Loading...
HomeMy WebLinkAboutNS ORD-1996-033 Zoning Ordinance Text Amendments - Telecommunication Towers rell— a 33 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 3, 1996 Action Agenda Item#_\/=-Gr SUBJECT: ZONING ORDINANCE TEXT AMENDMENT- Telecommunication Towers Article 4.3 Permitted Use Table Article 8.8.17 Radio and Television Transmitting and Receiving Towers and Elevated Water Storage Tanks(Class B Special Use) . Article 8.8.17a Telecommunication Towers(Special Use Permit requirements) Article 6.3.1 Principal Uses Article 6.18 Administrative Approval of Stealth Telecommunication Towers(new) DEPARTMENT: PLANNING PUBLIC HEARING Yes-X—No BUDGET AMENDMENT REQUIRED Yes X No ATTACHMENT(S): INFORMATION CONTACT: 11/27/95 Public Hearing Minutes(pp. 5 - 8) Mary Willis Response to 11/27/95 Comments(pp. 9 - 14) Extension 2583 Proposed Amendment(pp. 15 -22) Existing Provisions (pp. 23 - 24) TELEPHONE NUMBERS: Letter from BellSouth(pp. 25 -27) Hillsborough-732-8181 Letter from Co. Attorney(pp. 28 - 29) Durham -688-7331 Letter from 360° (pp. 30 - 36) Mebane -227-2031 EMF Studies (pp. 37 - 51) Chapel Hill -967-9251 June, 1995 Zoning News(APA) (pp. 52- 55) 5/28/96 Public Hearing Minutes (pp. 56- 58) 8/7/96 Planning Board Minutes(pp. 59- 62) PURPOSE: To consider a proposed amendment of Zoning Ordinance provisions relating to telecommunication towers BACKGROUND: Concern with the increasing number of telecommunication towers has been raised locally and nationwide by citizens, advisory boards and governing boards in recent years. At the November 27, 1995 public hearing, the Orange County Board of Commissioners and Planning Board received citizen comments on a proposed amendment to Special Use Permit provisions relating to telecommunication towers. Minutes from the public hearing are attached. 2 Speakers included five industry representatives and one Orange County resident. On January 18, 1996, the Ordinance Review Committee, as well as another interested Planning Board member and a member of the Board of Adjustment, met with the telecommunication providers who spoke at the public hearing. The purpose of the meeting was for the Committee to gain a better understanding of issues and technical concerns raised at the public hearing, and to consider modifications to the proposal which would address those issues while maintaining the purpose and intent of the proposed amendment. Attached is a summary of some of the key areas of concern raised at the November 27, 1995 public hearing. Changes to the original proposal were presented for public hearing on May 28, 1996. Additional revisions are recommended based on the comments received at the May public hearing, May 28, 1996 Public Hearing Comments 1. One of the major issues raised at the public hearing concerned the potential health effects of electro-magnetic radiation. The Telecommunications Act of 1996 (Section 704(B)(iv) and the Federal Communications Commission New National Wireless Tower Siting Policies(Section 1.1307(b))prohibit denial of a cellular telephone facility on the basis of health effects if it meets applicable standards issued by the American National Standards Institute (ANSI). Studies conducted in 1994 and 1995 for a 360°tower located at 515 South Greensboro Street, Carrboro, are attached. Conclusions of the 1995 study state that"exposure levels measured on the ground and inside the equipment shelter.......continue to be more than one hundred times less than the protection guides set forth in ANSI C95.1-1982..... It is extremely likely that a more sensitive electromagnetic monitor would show the exposure levels to be thousands of times less than the maximums established by the standards..." Attached is information from the American Planning Association regarding electromagnetic fields associated with communication facilities. It states that no scientific study has shown a specific correlation between cancer and cellular communication devices. Likewise, no study has conclusively proven them to be safe. It has not been possible to obtain conclusive evidence thusfar because most homes are equipped with a variety of appliances that generate 3 electromagnetic fields,therefore it is difficult to isolate the effect of any single source. 2. The amendment presented for public hearing in May 1996 did not include the previously-proposed requirement that the"tower and antenna will not unreasonably interfere with the view of or from any historic site, scenic road or major view corridor". Staff had recommended that the provision be deleted due to the difficulty in defining or interpreting "unreasonable interference". One citizen who spoke at the public hearing suggested that instead of being eliminated, the wording be changed to "significant adverse impact". This recommended change is incorporated in the proposed text, 3. It was also suggested that balloons be used to help visualize the height of the tower in order to determine its visual impact. The proposed application requirements have been revised to include a provision that a balloon be floated at the proposed tower location to the maximum height of the tower, and that photographs be taken from areas such as property lines, and nearby residential areas and roadways. 4. One representative from the telecommunication industry spoke at the public hearing. He expressed opposition to providing detailed information regarding co-location efforts for towers outside of the search range, as well as to information which may not be relevant(such as detailed structural information where the tower owner has refused to lease space on a commercially reasonable basis). Other concerns cited included tower setbacks, and the application of subdivision requirements to tower sites. (It has been determined that subdivision approval is not required for leased tower sites.) Additional comments concerning industry concerns are included in the attached letters from representatives of BellSouth and 360° Communications. Proposed Revisions The Planning Staff has incorporated the following changes in the proposal as presented at the May 28, 1996 public hearing in response to comments received through the public hearing process: 1) Add 8.8.17.26) (Standards of Evaluation) as follows: The tower and antenna will not result in a significant adverse impact on the view of or from any historic site, scenic road, or major view corridor. 4 2) Add 8.8.17a.I(h) (Additional Information) as follows: In addition to the information required in Subsections 8.2 and 8.8, the following shall be submitted as part of the application......(h) Photographs of a clearly- visible balloon floated at the proposed tower location to the maximum height of the towers. Photographs shall be taken from locations such as:property lines, and/or nearby residential areas, historic sites, roadways, including scenic roads and major view corridors, and other locations as deemed necessary by the Planning Staff to assess the visual impact of the proposed tower. 3) Revise 8.8.17a.1(d) to clarify that tower height is measured from ground level to the highest part of the support structure. 4) Add 8.8.17a.2(n)to require that compliance with FCC emission standards be demonstrated by including monitoring through periodic testing of equipment and submittal of results to the Planning Department. The Planning Board considered the proposed amendment on August 7, 1996 and recommended approval, including the revisions included in 1)through 4) above(see attached minutes). The vote was unanimous. RECOMMENDATION: The Administration recommends approval of the proposed amendment as revised,per the Planning Board recommendation. 11/27/95 Public Hearing Minutes 5 1 that Ms. Baldwin would be required to participate equally in paving the road and the right-of- 2 way from St. Mary's Road to Reba and Roses. He also asked that the Reba and Roses 3 facilities be inspected to assure that they meet all State safety standards and Federal handicap 4 accessibility standards. 5 - 6 John Hartwell spoke in support of this Special Use Permit. He stated that he has 7 discussed this request with most of the neighbors and each one of them supports her request. 8 The neighborhood wants to see this approved. He did express concern about necessary 9 improvements to the road and the intersection at St. Mary's. He requested that the 10 Commissioners consider apportioning the road costs so that those who will benefit from the 11 improvements are required to help with the costs. 12 13 Laura Baldwin requested that the Commissioners take into account that the cost of road 14 improvements for subdivisions are factored into the cost of the homes. It is not possible for her 15 to pass on the cost of improving this road to her customers. It would be an unreasonable and 16 devastating economic hardship on her. She also felt that only she bears the burden of traffic to 17 Reba and Roses. 18 19 A motion was made by Commissioner Willhoit, seconded by Commissioner Halkiotis, to 20 refer this item to the Planning Board for a recommendation to be returned no sooner than 21 January 16, 1996. 22 VOTE: UNANIMOUS 23 24 4. Zoning Ordinance Text Amendments 25 (a) Article 8.8.17 Telecommunications 26 This item was presented by Planner Mary Willis to receive comment on a 27 proposed amendment concerning Special Use Permit requirements for telecommunication 28 towers. The proliferation of telecommunication towers is an issue of concern to Orange County 29 as well as other jurisdictions nationwide. After reviewing provisions which have been adopted 30 in a number of other jurisdictions, the Planning staff recommends a proposed amendment. The 31 key aspects of this amendment are as follows: Telecommunication towers would be 32 established as a separate use and would require approval of a Class B Special Use Permit by 33 the Board of Adjustment. The set back to non-residential property lines could be reduced to 34 50% of the height of the tower if the remaining distance were included within an easement on 35 adjoining property. A type C Land Use Buffer (40 feet in width) would need to be provided. 36 Specific documentation to indicate that efforts to co-locate on an existing tower were 37 unsuccessful must be provided. Issues of tower color, lighting and view from historic site, 38 scenic road and major view corridor must be resolved. Obsolete towers must be removed. 39 40 QUESTIONS AND/OR COMMENTS FROM THE BOARD OF COMMISSIONERS. 41 None. 42 43 QUESTIONS AND/OR COMMENTS FROM THE PLANNING BOARD. 44 Planning Board member Bill Waddell asked about the request that engineers could 45 provide evidence that a setback includes the potential collapse zone. 6 1 2 Mary Willis commented that the industry representatives are able to calculate the 3 collapse zone. It is possible to calculate where a tower would break if it were to fall. It is also 4 possible to calculate the area to which the debris would be contained. 5 6 QUESTIONS AND/OR COMMENTS FROM CITIZENS. 7 An E ,a representative of the Carolina PCS Limited Partnership, made several 8 comments. This Partnership, which is comprised of Bell South Corporation, Duke Power 9 Company, Carolina Power & Light and the 31 independent telephone companies in North 10 Carolina, was formed to bring to the citizens of North Carolina a new technology called 11 Personal Communication Services. This is a new technology, recently licensed by the FCC, 12 which provides a wider range of services and operates at a lower power than existing cellular 13 services. This is a digital rather than an analog technology which means that it can transmit 14 data as well as voice. This provides greater clarity and security. All of the towers that use this 15 new technology will be lower than 200 feet. The concerns that he has about this proposed 16 rewrite include the possibility that it will be too restrictive for this new technology to grow and 17 expand. He asked that incentives be implemented to encourage all companies to build their 18 systems without constructing new towers. Other possible places to locate using "stealth 19 technology" are bell towers and church steeples, water towers, and tall buildings. He 20 suggested that the incentives would be the cost savings as well as the possibility that the Board 21 of Commissioners could exempt"stealth technology" locations from the Use Permit process and 22 allow for staff approval. He also commented on the suggested standard for "unreasonable 23 interference with the view" from historic sites, scenic roads or major view corridor. He felt that it 24 would be impossible to accurately determine this standard because of its subjectivity. If the 25 intent is to assure that the tower is in harmony with the area of location, that standard already 26 exists in the ordinance. 27 28 Rk* anager of Forsythe Development f l irl (ewer/operation of 29 Cellul `' , reiferatMr. Cain's comments. He disagreed with the requirement that industry 30 notify other companies about intention to erect a tower. The construction of towers which 31 support co-location of towers is already required. County staff is aware of all activity and is the 32 logical entity to keep tract of new requests for towers and/or tower use and matching those 33 requests with already erected towers with available space. He also felt that requiring this type 34 of notification unfairly handicaps current tower owners both competitively and from a capital 35 investment standpoint. Another area in which he expressed concern was the "fall zone" 36 requirement. The industry does not feel that"fall zones" are necessary. There are 2000 towers 37 across the United States and there has never been a tower failure. He requested that these 38 towers not be compared with the T.V. towers which are in excess of 1000 feet. He also 39 commented that the 100 foot setback is not necessary or reasonable. 40 41 rsonal Communications, expressed agreement with 42 previous comment Hie a ressee issue of"stealth technology" which refers to antennas 43 that do not look like antennas. He recommended that a task force be created to look at this 44 technology to assure that they meet the intended nature and intent of the technology. When 45 they are approved as "stealth technology"the industry could be provided relief from subdivision 7 1 setback regulations and other Special Use Request Ordinance. He indicated that he would 2 work with staff to present examples of how the Special Use Request process and subdivision 3 process work together to create burdens on their industry. 4 5 Jerry EAW North Carolina General Counsel fbr Sprint Cellular, expressed several 6 concerns. He mentioned that the requirement to share tower space indicates that a letter needs 7 to be sent to all owners of towers within a one mile radius. This raises the concern for industry 8 staff that they could be requested to locate a mile from their original requested site. The site 9 locations are not flexible and would not provide the necessary coverage if they were required to 10 locate at another location. There is a real financial motivation to locate on existing towers 11 where that is possible. The additional paperwork will not increase that motivation. He also felt 12 that requiring that applicants for new towers send notification to a preexisting list is not workable 13 for industry staff. The Special Use Permit process already requires co-location wherever 14 possible. This adds additional paperwork and questions about who gets on the list. He asked 15 for clarification that the buffer is to be around the tower compound rather than the entire 16 perimeter of the tract. Also, that the setback is from the base of the tower to the adjacent 17 property line rather than the base of the tower to the lease fine. 18 19 Mary Willis indicated that the buffer is to be around the tower compound but that the set 20 back is from the base of the tower to the lease line. 21 22 Mr. Eatman asked that the setback requirement be reconsidered so that it deals with 23 adjoining property owners and adjoining property lines rather than simply increasing the size of 24 the parcel that needs to be leased. 25 26 Jeff Lansing, �' , agreed with the previous comments. He requested 27 that a open discussion be held roil try and County staff, the Planning Board, citizens , and 28 County Commissioners to facilitate developing standards. 29 30 Commissioner Willhoit asked if it was true that land in an easement area could not be 31 cultivated. He mentioned that many of the issues to be addressed in the application do not 32 relate to telecommunications, but to the tower itself. He asked that the Planning Board address 33 the issue of whether the Special Use Permit ought to apply to a tower. 34 - 35 Mary Willis replied that the subdivision regulations addressed that issue. Land leased for 36 this particular purpose is considered under subdivision regulations and must receive approval in 37 order to create a lot for the principal use as opposed to just having an easement. It would not 38 specifically prohibit cultivation of that land. 39 40 Commissioner Gordon asked if the buffer was related to the lease line because other 41 nearby lots could have homes on them. She also asked for further clarification regarding the 42 objection to mailing notification to a specified list. 43 8 1 Mary Willis indicated that the buffering is required around the base of the tower to shield 2 the view around the base of the tower. It could be around the perimeter if, for instance, it was a 3 two acre area. It.is more likely that it would be around the base of the tower. 4 5 Jerry Eatman, indicated that the primary objection is that the list and who gets on the list 6 would involve the Planning Department in the day-to-day operation of the business of these 7 companies. He felt that the free-enterprise line is crossed when County staff keeps a list of 8 competitors who must be notified. The issues involved for the industry are financial and 9 competitive. 10 11 John Weldon mentioned that his company, BellSouth, is the newest company in this 12 business. ATT will soon be coming to this market and they will be a direct competitor. They do 13 not want to be required to co-locate with a direct competitor. 14 15 Lee Rafalow stated that in his opinion the only reason that these companies do not want 16 notification requirements is so that the public will not be informed. 