- �N-[iw •wm..aaea.mr±rM rw r •M arrf waf.tact+cwA ay Y' ♦1NaAlaPi,..wr h eMr t�ruv." Yrr»..c.-wew rtw. 46e w 111Y #rve B/M'Vnwn\M.s"rwfWYar tiNa Y+ne:4awn-t.r+ikeaa ao.a^�+e 5ve ~ f gnri a)fe#sw anrr a.m.rr m':a.^•M w.y wuxt ♦filet vw+Relle-wwr .,..eY...- # isP � f . Wa..:y l4r�r.AYrw rr ewrr-Y++!+!.«we Y W•wY WwMnt �ewwPa+a.e .w as`'.w 1 •:+� 1 1aMlr.r tYaK rrree as>l Wrl»aF!'rf AsraN.t# / Yee•...Wn.xnara A. are»wrwwew-wr..re.atNw 4'»ea•r ewma' �:. NYI net Iwrr�1 1�W1!°»?e'r ♦ •YWW tMFrl L{lbM an Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 28 In addition to the work performed by the Contractor on the project,the operational staff must be knowledgeable and comfortable with the new equipment installed as part of this project.Effective system start-ups identify and correct problems before plant staff have to operate the system, and thorough staff training provides them the knowledge base to effectively and efficiently operate and maintain the system for the life of the system. Document Control McGill Associates utilizes an Information Management Solution(IMS)that gives our Construction Administrator and Client,the ability to quickly access,track and manage the large and complex flows of time sensitive information from different sources.The Information Management Solution utilizes a single,online database,eliminating multiple data sources,thus improving accuracy and timeliness in tracking and archiving documents and correspondence.This ensures organization and proper documentation of the project through the construction and post- construction phases. This organization also aids in project closeout.Timely receipt of as-builts,0&M manuals and other closeout documentation is essential to the overall success of the project. �M��ii Information Management Solution Reports spill ZZ w. C.C.► �.. C t ..: :tic,.� uarwrua qe ^,� ' a :ter_ Project Coordination and Integration Although the contractor is responsible for his construction activities,many of the project permits are in the owner's name and therefore the contractor's actions can impact an owner's compliance. These often include erosion and stormwater violations from construction activities,as well as sanitary sewer overflows(SSOs). A significant level of our experience has included the integration of new work into an existing system. Maintaining compliance during construction activities is a must. Our role is to help ensure that operational compliance is not jeopardized. For critical construction activities where compliance is a concern we require the Contractor to complete significant pre-planning and coordination with the operational staff. This provides a detailed understanding of the issues,conflicts,and strict coordination,followed by carefully orchestrated activities. Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 29 x IIff U The complexity of your project demands that the Contractor complete a significant amount of pre-planning of construction activities and take proactive measures to ensure that the proposed construction activities themselves do not create compliance problems for the Owner.With proper planning,communication and anticipation of the potential problems facing this construction task,we can prevent a sanitary sewer overflows(SSOs). Project Commissioning McGill Associates'approach to the development of a commissioning plan starts with a strong understanding of the Owner's requirements,the project design intent,the systems to be installed and the desired outcome.The Commissioning Plan will include a detailed understanding of how commissioning communications will be processed,a complete outline of testing to be performed with the acceptance criteria,documentation that is required,and the training outline.We believe that commissioning is more than a validation of equipment operation and performance;it is also a form of quality assurance. Because of our extensive experience wastewater infrastructure,we have the ability to investigate,discover potential problems,and provide solutions to problems that arise during project commissioning of complex systems.Our Firm includes pipeline,pump station,electrical and construction experts during the commissioning phase. Furthermore,with the utilization of our document control system mentioned above,Operations&Maintenance Manuals are complete and organized when delivered to the Owner. Project Financial Management We consider the financial management of a public project one of the most important tasks assigned to the engineer during the construction phase.We have a strong working relationship with NC CG&L and SRF.McGill Associates has successfully completed a significant number wastewater infrastructure projects funded through their programs. Effective financial management begins with proactive management on-site