Loading...
HomeMy WebLinkAboutAgenda - 11-12-2013 - 31 SUBJECT: Space St ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 12, 2013 Update DEPARTMENT: Asset Management Services Action Agenda Item No. 3 PUBLIC HEARING: (Y /N) No ATTACHMENT(S): INFORMATION CONTACT: A) Board - Adopted Framework for Jeff Thompson, 919 - 245 -2658 Iterative, Continuous Space Study Wayne Fenton, 919 - 245 -2628 B) Consolidated Space Utilization and Limited Physical Assessment Report Performed by ECS Carolinas, LLP C) Consolidated Departmental Space Update Summary D) Work Session PowerPoint Presentation PURPOSE: To receive and discuss the space study update and provide guidance to the Interim Manager and staff in anticipation of the FY2014 -15 goals, planning, and budget processes. BACKGROUND: During the May 21, 2013 regular meeting, the Board of County Commissioners received the space study update report for review and comment. The abstract for that item can be found at http:// orangecountync .gov /occierks /130521.pdf (Item 8 -b). The Board suggested that these presented space study initiatives: 1) return for the Board's review and continued discussion in anticipation of the Board's annual planning, prioritization, budgeting, and decision making processes; and 2) be delivered within a framework conducive to iterative, continuous study over time. The Board adopted study framework is illustrated in Attachment A, entitled "Board- Adopted Framework for Iterative, Continuous Space Study ". The framework is founded in the original 2001 framework and guiding principles as well as the major space study framework update in 2005. As part of this framework, the County engaged ECS Carolinas, LLP of Raleigh, NC to work with County management and its departments in developing baseline information and ongoing analysis and benchmarking tools in the areas of space utilization and facilities assessment. Through the summer break and into the fall, ECS and County Asset Management Services staff performed limited physical assessments of County facilities (focusing upon County office and administrative spaces) and aggregated department director space "wants and needs" information through observation, interview, questionnaire, and comparative industry benchmarking techniques. Attachment B, entitled "Consolidated Space Utilization and Limited Physical Assessment Report performed by ECS Carolinas, LLP ". Attachment C, "Consolidated Departmental Space Update Summary", initially presented to the Board during the May 2013 space study presentation, is updated and in accord with the ECS study. Pete Domenico, Branch Manager of ECS will present the report, methodology, and suggested topics for Board discussion during the work session. Attachment D, entitled "Work Session PowerPoint Presentation" outlines the talking points of the work session presentation. FINANCIAL IMPACT: The Board adopted Capital Investment Plan (CIP) allocated $25,000 in FY2013 -14 for third party physical assessments, ongoing assessment and analysis tool assembly, and space use programming exercises for this space study initiative. ECS's professional services work, represented by the attached report, was performed through an agreement in the amount of $18,500. Staff recommends the balance of the allocation be devoted to formal storage education, planning, and policy development to allow maximum efficiency of defined storage areas within departmental areas as well as County consolidated storage areas. RECOMMENDATION(S): The Interim Manager recommends the Board receive and discuss the space study update and provide guidance to the Interim Manager and staff in anticipation of the FY2014 -15 goals, planning, and budget processes. 3 Attachment A Space Study Framework (BOCC adopted on June 18, 2013) 1. Purpose: The purpose of this space study framework is to provide staff a Board adopted set of guidelines to systematically inventory, assess, and manage County facility needs on a continuous basis. Specifically, the framework addresses: a. Space inventory (facility report updated May 2013) b. Projected space requirements through 2020 (short term; extended from original target of meeting needs up to 2010 in 2005 space study update) c. Projected space needs that may fall beyond 2020 time frame (long term; extended from original target of meeting needs up to 2010 in 2005 space study update) d. Identified space issues that may affect quality of service to County customers e. The systematic gathering, review and management of departmental space needs that impact services (i.e. service trends, locational needs, technology, growth and /or contraction) f. The presentation of options and recommendations to the Board that prioritize, optimize, manage, and ultimately meet County space needs in a reasonable and useful manner 2. Guiding Principles: a. Board Adopted in 2001: • Co- location of departments with similar functions and /or those that serve the same customer base • Consolidation of County operations to as few sites as may be practicable in an attempt to gain operational efficiency and customer access • Owning facilities in which County operations are located, as opposed to leasing, except where there exists a compelling business reason to do so b. Additional Guiding Principle Board Adopted in 2005: . Building and maintaining facilities and spaces according to sustainable practices and high performance building standards (Board adopted Environmental Responsibility Goals) c. Suggested Principle for Board Adoption in 2013: • Evaluation of the relative cost and benefit of facilities use where those facilities are stressed — "fully and /or practically depreciated ". This principle is necessary in order to manage the facility to its highest and best use while planning and providing for the potentially displaced space need. M 3. Basis of Study: The study will include a review of the use of all County buildings, along with a description of the space needs of each County department and other users of County buildings (e.g. District Attorney). These assessments will serve as a fundamental work product and will form the basis for the scope of the study: a. Management and Staff Assessment and Input. The Metrics of this Assessment are as follows: i. Management evaluation and comment ii. Staff evaluation, collected and documented by the user questionnaire established in 2001 b. Physical Assessment and Inventory. The Metrics of this Assessment are as follows: L Physical report (staff and consultant) ii. Maintenance and utility report (staff) iii. Identification of stressed and under - utilized assets iv. Valuation of stressed and under - utilized assets through a Net Present Value Calculation (staff) c. Departmental Space Needs Programming housed within stressed or under- utilized assets (staff and consultant) 4. Scope of Study: The scope of the study will be based upon the before - mentioned Basis of Study data, analysis, and conclusions and will be framed by: a. Space needs required no later than 2020; as well as beyond 2020 — based upon: L management and staff assessments, ii. facility assessments, iii. identified stressed or underutilized assets, iv. identified Board, management, and departmental needs; b. Board adopted strategic planning initiatives 5 5. Options and Recommendations: The criteria and decision factors for recommended space study action that are suggested for Board adoption are as follows: a. Making decisions based upon the before - mentioned guiding principles: • Consolidation • Centralization • Ownership • Sustainable building operation and programming • Cost and benefit analysis b. Minimizing under - utilized spaces c. Formulating reasonable, defensible courses of action for stressed facilities d. Providing exceptional facilities for County service delivery e. Meeting longstanding, publicly supported needs f. Recognizing, anticipating, and planning for growth (and contraction) trends 6. Timeline and Horizon: Staff will recommend space need prioritization, scheduling and funding sources to the Board for comment and adoption each fall prior to the annual Capital Investment Planning process. This space study framework is recommended to be fully updated every 5—" year, with annual status reports to be presented to the Board each fall before the budget season. These updates may serve as a vehicle to recognize and address the trends and strategic directions and receive Board guidance outside of the budget process. This space study framework will be used for a systematic study of County facility space needs in 2013. o Attachment B 6 ECS CAROLINAS, LLP `setting the Standard for Service" � Geotechnical • Construction Materials • Environmental • Facilities NC Registered Bgineenng Firm F -1078 October 23, 2013 Mr. Jeff Thompson Orange County Asset Management Services PO Box 8181 Hillsborough, North Carolina 27278 Reference: Executive Summary of Limited Facilities Consulting Services Orange County Facilities ECS Project No. 06 -20784 Dear Mr. Thompson: ECS Carolinas, LLC, along with our sub - consultant, Facility Futures (ECS will be defined as ECS Carolinas and Facility Futures for the remainder of this report), provided our services in accordance with our authorized proposal 06:16742. Please find the attached executive summary of the work completed to date. Puraose The purpose of this report is to provide the first step in developing the tools to allow Orange County to serve its constituents as it pertains to the management of their facilities. The baseline financial and space studies will allow future decisions to be based upon an objective snapshot of Orange County Facilities as of August, 2013. Future decisions will affect the results of this study, but the framework for determining financial and space efficiencies is in place and can be updated and modified by Orange County Staff. Space Use Study ECS conducted field site visits, interviewed Asset Management Staff, reviewed previous space utilization surveys, and developed /reviewed space utilization surveys completed by department directors to update the previous Orange County Facilities Space Studies. ECS also obtained detailed space use drawings and square footage information from Asset Management Services. These information sources were used to prepare an efficiency of space use summary on a square foot basis. Departmental wants and needs within assigned portions of facilities were identified within a majority of completed departmental space utilization surveys. Detailed survey responses are presented in Attachment 1. Of the County's approximately 798,000 total gross square feet of building space, ECS has focused its space use study on approximately 109,000 usable (291,000 gross) square feet of general administration /office space, assigned departmental storage space, and currently unassigned spaces designed for non - Court /Judicial /Law Enforcement office use. ECS did not conduct space studies for County enterprise fund spaces (Orange County Solid Waste and SportsPlex), leased spaces (Builders FirstSource, Terradotta space at 501 West Franklin Street, Piedmont Food and Agricultural Processing Center), and park administration spaces. 