17 18 Mary Willis stated that the provision of the list is to allow everyone to be on an equitable 19 basis. It is possible to reword this section of the Amendment to accomplish this. The intent is 20 to have tower owners identified, as well as to identify all additional users. New users would be 21 added to the list. Companies not erecting the towers themselves, but who have equipment to 22 co-locate, would also be included. The intent of the Amendment was to have as 23 comprehensive list as possible. 24 25 A motion was made by Commissioner Wllhoit, seconded by Commissioner Carey, to 26 refer this item to the Planning Board for a recommendation to be returned no sooner than 27 January 16, 1996. 28 VOTE: UNANIMOUS 29 30 (b) Article 6.16 Home Occupations 31 This item was presented by Mary Willis to receive citizen comment on a 32 proposed amendment to the Zoning Ordinance to clarify the intent of Article 6.16.6.3 regarding 33 screening of home occupations on lots in excess of 200,000 square feet (4.59 acres). The 34 Administration recommends that the proposed amendment be referred to the Planning Board 35 for a recommendation to be returned to the Board of Commissioners no sooner than January 36 16, 1996. 37 38 QUESTIONS AND/OR COMMENTS FROM THE BOARD OF COMMISSIONERS 39 . . Commissioner Gordon asked how it would be assured that the accessory buildings would 40 not be visible to adjacent roads and property. 41 42 Mary Wiles stated that by reviewing the Site Plan and the landscape on the property a 43 determination would be made. It would not apply in cases where the proposal was to plant 44 vegetation that would eventually grow up to be an adequate shield. In this particular case, the 45 shield would have to be in-place and already existing within a wooded area. 9 Response to November 27, 1995 Public Hearing Comments (see attached minutes) 1. Minimizing the Number of New Towers A major concern of industry representatives was related to the proposed means by which we would assure that adequate provision had been made to minimize the number of new towers by sharing space on existing or new towers. F=n__coraging Use Of Existing Towers The Zoning Ordinance now requires that efforts to locate on an existing tower be documented. There are no standards, however, by which to evaluate the documentation provided. Proposed Documentation Process: The amendment presented for public hearing in November, 1995 included a requirement that the applicant send letters to all tower owners within one mile of the proposed site requesting information such as availability of lease space, and tower height and strength. Also required was a copy of responses received. One concern raised was that the applicant must rely on the tower owner's response to requests for information, and delays could result if the tower owner did not prepare the needed information in a timely manner. The proposed wording was thought to place an implicit burden of responsibility on the owners of existing towers to provide detailed engineering and other information, upon the demand of potential applicants, which could be time-consuming and costly. The proposed revision continues to require submittal of information concerning availability of space to lease, and tower height and strength as was proposed in the initial draft. However, specific requirements as to how communication between the applicant and the tower owner is to occur are eliminated. The applicant must contact tower owners in order to obtain the needed information, however, the proposed revision focuses on the outcome of that contact,rather than the process. Location ion of Towers Considered for Possible Co-location: Typically, the range within which a new tower can perform its function within the communications network is on the order of 1/4 mile from the proposed site. There is some variability, however, depending on factors such as the tower height and topography. The area within which towers must be identified and evaluated is proposed to be at least 1 mile for towers 200 feet or taller(as originally proposed) and one-half mile for towers shorter than 200 feet. In addition, the applicant must provide an engineer's certification indicating the widest range from the proposed site within which the equipment could perform. 10 All towers within the applicable mile or one-half mile radius must be identified. However, a thorough and detailed explanation as to why co- location efforts were not successful is required only for the towers located within the functional range. Sb&dna Space on New Towers The Zoning Ordinance now requires that the applicant submit a statement indicating that that the proposed tower can support at least one additional use and that the applicant is willing to lease space on the tower to another user at a reasonable rate. The proposal presented at public hearing required that that letters be sent to all potential users, offering to share space on the tower and requesting a response. Potential users would have an opportunity to respond and express their interest in leasing space. Questions were raised regarding who would be notified,what to do in the case of no responses, or many responses, and the potential for unfair competitive advantage for those who do not have a tower network already in place. Also questioned was the need for this notification requirement. It was thought that these provisions were duplicative, since all applicants would be required to explore and document the possibilities of using an existing tower prior to submitting an application. The purpose of the provisions discussed above is to assure that existing towers will be utilized to the greatest possible extent before new towers are constructed. The Planning Staff agrees that the notification requirements for the purpose of offering to lease space is duplicative, and finds that the existing provisions, which require that the tower be designed to support an additional user, and that the Special Use Permit include a statement indicating the applicant's willingness to lease space, are sufficient. 2. Subdivision Requirement A lot to be used as a tower site which is created through the subdivision process must generally be 1 or 2 acres in size,depending on the zoning district, must be accessed by a right-of-way or easement at least 50 feet in width, and must meet other requirements of the zoning ordinance and subdivision regulations in much the same manner as a lot proposed for residential use. One exception is that a Notice of Restricted Development Potential may be recorded in lieu of having a soils analysis performed by Environmental Health, since tower sites are unmanned and no septic disposal facilities are needed. Concern with the requirement that separate lots be created for tower sites has been expressed. In most cases, the property to be used for the tower is leased, 11 and future residential use is not anticipated. Land area requirements, right-of- way width and road improvements may be more than is needed for an unmanned facility. In order to comply with State enabling legislation, property which is either purchased or leased on a long-term basis must be subdivided in order to create it as a separate building lot. Property leased on a short-term basis, such a year- to-year, is not required to be subdivided. No ordinance revisions pertaining to this issue are needed. This concern can be addressed by informing applicants of the option to eliminate the subdivision requirement by for tower sites by obtaining a year-to-year lease rather than a long-term lease. 3. Stealth Application In some cases, communications equipment can be located on an existing or proposed structure which either serves another purpose altogether (such as a tall building or water tower) or is disguised to look like it serves another purpose (such as a tower in a rural area built to look like a silo). Other examples of stealth applications may include church steeples, clock towers, and observation towers. Permits are not required to place equipment on an existing structure. However, permit approval is generally required for the initial construction of most structures which would be of a sufficient height and strength to support the equipment. The Planning Staff recommends that stealth applications be encouraged because of the reduced visual impact. It is proposed that new towers up to 160 feet in height which are sufficiently disguised be approved administratively by the Planning Staff if the following criteria are met: The primary purpose of the structure is, or visually appears to be, for something other than the support of telecommunications equipment, and the apparent purpose is customarily considered accessory to a use which is allowed in the zoning district. The structure and its use comply with the Orange County Zoning Ordinance; and •. For existing structures, the equipment does not extend more than 20 feet above the structure, or 10% of the height of the structure, whichever is greater, provided that height and setback limitations of the Zoning Ordinance are met. 12 If the structure is not sufficiently disguised or does not meet applicable requirements of the Zoning Ordinance, then a Class A or Class B Special Use Permit would be required, depending on the height. 4. Other Uses on Lot The Zoning Ordinance now requires that there be no more than one principal use on a parcel. Revisions to the proposal presented for public hearing in November, 1995 include revision to Article 6.3.1, specifying that a telecommunication tower may be allowed as a second principal use on a parcel. A tower located on property used also for some other purpose would require approval of a Class A or Class B Special Use Permit(unless it was found to be a sufficiently-disguised stealth application). The Special Use Permit would apply to the entire parcel, including any other uses. However, the standards of evaluation required .for permit approval would apply only to the tower itself. This change would allow towers to be located in conjunction with a shopping center, church, or other principal use without creating a separate subdivision lot(provided that the property is subject to a short-term lease only), and would facilitate the use of stealth applications. 5. Setbacks For towers requiring approval of a Special Use Permit, minimum setbacks adjacent to residential zoning districts are proposed to equal the height of the tower, but could be reduced by up to 50% with approval of the adjoining property owners, provided that the standard minimum setback requirement of the zoning district is met. Adjacent to non-residential uses or non-residential zoning districts, the setback must be the greater of 20% of the tower height or the minimum standard setback of the zoning district. The lesser setbacks adjacent to non-residential districts or uses could address potential setback problems on small commercial lots, without impacting existing residences. Towers or structures which qualify as stealth applications and are not subject to approval of a Special Use Permit must meet setback provisions of Article 6.2.1(a) which requires one additional foot for front and side setbacks, in addition to the standard setback specified in Article 5.1, for each two feet of height above the maximum height specified for the zoning district. For example, a 160' stealth tower in the R-1 zoning district (25' height limit, 40' front setback, 20' side setback) would be subject to a front setback of 108 feet and a side setback of 88 feet. 13 6. Unreasonable Interference with View. Tlie proposed amendment presented for public hearing in November 1995 included a standard that "the tower and antenna will not unreasonably interfere with the view of or from any historic site, scenic road, or major view corridor. Questions were raised regarding how "unreasonable interference" would be defined. This provision has been eliminated from the draft due to the lack of a specific standard to define "unreasonable". The intent of the provision would be met in making the general Special Use Permit findings, particularly the findings that the use maintain or enhance the value of contiguous property, and that the location and character of the use is in harmony with the area in which it is to be located and is in compliance with zoning regulations and the Land Use Plan. 7. Minimum Tower Height It is expected that the height of new towers will decrease after construction of the network of towers that will provide the basic coverage needed for the system. The location of additional towers is based on demand, and as towers are closer together, the height needed is not as great. Based on a review of requirement of other jurisdictions, both local and national, the Planning Staff recommends that towers less than 75 feet in height be permitted by right. 8. Other Types of Towers Commissioner Willhoit questioned applicability to towers other than those used for telecommunication purposes, such as those used for air quality monitoring. The staff recommends that telecommunication towers continue to be treated as a specific use because each tower is constructed in the context of a larger network, and it can be anticipated that requests for additional towers in the network will continue. The proposed ordinance provisions address issues which are unique to a telecommunications network. Other tower-like structures or facilities are now subject to an additional setback requirement of one foot for every two feet of height above the height limit specified for the zoning district. Also, the tower must be associated with a use that is permitted in the zoning district. Although there are occasional tower structures proposed for purposes other than telecommunication, these requests are infrequent, and the Staff has identified no-trend which would indicate plans to develop a coordinated network for some other purpose in the future. The Planning Staff recommends that other tower structures continue to meet the applicable setback requirements. If the County wishes to apply different or additional standards or review procedures to other types of towers, a separate ordinance amendment is recommended. 14 9. Notification Requirements The issue of notification requirements was raised by an Orange County citizen, who expressed concern with amendments which would limit notification of citizens. All property owners within 500 feet of a site are notified by mail of any rezoning, Special Use Permit, or other action requiring a public hearing. In addition, the property is posted with a sign and a newspaper notice is run twice prior to the public hearing. The Ordinance Review Committee recommended that property owners within 1000 feet be notified of Special Use Permit hearings for telecommunication towers. One Committee member recommended that the notification radius be extended further, to a distance of at least 1500 feet. Notification would not be required in cases where stealth applications were used to the extent that the project could receive administrative rather than Special Use Permit approval. Administrative approval in those cases is proposed in response to citizen concerns regarding the visual impact of towers, is intended as an incentive to encourage the use of effective stealth applications. 15 8.8.17 end T..lmifflkn T " *4a_ and HatebJUH&CU lim1ppq and Elevated Water torage Tanks(Class B SpuiRLU34 8.8.17.1 Additional Information In addition to the information required in Subsection 8.2 and 8.8, the following shall be submitted as part of the application: a) A Site Plan showing site and size of all existing and proposed structures, existing and proposed topography at a contour interval of five feet and any officially designated floodways and floodplains, or the presence of alluvial soils. b) Plans, and elevations for all proposed structures and descriptions of the color and nature of all exterior material. C) A Landscape Plan showing, at the same scale as the Site Plan, existing and proposed trees, plus shrubs, ground cover and other landscape materials. FeaserAble basis: 8.8.17.2 Standards of Evaluation The following specific standards shall be used in deciding upon an application for approval: a) Adequate provision has been made, by means of fencing or otherwise,for the security of the'site,including the provision of a gate at the access entrance of access roads leading to such facilities. b) A minimum lot size shall be adequate for the proposed use. C) Adequate provision has been made for the protection of adjacent property from the dangers of collapse, fire, flooding or other menaces to public health and safety. Ado eff em 1 6 t1, the C 1 1 T D r appli,...f:.. ,, 1: ,�:.... Y vv av szvf D t T'4.a '• ' •.� t 1 + ° ptsocaz�'irs �J Wappliewri lase. 8.8.17a Telecommunication Towers (NEW) 17 NOTE-Cross-out/Underline indicates revision of the original amendment presented for public hearing in November 1995. The existing ordinance provisions are included as a separate attachment. 8.8.17a.1 Additional Information In addition to the information required in Subsections 8.2 and 8.8, the following shall be submitted as part of the application: a) A Site Plan showing site and size of all existing structures within 500 feet of the site, existing and proposed topography at a contour interval of five feet and any officially designated floodways and floodplains,or the presence of alluvial soils. b) Plans, and elevations for all proposed structures and descriptions of the color and nature of all exterior material. C) A Landscape Plan showing, at the same scale as the Site Plan, existing and proposed trees, plus shrubs, ground cover and other landscape materials. d) Evidence that the applicant has investigated the possibilities for locating the proposed facilities on an existing tower. Such evidence shall consist of- A listing of all towers within a 1/2-mile(for towers shorter than 200 feet) or 1-mile (for towers 200 feet or taller) radius of the=posed tower site. Delineation of the boundaries of the maximum search range within which the tower eauinment can function as intended. T-! The following information shall be provided for all existing_ towers within the search range: T 4- (a) Tower height, a measured from the ground to the hiTzwint of the sunnort structure; (b) Existing and planned tower users; (c) Whether the existing tower could accommodate the antenna to be attached to the proposed tower without causing structural instability or radio frequency interference;and (d) If the proposed antenna cannot be accommodated on 17a the existing tower, assess whether the existing tower could be structurally strengthened or whether the antennas transmitters and related equipment could be protected from electromagnetic interference, and generally describe the means and projected cost of shared use of the existing tower; and 2. 