HomeMy WebLinkAboutAgenda - 10-15-2013-13 (4)INFORMATION ITEM Memorandum To: Michael Talbert, Interim County Manager From: Gayle Wilson, Solid Waste Management Director Subject: Walnut Grove Convenience Center — Information Report Date: September 30, 2013 The newly reconstructed Walnut Grove Church Road Solid Waste Convenience Center opened on May 7, 2013 and this memorandum will summarize the experiences and observations at this site over the first four months of its operation. This memorandum will also provide intended courses of action based on these observations to improve or remedy identified shortcomings. Funding for these corrective improvements /enhancements will be made from the $53,962 remaining Walnut Grove construction project budget. Public Feedback The feedback from customers who use the center has been overwhelmingly positive. Of particular note are the comments regarding the additional recycling services offered and the cleanliness and appearance of the paved site. The negative comments have been minimal, but some users who are used to driving back and forth around the previous site feel constrained having to follow more prescribed traffic patterns. Two comments have been received with regard to vehicles not being able to pull extremely close to the compactor hoppers so that the distance to throw the waste is less. Additionally, a small number of users do not like having to wait 3 -5 minutes to dispose of their waste when the site is busy and there is a 4 -5 car line at the compactors. Lessons Learned Facilities /Construction There have been a few lessons learned with regard to design and construction of the facility that will inform staff as planning for the next District center modernization proceeds: • Two bulky waste compactors rather than one should have been installed. Bulky items do not compact as well as require more frequent service. Two were originally planned, but due to project budget concerns the second unit was eliminated. Currently a roll -off is utilized for overflow, but it must be emptied frequently. • Concrete compactor pads were originally not long enough and through a change order had to be lengthened by about 15 feet. • Gutters should have been originally designed for each building structure to better control water and were added later. • Insufficient landscape buffering was originally installed that later had to be supplemented by additional plantings. • The center attendant booth between the compactors and salvage shed area is seldom used as the attendants must remain near compactors. The booth may be eliminated from future center designs. 1 • The center operators are stationed at the compactors most of the time and therefore need some protective cover from sun and weather, such as a canopy. We are utilizing umbrellas at present, but these are marginally effective. More permanent covering should be considered. Additionally, some center operators are suffering from lower body fatigue from standing on a hard surface all day. Anti - fatigue matts should be placed under the canopy in the areas where the operators will be standing in order to reduce the impact of the hard surfaces that can contribute to sore feet, legs and hips. • 110 volt outlets should have also been provided near the compactors; compactors operate off of 460 volts which is not suitable for other electrical power needs. • Additional covered storage is needed for skid steer, lawn mower and various implements and miscellaneous supplies. • Need to provide additional concrete (instead of asphalt) surface to allow the skid steer to more easily maneuver about to load white goods into the recessed container. • The HHW receiving area would be more functional during inclement weather if it were covered. When raining the HHW attendant must greet customers, remove delivered materials from the customer vehicle and assess material for proper disposal categorization. A dry area for assessing and sorting of potentially hazardous material is desired. The need for a receiving canopy was discussed during design but not included due to concern for interference with flow of traffic and project budget concerns. The current HHW facility at Eubanks Road has a covered receiving area. Operations Staff has identified several practices, refinements and adjustments that have been implemented or noted as an issue to be addressed with regard to operations: • To ensure that both MSW compactors do not become filled at the same time, unless the center is extremely busy, only one MSW compactor is made available at a time. • The new used lumber salvage area has been lightly utilized to date. • For the first several weeks of operation additional staff (mostly paid temporary and early -on volunteers) were provided to assist permanent staff in orienting residents to the new site, answering questions and explaining rules. This has been quite useful in assisting center users, cultivating desirable center use habits, explaining new services and maintaining good traffic flow. Most users appear to be becoming more comfortable and familiar with the site. • When the compactors are serviced and the compaction box is uncoupled from the stationary compaction unit materials were discharged onto the ground before the hopper door could be secured. This created a pile of debris /material that had to be cleaned -up with each uncoupling, which took about 20 minutes. Center staff, through trial and error, developed a method by which this is significantly reduced. • The bulky waste compactor reaches capacity more quickly than our projections indicated so that it will be necessary to install a second compactor in the near future. The compactor is available at original bid price and existing conduit will facilitate wiring. • Initial quantities of food waste received are below expectations, partially because of users desire to place their waste into the containers in the plastic bags they use at home to store their kitchen waste. These plastic bags are non - compostable and are not accepted by our contract food waste collector as they are incompatible with their composting process. We are currently