ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: November 5, 2013
Action Agenda
Item No. 5 -h
SUBJECT: Bid Award — McGowan Creek Sewer Interceptor Project and Approve Budget
Amendment #2 -D
DEPARTMENT: County Manager, Planning,
Finance, Asset Management
Services (AMS)
ATTACHMENT(S):
1) Certified Bid Tabulation
2) Award Recommendation Letter from
McGill Associates
3) Map of Project Area
4) Resolution of Tentative Award
PURPOSE: To consider:
PUBLIC HEARING: (Y /N) No
INFORMATION CONTACT:
Michael Talbert, Manager's Office, (919)
245 -2300
John Roberts, Attorney, (919) 245 -2318
Craig Benedict, Planning, (919) 245-
2592
Clarence Grier, Manager's Office/
Finance, (919) 245 -2453
Kevin Lindley, Planning, (919) 245 -2583
Jeff Thompson, AMS, (919) 245 -2658
David Cannell, Finance, (919) 245 -2651
• Awarding the bid and approving a construction contract (pending State approval) to Park
Construction of North Carolina, Inc. of Morrisville, NC in the amount of $597,813.13 for
the construction of the McGowan Creek Sewer Interceptor;
• Approve Budget Amendment #2 -D for $107,814 (bids received were in excess of the
originally budgeted project construction cost) consisting of:
o Authorizing staff to request an additional $50,000 in SRF loan funding from the
State;
o Approving funding of $57,814 from Article 46 Sales Tax proceeds;
• Approve and authorize the Chair to sign the Resolution of Tentative Award for this
project, as required by the State Revolving Fund Loan;
• Approve and authorize the Chair to sign the contract on behalf of the Board of County
Commissioners, subject to final review by the County Attorney and the State; and
• Authorize the Manager to execute individual change orders within the limit of his authority
($250,000) up to the extent of the project budget.
BACKGROUND: On March 13, 2012 the BOCC authorized staff to proceed with applying for a
State Revolving Fund (SRF) Loan to provide funding for this project. Orange County had
originally approached the State about paying for this project with proceeds from the SRF loan
used to pay for the Central Efland /North Buckhorn Sewer Project. However, the State
requested that the County apply for the McGowan project funding separately. Orange County
applied for a separate SRF loan in March 2012 and the unused money from the Central
Efland /North Buckhorn SRF loan that would have been used for this project was returned to the
State.
This project will allow the County to eliminate the McGowan Creek pump station by installing a
gravity sewer line to replace it. The new gravity sewer line will convey the wastewater that
previously flowed into the McGowan Creek pump station to the newly completed Brookhollow
pump station, which was designed to handle this future flow. Eliminating the McGowan Creek
pump station will lower the annual maintenance costs of the Efland Sewer System and take out
of service a 25 year -old pump station that would otherwise need refurbishing at an estimated
cost of over $450,000.
BID INFORMATION
The design, permitting, and bidding phase has been completed. The project was advertised for
competitive bid in early September and bids were opened on October 15, 2013. There were six
bids received and after a period of review by County staff and the County's engineering
consultant, McGill Associates, Park Construction was determined to have the lowest
responsible, responsive bid with a total bid of $597,813.13. (See Attachments 1 and 2.)
As stated above, the funding for this project was intended to come from an SRF loan. The loan
application was submitted in March 2012, along with an estimate of the cost for construction of
the project. Though the projected construction cost was considered reasonable at the time, the
low bid from Park Construction was approximately 22% higher than the estimated construction
cost of $490,000. The economic recovery can also bring higher costs in a competitive bid
market.
The following timeline represents the project delivery and completion:
TASK
PROPOSED
BEGINNING
DATE
END BY
DATE
BOCC Action: Approve bid award to Park Construction
11/5/13
11/5/13
BOCC Action: Approve Resolution of Tentative Award
11/5/13
11/5/13
Construction Period (est. 7 months)
1/15/14
8/15/14
System Commissioning, Completion of As -Built Drawings
8/15/14
10/30/14
RESOLUTION OF TENTATIVE AWARD
The next milestone in the SRF loan process is for the State to issue the Authority to Award this
project by December 2, 2013. The results of the competitive bid, along with other documents,
must be presented to the State as soon as possible. One of the required documents is the
Resolution of Tentative Award, which must be approved by the BOCC (see Attachment 5).