9001 Glenwood Avenue, Raleigh, NC • 27617 -7505 • T: 919 - 861 -9910 • F: 919 - 861 -9911 • www.ecslimited.com ECS Capitol Services, PLLC • ECS Carolinas, LLP • ECS Central, PLLC • ECS Florida, LLC • ECS Mid - Atlantic, LLC • ECS Midwest, LLC • ECS Southeast, LLC • ECS Texas, LLP 7 The compilation of the department director surveys revealed the most commonly identified wants and needs as: 1. Dedicated employee break rooms 2 More conference /"flexible space" rooms 3. Additional storage areas 4. Ergonomically correct work stations 5. More dedicated records storage rooms Although the department director surveys identified a need for more of the above listed spaces and features, the ECS' space analysis reaches a different conclusion. Orange County's space utilization within its current office space (dedicated portions of office buildings) range from 143 square feet of office space per person to 1,219 square feet per person, with an average of 403 square feet of office space per person. This average space per person is based on the provided assigned square feet per department. These assigned spaces reportedly include expansion capability recommended in previous space studies. The County facilities provide space with planned growth (roughly 20 %) to assist in offsetting the need to add new space in the future. In general, usable square footage is made up of all the square footage within a department's space including office, hallway, lobby, and dedicated conference room spaces. This ratio does not include dedicated storage space, and other non - office space, within the office buildings. Industry standards provide a standard range of between 200 and 250 square feet of usable office space square footage per person'. In addition to the current occupied office spaces, Orange County currently has significant areas of under- utilized and unoccupied /unassigned spaces designed for office use within several existing buildings. These buildings include the Link Government Services Center, the Government Services Annex building, and the Asset Management Services North (Fleet and Surplus Services) Administration Building. Table 1 presents the three most efficient and inefficient properties and /or departments from a space use standpoint (usable square feet per person). Table 4 of the full report includes a summary of all County facilities evaluated and their usable square footage per person. Table 1 Efficient and Inefficient Property Summary— Useable Square Footage Per Person Efficient Properties /Depts USF /person Inefficient Properties /Depts USF /person 1. Soil and Water-Env 143 1. Elections - Gov 1,219 and Ag Bldg Services Annex 2. Attorney - Link Gov. 160 2. Revenue - Gateway 369 Center Center 3. Land Records — 170 3. Planning and Insp. 373 Gateway Center — West Campus Office Limited Physical Assessment In conjunction with the space uses study, ECS conducted a limited physical assessment of Orange County facilities. The limited physical assessment utilized "walk- through" observations, RSMeans 1 IFMA is the International Facilities Management Association and their guidelines for definition of office space can be found at www.IFMA.org. capital expenditure information, and operational data provided by Orange County. The limited physical $ assessment was an integral portion of the model to provide relative financial performance of Orange County facilities. This model is capable of evaluating the County's public facilities relative to its possible peer group of commercially available buildings and uses. For available, comparable commercial property types — (office, warehouse and light industrial space) the annual cost of operating the buildings was compared to a full- service lease rate for private sector comparable buildings. Properties which are unique and are specific to specialized County government operations (Jail, Solid Waste operations, Emergency Services operations, etc.), capital and depreciation costs were compared to replacement costs (utilizing RSMeans to determine replacement costs). ECS consulted with the Orange County Tax Assessor for appropriate tax rate ranges, and used replacement costs as assessed value. As an overall portfolio, Orange County operates efficiently in regards to market rates and replacement costs. Table 2 presents the three most efficient facilities and the single inefficient facility from a cost standpoint. Appendix 3 of the full report includes a summary of all County facilities evaluated and their cost per square foot. Table 2 Efficient and Inefficient Property Summary – Cost Per Square Foot Most Efficient Properties Inefficient Properties 1. Court Street Annex 1. Environment and Agriculture Building 2. Link Government Services Center 3. Public Defender Building In conclusion, Orange County possesses a reasonably efficient portfolio and has sufficient space for short and longer term growth. ECS understands the County is currently interested in obtaining long term development rights for its Southern Orange Campus to address longer term growth nearest the County's population centers of Chapel Hill and Carrboro. ECS recommends Orange County: 1. Utilize this baseline report to consider the future use of its inefficient utilization of space and financially stressed assets identified; 2. Promote and maintain an adequate amount of public use conference /flex spaces that could be drawn from the currently available under - utilized spaces; 3. Initiate a focused educational and development program for organized, efficient and sustainable storage of equipment, supplies, and documents. The largest inefficiency observed is use of County office space for storage. 4. Actively strive for operational efficiencies and the reduction of capital and operating costs through a continuous and programmatic discussion of facilities and space utilization issues. Sincerely, ECS Carolinas, LLP alLI Cameron Anderson Project Manager "C41 fr 4 Peter Domenico, P.E. Principal Engineer 9 D ECS CAROLINAS, LLP "Setting the Standard for Service" I_ Geotechnical • Construction Materials • Environmental • Facilities NC Registered Engineering Firm F-1078 October 23, 2013 Mr. Jeff Thompson Orange County Asset Management Services PO Box 8181 Hillsborough, North Carolina 27278 Reference: Report of Limited Facilities Consulting Services Orange County Facilities ECS Project No. 06 -20784 Dear Mr. Thompson: ECS Carolinas, LLP (ECS) along with our sub - consultant, Facility Futures, provided our services in accordance with our authorized proposal 06:16742. We are pleased to submit this report that serves as a narrative discussion of the project, a summary of our observations and recommendations for further in -house evaluation of Orange County Facilities. We appreciate the opportunity to provide consulting services for this project. If you have questions or comments concerning this report, please feel free to contact us at your convenience. Sincerely, ECS Carolinas, LLP C� Cameron Anderson Project Manager k e'el 'I Peter Domenico, P.E. Principal Engineer 9001 Glenwood Avenue, Raleigh, NC • 27617 -7505 • T 919 -861 -9910 • F: 919- 861 -9911 • www.eeslimited.com ECS Capitol Services, PLLC • ECS Carolinas, LLP • ECS Central, PLLC • ECS Flonda, LLC • ECS Mid - Atlantic, LLC • ECS Midwest, LLC • ECS Southeast, LLC • ECS Texas, LLP REPORT OF LIMITED FACILITIES CONSULTING SERVICES 3700 Glenwood Avenue Raleigh, North Carolina 27612 Prepared for: Mr. Jeff Thompson Orange County Asset Management Services PO Box 8181 Hillsborough, North Carolina 27278 i TM Prepared by: ECS Carolinas, LLC 9001 Glenwood Avenue Raleigh, NC 27617 ECS Project: 06 -20784 November 6, 2013 10 11 Table of Contents ProjectInformation ......................................................................... ..............................1 SpacePlan Update .......................................................................... ..............................1 Limited Physical Assessment .......................................................... .............................13 MarketValue .................................................................................... .............................18 Financial Stress of Property ............................................................ .............................19 Summary and Recommendations Appendices Appendix 1 — Space Utilization Questionnaire Summaries Appendix 2 — Physical Attributes of a Well- Designed Workplace — Detailed Descriptions Appendix 3 — Facilities Market Value and Financial Stress Table 12 PROJECT PURPOSE AND INFORMATION /SCOPE ECS Carolinas ( "ECS ") was retained to assist Orange County in improving planning for current and future use of Orange County facilities. The following tasks were included as part of this work: 1. Review and updating the County's current use of space and departmental assignments. 2. Review and evaluation of the County's current space use plan. 3. Performance of limited physical assessments of County facilities to provide a consistent approach to identifying possible future capital improvements during the next ten years and associated cost estimates. The costs developed do not include additional public sector procurement costs. Costs were developed by using RSMeans. 4. Valuation of current assets including a comparison of Orange County's cost per square foot to operate their facilities and readily available full service lease market rates. This evaluation is only applicable /provided for facilities where similar commercial properties are available for comparison. 5. Providing data to assist Orange County in determining which properties are "stressed" financially (presented in detail below), under- utilized, or have capital needs greater than replacement cost. INTRODUCTION /BACKGROUND Orange County currently owns or operates approximately 798,000 gross square feet (GSF) of space in 36 individual facilities. ECS observed the County's use of its available office space in twelve County occupied /controlled buildings (did not include court system occupied buildings). The County buildings designed or utilized for County specific uses (Jail, Animal Services Center, etc.) were also not included within the space study portion of this report. ECS conducted limited physical assessments of the majority of County facilities (32 of 36) to evaluate the relative financial stress of the County's portfolio of buildings, and to provide cost estimates for corrective work required in the next ten years (the typical capital cost projection period used in the private sector). ECS also evaluated the relative financial stress of these County buildings. SPACE PLAN UPDATE ECS' sub - consultant, Facility Futures, a space planning and use specialist performed the necessary field work and analysis to provide direction for current and future space planning by the County. - 1 - Industry space use terminoloov 13 This report, in keeping with industry standards, considered _gross square footage for calculations and assessments related to asset valuation and financial comparison, and usable, or rentable, square footage for calculations and assessments related to space use. The First floor of the Link Center has been used as an example here to visually demonstrate the individual industry standard categorizations of spaces within buildings. The gross square footage of an area is calculated as the sum of the floor areas within the outside faces of the exterior walls for all stories which have usable floor surfaces. The following plans, quantities of space, and layout (used as an example) was provided directly by Orange County and was not confirmed by ECS. As an example, Figure 1 below demonstrates the gross square footage of the first floor level of the Link Government Services Center. Figure 1 GROSS SQUARE FEET 13,050 Usable square footage includes all assignable square footage plus a portion of non - assignable square footage (including service areas (custodial, restrooms), circulation areas, and mechanical areas, as defined below). Assignable square footage includes areas on all floors of a building assigned to, or available for use by, an occupant, including space functionally usable by an occupant. In the private sector lease market, these areas, though not assignable to an individual building occupant, would be charged to all building occupants on a pro -rated basis proportional to the assignable square footage included in their lease. Figure 2 below demonstrates assignable square footage for the first floor of the Link Government Services Center. -2- .. 