HomeMy WebLinkAboutAgenda - 10-15-1996 - 9b ORANGE COUNTY
BOARD OF COMMISSIONERS
Action Agenda
Item No.
ACTION AGENDA ITEM ABSTRACT
Meeting Date: October 15, 1996
SUBJECT: Community School For People Under Six Funding Request
DEPARTMENT: County Manager PUBLIC HEARING (Y/NS) NO
BUDGET AMENDMENT: (Y/N): N�
ATTACHMENT(S): INFORMATION CONTACT: Albert Kittrell
Letter From Community School Ext. 2300
Architect's Cost Estimate TELEPHONE NUMBERS:
Hillsborough -732-8181
Chapel Hill -968-4501
Durham -688-7331
Mebane -227-2031
PURPOSE: To consider a request from the Community School for People Under Six for funding.
BACKGROUND: On April 1, 1996, the Board approved a request from the Community School to
construct a 2, 150 square feet building addition to the Northside Multipurpose Center located on
Caldwell Street in Chapel Hill. Since April,the cost of the expansion project has increased beyond the
Community School's budget. The additional cost is the result of parking lot improvements required by
the Town of Chapel Hill.
On October 1, 1996, the Board requested staff to review the design and estimated cost of the building
addition,paving the parking lot and other improvements required by the Town. The County engineer
has met the project architect and Community School Director. The design and estimated cost are
appropriate for this project. Also, the facility improvements will increase the number of daycare spaces
and expand the parking lot used by county employees and citizens visiting the Northside Multipurpose
Center. (Please refer to the architect's cost estimate attachment.)
RECOMMENDATION(S): The Manager recommends that the Board appropriate $15,000 from the
Commissioners' contingency to fund the facility improvements at the Community School for People
Under Six and encourage the Town of Chapel to match the county contribution. We understand that this
item will be on the Town Council's Agenda on October 16th. County appropriations to the Community
School should be dispersed after parking improvements have been completed.
2
COMMUNITY SCHOOL
VOR PEOPLE UNDER, SIX
T the. Accredited by C
" National Academy
;
4
of Early Childhood
PrOFAMS
7,'_3r Mr. Carey:
jeatt-ar is to r-eqi_,.ezt an to apzaar before
''.he r e Orange coun' V at Vou _' --mber Meeting
r -1 Orange the
n -_* -_ &_
Apr : 496
L
r 'acJ1 4 ty on c-ounty pr,--,,L_-,erty at the
Nc thls 11 �ie mu I t-
C�-'Inp Ie_x iln ChapE,I H_- I i The
expansion o the facillt--v t-0, iDe. "!(D 12057- __Ci 7-he
al.'e --(D zoning comp-tialce requ41_r_-m.ants
e tablishe,_'t for this pro-Ject, we feel we cannot burden the
cost alone and are requesting support from Orange County.
- � 4 - t1
:at Town --,f Cnap-e-1 H-J -11 is reau .3 L--.n,, at we 1 pave
ex-isting parking lot v n Mcmazz-elv Street- Side ; 2 inr_4 i c a t-a
)w tine paring ng lo-1 w-* be screened and shaded; 3 ) provide
-i -bm pstar pad; ard !, provide e a five-f D t planting Strip
p
p'=Lj_,,C4-_ ! ,._)t. -his cos o e
I Oetwee.n the build'Lng and .1 ___'= - L
school wo,,il:i rangy from $15 , 000 to $210 , 000 .
With the growing Qos-t of the expansion _, ro j eCt increasing to
,Z) - t- _L g
$22.6 , 000 beyond our $1/5 ,000 boud,z a 1C We ca.--noiC afford the
4
a' dltiora'_ cost of tine Zoning recuirements . Because the
area is currently being uti! Jzed
by other county
Zgencies outside of our prcgram, we feel that we shou-1 -d not
av e o incur thlis cl.Dsz.
project is very ta.,,.t towards improving the (quall li:V
o" c4
;are Jn our progara Eor oulr chllidren and families ; and
increasing the number of available inf ant/toddler spaces in
the community.
attached is a copy of the final la-tter received from the
"hape' Hi "' 1 planning
:�wn 0 L' C s_ We eed the support
o z the County and tie Commi.�n-;.ty as a whGle to meet the needs
-Lk yc for your a33' Sta.qCe
J" our young children. TI-ai u
We fOrWal -- '-0 ear;ng om fr 7, u n! s cu,s-s L n g t h s
ma-_ter at 1_-.he September meet--gy .
