HomeMy WebLinkAboutAgenda - 05-28-1996 - C2(b) ORANGECOUNTY
BOARD OF COMMISSIONERS
PUBLIC HEARING AGENDA ITEM ABSTRACT
Meeting Date: May 28, 1996
Action Agenda
Item# C 2 C 1
SUBJECT: LAND USE PLAN AMENDMENT
CP-3-96 Buckhorn Road Economic Development Activity Node Expansion
ZONING ATLAS AMENDMENT
Z-3-96 Buckhorn Road Economic Development District Expansion
ECONOMIC DEVELOPMENT DISTRICT DESIGN MANUAL AMENDMENT
DEPARTMENT: PLANNING PUBLIC HEARING_X—Yes No
BUDGET AMENDMENT REQUIRED Yes_X—No
ATTACHMENT(S): INFORMATION CONTACT:
Mary Willis
Map of Proposed Expansion Extension 2583
Proposed EDD Design Manual Amendement
Citizen Comments from Information Meetings TELEPHONE NUMBERS:
Hillsborough -732-8181
Durham -688-7331
Mebane -227-2031
Chapel Hill -967-9251
PURPOSE: To receive citizen comment on expanding the boundaries of the Buckhorn Road
Economic Development District to include area at the southeast quadrant of I-85 and
Buckhorn Road.
BACKGROUND: The Board of Commissioners adopted as one of its goals for the 1995-96 fiscal
year the possible expansion of the Buckhorn Road EDD to include area on the
south side of I-85. The total study area considered for inclusion in the EDD is
bounded by Buckhom Road to the west, West Ten Road to the south, I-85 to the
north and the boundary of the Upper Eno Critical Area to the east. The study
area is now designated in the Land Use Element of the Orange County
Comprehensive Plan as a Commercial/Industrial Activity Node, which allows
property owners to request rezoning to certain commercial and industrial zoning
districts. Property included in an Economic Development District will not need
to be rezoned at the time of development if it is developed in accordance with the
Economic Development District Design Manual.
Expansion of the EDD west of Buckhom Road, south of I-85, will be
considered after obtaining input from Mebane concerning cooperative planning
efforts.
60
Input from Community Meetings
Community meetings to discuss the possible expansion of the Buckhorn Road
EDD were held on March 12 and April 23, 1996. Notices of the meetings were
sent to about 200 property owners. Twenty-seven citizens attended one or both
meetings. A summary of their comments is attached. Most of the comments
related to effects on the existing residential character, and the extension of water
and sewer service.
• Some of the group supported expansion of the EDD and the rezoning of their
property.
• Some of the group did not want to see any change to the residential character
of the area, and indicated that they would support changing the Land Use
Plan designation to allow only residential use.
• , Others were not opposed to non-residential development, but wanted some
assurance of when development would occur before rezoning the property.
They did not want to lose the potential for residential development if it would
be a long time before non-residential development would happen,
• There was considerable discussion about water and sewer extension. Several
believed that the County should extend water and sewer to the area in order
to attract business.
A summary of comments and questions from each meeting is attached.
Water and Sewer
Buckhorn Road is the approximate boundary between Haw Creek and Upper Eno
Watersheds. The east side of Buckhorn Road is in the Upper Eno Watershed,
and service by the Efland sewer system would maximize gravity flow. The area
on the west side of Buckhorn Road would best be served by the Mebane sewer
system for the same reason. Only the area on the east side of Buckhorn Road is
proposed to be included in the EDD at this time. The possible inclusion of area
on the west side of Buckhorn Road will be considered at a later public hearing,
after coordination with the City of Mebane on cooperative planning issues.
Inclusion of the area between the I-85 and West Ten in the EDD could result in
more efficient and cost-effective sewer service. Four intermittent streams in the
EDD on the north side of I-85 converge on the south side of I-85 near West Ten
Road. If sewer service is provided only on the north side of I-85, then as many
as four pump stations could be required to convey wastewater to a discharge
point in a gravity section of the Efland sewer system. If sewer service is
planned for both the north and south side, then gravity lines could carry
wastewater from throughout the district to a single pump station in the vicinity
of West Ten. A system which relies on gravity flow to the greatest possible
extent, minimizing the number of pump stations needed, would be more cost
effective, even considering that the gravity lines would need to be extended
underneath I-85.
61
A major concern raised at the public information meeting held for area residents
on March 12, 1996 concerned the lack of existing infrastructure as an incentive
for development. Although all of the Economic Development Districts are
expected to develop over a number of years, there were concerns with value in
the near future, since residential development would no longer be an option.