14 Qv Figure 2 EJ ASSIGNABLE AREA 7,550 SQ FT Building service areas are those areas on floors of a building used for custodial supplies, sink rooms, janitorial closets and for public restrooms. Figure 3 demonstrates the service areas on the first floor of the Link Government Service Center. The circulation area is the portion of the gross area — whether or not enclosed by partitions — which is required for physical access to some subdivision of space. Circulation areas include, but are not be limited to: corridors (access, public, service), elevator cars, escalators, stairs and stair halls, lobbies (elevator, entrance, public). Figure 4 demonstrates the circulation areas on the basement level of the Link Government Services Center. -3- 15 Mechanical areas include the portion of the gross area designed to house mechanical and electrical equipment, utility services, etc. Figure 5 below demonstrates the mechanical spaces on the basement level of the Link Government Services Center. N E Figure 5 MECHANICAL AREA 467 SQ FT Structural areas include the portion of the gross area that cannot be put to use because of structural features, and include exterior walls, fire walls, permanent partitions, unusable areas in attics or basements, or comparable portions of a building with ceiling height restrictions. Figure 6 demonstrates the structural areas of the first floor of the Link Government Services Center. -4- 16 Figure 6 STRUCTURAL AREA 3,088 SQ FT Table 1 Link Center Square Footage by Space Type Category Link Government Services Center — First Floor Square Feet Assignable square footage 7,550 Service area 311 Circulation area 1,607 Mechanical area 524 Structural area 3,058 Gross square footage 13,050 Note: Gross square footage equals the sum of all Assignable, Service, Circulation, Mechanical and Structural areas. These measures were used in calculating the usable square footage for each department in the buildings examined, and to evaluate space utilization. Table 2 presents a summary of space categorization in all buildings visited and evaluated for space use by ECS. -5- 17 TABLE 2 Buildings Assessed for Space Use Building Name Categorizations Office Storage Other Unassigned Service Circulation Mechanical Structural Gross Assignable usable Sq Ft + + + + + + + - (GSF) GOVERNMENT SERVICES ANNEX Office 3,430 486 2500 298 2254 619 2,863 12,450 JOHN LINK, JR GOVERNMENT SERVICES CENTER Office 6,717 3409 4681 606 5126 815 4,637 25,991 SOUTHERN HUMAN SERVICES CENTER Office /Health clinical 7,946 7945 1439 6204 511 4,567 28,612 ENVIRONMENTAL & AGRICULTURAL CENTER Office 5,810 3671 3929 454 2433 590 3,285 20,172 ASSET MGT SERVICES NORTH ADMIN BLD Office 762 1174 73 109 282 2,400 WHITTED HUMAN SERVICES CENTER COMPLEX Ofc /Health /dental clinic 17,173 13372 2565 2676 16519 1742 9,053 63,100 SKILLS DEVELOPMENT CENTER Office /classroom 1782 7259 546 2186 112 1,347 13,232 OPT MODULAR OFFICE BUILDING Office 883 916 75 285 361 2,520 ROBERT & PEARL SEYMOUR SENIOR CENTER Off ice /classrm /program 1,366 15804 1302 3590 680 4,038 26,780 CENTRAL ORANGE SENIOR CENTER Office /classrm /program 1,660 11720 1095 2104 298 2,123 19,000 WEST CAMPUS OFFICE BUILDING Office 16,205 9527 284 1856 12729 1091 5,024 46,716 GATEWAY CENTER Office 6,940 337 6719 701 4319 950 2,880 22,846 HILLSBOROUGH COMMONS Office 20,858 7122 8413 1317 14652 366 3,272 56,000 LIBRARY Program /office 2014 11092 1031 2138 658 6,521 23,454 TOTAL 93,546 11,130 101,765 10,030 13,469 74,539 8,541 50,253 363,273 Unassigned usable space: Government Services Annex includes - 2500 square feet of structurally usable square footage on the second floor Link Government Services Center includes approximately 4,680 square feet in the former Register of Deeds and County Engineer areas on the first floor level West Campus Office Building includes two small closet /storage spaces on the basement level 129 King Street (occupied by Public Defender) includes approximately 1,360 square feet of unconditioned, low bay warehouse space -6- In TABLE 3 Workplace Appropriateness Ratings Facility Work lace Attribute Comments A B C D E F GI H I J K L Av Asset Management Services North Administration 3 NA 3 3 2 1 NA 3 3 NA NA 1 2.4 Currently unoccupied -good place to move a small stand -alone department or agency Environmental & Ag 3 1 2 3 1 1 1 1 1 NA NA 1 1.5 Renovated former grocery store Gateway Center 3 2 2 3 2 2 3 2 2 NA NA 3 2.6 Government Services Annex 3 1 3 3 1 2 2 1 3 NA NA 1 2.0 Hillsborough Commons 3 1 2 3 2 2 3 1 2 NA NA 2 2.1 Link Govt Services Center 3 1 2 3 2 3 2 2 2 NA NA 3 2.3 Seymour Senior Center 3 3 3 3 2 3 3 3 3 NA NA 3 2.9 Skills Development Center 3 3 3 3 2 2 3 3 3 NA NA 3 2.9 South Human Svcs Center 3 2 2 3 2 2 3 2 3 NA NA 3 2.5 West Campus Office 3 3 3 3 2 2 3 3 3 NA NA 3 2.8 Whitted Human Services 3 1 1 3 1 1 1 1 2 NA NA 2 1.6 Renovated former school building Workplace Attributes A. Accommodates distraction free work on an individual basis B. Supportive of collaboration and interaction among employees C. Accommodates undistracted teamwork and meetings D. Flexibility of workspaces to accommodate personal work styles E. Some control over heating and cooling in the open office environment F. Visual access to daylight and control of glare G. Workspaces are designated in size and type by function H. The facility is easyto navigate through (Wayfinding) I. Appropriate adjacencies are met J. Ease of access to and flexibility of technology K. Ergonomics L. Manifeststhe culture of the overall organization Rating Key: 1 — Not incorporated 2 — Partially incorporate 3 — Fully incorporated NA— not applicableto facility or unknown -7- 19 SPACE UTILIZATION The purpose of the high -level space utilization study of County office buildings is to: 1. Identify areas that are either under - utilized or over - utilized; 2. Identify critical space issues and possible solutions; 3. Benchmark space utilization, where possible, using industry standards; and 4. Subjectively rate physical workplaces in various buildings using criteria identified and defined in Appendix 2 of this report, "The Physical Attributes of a Well- Designed Workplace — Detailed Descriptions ". The "understanding phase" of the study included identification and evaluation of the following: 1. The overall space strategy of Orange County; 2. How space is currently utilized; 3. County department business goals and initiatives; 4. County department operations and culture; 5. How existing facilities support or hinder service delivery for County departments; 6. How the velocity of technical innovation in service delivery may affect future service delivery; 7. How impediments inherent in the existing space restrict efficiency and effectiveness of service delivery; and 8. Challenges the County faces in managing its facilities. ECS and Facilities Futures completed its analysis through 1) thoroughly reviewing building plans and past space study documents; 2) reviewing and assessing department head survey data; and 3) information gathered through interviews and follow -up questions. Only those buildings occupied by County employees housed within general office environments were visited. ECS and Facilities Futures did not tour nor evaluate facilities such as the Emergency Services Headquarters, the Animal Services Facility, the Jail, Courthouses, nor other buildings that would only house specialized functions. KE The following buildings were visited: 1. Asset Management Services North Campus Administration Building 2. Central Orange Senior Center 3. Environment and Agriculture Center 4. Gateway Center 5. Government Services Annex 6. Hillsborough Commons 7. John Link Jr. Government Services Center 8. Seymour Senior Center 9. Southern Human Services Center 10. Skills Development Center 11. West Campus Office Building 12. Whitted Building Using annotated floor plans and related square footage assignments (as defined and described earlier in this report), space utilization factors for each building were developed, and problem areas identified. In addition, the department director surveys and management information were reviewed and space functionality was identified. Using these attributes of a well- designed workplace, each space was subjectively rated. All in all, square footage per occupant for office space in most Orange County buildings is in line with the type of work being performed (See Table 4, "Orange County Space Utilization Summary "). According to space utilization benchmarking statistics of the International Facility Management Association (IFMA), usable square feet per occupant is higher in Orange County's facilities than current standards for office space. In corporate office settings today, cubicles significantly out- number hard - walled offices and space utilization rates in the 200 -250 usable square footage per occupant range are more typical.' Orange County's office design is more hard - walled with very few cubicle workstations in its office spaces —a deliberate design element because of privacy needs for County operations. This coupled with the configuration of the space within older County facilities are very compartmentalized and that Orange County's newer facilities were space planned for an estimated 20% expansion, contributes to an increased square footage per person. The areas where usable square feet per occupant is highest in Orange Planning and Inspections – Assigned space includes a designed customer lobby and walk- up service counter space for the public. Revenue - Assigned space includes a large designated filing area. Register of Deeds - Assigned space includes a large designed records retention area. Board of Elections - Assigned space includes a significant amount of space dedicated to the storage of election equipment and other election materials. 