Once the County receives the Authority to Award from the State, the construction contract must
be signed and returned to the State for final review by January 2, 2014.
FINANCIAL IMPACT: Funding of $755,450 is available as part of the FY2013 -14 Capital
Improvement Project budget, which includes $94,200 in professional services funds for McGill
Associates related to design, construction administration, bidding, and easement
documentation. This project is being funded by a State Revolving Fund Loan, which will be
K
paid over a 20 year term from the General Fund. Existing funds for general contingency,
property easement procurement and loan origination are $63,437. Due to the competitive bids
received, staff estimates an additional $107,814 will need to be appropriated to cover the cost
of the project. The amount of the loan can be increased up to 10% of the original value of the
loan based on the competitive bids without going back to the Local Government Commission.
The proposed budget amendment would take a portion of the increased costs from a loan
increase and a portion from the Article 46 Sales Tax proceeds. The loan cannot be used to pay
for the origination fee on the loan (2% of the loan amount) or the cost of the easements.
Therefore, the budget amendment would assign a portion of the cost of the project from the use
of Article 46 Sales Tax proceeds to cover these costs and other incidental costs that may be
incurred as shown below. This will provide adequate funding for all known costs as well as a
10% construction contingency fund. Budget Amendment #2 -D below illustrates this in detail:
Revenues for this project:
Appropriated for this proiect:
FY 2013 -14
Amendments
Nov 5, 2013
Amendment
FY 2013 -14
Revised
SRF Loan
$755,450
$50,000
$805,450
Article 46 Sales Tax
Proceeds
$0
$57,814
$57,814
Total Project Revenues
$755,450
$107,814
$863,264
Appropriated for this proiect:
RECOMMENDATION(S): The Interim Manager recommends that the Board:
1.) Award the bid and approve a construction contract to Park Construction of North
Carolina, of Morrisville, NC, in the amount of $597,813.13 for the construction of the
McGowan Creek Sewer Interceptor project, pending State approval;
2.) Approve Budget Amendment #2 -D for $107,814 consisting of:
a. Authorizing staff to request an additional $50,000 in SRF loan funding from the
State;
b. Approving funding of $57,814 from Article 46 Sales Tax proceeds;
3.) Approve and authorize the Chair to sign the Resolution of Tentative Award required by
the State as part of the SRF loan milestones;
4.) Approve and authorize the Chair to sign the contract on behalf of the Board of County
Commissioners, subject to final review by the County Attorney and the State; and
5.) Authorize the Manager to execute individual change orders within the limit of his
authority ($250,000) up to the extent of the project budget.
FY 2013 -14
Amendments
Nov 5, 2013
Amendment
FY 2013 -14
Revised
Professional Services
$92,400
$0
$92,400
Construction
$490,000
$107,814
$597,814
Contingency, Easements,
Legal, Origination, Other
$173,050
$0
$173,050
Total Project Appropriation
$755,450
$107,814
$863,264
RECOMMENDATION(S): The Interim Manager recommends that the Board:
1.) Award the bid and approve a construction contract to Park Construction of North
Carolina, of Morrisville, NC, in the amount of $597,813.13 for the construction of the
McGowan Creek Sewer Interceptor project, pending State approval;
2.) Approve Budget Amendment #2 -D for $107,814 consisting of:
a. Authorizing staff to request an additional $50,000 in SRF loan funding from the
State;
b. Approving funding of $57,814 from Article 46 Sales Tax proceeds;
3.) Approve and authorize the Chair to sign the Resolution of Tentative Award required by
the State as part of the SRF loan milestones;
4.) Approve and authorize the Chair to sign the contract on behalf of the Board of County
Commissioners, subject to final review by the County Attorney and the State; and
5.) Authorize the Manager to execute individual change orders within the limit of his
authority ($250,000) up to the extent of the project budget.
I Attachment 1 1
CERTIFIED BID TABULATION
McGowan Interceptor
orange County, North Carolina
This is to certify that the bids tabulated herein were accompanied by a 5% bid bond or certified check and publicly opened and read aloud at 2:00 pro local time 011 the joLh day - 0-ber.
Room 004, 131 West Margaret Lane, Hillsborough, North Carolina 27278.
Apparent mathematical error does not affect award of contract.