Impacts on Neighborhood
Staff has identified 17 single-family residences and mobile homes within the
boundaries of the proposed expansion. Clearview Subdivision, approved in
1994, is the only subdivision located on the north side of West Ten, and is not
proposed to be included in the EDD. Five of the subdivision's 30 lots have been
developed. A resident of the subdivision was concerned with impacts of the
EDD on the neighborhood, as was the owner of the adjoining mobile home park.
Several property owners in the portion of the Study Area near Mt. Willing Road
and West Ten indicated that they preferred maintaining the existing residential
character of the area. Most of those individuals owned property in the Critical
Area of the Upper Eno,which would not be included in the EDD.
Recommended Expansion
The Planning Staff and Economic Development Commission Staff recommend
the following:
1. Designate the 587-acre area shown on the attached map as EDD Primary
Development Area, subject to the same set of permitted uses as the
portion of the EDD on the north side of I-85. The area of the
recommended expansion is bounded by Buckhorn Road to the west, West
Ten Road to the south, I-85 to the north, and the boundary of the Upper
Eno Critical Area to the east, excluding Clearview Subdivision and the
adjacent mobile home park.
The owner of the existing service station located at the souheast corner of
Buckhorn Road and I-85 has requested that his property be excluded from
the district. (see attached letter)
2. Provide a 150' buffer around the perimeter of the Clearview subdivision
and adjacent mobile home park. (A 100' buffer is required on the
remainder of the perimeter by the standard provisions of the EDD Design
Manual.)
3. Update the EDD Design Manual to include reference to and general
discussion of the expanded area. The only proposed change to the
existing design standards is the inclusion of a 150-foot buffer around
Clearview Subdivision and the adjacent mobile home park.
62
RECOMMENDATION: Article 20 of the Zoning Ordinance requires that the Zoning Officer's
recommendation for Comprehensive Plan, Zoning Atlas and Zoning-
Ordinance text amendments be presented to the Planning Board within 30
days of receipt of an application. However, Article 20.4 exempts any
application for amendments to the Zoning Ordinance by either the public or
the County from the provisions of Article 20.3. In either case, though, the
public hearing is the time scheduled for presentation of the Zoning Officer's
recommendation.
Zoning Officer Recommendation
Provided that the Planning Board and Board of Commissioners find in the
affirmative, the Zoning Officer recommends approval of the proposed text
amendment.
Administration Recommendation
The Administration recommends that the proposed amendment be referred
to the Planning Board for a recommendation to be returned to the Board of
Commissioners no sooner than August S, 1996
PROPOSED REVISIONS TO THE ECONOMIC DEVELOPMENT
DISTRICT DESIGN MANUAL
Section 2.1 Development Areas - Schematic Plans
I-85 Buckhorn Road District
The I-85/Buckhorn Road Economic Development District is comprised of
400 M acres located on the northe c of
the interstate interchange. This acreage is distributed among the three
principal land use categories in the schematic plan as follows:
Primary Development Area 2406(&Acres
Open Space Area 3-� i Q Acres
Rights-of-Way 29 Acres
Access to interior of the northern portions of the district is proposed
through the extension of a service road being constructed as part of the I-
85/I40 widening. The service road will terminate on the west side of
Buckhorn Road, and any collector road extended to serve the district must
align with it.
All of the lots in the southern quadrant have direct frontage on either.West
Ten Road or Buckhorn Road. Thenumber of access points onto
Buckhorn Road and West Ten Road should be minimized b, creating
internal access roads where possible. The extent to which internal access
roads are feasible na__d the points at which internal roads would intersect
with West Ten_ will depend in part on which I s)is(are) first
developd,_and how lots are combined as development occurs
Transit access is also proposed through a eemWly lee ated park-and-ride
lot or similar facility located in the northern Quadrant, with access to both
rail and thoroughfare systems. A sidew lk aiong Buckhorn Road to
provide access between the transit station and the southern Quadrant will
be needed. Design criteria for these systems are presented in section 3.3,
Circulation and Parking.
Land uses in and adjacent to the district range from single-family
residential to a variety of non-residential uses. The Southern Railroad
crosses the district as does a Duke Power transmission line and a Public
Service Company gas pipeline. The area is also served by the Orange-
Alamance Water Corporation,and sewer service would be available
through extension of the Efland sewer system owned by Orange County.