1 International Facility Management Association, Research Report # 30, 2008 MGM 21 County Manager - Assigned space includes large circulation and reception area. Housing, Human Rights and Community Development - Assigned space includes approximately 1,300 square feet of storage and waiting /reception area. BENCHMARKS FOR A WELL DESIGNED WORKPLACE A well designed workplace means different things to different organizations. One company may have a clear need for distraction free work 90% of each day. This may result in an office comprised of almost entirely private offices whereas a company whose chief business initiative is to get their product to market faster may require 90% group work. In that case, their workplace will likely be very different from the first. Just as we do not expect every well- designed workplace to be designed in the same way, we would not anticipate that all well- designed workplaces have all of the attributes described above either. As such, the definition of a well- designed workplace is subjective and relative. A $10 billion consumer goods company with a 500,000 square foot Class A, owned corporate headquarters may have state -of- the -art furniture, specially designed spaces for interaction and collaboration, team rooms and the highest HVAC system technology available. On the other hand, a $1 million ad agency that leases 20,000 square feet of Class B space may have low end furniture. But it may have the mobility required to support collaboration. It may also have a "look" that demonstrates their creative atmosphere. The ad agency may have a "spec building" grade HVAC system, but may also have operable windows. These are two entirely different types of workplaces, yet both would be considered well- designed because they support the work their company's employees do and they reflect their respective cultures. So, what is the definition of a well- designed workplace? One could say it is a workplace that supports the strategic business initiatives of the company, supports the employees in performing their work efficiently and productively, reflects and embodies the values and culture of the company and is environmentally healthy. The Physical Attributes of a Well - Designed Workplace Based on our research and our experience as workplace designers, we recognize the following attributes as those that have the biggest positive impact on the physical workplace. A. Accommodates free work on an individual basis; B. Is supportive of collaboration and interaction among employees; C. Accommodates undistracted teamwork and meetings; D. Flexibility of workspaces to accommodate personal work styles; E. Provides some control over heating and cooling in the open office setting; F. Visual access to daylight and control of glare; G. Workspaces are designated in size and type by function; H. The facility is easy to navigate through (wayfinding); I. Appropriate adjacencies are met; J. Ease of access to and flexibility of technology; K. Ergonomics; -10- 22 L. Manifests the culture of the overall organization. Full descriptions of the characteristics of each attribute are presented in Appendix 2. Space Utilization Summary The following is a space utilization summary of selected buildings owned or leased by Orange County, North Carolina. The summary is based on the following: 1. The information is extrapolated from the document entitled, Square Footage by Department or Agency as prepared by the Orange County, Asset Management Services Department (undated), latest version received October 11, 2013. 2. Conference rooms are allocated to the building in which they are located, even if they are available for use by occupants of other Orange County buildings. 3. For the purpose of this report, the following definitions are used. They are recognized by both the Building Owners and Managers Association (BOMA) and he International Facility Management Association (IFMA): • Usable area: The portion of a building or floor available for occupants. In leased space this is the area not shared with other tenants. It is the amount of functional space available for use by an occupant or tenant. • Rentable area: This is the gross area of a building minus exterior walls, major vertical penetration and interior parking spaces. In leased space, this area includes common areas (defined below) shared with other tenants, and is the amount the lessee pays for. • Common area: Common area is space shared by all tenants, such as but not limited to, the main lobby, main circulation corridors leading to individual leased spaces, elevator lobbies, duct chases, building columns, mechanical /electrical rooms, wiring closets, amenity spaces available to all tenants such as a fitness centers, cafes, day cares, etc. • Load Factor: The Load Factor is a percentage that takes into account the common areas. It is determined by dividing the total rentable area by the total usable area. A tenant's basic rent is determined by multiplying their usable area by the load factor, and the result (which is the rentable area) is then multiplied by his rental rate per square foot. 2 Vertical penetrations include stairs, elevator shafts, utility tunnels, flues, pipe and duct shafts and their enclosing walls (Source International Facility Management Association, Research Report #30, 2008 -11- 23 Table 4 Orange County Space Utilization Summary Facility Tot Common Load Department Dept Comm Dept # of USF / Comments Asset Mgmt North 2,400 Vacant Env & Ag Bldg 20,172 2,258 11% DEAPR 3,740 419 4,159 13 288 Building common area does not include Farm Services 759 85 844 4 190 Coop Ext 3,956 443 4,399 10 396 Soil & Water 717 80 797 5 143 Gateway Center 22,846 5,175 23% Tax/ Appraiser 3,221 730 3,951 19 170 Land Records 1,527 346 1,873 9 170 Reg of Deeds 8,626 1,954 10,580 14 616 Large area for records Revenue 3,323 753 4,076 9 369 Large filing area Govt Srvs Annex 12,450 2,212 18% Elections 4,875 4 1,219 GSF does not include 2nd floor space Hillsborough 56,000 14,752 26% Social Services 38,016 128 297 Link Govt Center 25,991 6,295 24% Attorney 641 155 796 4 160 BOCC 1,041 252 1,293 4 260 County Manager 2,090 506 2,596 6 348 Finance 3,737 905 4,642 14 267 Human Res 2,360 572 2,932 8 295 Skills Developmnt Social Services 1,782 12 149 South HS Center 28,612 8,400 29% Child Support 227 67 294 1 227 Health 1,802 529 2,331 15 120 USF includes office space only Housing 689 202 891 3 230 Social Services 7,536 2,212 9,748 30 251 Sheriff 449 132 581 2 225 West Campus 46,716 17,136 37% Asset Mgmnt 2,278 836 3,114 9 253 Files and plan storage + 1 conference Child Support 3,163 1,160 4,323 13 243 Economic Devlp 656 241 897 4 164 Env Health 3,760 1,379 5,139 21.50 175 IT 4,101 1,504 5,605 17 241 Ping & Inspect 8,388 3,077 11,465 22.50 373 Unassigned 699 Whitted Center "A" 30,769 7,542 25% Health 3,439 843 4,282 20 172 non - clinic space only Unassigned 8,985 2,202 11,187 Whitted Center "B" 132,3311 7,497 23% Health 5,327 1,235 6,562 25 213 non - clinic space only Housing/ CD /Hum Rights 5,020 1 1,164 6,184 13 386 -12- /.' Space Study Suaaestions for Consideration Relocate Elections' equipment from the Government Services Annex to either the Environmental and Agricultural Center or Hillsborough Commons. Both buildings have available dedicated storage space that would be much more efficient and appropriate spaces to store the election equipment and various election materials. The vacated space in the Annex could easily be upgraded and freshened up with new flooring, ceilings, lighting and paint. 2. Similar to the Annex space, the vacant North Administration building could be easily and quickly freshened up and used for a small department if another building were to reach capacity. 3. Going forward, the County should incorporate the attributes of a well- designed workplace into the future designs of their physical workplaces. It should be kept in mind that each of the attributes may apply differently to different departments and as such they should be applied accordingly. 4. Look for opportunities to move departmental storage that doesn't require frequent access to the caged storage area at the Environment and Agriculture building. Significant spaces could be open for use should the County engage in a fairly low -cost campaign of storage education and execution throughout available storage facilities. 5. Identify the most impactful and prioritize them by criticality, feasibility and cost. Then develop and execute a tactical plan to implement them. LIMITED PHYSICAL ASSESSMENT ECS conducted a limited physical assessment of the County's facilities, and reviewed the County's five -year capital investment plan (CIP) for 2012 -17. County Asset M a n a g e m e n t S t a f f i n f o r m e d ECS of the typical scope of work for restoration projects with the CIP. ECS then compared the age of existing facilities' equipment /systems to appropriate industry standard expected useful life (EUL). Based on age, EUL was used to develop a list of systems requiring substantial repair /replacement (projects) during the term of an industry- standard ten -year capital forecast. ECS utilized R. S. Mean S3 estimated costs for the above referenced list of projects, with a complete replacement scope of work. These costs, presented in Table 5, cannot be compared to Orange County solicited bids, or specific consultant's estimates of costs when making a system more efficient. The systems addressed during this assessment were parking lots, HVAC systems, roofing and building exteriors. The following facilities are currently in use in functions other than their original planned use. Although the space may serve the current purpose, the original structure, planning, and layout may not allow for the highest and best use of the space, or meet County needs in the most efficient manner. 3 RS Means (Reed Construction Data, Inc.), "a trusted name in construction costs for more than 70 years offers - -- annually updated construction and cost information." RSMeans.com -13- 25 1. Environmental and Agricultural Building This building, currently serving as an office and records storage building, was originally constructed as a grocery store. The building superstructure is not typical of office space property within Orange County. 2. Emergency Services Center This building was originally constructed as the Tweeter Audio /Video headquarters, housing some offices, retail merchandise and distribution center, and installation and service center. 3. Public Defender Office This facility was originally constructed as a residence and later expanded to include space for a retail furniture store. The construction is typical of a single family residential (timber stick built) in the front portion, and warehouse type block construction in the rear. The building was renovated in 2001 to create office space for the Purchasing and Central Services Department, and again in 2009 to house Public Defender staff. The building superstructure is not typical of office space property within Orange County. 