HomeMy WebLinkAboutAgenda - 01-16-1996 - IX-A ' 1
1
ORANGE COUNTY
BOARD OF COMMISSIONERS
Action Agenda
Item No -A
ACTION AGENDA ITEM ABSTRACT
Meeting Date: January 16, 1996
SUBJECT: North Carolina School Capital Construction Study Commission
Survey - Orange County Schools and Chapel Hill-Carrboro
City Schools Identified Needs
-----------------------------------------------------------------------
DEPARTMENT County Manager PUBLIC HEARING YES NO x
-------------------------------
BUDGET AMENDMENT
REQUIRED YES NO x
-------------------------------- -------------------------------
ATTACHMENT(S) INFORMATION CONTACT
CHCCS Survey Rod Visser, ext 2300
OCS Survey TELEPHONE NUMBER
Proposed Transmittal Letter Hillsborough 732-8181
(all under separate cover) Chapel Hill 968-4501
Mebane 227-2031
Durham 688-7331
-----------------------------------------------------------------------
PURPOSE: To review the surveys prepared by the Orange County
Schools and the Chapel Hill-Carrboro City Schools for the NC School
Capital Construction Study Commission.
BACKGROUND: In 1995, the General Assembly created the School Capital
Construction Study Commission to survey the capital needs of school
systems across the State. The Commission is charged to identify needs,
develop criteria for ranking identified needs, examine the respective
roles of the State and counties in meeting those needs, and developing
a long-term plan for funding identified needs in an equitable and
adequate manner. The Commission is to report to the General Assembly
by April 15, 1996 .
Each local school board is required to submit a survey of its ten year
capital needs to the board of county commissioners for approval or
disapproval . If a board disapproves the list, it must submit its own
list along with the one prepared by the board of education.
The Orange County Schools and Chapel Hill-Carrboro City Schools have
completed their surveys, which are included under separate cover as
attachments to this abstract . County staff have not had the
opportunity to fully analyze and critique the lists of capital needs
expressed .by the two school systems . That level of review will occur
in the coming weeks as the Mana'ger' s Recommended Capital Improvement
Plan for 1996-2006 is developed for consideration by the Board of
Commissioners this Spring. It is important to note that the costs of
new facilities cited in the surveys were derived from calculations made
by the Department of Public Instruction using cost parameters applied
statewide, and do not reflect locally generated cost estimates .
2
Accordingly, the Manager recommends that the Board qualify its approval
of the two school system surveys with the disclaimer that Board
approval of the surveys does not necessarily constitute either
endorsement of all the needs cited by the schools or approval of
any project as part of the CIP.
RECOMMENDATION: The Manager recommends that the Board approve the two
school system capital needs surveys, with the qualifications described
above; and authorize the Chair to sign the survey forms and transmit
them with the attached cover letter to the NC School Capital
Construction Study Commission.
3
January 16, 1996
Senator Fred M. Hobbs
Representative N. Leo Daughtry
Co-Chairs, School Capital Construction Study Commission
Suite 545, Legislative Office Building
Raleigh, NC 27611
Dear Senator Hobbs and Representative Daughtry:
At its regular meeting tonight, the Orange County Board of
Commissioners considered and approved the surveys prepared by the
Orange County Schools and Chapel Hill-Carrboro City Schools for the
School Capital Construction Study Commission. We recognize the
importance of the Commission' s undertaking, and appreciate your efforts
to help with one of Orange County' s most challenging issues - how to
pay for new school facilities for our rapidly growing student
population.
Because of the tight timeframes involved in the preparation and
submission of the surveys, neither County staff nor the Orange County
Board of Commissioners have had the opportunity to critically assess
the capital needs identified by our two school systems . Accordingly,
we feel that it is important to indicate that our approval of the two
school system capital surveys does not constitute endorsement by the
Orange County Commissioners of all the needs cited by the schools, or
of any particular project as part of our Capital Improvement Plan.
Sincerely,
Moses Carey, Jr.
Chair
? 3AV.161 i994l __4MW ix�4
, 1
3
SCHOOL CAPITAL CONSTRUCTION STUDY COMMISSION - SURVEY
9911 PUBLIC 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Mill-Carrboro Schools UNIT NO: 681
STUDENT POPULATION PROJECTIONS
GR. K-5 GR.6-8 GR.9-12 EXC+TMH Totals
FINAL ADM 1994-95 : 1 3,6511 1,747 1,998 113 7509
DPI Membership Projections :
(fill-in) 1999-2000: 4037 2281 2648 115 9081
2004-05: 3950 2420 3400 115 9885
Local Unit Membership Projections(Y or N)�
NOTE: Do not fill-in with local membership projections unless they are significantly different from DPI projections
Attach explanation if local projections are used.
CAPACITY OF FACILITIES (no. of students)
(Do not include capacity of mobile units or temporary structures)
Elementary Middle/Jr.Hi_ High Totals
Capacity of Existing Schools : 3092 210 16"1 6841
Now under construction or funded : 5961 1 1020 1616
(additional capacity of new schools or additions)
Total 3688 2104 2665 8457
Additional Capacity from Projects included in this report:
Added Capacity 1996-2004: 6001 700 500 1800
Total Capacity 2004-05: 1 42881 280 3165 10257
MOBILE UNITS and TEMPORARY BUILDINGS
Indicate the TOTAL number of mobile units and temporary buildings now used for EDUCATIONAL programs
(classrooms, exceptional children, resource, art, music, etc.) 21
TOTAL ESTIMATE FOR ALL PROJECTS NEEDED:
CURRENT COST : $ 39,453,217
IN YEARS NEEDED (incl inflation) : $ 44,535,771
Summary Reports -page 1 PRINTED: 14-Dec-95
•
2
i
PROJECT SUMMARY
. . , PUBLIC • s
CHAPEL HILL-CARRBORO SCHOOLS Inflation Rate: 5.0%
PROJECT YEAR ESTIMATED COST WITH
UNIT PRIORITY NAME PROJECT NUMBER NEEDED COST INFLATION
681 2 Middle School#4 New School 101_1 2000 10,293,772 12,210,602
681 2 Elementary School#8 New School 100_1 1999 7,582,408 8,566,046
681 2 East Chapel Hill High Addition Renovations 999_11 1999 10,452,361 11,808,307
681 1 Glenwood Elementary Addition Renovations 320_2 1995 529,045 529,045
681 1 Chapel Hill High Renovations 308_3 1996 832,215 832,215
681 1 Culbreth Middle School Renovations 322_4 1996 816,138 816,138
681 1 Seawell Elementary Renovations 310_5 1996 192,385 192,385
681 3 Ephesus Elementary Renovations 311_6 2000 356,975 423,448
681 3 Chapel Hill High Renovations 308_11 2000 594,050 704,670
681 1 Estes Hills Elementary Renovations 312_8 1996 124,805 124,805
681 4 Glenwood Elementary Renovations 320_9 2003 49,050 67,355
681 2 Chapel Hill High Renovations 308_10 1998 78,480 84,439
681 2 Carrboro Elementary Renovations 304_11 1998 242,525 260,940
eel 2 Glenwood Elementary Renovations 320_12 1998 1,424,085 1,632,216
681 1 Phillips Middle Renovations 324_13 1996 580,425 580,425
681 1 IChapal Hill High School Renovations 308_14 1996 395,806 395,806
681 2 jEstes Hills Elementary Renovations 312_15 1998 1,197,638 1,288,574
681 2 ICul breth Middle School Renovations 322_16 1997 517,750 530,536 _
681 1 Frank Porter Graham Elementary Renovations 316_17 1996 192,385 192,385
681 1 Mc Dougle Middle School Renovations 309_18 1996 152,600 1529600
681 1 Ephesus Road Elementary Renovations 311_19 1996 271,955 271,955
681 2 Seawell Elementary School Renovations 310_20 1998 207,100 222,825
681 3 Canboro Elementary School Renovations 304_21 2000 324,275 394,659
681 4 Ephesus Elementary School Renovations 311_22 2002 136,250 178,188
681 3 Estes Hills Elementary Renovations 312_23 2000 241,163 286,071
681 3 Frank Porter Graham Elementary Renovations 316_24 1999 272,500 307,850
681 3 Seawell Elementary Renovations 310_25 1999 348,800 394,049
681 3 Culbreth Middle - - Addition Renovations 322_27 2000 595,561 706,462
681 4 Phillips Middle School Renovations 324 28 2002 81,750 106,913
681 1 Carrboro Elementary School IRenov ations 304 28 1886 172,765 172,765
681 2 lPhillips Middle School IRenovations 324_30 1998 196,200 211,097
3
SCHUOL GAPI 'A;- CONSTRUCTION STUDY COMMISSION - SURVEY
: 1996 PUB+ $CHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro Schools UNIT NO: 681
The Chape Hill-Carrboro Schools Board of Education submits to the School Capital
Construction Study Commission this survey of public school facility projects that it estimates may
be needed within the next 10 years.
Approved for submission to the School Capital Construction Study Commission by the
Chapel Hill-Carrboro Schools Board of Education
Chairman Date
Secretary, Ex-officio Date
The County Board of Commissioners APPROVES this
survey for submission to the School Capital Construction Study Commission
OR
(] The County Board of Commissioners DOES NOT APPROVE
this survey for submission to the School Capital Construction Study Commission
Chairman Date
County Manager or Clerk Date
NOTE:A Board of County Commissioners that DOES NOT APPROVE the school board's survey must submit its own
survey to the School Capital Construction Study Commission,with a separate cover sheet.
•
4
INDIVIDUAL SCHOOL REPORT NEW MIDDLE SCHOOL
PUBLIC $CHO
I OL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
Administrative Unit: Chapel Hill-Carrboro Schools Priority: 2
Unit No: 681
School Name: IMIddle School#4 Grades : 6-8
Name of School(s)this project replaces : Capacity
Number of students: 700 (K-05)students Project no: 1011
Future capacity : 700
Exceptional (self-contained): 3 classrooms Pre-kindergarten cirms: N/A
Dance/Drama classrooms: 1 Year when needed: 2000
Land Cost/Acre: $6,819 On-site SewerMater(y/n): N
Bldg. area to be demolished: =sq.ft.
Construction Cost/sq.ft.: $82.30 Number of Academic Classrooms: 27
Sq.Ft. per Student(w/excp.): 140 Other Teaching Stations: 9
COST ESTIMATE
Construction Cost 97,887 s.f. building area X $82.30 per sq. ft. _ $8,056,100
Middle School additional sitework (playfields,drives) 4%const. cost 322,244
High School additional sitework (fields,parking,etc.) 7%contt. cost N/A
sub total $8,378,344
Construction Contingency construction cost X 0.05 contingency= 418,917
Administrative costs/fees construction cost X 0.07 586,484
sub total $9,383,745
Demolition of Exist. Buildings s.f. building area X $6.86 per sq. ft. _
On-site sewer/water system
Total Construction Cost $9,383,745
Land Acquisition 22 acres X $6,819 per acre= $150,018
Furnishings/Equipment 8,056,100 construction cost X 0.094 $760,009
Total Current Cost $10,293,772
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 1❑ To accommodate projected enrollment
Replace mobile units with permanent facilities 2❑ Ease current crowding at schools
El Other(indicate) : Change in grade organization
Middle School#4 printed: 12/13/95
5
INDIVIDUAL.SCHOOL REPORT NEW ELEMENTARY
4996 PUBLIC SCHOOL FACILIIYNE�E*DS' 10 YEAR NEEDS ASSESSMENT
Administrative Unit: Chapel Hill-Carrbora Schools Priority: 2
Unit No: 681
School Name: JElementary School #8 Grades : K-5
Name of School(s)this project replaces : Capacity
Number of students: 600 (K-05)students Project no: 100_1
Future capacity • 600
Exceptional (self-contained): 2 classrooms Pre-kindergarten clrms: 1
Dance/Drama classrooms: 1 Year when needed: 1999
Land Cost/Acre: $15,625 On-site Sewer/Water(y/n): N
Bldg.area to be demolished: sq.ft.
Construction Cost/sq.ft.: $82.30 Number of Academic Classrooms: 25
Sq.Ft. per Student(w/excp.): 114 Other Teaching Stations: 5
COST ESTIMATE
Construction Cost 73,368 s.f. building area X $82.30 per sq. ft. _ $6,038,186
Middle School additional sitework (playfields,drives) 4%const. cost N/A
High School additional sitework (fields,parldng,etc.) 7%const. cost N/A
sub total $6,038,186
Construction Contingency construction cost X 0.05 contingency= 301,909
Administrative costs/fees construction cost X 0.07 422,673
sub total $6,762,768
Demolition of Exist. Buildings s.f building area X $6.86 per sq. ft. _
On-site sewer/water system
Total Construction Cost $6,762,768
Land Acquisition 16 acres X $15,625 per acre= $250,000
Furnishings/Equipment 6,038,186 construction cost X 0.094 $569,640
Total Current Cost $7,582,408
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
ElReplace category IV or V facility 10 To accommodate projected enrollment
30 Replace mobile units with permanent facilities ❑2 Ease current crowding at schools
Other(indicate) : F7 Change in grade organization
Elementary School#8 printed: 12/13/95
6
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . PUBLIC SCHOOL 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: JEast Chapel Hill High project no: 999_11
capacity
Name of School(s)this
project replaces
Membership Now: (K-12)students Grades Now: 9-12
Current Capacity: [Z(when Grades Proposed: 9-12
Proposed Capacity: completed) Year when needed: 1999
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq.ft. _
18 Regular Classrooms 13,500 s.f. X $69.96 944,460
6 Science Classrooms 8,550 s.f. X $102.88 879,624
1 Small Group/Resource 450 s.f. X $74.07 33,332
Exceptional (self-contained) s.f. X $90.53
2 Computer/Keyboarding 1,700 s.f. X $98.76 167,892
2 Art Classroom 3,200 s.f. X $82.30 263,360
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
1 Vocational (business/service/cir 1,200 s.f. X $82.30 98,760
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdlJhigh) 12,000 s.f. X $106.99 1,283,880
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) 25,000 s.f. X $123.45 3,086,250
Other/miscellaneous 5,000 s.f. X $90.53 452,650
sub total 70,600 s.f. 7,210,208
Bldg.Support/Circulation 17,542 s.f. X $82.30 1,443,707
total area(sq.ft.)added 88,142 s.f. 8,653,915
Administrative costs/fees 18,653,915 const.cost. X 0.075 649,044
Total Additions $9,302,959
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 8,653,915 const.cost. X 0.094 816,407
Kitchen Equipment
Media Center Furnishings
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $816,407
East Chapel Hill High page 1 of 2
7
RENOVATIONS: Project No: 99911
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 3,500 s.f. bldg. area X $23.00 per sq. ft. = $80,500
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f bldg. area X $49.00 per sq. ft. =
sub total General Renovations $80,500
2A1r Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement IS1 X $6.25 per sq. ft. _
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. fL _
Security System
New Main Electrical Service
Athletic fields, bleachers,tennis courts, press box 225,000
sub total Other Renovations 225,000
SUB TOTAL 305,500
Administrative costs/fees 305,5001 const.cost. X 0.09 27,495
Total Renovation Cost $332,995
911-and Acquisition acres X per acre=
Total Current Project.Cost $10,452,361
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility � To accommodate projected enrollment
Replace mobile units with permanent facilities r 3—] Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
1 Other(indicate) : Deferred Maintenance(see below)
Complete original Ed.Spec. requirement
Meet State or Federal mandate(see below)
East Chapel Hill High printed: 12/13/95 page 2 of 2
8
INDIVIDUAL SCHOOL REPORT ! ADDITIONS & RENOVATIONS
11996 OO 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority:
SCHOOL NAME: JGienwood Elementary project no: 320_2
capacity
Name of School(s)this
project replaces
Membership Now: 451 (K-12)students Grades Now: K-5
Current Capacity: 447 Grades Proposed: K-6
Proposed Capacity: 447 (when completed) Year when needed: 1995
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational (business/service/cir s.f. X $82.30
Media Center 1,200 s.f. X $94.65 113,580
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total 1,200 s.f. 113,580
Bldg.Support/Circulation 264 s.f. X $82.30 21,727
total area(sq.ft.)added 1,464 s.f. 135,307
Administrative costs/fees 135,307 const.cost. X 0.075 10,148
Total Additions $145,455
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 21,727 const.cost. X 0.094 2,050
Kitchen Equipment
1 Media Center Furnishings" 48,000
'const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $50,050
Glenwood Elementary page 1 of 2
9
RENOVATIONS:. Project No: 32(`_2
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations 3,500 s.f. bldg. area X $49.00 per sq. ft. = $171,500
sub total General Renovations $171,500
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling 1 54,0001 s.f. bldg. area X $1.75 per sq. ft, = 94,500
Security System
New Main Electrical Service 40,000
sub total Other Renovations 134,500
SUB TOTAL 306,000
Administrative costs/fees 306,0001 const.cost. X 0.09 27,540
Total Renovation Cost $333,540
911-and Acquisition acres X per acre=
Total Current Project Cost $529,045
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 17 To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes 0 Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Glenwood Elementary printed: 12/13/95 page 2 of 2
10
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PIJBLIC�SCHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: Chapel Hill High project no: 308 3
_ capacity
Name of School(s)this
project replaces
Membership Now: 1 (K-12)students Grades Now: 9-12
Current Capacity: Grades Proposed: 9-12
Proposed Capacity: when completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq.'ft.