CENTURION
HAREN
JF WILKERSON
MOFFAT PIPE
PARK CONSTRUCTION
SULLIVAN
EASTERN
CONSTRUCTION
CONSTRUCTION
CONTRACTING
No
Description
Unit
Qty
Price
Extension
Price
Extension
Price
Extension
Price
Extension
Price
Extension
Price
Extension
Mobilization
LS
1
$ 19,898.36
$ 19,898.36
$ 25,000.00
$ 25,000.00
-
$ 15,000.00
$ 15,000.00
$ 25,000.00
$
25,000,00
$ 17,000.00
$
17,000.00
$ 28,500.00
$ 28,500.00
2
12" Class 350 DI Gravity Sewers 0-6 Ft. Depth
LF
74
$ 64.32
$ 4,759.68
$ 80.00
$ 5,920.00
$ 90.20
$ 6,674-80
$ 62.00
$
4,588.00
$
23,00
$
1,702.00
$ 85.00
$ 6,290.00
3
12" Class 350 DI Gravity Sewers 6-8 Ft. Depth
LF
100
$ - 68.23
$ 6,823.00
$ 90.00
$ 9,000.00
$ 92.30
$ 9,230.00
$ 67.00
$
6.700.00
$
23.00
$
2,300.00
$ 87.00
$ 8,700.00
4
12" Class 350 DI Gravity Sewers 8-10 Ft. Depth
LF
36
$ 78.72
$ 2.833-92
$ 100.00
$ 3,600.00
$ 94.65
$ 3,407.40
$ 72.00
$
2,59Z00
$
23.00
$
828.00
$ 89.00
P$
$ 3,204.00
5
12" Class 350 DI Gravity Sewers 10-12 Ft. Depth
LF
108
$ 63.76
$ 6,886,08
105.00
11,340.00
-�-97.2o
10-497.60
77�00
$
8,316.00
$
23.00
$
2,484.00
$ 92.00
$ 9,936.00
6
12" Class 350 DI Gravity Sewers 12-14 Ft. Depth
LF
1 120
$ 71.20
$ 8,544.00
$ 110.00
$ 13,200,00
$ 100.20
$ 12,024.00
$ 82.00
$
9,840.00
$
23.00
$
2,760.00
$ 95.00
$ 11,400.00
7
12" Class 350 DI Gravity Sewers 14-16 Ft. Depth
LF
128
$ 72.13
$ 9,232.64
$ 150.00
$ 19,200.00
$ 103.55
$ 13,254.40
$ 87.00
$
11,136.00
$
34.0 0
$
4,35Z00
500
1251.00
$ 16.000.00
8
12" Class 350 DI Gravity Sewers 16 -18 Ft. Depth
-
LF
-Z-
67
-$- 7-4.04
-19,768.68
1-60.00
4-2,720,00
$ 116.90
$ 31,212.30
$ 97.00
$
25,899.00
$
44.00
$
11,74800
$ 160.00
$ 40050.00
-
9
TFC[ass 350 DI Gravity S ewers 18-20 Ft. Depth
LF
393
$ 74-09
29,117,37
$ 180-00
70,740,00
130.20
$ 51,168.60
$ 107.00
$
42,051.00
$
54,00
$
21,222.00
$ 170,00
$ 66,810.00
1-0
-
12" Class 350 DI Gravity Sewers 20-22 Ft. Depth
-
LF
-'�6- .5
-�-
73.78
-�-
26.929-70
=�-
215,00
-�-
78,47500
-�- 5
1 0.2 ()
8
$ 5 4, 23.00
$ 127.00
$
46,355.00
$
64.00
$
23,360.00
$ 180.00
$ 65,700-00
11
12" Class 350 DI Gravity Sewers 22-24 Ft. Depth
LF
$ 72.65
$ 46,496.00
$ 225.00
$ 144,000.00
$ 185.20
$ 118,528.00
160.00
$
102,400,00
$
68.00
$
43,520,01)
$ 200-00
$ 128,000.00
640
1-2
TFC[ass 350 DI Gravity Sewers 24-26 Ft. Depth
LF
82
$ 113.33
$ 9,293.06
$ 240.00
$ 19,680.00
$ 275,00
$ 22,550.00
$ 250.00
$
20,500.00
$
90.00
$
7,380.00
$ 220.00
$ 18,040.00
13
120" x 0,25" Wall Thickness Steel Encasement
Pipe, Bore and Jacked Complete with 12" Class
LF
200
$ 73816
47 ' 72 00
$ 147,752.00
$ 910,00
$ 182,000.00
$ 700.00
$ 140,000.00
$ 810�00
$
1162,000.00
$
725.00
$
145,000.00
$ 1,000.00
$ 200,000.00
350 Ductile Iron Gravit Sewer Carrier Pi e
5,669.92
5 9.32
$ 3,300.00
$ 6,600m
$ 3,000.00
$ 6,000.00
$ 6,000-00
$