4. Whitted Human Services Center The facility was originally constructed as a school building with a dining hall and large classroom spaces. The load bearing block c o n s t r u c t i o n of t h i s f a c i l i t y typically does not lend itself w e l l to interior modifications and changes in layout. Code compliance evaluation services were not included within the approved scope of work and are not accounted for within this report. -14- M Table 5 Limited Physical Assessment - 10 Year Capital Cost Estimates Location Repair /replacement project Cost Central Orange Senior Center TPO roof replacement $35,000 HVAC Equipment $280,250 Total $315,250 Asset Mgmt North HVAC Equipment $35,400 Building envelope $20,000 Total $55,400 Animal Services Center Parking lot repair $187,350 Total $187,350 501 West Franklin Parking lot repair $14,400 Public Defender Replace modified bitumen roof $26,500 Replace shingle roof $7,200 Replace HVAC equipment $109,268 Piedmont Food & Ag Center Building Envelope $37,700 Total $195,068 West Campus Building Basement leak allowance $10,000 Replace TPO roof $26,000 Replace HVAC equipment $703,811 Total $739,811 Southern Human Services Parking lot repair $944,100 Motor Pool Cracked block in break room $3,000 Replace HVAC equipment $429,638 Building Envelope $85,000 Total $1,461,738 Solid Waste Admin Parking lot repair $193,500 Total $193,500 Skills Development Center Parking lot repair $103,950 Replace modified bitumen roof $15,000 Replace EPDM roof $22,000 Replace shingle roof $6,750 Replace HVAC equipment $195,172 Building Envelope $130,000 Total $472,872 Seymour Senior Center Parking lot repair $357,675 Replace HVAC equipment $395,005 Total $752,680 Public Defender Cracked block (fagade) repair $4,500 Replace HVAC equipment $104,135 Total $108,635 Piedmont Food & Ag Center Parking lot repair $7,500 Total $7,500 Orange County Jail Parking lot repair $127,575 Replace EPDM roof $24,000 Replace modified bitumen roof $25,000 Building Envelope $190,000 Total $366,575 Motor Pool Parking lot repair $1,363,050 Replace metal roof (Old) $99,000 Replace shingle roof (New) $51,750 Building Envelope (New) $80,000 Building Envelope (Old) $50,000 Replace HVAC equipment $159,300 Total $1,803,100 -15- 27 Library Replace TPO roof $26,000 Replace HVAC equipment $345,947 Total $371,947 Justice Facility Parking lot repair $213,750 Replace TPO roof $15,000 Replace HVAC equipment $957,821 Total $1,186,571 John Link Government Center Parking lot repair $104,625 Replace EPDM roof $10,000 Building Envelope $120,000 Total $234,625 Historic Court House Building Envelope $60,000 Total $60,000 Hillsborough Commons Replace HVAC equipment $413,000 Total $413,000 Government Services Annex Parking lot repair $252,500 Building Envelope $46,000 Replace HVAC equipment $183,638 Total $482,138 Gateway Center Replace HVAC equipment $336,979 Total $336,979 Farmers Market Pavilion $0 Total $0 EuroSports Soccer Center Parking lot repair $6,858,000 Total $6,858,000 Environmental & Agricultural Center Parking lot repair $279,000 Replace metal roof $429,000 Building Envelope $62,000 Replace HVAC equipment $281,533 Total $1,051,533 Emergency Services Substation #1 Parking lot repair $203,175 Building Envelope $13,000 Replace HVAC equipment $19,323 Total $235,498 Efland- Cheeks Park Parking lot repair $300,150 Total $300,150 District Attorney Building Parking lot repair $140,000 Replace EPDM roof $1,700 Building Envelope $32,000 Total $173,700 Dickson House Replace HVAC equipment $22,125 Building Envelope $50,000 Total $72,125 Court Street Annex Replace EPDM roof $2,600 Building Envelope $32,000 Total $34,600 Whitted Human Services Replace HVAC equipment $930,725 Building Envelope $315,000 Total $1,245,725 Emergency Services Center Parking lot repair $462,825 Repair leak in garage office $5,000 Building Envelope $104,000 Replace HVAC $325,518 Total $897,343 -16- W MARKET VALUE The market value of a commercial building is based on the quality of the lease(s) attached to the property and how the lease equates to free cash flow (calculated as all income minus all expenses (depreciation, original costs, capital expenses, operating expenses, etc.). The quality of the lease is based on the price per square foot, length of the lease, and credit worthiness of the lease holder. Free cash flow is then. The challenge in extrapolating this type of valuation of a commercial property to County facilities is the lack of current leases, and the fact that Orange County does not calculate free cash flow for their properties. ECS used a local licensed commercial real estate broker to assist in determining a fair market cost per square foot for buildings similar to those owned by Orange County, without tenants. Without tenants (and associated leases) the value of a building is based on location, condition of the building, strength of the rental submarket and demand for single- tenant, owner occupied buildings. In reviewing the prospectus report of class A, B and C rental space in Orange County, an average market value of $95 to $115 per square foot is a reasonable starting point for fair market evaluation, included here as Appendix 3, presents the annual operating cost per square foot, and Market Rental Cost per square foot for County facilities where readily comparable facilities exist in the private market place. If Orange County would attempt to sell these buildings with a long -term lease back condition (Orange County would occupy but not own the buildings), the value of the properties would be expected to increase, due to the free cash flow of the leases attached to the properties. The amount of this increase would be dependent on the length of the lease and free cash flow generated. 4 These classes represent a subjective quality rating of buildings which indicates the competitive ability of each building to attract similar types of tenants. A combination of factors including rent, building finishes, system standards and efficiency, building amenities, location /accessibility and market perception are used as relative measures. Class A Most prestigious bui9ldings competing for premier office users with rents above average for the area. Buildings have high quality standard finishes, state of the art systems, exceptional accessibility and definite market presence. Class B Buildings competing for a wide range of users with rents in the average range for the area. Building finishes are fair to good for the area. Building finishes are fair to good for the area and systems are adequate, but the building does not compete with Class A at the same price. Class C Buildings competing for tenants requiring functional space at rents below the average for the area. -17- CO FINANCIAL STRESS OF A PROPERTY ECS has provided two methods for determining the financial stress of Orange County owned and maintained properties. For properties with similar facilities available for rent in the real estate market, a table outlining the full service "in house" costs for Orange County vs. the full service market rental rates is included in Appendix 3. For properties without similar facilities available for rent in the real estate market, ECS used RS Means to estimate a replacement value (where available) to compare to the summation of pro -rated 10 -year capital costs ( "3 multiplier" — 30 year financing as opposed to 10 year financing — for each property, as future capital costs are difficult to quantify past 10 years but need to be accounted for) and 30 year straight line depreciation. Full- service lease terms include building costs, property taxes, utilities, cleaning services, and maintenance. As a government entity, Orange County does not pay property taxes. Therefore the table presents the cost per square foot for the Orange County space, calculated using an estimated tax value, provided by the Orange County Tax Assessor, based upon data and model assumptions. ECS was not able to determine the assessed value of the properties, and so used the current day RS Means rebuild costs as an estimate of value. In addition to replacement costs, ECS utilized RS Means and inflation indexes to estimate original construction costs to provide for depreciated costs. For simplicity ECS utilized a 30 year straight line depreciation table. These costs are summarized in the attached table. To assist in calculating the change in cost for additional off -site storage, ECS has been asked to provide a range in costs for climate controlled storage. Climate controlled storage (not cold storage) can be rented for between $7.00 and $9.00 per square foot. With efficient racking, inventory tracking and access, warehouse space can serve as 2 -5 times the square feet of space. 30 Appendix 1 Space Utilization Questionnaire Summaries In August of 2013, a survey was submitted to Orange County department directors to gather information regarding their department's space requirements. The information that follows is taken directly from the survey forms, organized by department /agency. Department on Aging 3 -5 Years • The senior population will continue to grow, as well as the demand for services, thus needing more space. 5 -10 Years • More space will be needed to offer a variety of services as seniors are living longer. Serving clients ages 55 -105 requires diversity in programming and needs, thus the need for more programming space. Central Orange Senior Center Specific 1. Not enough drop -in space for seniors. a. Enclose patio 2. Two existing entrances make evening security an issue. 3. Some employees are having physical issue due to poor ergonomics. 4. There is no designated conference space -must use program space. 5. No designated break room for staff. Seymour Senior Center Specific 1. Do not have enough space for temp staff or interns. 2. The Wellness Center needs to be expanded as soon as possible. 3. Some employees are having physical issue due to poor ergonomics. 4. They are using their conference room for program space. 5. There is inadequate storage space. 6. There are no designated break areas for staff. Animal Services Aside from some minor work flow problems, there are no major issues. 3 -5 Years • There will probably be a shift to have more electronic files and more online access to things such as applications, forms, and ads. 5 -10 Years 31 • Animal Services will continue to head in the direction of conducting more business online / virtually. Asset Management (West Campus Office Building) No major issues. 3 -5 Years • The buildings and vehicles that Asset Management is responsible for managing continue to grow in complexity. There are many automated systems that require significantly greater use of technology. New and developing technologies offer the potential to allow more work to be completed and documented "in the field" at the source of the work rather than in an office environment. Correspondingly, remote access allows a quicker response from a central command location rather than always having to travel to a location to troubleshoot. • It is anticipated that alternative energy and fuel sources, and technologies that reduce the amount of fuel and energy used, will only continue to grow. These are measures that elected officials support and demand. Individuals also expect more in their workplaces over time as well, looking for more balance between work and personal life. Facilities will need to support this. Board of Elections (Government Services Annex) 1. Inefficient use of space. a. Approximately 3,800 square feet of 4,800 total usable square feet office space in this building is used for election equipment and material storage. 3 -5 Years • Depends on directives from the General Assembly and State Board of Elections. 5 -10 Years • Depends on directives from the General Assembly and State Board of Elections. Coop Extension (Environment and Agriculture Center) 1. Located in a converted grocery store with little natural light and inadequate HVAC. 3 -5 Years • Little change. 5 -10 Years • Little change Child Support (West Campus Office Building) 1. There is a need for additional conference space and equipment space. 