3. A summary explanation of why proposed facilities cannot be located on any of the existing towers in the search range. �. Weeem—m-»ea6eHtewer- users—Mist--pr-evided--hy the the-fewer: -2. 3: due ♦ � s. -� iasa v>�, �sv ..rl......a.,.. . . g.€ Documentation from applicable state or federal agencies indicating requirements which affect the appearance of the proposed tower, 18 such as lighting and coloring. Drafis bond or other security which will g=ntee the Temoval of the tower in the event that it is abandoned or unused for a pen '? months. g, Alisting of all property owners within 1000 feet of the parcel shalt be provided. Each property owner shall he notifle of the public hearing in accordance with Article 2.3.3.4 ( 1 ss B Special Use Permit) or Article 8.4.5 (Class A Special Use Permit) of this Ordinance. h Photographs of a clearly-visible balloon floated at the proposed tower location to the maximum height of the towers.- Photographs shall be taken from locations such as: property lines and/or nearby residential areas historic sites, rod y�s. including scan; Loads and maior view corridors. and other location as deemed necessarv_by the Plmning Staff_ to assess the visual_ impact of the proposed tower. 8.8.17.2 Standards of Evaluation The following specific standards shall be used in deciding upon an application for approval: a) The Hinifflum let size shag be as r-equind by the applieable . b) Adjacent to residential zoning districts, minimum setbacks from the base of the tower to the property boundary shall be equal to the height of the tower. The setback may be reduced to no less than one-half of the tower height if easements for the remaining setback distance are granted by adjoining property owners. C) Adjacent to non-residential uses or non-residential zoning districts,minimum setbacks from the base of the tower to the property boundary shall be eqtW to 5044 of the height ef the me . the Hof 20°/a of the tower height or the mi red setback. d) A Type C Landscape Buffer shall be provided between the tower and adjoining property. Existing vegetation may be removed only to the extent necessary to accommodate the tower, equipment buildings, and support structures such as guy wires. 19 e) Ne-swietwes may be-leeeted with:-f the call zene f) The site plan shall indicate a location for at least one equipment building in addition to that proposed for use by the applicant. g) Security fencing is provided around the tower base or around the perimeter of the site. h) The telecommunications equipment planned for the proposed tower cannot be accommodated on an existing tower due to one or more of the following reasons: 1. The planned equipment would exceed the structural capacity of existing and approved towers, considering existing and planned use of those towers and the towers cannot be reinforced to accommodate planned or equivalent equipment at a reasonable cost. 2. The planned equipment would cause radio frequency interference with other existing or planned equipment for these towers, and the interference cannot be prevented at a reasonable cost. 3. Existing or approved towers do not have space on which the equipment can be placed so it can function effectively and reasonably in parity with similar existing or approved equipment. 4. No tower or other suitable facility exists in an area where the equipment to be placed on the tower will function in its intended manner. i) The communications tower is structurally designed to support at least one additional user, and the Special Use Permit includes a statement that owner of the tower is willing to permit other user(s) to attach communication facilities which do not interfere with the primary purpose of the tower, provided that such other users agree to negotiate a reasonable compensation to the owner from such liability as may result from such attachment. j) The color of the tower is of light tone, except to the extent required by law,so as to minimize its visual impact. k) The towers will not be artificially lighted unless required by the FAA, FCC or other federal or state agency. Where=h envies allow a choice between painting the tower or in_st, Wling strobe lighting,painting, shall be the Preferred 20 choice, 1) The tower and antenna will not unmaseRa-y=teeFe A4� rest_ 1n a sigiificant adverse impact on the view of or from any historic site,scenic road,or major view corridor. M) All Obselete and umised abandoned communication towers shall be removed within 12 months of the cessation of use. The .Sineeinl Use Re^~`i* ^>,W a . dim .t. r - eq+4emepA A bond or other security gua tang the removal of the tower in the event that it is abandoned or unused for a period of 12 months shall be posted A cost estimate shall be provided by a qualified contractor, The amount of the security shall be 110 percent of the estimate The Special Use Permit shall include a condition that the electro-magnetic radiation levels maintain compliance with requirements of the Federal Communication Commission. rejarding emission of electromagnetic radiation Within 30 days of installation of cquiipment on the tower and within 30 days of the installation of any additional equipment in the future_ the tower owners all provide documentation of emission levels in relation to FCC standards In addition- the tower owner must provide documentation of emission levels within five workingdys if so mQuested by Qmgc o n . Orange COun may make such requests at any time_not to exceed four times vear. 63.1 Principal Uses TReets shall be no more than one pimp_ WW use on army zoning to x p wt here: a) pe>mitted as part of a Planned Development:or b) the parcel is less than 2 acres in size_and non-residential multiple uses are praposed within a single pprin_cipal structure:or C) One of the uses is an unmanned telecommunication tower subject to a vear- to-year or other short-term lease. 6.18 Administrative Approval of Stealth Telecommunication Towers 21 New telecommunication town up to 160 feet in height which are sufficiently- disguised so as to minimi isual impact may be approved administratively tratively by the Planning Staff provided that all of the provisions contained in Article 8.8.17a are met A new tower may be considered sufficiently dis Wised if: the prim= Mgp= of the structure is or visually appears to be. something other than the auDnW of telecommunicatio ns equipment: the apparent purpose is customarily cw dered as accessory,to a use which is allowed in the zoning district: and the structure and its pnm use comply with the Orange County Zoning Ordinance. The placement of telecommunication equipment on existing structures may be approved administratively provided that the equipment does not extend more than 2n feet above the structure, or 10% of the height of the structure. whichever is greater, and height and setback limitations of the Zoning Ordinance are met. 4.3 PERMITTED USE TABLE • - PERMITTED USE A . CLASS A SPECIAL USE (ARTICLE 81 B . CLASS B SPECIAL USE (ARTICLE 8) RB AR I R1 I R2 R3 R4 R5 RB R13 LC1 NC2 I CC3 GC4 I ECS 1 01 EI I1 I2 13 AS ED I PID P17 ROD B B Is Is B B B B B 8 B 8 8 B B B> I Tow we r Elevated 11Ftgr Storage Tanks Pie Research Lands & Installations. Non - Profit P19 Schools: Elementary, Middle 4 Secondary P20 Schools: vocational ' P21 Schools: Dance, Art L Music P21A Non - Profit Educational Cooperative (1) A P22 Transmission Lines _ B B 8 B B B B B B B B B B B B B B e B P23 Universities, Colleges 4 Institute& P24 Governmental Facilities G office Suil4ings P25 Water & Sanitary Sewer Pumping Stations P26 Camp /Retreat Center (3) B B B Amendments: (1) 7- 1 -95 (2) 1- 5-97 (3) 2 -19 -91 (4) 3- 1 -94 RB AR R1 R2 R3 R4 R5 R8 R13 LC1 NC2 CC3 GC4 ECS OI EI I1 I2 I3 AS ED PID (4) Telecommunication Towers meeting requirements of Article 6.18 may receive .administrative approval. N N standards and conditions will constitute a modification and will require 23 the approval of the Board of Adjustment. In determining whether a —L change in the operation of the facility has occurred, the Zoning Officer shall be guided by the procedures and criteria contained in Article 8.7 and Article 8.8.16.2. 8.8.17 Radio and Television Transmitting and Receiving Towers and Elevated Water Storage Tanks (Class B Special Use) 8.8.17.1 Additional Information Amended In addition to the information required in Subsection 8.2 and 8.8, the 10-5-94 following shall be submitted as part of the application: a) A Site Plan showing siting and size of all existing and proposed ' structures, existing and proposed topography at a contour interval of five feet and any officially designated floodways and floodplains, or the presence of alluvial soils. b) Plans, and elevations for all proposed structures and descriptions of the color and nature of all exterior material. c) A Landscape Plan showing, at the same scale as the Site Plan, existing and proposed trees, plus shrubs, ground cover and other landscape materials. s ^-1 d) If an existing communications tower is located in the general vicinity of the proposed communications tower, applicant shall attempt to obtain space on the existing tower. A letter indicating this attempt shall be submitted with the application materials. e) A statement indicating the applicant is willing to lease space on its communications tower to other communications providers whose use would not interfere with applicant's use on a commercially reasonable _basis. f) A statement from the applicant indicating the communications tower is of sufficient size and structure to support the proposed use, plus one additional use which would not interfere with the applicant's use. 8.8.17.2 SbuWards of Evaluation Amended The following specific standards shall be used in deciding upon an application 10-5-94 for approval: a) Adequate provision has been made, by means of fencing or otherwise, for the security of the site, including the provision of a gate at the i access entrance of access roads leading to such facilities. b) A minimum lot size shall be adequate for the proposed use. 8-20 C) Adequate provision has been made for the protection of adjacent 24 property from the dangers of collapse, fire, flooding or other menaces to public health and safety. ' L f d) Adequate provision has been made to obtain space on an existing communications tower in the general vicinity. e) If a communications tower is proposed a statement is to be included with the Special Use Permit Application indicating the applicant will lease space on its tower on a commercially reasonable basis provided the additional use would not interfere with the applicant's use. The applicant may have the option of leasing space within an equipment storage area or building or providing separate facilities for this purpose. f) Adequate provision has been made for the communications tower to support the proposed use, plus one additional use which would not interfere with the applicant's use. 8.8.18 Bulildinss for Temporary Use (Class B Special Use) 8.8.18.1 Additional Information In addition to the information required in Subsection 8.2 and 8.8, the following shall be submitted as part of the application: a) Site Plan showing all existing and proposed structures on the site, existing and proposed topography at a contour interval of five feet, existing and proposed landscaping, parking areas, access points, any officially designated flood plains, and other site details. b) A description of the exterior materials, color and construction details. c) Statement of proposed use and length of time building will be in use. 8.8.18.2 Standards of Evaluation The:following specific standards shall be used in deciding upon an application for this use: 4) The temporary building shall not be used for residential purposes. b) The requirements of Articles 4, 5, 8 and 9 of this ordinance have been met. c) The temporary building shall not be used by operations offering drive- in services. d) The use of the building shall be only for the period of time specified and for the use specified. - 8-21 PETREE STOCKTON, L.L.P. 25 ATTORN EYS AT LAW 4101 LAKE 800NE TRAIL.SUITE 400 RALEIGH, NORTH CAROLINA 27607-6519 TELEPHONE(919) 420-1700 FAX(919) 420-1800 OTHEROACCES CHARLOTTE. N C. M. GRAY STYERS. 1R. WINSTON-SALEM, N.G. (9191 420-1719 June 14, 1996 Orange County Planning Board- 306-F Revere Road Hillsborough, North Carolina 27278 Re: Zoning Ordinance Text Amendments Regarding Telecommunication Towers Dear Chair and Planning Board Members: As regional counsel for BellSouth Carolinas PCS Limited Partnership ("BellSouth"), we would like to respond to the proposed zoning ordinance text amendments regarding telecommunication towers. As you know, BellSouth is currently planning and constructing its system to provide the first digital personal communication service ("PCS") in North Carolina. This system, which should be operational later this summer, includes several sites in Orange County. Because BellSouth is one of the newest entrants in the wireless telecommunications market and is building its system this year from scratch, we are extremely interested and concerned about the proposed zoning ordinance text amendments and how they will effect BellSouth's ability to provide this new technology to the residents of Orange County. (1) BellSouth recognizes the issues raised by the increasing number of telecommunication towers that have been needed in the past few years as consumer demand for mobile wireless telecommunication service increases and as new technologies become available. Consequently, BellSouth attempts to co-locate its antennas on existing or proposed structures whenever possible, constructs its own towers to accommodate co-location by other wireless communication carriers, and is a leader in utilizing stealth applications, such as church steeples, clock towers, light poles, flag poles and existing buildings. Therefore, we agree with the Planning Staff's recommendation that stealth applications be encouraged and support the proposal of a new Section 6.18. This new section, however, could be interpreted to make stealth installation of antennas on existing buildings extremely difficult unless the existing structure already met the set-back limitations of the zoning ordinance. BellSouth has successfully avoided constructing additional towers in many area by locating antennas on top of existing multi-story buildings. This stealth application does not effect the existing building's relationship to property lines and other structures. Therefore, there is no reason for expanded set-back requirements in this situation. We would propose, therefore, deleting the last clause of the new proposed 26 Orange County Planning Board June 14, 1996 Page 2 section 6.18 after the word "greater," as being unnecessary and contrary to'the section's intent. (2) BellSouth strongly recommends that the zoning ordinances clarify that a leased site for a telecommunications tower does not trigger the requirements of the County's subdivision ordinances, so long as the lease does not create a separate, delineated parcel that survives its use as a telecommunication tower site. None of BellSouth's sites require a lease of one or two acres of land and none require an improved right-of-way or easement of at least 50 feet in width. Most BellSouth sites are on very small leased parcels of approximately 40 x 60 feet and require access only for construction and occasional maintenance and inspection (and, eventually, removal). The leases terminate whenever a tower is removed and does not allow the leased site to be used for any other purpose. Neither the property owner or BellSouth intends to create a parcel for potential residential or any other use. Therefore, the subdivision requirements are not necessary and should be expressly noted to be inapplicable. (3) Proposed section 8.8.17a.1(g) would increase the area in which property owners must be notified of the public hearing from 500 to 1,000 feet of the parcel on which the structure site is to be located. As discussed during prior meetings, most PCS towers initially constructed to provide basic coverage are less than 200 feet tall. Any towers needed to provide additional capacity in the future will most likely be shorter, as noted in Section 7 of the Response to November 27, 1995 Public Hearing Comments. Towers less than 200 feet tall, as a general rule, either cannot be seen at all, or at least are not noticeable, from a distance greater than 500-600 feet if there are any trees at all between the observer and the structure. As you know, BellSouth often conducts informal meetings with area property owners prior to the formal public hearings in order to answer questions, address concerns, and provide information at an early stage in the siting process. Occasionally, these public meetings result is BellSouth modifying its original plans for a site. Our experience at these meetings has been that, once the location of the site is identified, residents living more than 100-150 yar&from the structure often leave because it is so far away from them. Moreover, bwuse BellSouth attempts to locate its structures on large parcels of undeveloped land whenever`possible, notifying every property owner within 1000 feet of the property line .of the parcel is not only unnecessary, but also difficult. For all of these reasons, BellSouth proposes alternative language requiring notification of all owners-of property within 3 or 4 times the tower height from the base of the structure. 