SUBJECT: Resolutions to Endorse Orange County's Priority Transportation Projects for the
Durham - Chapel Hill - Carrboro Metropolitan Planning Organization and the
Trianqle Area Reqional Planninq Organization
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) No
ATTACHMENT(S):
1. TARPO and DCHC MPO Priority
Lists Submitted in 2011
2. Resolution Endorsing Projects for
the TARPO Regional Priority List
3. TARPO Project Descriptions and
Recommendations
4. TARPO Project List Map
5. Resolution Endorsing Projects for
the DCHC MPO
6. DCHC MPO Project Descriptions
and Recommendations
7. DCHC MPO Project List Map
INFORMATION CONTACT:
Bret Martin, Transportation Planner 919 - 245 -2582
Tom Altieri, Comprehensive Planning Supervisor,
919- 245 -2575
PURPOSE: To consider two (2) resolutions (Attachments 2 and 5) endorsing two (2) priority
lists of transportation projects within the Durham - Chapel Hill - Carrboro Metropolitan Planning
Organization (DCHC MPO) and the Triangle Area Regional Planning Organization ( TARPO)
planning areas for consideration of inclusion in the 2016 -2022 Statewide Transportation
Improvement Program (STIP).
BACKGROUND: At the BOCC's September 17, 2013 meeting, the BOCC considered and
approved a list of new priority transportation projects to submit to the Burlington- Graham
Metropolitan Planning Organization (BGMPO) for the portion of Orange County within that
MPO's planning area. That list has since been submitted to the BGMPO. As a continuation of
the process of submitting priority projects for consideration and inclusion in the 2016 -2022 STIP
to the three (3) transportation planning organizations covering Orange County, project priority
lists for both the DCHC MPO and TARPO were developed by staff and considered and
recommended to the BOCC for approval /endorsement by the OUTBoard at the OUTBoard's
September 18, 2013 meeting. The OUTBoard made no changes to the staff - recommended
priority lists for the DCHC MPO and TARPO.
Staff Proiect Ranking Methodology
Generally for both priority lists, the starting point for staff and the OUTBoard was to carry
forward those projects submitted as the County's project priorities to both TARPO and the
DCHC MPO from the last iteration of project prioritization in 2011 that have a prior history of
scoring and ranking through both Orange County's and the MPO's /RPO's ranking processes
(Attachment 1). For the TARPO project priority list (Attachment 3), all projects that were
submitted in 2011 were carried forward to the current priority list, and two (2) new projects that
were not submitted in 2011 were added to the list and prioritized as top projects. One of these
projects (NC 54 widening) is a completely new highway project not previously submitted that is
recommended in the newly adopted Orange County Comprehensive Transportation Plan
(OCCTP). The other project (Efland -Cedar Grove Road improvements), also recommended in
the OCCTP, was previously submitted for prioritization iterations before 2011, but was removed
from that priority list before submission to TARPO and is now being added again for
consideration.
These two (2) projects were added to the top of the list because they are both OCCTP-
recommended projects and are likely to score higher against the State's prioritization scoring
criteria giving them a greater chance of being funded and included in the 2016 -2022 STIP. The
other four (4) projects were shifted down to priorities 3 -6 because they are not likely to score as
well for consideration in the 2016 -2022 STIP as a result of not having added capacity impacts
and not as much of an impact on safety to users as the other two (2) projects. Attachment 4 is a
map depicting the locations of the draft project priorities for those projects within TARPO's
planning area.
For the DCHC MPO project priority list (Attachment 6), all except one of the projects that was
submitted in 2011 were carried forward to this priority list. Three (3) projects that were not
submitted in 2011 were added to the list — NC 54 widening from Neville Road to Old Fayetteville
Road, 1 -40 widening from the 1- 40/1 -85 interchange to the Durham County line, and 1 -85
widening from the 1- 40/1 -85 interchange to the Durham County line. The NC 54 widening project
is a continuation of the recommended NC 54 widening project in the draft TARPO project priority
list, while the 1 -40 and 1 -85 widening projects were not included in previous County priority lists,
but are projects that have already been included in the STIP and are of statewide significance
that will be scored regardless of Orange County's submission. These two widening projects are
likely to score higher than many of the other projects recommended for submission.