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Chapel Hill High page 1 of 2
11
RENOVATIONS: Project No: 308_3
No. Size/Amount Unit Cost Total
1 General Renovations '
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations 11,500 s.f. bldg. area X $49.00 per sq. ft. = $563,500
sub total General Renovations $563,500
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 125,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling I I s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Modify kitchen/cafeteria 75,000
sub total Other Renovations 200,000
SUB TOTAL 763,500
Administrative costs/fees 1 763,5001 const.cost. X 0.09 68,715
Total Renovation Cost $832,215
911-and Acquisition acres X per acre=
Total Current Project Cost $832,215
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
F37 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
Roof repl.
—, Meet State or Federal mandate(see below)
Chapel Hill High printed: 12113/95 page 2 of 2
12
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC • • 1-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JCulbreth Middle School project no: 322_4
capacity
Name of School(s)this
project replaces
Membership Now: M(when(K-12)students Grades Now: 6-8
Current Capacity: Grades Proposed: 6-8
Proposed Capacity: completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft=
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53 -
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdlJhigh) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
"const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Culbreth Middle School page 1 of 2
13
" ~RENOVATIONS: Project No: 3224
j No. Size/Amount Unit Cost Total
1 General Renovations
Minor,Renovations 3,000 s.f. bldg. area X $23.00 per sq. ft. = $69,000
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $69,000
2Air Conditioning 1 10,0001 s.f. bldg. area X $12.00 per sq. ft. = $120,000
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling 1 105,0001 s.f. bldg. area X $1.75 per sq. ft. = 183,750
Security System
New Main Electrical Service
Replace 27 yr.old electric rooftop HVAC equip. 350,000
Replace Water Heaters 26,000
sub total Other Renovations 559,750
SUB TOTAL 748,750
Administrative costs/fees 748,7501 const.cost. X 0.09 67,388
Total Renovation Cost $816,138
911-and Acquisition acres X per acre=
Total Current Project-Cost $816,138
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
117 Energy Conservation/Air Conditioning
For reduced class sizes � Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Culbreth Middle School printed: 12/13/95 page 2 of 2
14
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC FACILITY NEEDS i ASSESSMEhT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: Iseawell Elementary project no: 310_5
capacity
Name of School(s)this
project replaces
Membership Now: 692 (K-12)students Grades Now: K-5
Current Capacity: 498 Grades Proposed: K-5
Proposed Capacity: 498 (when completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include fumishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft._
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service%ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdlJhigh) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
"const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn.1 Eqpt.
Seawell Elementary page 1 of 2
15
RENOVATIONS: . Project No: 3105
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I Is.f. X $8.25 per sq. ft. =
Computer Network/Cabling 1 58,0001 s.f. bldg. area X $1.75 per sq. ft. = 101,500
Security System
New Main Electrical Service
Replace 12 four ton electric heat ventilators 75,000
sub total Other Renovations 176,500
SUB TOTAL 176,500
Administrative costs/fees 176,5001 const.cost. X 0.09 15,885
Total Renovation Cost $192,385
9 Land Acquisition acres X per acre=
Total Current Project Cost $192,385
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
117 Energy Conservation/Air Conditioning
For reduced class sizes F-2 I Provide for technology(infrastructure)
Other(indicate) : F-3 Deferred Maintenance(see below)
Most State or Federal mandate(see below)
Seawell Elementary printed: 12/13/95 page 2 of 2
16
INDIVIDUAL SCHOOL REPORT ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: --3
SCHOOL NAME: JEphesus Elementary project no: 311 6
capacity
Name of School(s)this
project replaces
Membership Now: 667 (K-12)students Grades Now: K-5
Current Capacity: 472 Grades Proposed: K-5
Proposed Capacity: 472 (when completed) Year when needed: 2000
Avg. Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdlJhigh) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. x $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
'const. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Ephesus Elementary page 1 of 2
17
RENOVATIONS: _Project No: 3116
No. Size/Amount Unit Cost Total
1 General Renovations _
Minor Renovations s.f. hidcg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I 34,000 s.f. X $6.25 per sq. ft. = 212,500
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Replace ten packaged electrical heat roof 115,000
op units with gas powered units
sub total Other Renovations 327,500
SUB TOTAL 327,500
Administrative costs/fees 1 327,5001 const.cost. X 0.09 29,475
Total Renovation Cost $356,975
911-and Acquisition 7 1 acres X per acre=
Total Current Project Cost $356,975
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
1� Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Ephesus Elementary printed: 12/13/95 page 2 of 2
18
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
: 1996 PUBLIC SCHOOL FACILITY NEEDS 1 O-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: Chapel Hill High project no: 308J I
capacity
Name of School(s)this
project replaces :
Membership Now: 1700 (K-12)students Grades Now: 9-12
Current Capacity: 1645 Grades Proposed: 9-12
Proposed Capacity: 1645 (when completed) Year when needed: 2000
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational (business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
M zdia Center Furnishings'
.const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Chapel Hill High page 1 of 2
19
RENOVATIONS:- Proj&,t? o: 308_11
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $2a.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 130,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Convert two chillers from R11 refrigerant 55,000
Bleachers,Press Box,Concession Fac.,Restrooms 250,000
Tennis Courts 110,000
sub total Other Renovations 545,000
SUB TOTAL 545,000
Administrative costs/fees 1 545,0001 const.cost. X 0.09 49,050
Total Renovation Cost $594,050
911-and Acquisition acres X per acre=
Total Current Project.Cost $594,050
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
117 Building Code/Life Safety(explain below) Change in grade organization
Replace R11 refrigerate Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Chapel Hill High printed: 12/13/95 page 2 of 2
20
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
11996 _ • • . NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JEstes Hills Elementary project no: 312 8
capacity
Name of School(s)this
project replaces
Membership Now: 590 (K-12)students Grades Now: K-5
Current Capacity: 540 Grades Proposed: K-5
Proposed Capacity: 540 (when completed) Year when needed: 1996
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource 51 X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding Is.f. X $98.76
Art Classroom s.f. X $82.30
Dance!Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings"
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furnd Eqpt.
Estes Hills Elementary page 1 of 2
21.
RENOVATIONS: Project No:
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. = _
subtotal General Renovations
2Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $20,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft._
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling 1 54,0001 s.f. bldg. area X $1.75 per sq. ft: = 94,500
Security System
New Main Electrical Service
sub total Other Renovations 94,500
SUB TOTAL 114,500
Administrative costs/fees 1 114,5001 const.cost. X 0.09 10,305
Total Renovation Cost $124,805
911-and Acquisition acres X per acre=
Total Current Project-Cost $124,805
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes F7 Provide for technology(infrastructure)
Other(indicate) : F-3—] Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Estes Hills Elementary printed: 12113/95 page 2 of 2
22
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL FACILITYALPS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 4
SCHOOL NAME: Glenwood Elementary project no: 320 9
capacity
Name of School(s)this
project replaces :
Membership Now: 451 (K-12)students Grades Now: K-5
Current Capacity: 447 Grades Proposed: K-5
Proposed Capacity: 447 (when completed) Year when needed: 2003
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance!Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*contt. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Glenwood Elementary page 1 of 2
23
RENOVATIONS: Project No: 320_9
r No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f X $6.25 per sq. ft. =
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Replace cooling tower 45,000
sub total Other Renovations 45,000
SUB TOTAL 45,000
Administrative costs/fees I 45,0ool const.cost. X 0.09 4,050
Total Renovation Cost $49,050
911-and Acquisition acres X per acre=
Total Current Project Cost $49,050
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
117 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : F-2 ] Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Glenwood Elementary printed: 12/13/95 page 2 of 2
24
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PueLIC SCHOOL FACILITY NEEDS 1-0-YEAR.NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: Z
SCHOOL NAME: JChapel Hill High project no: 308_10
capacity
Name of School(s)this
project replaces
Membership Now: 1700 (K-12)students Grades Now: 9-12
Current Capacity: 1645 Grades Proposed: 9-12
Proposed Capacity: 1645 (when completed) Year when needed: 1998
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
'const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total FurnJ Eqpt.
Chapel Hill High page 1 of 2
25
RENOVATIONS: Project No: 30810
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos A;:iatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
Relocate six mobile units(moving from site) 72,000
sub total Other Renovations 72,000
SUB TOTAL 72,000
Administrative costs/fees 1 72,000 const.cost. X 0.09 6,480
Total Renovation Cost $78,480
9 Land Acquisition I acres X per acre=
Total Current Project Cost $78,480
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 17 To accommodate projected enrollment
Replace mobile units with permanent facilities 27 Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Chapel Hill High printed: 12/13/95 page 2 of 2
26
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL FACILITY NEEIDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: Carrboro Elementary project no: 304 11
capacity
Name of School(s)this
project replaces
Membership Now: 624 (K-12)students Grades Now: K-5
Current Capacity: 563 Grades Proposed: K-5
Proposed Capacity: 563 (when completed) Year when needed: 1998
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms 51 X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding S.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms S.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) S.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./egpt, for addition abov Total Furn./Eqpt.
Carrboro Elementary page 1 of 2
27
RENOVATION;;: Project No: 30411
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 60,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I 22,000 s.f. X $6.25 per sq. ft. = 137,500
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. =
Security System 25,000
New Main Electrical Service
sub total Other Renovations 222,500
SUB TOTAL 222,500
Administrative costs/fees 1 222,15001 const.cost. X 0.09 20,025
Total Renovation Cost $242,525
911-and Acquisition acres X per acre=
Total Current Project_Cost $242,525
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
F 27 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Carrboro Elementary printed: 12/13/95 page 2 of 2
28
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL FACILITY NEEDS . ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: lGienwood Elementary project no: 320_12
capacity
Name of School(s)this
project replaces
Membership Now: 451 (K-12)students Grades Now: K-5
Current Capacity: 447 Grades Proposed: K-5
Proposed Capacity: 447 (when completed) Year when needed: 1998
Avg.Construction Costlsq.ft.: $82.30 Does not include furnishings,equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X -$89.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) S.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Glenwood Elementary page 1 of 2
29
RENOVATIONS: _ Project No: 320_12
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 38,000 s.f. bldg. area X $23.00 per sq. ft. = $874,000
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f bldg. area X $49.00 per sq. ft. =
sub total General Renovations $874,000
2 Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $25,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 100,000
Building Code/Life Safety 45,000
Energy Conservation 25,000
Environmental
Roof Replacement I 38,000 s.f. X $6.25 per sq. ft. = 237,500
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 407,500
SUB TOTAL 1,306,500
Administrative costs/fees 1 1,306,5001 const.cost. X 0.09 117,585
Total Renovation Cost $1,424,085
9 Land Acquisition I I acres X per acre=
Total Current Project Cost $1,424,os5
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Glenwood Elementary printed: 12/13/95 page 2 of 2
30
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 _L-IC SCHOOL FACILITY NEEDS A- NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JPhillips Middle project no: 324 13
capacity
Name of School(s)this
project replaces
Membership Now: 578 (K-12)students Grades Now: 6-8
Current Capacity: 702 Grades Proposed: 6-8
Proposed Capacity: 702 (when completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms S.f. X $69.96
Science Classrooms S.f. X $102.88
Small Group/Resource S.f. X $74.07
Exceptional(self-contained) S.f. X $90-S3
Computer/Keyboarding S.f. X $98.76
Art Classroom S.f. X $82.30
Dance/Drama Classrooms S.f. X $90.53 -
Music Room (elementary) S.f. X $82.30
Band/Chorus Rooms(mdl./high) S.f. X $98.76
Vocational(trade/ind.) S.f. X $94.65
Vocational(business/service/clr S.f. X $82.30
Media Center S.f. X $94.65
Multipurpose/P.E.(elem) S.f. X $90.53
Gymnasium/P.E.(mdl./high) S.f. X $106.99
Administration/Guidance/Staff S.f. X $82.30
Cafeteria/Kitchen S.f. X $123.45
Auditorium(high) S.f. X $123.45
Other/miscellaneous S.f. X $90.53
sub total S.f.
Bldg.Support/Circulation S.f. X $82.30
total area(sq.ft.)added S.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Phillips Middle page 1 of 2
31
RENOVATIONS: Project Flo:. 324 13
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $20,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation 225,000
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. _
Computer Network/Cabling 110,0001 s.f. bldg. area X $1.75 per sq. ft. = 192,500
Security System 5,000
New Main Electrical Service
Bathrooms in auditorium 75,000
Soundproofing gym 15,000 _
sub total Other Renovations 512,500
SUB TOTAL 532,500
Administrative costs/fees 1 532,5001 const.cost. X 0.09 47,925
Total Renovation Cost $580,425
911-and Acquisition acres X per acre=
Total Current Project-cost $580,425
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
117 Energy Conservation/Air Conditioning
For reduced class sizes 0 Provide for technology(infrastructure)
Other(indicate) : F4 Deferred Maintenance(see below)
L2-J Meet State or Federal mandate(see below)
Phillips Middle printed: 12/14/95 page 2 of 2
32
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC 1 10-YEAR NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: �
SCHOOL NAME: Chapel Hill High School project no: 308_14
capacity
Name of School(s)this
project replaces
Membership Now: (K-12)students Grades Now: 9-12
Current Capacity: 121 Grades Proposed: 9-12
Proposed Capacity: (when completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings"
*contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Chapel Hill High School page 1 of 2
33
RENOVATIONS: Project No: '408_14
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility $60,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation 150,000
Environmental
Roof Replacement 16,500 s.f. X $6.25 per sq. ft. = 103,125
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft, =
Security System
New Main Electrical Service
Boiler replacements 50,000
sub total Other Renovations 303,125
SUB TOTAL 363,125
Administrative costs/fees 363,1251 const.cost. X 0.09 32,681
Total Renovation Cost $395,806
911-and Acquisition acres X per acre=
Total Current Project-Cost $395,806
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
1� Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
L2-J Meet State or Federal mandate(see below)
Chapel Hill High School printed: 12/14195 page 2 of 2
34
INDIVIDUAL SCHOOL REPORT ADDITIONS & RENOVATIONS
: 1996
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: JEstes Hills Elementary project no: 312_1
capacity
Name of School(s)this
project replaces
Membership Now: 590 (K-12)students Grades Now: K-5
Current Capacity: 540 Grades Proposed: K-5
Proposed Capacity: 540 (when completed) Year when needed: 1998
Avg.Construction Cost/sq.ft.: $82.30 Does not include fumishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
*contt. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Estes Hills Elementary page 1 of 2
35
RENOVATIONS: Project No: 312_15
K No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 40,000 s.f. bldg. area X $23.00 per sq. ft. = $920,000
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f bldg. area X $49.00 per sq. ft. =
subtotal General Renovations $920,000
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site DevelopmentlParking/Drives 60,000
Building Code/Life Safety
Energy Conservation 25,000
Environmental
Roof Replacement I 11,000 s.f. X $6.25 per sq. ft. = 68,750
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Multi Purpose Bldg.-Drainage/Site improvements 25,000
sub total Other Renovations 178,750
SUB TOTAL 1,098,750
Administrative costs/fees 1,098,750 const.cost. X 0.09 98,888
Total Renovation Cost $1,197,638
9 Land Acquisition I 7acres X per acre=
Total Current Project Cost $1,197,638
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
F27 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : F-1 I Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Estes Hills Elementary printed: 12/14195 page 2 of 2
36
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . PUBLIC SCHOOL AISSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 631 Priority: 2
SCHOOL NAME: JCulbreth Middle School project no: 322 16
capacity
Name of School(s)this
project replaces
Membership Now: (K-12)students Grades Now: 6-8
Current Capacity: lz(when Grades Proposed: 6-8
Proposed Capacity: completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys,or design fees
ADDITIONS:
No. Size/Amount Unit-Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer I Keyboarding s.f. X $98.76
Art Classroom S.I. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) S.f. X $82.30
Band/Chorus Rooms(mdl./high) S.f. X $98.76
Vocational(tradelind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen S.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
•contt. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Culbreth Middle School page 1 of 2
37
NOVATIONS: Project No: 322_16
FNO. Size/Amount Unit Cost Total
1 enerai Renovations
Minor Renovatinns s.t bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.t bldg. area X $32.00 per sq. ft. =
Major Renovations s.t bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $20,000
7 Other:
Demolition of Exist. Buildings s.t bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety
Energy Conservation 225,000
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.t bldg. area X $1.75 per sq. ft: =
Security System
New Main Electrical Service
Science Lab renovations 80,000
sub total Other Renovations 455,000
SUB TOTAL 475,000
Administrative costs/fees 475,000 const.cost. X 0.09 42,750
Total Renovation Cost $517,750
911-and Acquisition acres X per acre=
Total Current Project-Cost $517,750
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
117 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
L3—] Meet State or Federal mandate(see below)
Culbreth Middle School printed: 12/14195 page 2 of 2
313
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: Frank Porter Graham Elementary project no: 316 17
capacity
Name of School(s)this
project replaces :
Membership Now: 673 (K-12)students Grades Now: K-5
Current Capacity: 572 Grades Proposed: K-5
Proposed Capacity: 572 (when completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in Turn./egpt, for addition abov Total Furn./Eqpt.