Because the district is bordered or bisected by so many transportation and
utility systems,the entire district has been designated as Primary
Development Area.
The district is characterized by gently rolling topography with few
building constraints. However, soils unsuited for development are found
along intermittent streams which flow south beneath I-40/1-85 to join
Seven-mile Creek, a tributary of the Eno River. Because of its location
on the western edge of the Upper Eno Watershed, land uses in the district
are subject to watershed protection standards governing impervious
surface and the control of stormwater.
The total amount of impervious surface covered by buildings and parking
lots is limited to 70%of a building site. As shown on the schematic plan,
stormwater control for multiple sites may be provided through
construction of several detention basins.located along individual streams
draining the district, particularLy on the north side of the interstate(ac
shown on the schematic p1=). Alternatively.a larger_, single detention
basin could be constructed on the south side of 1-85 at or below the
confluence of he streams Detention basins may also be constructed on
individual sites. . Impervious surface limits and standards for detention
basin construction and maintenance are discussed further in Section 2.3 -
Land Intensity and Appendix C- Wet Detention Basin Standards.,
respectively.
Section 2.4 Environmental Factors
I-85/Buckhorn Road District
The I-85 Buckhorn Road Economic Development District has three
potential service providers-the Orange-Alamance Water Corporation,
Orange County(through the Efland sewer system),and the City of
Mebane.
Water Supply. Service to this District is available from the Orange
Alamance Water Corporation by-way-of an existing 12-inch water line
along U.S. Highway 70. From this distribution main extend the following
lines:
6-inch water line West side of Buckhom Road from U.S. Highway 70
to south side of Southern Railroad
sj
3-inch Water Line West side of Buckhorn Road from south side of
Southern Railroad to I-85
2-inch and 12-inch water lines From U.S. Highway 70 down
Redman Road to south side of
Southern Railroad
Extending the 12-inch water main along U.S. 70 to the approximate center
of the northern quadrant of the District would cost approximately $62,500.
This cost includes 2,000 linear feet of 12-inch ductile iron water line at
$25 per linear foot plus contingencies and engineering costs (25%).
Another potential provider is the City of Mebane (Graham-Mebane Water
System) through an existing 12-inch water main which terminates at the
Pak-Lite plant on Washington Street south of the Southern Railroad 0.3
mile from Buckhorn Road.
Sewage Disposal Orange County's E11and sewer system has an 8-inch
gravity line on the north side of U.S. Highway 70 which terminates 400
feet west of Richmond Road. Any service west or south of thai point
would have to be pumped, and flows of up to 100,000 gallons per day
(GPD)could be accommodated in that line. Plants with flows of greater
than 100,000 GPD would have to pump farther to the east to a section of
12-inch gravity sewer line.
The four intermittent streams in the northern quadrant flow south
underneath_I-85 and converge in the southern quadrant of the EDD
Sewer construction which will occur as the EDD develops should rely to
the extent possible on gmyity flow in order to minimize the number of
pump stations and associated costs by the use of gmyity lines along the
intermittent streams in the north Quadrant and underneath I-85 to West
Ten Road. A single pump station near the stream crossing at West Ten
could then convey wastewater from the entire EDD to a gravity section_of
the Eflaud sewer system.
Otherwise.several_pump stations could be necessary in the northern
quadrant of the EDD because the top.Q by there generally runs
pe=jWicular to the gravity sewer on High=70.
Cost estimates for constructing a grayiV system along the streams and a
pump station at West Ten may be developed to determine potential
funding scenarios.
statien having 100,000 GPD avefage and 250,000 peak eapaei4ies.
iCj � 4
bV
Sewage &wq;e the pump swien weuld then be pwaped by way of
Se%Vr-8-YS4Via7
1fistWiatien of the pump swien and sewer-fer-ee main weWd
duetile ime sew r-fer-ee line at $16 per-kneaf feet, a$100,000 GPD pwap
�
�wssf. n4S (2544).
�rab�
Section 3.2 Landscape Design
Buffering Neighboring Uses
Well-designed landscape treatments lessen adverse visual impacts between
different types of land uses,reduce noise levels, increase privacy levels,
and mitigate effects from fumes, glare,and vibration.
To create transition between neighborhoods and areas of differing
development intensities, and separate incompatible land uses, a buffer of
100 feet in width( xcCpt where otherwise snecif ed)is to be provided at
the boundary of the Economic Development District as well as between
Primary and Secondary Development Areas within the Districts.