Q
PA Box 633 Chapel Hill, N.C. 27514 (919) 929-1543
3
TOWN OF CHAPEL HILL
306 NORTH COLUMBIA SrREET
CHAPEL HX1_ NORTH CAROLINA 27516
z Tciq* a(919)468-2700
July 8, 1996
Ms. Anna Mercer-Mclean, Director
Community School for People Under Six
P.O. Box 633
Chapel Hill, N.C. 27514
RE: Community School for People Under Six
Zoning Compliance Permit (File # 84.J.3)
Dear Ms. Mercer-McLean
Town Manager Cal Horton has asked me to respond to your letter of June 10, which
requests waiver of zoning requirements. I am sorry to report that, after inspecting the
site and discussing the request with the Town Manager and key Town staff, we cannot
offer you the relief you are seeking.
In your letter you refer to our approval of your application for a Zoning Compliance
Permit. That approval contained conditions, including requirements to:
Pave your existing parking lot;
Indicate how the parking lot will be screened and shaded;
- Provide a dumpster pad; and
- Provide a five-foot planting strip between the building and parking lot.
With this letter we are reiterating those requirements, along with the other conditions
noted in a May 9 letter from our Development Coordinator, Ms. J.B. Culpepper, to your
architect, Mr. Steven Triggiano.
I understand that these site improvements cost money. However, they are basic
improvements routinely required of development projects in Chapel Hill. Upon
inspection of your site, I was reminded of the conditions which currently exist: gravel
spilling out into the street, erosion of the bank on both sides of the driveway, an
unshaded and unscreened parking area, a dumpster that rests on a combination of grass
' T
and gravel, no landscaping. I'believe that we cannot approve an expansion to this facility
without having these deficiencies corrected. Approval without these requirements for
site improvements would worsen an existing problem.
I am sorry that we cannot accommodate your request.
Sincerely,
Roger S. Waldon,
Planning Director
cc: Mr. Steven A. Triggiano, Tise-Kiester Architects
W. Calvin Horton, Town Manager
J.B. Culpepper, Development Coordinator
� 5
T ZCP SITEWORK COST ESTIMATE
October 7, 1996
Page 1
1
118 /z East Main Street Project: Community School for People Under Six
Carrboro,NC 27510 400 Caldwell Street
Chapel Hill, NC 27514
Architect's Project No: 9601
The following is an estimate of costs for construction work and services required
to comply with the Town of Chapel Hill's conditions of approval for the Zoning
Compliance Permit.
Parking Lot:
6' stone base with 2' 1-2 asphalt paving 600 SY® S13.50/SY = $8,100
24" Curb & Gutter 400 LF® $14.00/LF = $5b00
Grading,striping & layout $ 1,700
Survey&Testing: $ 1,500
Dumpster.pad bollards&screenings $ 1,750
Landscaping:
Parking lot screening and shading $2,750
Planting strip along building $ 1,000
Playground shading $ 1,500
Civil Engineer& Landscape Architect Design Fees: $ 1,750
Total Cost: 425,650
telephone 9199670158
fax/data 9199670159
6•
•� le,
BUILDING COST ANALYSIS
October 7, 1996
Page 1
118'/2 East Maln Street Project: Community School for People Under Six
Carrboro,NC 27510 400 Caldwell Street
Chapel Hill, NC 27514
Architect's Project No: 9601
Summary of Building Cost(not including sitework)
Current Building Design
Resolute Building Co. $246,387
Pricing based on plans dated 6-20-96
Alexandra Building Co. $215,000
Pricing based on pions dated 8-15-96
Revised Building Design
Alexandra Building Co. (estimate) $ 180,490
Changes associated with revised building desig:
Reduce "Square Footage per Child' from 40 SF to 35 SF.
(This change deletes approx. 160 SF from building.)
Delete raised roof over Lobby and Playroom.
(This change deletes approx. 110 SF from Playroom.)
Simplify Entrance Gable.
Incorporate Value Engineering Items of August 26, 1996.
(Note: Item 7 will remain)
Building Estimate based on the following:
New revised building size of 2053 SF x S80/SF= $164,240
Renovated building area of 650 SF x$25/SF = $ 16,250
Total Cost(not including sitework) $ 180,490
Construction Start- Beginning of January 1997
telephone 919.967-0158
fax/data 919967-0159
7
T
REVISED PROGRAM
October 7, 1996
Page 1 P40,
1 18'/2 East Main Street Project: Community School for People Under Six
Carrboro,NC 27510 400 Caldwell Street
Chapel Hill, NC 27514
Architect's Project No: 9601
Summmy of Revised Building Size
New Sgces: Actual Size:
Infants A 210 SF
(6 children x 35 SF=210 SF required)
• Infant B 192 SF
(4 children x 35 SF= 140 SF required)
• Toddlers 358 SF
0 0 children x 35 SF = 350 SF required)
• 4-5 Year Old Classroom (272 SF)
(8 children x 35 SF= 280 SF required)
• Playroom 573 SF
(16 children x 35 SF= 560 SF required)
• Office/Therapy Room 115 SF
(unchanged)
• Staff lounge 103 SF
(unchanged)
Administration Storage 43 SF
(unchanged)
telephone 9199674158
fax/data 919961-0159