Frank Porter Graham Elementary page 1 of 2
39
RENOVATIONS: Projezct.Jo: 316_17
No. Size/Amount Unit Cost Total
1 General Renovations _
Minor Renovations —�— s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations _ s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility $15,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 45,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling 1 58,0001 s.f. bldg. area X $1.75 per sq. ft. = 101,500
Security System 15,000
New Main Electrical Service
sub total Other Renovations 161,500
SUB TOTAL 176,500
Administrative costs/fees 176,500 const.cost. X 0.09 15,885
Total Renovation Cost $192,385
911-and Acquisition acres X per acre=
Total Current Project_Cost $192,385
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes 0 Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Frank Porter Graham Elementary printed: 12/14/95 page 2 of 2
40
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
• • . PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: Mc Dougle Middle School project no: 309_18
capacity
Name of School(s)this
project replaces :
Membership Now: 11(when(K-12)students Grades Now: 6-8
Current Capacity: Grades Proposed: 6-8
Proposed Capacity: completed) Year when needed: 1996
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small GrouplResource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $96.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational (business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
'contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Mc Dougle Middle School page 1 of 2
41
RENOVATIONS: Project No: 309_18
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f bldp, area X $12 00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation 40,000
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft: =
Security System
New Main Electrical Service
Athletic fields:fences, bleachers, irrigation 100,000
sub total Other Renovations 140,000
SUB TOTAL 140,000
Administrative costs/fees I i4o,000l const.cost. X 0.09 12,600
Total Renovation Cost $152,600
911-and Acquisition acres X per acre=
Total Current Project.Cost $152,600
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
1 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
0 Other(indicate) : Deferred Maintenance(see below)
Facilities deleted during construction
contract neg. Meet State or Federal mandate(see below)
Mc Dougie Middle School printed: 12/14195 page 2 of 2
42
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , _ • • NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: Ephesus Road Elementary project no: 311_19
capacity
Name of School(s)this
project replaces
Membership Now: M(when(K 12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade find.) s.f. X $94.65
Vocational (business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulatlon s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings"
•contt. cost of Media Ctr. not iciuded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Ephesus Road Elementary page 1 of 2
43
RENOVATIONS:. Project No: 311_19
No. Sizc/Amount Unit Cost 'i otai
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations 1,000 s.f bldg. area X $49.00 per sq. ft. = $49,000
subtotal General Renovations $49,000
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $10,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 75,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling 1 66,0001 s.f. bldg. area X $1.75 per sq. ft. = 115,500
Security System
New Main Electrical Service
sub total Other Renovations 190,500
SUB TOTAL 249,500
Administrative costs/fees 1 249,5001 const.cost. X 0.09 22,455
Total Renovation Cast $271,955
9 Land Acquisition acres X per acre=
Total Current Project Cost $271,955
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Ephesus Road Elementary printed: 12/14195 page 2 of 2
44
INDIVIDUAL SCHOOL. REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC ! • r S .110-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: Iseaweil Elementary School project no: 310_20
capacity
Name of School(s)this
project replaces
Membership Now: T(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1998
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational (business/service%ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg. Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Seawell Elementary School page 1 of 2
45
RENOVATIONS: Project No: 310_20
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility $20,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 125,000
Building Code/Life Safety
Energy Conservation 10,000
Environmental
Roof Replacement s.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Walkway connecting bldgs. -covered 35,000
sub total Other Renovations 170,000
SUB TOTAL 190,000
Administrative costs/fees 1 190,0001 const.cost. X 0.09 17,100
Total Renovation Cost $207,100
9 Land Acquisition acres X per acre=
Total Current Project Cost $207,100
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
FIE Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
2 Meet State or Federal mandate(see below)
Seawell Elementary School printed: 12/14195 page 2 of 2
46
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . PUBLIC SCHOOL . DS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: Carrboro Elementary School project no: 304 21
capacity
Name of School(s)this
project replaces :
Membership Now: 624 (K-12)students Grades Now: K-5
Current Capacity: 563 Grades Proposed: K-'
Proposed Capacity: 563 (when completed) Year when needed: 2000
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (tradelInd.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous 51 X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Carrboro Elementary School page 1 of 2
47
RENOVATIONS: Project No: 30421
No. Size/Amount Unit Cost Total
1 General kenovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety 35,000
Energy Conservation 125,000
Environmental
Roof Replacement I 22,000 s.f. X $6.25 per sq. ft. = 137,500
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
sub total Other Renovations 297,500
SUB TOTAL 297,500
Administrative costs/fees 297,500 const.cost. X 0A9 26,775
Total Renovation Cost $324,275
911-and Acquisition acres X per acre=
Total Current Project_Cost $324,275
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
F17 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
0 Other(indicate) : Deferred Maintenance(see below)
Replacement/updating/facility
Meet State or Federal mandate(see below)
Carrboro Elementary School printed: 12114195 page 2 of 2
48
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . PUBLIC SCHOOL . •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: J 4
SCHOOL NAME: JEphesus Elementary School project no: 311 22
capacity,
Name of School(s)this
project replaces :
Membership Now: 667 (K-12)students Grades Now: K-5
Current Capacity: 472 Grades Proposed: K-5
Proposed Capacity: 472 (when completed) Year when needed: 2002
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in Turn./eqpt,for addition abov Total Furn./Eqpt.
Ephesus Elementary School page 1 of 2
49
RENOVA T IONS: Project No: 311_22
FNo. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Maior Renovations s.f. bldg. area X $49.00 per sq. ft. =
rub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation 125,000
Environmental
Roof Replacement s.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 125,000
SUB TOTAL 125,000
Administrative costs/fees 1 125,0001 const.cost. X 0.09 11,250
Total Renovation Cost 1 $136,250
911-and Acquisition acres X per acre=
Total Current Project Cost $136,250
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
0 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 2 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Ephesus Elementary School printed: 12/14/95 page 2 of 2
50
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC • • . NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: Estes Hills Elementary project no: 312_23
capacity
Name of School(s)this
project replaces
Membership Now: 590 (K-12)students Grades Now: K,5
Current Capacity: 540 Grades Proposed: K-5
Proposed Capacity: 540 (when completed) Year when needed: 2000
Avg.Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms 51 X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $T4.0T
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costslfees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
"const. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Estes Hills Elementary page 1 of 2
51
RENOVATIONS: _ Project No: 312_23
No. Site/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations _ s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site DevelopmentlParking/Drives
Building Code/Life Safety 40,000
Energy Conservation
Environmental
Roof Replacement 29,000 s.f. X $6.25 per sq. ft. = 181,250
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 221,250
SUB TOTAL 221,250
Administrative costs/fees 221,250 const.cost. X 0.06 19,913
Total Renovation Cost $241,163
911-and Acquisition acres X per acre=
Total Current Project Cost $241,163
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
(� Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
17 Building Code/Life Safety(explain below) Change in grade organization
F27 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Estes Hills Elementary printed: 12/14/95 page 2 of 2
52
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC FACILITY NEEDS 1 1 i
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority:73
SCHOOL NAME: Frank Porter Graham Elementary project no: J 316_24
capacity
Name of School(s)this
project replaces ,
Membership Now: Z(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: (when completed) Year when needed: 1999
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(tradelInd.) s.f. X $94.65
Vocational(business/serviceicir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in 'urn./egpt, for addition abov Total Furn./Eqpt.
Frank Porter Graham Elementary page 1 of 2
53
RENOVATIONS: Project Nu: 31624
No. Size/Amount Uni'Cest Total
1 Genaral Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $$2.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 75,000
Building Code/Life Safety
Energy Conservation 125,000
Environmental
Roof Replacement I 8,000 s.f. X $6.25 per sq. ft. = 50,000
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 250,000
SUB TOTAL 250,000
Administrative costs/fees 1 250,0001 const.cost. X 0.09 22,500
Total Renovation Cost $272,500
911-and Acquisition acres X per acre=
Total Current Project Cost $272,500
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
1 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : F-2 ] Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Frank Porter Graham Elementary printed: 12/14/95 page 2 of 2
54
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
• • • PUBLIC OOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: JSeawell Elementary project no: 310_25
capacity
Name of School(s)this
project replaces
Membership Now: 11(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1999
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(tradelind.) s.f. X $94.65
Vocational(business/servicelclr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total FurnJ Eqpt.
Seawall Elementary page 1 of 2
55
RENOVATIONS: Project No: 310_25-1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety 70,000
Energy Conservation 125,000
Environmental
Roof Replacement I 20,000 s.f. X $6.25 per sq. ft. = 125,000
Computer Network/Cabling s.t bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 320,000
SUB TOTAL 320,000
Administrative costs/fees 320,0001 const.cost. X 0.09 28,800
Total Renovation Cost $348,800
911-and Acquisition acres X per acre=
Total Current Project Cost $348,800
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
1 I Meet State or Federal mandate(see below)
Seawell Elementary printed: 12/14/95 page 2 of 2
56
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC w NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: JCulbreth Middle project no: 322 27
capacity
Name of School(s)this
project replaces
Membership Now: T(when(K-12)students Grades Now: 6-8
Current Capacity: Grades Proposed: 6-8
Proposed Capacity: completed) Year when needed: 2000
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/Ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous 3,000 s.f. X $90.53 271,590
sub total 3,000 s.f. 271,590
Bldg.Support/Circulation 510 s.f. X $82.30 41,973
total area(sq.ft.)added 3,510 s.f. 313,563
Administrative costs/fees 313,563 const.cost. X 0.075 23,517
Total Additions $337,080
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 313,563 const.cost. X 0.094 29,581
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $29,581
Culbreth Middle page 1 of 2
57
RENOVATIONS: Project No: 32227
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.t bldg. area X $32.00 per sq. ft. =
Major Renovations s.t bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.t bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Locker room renovations 60,000
sub total Other Renovations 210,000
SUB TOTAL 210,000
Administrative costs/fees 210,0001 const.cost. X 0.09 18,900
Total Renovation Cost $228,900
911-and Acquisition acres X per acre=
Total Current Project Cost $595,561
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 1E—� To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Culbreth Middle printed: 12/14/95 page 2 of 2
58
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
SCHOOL 1996 PUBLIC
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 4
SCHOOL NAME: Phillips Middle School project no: 324 28
capacity
Name of School(s)this
project replaces
Membership Now: 578 (K-12)students Grades Now: 6-8
Current Capacity 702 Grades Proposed: 6-8
Proposed Capacity: 702 (when completed) Year when needed: 2002
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq.
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(businesslservice/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Phillips Middle School page 1 of 2
59
RENOVATIONS: Project No: 32428
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2 Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 75,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft: =
Security System
New Main Electrical Service
sub total Other Renovations 75,000
SUB TOTAL 75,000
Administrative costs/fees 1 75,0001 const.cost. X 0.09 6,750
Total Renovation Cost f $81,750
911-and Acquisition I I acres X per acre=
Total Current Project Cost $81,750
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 711 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Phillips Middle School printed: 12/14195 page 2 of 2
60
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC • • NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: Icarrboro Elementary School I project no: 304 29
capacity
Name of School(s)this
project replaces
Membership Now: T(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1996
Avg.Construction Costfaq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X 59816
Vocational(tradelInd.) S.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdi./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
•contt. cost of Media Ctr. not iciuded in furn./eqpt, for addition abov Total Furn./Eqpt.
Carrboro Elementary School page 1 of 2
f,3
RENOVATIONS: Project No: 30429
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $35,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 15,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling 1 62,0001 s.f. bldg. area X $1.75 per sq. ft. = 108,500
Security System
New Main Electrical Service
sub total Other Renovations 123,500
SUB TOTAL 158,500
Administrative costs/fees 158,5001 const.cost. X 0.09 14,265
Total Renovation Cost $172,765
911-and Acquisition acres X per acre=
Total Current Project-Cost $172,765
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes 27 Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Carrboro Elementary School printed: 12/14195 page 2 of 2
c
62 ►
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
, 1996 PUBLIC SCHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT,
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: Phillips Middle School project no: 324 30
capacity
Name of School(s)this
project replaces
Membership Now: 11(when(K-12)students Grades Now: 6-8
Current Capacity: Grades Proposed: 6-8
Proposed Capacity: completed) Year when needed: 1998
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Phillips Middle School page 1 of 2
63
RENOVATIONS: Project No: 324_30
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.t bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2 Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 60,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Athletic field, bleachers, irrigation 60,000
Locker Room improvements 60,000 _
sub total Other Renovations 180,000
SUB TOTAL 180,000
Administrative costs/fees 1 180,0001 const.cost. X 0.09 16,200
Total Renovation Cost $196,200
911-and Acquisition acres X per acre=
Total Current Project-Cost $196,200
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 1 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Phillips Middle School printed: 12/14/95 page 2 of 2
SCHOOL CAPITAL CONSTRUCTION STUDY COMMISSION - SURVEY
SCHOOL"96 PUBLIC 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Orange County Schools UNIT NO: 680
The Orange County Schools Board of Education submits to the School Capital
Construction Study Commission this survey of public school facility projects that it estimates may
be needed within the next 10 years.
Approved for submission to the School Capital Construction Study Commission by the
Orange County Schools Board of Education
Chairman Date
Secretary, Ex-officio Date
The County Board of Commissioners APPROVES this
survey for submission to the School Capital Construction Study Commission -
OR
n The County Board of Commissioners DOES NOT APPROVE
this survey for submission to the School Capital Construction Study Commission
Chairman Date
County Manager or Clerk Date
NOTE: A Board of County Commissioners that DOES NOT APPROVE the school board's survey must submit its own
survey to the School Capital Construction Study Commission,with a separate cover sheet.
2
i
SCHOOL CAPITAL CONSTRUCTION STUDY COMMISSION - SURVEY
. . . PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Orange County Schools UNIT NO: 680
STUDENT POPULATION PROJECTIONS
GR. K4 GR.64 GR.9-12 EXC+TMH Totals
FINAL ADM 1994-95 : 2,698 1,239 1,396 131 5464
DPI Membership Projections :
(fill-in) 1999-2000: 2938 1312 1458 1 5852
2004-05: 2847 1446 1634 1 6071
Local Unit Membership Projections(Y or N)�
NOTE: Do not fill-in with local membership projections unless they are significantly different from DPI projections
Attach explanation if local projections are used.
CAPACITY OF FACILITIES (no. of students)
(Do not include capacity of mobile units or temporary structures)
Elementary Middle/Jr.Hi High Totals
Capacity of Existing Schools : 29281 15221 1520 5970
Now under construction or funded
(additional capacity of new schools or additions)
Total 2928 1522 1520 5970
Additional Capacity from Projects included in this report:
Added Capacity 1996-2004:E 200 200
Total Capacity 2004-05: 29281_ 15221 1720 6170
MOBILE UNITS and TEMPORARY BUILDINGS
Indicate the TOTAL number of mobile units and temporary buildings now used for EDUCATIONAL programs:
(classrooms, exceptional children, resource, art, music, etc.)