27 Orange County Planning Board June 14, 1996 Page 3 Thank you for this opportunity to share some of our concerns about the proposed ordinance. BellSouth is excited to be offering this new PCS service to Orange County, and we would be glad to provide additional information regarding any of these issues discussed above. Very truly yours, PETREE STOCKTON, L.L.P. __0 M. Gray Sty s, Jr Enclosures cc: Mr. John Weldon, BellSouth PCS Mr. Keith Lee, BellSouth PCS Ms. Mary Willis, Orange County Planning Dept. 28 Law OFFICES COLEMAN, GLEDHILL & HARGRAVE A PROFESSIONAL CORPORATION 129 E.TRYON STREET P.O.DRAWER 1529 HILLSBOROUGH,NORTH CAROLINA 27278 919.732.21% FROM THE DESK OF FAX 919-732-7997 GEOFFREY E.GLEDHILL June 21, 1996 Ms. Mary Willis Supervisor Orange County Planning Department Post Office Box 8181 Hillsborough, North Carolina 27278 RE: Telecomum cations Towers Dear Mary: This letter confirms our June 20, 1996 telephone conversation. Upon reconsideration of the question of whether telecommunications tower installations constitute a subdivision of land, it is now my opinion that they do not. North Carolina General Statutes g 153A-335 defines a subdivision, for the purpose of subdivision regulations, as "all divisions of a tract or parcel of land into two or more lots, building sites, or other divisions for the purpose of sale or building developments (whether immediate or future) and includes all division of land involving the dedication of a new street or a change in existing streets. . . . " All of the telecommunications tower installations that have occurred in Orange County have occurred pursuant to leases of 25 years or less and, the facilities placed on the leased premises have been towers, guy wires, electronic equipment and perhaps a small facilities building. It is now my view that these leases are not sales of property and, it is now my view that the facilities erected on the tower sites are not building development. Therefore, unless the tower site involves the dedication of a new public street or a change in an existing public street (not likely) , there is no division of land for subdivision regulation purposes. I therefore recommend that the applications for telecommunications towers be reviewed by the .Planning Department pursuant to Orange County Zoning Ordinance requirements only. The consequence of zoning regulation review only is that it will not be necessary for the Planning Department or me to review lease agreements. between the tower company and the property owner. However, it will be necessary for any special use permit 29 Ms. Mary Willis Page 2 June 21, 1996 to be applicable to the tract or parcel of land on which the telecommunications tower is located. Put another way; if the telecommunications company does not subdivide its leased parcel, thus creating a separate land parcel for land records purposes, the special use permit will apply to whatever tract or parcel of land is separate for land records purposes. The corollary of this is that the applicant must provide the Planning Department, with its application, with the legal description of the appropriate parcel and evidence of title to enable the Planning Department to prepare the special use permit. If you have any questions about this, please call. Very truly yours, ;u'IA GLEDHILL HARGRAVS, P.C. Ge ley Gle 'll GEG/lsg xc: E. Christopher Cox Esquire lsg\c:\wp60\willtel.ltr 30 LYNCH, EATMAN & TWIDDY, L.L.P. LAWYERS SUITE 195, CAROLINA PLACE 2626 GLENWOOD AVENUE RALEIGH, NORTH CAROLINA 27608 919/571-3332 FAX 919/571-9983 MARIA M. LYNCH MAILING BDOR cc: JEROME R. EATMAN, JR. POST OFFICE BOX 30515 CURTIS A. TWIDDY RALEIGH, NC 27622-0515 KATHERINE B. WILKERSON ALBERT M. BENSHOFF July 23, 1996 Chair Joan Jobsis, Orange County Planning Board Vice Chair Karen Barrows Leo Allison, S.A.M. Brooks, Margaret Brown H. Paul Hoecke, Cheryl Howie, Arnie Katz, Renee Price, Cherie Rosemond, Robert Strayhorn, Elizabeth Walters RE: Zoning Ordinance Text Amendments in Regard to Telecommunication Towers Dear Chair and Planning Board Members: Based on the terms of the proposed amendments and the comments of the staff found in the Telecommunication Tower's Response to November 27 1995 Public Hearing Comments, the primary purpose of the proposed amendments appears to be to minimize the number of new towers in Orange County. The comments made by the staff and others at the recent public hearings also seem to indicate that there is concern over construction of unnecessary communications towers in Orange County. While most of the proposed amendments do not present serious problems for the industry, we are concerned that they have little prospect for accomplishing the County's desired results. The staff has done an excellent job in studying this issue and in looking at the way other jurisdictions have approached the problem of tower proliferation. Unfortunately, very few jurisdictions have approached this issue in any comprehensive manner and, as a result, the desired results are seldom achieved. Many areas have been successful in making the process extremely burdensome and costly for the industry, but none have substantially reduced the number of towers constructed in their community. The best that can be achieved, particularly in light of the Telecommunications Act of 1996, which eliminates prohibition of new towers as an option, is to regulate the siting of transmission facilities in a way which will achieve the best possible mitigation of the appearance of 31 July 23, 1996 Page 2 these facilities. The approach suggested-by the current draft zoning amendments is to minimize the number of towers by requiring companies to share towers. The economic benefit of co-location to wireless companies is so great that voluntary co-location has been practiced for several years. The reason most companies have not objected to the mandatory co-location in your current ordinance is because they follow this procedure in the normal course of business-.- Tower proliferation is not a function of lack of co-location; it is a product of existing wireless technology. In this regard, I have set forth below some observations for your consideration. a. Limitations of Wireless_Technology. The biggest cause of tower proliferation in all areas is the nature of wireless technology and the number of companies desiring to provide this technology to . the public. The number, height and location of transmission towers is dictated by customer demand, topography, and the low power technology used to provide conventional cellular and PCS service. Based on my experience over the last eight years as North Carolina general counsel to Centel/Sprint/3601 Communications and special zoning counsel to Sprint Spectrum PCS in Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island and New Jersey, I estimate that the failure, or inability, of a company to locate on existing towers or structures accounts for less than five percent of the new towers constructed. The reason most new towers are constructed is the company's need for a transmission facility in a certain geographic area where there are no existing towers or other structures suitable for the transmission facility. No amount of governmentally mandated or encouraged co-location can change the fact that, in a predominantly rural area like Orange County, most companies will need to build new transmission facilities to serve their customers.. b..- Co-Location Policies. Most local ordinances, including the proposed amendments to the Orange County Code, focus their attention on "forcing" companies to attempt to co-locate on existing towers or facilities. While there is nothing wrong with these regulations, they will have little effect on tower proliferation. These regulations presume that the wireless communications companies have some desire to avoid utilizing existing facilities in their search areas. This is untrue. The reason the wireless communication companies do not object to co-location policies generally is because they do it now. There is, on the average, a cost savings of approximately $300,000 every time a company can utilize an existing tower. The cost savings will exceed this $300,000 estimate in 32 July 23, 1996 Page 3 jurisdictions like Orange County where the approval process for a new tower is extraordinarily lengthy and cumbersome. The only effect that the information required under Section 8.8.17a.1 will have is to increase the cost to the company of getting a tower site approved. The typical "search area" for a cellular transmission facility is 1 /4 to 1 /2 mile. The"industry does not object to providing information regarding existing structures within this radius because all of those structures will have been thoroughly examined prior to making the application. If there is a tower in that search area, the company will have made every effort to locate its facility on that tower because the cost savings are enormous. The list of towers or other structures within a one mile radius of towers taller than 200 feet is irrelevant because most of these towers are too far out of the search area for the company to use. If the company could use those towers, it would do so. If the May draft amendments are to be retained with only minor changes, then I suggest the following amendments: 1 ) 1 suggest that the County collect the information required under Section 8.8.17a.1 when it has some relevance to co-location. The requirement to list all towers within a one mile radius of proposed towers taller than 200 feet will produce a list containing towers too distant to be used for co-location. This requirement will make the process more time consuming and costly but will not result in fewer towers. 2) Section 8.8.17a1 .(d) requires applicants to provide all of the following information for all towers within the search range: - tower height - existing and planned users - can the proposed antennas be accommodated on the existing tower? - an explanation of why the tower cannot be used by the applicant; - and `assess whether the existing tower could be structurally strengthened or whether the antennas, transmitters and related equipment could be protected from Electro-Magnetic Interference, and generally describe the means and projected cost of shared use of the-existing tower." It may not be possible to supply all of the information listed above for every tower within the search range because some of the information may be proprietary. If a tower owner refuses an offer of co-location, then it 33 July 23, 1996 Page 4 should be unnecessary to "assess whether the tower could be structurally strengthened." Submitting the required information should be dependent on whether the tower can be used for co-location. I suggest drafting Section 8.8.17a.1 .(d) to contain a conditional alternative as follows: "Delineation of the boundaries of the maximum search range within which the tower equipment can function as intended. The following information shall be provided for all existing towers within he search range: (a) Tower height; (b) Existing tower users; (c) Planned tower users, if available; (d) If the tower owner will consider co-location at a height usable by the applicant, then 1 ) Whether the existing tower could accommodate the antenna to be attached to the proposed tower without causing structural instability or radio frequency interference; and/or 2) If the proposed antenna cannot be accommodated on the existing tower, assess whether the existing tower could be structurally strengthened or whether the antennas, transmitters and related equipment could be protected from electro- magnetic interference, and generally describe the means and projected cost of shared use of the existing tower." 3) To my knowledge, only Orange County interprets the General Statutes to require that leased property be subject to the Subdivision Ordinance. Most transmission sites are on small tracts of leased property. We ask for additional relief from this interpretation. 4) The-area in which property owners are to be notified of a Class B Special Use Permit application is proposed to be increased from 500 to 1 ,000 feet. A Class B Special Use Permit can only be issued for towers under 2004"t. There is no reason to notify a property owner 1 ,000 feet away from a 200 foot tower, unless you are planning to increase the notice area for all Special Use Permits. The standards for a Class B Special Use Permit under your current ordinance makes any concerns of residents 1 ,000 feet away from a 200 foot tower very hard to address. Any impact of a 200 foot (or lower) tower on a property owner 1 ,000 feet away is going to be very difficult to establish in the context of a quasi-judicial Special Use Permit hearing. July 23, 1996 34 Page 5 5) Both the November and May drafts provide that minimum setbacks from the base of the tower to the property boundary will be equal to the height of the tower unless the tower owner acquires an easement to adjacent property. (Section 8.8.17.2.(b)) In that case, the setback may be reduced by up to 50%. An easement is a legal estate in land. Easements are purchased just like other estates in real property. The easement requirement will provide the level of legal formality necessary to prevent a neighboring property owner from simply giving permission to a tower owner to reduce the setback. An illustration of the typical use of a setback reduction easement is attached. 6) At the public hearing considerable interest was expressed in the health effects of electro-magnetic radiation from cellular antennas. Questions were raised as to whether local governments regulatory authority has been preempted by Congress. Section 704 (B)(iv) of the Telecommunications Act of 1996 reads, "No State or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the Commission's regulations concerning such emissions." Section 704 (b) requires the FCC to "make effective rules regarding the environmental effects of radio frequency emissions" within 180 days of the passage of the Act, or by early August. The Federal Communications Commission New National Wireless Tower Siting Policies, dated April 23, 1996, established the uniform national standards for evaluating tower siting decisions based on the health effects of electro-magnetic frequency radiation. The Policies state "Section 704(b) gives preemptive effect to these existing rules. ... Presently, RF emission requirements are contained in Section 1 .1307(b) of the FCC's rules, 47 C.F.R. §1 .1307(b), for all services." Section 1 .1307 (b) cross- references the "Radio Frequency Protection Guides recommended in American National Standard Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields, 300 kHz to 100 GHz (ANSI C95.1-1982) issued by the American National Standards Institute..." This means that no application for a cellular telephone facility may be rejected on the grounds of health effects if the proposed facility meets the federally established radio frequency thresholds contained in ANSI (95.1- 1982). Local governments can (and should) require a statement that a proposed facility will be operated in compliance with the federal standards. 35 July 23, 1996 Page 6 For your general information on this issue, I have attached two studies by Denny & Associates, P.C., consulting radio frequency engineers. These studies measure the electro=magnetic radiation discharged by the 360° Communications Company tower next to the school on Merrit Mill Road in Chapel Hill. Both studies show that the maximum radiation levels from this tower is about 100 times less than the ANSI C95.1-1982 standard. Please contact me if I can provide any more information or any clarification on any of the issues raised in this letter. Very trul yours, J me R. atman, Jr. AMB:sla Attachment cc: Scott Martenson f:1sussn%3Woran9alzon2.1tr 36 I Illustration of a 100 Foot Setback I Reduction by Basement on Parcel B { � I � � I a I r � I ' 0 I o a / N E I I � N V a � I ZI 4- 04 C14 I � I P x (C: :l I a as a L JULES COHEN 3 ASSOCIATES, P.C. CONSULTING ENOINEEKS 37 WASHINGTON. D.C. 20036 ENGINEERING STATEMENT ELECTROMAGNETIC FIELD STRENGTH SURVEY SPRINT CELLULAR COMPANY STATION KNKA293 CARR.BORO,NORTH CAROLINA Electromagnetic field strength measurements were made by the undersigned at the transmitting site of Domestic Public Cellular Radio Telecommunications Service station KNKA293. The measurements were made on April 28, 1994, on behalf of Sprint Cellular Company, licensee of KNKA293. Locations on the cell site grounds, both inside and outside the tower, and in the equipment shelter were surveyed to determine the levels of radio-frequency energy present. Data collected during the survey were evaluated against two standards which establish the maximum levels of radio-frequency energy to which humans may be exposed without known harmful biological effects. The two standards are American National Standards Institute (ANSI) C95.1-1982 and ANSI/Institute of Electrical and Electronics Engineers (IEEE) C95.1-1992. ANSWEEE C95.1-1992 is the revision of C95.1-1982. The protection guide levels specified in ANSI C95.1-1982 have been adopted by the Federal Communications Commission as the acceptable levels of human exposure to RFR. The FCC currently is considering adoption of the revised standard and most likely will do so in the next twelve months. By evaluating the survey data against both.the existing and revised standards, there should be no need to repeat the survey effort at such time as the FCC adopts the revised standard. Survey measurements were made at representative locations on the ground at the cell site, both=a&and outside the tower fence, and inside the equipment shelter. The exposure level at each location surveyed was below the sensitivity threshold of the measurement instrument and well below the exposure limits established by either standard. Further discussion of the survey follows. JULES COHEN & ASSOCIATES, P.C. CONSULTING ENGINEERS 38 WASHINGTON, D.C. 20036 Engineering Statement Page 2 Carrboro,_North Carolina Site Descri2tion The surveyed cellular site is located at 515 South Greensboro Street, Carrboro, Orange County, North Carolina. The geographic coordinates of the site, referenced to the 1983 North American Datum, are: 35°54'09"North Latitude, 790 04' 11" West Longitude. A 180-foot self- supporting tower has been erected at the site to support the KNKA293 base station antennas._,T wo Decibel Products, type DB810, transmitting antennas are mounted at the top of the tower with centerlines 187 feet above ground level (AGL). Six other antennas are mounted near the top of the tower, but these antennas are for receiving only. Access to the tower is restricted to authorized personnel by a fence with a lockable gate. Exposure Standards As stated earlier, analysis of-the data collected in this survey is based on two standards for human exposure to radio-frequency electromagnetic fields: ANSI C95.1-1982, the currently adopted FCC standard, and ANSMEEE C95.1-1992, the revision of