12,000.00
$
3,000.00
$
6,000.00
_9
$ 7,000.00
$ 14,000.00
14
14' Diameter Standard Manhole 12-14 Ft. Depth
EA
2
$ 2,834.96
k$1
$ '66
$
10,500-00
T 3�200.00
9-600,00
-� -6,250.00
-18,750.00
_j
-3,200.00
--f
600,00
8,000.00
24,000.00
15
4' Diameter Standard Manhole 1-4-16 Ft. Depth
EA
3
$ 3,535.59
$ 10,606.77
1 0 '606 77
$ g
$ 3,500.00
$
8,750,00
$
----
8,750.00
$
3,800.00
$
3.800.00
9
$ 9,000.00
16
4' Diameter Standard Manhole 16-18 Ft. Depth
EA
1
-I
$ 3,714.33
-T
$ 3,714.33
$ 3,750.00
-
$ 3,750.00
$ 3,500.00
$ 3,500.00
$
13,500.00
$
4,000.00
$
4,000.00
-$- .000.00
$ 10,000,00
$ 10,00000
17
4'Diameter Standard Manhole 20-22 Ft. Depth
EA
5,84-7,82
$ 58 8
$ 5,847.82
$ 4,000.00
$ 4,000.00
$ 6,000.00
$ 6,000.00
$ 13,500.00
$
000
$
4,100.00
$
12,300.00
$ 11,500.00
$ 34,500.00
18
8
4' Diameter Standard Manhole 22-24 Ft. Depth
EA
3
$ 6,139.28
$ 18,417.84
$ 4,500.00
$ 13,500.00
$ 6,800.00
$ 20,400.00
$ 2 '000.00
0
60,000-00
19
5' Diameter Standard Manhole 24-26 Ft. Depth
EA
2
$ 7,529.04
$ 15,058.08
0
$ 11,600-00
$ 8,800.00
$ 17,600.00
$ 21,000,00
$
42,000.00
$
6,100-00
$
12,200,00
$ 12,500-00
$ 25,000.00
20
0
Tie in to Existing Manhole w Booted Connection
EA
1
-i-
4,527.53
- -
� 4,527-53
T-
9,00000
_9
fioo.00
-j�-
15,000.00
$ 15,000.00
--j-
$ 2,500�00
$ �5" "
$
$
=$
2,500.00
$
3,750.00
$
3,750.60
$ 10,000-00
-
$ 10,000.00
21
Tie into Existing Sewer
EA
1
4.�5-143
-!F -4,051 43
$ 11,000.00
11,00000
f10-00000
j� 10,0fl000
$ 0000,
5,00000
$
$
5.000.00
'0 00
1,60713
1,607-13
5.000-00
$ 5,000.00
22
Abandon Existing Pump Station
LS
SYD
1
150
$ 14,626.75
$ 19.19
$ 14,626.75
$ 2,878.50
$ 10,00000
$ 10.00
$ 10,000-00
$ 1,500.00
$ 3,500,00
$ 30.00
$ 3,500.00
$ 4,500.00
$ 00000
$ 3,000.00
5.00
$
$
$
3,000,00
750.00
$
$
8,000.00
12.00
$
$
8,000-00
1,800.00
$ 27,100.00
0
_ L 20.00
$ 27,100.00
$ 3,000.00
23
Gravel Drive and Parking Repair
24
Construction Entrance
EA
3
$ 3,700.06
$ 11,100.18
$ 2,000.00
$ 6,000.00
$ 1,200-00
$ 3,600.00
1,50-
$ �o7oo
$
4,500.00
$
1,200.00
$
3,600.00
$ 3,000 .00
L$ 000.00
9_
25
Rock Excavation w Select Backfill as Necessary
CY
2000
$ 120.001
,
$ 240,000.00
1 $ 120.00
$ 240,000.00
$ :-120.00
$ 240,000.0
::$:j::2::o�oo
�$240�,00000
$
120.00
1 $
240,000.00
$ 120.00
1 $ 240,000.00
26
Silt Fence Installed per Details
LF
2500
$ 2.36
1 $ 5,900.00
1 $ 2.50
$ 6.250.00
glar
$ 3.00
$ 7,500.00
$ 2.00
1 $
5,000.00
::$::3�,00$
7,500.00
::$:� �30 0
$� 7,500.00
TOTAL
$680,733.64
$9581,676A0
$836,670.10
$
$883,127.00
$597,813.13
--
$1,020,730.00
-
- ---1
on-
r--1 f
fh
n-n- r- iniv
VVP..qt (2MDUS
Office Buildina,
This is to certify that the bids tabulated herein were accompanied by a 5% bid bond or certified check and publicly opened and read aloud at 2:00 pro local time 011 the joLh day - 0-ber.