The general grouping order of staff - suggested and OUTBoard-recom mended project ranking in
the DCHC MPO priority list is-
1 ) Added capacity /mobility projects of local significance;
2) Added capacity /mobility projects of statewide /regional significance;
3) Transit/rail projects;
4) Roadway modernization /bikeway projects of local significance exceeding $1,000,000;
and a
5) Pedestrian project (the pedestrian project was prioritized last because it would require a
20% local match that the County has not indicated it would provide).
This ranking strategy developed by staff intends to optimize scoring output and corresponding
funding probability for the subject projects in the face of the contributing factors to such output of
State scoring, funding tier eligibility, and projects' necessity for reliance on local input points to
be funded. Attachment 7 is a map depicting the locations of the draft project priorities for those
projects within the DCHC MPO planning area.
K
Attachments
Attachment 1 is the list of project priorities submitted to TARPO and DCHC MPO for the last
STIP development and project prioritization iteration in 2011. Attachments 2 and 5 are draft
resolutions for the BOCC to approve /endorse with the OUTBoard- approved project priority lists
to submit to the DCHC MPO and TARPO for scoring /ranking and for consideration of inclusion
in DCHC MPO's Metropolitan Transportation Improvement Program (MTIP) and TARPO's
regional priority list, and by extension, the STIP. Attachments 3 and 6 contain more detailed
descriptions of each project, each project's history of previous consideration or ranking, and
staff's prioritization recommendation for projects proposed within each planning area.
Attachments 4 and 7 are maps depicting the locations of these projects within each MPO /RPO
planning area within Orange County.
Background Information on STIP Development:
For background information on the State's STIP development process, the State's newly
adopted Strategic Transportation Investments (STI) Act, the State's Strategic Mobility Formula
(SMF) developed as part of the STI legislation, and the State's revised /updated scoring
methodology that institutes major changes to the inputs and weights used to rank projects for
consideration and inclusion in the STIP, please reference the abstract for the resolution to
endorse Orange County's priority transportation projects within the BGMPO planning area staff
prepared for the BOCC's September 17, 2013, meeting. That abstract is accessible using the
following weblink: http: / /www.co. orange .nc.us /occlerks /130917.pdf
FINANCIAL IMPACT: There is no immediate financial impact associated with this item except
that projects specifically categorized as bicycle and pedestrian projects will require a 20 percent
local match from the County and will require the County to expend any costs related to project
management and administration.
RECOMMENDATION(S): The Interim Manager recommends that the Board approve /endorse
the resolutions (Attachments 2 and 5) to submit priority transportation projects to the DCHC
MPO and TARPO.
M
Attachment 1
ORANGE COUNTY TRANSPORTATION PRIORITY LIST
2014— 2020 TRANSPORTATION IMPROVEMENT PROGRAM
FOR THE REGIONAL PRIORITY LIST OF
THE TRIANGLE AREA RURAL PLANNING ORGANIZATION
1. Dairyland Road /Orange Grove Road /Buckhorn Road bicycle facilities. construct 4 -ft.
paved shoulders along the following route from Carrboro to West Ten Road to
provide a connection with proposed routes to Mebane and Elfand.
• TIP Project EB -5108: Dairyland Road (SR 1112 - SR 1113 — SR 1177) from
Union Grove Church Road to Orange Grove Road (SR 1006);
• Orange Grove Road (SR 1006) from Dairyland Road (SR 1177) to Buckhorn
Road (SR 1114); and
• Buckhorn Road (SR 1114) to West Ten Road (SR 1144).
This route would extend bicycle facilities proposed in concert with highway
improvements on Buckhorn Road Road (SR 1114) to provide a connection through
western Orange County from Carrboro to the Buckhorn Road /Interstate 85
Economic Development District and US 70 near Mebane. This route is listed in
Orange County's Bicycle Transportation Plan as a secondary priority bicycle route
connecting southern Orange County with the western portion of its number 2 primary
priority bicycle route on West Ten Road (SR 1148). Project EB -5108 schedules a
portion of this route, Dairyland Road from Union Grove Church Road to Orange
Grove Road, for a feasibility study. Orange County recommends that the feasibility
study also include the segment of Dairyland Road from Union Grove Church Road
(SR 1111) to Old NC 86 to connect to proposed bicycle facilities on Old NC 86
along Carrboro's ETJ.