ANSI C95.1-1982. The FCC is in the process of changing its rules to incorporate the revised standard, ANSUIEEE C95.1-1992, in place of the current standard, ANSI C95.1-1982. It is expected that the FCC will incorporate the revised standard into its rules with few changes. AN C95.1-1982 specifies maximum exposure in terms of frequency-dependent protection guides. The pn*wtion guides are concerned with total whole-body absorption of radio- frequency energy over any 0.1-hour period. All of the radio-frequency sources at the KNKA293 cellular spa are in dw 300 to 3000 megahertz(N4Hz) frequency range. The protection guide level for this frequency range corresponds to an average equivalent plane wave power density that may be calculated using the formula. r S 300 JULES COHEN & ASSOCIATES, P.C. 39 CONSULTING ENGINEERS WASHINGTON, D.C. 20036 Engineering Statement Page 3 Carrboro, North Carolina where f is frequency in megahertz and S is power density in milliwatts per square centimeter (m W/cm=). Given this relationship, the most restrictive exposure guide level would occur at 869 MHz, the lowest possible operating frequency for cellular base stations. Applying this frequency to the formula yields a protection guide level of 2.9 mW/cm2. The revised standard, C95.1-1992, also specifies maximum exposure in terms of a frequency-dependent maximum level, but, instead of a protection guide, this level is referred to as a maximum permissible exposure (MPE) level. The new standard also categorizes exposure environments as controlled or uncontrolled. The 1982 standard did not distinguish between exposure environments. Under C95.1-1992, controlled environments are locations where there is exposure that may be incurred by persons who are aware of the potential for exposure as a concomitant of employment, by other cognizant persons, or as the incidental result of transient passage through area where analysis shows the exposure levels may be above the MPEs for uncontrolled environments but less than the MPEs for controlled environments. The MPE for controlled environments under the 1992 standard for emissions in the 300 to 3000 MHz frequency range is the same as the 1982 protection guide level and therefore may be calculated using the formula given above. The averaging time for controlled environment exposures is also 0.1 hour as with the 1982 standard. Thus, in this case, the MPE for controlled environments would be the same as the protection guide level, 2.9 mW/cm2. The base of the KNKA293 tower, which is enclosed by a fake, is an example of a controlled environment. Locations inside the KN A293 equipment shelter also are examples of a controlled environment. JULES COHEN & ASSOCIATES, P.C. CONSULTING E VGiNEExS WASHINGTON, D.C. 20036 40 Engineering Statement Page 4 Carrboro, North Carolina Uncontrolled environments are locations where there is exposure of individuals who have no knowledge or control of their exposure. A residential area would be an example of an uncontrolled environment. The MPE for uncontrolled environments for emissions in the 300 to 3000 MHz frequency range may be calculated using the formula S= f 1500 where, as before, f is the frequency in megahertz, and S is power density in milliwatts per square centimeter. While there are some exceptions, in general, the MPEs for uncontrolled environments are one-fifth the MPEs for controlled environments, and the averaging times for uncontrolled environments are five times longer than for controlled environments. As was the case with the protection guide level and the MPE for controlled environments, the most restrictive MPE for uncontrolled environments occurs at 869 MHz. Applying this frequency to the formula yields an WE for uncontrolled environments 0.58 mW/cm=. Measurement Procedure Electromagnetic field sa gth measurements were made using a Narda, model 8716, serial number 06052, electromagnetic monitor calibrated in units of milliwatts per square centimeter. The model 8761, serial number 02003, isotropic probe was used for all electric field measurements. The electromagnetic monitor exhibits of sensitivity threshold of 0.005 mW/cm2. The sensitivity threshold of the instrument corresponds to 0.17 percent of the MPE for controlled environments and 0.86 percent of the MPE for uncontrolled environments. Because of the frequencies is use at the site and the distances from the radiation sources being measured, the electric field component of radiation alone was sufficient to define cgxmire, and a full course of magnetic field measurements was deemed unnecessary. However, a model 8731, serial number 02030, isotropic probe was used for spot magnetic field measurements. The electromagnetic monitor and probes were calibrated as a system in April 1992. JULES COHEN & ASSOCIATES, P.C. CONSULTING Emoi-mus 41 WASHINGTON, D.C. 20036 Engineering Statement page 5 Carrboro, North Carolina Measurement data provided by the electromagnetic monitor were recorded by a Holaday, model HI-3320, data logger. The data logger input was calibrated to the electromagnetic monitor output to record data'in units of equivalent plane wave power density, milliwatts per square centimeter. The data logger was programmed to sample the meter output once each second. Data were logged for 20-second sample periods and, at the end of each sample period, the average equivalent plane wave power density encountered over the course of the sample period would have been calculated had the exposure levels been above the sensitivity threshold of the instrument. Then, the calculated average and measured minimum and maximum power density levels for each sample period would have been stored in the data logger memory for later analysis. The extremely low maximum exposure levels present at the site made rigorous analysis of the measurement data unnecessary. On the ground and inside the equipment shelter, the probe was scanned slowly in a vertical plane over an approximate one-square-meter area to simulate the surface of a human torso. At tight locations inside equipment racks containing cellular transmitters, filters, and combiners, and near transmission lines, there was not enough space to make whole body measurements. These locations simply were probed to ascertain the electromagnetic field strength present. Findings The exposure level present at each.survey location was below the sensitivity threshold of the elecumupedc monitor. Thus, exposure at the site inside the tower fence and equipment shelter is Iewd=0.17 parrot of the MPE for controlled environments, the sensitivity threshold of the instrvosmt for controlled environments. At publicly accessible locations, exposure was less the 0.86 percent of the MPE for uncontrolled environments, the sensitivity threshold of the instrument for uncontroUed environments. Because of the extremely low electromagnetic field JULES COHEN & ASSOCIATES, P.C. CONSULTING ENGINHBRS 42 WASHINGTON, D.C. 20036 Engineering Statement - Page 6 Canboro,_North Carolina strengths, it was not possible to distinguish cellular signals from ambient electromagnetic noise. Inside the equipment rack that housed the cellular transmitters, wgmure levels wen found also to be below the threshold of the electromagnetic monitor. There were 22 cellular transmitters installed at the site at the time of the survey. Taking into account transmitter power output, lion line loss, and antenna gain, the effective radiated power of each transmitter is nominally 100 watts. Assuming simuhaneou S operation of all tiransmitters, mau3m sm effective radiated power at the site is 2200 want Gives the height above ground level of the trans:mitting antennas and the directivity of the t:aasanittiag antennas in the vertical plane, the estimated exposure level six feet above ground level at the tower base is less than 0.0003 mW/em=, which is equivalent to 0.01 percent of the MPE for controlled environments and 0.05 percent of the WE for uncontrolled environments. Conclusion RFR exposure levels measured on the ground and inside the equipment shelter at the KNKA293 site were non than one hundred times less than the protection guide.: set forth in ANSI 095.1-1982 and the applicable MM set forth in 095.1.1992 It is extremely Maly that a more sensitive electromag monitor would show the wgxm n levels to be thou ands of times less than the maromnms established by the standards. Further, public access to the site is restricted, fits, by a fence enclosing the self-storage complex within which the cellular site located, anct second, by a fence enclosing the tower base. A any changes to the transmission system, routine measurement of elearomagnedc field strengths at the K NKA293 site would serve no purpose other than to prove well established laws of physics by demonsorating that no change in the transmission system JULES COHEN & ASSOCIATES, P.C. CONSULTING ENCINSBRS 43 WASHINGTON, D.C. 20036 Engineering Statement Page 7 Cantoro, North Carolina results in no increase in the exposure levels present at the site. Because exposure levels are a function of effective radiated power, antenna electrical characteristics, and distance between the antenna and observer, it is quite reasonable to assume that there will be no change in the ground level exposure as long as there is no change in effective radiated power, antenna type, or antenna mounting height above ground level. If future measurements at this site are to-be made to verify compliance with the standards, such measurements should only be required if maximum effective radiated power is increased, a transmitting antenna changed or added, or transmitting antenna height is changed more than six feet. The addition or relocation of a receiving antenna should not require a new field strength survey. Robert W. Denny, Jr4P.E. June 13, 1994 DENNY & ASSOCIATES, P.C. 44 CONSULTING ENGINEERS WASHINGTON, DC ENGINEERING STATEMENT ELECTROMAGNETIC FIELD STRENGTH SURVEY SPRINT CELLULAR COMPANY STATION ILNKA293 CARRBORO, NORTH CAROLINA INTRODUCTION Electromagnetic field strength measurements were made by the undersigned at the transmitting site of Domestic Public Cellular Radio Telecommunications Service station KNKA293. The measurements were made on September 19, 1995, on behalf of Sprint Cellular Company, licensee of KNKA293. Data collected during the survey were evaluated-against two standards which establish the maximum levels of radio-frequency energy to which humans may be exposed without known harmful biological effects. The two standards are American National Standards Institute (ANSI) C95.1-1982 and ANSI/Institute of Electrical and Electronics Engineers (IEEE) C95.1-1992. ANSI/IEEE C95.1-1992 is the revision of C95.1-1982. The protection guide levels specified in ANSI C95.1-1982 have been adopted by the Federal Communications Commission as the acceptable levels of human exposure to radio-frequency radiation (RFR). The FCC currently is considering adoption of the-revised standard and most likely will do so when the docket comes up for consideration. By evaluating the survey data against both the existing and revised standards,there should be no need to repeat the survey effort at such time as the FCC adopts the.revised standard. Survey measurements were made at representative locations on the ground at the cell site, both inside and outside the tower fence, and inside the equipment shelter. The exposure level at each location surveyed was below the sensitivity DENNY SI ASSOCIATES, P.C. CONSULTING ENGINEERS 45 WASHINGTON, DC Engineering Statement Page 2 KNKA293, Carrboro, North Carolina threshold of the measurement instrument and well below the exposure limits established by either standard. Further discussion of the survey follows. SITE DESCRIPTION The surveyed cellular site is located at 515 South Greensboro Street, Carrboro, Orange County, North Carolina. The geographic coordinates of the site, referenced to the 1983 North American Datum, are: 35° 54' 09' North Latitude, 79° 04' 11" West Longitude. A 180-foot self-supporting tower has been erected at the site to support the KNKA293 base station antennas. Two, Decibel Products, type DB810, transmitting antennas are mounted at the top of the tower with center lines 187 feet above ground level (AGL). Six other antennas are mounted near the top of the tower, but these antennas are for receiving only. Access to the tower is restricted to authorized personnel by a fence with a lockable gate. A sketch of the cell site is shown in Figure 1 of this statement. EXPOSURE STANDARDS As stated earlier,analysis of the data collected in this survey is based on two standards for human exposure to radio-frequency electromagnetic fields: ANSI C95.1- 1982, the.-currently adopted FCC standard; and ANSMEEE C95.1-1992, the revision of ANSI C95.1-1982. The FCC is in the process of changing its rules to incorporate the revised standard, ANSLUEE C95.1-1992, in place of the current standard, ANSI C95.1-1982. It is expected that the FCC will incorporate the revised standard into its rules with few changes. DENNY & ASSOCIATES, P.G. 46 CONSULTING ENGtNBERS WASHINGTON, DC Engineering Statement Page 3 KNKA293, Carrboro, North Carolina ANSI C95.1-1982 specifies maximum exposure in terms of frequency- dependent protection guides. The protection guides are concerned with total whole. body absorption of radio-frequency energy over any 0.1-hour period. All of the radio- frequency sources at the IOMM93 cellular site are in the 869 to 894 megahertz (MHz) frequency range. The protection guide level for this frequency range corresponds to an average equivalent plane wave power density that may be calculated using the formula S= f 300 where f is frequency in megahertz and S is power density in milliwatts per square centimeter(mW/cm). Given this relationship, the most restrictive exposure guide level would occur at 869 MHz, the lowest possible operating frequency for cellular base stations. Applying this frequency to the formula yields a protection guide level of 2.9 mW/cm2. The revised standard, C95.1-1992,also specifies maximum exposure in terms of a frequency-dependent maximum level, but, instead of a protection guide, this level is referred to as a maximum permissible exposure WE)level. The new standard also categorizes exposure environments as controlled or uncontrolled. The 1982 standard did not distinguish between exposure environments. Under C95.1-1992, controlled environments are locations where there is exposure that may be incurred by persons who are agars of the potential for exposure as a concomitant of employment, by other cognizant persons,or as the incidental result of transient passage through areas where analysis shows the exposure levels may be above the MPEs for uncontrolled environments but less than the MPEs for controlled environments. The MPE for controlled environments under the 1992 standard for emissions in the 300 to 3000 MHz DENNY & ASSOCIATES, P.C. CONSULTING ENGINEERS 47 WASHINGTON, DC Engineering Statement Page 4 KNKA.293,Carrboro, North Carolina frequency range is the same as the 1982 protection guide level and, therefore, may be calculated using the formula given above. The averaging time for controlled environment exposures is also 0.1 hour as with the 1982 standard. Thus, in this case, the MPE for controlled environments would be the same as the protection guide level, 2.9 mW/cm2. The base of the K NKA293 tower, which is enclosed by a fence, is an example of a controlled environment. Locations inside the KNKA293 equipment shelter also are examples of a controlled environment. Uncontrolled environments are locations where there is exposure of individuals who have no knowledge or control of their exposure. A residential area would be an example of an uncontrolled environment. The MPE for uncontrolled environments for emissions in the 300 to 3000 MHz frequency range may be calculated using the formula S= f 1500 where, as before, f is the frequency in megahertz, and S is power density in mW/cmz. While there are some exceptions, in general, the MPEs for uncontrolled environments are one-fifth the MPEs for controlled environments, and the averaging times for uncontrolled environments are five times longer than for controlled environments. As was the came with the protection guide level and the MPE for controRT_1 environments, the most restrictive MPE for uncontrolled environments occurs at 869 iVfHz. Applying this frequency to the formula yields an NPE for uncontrolled environments of 0.58 mw/Croy. DENNY & ASSOCIATES, P.C. CONSULTING ENGINEERS 48 WASHINGTON, DC Engineering Statement Page 5 ENKA29-1,-Carrboro, North Carolina MEASUREMENT PROCEDURE Electromagnetic field strength measurements were made using a Narda, model 8718,serial number 01155,radio-frequency electromagnetic field strength survey meter. The model 8722B,serial number 13012, broadband electric field probe was used for all electric field measurements. The frequency response of the mode18722B probe is shaped to conform to the 1992 ANSI/IEEE exposure standard. Configured with this conformal probe,the survey meter indicates exposure level as a percent of the MPE for controlled environments. Configured with the model 8722B conformal electric field probe, the survey meter exhibits a sensitivity threshold of 0.15 percent of the MPE for controlled environments. Because of the frequencies in use at the site and the distances from the radiation sources being measured, the electric field component of radiation alone was sufficient to define exposure, and a full course of magnetic field measurements was deemed unnecessary. However,a model 8731, serial number 02030, isotropic probe was used for spot magnetic field measurements. The electromagnetic monitor was calibrated in August 1995. Measurement data were recorded by the electromagnetic monitor for later analysis. The monitor was programmed to sample the measured exposure level once each second. Data were logged for 30-second sample periods and, at the end of each sample period;the average exposure encountered over the course of the sample period would have been calculated had the exposure levels been above the sensitivity threshold of the instrument. Then, the calculated average and measured minimum and maximum power density levels for each sample period would have been stored in the DENNY & ASSOCIATES, P.C. 49 CONSULTING ENGINEERS WASHINGTON, DC Engineering Statement Page 6 KNKA293,,Carrboro, North Carolina data