TOTAL ESTIMATE FOR ALL PROJECTS NEEDED:
CURRENT COST : $ 17,128,900
IN YEARS NEEDED (incl inflation) : $ 18,914,154
Summary Reports -page 1 PRINTED: 06-Dec-95
• 3
PROJECT SUMMARY
. . PUBLIC SCHOOL 1
ORANGE COUNTY SCHOOLS Inflation Rate: 5.0%
PROJECT YEAR ESTIMATED COST WITH
UNIT PRIORITY NAME PROJECT NUMBER NEEDED COST INFLATION
680 2 G.A.Brown Elementary Renovations 328_1 1997 741,200 759,5
680 2 C.W.Stanford Middle Addition Renovations 316_1 1997 2,880,681 2,951,820
680 4 C.W.Stanford Middle Renovations 316_2 2004 729,483 1,051,804
680 2 Hillsborough Elementary Renovations 310_1 1996 1,963,220 1,963,220
680 2 Icarneron Park Elementary Renovations 308_1 1997 1,878,670 1,925,064
680 4 Cameron Park Elementary Renovations 308_2 2003 473,946 650,818
680 2 Central Elementary Renovations 312_1 1997 898,296 920,479
680 4 Central Elementary Renovations 312_2 2004 222,960 321,475
680 2 Orange High School Addition Renovations 332_11 1997 3,976,081 49074,271
680 4 Orange High School Addition Renovations 332 2 2004 2,033,429 2,931,897
680 1 2 jEfland Cheeks Elementary Addition Renovations 324_1 1997 1,330,93M 1,363,802
4
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
• • . PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 2
SCHOOL NAME: lCameron Park Elementary I project no: 308_1
capacity
Name of School(s)this
project replaces
Membership Now: 661 (K-12)students Grades Now: K-5
Current Capacity: 609 Grades Proposed: K-5
Proposed Capacity: 609 (when completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(tradelind.) s.f. X $94.65
Vocational(business/serviceicir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Cameron Park Elementary page 1 of 2
S
RENOVATIONS: Project No: 308 1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 48,850 s.f. bldg. area X $23.00 per sq. ft. = $1,123,550
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $1,123,550
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $125,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service 75,000
Kitchen-equipment,serving line&dishwasher 105,000
sub total Other Renovations 475,000
SUB TOTAL 1,723,550
Administrative costs/fees 1 1,723,5501 const.cost. X 0.09 155,120
Total Renovation Cost $1,878,670
911-and Acquisition acres X per acre=
Total Current Project Cost $1,878,670
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
1� Building Code/Life Safety(explain below) Change in grade organization
F37 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
2 Meet State or Federal mandate(see below)
ADA
Cameron Park Elementary printed: 12/06/95 page 2 of 2
f
6
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
POBLId SCH056L a A- NEEDS
ADMINISTRATIVE UNIT: Orange county Schools 680 Priority: 4
SCHOOL NAME: Cameron Park Elementary project no: 308_2
capacity
Name of School(s)this
project replaces
Membership Now: 610 (K-12)students Grades Now: K-5
Current Capacity: 609 Grades Proposed: K-5
Proposed Capacity: 609 (when completed) Year when needed: 2003
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center 01. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg. Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
"const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Cameron Park Elementary page 1 of 2
7
Y
RENOVATIONS: Project No: 308_2
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning T Is.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I 69,570 s.f. X $6.25 per sq. ft. = 434,813
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 434,813
SUB TOTAL 434,813
Administrative costs/fees 1 434,8131 const.cost. X 0.09 39,133
Total Renovation Cost 1 $473,946
911-and Acquisition acres X per acre=
Total Current Project Cost $473,946
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : r I I Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
Cameron Park Elementary printed: 12/05/95 page 2 of 2
c
8
Y
t INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1.996 PUBLIC
ADMINISTRATIVE UNIT: Orange County schools 680 Priority: 2
SCHOOL NAME: Icentral Elementary project no: 312_1
capacity
Name of School(s)this
project replaces :
Membership Now: M(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms I s.f bldg. area X =74A7 per sq. ft_
Regular Classrooms s.f. x $69.96
Science Classrooms s.f. x $102.88
Small Group/Resource s.f. x $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. x $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. x $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center 51 X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdlJhigh) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg. Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. x 0.094
Kitchen Equipment
Media Center Furnishings"
*coast. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Central Elementary page 1 of 2
9
RENOVATIONS: . Project No: 3121
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 3,875 s.f. bldg. area X $23.00 per sq. ft. = $89,125
T Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $89,125
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement $90,000
6 Handicapped Accessibility $100,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft..=
Security System
New Main Electrical Service 175,000
Kitchen-equipment, serving line&dishwasher 75,000
sub total Other Renovations 545,000
SUB TOTAL 824,125
Administrative costs/fees I 824,125 const.cost. X 0.09 74,171
Total Renovation Cost 1 $898,296
9 Land Acquisition acres X per acre=
Total Current Project Cost $898,296
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
1 Building Code/Life Safety(explain below) Change in grade organization
F37 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
2 Meet State or Federal mandate(see below)
ADA
Central Elementary printed: 12/06/95 page 2 of 2
10
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC • • 1'0- -YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Orange county Schools 680 Pdodty: F 4
SCHOOL NAME: Central Elementary project no: 312_2
capacity
Name of School(s)this
project replaces
Membership Now: 530 (K-12)students Grades Now: K-5
Current Capacity: 534 Grades Proposed: K-5
Proposed Capacity: 534 (when completed) Year when needed: 2004
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount unit Cost Total
Pre-K Classrooms i s.f. bldg. area X $74.07 per sq. ft =
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(businesslservice/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
•contt. cost of Media Ctr. not icluded in fum./egpt, for addition abov Total Furn./Eqpt.
Central Elementary page 1 of 2
11
Y
RENOVATIONS: _ Project No: 312_z
No. , Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I 32,728 s.f. X $6.25 per sq. ft. = 204,550
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 204,550
SUB TOTAL 204,550
Administrative costs/fees 204,5501 const.cost. X 0.09 18,410
Total Renovation Cast $222,960
911-and Acquisition acres X per acre=
Total Current Project Cost $222,960
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 17 Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
Central Elementary printed: 12105/95 page 2 of 2
12
Y
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PdAld r . . • -
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 2
SCHOOL NAME: JEfland Cheeks Elementary -�project no: 324 1
capacity
Name of School(s)this
project replaces
Membership Now: T(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/servicelcir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous 500 s.f. X $90.53 45,265
sub total 500 s.f. 45,265
Bldg.Support/Circulation 85 s.f. X $82.30 6,996
total area(sq.ft.)added 585 s.f. 52,261
Administrative costs/fees 52,261 const.cost. X 0.075 3,920
Total Additions $56,181
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 52,261 const.cost. X 0.094 4,930
Kitchen Equipment
Media Center Furnishings
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $4,930
Efland Cheeks Elementary page 1 of 2
13
RENOVATIONS: __ Project No: 3241
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning I 4,000 s.f. bldg. area X $12.00 per sq. ft. = $48,000
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5Asbestos Abatement $90,000
FHandicapped Accessibility $125,000
6
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement 64,316 s.f. X $6.25 per sq. ft. = 401,975
Computer Network!Cabling s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service 175,000
Kitchen -equipment&serving line 30,000
sub total Other Renovations 901,975
SUB TOTAL 1,164,975
Administrative costs/fees 1,164,975 const.cost. X 0.09 104,848
Total Renovation Cost $1,269,823
911-and Acquisition acres X per acre=
Total Current Project Cost $1,330,934
Why Is this project (needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
F 17 Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology
ogy(infrastructure
Other(indicate) : F4 Deferred Maintenance(see below)
Roof replacement
2 Meet State or Federal mandate(see below)
ADA
Efland Cheeks Elementary printed: 12/06/95 page 2 of 2
14
r
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC-SCkOt)� FAC' ILITY NEEDS 1 O-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE'UNIT: Orange County Schools 680 Priority: -2
SCHOOL NAME: IG.A. Brown Elementary project no: 328 1
capacity
Name of School(s)this
project replaces
Membership Now:T(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl.lhigh) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.) added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
G.A. Brown Elementary page 1 of 2
15
RENOVATIONS: _ _ Project No: 328_1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
SAsbestos Abatement $90,000
6 Handicapped Accessibility $200,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Ca I s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
Kitchen-add dishwasher,equipment X serving line 95,000
sub total Other Renovations 390,000
SUB TOTAL 680,000
Administrative costs/fees 680,0001 const.cost. X 0.09 61,200
Total Renovation Cost $741,200
911-and Acquisition acres X per acre=
Total Current Project Cost $741,200
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
17 Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
3 Meet State or Federal mandate(see below)
ADA
G.A. Brown Elementary printed: 12105195 page 2 of 2
16
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , PUBLIC 010 ,
ADMINISTRATIVE UNIT: 'Orange County Schools 680 Priority: 2
SCHOOL NAME: C.W. Stanfort; Middle projpa no: 3161
capacity
Name of School(s)this
project replaces
Membership Now: (K-12)students Grades Now: 6-8
Current Capacity:[V(when Grades Proposed: 6-8
Proposed Capacity: completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
1 Art Classroom 1,400 s.f. X $82.30 115,220
1 Dance/Drama Classrooms 1,800 s.f. X $90.53 162,954 -
Music Room(elementary) s.f. X $82.30
2 Band/Chorus Rooms(mdl./high) 2,600 s.f. X $98.76 256,776
Vocational(trade/ind.) 51 X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total 5,800 s.f. 534,950
Bldg.Support/Circulation 1,756 s.f. X $82.30 144,519
total area(sq.ft.)added 7,556 s.f. 679,469
Administrative costs/fees 679,469 const.cost. X 0.075 50,960
Total Additions $730,429
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 679,469 aonst.cost. X 0.094 64,101
Kitchen Equipment
Media Center Furnishings"
'contt. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt. $64,101
C.W.Stanford Middle page 1 of 2
17
RENOVATIONS: P�ojict Nc: 316_1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 40,300 s.f bldg. area X $23.00 per sq. ft. = $926,900
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f bldg. area X $49.00 per sq. ft. =
subtotal General Renovations $926,900
2Air Conditioning 6,0001 s.f. bldg. area X $12.00 per sq. ft. = $72,000
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement $140,000
6 Handicapped Accessibility
$50,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 300,000
Building Code/Life Safety 100,000
Energy Conservation 85,000
Environmental
Roof Replacement is.f X $6.25 per sq. ft. _
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service 200,000
Kitchen-equipment S dishwasher 40,000
sub total Other Renovations 725,000
SUB TOTAL 1,913,900
Administrative costs/fees 1,913,9001 const.cost. X 0.09 172,251
Total Renovation Cost $2,086,151
911-and Acquisition lacres X per acre=
Total Current Project Cost $2,880,681
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
1 Building Code/Life Safety(explain below) Change in grade organization
F37 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
2 1 Meet State or Federal mandate(see below)
ADA
C.W.Stanford Middle printed: 12/05/95 page 2 of 2
18
r
INDIVIDUAL SCHOOL REPORT ADDITIONS & RENOVATIONS
. . . PUBLIC o • �` 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 4
SCHOOL NAME: C. W. Stanford Middle project no: 316 2
capacity
Name of School(s)this
project replaces
Membership Now: 720 (K-12)students Grades Now: 6-8
Current Capacity: 722 Grades Proposed: 6-8
Proposed Capacity: 722 (wheii completed) Year when needed: 2004
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
"const. cost of Media Ctr. not icluded in fum./egpt, for addition abov Total Furn./Eqpt.
C.W.Stanford Middle page 1 of 2
19
1
RENOVATIONS: Project No: 3.6_2
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county sy-.tern)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement 107,080 s.f. X $6.25 per sq. ft. = 669,250
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 669,250
SUB TOTAL 669,250
Administrative costs/fees 1 669,2501 const.cost. X 0.09 60,233
Total Renovation Cost $729,483
911-and Acquisition acres X per acre=
Total Current Project Cost $729,483
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 17 Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
C.W.Stanford Middle printed: 12/06/95 page 2 of 2
20
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , PUBLIC • •
ADMINISTRATIVE UNIT: Orange county Schools 680 Priority: 2
SCHOOL NAME: Orange High School project no: 332_11
capacity
Name of School(s)this
project replaces :
Membership Now: 1515 (K-12)students Grades Now: 9-12
Current Capacity: 1520 Grades Proposed: 9-12
Proposed Capacity: 1520 (when completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl.lhigh) 12,000 s.f. X $106.99 1,283,880
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total 12,000 s.f. 1,283,880
Bldg.Support/Circulation 2,040 s.f. X $82.30 167,892
total area(sq.ft.)added 14,040 s.f. 1,451,772
Administrative costs/fees 1,451,772 const.cost. X 0.075 108,883
Total Additions $1,560,655
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 1,451,772 const.cost. X 0.094 136,960
Kitchen Equipment
Media Center Furnishings
•contt. cost of Media Ctr. not icluded in furn./egpt, for addition abov Total Furn./Eqpt. $136,960
Orange High School page 1 of 2
21
RENOVATIONS: Project No: _ 332_11
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations 8,448 s.f. bldg. area X $32.00 per sq. ft. = $270,336
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $270,336
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5Asbestos Abatement $175,000
6 Handicapped Accessibility $150,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 725,000
Building Code/Life Safety 150,000
Energy Conservation 115,000
Environmental
Roof Replacement s.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service 400,000
Kitchen -equipment,serving line&dishwasher 105,000
sub total Other Renovations 1,495,000
SUB TOTAL 2,090,336
Administrative costs/fees 1 2,090,3361 const.cost. X 0.09 188,130
Total Renovation Cost 1 $2,278,466
911-and Acquisition acres X per acre=
Total Current Project Cost $3,976,081
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
17 Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
2 Meet State or Federal mandate(see below)
ADA
Orange High School printed: 12/06/95 page 2 of 2
22
I
INDIVIDUAL SCHOOL REPORT - ADDI r IOW RENOVATIONS
. . , PUBLIC . ,
ADMINISTRATIVE UNIT: Orange county Schools 680 Priority: 4
SCHOOL NAME: Orange High School project no: 332 2
capacity
Name of School(s)this
project replaces
Membership Now: 1634 (K-12)students Grades Now: 9-12
Current Capacity: 1520 Grades Proposed: 9-12
Proposed Capacity: 1720 (when completed) Year when needed: 2004
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
8 Regular Classrooms 6,000 s.f. X $69.96 419,760
2 Science Classrooms 2,950 s.f. X $102.88 303,496
4 Small Group/Resource 1,800 s.f. X $74.07 133,326
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53 -
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/servicelcir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total 10,750 s.f. 856,582
Bldg. Support/Circulation 3,978 s.f. X $82.30 327,389
total area(sq.ft.)added 14,728 s.f. 1,183,971
Administrative costs/fees 11,183,971 const.cost. X 0.075 88,798
Total Additions $1,272,769
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 1,183,971 const.cost. X 0.094 111,695
Kitchen Equipment
Media Center Furnishings"
•const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $111,695
Orange High School page 1 of 2
23
RENOVATIONS: Project No: 3322
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I 95,261 s.t X $6.25 per sq. ft. = 595,381
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 595,381
SUB TOTAL 595,381
Administrative costs/fees 595,3811 const.cost. X 0.09 53,584
Total Renovation Cost $648,965
911-and Acquisition acres X per acre=
Total Current Project Cost $2,033,429
Why Is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 17 To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
Orange High School printed: 12/06195 page 2 of 2
24
r
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
SCHOOL' 1996 PUBLIC
ADMINISTRATIVE UNIT: Orange county Schools 680 Priority: 2
SCHOOL NAME: Hillsborough Elementary project no: 310 1
capacity
Name of School(s)this
project replaces
Membership Now: (K-12)students Grades Now: K-5
Current Capacity: lil(when Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl.lhigh) s.f. X $98.76
Vocational(tradefind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) - s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings"
'contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Hillsborough Elementary page 1 of 2
i
25
1
RENOVATIONS: Project No: _ 310_1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 31,2901 s.f. bldg. area X $23.00 per sq. ft. = $719,670
Moderate Renovations s.f. bldg. area X $32.00.per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $719,670
2A1r Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement $90,000
6 Handicapped Accessibility $150,000
7 Other:
Demolition of Exist.Buildings s1 bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 200,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement I 49,122 s.f. X $6.25 per sq.ft. = 307,013
Computer Network/Cabling 1 51,1061 s.f. bldg. area X $1.75 per sq. ft. = 89,436
Security System
New Main Electrical Service 100,000
sub total Other Renovations 841,449
SUB TOTAL 1,801,119
Administrative costs/fees 11,801,1191 const.cost. X 0.09 162,101
Total Renovation Cost $1,963,220
911-and Acquisition acres X per acre=
Total Current Project Cost $1,963,220
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility F 2—] To accommodate projected enrollment
Replace mobile units with permanent facilities � Ease current crowding at schools
F37 Building Code/Life Safety(explain below) = Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
Hillsborough Elementary printed: 12/06/95 page 2 of 2
SCHOOL CAPITAL CONSTRUCTION STUDY COMMISSION - SURVEY
• ii 10-YEAR NEEDS ASSESSMENT
ADMINISTP.A?1VF UNIT: Orange County Schools UNIT NO: 680
The Orange County Schools Board of Education submits to the School Capital
Construction Study Commission this survey of public school facility projects that it estimates may
be needed within the next 10 years.