2. There is no growth space. 32 3 -5 Years • Teleconferencing will be utilized more. 5 -10 Years • Teleconferencing will be utilized more. Clerk to the Board (Link Government Services Center) 1. Lacking confidential conference space. 2. There is a need for additional filing and storage space. 3 -5 Years • Dependent on my BOCC and their goals and priorities. • Same County Attorney (Link Government Services Center) No major issues. 3 -5 Years • Departmental needs for legal services should not change much. 5 -10 Years • There will be more digital interface. Department of Environment, Aqriculture, Parks and Recreation (Environment and Agriculture Center) 1. Located in a converted grocery with inadequate HVAC. 2. DEAPR staff in this building is in three physically- separated sections of the building, which is a hindrance to workflow and administrative support. The Soil & Water District section is undersized for its current staff and has very little support and storage areas, with one FTE working in a carved -out section of the lobby. The present Soil & Water offices are very small; in addition this division hosts a number of programs and could benefit from a conference /staging area. Two staff members have to enter the main building lobby to reach the rest of the offices because of a solid brick wall (original design issue). 3. Nearly all of the work stations for DEAPR /Soil & Water are outdated and worn. Many desks are 15 -25 years old and are not optimal for current -day needs. 4. Little consideration has been given to ergonomics. Storage is extremely inadequate for the Soil & Water office. DEAPR purchased an outside pod approximately 15 years ago to store equipment and files. A vacant office is currently used for storage, which is adequate at present. 5. Department filing is inadequate for the Soil & Water division, adequate for other sections. Soil and Water files require secure access and close location. 6. Personal workspace filing is inadequate for Soil & Water, generally adequate for others. 33 3 -5 Years • Greater interaction with the Parks Division is a current need that will become more pronounced. Areas for storage of outdoor equipment may be needed (unless co- located with Parks). Since the department is focused on outdoor uses, an outdoor classroom and natural open space is needed. 5 -10 Years • DEAPR currently has staff located in three distinct locations. Many of these staff would benefit greatly from being in the same location, offering better workflow, ease of staff meetings, and opportunities for "water cooler" conversations that do not exist. County Manager's Office - Public Affairs (Link Government Services Center) 1. They have outgrown their current space. 3 -5 Years • The work performed will continue to evolve based on emerging technologies. A great deal is already electronic and that trend will continue. Many of the tasks could be performed off site, increasing the ability to work - from -home. From a video production standpoint, the use of robotic cameras is currently the industry standard and reduces the need for additional staff /manpower. 5 -10 Years • In 5 -10 years, it is envisioned that Public Affairs will be a fully staffed department with emphasis being placed on a high functional multi -media interface. This will consist of specialists in the areas of graphic design, social media, video production, and mass communications. As the county continues to grow, so too will the need for informing and educating the public. Economic Development (West Campus Office Building) No major issues. 3 -5 Years • Filing space needs to be increased. Staff may increase in size and require more office space, computers. Current shortage of AV presentation & monitor hinders the marketing aspect of economic development presentations to business prospects. 5 -10 Years • Same as 3 -5 years. Emergency Services (Emergency Services Center) 1. Being split on two floors slightly impedes work flow. 2. They do not have a decontamination area -this does not meet OSHA requirements. 3. Long term needs - expand space to include break room space showers and dressing rooms. 34 3 -5 Years • Permanent EMS stations will need to be built in strategic areas. The 510 building should be expanded to provide break space, showers, and dressing areas for EMS personnel. 5 -10 Years • The EOC and 9 -1 -1 Center should be moved out of the 510 building and a new, hardened facility should be built that can handle severe weather events, with increased space, and training areas. Environmental Health (West Campus Office Building) 1. Spaces are closed off and it is difficult for front desk to track staff location . 2. Front desk area is not customer friendly. Counters are too high and are not ADA compliant. 3. Noise level is entirely too high at the front desk. 4. Staff use personal cellphones for business communication, even at their workstations, however the signal strength is inadequate at WCOB 5. Space is not large enough for full staff. 6. File cabinets are overloaded and broken. 7. There is No break area on this floor Farm Service Agency (Environment and Agriculture Center) No major issues. 3 -5 Years • In -house customer service will continue. 5 -10 Years • The agency is driven by customer service. Though technology may increase the needs will be the same. Health (All Locations) 1. Need art on the walls and a friendlier welcoming lobby space. 2. Front desk ergonomics needs improvement. 3. Extreme fluctuations in temperature are unpleasant for clients and staff and affect clinical lab procedures i.e. lab temps must be maintained within a range for testing to be performed accurately. Health Southern Human Services Center 1. Clinic space limited 2. There is no natural light in clinical space is cold not pleasing. Needs painting. Does not present a pleasant environment to clients. 3. There is virtually no meeting space at.. DSS has rooms but they are always booked. No rooms have projectors. Health ( Whitted Human Services Center) 1. The Whitted Human Services Center is an older building, stairs are not designed for 35 safety as they would be if built with today `s standards. 2. There is a lack of storage space. 3. The furniture is not ergonomically appropriate. No one evaluates ergonomics. 4. The space is too compartmentalized. 5. Uneven floors are hard on furniture and workstations. 6. Bland —too much blue (walls, floors, baseboards, etc.) 7. The rock stairs leading to upper parking lot are incredibly uneven and difficult to navigate for those with certain medical conditions. 8. Lack of true conference room for the Dental Clinic. 9. No private space outfitted with water (sink) for 2nd floor. 10. There is limited seating. 11. Poor break areas. 3 -5 Years • Increased demand for services will drive space needs. • More room for technology components. 5 -10 Years • May need additional resources both human and capital to meet needs as it relates to Health Department services. • Increased collaborations may increase the need for additional space. Human Resources (Link Government Services Center) 1. Almost every employee starts and ends their employment by visiting Human Resources (to complete new hire paperwork and /or an exit interview). Aesthetically, the space is relatively boring. The environment feels sterile & doesn't accurately reflect the image that the staff presents. HR feels a more earthy color palette similar to west campus would provide a more professional appearance. 2. Temperatures are inconsistent throughout the office and the training room gets hot when classes are held. The fans don't provide cooler air, they circulate the warm air within the room. 3. Conference /meeting space is the same as the training room which sometimes creates a conflict. 4. The existing space used as the training room is located in the center of the office and isn't large enough. There are temporary walls which do not provide enough sound barrier outside of a standard meeting. Videos are used in the presentations and sometimes the noise is distracting to the offices & other times, those passing by in the hallway are distracting to the training participants. A permanent space dedicated solely for training would include a ceiling mounted projector, a lectern with audio and video controls and provide the opportunity to communicate via Skype and host video conferences, and tables and chairs that can easily be rearranged. 5. HR is responsible for maintaining employee benefits enrollment packets and have limited space to do so. This requires them to contact the vendors throughout the year to send additional packets & spend time assembling information for New Employee Orientation. 6. HR is required to keep personnel records for decades after an employee leaves the County. Until a few weeks ago, those files were stored in an area that was not fire proof, nor water proof. Those files have been temporarily moved to the "vault" in the Link building until the scanning project can be completed. HR is in the process of removing 36 inactive files from the Annex and they will be housed in the Link building. HR feels they need more space, in addition to the off -site storage in DEAPR, however, they would wait to validate that after the scanning is complete 7. HR offers New Employee Orientation almost every Monday, and other training throughout the month. Nice to have- a break room with a kitchen sink, refrigerator, ice maker, and tables for participants to use for lunch or to make a phone call. There is also enough space to have a quiet room /lounge space /fitnessarea for employees to use. Housing, Human Rights and Community Development (Whitted Human Services Center) 1. The offices are small so the work stations take up most of the space in our tiny offices. 2. Thermal comfort is elusive. For example, many offices were over 90 degrees this summer. In 3 -5 years • Consistent In 5 -10 years • Consistent Library 1. Library was designed in the manner of a regular office building; therefore it is not ideal for unimpeded view or flow of materials and the public in need of assistance. Limited space for collaborative and individual public work spaces. 2. The 2 story design can inhibit communicption between the departments on a daily basis; also, materials have to be sent to the 2n floor via the public elevator. There is a definite lack of storage for discarded materials, office, future staffing, and programming supplies. In essence, the library was retro- fitted to the shell of an office building. 3. In all areas of the library all available space in the offices has been maximized. This limits additions and expansions of services outlined in the Strategic Plan. 4. Too cold and damp, especially in the large meeting room. Temperatures can fluctuate between the 2 floors and even in Administration. 5. Could use more space for office supplies for 3 branches, discarded materials and programming supplies 6. The shared office spaces mean that when staff visits a colleague in another department they are often interrupting the work of their officemate as well. This is a barrier to open inter - departmental communication. The only other easily accessible spaces are public spaces, or the break room. Neither is well- suited for work - related conversations. This is the number one concern. Shared office space means that it is challenging to conduct confidential conversations or find a quiet space to think when needed. The only place to do this is library study rooms, which are not sound -proof and not always available. When these rooms are booked, public access to them is limited. Dedicated, unassigned staff meeting spaces would go a long way toward helping this issue. 