2. SR 1005 (Old Greensboro Road) bicycle facility: Add 4 -ft. paved shoulders on Old
Greensboro Road from Carrboro's ETJ to the Orange /Alamance County line. This
route is the number 3 primary priority of the Orange County Bicycle Transportation
Plan, and would enhance bicycle transportation between southwestern Orange
County and Carrboro /Chapel Hill. This project is a segment of the Mountains to Sea
Bicycle Route.
3. Orange Grove Road bicycle facilities: Construct 4 -ft. paved shoulders along Oranqe
Grove Road (SR 1006) from Interstate 40 to Dodson's Crossroads (SR 1102). This
route would provide bicycle facilities to the Grady Brown Elementary School and
Cedar Ridge High School from the area south of the schools and connect to a
proposed bicycle facility on Orange Grove Road into Hillsborough.
4. Dodson's Crossroad bicycle facilities: Construct 4 -ft. paved shoulders along
Dodson's Crossroads (SR 1102) from Orange Grove Road (SR 1006) to Dairyland
Road (SR 1177). This route would provide bicycle facilities from the Chapel Hill -
Carrboro area to connect to a proposed bicycle facility on Orange Grove Road into
Hillsborough.
Attachment 1
ORANGE COUNTY TRANSPORTATION PRIORITY LIST
2014 — 2020 DURHAM - CHAPEL HILL - CARRBORO
METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM
1. TIP Project No. EB -4980, SR 1006 (Orange Grove Road) at Interstate 40. Construct
a pedestrian bridge over 1 -40; construct sidewalk along the north side of Orange
Grove Road from the bridge to Timbers Drive. This pedestrian bridge is the
central element in the Safe Routes to School plan for Grady A. Brown Elementary
School and for Cedar Ridge High School. Without the bridge, the SRTS plan cannot
move forward. Construction of 0.14 mile (approx.) sidewalk on the north side of the
bridge extending from the bridge to Timbers Avenue will provide connectivity from
the bridge to three high- density neighborhoods: Patriot's Point, Colonial Estates, and
the Timbers. To improve the pedestrian access to the south of the bridge, the
Orange County School System has committed to constructing a safe and
comfortable path from the pedestrian bridge to the Cedar Ridge entrance.
Interstate 40 separates two schools, Grady Brown Elementary and Cedar Ridge
High School, from residential areas north of the interstate. The Orange County
school system estimates that over 262 students live within one mile of the schools.
Most of these students live in the high- density Timbers, Patriot's Pointe, and
Colonial Estates neighborhoods.
The "Access Management and Awareness Project and Report for Orange Grove
Road" recommends this project.
2. TIP Project No.R -2825, SR 1009 (South Churton Street) Improvements: Develop
congestion management, limited access, aesthetic and capacity improvements
including bicycle and pedestrian improvements between US 70 Business and
Interstate 40. The portion between Interstates 40 and 85 will conform to the design
criteria of the Economic Development District Design Manual (4 -lane divided section
with bike and pedestrian improvements). The feasibility study completed by NCDOT
in February 2002 recommends a 4 -lane divided curb and gutter cross section, with
16 -foot median, for the entire corridor from 1 -40 to the Eno River. Orange County
stresses the need to study improvements within the current right -of -way for the
segment north of Interstate 85. Improved capacity through widening is not the
County's first choice because of significant constraints between Interstate 85 and US
70 Business and the proximity of the historic district north of the project limits.
Orange County requests that, where conditions do not prevent the addition of
frontage roads, the feasibility study include the addition of frontage roads with limited
access from the corridor.
3. Hillsborough Train Station: Construct a train station in Hillsborough as designated in
Hillsborough's Rail Station Small Area Plan, and implement AMTRAK service to
Orange County. The train station can also serve future commuter rail operations
and anchor a multimodal transportation hub in Hillsborough. A revenue and
ridership study conducted by the North Carolina Department of Transportation Rail
Attachment 1
Division and AMTRAK has indicated that there is enough potential ridership to make
a stop in Hillsborough financially feasible.
4. Park and Ride Lot in the Buckhorn Economic Development District: Orange County
requests funding for a park and ride facility (from the adopted Orange County
Economic Development District Design Manual) to be located in the 1 -85 /Buckhorn
Road Economic Development District. This project would provide an opportunity for
coordination of public transportation efforts between two growing regions in North
Carolina, the Triad and Triangle.