Approved for submission to the School Capital Construction Study Commission by the
Orange County Schools Board of Education
Chairman Date
Secretary, Ex-officio Date
F] The County Board of Commissioners APPROVES this
survey for submission to the School Capital Construction Study Commission
OR
n The County Board of Commissioners DOES NOT APPROVE
this survey for submission to the School Capital Construction Study Commission
Chairman Date
County Manager or Clerk Date
NOTE: A Board of County Commissioners that DOES NOT APPROVE the school board's survey must submit its own
survey to the School Capital Construction Study Commission,with a separate cover sheet.
2
` SCHOOL CAPITAL CONSTRUCTION STUDY COMMISSION - SURVEY
1996 PUBLIC " ASSESSMENT
ADMINISTRATIVE UNIT: Orange County Schools UNIT NO: 680
STUDENT POPULATION PROJECTIONS
GR. K4 GR.64 GR.9-12 EXC+TMH Totals
FINAL ADM 1994-95 : F-2,6981 1,2391 1,3961 5464
DPI Membership Projections :
(fill-in) 1999-2000: 2938 1312 1458 1 5852
2004-05: 2847 1446 1634 1 6071
Local Unit Membership Projections(Y or N)�N�
NOTE: Do not fill-in with local membership projections unless they are significantly different from DPI projections
Attach explanation if local projections are used.
CAPACITY OF FACILITIES (no. of students)
(Do not include capacity of mobile units or temporary structures)
Elementary MiddleJ Jr.Hi High Totals
Capacity of Existing Schools : 29281 15221 15201 5970
Now under construction or funded :
(additional capacity of new schools or additions)
Total 2928 1522 1520 5970
Additional Capacity from Projects included in this report:
Added Capacity 1996-2004: 200 200
Total Capacity 2004-05: 29281 15221 1720 6170
MOBILE UNITS and TEMPORARY BUILDINGS
Indicate the TOTAL number of mobile units and temporary buildings now used for EDUCATIONAL programs
(classrooms, exceptional children, resource, art, music, etc.)
TOTAL ESTIMATE FOR ALL PROJECTS NEEDED:
CURRENT COST : $ 17,128,900
IN YEARS NEEDED (incl inflation) : $ 18,914,154
Summary Reports -page 1 PRINTED: 06-Dec-95
• 3
PROJECT SUMMARY
. . , PUBLIC SPHOOL • -
ORANGE COUNT.Y SCHOOLS Inflation Rate: 5.0%
PROJECT YEAR ESTIMATED COST WITH
UNIT PRIORITY NAME PROJECT NUMBER NEEDED COST INFLATION
680 2 IG.A.Brown Elementary Renovations 328_1 1997 741,200 759,504
680 2 C.W.Stanford Middle Addition Renovations 3161 1997 2,880,681 2,951,820
680 4 C.W.Stanford Middle Renovations 316_2 2004 729,483 1,051,804
680 2 Hillsborough Elementary Renovations 3101 1 1996 1,963,220 1,963,220
680 2 Cameron Park Elementary Renovations 308_1 1997 1,878,670 1,925,0
680 4 Cameron Park Elementary Renovations 3082 2003 473,946 650,818
680 2 Central Elementary Renovations 312_1 1997 898,296 920,479
680 4 Central Elementary Renovations 3122 2004 222,960 321,475
680 2 Orange High School Addition Renovations 33211 1997 3,976,081 4,074,271
680 4 Orange High School Addition Renovations 332_2 2004 2,033,429 2,9319897
680 2 jEfland Cheeks Elementary Addition Renovations 3241 1997 1,330,9 1,363,802
4
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
F• -UBL'IC SCHOOL FACILITY NEEDS
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 2
SCHOOL. NAME: lCameron Park Elementary project no: 308_1
capacity
Name of School(s)this
project replaces :
Membership Now: T(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1997
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(tradelInd.) s.f. X $94.65
Vocational(business/service%lr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) 0. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Cameron Park Elementary page 1 of 2
s
RENOVATIONS: _ Project No: 308_1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 48,850 s.f. bldg. area X $23.00 per sq. ft. = $1,123,550
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $1,123,550
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $125,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service 75,000
Kitchen-equipment,serving line&dishwasher 105,000
sub total Other Renovations 475,000
SUB TOTAL 1,723,550
Administrative costs/fees 1,723,5501 const.cost. X 0.09 155,120
Total Renovation Cost $1,878,670
911-and Acquisition acres X per acre=
Total Current Project Cost $1,878,670
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
117 Building Code/Life Safety(explain below) Change in grade organization
F37 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
2 Meet State or Federal mandate(see below)
ADA
Cameron Park Elementary printed: 12/06/95 page 2 of 2
6
e
INDIVIDUAL 'SDMOOt REPORT - ADDITIONS & RENOVATIONS
1996 + - i + NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: orange County Schools 680 Priority: 4
SCHOOL NAME: Icameron Park Elementary project no: 308 2
capacity
Narne of School(s)this
project replaces
Membership Now: 610 (K-12)students Grades Now: K-5
Current Capacity: 609 Grades Proposed: K-5
Proposed Capacity: 609 (when completed) Year when needed: 2003
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft.
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(tradelInd.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees L const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Cameron Park Elementary page 1 of 2
•
7
RENOVATIONS: Project No: 308 2
No. Size/Amourpt Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
T Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement 69,570 s.f. X $6.25 per sq. ft. = 434,813
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 434,813
SUB TOTAL 434,813
Administrative costs/fees 1 434,8131 const.cost. X 0.09 39,133
Total Renovation Cost 1 $473,946
911-and Acquisition acres X per acre=
Total Current Project Cost $473,946
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : F I I Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
Cameron Park Elementary printed: 12/05/95 page 2 of 2
8
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC • •
ACILITY NEEDS 10-YEAR NEEDS ASSESSMENIN
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 2
SCHOOL NAME: Icentrai Elementary project no: 312 1
capacity
Name of School(s)this
project replaces
Membership Now: 537 (K-12)students Grades Now: K-5
Current Capacity: 534 Grades Proposed: K-5
Proposed Capacity: 534 (when completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53 -
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational (business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl.lhigh) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees • const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
•contt. cost of Media Ctr. not icluded in fum./egpt, for addition abov Total Furn./Eqpt.
Central Elementary page 1 of 2
9
1
RENOVATIONS: _ Project No: 312_1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 3,875 s.f. bldg. area X $23.00 per sq. ft. = $89,125
- Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $89,125
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5Asbestos Abatement $90,000
6 Handicapped Accessibility $100,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement I ISJ. X $6.25 per sq. ft. =
Computer Network/Cabling I I s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service 175,000
Kitchen -equipment,serving line&dishwasher 75,000
sub total Other Renovations 545,000
SUB TOTAL 824,125
Administrative costs/fees 1 824,1251 const.cost. X 0.09 74,171
Total Renovation Cast $898,296
911-and Acquisition acres X per acre=
Total Current Project Cost $898,296
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
17 Building Code/Life Safety(explain below) Change in grade organization
0 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
2 Meet State or Federal mandate(see below)
ADA
Central Elementary printed: 12/06/95 page 2 of 2
10
1
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 4
SCHOOL NAME: Central Elementary project no: 312 2
capacity
Name of School(s)this
project replaces
Membership Now: 530 (K-12)students Grades Now: K-5
Current Capacity: 534 Grades Proposed: K,5
Proposed Capacity: 534 (when completed) Year when needed: 2004
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Central Elementary page 1 of 2
11
RENOVATIONS: Project No: 3122
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2 Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system).
Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I 32,728 s.f. X $6.25 per sq. ft. = 204,550
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 204,550
SUB TOTAL 204,550
Administrative costs/fees 204,550 const.cost. X 0.09 18,410
Total Renovation Cost $222,960
911-and Acquisition acres X per acre=
Total Current Project Cost $222,960
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 1� Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
Central Elementary printed: 12105/95 page 2 of 2
12
f
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , SCHOOL
ADMINISTRATIVE UNIT: Orange county Schools 680 Priority: 2
SCHOOL NAME: Efland Cheeks Elementary project no: 324 1
capacity
Name of School(s)this
project replaces
Membership Now: 438 (K-12)students Grades Now: K-5
Current Capacity: 560 Grades Proposed: K-5
Proposed Capacity: 560 (when completed) Year when needed: 1997
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53 _
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous 500 s.f. X $90.53 45,265
sub total 500 s.f. 45,265
Bldg.Support/Circulation 85 s.f. X $82.30 6,995
total area(sq.ft.)added 585 s.f. 52,261
Administrative costs/fees 52,261 const.cost. X 0.075 3,920
Total Additions $56,181
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 52,261 donst.cost. X 0.094 4,930
Kitchen Equipment
Media Center Furnishings
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $4,930
Efland Cheeks Elementary
page 1 of 2
13
r
RENOVATIONS: _ Project No: 3241
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft.=
sub total General Renovations
2Air Conditioning T 4,000 s.f. bldg. area X $12.00 per sq. ft. = ;48,000
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement $90,000
6 Handicapped Accessibility $125,000
7 Other:
Demolition of Exist. Buildings s.f, bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement I 64,316 s.f. X $6.25 per sq. ft. = 401,975
Computer Network/Cabling s.f. bldg. area X $1.75 per sq.ft. =
Security System
New Main Electrical Service 175,000
Kitchen-equipment&serving line 30,000
sub total Other Renovations 901,975
SUB TOTAL 1,164,975
Administrative costs/fees 11,164,9751 const.cost. X 0.09 104,848
Total Renovation Cost $1,269,823
911-and Acquisition acres X per acre=
Total Current Project Cost $1,330,934
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category 1V or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
17 Building Code/Life Safety(explain below) Change in grade organization
0 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : F4 Deferred Maintenance(see below)
Roof replacement
2 Meet State or Federal mandate(see below)
ADA
Efland Cheeks Elementary printed: 12106195 page 2 of 2
14
INDIVIDUAL SCHOOL REPORT - f ADDITIONS,& RENOVATIONS
. . PUBLIC • • NEEI)S t10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 2
SCHOOL NAME: IG.A. Brown Elementary project no: 328_1
capacity
Name of School(s)this
project replaces
Membership Now: 518 (K-12)students Grades Now: K-5
Current Capacity: 606 Grades Proposed: K-5
Proposed Capacity: 606 (when completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53 -
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl.lhigh) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdlJhigh) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/ EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
'contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
G.A. Brown Elementary page 1 of 2
15
RENOVATIONS: Project No: 328 1 i
No. Size/Amount Unit Cost 'Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement $90,000
6 Handicapped Accessibility $200,000
7 Other:
Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq.ft.=
Site Development/Parking/Drives 150,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Kitchen-add dishwasher,equipment&serving line 95,000
sub total Other Renovations 390,000
SUB TOTAL 680,000
Administrative costs/fees 1 680,0001 const.cost. X 0.09 61,200
Total Renovation Cost 1 $741,200
911-and Acquisition acres X per acre=
Total Current Project Cost $741,200
Why Is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
117 Building Code/Life Safety(explain below) Change in grade organization
F27 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
3 Meet State or Federal mandate(see below)
ADA
G.A. Brown Elementary printed: 12/05/95 page 2 of 2
16
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
•
. . , PUBLIC . • •
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 2
SCHOOL NAME: C.W. Stanford Middle project no: 316_1
capacity
Name of School(s)this
project replaces
Membership Now: 620 (K-12)students Grades Now: 6-8
Current Capacity: 722 Grades Proposed: 6-8
Proposed Capacity: 722 (when completed) Year when needed: 1997
Avg.Construction Costlsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
1 Art Classroom 1,400 s.f. X $82.30 115,220
1 Dance/Drama Classrooms 1,800 s.f. X $90.53 162,954
Music Room(elementary) s.f. X $82.30
2 Band/Chorus Rooms(mdi.lhigh) 2,600 s.f. X $98.76 256,776
Vocational (trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total 5,800 s.f. 534,950
Bldg.Support/Circulation 1,756 s.f. X $82.30 144,519
total area(sq.ft.)added 7,556 s.f. 679,469
Administrative costs/fees 679,4691 const.cost. X 0.075 50,960
Total Additions $730,429
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 679,469 const.cost. X 0.094 64,101
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $64,101
C.W.Stanford Middle page 1 of 2
17
RENOVATIONS: Project No: 316_1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 40,300 s.f bldg. area X $23.00 per sq. ft. = $926,900
Moderate Renovations s.f bldg. area X $32.00 per sq. ft.=
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $926,900
2Air Conditioning 6,0001 s.f bldg. area X $12.00 per sq. ft. = $72,000
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement $140,000
6 Handicapped Accessibility $50,000
7Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 300,000
Building Code/Life Safety 100,000
Energy Conservation 85,000
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service 200,000
Kitchen -equipment&dishwasher 40,000
sub total Other Renovations 725,000
SUB TOTAL 1,913,900
Administrative costs/fees 1,913,9001 const.cost. X 0.09 172,251
Total Renovation Cost $2,086,151
911-and Acquisition acres X per acre=
Total Current Project Cost $2,880,681
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
F7 Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
2 Meet State or Federal mandate(see below)
ADA
C.W.Stanford Middle printed: 12/05195 page 2 of 2
l
rl3
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC • • . ASSESSMENT
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 4
SCHOOL NAME: C.w. Stanford Middle project no: 3162
capacity
Name of School(s)this
project replaces
Membership Now: 720 (K-12)students Grades Now: 6-8
Current Capacity: 722 Grades Proposed: 6-8
Proposed Capacity: 722 (when completed) Year when needed: 2004
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational (business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
'contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
C.W.Stanford Middle page 1 of 2
i
19
RENOVATIONS: Project No: 316_2
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement 107,080 s.f. X $6.25 per sq. ft. = 669,250
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 669,250
SUB TOTAL 669,250
Administrative costs/fees 669,2501 const.cost. X 0.09 60,233
Total Renovation Cost $729,483
911-and Acquisition acres X per acre=
Total Current Project Cost $729,483
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 1 Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
C.W.Stanford Middle printed: 12106/95 page 2 of 2
20
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
• • . PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Orange County schools 680 Priority: 2
SCHOOL NAME: 10range High School project no: 332 11
capacity
Name of School(s)this
project replaces
Membership Now:T(when(K-12)students Grades Now: 9-12
Current Capacity: Grades Proposed: 9-12
Proposed Capacity: completed) Year when needed: 1997
Avg.Construction Costlsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service%ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) 12,000 s.f. X $106.99 1,283,880
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total 12,000 s.f. 1,283,880
Bldg.Support/Circulation 2,040 s.f. X $82.30 167,892
total area(sq.ft.)added 14,040 s.f. 1,451,772
Administrative costs/fees 11,451,772 const.cost. X 0.075 108,883
Total Additions $1,560,655
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 1,451,772 const.cost. X 0.094 136,960
Kitchen Equipment
Media Center Furnishings
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $136,960
Orange High School page 1 of 2
1
21
RENOVATIONS: Project No: 332_11
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations 8,448 s.f. bldg. area X $32.00 per sq. ft. = $270,336
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $270,336
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement $175,000
6 Handicapped Accessibility $150,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 725,000
Building Code/Life Safety 150,000
Energy Conservation 115,000
Environmental
Roof Replacement ls.f X $6.25 per sq. ft. _
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service 400,000
Kitchen-equipment,serving line&dishwasher 105,000
sub total Other Renovations 1,495,000
SUB TOTAL 2,090,336
Administrative costs/fees 2,090,3361 const.cost. X 0.09 188,130
Total Renovation Cost $2,278,466
911-and Acquisition acres X per acre=
Total Current Project Cost $3,976,081
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
117 Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
L2 Meet State or Federal mandate(see below)
ADA
Orange High School printed: 12/06/95 page 2 of 2
22
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . O• r NEEDS
ADMINISTRATIVE UNIT: Orange county Schools 680 Priority: 4
SCHOOL NAME: Orange High School project no: 332 2
capacity
Name of School(s)this
project replaces
Membership Now: 1634 (K-12)students Grades Now: 9-12
Current Capacity: 1520 Grades Proposed: 9-12
Proposed Capacity: 1720 (when completed) Year when needed: 2004
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
8 Regular Classrooms 6,000 s.f. X $69.96 419,760
2 Science Classrooms 2,950 s.f. X $102.88 303,496
4 Small Group/Resource 1,800 s.f. X $74.07 133,326
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total 10,750 s.f. 856,582
Bldg.Support/Circulation 3,978 s.f. X $82.30 327,389
total area(sq.ft.)added 14,728 s.f. 1,183,971
Administrative costs/fees 1,183,971 const.cost. x 0.075 88,798
Total Additions $1,272,769
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 1,183,971 const.cost. x 0.094 111,695
Kitchen Equipment
Media Center Furnishings"
"contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $111,695
Orange High School page 1 of 2
1
23
P.ENOVATICNS: Project No: 3322
No. Size/Amount Unit Cost Total
4 '1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderwte Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq.ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement I 95,261 s.f. X $6.25 per sq. ft. = 595,381
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 595,381
SUB TOTAL 595,381
Administrative costs/fees 1 595,3811 const.cost. X 0.09 53,584
Total Renovation Cost 1 $648,965
911-and Acquisition acres X per acre=
Total Current Project Cost $2,033,429
Why Is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility F , I To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
Orange High School printed: 12/06/95 page 2 of 2
1
24
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
• - . PUBLIC SCFfOO' L
ADMINISTRATIVE UNIT: Orange County Schools 680 Priority: 2
SCHOOL NAME: Hillsborough Elementary project no: 310 1
capacity
Name of School(s)this
project replaces
Membership Now: (K-12)students Grades Now: K-5
Current Capacity: 400 Grades Proposed: K-5
Proposed Capacity: 400 (when completed) Year when needed: 1996
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) 51 X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53 -
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg. Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
'contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Hillsborough Elementary page 1 of 2
R
25
7
RENOVA 'IONS: Project No: 310_1
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 31,290 s.f bldg. area X $23.00 per sq. ft. = $719,670
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. _
Major Renovations s.f. bldg. area X $49.00 per sq. ft. _
sub total General Renovations $719,670
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement $90,000
6 Handicapped Accessibility
$150,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 200,000
Building Code/Life Safety 80,000
Energy Conservation 65,000
Environmental
Roof Replacement 49,122 s.f. X $6.25 per sq. ft. = 307,013
Computer Network/Cabling 51,1061 s.f. bldg. area X $1.75 per sq. ft. = 89,436
Security System
New Main Electrical Service 100,000
sub total Other Renovations 841,449
SUB TOTAL 1,801,119
Administrative costs/fees 1,801,1191 const.cost. X 0.09 162,101
Total Renovation Cost $1,963,220
911-and Acquisition acres X per acre=
Total Current Project Cost $1,963,220
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility F 2� To accommodate projected enrollment
Replace mobile units with permanent facilities 17 Ease current crowding at schools
Ell Building Code/Life Safety(explain below) = Change in grade organization
F47 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
Roof replacement
Meet State or Federal mandate(see below)
Hillsborough Elementary printed: 12/06/95 page 2 of 2
•, 1
i
SCHOOL CAPITAL CONSTRUCTION STUDY COMMISSION - SURVEY
Si
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro Schools UNIT NO: 681
STUDENT POPULATION PROJECTIONS
GR.K-0 GR.6-6 GR.9-12 EXC+TMH Totals
FINAL ADM 1994-95 : 1 3,665111 1,7471 11,991sl 113 7509
DPI Membership Projections
(fill-in) 1999-2000: 40371 2281 2648 115 9081
2004-05: 39501 24201 34001 1151 9885
Local Unit Membership Projections(Y or N)�
NOTE: Do not fill-in with local membership projections unless they are significantly different from DPI projections
Attach explanation if local projections are used.