In the Buckhorn Road Economic Development District_a buffer of 150
feet is required on the-Portion of the boundary adiacent to th_e Clearview
Subdivision wd a4ioiningresidential area on the north side of West Ten.
Section 3.3 Circulation and Parking - Thoroughfare Planning
I-85/Buckhorn Road District:
Aside from I-85/1-40,W.;e jh=roads have been included in the Orange
County Thoroughfare Plan.
• U.S Highway 70 has been classified as an arterial road. It has a 22-
foot pavement width(two lanes)located in a 60-foot right-of-way. It is
currently capable of handling 8,500 vehicles per day and had an
average daily traffic volume of 4,000 vehicles per day in 1987. By the
year 2010,traffic on the road is expected to reach 7,500 vehicles per
day.
• West Ten has been classified as collector road. It has a 20-foot
pavement width(two 1 ne )located in a 60-foot right-of-way. It is
currently capable of handling 7500 vehicles per day and had an
average traffic volume of 500 vehicles e� r day in 1987. By the
year 2010,traffic on the road is expected to reach 900 ner dU.
• Buckhorn Road has been classified as collector road. It has a 20-foot
pavement width(two lanes) and is currently capable of handling 7500
vehicles=day and had an average daily traffic volume of 400
vehicles per day in 1987. By the year 2010.traffic on the road is
expected to reach 1.000 per day.
Although the roadway and right-of-way width are considered adequate to
handle the projected traffic,the widening of Buckhorn road to a 24-foot
pavement width is preferred to matching the cross-section being installed
as part of the I-85 widening, Grade crossing improvements at the
Southern Railroad are warranted.
Also warranted are the
installation of turn lanes and im=ved turn radii for easier and safer truck
�rni g movements at the intersections of US 70/Buckhorn Road,
Buckhorn Road/West Ten Road, and West Ten Road/klt. Willing Road.
i
r
-.`
— n_: ■d � �f►/ I III � / .��
won
- s
SOUTH BUCKHORN ECONOMIC DEVELOPMENT DISTRICT
Comments from March 12 Community Meeting
Efland-Cheeks Community Center
• What if property owner wants to do residential development? Residential value of property is being
taken away, yet the County is doing anything to get new businesses here, and it will be a long time
before the property has any commercial or industrial value.
• Water and sewer needs to be extended first. Without it,no development will occur.
• Who will pay for water and sewer?In other places, towns and counties pay for extending services to
attract industry. We need a plan to develop water and sewer so that businesses will come.
• If a good industry were to want to locate in Orange County,then the Board of Commissioners would
work to get the water and sewer to the site.
• Several property owners indicated that they do not want to see any changes, and want the area to
remain residential, and would support changing the Land Use Plan designation to residential so that
business would not be allowed at all.
• The Board of Commissioners should make NCDOT build retaining walls or other types of buffers to
protect adjacent property from the impacts of widening I-85.
• Orange County already has high taxes and impact fees. It should go ahead and extend water and sewer
so that property owners would get more for their tax money.
• Uses such as shopping centers would be good at the interchange of Buckhom and Mt. Willing Roads.
This would be compatible with and help residential development farther down West Ten Road.
• Property owner with 1400 feet of frontage on I-85 would like to be able to sell to an employer who
would pay good wages.
• Residents who have lived in the area a long time do not want to see any changes.
• Residents need to be able to work near their homes and not travel a long distance into another county
to work.
• What is Orange County doing to promote economic development?
• Will tax value increase if property is rezoned? Would like to see written assurance from Assessor that
tax is based on use value,not just on zoning district.
70
• Need to have water and sewer on the north side of I-85 east of Mt. Willing Road (Sim Efland) in area
shown as Critical Area for Seven-mile Creek. Water and Sewer was supposed to be extended there 10
years ago. It should not be designated as Critical Area. Water is needed there as well as in the rest of
the County.
• Would the flea market at Buckhorn/I-85 still be non-conforming?
• Need to get rid of planners and buy backhoes to extend water and sewer.
• Who bought Kirkpatrick land and why? (Discussion indicated that area was leased for hunting
purposes).
• Property owner wants to be able to create new residential lots (small number).
• Clearview homeowner was surprised to learn that the current Land Use Plan designation would allow
the property to be rezoned to commercial or industrial use. She was not aware of that when she
purchased the property. She expected that it would remain rural, and does not want to see any
changes.
Straw poll: about 1/3 do not like idea of expanding EDD. (most owned property within the WQCA
and would not be included in the district)
about 1/2 wanted to continue the process of developing an EDD.