with periodic review of work performed and materials purchased. These reviews assure the project team,especially the Owner's finance department,that the funds expended have been earned. McGill Associates also recognizes the importance of a cash flow schedule aligned with the construction activity schedule to aid the Owner in preparing for the monthly payments for the project.The alignment of the cash flow schedule and construction activity schedule provides for optimal use of the available funds for the project. Project Status Reports McGill Associates understands the need for information dissemination on municipal projects,especially for a high profile project such as yours. The county should receive timely and informative updates on the project to effectively respond to citizens'questions and requests.Our monthly status reports to the county provide a general summary of activities on site,a financial and schedule update and listing of any issues that might impact cost or schedule as well as any action items that remain open for the Owner.At the direction of the county,we are available to provide updates to Manager,Commissioners or others as needed. In addition to the reporting provided to the Owner,McGill Associates provides project status reporting as required by funding agencies,to maintain funding compliance. Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 30 Approximate Project Man-Hours PRINCIPAL SPM PE SCA SET SUR Analysis Phase 12 50 40 40 20 40 Construction Phase 96 96 144 1288 144 1440 Project Commissioning and 8 24 48 40 98 60 Post Construction Total 116 170 1232 368 1262 11540 This project man-hour budget is for reference only. This budget can and will likely vary based on the negotiated scope of services specific to your project needs.This budget can also vary based on actual construction time and level of on-site services desired.We would propose a contract that allows the Owner to realize savings on engineering fees should the contractor finish early.Reimburseables are in addition to the above. Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 3 u u �O�l1 tato�w Orange County Financial Services Department ADDENDUM#1 June 27, 2011 ORANGE COUNTY RFQ NO. 367-5176 Request for Qualifications - Professional Engineering Services - Central Efland/Northern Buckhorn Sewer Extension —Construction Phase Services To all Vendors: Modifications to bid documents for the above named Request for Proposal are made as follows and shall be included in the proposed amount. 1. The due date for this RFQ has been extended one week. The new due date is 5:00 PM EST,Thursday July 7, 2011 2. Page 2 of this addendum contains questions received from interested firms, with the County's respones All other terms and conditions shall remain the same By: David E. Cannell, Purchasing Agent; dcannell co.orange.nc.us - (919) 245-2651 A signed copy of this addendum shall be included with the bid submitted by your company Company Name: McGill Associates, P.A. By. Andy Lovingood, PE �6�vt Date Received: June 28, 2011 P.O. Box 8181 200 South Cameron Street Hillsborough, North Carolina 27278 Telephones: Area Code 919 245-2651 Fax: 919 644-3324 Page 1 QUESTIONS W/RESPONSES 1. Has the original design engineer completed all necessary permitting required for construction? YES 2. Who is the design engineer? COULTER JEWELL THAMES 3. Is the Special Appropriation a STAG Grant or some other source? EPA SPAP (SPECIAL APPROPRIATION) GRANT AND STATE REVOLVING LOAN FUND LOAN 4. Has the Application to release funds been approved? YES EPA GRANT HAS BEEN APPROVED, BUT THE SRF LOAN IS CONTINGENT UPON US MEETING THE AUGUST 1 AND SEPTEMBER 1 DEADLINES. 5. Are plans and specifications available for review? YES, PLANS AND SPECIFICATIONS ARE ON FILE FOR INSPECTION IN THE PLANNING DEPARTMENT AT 131 W. MARGARET LANE, SUITE 201, HILLSBOROUGH, NORTH CAROLINA 27278; WITH THE ENGINEERS IN DURHAM, NORTH CAROLINA AT THE ADDRESS LISTED BELOW; AND AT THE OFFICES OF THE ASSOCIATED GENERAL CONTRACTORS IN RALEIGH, AND CHARLOTTE, NORTH CAROLINA; AND ON-LINE AT THE DODGE PROJECT INTERNET SITE. 6. Have all easements been procured? IN PROCESS, WILL BE PROCURED PRIOR TO NOTICE TO PROCEED 7. The County is asking for the Construction Administration Engineer indemnify the County and the original engineer for design. The original designer has designed and professionally sealed the plans and specifications and has permitted the project through Constriction Grants and Loan. Is the County trying to absolve the original design engineer of their professional responsibility? NO Normally the design engineer remains responsible for the adequacy of their design. THE COUNTY IS ASKING THE CA CONSULTANT TO ACCEPT RESPONSIBILITY FOR ISSUES THAT ARISE DUE TO A LACK OF CONSTRUCTION OVERSIGHT, BUT STILL EXPECTING THE ORIGINAL DESIGN ENGINEER TO BE RESPONSIBLE FOR ANY ACTUAL DESIGN FLAWS THAT WERE NOT DETECTED BY THEM OR THE STATE 8. Under Owners responsibility.