CAPACITY OF FACILITIES (no. of students)
(Do not include capacity of mobile units or temporary structures)
Elementary Middle/Jr.Hi High Totals
Capacity of Existing Schools : 3092 210 1645 6841
Now under construction or funded : 5961 1 1020 1616
(additional capacity of new schools or additions)
Total 3688 2104 2665 8457
Additional Capacity from Projects included in this report:
Added Capacity 1996-2004: 6001 700 500 1800
Total Capacity 2004-05: 1 42881 280 3165 10257
MOBILE UNITS and TEMPORARY BUILDINGS
Indicate the TOTAL number of mobile units and temporary buildings now used for EDUCATIONAL programs:
(classrooms, exceptional children, resource, art, music, etc.) 21
TOTAL ESTIMATE FOR ALL PROJECTS NEEDED:
CURRENT COST : $ 39,453,217
IN YEARS NEEDED(incl inflation) : $ 44,535,771
Summary Reports -page 1 PRINTED: 14-Dec-95
2
i
PROJECT SUMMARY
. . . PUBLIC SCHOQL ` 'R NEEDS ASSESSMENT
CHAPEL HILL-CARRBORO SCHOOLS Inflation Rate: 5.0%
PROJECT YEAR ESTIMATED COST WITH
UNIT PRIORITY NAME PROJECT NUMBER NEEDED COST INFLATION
681 2 Middle School#4 New School 101_1 2000 10,293,772 12,210,602
681 2 Elementary School#8 New School 100_1 1 1999 7,582,408 8,566,046
681 2 East Chapel Hill High -Addition Renovations 999_11 1999 10,452,361 11,808,307
681 1 Glenwood Elementary Addition Renovations 320_2 1995 529,045 529,045
681 1 IChapel Hill High Renovations 308_3 1996 832,215 832,215
681 1 lCulbreth Middle School Renovations 322_4 1996 816,138 816,138
681 1 Seawell Elementary Renovations 310_5 1996 192,385 192,385
681 3 Ephesus Elementary Renovations 311_6 2000 356,975 423,448
681 3 Chapel Hill High Renovations 308_11 2000 594,050 704,670
681 1 Estes Hills Elementary Renovations 312_8 1996 124,805 124,805
681 4 Glenwood Elementary Renovations 320_9 2003 49,050 67,355
681 2 Chapel Hill High Renovations 30810 1998 78ASO 84,439
681 2 Carrboro Elementary Renovations 304_11 1998 242,525 260,940
681 2 Glenwood Elementary Renovations 320_12 1998 1,424,085 1,532,216
681 1 Phillips Middle Renovations 32413 1896 580,425 580,425
681 1 Chapel Hill High School Renovations 30914 1996 395,806 395,806
681 2 Estes Hills Elementary Renovations 312_15 1998 1,197,638 1,288,574
681 2 Culbreth Middle School Renovations 322_16 1997 517,750 530,536
681 1 Frank Porter Graham Elementary Renovations 316_17 1996 192,385 192,385
681 1 Mc Dougle Middle School Renovations 309 18 1996 152,600 152,600
681 1 Ephesus Road Elementary Renovations 311_19 1996 271,955 271,955
681 2 Seawell Elementary School Renovations 310_20 1998 207,100 222,825
681 3 Icarrboro,Elementary School Renovations 304_21 2000 324,275 384,659
681 4 Ephesus Elementary Schoot. Renovations 311_22 2002 136,250 178,188
681 3 Estes Hills Elementary Renovations 312_23 2000 241,163 286,071
681 3 Frank Porter Graham Elementary Renovations 31624 1999 272,500 307,850
681 3 Seawell Elementary Renovations 31025 1999 348,800 394,049
681 3 Culbreth Middle Addition Renovations 32227 2000 595,561 7069462
681 4 Phillips Middle School Renovations 32428 1 2002 81,750 106,913
681 1 Carrboro Elementary School Renovations 304 29 1996 172,765 172,765
681 2 Phillips Middle School Renovations 324_30 1998 196,200 211,097
3
f
SCHOOL CAPITAL CONSTRUCTION STUDY COMMISSION - SURVEY
. . . PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro Schools KNIT NO: 681
The Chapel Hill-Carrboro Schools Board of Education submits to the School Capital
Construction Study Commission this survey of public school facility projects that it estimates may
be needed within the next 10 years.
Approved for submission to the School Capital Construction Study Commission by the
Chapel Hill-Carrboro Schools Board of Education
Chairman Date
Secretary, Ex-officio Date
The County Board of Commissioners APPROVES this
survey for submission to the School Capital Construction Study Commission
OR
The County Board of Commissioners DOES NOT APPROVE
this survey for submission to the School Capital Construction Study Commission
Chairman Date
County Manager or Clerk Date
NOTE: A Board of County Commissioners that DOES NOT APPROVE the school board's survey must submit its own
survey to the School Capital Construction Study Commission,with a separate cover sheet.
4
i
INDIVIDUAL SCHOOL REPORT NEW MIDDLE SCHOOL
• • ► 11 ! NEEDS
Administrative Unit: Chapel Hill-Carrboro Schools Priority: 2
Unit No: 681
School Name: IMiddle School #4 Grades : 6-8
Name of School(s)this prcjec'_replaces : Capacity
Number of students: 700 (K-05)students Project no: 1 1011
Future capacity • 700
Exceptional (self-contained): 3 classrooms Pre-kindergarten cirms: N/A
Dance/Drama classrooms: 1 Year when needed: 2000
Land Cost/Acre: $6,819 On-site SewerMater(y/n): N
Bldg. area to be demolished: sq.ft.
Construction CosVsq.ft.: $82.30 Number of Academic Classrooms: 27
Sq.Ft. per Student(w/excp.): 140 Other Teaching Stations: 9
COST ESTIMATE
Construction Cost 97,887s.f. building area X $82.30 per sq. ft. = $8,056,100
Middle School additional sitework (playfields,drives) 4%const. cost 322,244
High School additional sitework (fields,parking,etc.) 7%contt. cost N/A
sub total $8,378,344
Construction Contingency construction cost X 0.05 contingency= 418,917
Administrative costs/fees construction cost X 0.07 586,484
sub total $9,383,745
Demolition of Exist. Buildings s.f. building area X $6.86 per sq. ft. _
On-site sewer/water system
Total Construction Cost $9,383,745
Land Acquisition 22 acres X $6,819 per acre= $150,018
Furnishings/Equipment 8,056,100 construction cost X 0.094 $760,009
Total Current Cost $10,293,772
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 1❑ To accommodate projected enrollment
ElReplace mobile units with permanent facilities 2❑ Ease current crowding at schools
Other(indicate) : 7 Change in grade organization
Middle School#4 printed: 12/13/95
5
t
INDIVI DUAL.SCHOOL REPORT NEW ELEMENTARY
1996: PUBLIC SCHOOL FACILITY 101-YEAR NEEDS ASSESSMENT
Administrative Unit: Chapel Hill-Carrboro Schools Priority: 2
Unit No: 681
School Name: JElementary School #8 Grades : CK-5
Name of School(s)this project replaces : Capacity
Number of students: 600 (K-05)students Project no: 100_1
Future capacity : 600
Exceptional (self-contained): 2 classrooms Pre-kindergarten clans: 1
Dance/Drama classrooms: 1 Year when needed: 1999
Land Cost/Acre: $15,625 On-site SewerMater(y/n): N
Bldg.area to be demolished: sq.ft.
Construction Cost/sq.ft.: $82.30 Number of Academic Classrooms: 25
Sq.Ft. per Student(w/excp.): 114 Other Teaching Stations: 5
COST ESTIMATE
Construction Cost 73,368 s.f. building area X $82.30 per sq. ft. _ $6,038,186 -
Middle School additional sitework (playfields,drives) 4%const cost N/A
High School additional sitework (fields,parking,etc.) 7%const. cost N/A
sub total $6,038,186
Construction Contingency construction cost X 0.05 contingency= 301,909
Administrative costs/fees construction cost X 0.07 422,673
sub total $6,762,768
Demolition of Exist. Buildings s.f. building area X $6.86 per sq. ft. _
On-site sewer/water system
Total Construction Cost $6,762,768
Land Acquisition 16 acres X $15,625 per acre= $250,000
Furnishings/Equipment 6,038,186 construction cost X 0.094 $569,640
Total Current Cost $7,582,408
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 5-1 To accommodate projected enrollment
F3 Replace mobile units with permanent facilities 2❑ Ease current crowding at schools
Other(indicate) : 7 Change in grade organization
Elementary School#8 printed: 12/13/95
6
INDIVIDUAL SCHOOL REPORT - ADDITIONS t RENOVATIONS
. . PUBLIC • •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: East Chapel Hill High project no: 999_1
capacity
Name of School(s)this
project replaces
Membership Now: [Z(when(K-12)students Grades Now: 9-12
Current Capacity: Grades Proposed: 9-12
Proposed Capacity: completed) Year when needed: 1999
Avg.Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
18 Regular Classrooms 13,500 s.f. X $69.96 944,460
6 Science Classrooms 8,550 s.f. X $102.88 879,624
1 Small Group/Resource 450 s.f. X $74.07 33,332
Exceptional(self-contained) s.f. X $90.53
2 Computer/Keyboarding 1,700 s.f. X $98.76 167,892
2 Art Classroom 3,200 s.f. X $82.30 263,360
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
1 Vocational (business/service/clr 1,200 s.f. X $82.30 98,760
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) 14000 s.f. X $106.99 1,283,880
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) 25,000 s.f. X $123.45 3,086,250
Other/miscellaneous 5,000 s.f. X $90.53 452,650
sub total 70,600 s.f. 7,210,208
Bldg.Support/Circulation 1 17,542 s.f. X $82.30 1,443,707
total area(sq.ft.)added 88,142 s.f. 8,653,915
Administrative costs/fees 18,653,915 const.cost. X 0.075 649,044
Total Additions $9,302,959
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 8,653,915 const.cost. X 0.094 816,407
Kitchen Equipment
Media Center Furnishings'
'const. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt. $816,407
East Chapel Hill High page 1 of 2
7
RENOVATIONS: Project No: 999_11
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 3,500 s.f. bldg. area X $23.00 per sq. ft. = $80,500
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $80,500
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
Athletic fields, bleachers,tennis courts, press box 225,000
sub total Othetr Renovations 225,000
SUB TOTAL 305,500
Administrative costs/fees 1 305,5001 const.cost. X 0.09 27,495
Total Renovation Cost $332,995
911-and Acquisition acres X per acre=
Total Current Project.Cost $10,452,361
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility � To accommodate projected enrollment
Replace mobile units with permanent facilities 0 Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
F17 Other(indicate) : Deferred Maintenance(see below)
Complete original Ed.Spec. requirement
Meet State or Federal mandate(see below)
East Chapel Hill High printed: 12/13195 page 2 of 2
8
1
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC • •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JGienwood Elementary project no: 320_2
capacity
Name of School(s)this
project replaces
Membership Now: 451 (K-12)students Grades Now: K-5
Current Capacity: 447 Grades Proposed: K-6
Proposed Capacity: 447 (when completed) Year when needed: 1995
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost I Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft.
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center 1,200 s.f. X $94.65 113,580
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total 1,200 s.f. 113,580
Bldg.Support/Circulation 2641 s.f. X $82.30 21,727
total area(sq.ft.)added 1,46 s.f. 135,307
Administrative costs/fees 135,3071 const.cost. X 0.075 10,148
Total Additions $145,455
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 21,727 const.cost. X 0.094 2,050
Kitchen Equipment
1 Media Center Furnishings 48,000
'const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt. $50,050
Glenwood Elementary page 1 of 2
a
9
{
RENOVATIONS: Project No: 320_2
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations �— s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations 3,500 s.f. bldg. area X $49.00 per sq. ft. = $171,500
sub total General Renovations $171,500
2Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement IS1 X $6.25 per sq. ft. =
Computer Network/Cabling 1 54,0001 s.f bldg. area X $1.75 per sq. ft. = 94,500
Security System
New Main Electrical Service 40,000
sub total Other Renovations 134,500
SUB TOTAL 306,000
Administrative costs/fees 1 306,0001 const.cost. X 0.09 27,540
Total Renovation Cost $333,540
911-and Acquisition acres X per acre=
Total Current Project-Cost $529,045
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 17 To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes � Provide for technology(infrastructure)
Other(indicate) : = Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Glenwood Elementary printed: 12/13/95 page 2 of 2
10
-INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JChapel Hill High project no: 308_3
capacity
Name of School(s)this
project replaces
Membership Now: 1700 (K-12)students Grades Now: 9-12
Current Capacity: 1645 Grades Proposed: 9-12
Proposed Capacity: 1645 (when completed) Year when needed: 1996
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational (business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings"
'const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Chapel Hill High page 1 of 2
11
RENOVATIONS: Project No: 3083
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations 11,500 s.f. bldg. area X $49.00 per sq. ft. = $563,500
sub total General Renovations $563,500
2 Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 125,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Modify kitchen/cafeteria 75,000
sub total Other Renovations 200,000
SUB TOTAL 763,500
Administrative costs/fees 1 763,5001 const.cost. X 0.09 68,715
Total Renovation Cost $832,215
911-and Acquisition acres X per acre=
Total Current Project.Cost $832,215
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
F37 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Roof repl.