Room 004, 131 West Margaret Lane, Hillsborough, North Carolina 27278.
Apparent mathematical error does not affect award of contract.
Attachment 2
qJ(U
m A S S O C I A T E S
October 23, 2013
Mr. Kevin Lindley, PE
Staff Engineer
Planning & Inspections Department
Orange County
Post Office Box 8181
Hillsborough, North Carolina 27278
RE: Award Recommendation
McGowan Interceptor
Orange County, North Carolina
Dear Mr. Lindley:
A total of six (6) bids were received on October 15, 2013 for the McGowan Interceptor
project. Park Construction of North Carolina, Inc. of Morrisville, North Carolina, submitted the
lowest bid with a total bid amount of $597,813.13.
Park Construction of North Carolina, Inc. is appropriately licensed with the North Carolina
General Contractor Board, and is qualified to perform this project. Following final review and
acceptance of all DBE outreach documentation, we recommend award of the McGowan Interceptor
project to Park Construction of North Carolina Inc. in the amount of $597,813.13. The award should
be made contingent upon approval by NC DENR Infrastructure Finance Section.
Enclosed for your use are the certified bid tabulation and project cost summary. If you have
any questions or comments, please do not hesitate to contact us at (828) 328 -2024.
Sincerely,
Me,GILL ASSOCIATM P.A.
G. C IUMMAN, PE
DC:mgp
Enclosures
Cc: Craig Benedict, Orange County
David Cannell, Orange County
E n g i n e e r i n g o P l a n n i n g F i n a n c e
McGill Associates, P.A. • P.O. Box 1136, Hickory, NC 28603 • 1240 191h St. Lane NW. Hickory, NC 28601
828 - 328 -2024 • Fox. 828 - 328 -3870
5
McGowan Creek Sewer Interceptor - Easements Needed (8/15/2013) s
ATTACHMENT 3
E15
PS
o°
M
T
'
Z
v
n
'
M
v
v
o
' E08
M
v
N
♦
E07
0
♦
z�
woo
PS *#
5
B24
o',
J
PS Pump Station
J
=
o'
Proposed McGowan
o
Creek Sewer Interceptor
m'
Existing Sewer
Water Bodies
1 in = 300 feet
Streams
0 100
Feet
- Easement Parcels
Orange County Planning and Inspections
Brian Carson (8/16/2013) No
FES2013 -086 Attachment 4
WHEREASy Orange County, North Carolina has received bids, pursuant to duly advertised notice
therefore, for construction of the McGowan Creek Interceptor, Project No. CS370884 -02, and
WHEREASy the McGill Associates Consulting Engineers have reviewed the bids; and
WHBWASy Park Construction of North Carolina, Inc. was the lowest bidder for the McGowan
Creek Interceptor, in the total bid amount of $597,813.13, and
WHEREAS the consulting Engineers recommend TENTAIIVEAWARDto the lowest bidder(s).
NOW, THM ORE, BEITRESOLVED that TENTAIIVEAWARD is made to the lowest bidder(s) in
the Total Bid Amount of $597,813.13.
Name of Contractor
1. Park Construction of North Carolina, Inc. $597,813.13
BE IT RJRTHEZ RESOLVED that such TENTATIVE AWARD be contingent upon the approval of
the North Carolina Department of Environment and Natural Fbsources.
Upon motion of , seconded by the above
RESOW110N was unanimously adopted.
This the 5th day of November, 2013.
Barry Jacobs, Chair, Orange County Board of
County Commissioners
(Seal)
Attest-
Donna Baker, Clerk to the Board
7