—Will the county provide reproducible sealed plans and specifications that can be used to construct the project by the construction administration Engineer? YES, THE SEALED PLANS AND SPECIFICATIONS AS DESIGNED BY THE ORIGINAL DESIGN ENGINEER 9. We repeat "Revise drawings as necessary to reflect specific minor details prior to beginning of construction or during construction, e.g. minor manhole location shifts and additions, deletion or shifting of service lateral locations, etc." under 4. Other Engineering Related Activities (we pay hourly as needed and under # 2: construction services (part of main scope) THE COUNTY ANTICIPATES THERE WILL BE SOME LATERAL SHIFTS AND MANHOLE SHIFTS INCLUDED IN THE SCOPE OF WORK NEGOTIATED WITH THE SELECTED FIRM. Page 2 of 4 CHANGES THAT COME UP AFTER CONSTRUCTION BEGINS ARE CONSIDERED "OTHER ENGINEERING RELATED ACTIVITIES" AND ARE PAID BY THE HOUR 10.Will this be paid out of the county funds, or from the state money. If state money they have to fill out more forms IT COULD BE PAID AT LEAST PARTIALLY FROM THE SRF LOAN. 11.The project may be funded by an EPA Grant and/or a Clean Water State Revolving Loan. One of the requirements of the RFQ is to verify that our firm has the ability to receive funds from these sources. We have attempted to call both the EPA and the State authorities and were told to contact the Grantee (Orange County in this case) for further clarification. As such, could you please verify what the requirements, if any, are for our firm to receive funds from said sources? Our firm is a North Carolina Corporation licensed as shown herein. THE FIRM SHALL NOT BE DEBARRED BY THE STATE OF NORTH CAROLIN, AND CAPABLE OF MEETING THE INSURANCE AND BONDING REQUIREMENTS INCLUDED IN THE RFQ 12.1 was wondering why the County is seeking engineering services for construction phase services as it appears the design engineer's original contract of 2004 included it. Is it a funding requirement to rebid or just the County's desire? IT IS NOT A FUNDING REQUIREMENT. IT IS BEING RESOLICITED IN PART DUE TO THE CURRENT ENVIRONMENT AS WELL AND THE AMOUNT OF TIME THAT HAS LAPSED SINCE THE ORIGINAL AGREEMENT WAS EXECUTED 13.Was the RFQ sent to select firms as well as posted to the web site? IT WAS SENT TO FIRMS ON OUR BID LIST AS WELL AS ADVERTISED ON THE COUNTY AND STATE IPS WEBSITE Just wondering if the County is seeking to work with new firms that can offer multiple resources and services to the County. SEE #12 14.1 noted the project construction has been bid and bids were opened today. Can you provide the uncertified bid tab? Knowing the contractor the selected consultant would work with will be helpful. A COPY OF THE UNCERTIFIED BID IS ATTACHED 15.Please clarify the design review -would that include the specifications? YES 16.A concern exists with indemnifying another firm from their sealed design plans. This would take significant review of not only design plans but the planning data used to develop the design plans. I believe many consulting firms and their risk managers/insurance companies would share this concern. We are not even sure if the NCPE board rules would allow that. If the intent is to indemnify the design firm from construction of their design, that is a little different. One can perform a constructability and a regulatory compliance review (for design criteria) but to indemnify the design firm is not typically requested. Additionally, given the project has been bid based upon sealed design plans and contract documents from the original design firm, things are pretty much set and any design or contract modifications would need to be after contract award through change orders, field or work directives. Please consider this concern and clarify the statement if appropriate. SEE #7 Page 3 of 4 17.The RFQ asks for a plan to include W/MBE firms. Is there a percentage requirement to utilize such firms? Additionally, some government agencies will count women and minorities identified on a project team towards W/MBE goals. Does the County consider this? THE COUNTY DOE NOT HAVE A POLICY FOR M/WBE FIRMS FOR ENGINEERING CONTRACTS. HOWEVER UTILIZATION FO M/WBE FIRMS IS ENCOURAGED 18.Are the design and permit documents available for review prior to the SOQ due date? SEE #5 19.Is there a page limit on the submittal? NO 20.Can the successful firm on this proposal also respond to any RFP issued by Orange County for testing? YES 21.How much time will the successful firm have for analysis? WE ANTICIPATE EXECUTING AND AGREEMENT WITH THE SUCCESSFUL FIRM BY AUGUST 1, 2011 AND PLAN TO ISSUE A NOTICE TO PROCEED ON CONSTRUCTION BY 9-30-2011 Page 4 of 4