logger memory for later analysis. The extremely low maximum exposure levels present at the site made rigorous analysis of the measurement data unnecessary. On the ground and inside the equipment shelter, the probe was scanned slowly in a vertical plane over an approximate one-square-meter area to simulate the surface of a human torso. At tight locations inside equipment racks containing cellular transmitters,filters, and combiners, and near transmission lines, there was not enough. space to make whole body measurements. These locations simply were probed to ascertain the electromagnetic field strength present. FINDINGS The exposure level present at each survey location was below the sensitivity threshold of the electromagnetic monitor. Measurements made inside the fenced area were repeated outside the fence with similar results. Thus, exposure at the site inside the tower fence and equipment shelter is less than 0.15 percent of the MPE for controlled environments, the sensitivity threshold of the instrument for controlled environments. At publicly accessible locations outside the fence,exposure was less the 0.75 percent of the MPE for uncontrolled environments, the sensitivity threshold of the instrument for uncontrolled environments. Because of the extremely low electromagnetic field strengths, it was not possible to distinguish cellular signals from ambient electromagnetic noise. Inside the equipment rack that housed the cellular transmittem exposure levels were found also to be below the sensitivity threshold of the electromagnetic monitor. DENNY & ASSOCIATES, P.C. 50 CONSULTING ENGINEERS WASHINGTON, DC Engineering Statement Page 7 KNKA293, Carrboro, North Carolina There were 22 cellular transmitters installed at the site at the time of the survey. Taking into account transmitter power output, transmission line loss, and antenna gain, the effective radiated power of each transmitter is nominally 100 watts. Assuming simultaneous operation of all transmitters, maximum effective radiated power at the site is 2200 watts. Given the height above ground level of the transmitting antennas and the directivity of the transmitting antennas in the vertical plane, the estimated exposure level six feet above ground level at the tower base is less than 0.0003 mW/cm?, which is equivalent to 0.01 percent of the MPE for controlled environments and 0.05 percent of the MPE for uncontrolled environments. CONCLUSION RFR exposure levels measured on the ground and inside the equipment shelter at the KNKA293 site continue to be more than one hundred times less than the protection guides set forth in ANSI C95.1.1982 and the applicable MPEs set forth in C95.1-1992. It is extremely likely that a more sensitive electromagnetic monitor would show the exposure levels to be thousands of times less than the maximums established by the standards. Further, public access to the site is restricted: first, by a fence enclosing the self-storage complex within which the cellular site located, and, second, by a fence enclosing the tower base. Absent any changes to the transmission system, routine measurement of electromagnetic field strengths at the I04CA293 site serves no purpose other than to prove well-established laws of physics by demonstrating that no change in the transmission system results in no increase in the exposure levels present at the site. Because exposure levels are a function of effective radiated power, antenna electrical characteristics, and distance between the antenna and observer, it is quite reasonable DENNY & ASSOCIATES, P.C. CONSULTING ENGINEERS 51 WASHINGTON, DC Engineering Statement - Page 8 IC`TKA293,.Carrboro,North Carolina to assume that there will be no change in the ground level exposure as long as there is no change in effective radiated power, antenna type, or antenna mounting height above ground level. If future measurements at this site aro to be made to verify compliance with the standards, such measurements should be required only if maximum effective radiated power is increased,a transmitting antenna changed or added,or transmitting antenna height is changed more than six feet. The addition or relocation of a receiving antenna should not require a new field strength survey. Robert W.Denny,Jr.,ME. , November 8, 1995 52 JUNE 1995 AMERICAN PLANNING ASSOCiA110N Local Planning Issues in end of last year.That, in turn,has expanded the number of Siting Cellular Towers cellular transmission sires to 17,920 last December from just 384 a decade earlier. In response to both the increasing demand for mobile By Michelle Gregory communication options and a very aggressive lobbying effort by the industry,the FCC opened another portion of the airwaves for In coming months,communities may lose the righc to regulate the industry use.On March 14, the agency completed the biggest siting of cellular telephone cowers,just as that industry is emerging auction in U.S.history, luting three months and costing as a major player in the larger telecommunications industry.The telecommunications carriers S7 billion.The airwave rights were Cellular Telecommunications Industry Association (CTIA) filed a divided geographically into 99 licenses that went to commercial petition with the Federal Communications Commission(FCC) mobile radio service(CMRS) carriers nationwide.The licenses last December that asps for federal preemption of local zoning were awarded to the highest bidders among a combination of powers over cellular cransmission-facilities.—This issue of Zoning older and newly formed companies.The FCC will auction more News aims to acquaint local planners with the impacts,real and licenses later this year to accommodate private mobile radio perceived,of cellular towers.Local siting regulations,staff reports, service(PMRS)carriers,which serve freight transporters,public and telecommunications plans from 15 jurisdictions were reviewed safety entities,citizens band radio,and ham operators.The newly to provide a summary of siting considerations. licensed carriers are already acquiring sites for towers and their Planners should understand that some jurisdictions regulate accompanying equipment buildings.Where a market exists for cellular towers specifically,while others have regulations that cellular communications,local government must be prepared co apply to"communication towers"generally.Wherever possible, deal with siting issues. we have tried to cull examples of regulatory techniques specificCamorr rd cellular The industry's growth to cellular technology.These varying degrees of specificity also }lag has outpaced many local exist in the regulations of many state communications and tower-a solution to governments'ability to public utilities agencies.Planners should learn their state's g_ _ understand the impacts of bureaucratic structure and its definition of communication a cellular towers and, cowers before drafting local regulations. therefore,co properly sire Representatives of the cellular industry were also consulted and regulate them.The for this article.In contrast to the cone of the CTIA petition, situation is further many expressed an eagerness to work with APA and local complicated when residents, communities to educate planners and citizens coward the expressing alarm over the development of safe,fair,and informed regulations. aesthetic and reported health-related effects of Cellular History cellular cowers,prompt In 1974,the FCC expanded the radio spectrum available to the a:.�.._ hasty,reactionary public in order to make-room for budding cellular telecommu- regulation.To avoid writing .V • j nications technology.Through the mid-1980s,the industry , ` '•`A bad law,some communities worked to develop higher-quality uw=iission devices.Cellular have instituted siting technology was first marketed-to consumers in the form of the moratoriums until they have car phone.It presented local governments with the phenomena ample opportunity to of cellular telephone antennas and the rowers on which they am research and formulate mounted—cowers that had to be erected somewhere in the regulations thac are fair to community. Unlike grouvA-wired telecommunications,cellular both the community and technology made it posul&for a caller to travel while commu- the industry. nicacing with someone at a conventional telephone or with Both trends have put another mobile user.Cellular technology,explained in greater carriers on the offensive. derail below,operates on a fixed number of channels that share Thwarted by local"learning the same radio waves.As-a mobile user passes through"cells" curves"and"regulatory that parcel the landscape into a transmitting grid,the caller's barriers"in their efforts to break into new markets,they have connection is"parched"from one cell antenna to the next, sought powerful remedies.The CTIA petition argues that the Twenty,years later,personal communication services(PCS) supremacy clause(section 332)of the 1934 Federal have expanded to include hand-held portable phones and Communications Act authorizes preemption of state and local paging systems,and they are everywhere.A survey in the regulation of cellular tower siting.APA,in a letter to the FCC, January 1993 issue of Consumer Reports reported chat cellular expressed opposition to such preemption.In March,executive technology added an average of 7,300 users per day in 1992, director Michael Barker cold the FCC that local communities bringing the U.S. total to about 10 million.Those numbers and planners are in the best position to balance their concerns have continued to grow,reaching more than 24 million by the with the needs of the cellular industry.The National 53 Association of Telecommunications Officers and and lattice,or self-support cowers,which have three or four Administrators, the U.S.Conference of Mayors,the National sides of open-framed steel supports.Some cellular antennas can League of Cities,and the National Association of Counties have occupy space on ocher types of communication towers when the filed similar objections. engineering is feasible.This is known'as using a donor size to troubleshoot a small gap or dead spot within the grid.A micro- Hafnre of tbo T el6ao16" cell or repeater facility is installed on a preexisting tower to Low-power mobile radio communication,also known as cellular ensure chat transmissions within that area tae clear.Antennas communication,is accomplished by linking a wireless network tan also be placed on roofiops and ocher building features if the of radio wave transmitting devices(portable phones,pagers,or building's height an accommodate their service arcs. In car phones) co the conventional ground-wired communications addition,antennas have been mounted on silos,water tanks, system(telephone lines) through a series of short-range, windmills,and smokestacks.As cellular use proliferates and the contiguous cells that are part of an evolving cell grid. technology improves, the trend coward shorter towers and less For example,a portable phone transmits a signal co the obtrusive mounting fixtures is likely to prevail. nearest cellular antenna.The call is relayed from the antenna to Antennas are of three types:omnidirectional,directional,and the nearesc land-based telephone line or microwave dish,and microwave. Omnidirectional antennas,also called whip then to a central switching computer. From there,.the call is antennas,serve a 360-degree area.Directional antennas,also sent to its destination,either a landrbased telephone via the known as panel antennas or rectangular antennas,are used to land-based line or another mobile communiadon device via the achieve transmission or reception in a specific direction. closest cellular antenna. Microwave antennas are used to link different types of Calls can originate or be received from a wireless source telecommunications facilities,such as when a portable phone bemuse antennas share a faced number of frequencies across the user calls a conventional telephone number. cellular grid.In other words,while a caller may dial her destina- tion number from within the radius of one cell antenna,she may Screening, Landscaping, and Setbacks travel into the radius of another during the call.The call proceeds The most common objection to cellular cowers and antennas is uninterrupted as the transmission is"patched"from one antenna their aesthetic impact.Residents,many of whom use the co the next.While the caller is moving,the cellular antennas are technology,do noc want to see the towers cluttering their automatically locating an unoccupied frequency on the next landscape or degrading property values.Planners and industry antenna, thus enabling continued transmission. professionals have gone to great lengths to screen,conceal,and When a caller cannot successfully place or maintain a call, set back cowers and their associated buildings.All the either he is our of range or the nearest antenna is at full ordinances reviewed contain some sort of requirement for capacity.Cellular tower technology differs from satellite, maintaining existing vegetation or installing landscaping for the microwave,or land-based communications in that its based on purpose of screening the base of the tower and the storage a network of short-range cell sites with a fixed capacity.If the building.Towers can also be camouflaged to blend with the cells are not linked by cellular towers,microwave dishes,or surrounding environment through the use of color, materials, ground-wired towers,transmission will fail.Similarly,if a cell is and design. For instance,Jefferson Parish,Louisiana,requires crowded by coo many users,is must be"split"into two cells, that all cellular towers be disguised as trees: each having its own radius:thus,only the cellular antennas of 1.The entire facility must be aesthetically and architecturally separate carriers can share space on the same tower.It is compatible with its environment.The use of residentially physically impossible for a single carrier to deliver service compatible materials such as wood.brick,or stucco is successfully if its antennas are not dispersed. required for associated support buildings,which shall be Most local regulations require that all technically available designed to architecturally match the exterior of residential space on existing cowers within the jurisdiction be used before structures within the neighborhood.In no rase will metal new towers are erected.In other words,cellular carriers must _ _ernriocs be allowed for accessory buildin . lease space to ocher carrier:on their towers:the cellular indusay --2.The cower itself must be of such design and creaced avidLan considers this leasing arrangement to be a less-than-ideal architectural material so that it is camouflaged to resemble a solution.As the demand for cellular telecommunications woody tree with a single trunk and branches on its upper put. increases,cells in a given area must be subdivided,or additional carriers must be permitted to opetare there.The end result is the Setback distances can be guided by aesthetic and safety need for more towem concerns.Most are expressed as a percentage of the tower height.In ttrg-Pensacola,Florida,ordinance,the setback serves a Towers mad Awlemeas primarily aesthetic purpose: Towers may need.to nn¢in hertz from 50 to 200 feet so that (Tlhe distance between the base of the communications towers antennas can overcome the challenges posed to communications and any residential zoning district or any historical or by local topography.The requited height is usually proportional to architecturally significant building must equal 20 percent of the a combination of the distance antennas can cover and the demand cower height. within their radius:Higher cowers generally cover a larger geographic area,but have a lower service demand,and are known Safety-oriented setbacks establish a dear zone for falling as coverage sites.Shorter cowers.known as capacity sites,cover cower debris or the worst-case scenario,the cowers collapse. smaller areas with a more concentrated demand.Tower height can Falling zones for towers vary with their design.At most,they also vary according to engineering requirements for a specific site will collapse to a distance equal to their full height,but many or the technical capabilities of the antennas being mounted. are designed to collapse first toward their base.The Oldham In addition co dedicated.free-sanding cellular cowers County,Kentucky,setback provisions are designed with falling (monopoles),there are guyed towers(anchored with guy wires) zones in mind- 2 54 Towers 100 feet or more in height shall be located on the lot so warts, the typical cell site emits 100 watts of power or less, that the distance from the base of the cower to any adjoining sometimes as little as 10 in urban areas. property line or supporting structure of another cower is a It should be noted that some ordinances,like Multnomah minimum of 100 percent of the proposed cower height. No County's,include provisions that automatically apply more variance shall be granted from this minimum setback stringent standards if chose are ever issued by the federal requirement.Towers.less than 100 feet in height that cannot government. For more information about the relationship of satisfy this 100 percent setback requirement may be approved P by the board,provided that the applicant present a certification cellular communications to EMFs,planners may consult the from a registered engineer chat the cower will withstand winds Electromagnetic Energy Association, 1255 23rd Sr.,NW. of 100 miles per hour. Washington. DC 20037; 202-452-1070. EEA is a nonprofit group representing corporations and individuals associated with Some communities also determine setbacks by what are industries chat use non-ionizing EMFs. considered acceptable levels of electromagnetic radiation. Oldham Count/;Jefferson Count/,Colorado; Multnomah For M o r e Information Count/, Oregon;and King County,Washington,all have specific provisions related co the electromagnetic fields(EMFs) o n EMFs . s generated by the new cower.The Jefferson County ordinance requires a complete non-ionizing electromagnetic radiation 1 (NIER) analysis with every cower application. o assist local governments in developing regulations for siting cellular towers,the American Elaetremagnotle Eirslds rQnal Standards Institute his published the The health risks associated with EMFs have been the second ��Tndt o f the