7. While the WCOB training room is nice, it would be a great benefit to have another space in the library for this purpose that we did not have to compete with the public to use. Department training might be conducted more often if scheduling a room weren't such a challenge. 37 8. The break room is directly connected to the administration area and used as a through - space to staff restrooms limits its usefulness as a way really to take a break. The addition of a quiet space (even outdoors) would welcome. 9. The department needs a mix of collaborative and private space for meetings. More removed from the public eye would allow us to be more productive on and off -desk and would prevent noise -bleed from the office into public areas. Additional storage space at individual workstations would allow us to better organize projects and have less cluttered workstations. Additional phone lines or a wireless phone option would also help workflow. 10. The current workspace doesn't work well in that it limits our interactions with the public and leads to constant distractions. The lack of appropriate spaces for meetings and programs is also a challenge. 3 -5 Years • Barriers to public will need to be removed including large service desks. The space needs to be adaptable and movable based on service needs. Integrating technology will be more present, requiring more collaborative spaces for work and public interactions. • Interactions with the public will increasingly happen away from a service desk. The service desk will need to be designed less as a barrier, and more as a home base that encourages interaction and movement. • There is need invest in a re- design of the Main Library space for current and future staff and public use as outlined in the Strategic Plan. 5 -10 Years • Based on the Library's growth from 2010 to 2013 of doubling circulation and 10% increase in public use, our public /staffing space will need to adapt to changing conditions. • Less space will be dedicated to static stacks and more to collaborative space. Adaptability will be key. Planning and Inspections OPT Modular Office Building (Asset Management North Campus) 1. Thermal comfort and aesthetics were deemed to be "poor ". 2. More space for training area and driver work preparation areas will be needed in the future. West Campus 1. Need more building customer work/talk spaces. 3 -5 Years • More technology, kiosks and interactive webinar rooms (i.e. audio /visual). 5 -10 Years • Space is adequate given current and projected work systems. W Resister of Deeds (Gateway Center) 1. Space plan could have been different. Having another department in the middle of your office can be a hindrance at times. 2. Storage space is at capacity. 3 -5 Years • If printing of books continues, additional space for storage of books will be required. 5 -10 Years • Same as above Social Services (Hillsborough Commons) No major issues. 3 -5 Years • More customers online for public assistance. There will be an increased need for resource rooms with computers. Child welfare and other functions are not likely to change as much. More space for collaboration /meeting. 5 -10 Years • More customers online for public assistance. Resource rooms with computers will be needed. Child welfare and other functions are not likely to change as much. Solid Waste Administrative Building 1. A larger storage space is needed. 2. Personal storage lockers located in building 2 bathrooms are minimally functional due to size 3 -5 Years • Not much; some increase in field use of digital communications. 5 -10 Years • Not much, except as relates to facility digital communications and integration of that infrastructure. Tax (Gateway Center) 1. Tax is outgrowing their allotted workspace. They recently acquired 4 additional staff members in the Land Records division when GIS joined the staff, which took up the last of the office space. 2 additional staff members are planned in the very near future, and currently Tax does not have office space that is available for them. Also, it is possible that they will add 2 more staff members by the beginning of the 2013 -2014 fiscal year, 39 and we will need office space for both of them. 2. Approximately 6 additional workstations will be required to accommodate the anticipated increase in staff and to create an additional office location in Chapel Hill. 3. The tax office has a strict set of record retention schedules to follow. A plethora of records must be kept for up to 10 years, therefore making storage essential 4. Currently they have a very small conference room that cannot accommodate their needs. Often they must schedule meetings elsewhere outside their department. Conference space for the tax office is important. Webinars and conference calls often require that small groups view data, and they often use a projector to display the images on the wall of the meeting area. 3 -5 Years Technology changes rapidly. To provide the most effective and efficient customer service as possible, they need to keep up with technology. This includes going paperless, providing electronic notifications to visited properties and being more and more accessible to the public. The Chapel Hill area is growing rapidly. Half the county's population is there, and the tax office has no presence in Chapel Hill. Creating an easily accessible public office located in a high traffic area of Chapel Hill is a top priority for Tax. 5 -10 Years • No comments. M Appendix 2 The Physical Attributes of a Well - Designed Workplace — Detailed Descriptions A. Accommodates distraction free work on an individual basis Characteristics • Everyone is provided with private offices (walls to ceiling) or a high panel workstation with a door • Seated privacy height partition panels • Standing privacy height partition panels ( +60 ") • Ability to control privacy at individual workstations with portable screens, panels or other temporary devices • White noise • Ample conference rooms • Other non - assigned private spaces (i.e. enclaves, patio, etc.) B. Supportive of collaboration and interaction among employees Characteristics • Wide corridors • Alcoves or huddle spaces • Coffee stations with room to congregate • Breakroom, cafe or cafeteria • Readily available /ample conference rooms • Outside seating (i.e. patio) • Central workrooms, supply rooms, etc. (unintended interaction space) • Side chairs at workstations C. Accommodates undistracted teamwork and meetings Characteristics • Variety of types and sizes of conference rooms • Dedicated team or project rooms • Open and informal gathering space (i.e. a conference table in an open area) • Mobile tables that can be quickly pushed together • Mobile work surface that can accommodate a small meeting at an individual's workstation D. Flexibility of workspaces to accommodate personal work styles Characteristics • Ergonomic chair with adjustable back, etc. -Choices with "handed" (right or left) workstations -Height adjustable work surfaces -Task lighting • Mobile furnishings (i.e. mobile pedestals, side chairs with wheels, etc.) 41 • Desktop organizing tools •A standard accessories program E. Some control over heating and cooling in the open office environment (:hnrartarictirc -Operable windows -Small heating /cooling zones with some control at accessible thermostat • Individual workstation heating /cooling units (i.e. personal environmental module) -Allow individual devices to supplement environmental control (i.e. fans, heaters) F. Visual access to daylight and control of glare Characteristics • Access to light switches and window shading, but requires group consensus • Window shading devices for glare and lighting control provided to each individual • Anti -glare devices for monitors provided as needed • Ability to relocate computer equipment as needed to reduce glare • Workspaces are designated in size and type by function G. Workspaces are designated in size and type by function H. The facility is easy to navigate through (Wayfinding) Characteristics • Consideration of traffic patterns and navigation routes in terms of it's impact on encouraging impromptu collaboration as part of the design • Low partitions allow views to individuals and common spaces •Some directional signage and graphics are provided •Ample signage, group identification signs and individual workstation signage are present I. Appropriate adjacencies are met Characteristics • Departments that interact with each other are located reasonably close by (these are typically long term adjacencies) • People within departments that frequently work together are grouped together (e.g. several people that are working on a specific project -these could be short term adjacencies)) J. Ease of access to and flexibility of technology Characteristics • Access to power and data, etc., above work surface • Conference rooms, training rooms, team project rooms with plug and play cable management capabilities for quick change • Wireless technology 42 K. Ergonomics Characteristics • Annual ergonomic audit • Basic ergonomic instructions to employees (i.e. chair operation) • Formal ergonomics training (i.e. programs, orientations, written manuals, etc.) • Provide ergonomic solutions when specifically requested L. Manifests the culture of the overall organization 43 Appendix 3 Facilities Market Value and Financial Stress Table ANNUAL COM V-S IAARKET PENT gwiding Age %9— F. i so FrI Ty� nf Remtal Sp� S 11.3n Sts kAenmw cost, TI-r—t v— Estkne--d Annual owtal G�r- lases' , uld" Coat -tanitodal CbSC M AmLW Cos-� c A—W Cwt. `so FT Mdel I ientd Uml 9 i"m Z= 2 - ZK- :1 dfi� 24.4210 I z;7rIEM 3�7K S ,8S3 5 11:1.3-M-1 S M43ru- MOSS S_- Z- gi,ft-fl I - $ 22.Gr-r St 2�2-9 fi- 7 R!L $ 23F.C-00 _ �%!r, ;�i i p 0,-, D V,-,,7 An 3KC p� ir -"PP Z-84S 3 s s'g-I Sl-sl m. S�Q.--2 s M 9 40 -,-A SHIS�51-- S" sl&�70 wa s Z3 s s -2,34, $r IM SA3 sl?.eoa �.&9 j M S 4C-5-1 I IS�wAM�, M 24 tl-..XQ B di=m 5. 9-13 F W 33 WFAIC SKI.Q85- OCS&I v&I.-i 53 STO 5 ZQ b- I=,,, A= r___ q ---fl- I'ln =�_ ;Nn :"q -R i39- qvd 9p sA-;, --%!Is D,eloli- r w e �i�, aTi EW, vz- G�Mer 30- '_.`e32 28.612 s a _-q -eke V T,? -33 $29.686 171. lK 4 3 $146.ZK1 S23.02a V9.78- _1. . °3G c SE�I.ArA � .89, WAD 1, WZP-O' =- 514 V&- -vv �l 4 4-5 T 9 5 drl� sM.235 515-R,3116 V4 Q-3`3 Mt-2-H SS-S.H2 WO. I19 19 SKA-928 V II4-20 W?t:tr�.: Aqf W; ig.M Q PDO vlli7g V s 12 !1 &W S, M7 91 s 1'i, 9 , W. I sil 12 29- ': V' es, �.w4d m P•Llic Dele nd Ml- 30- 7,539 L 3 3 Acv M.415 S3. , -- $C V, s al :1 1. 9--Xq 2 912.2�A $11.311 sb;�� 1122-4 S296A 54-1. 1 C7 9 V Ea 3._ ®t P,DTM M F MM & 4,5 P W-V-q 22 0.01 -FA Mammlalle"Lw so 18-.; K $i7; s I S. DW I 6. C-A a 1,-.1992 i�T 1 c thigr per 17 1 IM. X16!;2 -11 I-Mll Ic R- S-j + TAT, -a %27 V4.c�05 2 LB.