71
SOUTH BUCKHORN ECONOMIC DEVELOPMENT DISTRICT
Comments from April 23, 1996 Community Meeting
Planning and Agricultural Center
Height limit for signs is too restrictive along interstate.
What are interior setbacks?
What uses would be permitted?
What are plans for water and sewer extensions?
There should be lower impact uses (secondary area)around Clearview. 150' buffer is not enough.
What role does EDC play in marketing lots?
What are reasons for including small lots in the EDD?
What if property owner wants to include or remove property from EDD later?
Water should be extended from Mebane Oaks Road West Ten and down West Ten to Hillsborough.
73
Hatch, Little & Bunn, L.L.P.
_ Harold W. Barry,Jr. J.Wilbur Bunn(1882-1969) Attorneys at Law
Thomas D. Bunn William T. Hatch(1905-:979)
Tina L.Frazier lames C.Little(1917-1977)
Robin M. Hammond
John N.McClain,Jr. 327 Hillsborough Street
David H.Permar POSt 0111C®Box 527
A.Bartlett White Raleigh,North Carolina 27602
Douglas Q.Wickham 919/6563940
William D. Young IV Fax 919/856-3950
April 25, 1996
Ms . Mary Willis
Orange County Planning Department
306F Revere Road
Hillsborough, North Carolina 27278
Re: Proposed Expansion of the Buckhorn Road Economic
Development District
Dear Ms. Willis :
As we discussed when I visited your office on April 22, I
represent Venture Capital Group - Project No. 4 which owns a two
and one half acre site in the southwest intersection of Buckhorn
Road and I-40/85. Since the 1960s, the site has been occupied by
a service station dispensing petroleum products, selling
convenience food items, operating a repair facility and a towing
and wrecker service. As the I-40/85 expansion project is completed
in this vicinity, the property owner desires to upgrade and
renovate the facility, including a possible expansion of highway
services that are typically available at interstate exchanges. The
site is currently zoned NC-2. The property owner has asked me to
review the Economic Development District proposal and determine
what the best approach is considering the present and future
development of the site.
While we certainly think that an Economic Development District
is appropriate for this area, an economic development district is
designed primarily to preserve large acreage tracts for industrial
park type development. Due to the increased buffers and higher
development standards, it can be counter productive, and indeed
prohibitive on a small acreage tract developed for interstate
highway services . For example, current zoning on the site only
requires a 50-foot buffer on Buckhorn Road. The proposed EDD would
require a 100-foot buffer. In addition, while most highway service
businesses are permitted as of right in the NC-2 zoning district,
all uses which are appropriate for the site would require a Type A
special use permit under the EDD zoning.
Accordingly, I request that you remove tax parcel number 20A
as shown on the enclosed zoning map from your proposed Economic
7 4 Development District. As an alternative solution, I request that
you reduce the required buffer from 100 feet to 50 feet along
Buckhorn Road and that you allow "storage and distribution of
petroleum products", "motor vehicle service stations", "restaurants
(carry-out, drive-in, and general) ", and "retail trade, sales and
rental of durable and convenience goods, merchandise, and
equipment" as a permitted use of right in the Buckhorn Road
Economic Development District. I note that these uses have much
less of an impact than many of the other manufacturing,
transportation and wholesale uses which are currently permitted in
the proposed Economic Development District as a matter of right.
Since there might be some concern that these highway service uses
might not be appropriate throughout the Buckhorn Road Economic
Development District, you could also limit them to within 500 feet
of an interstate highway interchange, thus assuring that they
remain clustered around the interchanges.
I appreciate your assistance in helping me to understand the
Economic Development District proposal. I do intend to appear and
speak at the May 28 public hearing. If you wish to discuss this
matter further, I will be happy to meet with you at any time.
Sincerely yours,
HATCH, LITTLV & BUNN
David H. Permar
DHP/rt
Enclosure
c: Loren Tompkins
75
z1 EC-5
0107
2,
Tom_ . 0 14o N 2282 21
^' 2 57
1 1 SE 17 8157 ►�T p �.
20 , MA 2W
MTC 198A0! r
A • ' 1807 ' �h
:o�2f 9923
1
1
SEE
' MAP 27
SEE
MAP 26 1
_ 1
48
28 —
—
�t
414
051 .59 AC- A
4A � i
1.92 12 AG,O M `•
O . 0955 9
9
\ 6 I B AC
12 \ 4.44 30e0 7s
� 6
9t AO• A