institute of Electrical and Electronics greatest source of communiey opposition to the siting of cellular Engineers in IEEE Standard for Safety Levels with Respect g to Human Exposure to Radio Frequency Electromagnetic phone cowers for reasons related co both personal safety and the ,Fields,3g1'I to 300 GHz. 1992(ANSUIEEE C.95.1-1992 perceived impact on property values. EMFs are divided into two (Redesgnation as ANSUIEEE C95.1-19911).Another basic categories.Ionizing radiation includes X-rays and gamma useful ANSI document is Recommended Practice for the rays.Non-ionizing radiation,the category to which cellular Measurement of Potentially Hazardous Electromagnetic communication devices,radio and TV broadcasting antennas, Fields—RF and Microwave(ANSVIFEE C95.3-1992)• and sacellice stations belong,is considered less powerful because Order from American National Standards Institute,11 it does not strip the electrons from atoms and molecules to form W 42nd St•;New York,NY 10036;212-642-4900.Also highly reactive panicles known as ions.Instead,it harnesses see the IEEE position statement,'Human Exposure to energy gen-erated from the vibration of molecules to convey Radiofrequency Fields for Portable and Mobile Tele- information or,in the case of microwave ovens or electric phones and Other GOnvou""adow Devices,1992." t predates blankets, to create heat. Though the advent of cellular communi- cations,a good source for general information on the Since 1979,scientists have conducted morq than 1,000 regulation of radio and television towers is PAS Report studies,some of which have linked non-ionizing #384,Regulating Radio and TV Towers,by Beverly electromagnetic field sources to higher incidences of cancer Bookin and Larry Epstein(Chicago:American Planning among children living in close proximity to an EMF source. Association, 1984).For more information on EMFs in However, these studies,often cited in opposition co the siting of enera1,consult PAS Report#43S,Electrorna netic power lines and communication antennas,have also been found Ws and Land-Use Cabawls,by inconclusive because they were unable to isolate their findings a Ma Connelly( 1ni Co a single EMF source.This is because most homes ate equipped with a variety of modern appliances chat generate o 3 3Q 2 varying EMF levels.No scientific study has shown a specific correlation between cancer and the NIER levek Vrferakd Gy a cellular communication faciUry or device.Likewise,no scientific ` research his proven them to be completely safe. > The cellular radio system operates in the 800-900 megahertz (MHz)ultra-high frequamy band,formerly used for UHF C"her Standard Previsions television broadcasting,CArrendy there are no general federal Colocatiors.In order to minimize Cower proliferation,most guidelines for what is considered acceptable public exposure to communities require applicants to exhaust all possible avenues radio-frequcnry-emitted radiadon.The U.S.Environmental for sharing space on-existing Cowen,usually in a section of the Protection Agency is developing such standards,but,in the ordinance on coloration or shared cue.Faxon that determine meantime,many communities ate relying on the American feasibility include available space on existing towers,the cower National Standards Institute for professionally acceptable radio owner's ability to lease space,the rowels structural capacity, frequency emissions standards for all types of communication radio frequency interference,geographic service area towers(see box on page 3). Many of the ordinances we reviewed requirements,mechanical or electrical incompatibilities.the incorporate the ANSI standards into their review process and comparative costs of coloation and new construction,and any approval requirements.Though coo detailed to list here.they FCC limitations on cower sharin& present acceptable levels of NIER exposures from cowers Many ordinances name the regional or state communications operating at various frequencies. division responsible for tracking the availability of suitable Of all transmitting facilities,cellular towers typically operate sharing space on towers.Local regulations should be developed at the lowest power levels.While a television cower emits up to in tandem with such agencies. In Palm Bea h y.Florida-t, 5 million warts,and commercial radio stations up to 100,000 tower applicants must send a certified mail announcement to all 3 55 other cower users in the area,stating cheir siting needs and/or Where the site abuts or has access to a collector and local street, sharing capabilities in an effort to encourage tower sharing. access for maintenance vehicles shall be exclusively by mans of Applicants cannot be denied or deny space on a tower unless the collector street. mechanical,structural,or regulatory factors prevent them from Parking requirements generally do nor apply to cellular sharing. In ocher words.competing carriers cannot lock each cowers. For chose communities that require parking,the ocher our of territory:The ordinances for Jefferson Counry, provision applies to an overall"communication cower facility- Oldham County,Multnomah County,and Palm Beach.County ordinance in which spaces are required only when the offer derailed examples of sharing provisions and leasing terms. equipment building is staffed. Structural Intrrity and Inspection.Most ordinances require Lighting and Security Lighting for communication cowers is chat any new or modified cowers be certified by an engineer accord- required when the cower is tall enough to concern the Federal ing to structural standards for antennas offered by either the Elec- Aviation Administration(FAA).Jefferson Parish acknowledges ironic Industries Association or the Telecommunication Industry FAA regulations and the privacy of neighboring properry owners: Association. Inspection schedules seem co vary widely according to When lighting is required and is permitted by the Federal the type of cower;as in this provision from Jupiter,Florida: Aviation Administration or other federal or scare authority,is Inspections—The town council may require periodic inspections shall be oriented inward so as not to proiect onto surrounding of communication cowers to ensure structural ins wry•Such residential proper. inspections may be required as follows:a)monopole cowers—at Others,in more urban areas,may require full review and least once every 10 years;b)self-support towers—at least once certification of the tower application by their local airport every five years;c)guyed towers—at least once every three yean. authority.This provision is from Palm Beach County- Inspections shall be conducted by an engineer licensed by the state of Florida.The results of such inspections shall be provided Prior to the site plan certification,the applicant shall provide co the director of community development.Based upon results of documentation that the proposed communication tower has been an inspection,the town council may require repair or removal of reviewed and is not determined to be a haurd by the FAA,.. a communication cower. (via)the Palm Beach County Department of Airports....The PBCDOA shall review the non ssiu asation tower application co Equipment Buildings and Lot Sint Cellular towers are often determine if is is a hward ca any FAA flight paths. accompanied by a small,usually unscaffed storage building that houses transmitting equipment.Some ordinances crear them as Some ordinances also require fencing or signage.Jupiter accessory uses or structures,while others specifically sure that requires a six-foot safety fence with a locked gate. If high voltage they are not. Most require some setback from adjoining is necessary,signs must be posted every 20 feet,saying, property lines; the required setback is usually proportional to "Danger—High Voltage."The operator must also post"No the area's density.Oldham County seeks to discourage more Trespassing"signs. intense use of the site: Abandonment Most ordinances also restrict the time in ('I'jhese facilities may not include offices,long-term vehicle which an unused cower may stand to between six and 18 storage,other outdoor storage,or broadcast studios,except for months,with some requiring the tower applicant co cover the emergency purposes.or other uses chat are not needed to send demolition costs. or receive transmissions. Application A quirmsertts Perhaps the most telling section of any ordinance is its application requirements.Although some Lot sizes for cellular sites are usually the minimum for the communities do not list these separately,doing so lets the district in which they will be built. applicant know exactly what must be provided and indicates Maintenance and Parking A few ordinances include how much the community(snows about the impacts of cellular standards for facility maintenance and parking.The phone cower siting.These requirements should be clearly stated Multnomah County ordinance has the most extensive treatment and not impossible to fulfill.Jefferson County offers an of maintenance im�aca: _ excellent explanation of what it iiigiur—a m any cower Equipment at a transmission facility shall be anwm aced w the--- --applicant.and its provisions demonstrate serious research by the greatest extent possible w reduce uaEFie and congestion.The planning department and other local agencies.R—cdc of this applicant shall describe anticipated maintenance needs. ordinance and its aecompanying,_"Low Power_Mobile Ridio__ including frequency of5avilce.personnel needs,equipment ocaaonsTd Use Plan Addendum"is recommended needs,and traffic.wim or safety impacts of such maintenance. fcr anyone dealing with cellulai'sidng iisiues. - -- - Meeting the Challenge Zoning MOW$is a monthly published by the American Planning Association. Any cellular carrier seeking co locate in a community is prepared Subscriptions are available fix$45(U.s.)a"S%(foreign). to deal with siting controversies.Some corporations have even Michael B.Barker.Executive Director:Frank S.So.Deputy Executive Director. William R.Klein,Director of Romansch. gone so far as to pay for retaining a third-parry consultant to Zoning Mery is produced at APA.Jim Scrub.Editor:Michael Barrette.Dan giver.Fay review anything they have helped draft.These firms target sites Doinick.Michelle Gregory.Sanjay Jeer.Beat McGuire.Maya Morris.Chub smith for acquisition based on their topographic efficiency,their Report..,;Cynthia ChcsW.Assistant Editor Lin Barton.Dings and Production. accessibility by road.the availability of electric power and land- Copyright 01995 by American Planning Association.(313 L 60th St..Chicago.IL based telephone lines,their leasability,preexisting vegetation and 60637.The American Planning Association has headquarters o(Eces m 1-6 Massachusetts Ave..N.W..Washington,DC 20036- screening potential,existing zoning,compatibility with adjacent All rights reserved.No part of this publication may be reproduced or utilised is any land uses,and their ability to transmit to the largest area. form or by any means,electronic or mechanical,including photocopying.recording. If local governments show chat they an meet most of these or by any information storage and retrieval system,without permission in writing needs while preserving their rnmmuniry's aesthetic integrity, from the American Planning Association. Printed on rtrnled paper.including 50-704b recycled fiber health,and safety, they should be able to avert federal and 10%postconsumer waste. ® preemption of their local rights and responsibilities. 4 DRAFT PUBLIC HEARING MINUTES 5/28/96 56 6 1 west and Mill House Road to the east and is located at the north intersection of these two roads. The 2 28.46 acre tract is currently zoned NC-2. The applicant proposes to rezone approximately 4.8 acres of the 3 tract to RB (Rural Buffer). 4 Commissioner Gordon asked why they want the rezoning and Eddie Kirk said that the 5 applicant has indicated his intention to apply for a Class B Special Use Permit for a communications tower. 6 However, the staff has not received an application. 7 8 THE PUBLIC HEARING WAS OPEN FOR CITIZEN COMMENT 9 JERRY EATMAN spoke on behalf of the applicant. He stated that this application is 10 consistent in all respects with the code. Mr. Tapp has been approach by a company to buy this property for 11 a communication tower, though the project is not guaranteed. 12 NEAL TAPP said thatthis property is in the woods and this use would cause the property to 13 remain wooded and the tower would not be seen from the road. 14 EVE OLIVE, President of the Emerson Waldorf School, which is close to this area, said that if 15 there is going to be a telecommunications tower on this property, she is concerned about the health impact 16 on the children. She stated that there has been a lot of evidence concerning the high incidence of leukemia 17 in children living near power lines. She asked that this health impact be stated in the Zoning Ordinance and 18 that the regulations limit the proximity of radio towers to areas where there are large numbers of younger 19 children. 20 21 County Attorney Geoffrey Gledhill clarified that the County Commissioners have a 22 responsibility to look at all the possible uses in making their decision on a rezoning. The Board would be 23 endorsing these uses if they approve the rezoning request. 24 A motion was made by Commissioner Willhoit, seconded by Commissioner Crowther to 25 refer this item to the Planning Board for a recommendation to be returned to the Board of County 26 Commissioners no sooner than August 5, 1996. 27 VOTE: UNANIMOUS 28 29 (b) Z-3-96 Buckhom Road Economic Development District Expansion 30 (HEARD ABOVE WITH 2b) 31 32 4. Zoning Ordinance Text Amendments 33 (a) Telecommunication Towers 34 1) Article 4.3 Permitted Use Table 35 2) Article 8.8.17 Radio and Television Transmitting and Receiving Towers and 36 Elevated Water Storage Tanks(Class B Special Use) 37 3J.Article 8.8.17a Telecommunication Towers (Special Use Permit requirements) 38 4).Article 6.3.1 Principal Uses 39 _ 6) Article 6.18 Administrative Approval of Stealth Telecommunication Towers 40 (new) 41 Planter Mary Willis presented the information for this item. She summarized her response tc 42 the concerns heard at the November 27, 1995 public hearing. She outlined the changes in this proposal 43 which are listed in the agenda abstract. 44 In answer to a question from Commissioner Gordon, Mary Willis said that all the changes wit! 45 the exception of the notice to citizens are less stringent. She clarified some of the new language used in 46 the proposed changes. 47 In-answer to a question from Chair Carey about a study showing adverse health impacts fron 48 communication towers, Mary Willis said that everything she has read indicates that there is no identifiable 49 health risk associated with communication towers. She will provide documentation to the County 50 Commissioners. 51 County Attorney Geof Gledhill stated that he feels that the 1995 Cable Communications Act 52 takes the County Commissioners out of the business of making a decision based on safety issues 53 concerning communication towers. Congress made the decision that they were safe. He will provide 54 information to the Board on this issue. DRAFT PUBLIC HEARING MINUTES 5/28/96 57 7 1 Karen Barrows asked about the minimum setback and Mary Willis said that the full setback of 2 100%will be required. However, if the adjacent property owner did not object to a lesser setback, that 3 could be approved. This provides for flexibility. 4 Renee Price noted that there have been studies about health impacts from communication 5 towers and that sho is also concerned about this issue. 6 S.A.M. Brooks asked about the setbacks for the adjoining property owners and noted that it 7 would be difficult to know the impact on adjoining property until after the tower is.built Mary Willis indicated 8 that they do have photographs which help in determining what impact towers of varying heights would have 9 on adjoining property. 10 In answer to a question from Margaret Brown, Mary Willis said that the 500 foot notice is from 11 the boundaries of the property on which the tower would be located. 12 13 THE PUBLIC HEARING WAS OPEN FOR CITIZEN COMMENTS 14 15 EVE OLIVE reiterated the views she expressed earlier about the health dangers of communication 16 towers and asked that this issue be addressed and considered for including in the regulations. 17 ALBERT BENSHOFF, Associate General Counsel for 360 Degrees Communications Company, 16 which used to be Sprint Cellular,made reference to several sections and made comments. 19 20 (1) 8.8.17a.1 requires"a listing of all towers within a one mile radius for towers which are 200 21 feet or taller." He noted that most search ranges for towers are 1/4 mile. He has no problems with 22 providing any reasonable information for other towers within their search range. However, any information 23 on towers outside of that search range is irrelevant for determining sharing of towers or minimizing the 24 number of towers. He suggested that the information be limited to information within the search range. 25 (2) 8.8.17a1(d) requires that "the applicant provide a laundry list of information on all 26 existing towers in the search range and assess whether the existing tower could be structurally 27 strengthened or whether the antennas'transmitters and related equipment could be protected from 28 electromagnetic interference, and generally describe the means and projected cost of shared use of the 29 existing tower." He said that they are prepared to provide that information. He suggests that they may want 30 it only if it is relevant. For example, 0 a tower owner refuses to lease space on an existing tower at a 31 commercially reasonable rate, it is really unnecessary for the County to receive that information. These are 32 fairly detailed and expensive engineer studies. 33 (3)6.3.1 of the Subdivision Ordinance- Principal Uses-to his knowledge, this is the only 34 County that interprets the General Statutes to require that leased property be subject to the Subdivision 35 Ordinance. Most cell sites are on leased property. He requested some relief from this interpretation. 36 37 With reference to residential setbacks, he understands that setbacks may be reduced to no 38 less than the tower height if easements for the remainder setback distance is granted by adjoining property 39 owners. An easement'is a property right which must be negotiated and purchased. 