1 Meet State or Federal mandate(see below)
Chapel Hill High printed: 12/13/95 page 2 of 2
12 y
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
: 19.96,PUBLIC SCHOOL NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: F--'
SCHOOL NAME: JCulbreth Middle School project no: 322_4
capacity
Name of School(s)this
project replaces
Membership Now: 655 (K-12)students Grades Now: 6-8
Current Capacity: 670 Grades Proposed: 6-8
Proposed Capacity: 670 (when completed) Year when needed: 1996
Avg. Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource S.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center S.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
"const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Culbreth Middle School page 1 of 2
13
RENOVATIONS:- Project No: 322_4
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 3,000 s.f. bldg. area X $23.00 per sq. ft. = $69,000
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $69,000
2Air Conditioning 10,000 s.f. bldg. area X $12.00 per sq. ft. = $120,000
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling 105,000 s.f. bldg. area X $1.75 per sq. ft. = 183,750
Security System
New Main Electrical Service
Replace 27 yr.old electric rooftop HVAC equip. 350,000
Replace Water Heaters 26,000
sub total Other Renovations 559,750
SUB TOTAL 748,750
Administrative costs/fees 748,750 const.cost. X 0.09 67,388
Total Renovation Cost $816,138
9 Land Acquisition acres X per acre=
Total Current Project-Cost $816,138
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes � Provide for technology(infrastructure)
Other(indicate) : F3 Maintenance(see below)
Meet State or Federal mandate(see below)
Culbreth Middle School printed: 12/13/95 page 2 of 2
14
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC • •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 71
SCHOOL NAME: Iseawell Elementary project no: 310_5
capacity
Name of School(s)this
project replaces
Membership Now: T(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1996
Avg.Construction CosUsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational (business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
'contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Seawell Elementary page 1 of 2
15
RENOVATIONS: . Project No: 310S
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement 1s.f X $6.25 per sq. ft.
Computer Network/Cabling 1 58,0001 s.f. bldg. area X $1.75 per sq. ft. = 101,500
Security System
New Main Electrical Service
Replace 12 four ton electric heat ventilators 75,000
sub total Other Renovations 176,500
SUB TOTAL 176,500
Administrative costs/fees 1 176,5001 const.cost. X 0.09 15,885
Total Renovation Cost $192,385
9 Land Acquisition acres X per acre=
Total Current Project Cost $192,385
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
17 Energy Conservation/Air Conditioning
For reduced class sizes � Provide for technology(infrastructure)
Other(indicate) : F 37 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Seawell Elementary printed: 12/13/95 page 2 of 2
16 ,
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996,PU8LIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrborc,School 681 PrioriWI 3
SCHOOL NAME: Ephesus Elementary project no: 311 6
capacity
Name of School(s)this _
project replaces
Membership Now: 667 (K-12)students Grades Now: K-5
Current Capacity: 472 Grades Proposed: K-5
Proposed Capacity: 4TZ (when completed) Year when needed: 2000
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys,or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdlJhigh) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
"contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Ephesus Elementary page 1 of 2
17
RENOVATIONS:' Project No: 311_6
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. _
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. _
Major Renovations s.f bldg. area X $49.00 per sq. ft. _
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement 34,000 s.f. X $6.25 per sq. ft. = 212,500
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
Replace ten packaged electrical heat roof 115,000
op units with gas powered units
sub total Other Renovations 327,500
SUB TOTAL 327,500
Administrative costs/fees 1 327,5001 const.cost. X 0.09 29,475
Total Renovation Cost $356,975
911-and Acquisition acres X per acre=
Total Current Project Cost $356,975
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
17 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
LJMeet State or Federal mandate(see below)
Ephesus Elementary printed: 12/13/95 page 2 of 2
18
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC SCHOOL . _ - NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: Chapel Hill High project no: 0308 11
capacity
Name of School(s)this
project replaces
Membership Now: 1700 (K-12)students Grades Now: 9-12
Current Capacity: ]1645 Grades Proposed: S-1 Z
Proposed Capacity: 1645 (when completed) Year when needed: 2000
Avg. Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Chapel Hill High page 1 Of 2
19
R NOVATIONS: Project No: 308_11
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 130,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. =
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Convert two chillers from R11 refrigerant 55,000
Bleachers,Press Box,Concession Fac.,Restrooms 250,000
Tennis Courts 110,000
sub total Other Renovations 545,000
SUB TOTAL 545,000
Administrative costs/fees 545,0001 const.cost. X 0.09 49,050
Total Renovation Cost $594,050
911-and Acquisition acres X per acre=
Total Current Project-Cost $594,050
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
0 Building Code/Life Safety(explain below) Change in grade organization
Replace R11 refrigerate Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Chapel Hill High printed: 12/13/95 page 2 of 2
20
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
11996 PUBLIC . •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JEstes Hills Elementary project no: 312_8
capacity
Name of School(s)this
project replaces
Membership Now: 590 (K-12)students Grades Now: K-'
Current Capacity: 540 Grades Proposed: K-5
Proposed Capacity: 540 (when completed) Year when needed: 1996
Avg.Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
'const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Estes Hills Elementary page 1 of 2
21
RENOVATIONS: Project Nu: 3128
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $20,000
7 Other:
Demolition of Exist. Buildings s.f bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. _
Computer Network/Cabling 54,0001 s.f. bldg. area X $1.75 per sq. ft. = 94,500
Security System
New Main Electrical Service
sub total Other Renovations 94,500
SUB TOTAL 114,500
Administrative costs/fees 1 114,5001 const.cost. X 0.09 10,305
Total Renovation Cost $124,805
911-and Acquisition acres X per acre=
Total Current Project_Cost $124,805
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes � Provide for technology(infrastructure)
Other(indicate) : 731 Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Estes Hills Elementary printed: 12113/95 page 2 of 2
22
j
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 4
SCHOOL NAME: JGIenwood Elementary project no: 320 9
capacity
Name of School(s)this
project replaces
Membership Now: T(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 2003
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $10288
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishings Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
"contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Glenwood Elementary page 1 of 2
23
RENOVATIONS:. Project No: 320_9
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. _
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
Replace cooling tower 45,000
sub total Other Renovations 45,000
SUB TOTAL 45,000
Administrative costs/fees I 45,000l const.cost. X 0.09 4,050
Total Renovation Cost $49,050
911-and Acquisition acres X per acre=
Total Current Project Cost $49,050
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
117 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Glenwood Elementary printed: 12/13/95 page 2 of 2
a
24
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , PUBLIC • •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: JChapel Hill High project no: 308 10
capacity
Name of School(s)this
project replaces
Membership Now: T(when(K-12)students Grades Now: 9-12
Current Capacity: Grades Proposed: 9-12
Proposed Capacity: completed) Year when needed: 1998
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
'const. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Chapel Hill High page 1 of 2
25
RENOVATIONS: Project No: _ 308_10
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. & =
Moderate Renovations s.f, bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement ls.f X $6.25 per sq. ft. _
Computer Network/Cabling s.t bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
Relocate six mobile units(moving from site) 72,000
sub total Other Renovations 72,000
SUB TOTAL 72,000
Administrative costs/fees 72,0001 const.cost. X 0.09 6,480
Total Renovation Cost $78,480
9 Land Acquisition I acres X per acre=
Total Current Project Cost $78,480
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 1 To accommodate projected enrollment
Replace mobile units with permanent facilities � Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Chapel Hill High printed: 12/13195 page 2 of 2
26
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: Icarrboro Elementary project no: 304 11
capacity
Name of Schools)this
project replaces :
Membership Now: 624 (K-12)students Grades Now: K-5
Current Capacity: 563 Grades Proposed: K-5
Proposed Capacity: 563 (when completed) Year when needed: 1998
Avg. Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational (business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total FurnJ Eqpt.
Carrboro Elementary page 1 of 2
2.7
RENOVATIONS: Project No: 30411
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 60,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement 22,000 s.f. X $6.25 per sq. ft. = 137,500
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft, =
Security System 25,000
New Main Electrical Service
sub total Other Renovations 222,500
SUB TOTAL 222,500
Administrative costs/fees 1 222,5001 const.cost. X 0.09 20,025
Total Renovation Cost $242,525
911-and Acquisition acres X per acre=
Total Current Project Cost $242,525
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
F27 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 1I Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Carrboro Elementary printed: 12/13/95 page 2 of 2
28
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
11,996 PUBLIC SCHOOL FACILITY NEEf)S -10-YEAP NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: JGIenwood Elementary project no: 320 12
capacity
Name of School(s)this
project replaces
Membership Now: 451 (K-12)students Grades Now: K-5
Current Capacity: 447 Grades Proposed: K-5
Proposed Capacity: 447 (when completed) Year when needed: 11998
Avg. Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. =
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*contt. cost of Media Ctr. not icluded in fum./egpt, for addition abov Total Furn./Eqpt.
Glenwood Elementary page 1 of 2
29
RENOVATIONS: Project No: 32012
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 38,000 s.f. bldg. area X $23.00 per sq. ft. = $874,000
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $874,000
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility $25,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 100,000
Building Code/Life Safety 45,000
Energy Conservation 25,000
Environmental
Roof Replacement I 38,000 s.f. X $6.25 per sq. ft. = 237,500
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
sub total Other Renovations 407,500
SUB TOTAL 1,306,500
Administrative costs/fees 1,306,500 const.cost. X 0.09 117,585
Total Renovation Cost $1,424,085
911-a nd Acquisition acres X per acre=
Total Current Project Cost $1,424,085
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 37 Deferred Maintenance(see below)
Lij Meet State or Federal mandate(see below)
Glenwood Elementary printed: 12/13/95 page 2 of 2
30
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . PUBLIC SCHOOL ` 1 NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JPhillips Middle project no: 324 13
capacity
Name of School(s)this
project replaces
Membership Now: M7O (K-12)students Grades Now: 6-8
Current Capacity: Grades Proposed: 6-8
Proposed Capacity: (when co mpleted) Year when needed: 1996
Avg. Construction CosVsq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational (business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costslfees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
•const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Phillips Middle page 1 of 2
31
RENOVATIONS: Project No: 32413
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $20,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation 225,000
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling 110,000 s.f. bldg. area X $1.75 per sq. ft: = 192,500
Security System 5,000
New Main Electrical Service
Bathrooms in auditorium 75,000
Soundproofing gym 15,000 _
sub total Other Renovations 512,500
SUB TOTAL 532,500
Administrative costs/fees 532,500 const.cost. X 0.09 47,925
Total Renovation Cost $580,425
9 Land Acquisition acres X per acre=
Total Current Project-Cost $580,425
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change In grade organization
Energy Conservation/Air Conditioning
For reduced class sizes 0 Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
2 1 Meet State or Federal mandate(see below)
Phillips Middle printed: 12/14/95 page 2 of 2
32
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JChapel Hill High School project no: 308_14
capacity
Name of School(s)this
project replaces
Membership Now: 1700 (K-12)students Grades Now: 9-12
Current Capacity: 1645 Grades Proposed: 9-12
Proposed Capacity: 1645 (when completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational (business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings"
•const. cost of Media --tr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Chapel Hill High School page 1 of 2
33
RENOVATIONS: Project No: 30814
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility $60,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation 150,000
Environmental
Roof Replacement 16,500 s.f. X $6.25 per sq. ft. = 103,125
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
Boiler replacements 50,000
sub total Other Renovations 303,125
SUB TOTAL 363,125
Administrative costs/fees 363,125 const.cost. X 0.09 32,681
Total Renovation Cost $395,806
9 Land Acquisition acres X per acre=
Total Current Project.Cost $395,806
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
1 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
2 Meet State or Federal mandate(see below)
Chapel Hill High School printed: 12/14/95 page 2 of 2
34
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
SCHOOL PUBLIC r . -
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: Z
SCHOOL NAME: JEstes Hills Elementary project no: 312_15
capacity
Name of School(s)this
project replaces
Membership Now: 590 (K-12)students Grades Now: K-5
Current Capacity: 540 Grades Proposed: K-5
Proposed Capacity: 540 (when completed) Year when needed: 1998
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational (business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
'contt. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Estes Hills Elementary page 1 of 2
35
RENOVATIONS: Project Flo: 312_15
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations 40,000 s.f. bldg. area X $23.00 per sq. ft. = $920,000
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations $920,000
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system of to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 60,000
Building Code/Life Safety
Energy Conservation 25,000
Environmental
Roof Replacement 11,000 s.f. X $6.25 per sq. ft. = 68,750
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Multi Purpose Bldg.-Drainage/Site improvements 25,000 _
sub total Other Renovations 178,750
SUB TOTAL 1,098,750
Administrative costs/fees 1,098,750 const.cost. X 0.09 98,888
Total Renovation Cost $1,197,638
9 Land Acquisition I acres X per acre=
Total Current Project.Cost $1,197,638
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
0 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 1� Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Estes Hills Elementary printed: 12/14/95 page 2 of 2
36
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority:72
SCHOOL NAME: lCulbreth Middle School project no: 322_16
capacity
Name of School(s)this
project replaces
Membership Now: 655 (K-12)students Grades Now: 6-8
Current Capacity: 670 Grades Proposed: 6-8
Proposed Capacity: 670 (when completed) Year when needed: 1997
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Culbreth Middle School page 1 of 2
37
RENOVATIONS: Project No: _ 32216
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility $20,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety
Energy Conservation 225,000
Environmental
Roof Replacement I is't X $6.25 per sq. ft. _
Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft: _
Security System
New Main Electrical Service
Science Lab renovations 80,000
sub total Other Renovations 455,000
SUB TOTAL 475,000
Administrative costs/fees 1 475,0001 const.cost. X 0.09 42,750
Total Renovation Cost $517,750
9 Land Acquisition acres X per acre=
Total Current Project-Cost $517,750
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
17 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
3 1 Meet State or Federal mandate(see below)
Culbreth Middle School printed: 12/14/95 page 2 of 2
38 ,
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC.SCHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: Frank Porter Graham Elementary project no: 316 17
capacity
Name of School(s)this
project replaces
Membership Now: m(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment,surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. =
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (tradefInd.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. x $82.30
Cafeteria/Kitchen s.f. x $123.45
Auditorium(high) s.f. x $123.45
Other/miscellaneous s.f. x $90.53
sub total s.f.
Bldg.Support/Circulation s.f. x $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. x 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. x 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Frank Porter Graham Elementary page 1 of 2
39
RENOVATIONS: Project No: 316_17
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2 Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $15,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 45,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. _
Computer Network/Cabling 1 58,0001 s.f. bldg. area X $1.75 per sq. ft. = 101,500
Security System 15,000
New Main Electrical Service
sub total Other Renovations 161,500
SUB TOTAL 176,500
Administrative costs/fees 1 176,500 const.cost. X 0.09 15,885
Total Renovation Cost $192,385
911-and Acquisition acres X per acre=
Total Current Project_Cost $192,385
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes 27 Provide for technology(infrastructure)
Other(indicate) : = Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Frank Porter Graham Elementary printed: 12/14/95 page 2 of 2
40
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 691 Priority:
SCHOOL NAME: IMc Dougle Middle School project no: 309_18
capacity
Name of School(s)this
project replaces
Membership Now: M(when(K-12)students Grades Now: 6-8
Current Capacity: Grades Proposed: 6-8
Proposed Capacity: completed) Year when needed: 1996
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq.fl: _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53 -
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/Ind.) s.f. X $94.65
Vocational (business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Mc Dougle Middle School page 1 of 2
41
RENOVATIONS: Project No: 309_18
No, Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. _
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. _
Major Renovations s.f bldg. area X $49.00 per sq. ft. _
sub total General Renovations
2Air Conditioning s.f bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation 40,000
Environmental
Roof Replacement s.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Athletic fields: fences, bleachers, irrigation 100,000
sub total Other Renovations 140,000
SUB TOTAL 140,000
Administrative costs/fees 1 140,0001 const.cost. X 0.09 12,600
Total Renovation Cost $152,600
911-and Acquisition acres X per acre=
Total Current Project Cost $152,600
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
17 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
0 Other(indicate) : Deferred Maintenance(see below)
Facilities deleted during construction
contract neg. Meet State or Federal mandate(see below)
Mc Dougle Middle School printed: 12/14/95 page 2 of 2
42
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
- • . PUBLIC • • NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: JEphesus Road Elementary project no: 311_19
capacity
Name of School(s)this
project replaces
Membership Now: 667 (K-12)students Grades Now: K-5
Current Capacity 472 Grades Proposed: K-5
Proposed Capacity: 472 (when completed) Year when needed: 1996
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(tradelInd.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg. Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
•const. cost of Media Ctr. not icluded in furn./egpt, for addition abov Total Furn./Eqpt.