working with our composting contractor to identify acceptable compostable plastic bags. Once identified, we will consider distribution of these bags to users of the food waste program. The 2 food waste containers are also drawing flies and bees that we are actively working to address by applying powdered lime at the end of each day, which seems to be helping. • The single textiles receptacle filled within a few days so staff located a second receptacle. • Plastic film receptacles were originally too small and filled up too quickly. Larger receptacles were obtained and are working well. • As mentioned above, center attendants are stationed at the compactors virtually full time to maintain compactor hopper capacity to allow for the continuous flow of customers and therefore need shelter from the sun /weather. The umbrellas currently in use are inadequate. • Given the large size of the center, the many services provided, the need to clean up spills and litter, the distance between the four MSW /recycling compactors and the bulky waste compactor that require frequent activation, the need to closely monitor the compactors, the need to haul unacceptable items from the salvage shed for disposal and the necessity to oversee and advise customers to follow materials separation rules and limit contamination, the current two full time center attendants are unable to adequately maneuver around the center to monitor the various recycling and disposal stations and to assist customers. The distance is too great and the center attendants are simply physically incapable of scurrying around the center to effectively provide the necessary customer service and satisfactorily overseeing operations. Some means of internal transportation would seem necessary. • Currently there are two permanent county staff assigned to the center and one contract employee provided by our household hazardous waste (HHW) contractor. Given the afore stated necessity of the two center attendants stationing near the compactors and the size of the center, cooperation of the contractor has been obtained in that their employee will assist in monitoring services near the HHW area such as motor oil, batteries, food waste, etc. If this contract employee were to be replaced by a permanent Sanitation Division employee center customer service, maintenance, enforcement and supervision could be expanded and improved (and existing supplemental staffing assistance eliminated). Otherwise supplemental staffing by temporary employees may be necessary indefinitely to oversee the site on busier days. Increased Efficiencies /Usage Plastic Film - Between 6 -8 40 gallon bags of plastic film (a newly added recycling material) are collected weekly. Electronics — An additional trailer of electronics is being collected weekly at the new site (5 /week versus 6 /week) Cardboard — The new cardboard compactor is collected and taken to market every two weeks. Previously, the ten 8 cu /yd. cardboard dumpsters were emptied and hauled to market 3 times /week. We have seen that the average monthly tonnage of cardboard going to market is about the same but the average load weight to market has gone from about 3 tons per truck trip (average) to Durham paper market to almost 5 tons per tuck trip (average) to Durham. This seems to be a very good return on investment in terms of fuel usage, carbon emissions and wear and tear on the trucks. Single Stream — The single stream material compactor is collected and taken to market once /week. Previously, the four 25 cu /yd. containers were each emptied 2 -3 times /week. Our tonnage is very similar to the old WG tonnages (20 -30 tons per month) but even at this early stage at the new facility we can see a slow but continuous uptick in volume coming in. Average tons per load hauled to Eubanks Road processing center was 1.76 /tons /load and currently (through use of compactor) is 6.1 tons /load. 3 Staff Responses /Actions ➢ Proceed to install more permanent canopy (that also includes a raised platform with anti - fatigue /slip mat surface) adjacent to compactors that will shade and shelter center attendants. A 110 volt line will be extended so that fans can be provided to cool staff during the summer. Cost of three 6'X8' metal canopies (matching other metal structures on site), including the extension of 110 volt power, the platform, etc. is estimated to be $8,494. ➢ Obtain a modified golf cart that can be used to quickly move to a disposal or recycling station and address customer questions, enforce material separation rules, haul trash from the salvage shed, monitor various material stations, collect litter and clean up spillage, or even to use toilet facilities, etc. The site is so large that coverage of the entire site by walking is not practicable and an attendant is unable to leave compactors unattended for any length of time. Will include in FY 2014/15 budget request. Estimated cost of electric cart is $10,700 ➢ Acquire a storage shelter ( 16'X20') for storage of the skid steer and implements, lawnmower, spill absorbent, bags of lime and other tools or equipment. Estimated cost is $5,068. ➢ As part of FY 2014/15 budget process, coordinate staff analysis with Human Resources to consider replacement of existing contract HHW employee and frequent third temporary convenience center operator with one permanent Sanitation Division staff, who would be certified to manage daily HHW program. ➢ Proceed to identify, obtain and begin distribution of approved compostable plastic food waste bags to food waste program users so that they may more easily and sanitarily store and deliver their food waste to the center food waste receptacle. ➢ Consider recommendation for permanent canopy for HHW receiving area in FY 2014/15 budget. ➢ Acquire two additional compactor containers for storage of bulky waste at original price of $16,196. Consider a second bulky waste compactor in the FY 2014/15 budget as current project budget balance cannot fully fund a new compactor at this time. Estimated cost of current year planned improvements is $29,758. Staff is available to provide additional information as necessary. 4