- -6 V 6-20 �q - Ho �m r17=+4E�- L_: =s I I I wl CAPITAL COSTS--DEPRECIAMON VS., REPLACEMENT COSTS F��rwng CmpmaWm and s Z-356 I - 5 I&CM & 72140-1 S 11.3n S 12 - K, -, $ K.GOLI s 1,50-9 5.9114 b 3O .M-0 4398 1 71. E $ 3- .314 9 i"m f7�nQE 5 -53W =1 5 D - i � 1 1 -1 ri I z;7rIEM 3�7K S ,8S3 5 11:1.3-M-1 S M43ru- Ats Ea $ '-;Z1,-3d 1 -6D- I - $ 22.Gr-r St 2�2-9 S 12-AS $ 23F.C-00 9516 s S--I.gc-c & 4384 3KC 8-55 -"PP i - ; CQQ9 s s'g-I Q 1 a 9 6,447 S Bi5i 6 s M 9 40 -,-A J'ZA.977 S 4C,n -: $ 2 K-. s 3 11 7X, s s -2,34, $ 44 �13- �20C --1-0711 5 S 4C-5-1 i M i t. p, a, 6� a I G E 3 af Gra n g c r, L, L-Tf usea kx e! me mm q& OsNe Facflme, aJ m a! rTc- -r�. - , - -m. ' - 1 1-r m, dial ot' Du -C- lr� LFm�d A-%e tyre E,�wr-�- mal a�� Aqm�- V�,� Buil ci m w aH cufvf ta h�v e 5 si-mv �,- qz� .1 -,z w-ace, offi s es we ---enw Qrwmj, thwmlu aim -M�cdazm d a-Mi i� inclu ueid wifti -tp c�ze � llsbwiotp;p "- �-,BE * Fe -�. abate is ala, 17'am M Consolidated Departmental Space Update Summary Attachment C Department Current Location Former Location Last Moved Space Study Emphasis Seymour Senior Center, Galleria (Leased Space), Seymour Senior Center programming Aging Chapel Hill; Central Northside Building 1, Chapel Hill; Meadowlands, 2007 & 2009 and potential expansion contemplated Orange Senior Center, Hillsborough (Leased as part of Southern Campus Master Hillsborough Space) Plan process. Animal Services: Administration, Eubanks Road, Chapel Carolina North (Leased Animal Control, Animal Shelter Hill Space); 306 Revere Road; 2009 501 W. Franklin, Ste. 105 Arts Commission Visitor's Bureau, 501 W Court Street Annex 2010 Frankin St, Chapel Hill AMS: (previously Purchasing and Central us West Cam Office p 129 E. King Street; 600 Hwy 86 North 2009 Services and Public Works) Building Maintenance Campus Currently re- purposing vacated 600 AMS: Facilities Maintenance & West Campus Office 600 Hwy 86 Maintenance Hwy 86 North Administration Building Services Divisions Building Campus 2013 for OPT administration use, thereby elminating leased modular trailer. AMS: Fleet Division, Warehouse, 600 Hwy 86 GovDeals Yard Maintenance Campus Board of Elections Govt. Services Annex Court Street Annex 2009 Potential space study candidate for FY13 -14 Child Support Enforcement West Campus Office 110 N. Churton Street 2012 Building Leased Space Child Support Enforcement Southern Human Expansion of facility contemplated in (Southern Campus) Services Center FY2016 -17; Southern Campus Master Plan Cooperative Extension 306 Revere Road Potential space study candidate for FY13 -14 Page 1 45 Department Current Location Former Location Last Moved Space Study Emphasis Permanent meeting room being addressed at Whitted Facility, space County Commissioners Link Center 2009 planning to continue through summer, 2013; schematic plan to be presented to BOCC in fall of 2013 County Manager Link Center 2009 Courts: Clerk of Courts, Judge's Justice Facility New Courthouse; 112 N. chambers, courtrooms (expanded) Churton 2009/2010 Courts: Judge's Chambers, Courthouse Historic Courthouse Courts: District Attorney 144 E. Margaret Lane New Courthouse 2009 Courts: Public Defender 129 King Street Carr Mill Mall, Carrboro 2011 Courts: Guardian ad Litem 501 W. Franklin St., Ste. Moody Building, Carrboro 2011 104, Chapel Hill Courts: Probation & Parole Court Street Annex Moody Building, Carrboro 2011 Courts: Juvenile Justice Court Street Annex Moody Building, Carrboro 2011 Historic Jail (Jailer's living quarters) Courts: Magistrate's Office Jail Historic Jail (Jailer's living 2013 recently re- purposed and renovated for quarters) Magistrate operations; completed summer 2013. DEAPR: Administration (previously 306 Revere Road, Potential space study candidate for Environment & Resource Conservation Hillsborough FY13 -14 Department) DEAPR: Soil & Water 306 Revere Road, Hillsborough DEAPR: Farm Service Agency (FSA) 306 Revere Road, Hillsborough DEAPR: Parks & Recreation Central Recreation, Potential space study candidate for Whitted Campus FY13 -14 DEAPR: Parks Operations Blackwood Farm Cornerstone Drive (leased Potential space study candidate for Is pace) FY13 -14 Page 2 M Department Current Location Former Location Last Moved Space Study Emphasis Economic Development West Campus Office Court Street Annex 2009 Building County Substation Space Needs Emergency Services - 911 Center, 510 Meadowlands Drive Programming FY13 -14 - Space Administration Hillsborough 1914 New Hope Road 2008 prototype and guidelines consultants recently interviewed through RFQ process. Financial Services Department Link Center Govt. Services Annex 2009 (Budget, Finance, Purchasing, Risk Management) I Health Department: Administration, Dental expanded in Whitted renovated space as interim Personal Health and Dental (Whitted Whitted Building Hillsborough with 2011 solution; long term solution potential Center) relocation from Carr Mill space study candidate Mall in Carrboro Health: Environmental Health West Campus Office 306 Revere Road, 2009 Building Hillsborough Health: Personal Health (Southern Southern Human Expansion of facility contemplated in Campus) Services Center FY2016 -17; Southern Campus Master Plan Housing, Human Rights & Community Human Rights relocated Development (Whitted Center) Whitted Building from 501 W. Franklin 2011 Street Housing, Human Rights & Community Southern Human Expansion of facility contemplated in Development (Southern Campus) Services Center FY2016 -17; Southern Campus Master Plan Human Resources Link Center Govt. Services Annex 2009 Information Technology West Campus Office Govt. Services Annex 2009 Building Main Branch, West Potential space study candidate for Library - Main Branch Campus Whitted Building 2010 internal modifications to best meet needs and library programming growth. Page 3 47 Department Current Location Former Location Last Moved Space Study Emphasis Staff currently evaluating proffered sites Library - Southern Branch TBD within Board adopted site criteria evaluation process. Planning and Inspections West Campus Office 306 Revere Road 2009 Building 1600 Currently re- purposing vacated 600 Planning: Transportation Hwy 86 Whitted Building anticipated fall Hwy 86 North Administration Building Maintenance Campus 2013 for OPT administration use, thereby elminating leased modular trailer. Register of Deeds Gateway Center Link Center, Lower Level 2008 Sheriff: Administration, Operations Justice Facility 144 East Margaret, 2009 Hillsborough Sheriff: Jail IServices 125 Court Street, New Jail programming and planning Hillsborough expected to begin in FY2013 -14 Social Services (Hillsborough) Hillsborough Commons Whitted Building 2010 Leased space Southern Human Expansion of facility contemplated in Social Services (Southern Campus) Center FY2016 -17; Southern Campus Master Plan Social Services (Skills 503 West Franklin Development Center ) Street, Chapel Hill Eubanks Road, Chapel Martin Luther King Drive, Solid Waste Operations Center Hill Chapel Hill (Leased 2008 Space) Renovated and expanded in 2009; Sportsplex 101 Meadowland Drive, contemplated expansion and related Hillsborough space study presented in current Manager's recommended CIP Visitors Bureau 501 West Franklin Street, Chapel Hill Tax Administration (previously Assessor Gateway Center Link Center, Upper Level 2008 and Revenue Page 4 Space Study Update Attachment D 4e November 12, 2013 Work Session • Purpose: — To update the BOCC on the Space Study according to the BOCC adopted space study framework); — To receive and discuss the space study update and provide guidance to the Interim County Manager and staff in anticipation of the FY2014 -15 goals, planning, and budget processes. Space Study Framework 49 BOCC Adopted 6 -18 -13 •Characteristics: — Tool for Analysis, Recommendations, and Resource Discussion — Criteria and model for iterative and continuous space study — Annual Budget Process Input — Inform Board goals, planning and priorities all Guiding Principles • Co- Location • Consolidation • Owning • Building and Maintaining According to Sustainable Practices • Evaluating and managing facilities based upon relative cost and benefit analysis 51 Basis of Study • Space use &needs assessment — Observation — Management & staff Input, interview, questionnaire • Physical assessment &inventory — Thorough inspection &evaluation — Maintenance and utility data /experience — Identification of stressed and/or under-utilized assets 52 Scope of Study • Basis of study information analysis — Short term assessment — Longer Term assessment • Consideration of BOCC goals, planning initiatives, and goals • Study suggestions and recommendations framed by: — Guiding principles — Defensible courses of action for stressed and under - utilized assets — Providing exceptional facilities for County service delivery — Recognizing, anticipating and planning for growth /contraction trends 53 ECS Carolinas, LLP Work with AMS staff to provide: • Space use assessment • Space use efficiencies, trends, needs • Physical facilities assessment • Facilities asset methodology &model • Groundwork for further analysis, staff &Board discussions 54 Space Use Assessment • Observation — Orange County generally follows proper use of space — General administrative office baseline: • 250 usable square feet per employee; • Orange County is within reasonable variance of baseline — Use of office space as storage is the largest component of baseline difference 55 Physical Facilities Assessment • Observation, Operations Cost Inputs, Capital Needs, Relative Market Value • All Orange County general administrative office facilities are considered "Class 6" or "Class C" 401 Facilities Physical Assessment • Public asset "model conversion" to accepted commercial real estate valuation standards • Cost > Relative Market Value = "Stressed Asset" • (Dep Value +Cap Need) > Replacement Cost= "Stressed Asset" 57 General Findings • Orange County has a reasonably efficient portfolio in both areas of study • Building program over the past several years has yielded results in line with BOCC space goals • Adequate expansion spaces available 61:3 General Findings (cont.) • Some inefficient areas for discussion • More organized and programmed storage may address immediate space concerns from the Department Directors • Southern Campus programming discussion needed in preparation for future budget discussions BOCC Feedback Low Workplace Appropriateness From Space Use Assessment !.'O'7 Valuable, Under - Utilized Asset Focus? Environment & Agriculture Cen IM Environment & Agriculture Center Whitted Building Low Workplace Appropriatenes! From Space Use Assessrr 61 General Administrative Office Spa( - Whitted Building -Link Govt Services Center -Govt Services Annex Storage Assets -510 Meadowlands -AMS North Campus - Revere Road Campus o EAC records storage o Former Car Wash facility - Department Controlled Areas Valuable, unaer - Utilized As nn 1 Suggestions for Discussion and Feedback • Emphasize Department and County storage organization and policy (AMS can drive this) • Consider uses for Whitted 2nd floor programmable space (potential Elections uses, DEAPR uses, etc.) FY14 -15 CIP • Consider more efficient uses for GSA, Link I AI i Suggestions for Discussion and Feedback • Growth of Aging Programs to serve aging population • Embrace electronic records storage and management • Continue programming discussions for Southern Campus (SUP - modification request of Chapel Hill expected in late Spring- early Summer) I AV Discussion, Next Steps