Ephesus Road Elementary page 1 of 2
43
RENC'VAMON5: Project No: 311_19
No. Size/Amount Unit Cost Total
1 General Rc novations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations 1,000 s.f. bldg. area X $49.00 per sq. ft. = $49,000
sub total General Renovations $49,000
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility $10,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 75,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. _
Computer Network/Cabling 1 66,0001 s.f. bldg. area X $1.75 per sq. ft. = 115,500
Security System
New Main Electrical Service
sub total Other Renovations 190,500
SUB TOTAL 249,500
Administrative costs/fees 1 249,5001 const.cost. X 0.09 22,455
Total Renovation Cost $271,955
9 Land Acquisition I I acres X per acre=
Total Current Project_Cost $271,955
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : E7 Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Ephesus Road Elementary printed: 12/14/95 page 2 of 2
44
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
SCHOOL 1996 PUBLIC •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: Iseaweil Elementary School I project no: 310 20
capacity
Name of School(s)this
project replaces
Membership Now: 692 (K-12)students Grades Now: K-6
Current Capacity: 498 Grades Proposed: K-5
Proposed Capacity: 498 (when completed) Year when needed: 1998
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) S.f. X $90.53
Computer/Keyboarding S.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms S.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X 982.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
•contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Totals Furn./Eqpt.
Seawell Elementary School page 1 of 2
45
RENOVATIONS: Project No: 310_20
No. Size!Amount Unit Cost Total
1 General Renovations
Minor Renovations _ s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility $20,000
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft =
Site Development/Parking/Drives 125,000
Building Code/Life Safety
Energy Conservation 10,000
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
Walkway connecting bidgs.-covered 35,000
sub total Other Renovations 170,000
SUB TOTAL 190,000
Administrative costs/fees 1 190,0001 const.cost. X 0.09 17,100
Total Renovation Cost 1 $207,100
911-and Acquisition acres X per acre=
Total Current Project Cost $207,100
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
117 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 73 Maintenance(see below)
2 Meet State or Federal mandate(see below)
Seaweil Elementary School printed: 12/14/95 page 2 of 2
46
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
' 19§6 PUBLIC SCHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: Icarrboro Elementary School project no: 304 21
capacity
Name of Schools)this
project replaces
Membership Now: 624 (K-12)students Grades Now: K-5
Current Capacity: 563 Grades Proposed: K-5
Proposed Capacity: 563 (when completed) Year when needed: 2000
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $89.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooins(mdl./high) s.f. X $98.76
Vocational (tradelInd.) s.f. X $94.65
Vocational(business/service%ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees F const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not iciuded in furn./eqpt, for addition abov Total Furn./Eqpt.
Carrboro Elementary School page 1 of 2
47
RENOVATIONS: Project Pao: 304 21
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety 35,000
Energy Conservation 125,000
Environmental
Roof Replacement 22,000 s.f. X $6.25 per sq. ft. = 137,500
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 297,500
SUB TOTAL 297,500
Administrative costs/fees 1 297,5001 const.cost. X 0.09 26,775
Total Renovation Cost $324,275
9 Land Acquisition acres X per acre=
Total Current Project Cost $324,275
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
17 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
F27 Other(indicate) : Deferred Maintenance(see below)
Replacement/updating/facility
Meet State or Federal mandate(see below)
Carrboro Elementary School printed: 12/14195 page 2 of 2
48
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996-PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 4
SCHOOL NAME: Ephesus Elementary School J project no: 311_22
capacity
Name of School(s)this
project replaces
Membership Now: (K-12)students Grades Now: K-5
Current Capacity:LE(when Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 2002
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.78
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Ephesus Elementary School page 1 of 2
49
RENOVATIONS: Project No: 31122
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. _
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. _
Major Renovations s.f. bldg. area X $49.00 per sq. ft. _
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety
Energy Conservation 125,000
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft: =
Security System
New Main Electrical Service
sub total Other Renovations 125,000
SUB TOTAL 125,000
Administrative costs/fees 125,0001 const.cost. X 0.09 11,250
Total Renovation Cost $136,250
911-and Acquisition acres X per acre=
Total Current Project-Cost $136,250
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
7 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Ephesus Elementary School printed: 12/14195 page 2 of 2
50
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: JEstes Hills Elementary project no: 312_23
capacity
Name of School(s)this
project replaces
Membership Now: 590 (K-12)students Grades Now: K-5
Current Capacity: 540 Grades Proposed: K-5
Proposed Capacity: 540 (when completed) Year when needed: 2000
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service/clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E. (elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*contt. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Estes Hills Elementary page 1 of 2
51
RENOVATIONS: Project No: 312_23
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. _
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. _
Major Renovations s.f. bldg. area X $49.00 per sq. ft. _
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives
Building Code/Life Safety 40,000
Energy Conservation
Environmental
Roof Replacement I 29,000 s.f. X $6.25 per sq. ft. = 181,250
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. _
Security System
New Main Electrical Service
sub total Other Renovations 221,250
SUB TOTAL. 221,250
Administrative costs/fees 1 221,2501 const.cost. X 0.09 19,913
Total Renovation Cost $241,163
911-and Acquisition acres X per acre=
Total Current Project_Cost $241,163
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
117 Building Code/Life Safety(explain below) Change in grade organization
0 Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Estes Hills Elementary printed: 12/14/95 page 2 of 2
52
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , PUBLIC • •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: JFrank Porter Graham Elementary project no: 316 24
capacity
Name of School(s)this
project replaces
Membership Now: m(when(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: completed) Year when needed: 1999
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational (business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings'
'contt. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total Furn./Eqpt.
Frank Porter Graham Elementary page 1 of 2
53
RENOVATIONS: Project No: 31624
No. Size/Amount Unit Cost Total
1 General Renovations
Mirror Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 75,000
Building Code/Life Safety
Energy Conservation 125,000
Environmental
Roof Replacement I 8,000 s.f. X $6.25 per sq. ft. = 50,000
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 250,000
SUB TOTAL 250,000
Administrative costs/fees 1 250,0001 const.cost. X 0.09 22,500
Total Renovation Cost $272,500
911-and Acquisition acres X per acre=
Total Current Project-Cost $272,500
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
17 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : � Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Frank Porter Graham Elementary printed: 12/14/95 page 2 of 2
54
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . , PUBLIC • •
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: Iseawell Elementary project no: 310 25
capacity
Name of School(s)this
project replaces
Membership Now: 692 (K-12)students Grades Now: K-5
Current Capacity: 498 Grades Proposed: K-5
Proposed Capacity: 498 (when completed) Year when needed: 1999
Avg. Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms S.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional:(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/ind.) s.f. X $94.65
Vocational(business/service%Ir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings•
"const. cost of Media Ctr. not icluded in Turn./eqpt, for addition abov Total Furn./Eqpt.
Seawall Elementary page 1 of 2
4
55
RENOW,'XONS: Project No: 310_25
No. _ Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations S. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2 Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f bldg. area X $6.86 per sq. ft.
Site Development/Parking/Drives
Building Code/Life Safety 70,000
Energy Conservation 125,000
Environmental
Roof Replacement 20,000 s.f. X $6.25 per sq. ft. = 125,000
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 320,000
SUB TOTAL 320,000
Administrative costs/fees 1 320,0001 const.cost. X 0.09 28,800
Total Renovation Cost $348,800
911-and Acquisition acres X per acre=
Total Current Project-Cost $348,800
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
F27 Energy Conservation/Air Conditioning
For reduced class sizes = Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Seawell Elementary printed: 12114/95 page 2 of 2
z
56 ,
INDIVIDUAL SCHOOL REPORT - ADDITIONS &- RENOVATIONS
. . . PUBLIC SCHOOL. . NEEDS
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 3
SCHOOL NAME: JCulbreth Middle project no: 322_27
capacity
Name of School(s)this
project replaces
Membership Now: 11((K-12)students Grades Now: 6-8
Current Capacity: Grades Proposed: 6-8
Proposed Capacity: when completed) Year when needed: 2000
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq.ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service clr s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous 3,000 s.f. X $90.53 271,590
sub total 3,000 s.f. 271,590
Bldg.Support/Circulation 510 s.f. X $82.30 41,973
total area(sq.ft.)added 3,510 s.f. 313,563
Administrative costs/fees 313,563 const.cost. X 0.075 23,517
Total Additions $337,080
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ 313,563 const.cost. X 0.094 29,581
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total FurnJ Eqpt. $29,581
Culbreth Middle page 1 of 2
57
RENOVATIONS: Project Nu: 322_27
No. Size/Anount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 150,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement s.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft, =
Security System
New Main Electrical Service
Locker room renovations 60,000
sub total Other Renovations 210,000
SUB TOTAL 210,000
Administrative costs/fees 210,0001 const.cost. X 0.09 18,900
Total Renovation Cost $228,900
911-and Acquisition acres X per acre=
Total Current Project Cost $595,561
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility 17 To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Culbreth Middle printed: 12/14/95 page 2 of 2
6
58
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . PUBLIC SCHOOL . , - NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 4
SCHOOL NAME: JPhillips Middle School project no: 324 28
capacity
Name of School(s)this
project replaces
Membership Now: (K-12)students Grades Now: 6-8
Current Capacity: 11(when Grades Proposed: 6-8
Proposed Capacity: completed) Year when needed: 2002
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $50.53
Computer/Keyboarding s.f. X $98.Te
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl.lhigh) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational (business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*contt. cost of Media Ctr. not icluded in furn./egpt, for addition abov Total Furn./Eqpt.
Phillips Middle School page 1 of 2
59
RENOVATIONS: Project No: 324 28
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f. bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
7 Other:
Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 75,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
sub total Other Renovations 75,000
SUB TOTAL 75,000
Administrative costs/fees 1 75,0001 const.cost. X 0.09 6,750
Total Renovation Cost $81,750
911-and Acquisition acres X per acre=
Total Current Project Cost $81,750
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 17 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Phillips Middle School printed: 12/14/95 page 2 of 2
60
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
1996 PUBLIC SCHOOL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 1
SCHOOL NAME: Carrboro Elementary School project no: 304 29
capacity
Name of School(s)this
project replaces
Membership Now: T(K-12)students Grades Now: K-5
Current Capacity: Grades Proposed: K-5
Proposed Capacity: (when completed) Year when needed: 1996
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74A7 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional (self-contained) s.f. X $90.53
Computer i Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room(elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational(trade/Ind.) s.f. X $94.65
Vocational(business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E. (mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium (high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total FurnJ Eqpt.
Carrboro Elementary School page 1 of 2
RENOVATIONS: Project No: soa 29
No. Size/Amount Unit Cost Total
1 General Renovations
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
subtotal General Renovations
2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4 Sewer System (on-site system or to connect to county system)
5 Asbestos Abatement
6 Handicapped Accessibility
$35,000
7 Other:
Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 15,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement Is.f. X $6.25 per sq. ft. _
Computer Network/Cabling 62,0001 s.f. bldg. area X $1.75 per sq. ft: = 108,500
Security System
New Main Electrical Service
sub total Other Renovations 123,500
SUB TOTAL 158,500
Administrative costs/fees 1 158,5001 const.cost. X 0.09 14,265
Total Renovation Cost T $172,765
911-and Acquisition acres X per acre=
Total Current Project Cost $172,765
Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes 0 Provide for technology(infrastructure)
Other(indicate) : 0 Deferred Maintenance(see below)
1 Meet State or Federal mandate(see below)
Carrboro Elementary School printed: 12/14/95 page 2 of 2
b2
INDIVIDUAL SCHOOL REPORT - ADDITIONS & RENOVATIONS
. . . PUBLIC SCHOOL
ADMINISTRATIVE UNIT: Chapel Hill-Carrboro School 681 Priority: 2
SCHOOL NAME: 113hillips Middle School project no: 324 30
capacity
Name of School(s)this
project replaces
Membership Now: 578 (K-12)students Grades Now: 6-8
Current Capacity: 702 Grades Proposed: 6-8
Proposed Capacity: 702 (when completed) Year when needed: 1998
Avg.Construction Cost/sq.ft.: $82.30 Does not include furnishings, equipment, surveys, or design fees
ADDITIONS:
No. Size/Amount Unit Cost Total
Pre-K Classrooms s.f. bldg. area X $74.07 per sq. ft. _
Regular Classrooms s.f. X $69.96
Science Classrooms s.f. X $102.88
Small Group/Resource s.f. X $74.07
Exceptional(self-contained) s.f. X $90.53
Computer/Keyboarding s.f. X $98.76
Art Classroom s.f. X $82.30
Dance/Drama Classrooms s.f. X $90.53
Music Room (elementary) s.f. X $82.30
Band/Chorus Rooms(mdl./high) s.f. X $98.76
Vocational (trade/ind.) s.f. X $94.65
Vocational (business/service/cir s.f. X $82.30
Media Center s.f. X $94.65
Multipurpose/P.E.(elem) s.f. X $90.53
Gymnasium/P.E.(mdl./high) s.f. X $106.99
Administration/Guidance/Staff s.f. X $82.30
Cafeteria/Kitchen s.f. X $123.45
Auditorium(high) s.f. X $123.45
Other/miscellaneous s.f. X $90.53
sub total s.f.
Bldg.Support/Circulation s.f. X $82.30
total area(sq.ft.)added s.f.
Administrative costs/fees const.cost. X 0.075
Total Additions
FURNISHINGS/EQUIPMENT:
Furnishing/Eqpt.for Addition $ const.cost. X 0.094
Kitchen Equipment
Media Center Furnishings
*const. cost of Media Ctr. not icluded in furn./eqpt, for addition abov Total FurnJ Eqpt.
Phillips Middle School page 1 of 2
63
RENOVATIONS: Project Nu: 324 30
No. Size/Amount Unit Cost Total
1 General Renovations r
Minor Renovations s.f bldg. area X $23.00 per sq. ft. =
Moderate Renovations s.f bldg. area X $32.00 per sq. ft. =
Major Renovations s.f. bldg. area X $49.00 per sq. ft. =
sub total General Renovations
2Air Conditioning s.f, bldg. area X $12.00 per sq. ft. =
3 Water System (on-site system or to connect to county system)
4Sewer System (on-site system or to connect to county system)
5Asbestos Abatement
6 Handicapped Accessibility
7Other:
Demolition of Exist. Buildings s.f bldg. area X $6.86 per sq. ft. _
Site Development/Parking/Drives 60,000
Building Code/Life Safety
Energy Conservation
Environmental
Roof Replacement is.f. X $6.25 per sq. ft. =
Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. =
Security System
New Main Electrical Service
Athletic field, bleachers, irrigation 60,000
Locker Room improvements 60,000
sub total Other Renovations 180,000
SUB TOTAL 180,000
Administrative costs/fees 180,0001 const.cost. X 0.09 16,200
Total Renovation Cost ;196,200
1 911-and Acquisition acres X per acre=
Total Current Project Cost $196,200
Why 1S this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY
Replace category IV or V facility To accommodate projected enrollment
Replace mobile units with permanent facilities Ease current crowding at schools
Building Code/Life Safety(explain below) Change in grade organization
Energy Conservation/Air Conditioning
For reduced class sizes Provide for technology(infrastructure)
Other(indicate) : 11 Deferred Maintenance(see below)
Meet State or Federal mandate(see below)
Phillips Middle School printed: 12/14/95 page 2 of 2