40 41' BARM JACOBS, Caretaker of Mooreflelds in Hillsborough, applauded the County for their 42 efforts in regulaftft a towers. The OWASA Board, of which he is Chair, have had an occasion to deal 43 with a request art an of their water tanks,which they approved. He has some concerns with removing the 44 requirements for"Unreasonable Interference with View". He suggested that the wording"significant 45 adverse impact be used instead of"Unreasonable". He suggested that under the"Special Use Permit 46 Findings" where reference is made to adverse impacts on contiguous property, that contiguous property_ 47 may not be the only property that is adversely impacted. Therefore, this would not be a consideration 48 under a Special Use Permit. The idea that maintenance and enhancement of property values is 49 maintained is subjective.. He suggested that the County may want to actually use balloons to help 50 visualize how high the tower would be and what it may impact from that height. With reference to health 51 effects, they found that there are no proven health risk from communication towers. 52 DRAFT PUBLIC HERING MINUTES 5/28/96 58 8 1 A motion was made by Commissioner Gordon, seconded by Commissioner Willhoit to refer 2 this item to the Planning Board for a recommendation to be returned to the Board of County Commissioners 3 no sooner than August 5, 1996. 4 VOTE: UNANIMOUS 5 6 Commissioner Willhoit asked that the communication companies be requested to provide 7 information on the health impact of communication towers --what the standards are, energy level, and if 8 they are directional or focused and the power level compared to the standard. 9 10 Mr. Benshoff added that what the Communications Act of 1996 does is establish a safety 11 standard. It does not take the County out of the business of regulating it. It says that the American National 12 Standards Institute, the Institute that sets safety guidelines for everything from towers to bicycle helmets, 13 has established a safety standard where all this evidence we have been referring to indicates it is safe. 14 What the Telecommunications Act says is that the County must look at this standard and use that standard 15 and so long as the facility meets that standard, that it is the standard applicable for local governments. 16 17 18 ADJOURNMENT 19 A motion was made by Commissioner Willhoit, seconded by Chair Carey to adjourn this meeting to 20 June 26, 1996 at a meeting that begins at 7:30p.m. at OWASA in Carrbom. The items listed below will be 21 heard at that time. 22 VOTE: UNANIMOUS 23 24 25 (b) Article 6.16.6 Regulations Concerning Home Occupations 26 27 (c) Article 8.8.24 Special Uses- Use of Historic Structures 28 29 (d) Economic Development District Design Manual 30 (HEARD ABOVE WITH 2b) 31 32 33 5. Subdivision Regulations Text Amendments 34 (a) Section III-C4 action Subsequent to Approval (minor subdivisions) 35 36 (b) Section ill-D-3(c) action Subsequent to Approval (major subdivisions) 37 38 ADJOURNMENT: 39 A motion was made by Commissioner Willhoit, seconded by Chair Carey to adjourn this meeting to 40 June 26, 1996 to begin at 7:30 p.m. at OWASA in Canboro. The remaining items will be heard at that 41 time. 42 VOTE: UNANIMOM 43 44 Moses Carey, Jr., Chair 45 46 Beverly A. Blythe,-Clerk 47. 48 59 Brooks asked if the Planning Board could decide the use of lot 16 if no perc site is found. Cameron responded a significant design change would require reconsideration. Price asked when phases III and IV would be submitted. Cameron responded that Phase III will be the 23 acres that has already been submitted as a concept plan which is about to expire. If it does expire,it will come in later under the new provisions. Price continued expressing concern with the road system. Cameron responded that on the concept plan there were two cul-de-sacs in Phase III. Once all of the soils work is completed,densities may change and the roads may not be built as shown on the concept plan. Price was concerned with the amount of traffic being dumped onto Bacon Road. Cameron noted that due to the soils and stream buffers there would not be as many as twenty lots. MOTION: Barrows moved approval as recommended by the Planning Staff. Seconded by Hoecke. VOTE: Unanimous. AGENDA ITEM#9: MATTERS HEARD AT PUBLIC HEARING 5/28/96 a. Zoning Ordinance Text Amendments (1) Telecommunication Towers Presentation by Mary Willis. Concern with the increasing number of telecommunication towers has been raised locally and nationwide by citizens,advisory boards and governing boards in recent years. At the November 27, 1995 public hearing,the Orange County Board of Commissioners and Planning Board received citizen comments on a proposed amendment to Special Use Permit provisions relating to telecommunication towers. The speakers at the public hearing included five industry representatives and one Orange County resident. On January 18, 1996,the Ordinance Review Committee,as well as another interested Planning Board member and a member of the Board of Adjustment met. with the telecommunication providers who spoke at the public hearing. The purpose of the meeting was for the Committee to gain an understanding of issues and technical concerns raised at the public hearing and to consider modifications to the proposal which would address those issues while maintaining the purpose and intent of the proposed amendment. One of the major issues raised at the public hearing concerned the potential health effects of electro-magnetic radiation. The telecommunications Act of 1996(Section 704(B)(iv)and the Federal Communications Commission New National Wireless Tower Siting Policies (Section 1.1307(b))prohibit denial of a cellular telephone facility on the basis of health effects if it meets applicable standards issued by the American National Standards Institute(ANSI). Studies conducted in 1994 and 1995 for a 360 tower located at 515 South Greensboro Street,are on file in the Planning Department. Conclusions of the 1995 study state that"exposure levels measured on the ground and inside the equipment 60 shelter.....continue to be more than one hundred times less than the protection guides set forth in ANSI C95.1-1982.....It is extremely likely that a more sensitive electromagnetic monitor would show the exposure levels to be thousands of times less than the maximums established by the standards...." Information from the American Planning Association regarding electromagnetic fields associated with communication facilities is also on file in the Planning Department. It states that no scientific study has shown a specific correlation between cancer and cellular communication devices.Likewise,no study has conclusively proven them to be safe. It has not been possible to obtain conclusive evidence thus far because most homes are equipped with a variety of appliances that generate electromagnetic fields,therefore it is difficult to isolate the effect of any single source. The amendment presented for public hearing in May 1996 did not include the previously-proposed requirement that the"tower and antenna will not unreasonable interfere with the view of or from any historic site,scenic road or major view corridor". Staff had recommended that the provision be deleted due to the difficulty in defining or interpreting"unreasonable interference". One citizen who spoke at the public hearing suggested that instead of being eliminated,the wording be changed to"significant adverse impact". This recommended change is incorporated in the proposed text. It was also suggested that balloons be used to help visualize the height of the tower in order to determine its visual impact. The proposed application requirements have been revised to include a provision that a balloon be floated at the proposed tower location to the maximum height of the tower,and that photographs be taken from areas such as property lines,and nearby residential areas and roadways. One representative from the telecommunication industry spoke at the public hearing. He expressed opposition to providing detailed information regarding co-location efforts for towers outside of the search range,as well as to information which may not be relevant(such as detailed structural information where the tower owner has refused to lease space on a commercially reasonable basis). Other concerns cited included tower setbacks,and the application of subdivision requirements to tower sites. (It has been determined that subdivision approval is not required for leased tower sites.) Additional comments concerning industry concerns are included in letters on file in the Planning Department. The Planning Staff has incorporated changes in the proposal as presented at the May 28, 1996 public hearing in response to comments received through the public hearing process. 1) Add 8.8.17.2(l)(Standards of Evaluation): The tower and antenna will not result in a significant adverse impact on the view of or from any historic site,scenic road,or major view corridor. 2) Add 8.8.17a.1(h)(Additional Information): In addition to the information required in subsections 8.2 and 8.8,the following shall be submitted as part of the application...(h)Photographs shall be taken from locations such as property lines,and/or nearby residential areas,historic sites,roadways,including scenic 61 roads and major view corridors,and other locations as deemed necessary by the Planning Staff to assess the visual impact of the proposed tower. 3) Revise 8.8.17al(d)to clarify that tower height is measured from ground level to the highest part of the support structure. 4) Add 8.8.17a.2(n)to require that compliance with FCC emission standards be demonstrated by including monitoring through periodic testing of equipment and submittal of results to the Planning Department. The Planning Staff recommends approval of the proposed amendment,including the revisions identified. (The proposed amendment and revisions attachments to these minutes on pages ) Willis introduced Jerry Eatman of North Carolina General Counsel for Sprint Cellular and Gray Styers as regional counsel for BellSouth,indicating they would answer questions from the Planning Board. Letters from these representatives are attachments to these minutes on pages Mr.Eatman expressed concern regarding information requirement on existing structures. If the owner of an existing tower refused the request for co-locating,and would not allow access to the tower,analysis could not be done to provide the additional information required on the existing tower. Jobsis asked how Staff would respond to such a concern. Willis responded that if such was the reason for being unable to provide that information,then documentation from the applicant would indicate a good faith effort on that part and would be accepted. Brooks asked if there could be another approach. Could the County require that those who have towers on their property give permission for other users for the same tower. Barrows noted that one of the proposals is that for new towers a letter be presented stating that the tower will be shared. It was agreed that requirement could be made of new towers,but not of existing towers. Jobsis asked how it is determined when a tower is full up to capacity. Willis responded that would depend upon what the structure would support and whether it is feasible to do so. Mr.Eatman agreed and noted that the increased need will cause users to want to make the maximum use of existing facilities/towers. He also noted that new towers will be designed to make maximum use. Brooks asked if it would be in the economic best interest of telecommunications companies to"tap on"to an existing tower and improve it to today's standards. Mr.Eatman responded that it is almost always to their benefit to locate on an existing facility. Mr.Styers agreed noting that almost all mobile communicators in North Carolina have agreements with each other to allow and encourage co- location. Barrows asked about Mr. Styers' concern in his letter regarding co-location on an existing structure that was not in compliance and having to meet additional setback requirements. Willis responded that the concern with this issue is increasing the amount of non-conformity by further reducing the setbacks. If placing equipment on an existing structure did not make it more non-conforming that would be another issue. Mr.Styers noted that he felt some allowances should be allowed in such instances and Willis agreed. Willis continued that wording to the effect that height 62 would not be increased on existing non-conforming structures would address this concern and Mr.Styers agreed. Strayhom asked if a tower is removed whether another tower could be placed on the site or must the entire process be followed again. Willis responded that the entire application process would have to be followed to place a tower on'a site where one has been removed. Strayhom asked what could occur in the fall zone around the tower. Willis responded that the fall zone had been replaced with specific setback requirements. MOTION: Strayhom moved to approve the proposed amendment as recommended by the Planning Staff. Seconded by Hoecke. VOTE: Unanimous. (2) Article 6.16.6 Regulations Concerning Home Occupations Presentation by Mary Willis. This item is to consider a proposed amendment to Zoning Ordinance provisions relating to home occupations. The existing home occupation regulations are contained in Article 6.16.6.1 through 6.16.6.4. Concerns with home occupation provisions have been raised on several occasions in recent years,particularly in relation to the type of activity allowed and the location of accessory buildings. Proposed revisions were presented for public hearing in 1992 and 1995,but were not adopted due to the preference of the Board of Commissioners to deal with the home occupation provisions as a whole,rather than modifying particular standards. The proposed amendment seeks to clarify the intent of home occupation regulations, provide greater emphasis on performance standards,and simplify the text. The proposed amendment was presented for public hearing on June 26, 1996. One citizen spoke in opposition to the amendment. Concerns expressed included the restrictions on size and appearance of accessory buildings,and the size limitations for delivery trucks,particularly for home occupations which would be located on very large parcels and would have no impacts on the surrounding properties. The Planning Staff recommends approval of the proposed amendment(copy an attachment to these minutes on pages ) Strayhom expressed concern with treating a small lot the same as a larger lot. Strayhom continued that many farmers have a welding business located on their farms and the supplies needed for such a business could not be delivered in/on a pickup truck. Willis responded that one of the greatest issues regarding home occupations has been the issue of traffic and the size of vehicles. That is the reason for trying to address vehicle size in the proposed amendments. Traffic impact has been one factor to help determine whether an occupation qualifies as a true home occupation. a .QA) - /9 �G - C3 3 9 ,�1 rg G The Board approved proceeding with construction activities related to placing earth and rock fill in the existing "borrow pit" area within the planned Eno Riverfront Park in the County's Hillsborough campus area. VOTE ON THE CONSENT AGENDA: UNANIMOUS ITEMS REMOVED FROM THE CONSENT AGENDA E. ZONING ORDINANCE TEXT AMENDMENT -HOME OCCUPATIONS A motion was made by Commissioner Gordon, seconded by Commissioner Crowther to add to the end of Section 6.16.6.2(c)(4) language which would indicate that the residential accessory structure must have been in existence for at least thirty-sic months before September 3, 1996. VOTE: AYES, 2; NOES, 3 (Chair Carey, Commissioner Halkiotis, Commissioner Willhoit) A motion was made by Commissioner Crowther, seconded by Commissioner Willhoit to approve the proposed amendment per the Planning Board recommendation, except for the proposed revision to Article 6.16.6.2b(3). With respect to ;6.16.6.2b(3), the Administration recommends the following: There shall be no use of a vehicle with a load capacity in excess of one ton in connection with the home occupation, including vehicles used for delivery or pick-up. Vehicles with the permitted load capacity generally include large pick-up trucks, and delivery trucks and vans such as those used by UPS, but would not include vehicles such as tractor trailers or dump trucks. VOTE: UNANIMOUS G. ZONING ORDINANCE TEXT AMENDMENT -TELECOMMUNICATION TOWERS The Board discussed the height of towers requiring administration approval. A motion was made by Commissioner Crowther, seconded by Commissioner Gordon to lower the height of towers which may be approved by the administration to 120 feet. VOTE: AYES, 2; NOS, 3 (Commissioners Carey, Halkiotis and Willhoit) After ensued discussion, a motion was made by Commissioner Halkiotis, seconded by Chair Carey to table this item for further consideration at a future meeting. VOTE: UNANIMOUS APPOINTMENTS Industrial Development Review Board Authority Commissioner Gordon asked about staggered terms to run concurrently with the Economic Development Commission appointments. Economic Development Director Ted Abernathy explained that the terms will end at the same time the persons term ends on the EDC. A motion was made by Commissioner Crowther, seconded by Commissioner Halkiotis to appoint the following individuals with the terms as indicated below: Ed Siebert for a term ending 6/30/97 Bill Bracey for a term ending 6/30/98 R. Keith Coleman for a term ending 6/30198 Lilyn Hester for a term ending 6/30/97 Bev Webb for a term ending 6/30/98 Cathy Carroll for a term ending 6130/98 Stuart Wallace for a term ending 6/30/97 VOTE: UNANIMOUS IX. ITEMS FOR DECISION - REGULAR AGENDA A. SIBLING PINE ESTATE PRELIMINARY PLAN Planner Eddie Kirk made this presentation. The property is located in Eno Township on the east side of Pleasant Green Road. It is zoned Agricultural Residential and Lower Eno Protected Watershed. The property is wooded with large residential lots to the north and south. The tract is 30.64 acres in size with seven (7) new residential lots proposed that average 4.38 acres in size. Each lot will have an individual well and septic system.