5. US 70 East - Interstate 85 Connector: Modify the 1 -85 Connector interchange at US
70 to provide access from all directions. This project would enable traffic from
northwest Orange County to access Interstate 85 more easily without risking the
many points of traffic conflict through Efland. The Interstate 85 /US 70 Connector just
east of Efland is not accessible to traffic on eastbound US 70 and there is no access
to westbound US 70 from the connector.
Traffic has increased through northwestern Orange County on Efland Cedar Grove
Road as an alternative to NC 86. Much of that traffic "dog -legs" through Efland via
Forrest Avenue to Mt. Willing Road to access Interstate 85. Mt. Willing Road
provides an at grade crossing of the North Carolina Railroad corridor, the only
access across the railroad tracks between Hillsborough and Buckhorn Road.
6. SR 1009 (Old NC 86) Bicycle Facilities: Construct bicycle facilities on Old NC 86
from Hillsborough Road in Carrboro to 1 -40 in Hillsborough. This route along Old NC
86, from Carrboro's Transition Area just north of Eubanks Road (SR 1727) to Rippy
Lane (SR 1224), is priority 6 of the primary bicycle routes listed in the Orange
County Bicycle Transportation Plan. This project would extend bicycle
accommodations requested in TIP Project R -2825 (South Churton Street bicycle
lanes from Interstate 40 to the Eno River) to Hillsborough Road in Carrboro and
provide a connection between proposed bicycle facilities in Carrboro along Old
Fayetteville Road, Homestead Road and Eubanks Road.
7. SR 1006 (Orange Grove Road) Extension: Extend Orange Grove Road from the
east side of Churton Street (SR 1009) to US 70 business. This project is scheduled
for reprioritization. The "EDD Transportation Work Group Recommendations" and
the "Access Management and Awareness Project and Report for Orange Grove
Road" recommend this project as an alternative access to the US 70 Business /NC
86 corridor to alleviate congestion on Churton Street. This project could also provide
access to a potential site for Orange County's priority rail project, AMTRAK service
and train station in Hillsborough, although the site for such rail station has not been
determined.
8. Tip Project No. U -3436, SR 1148 (Eno Mountain Road) and SR 1192 (Mayo Street)
at SR 1006 (Orange Grove Road): realign intersection and make safety
improvements. This project is not included in the Draft 2012 — 2018 TIP, and is
7
Attachment 1
scheduled for reprioritization. The Hillsborough Town Board and Orange County
Commissioners have endorsed this project in two joint studies that included
commissioners from both jurisdictions. The "EDD Transportation Work Group
Recommendations" and the "Access Management and Awareness Project and
Report for Orange Grove Road" recommend this project for improved traffic flow and
safety.
9. U -2805, SR 1777 (Homestead Road) Improvements: Improve Homestead Road
from Old NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in
sections of the corridor where those facilities do not exist. This project is not in
included in the Draft 2012 -2020 TIP , and is scheduled for reprioritization. There are
three schools in the vicinity of Homestead Road: Chapel Hill High School, Smith
Middle School and Seawell Elementary School. Many students live within walking
distance and cycling distance to Chapel Hill High School and must walk or cycle
along Homestead Road, and cross the road daily. Provision of sidewalks is of
utmost importance for the safety of students and other pedestrians who use this
corridor. Provision of bicycle facilities is, likewise, necessary for the safety of
students and others
10.SR 1727 (Eubanks Road) bicycle lanes: Construct bicycle lanes on Eubanks Road
from Old NC 86 (SR 1009) to Rogers Road (SR 1729). The project would provide
bicycle access to the new Morris Hill Elementary School off Eubanks Road.
Increased traffic on Eubanks from the solid waste convenience center and Chapel
Hill Public Works Facility and Transportation Facility on Millhouse Road off of
Eubanks presents conflicts with bicycle transportation on the facility.
11. Dairyland Road bicycle facilities: Construct 4 -foot paved shoulders on Dairyland
Road (SR 1112, SR 1113, SR 1177) from Union Grove Church Road (SR 1111) to
Orange Grove Road (SR 1006). This project is one segment of a route providing
connection from Carrboro to the Efland /Mebane area via Orange Grove Road and
Buckhorn Road (SR 1114) to West Ten Road (SR 1144). The complete route would
extend bicycle facilities proposed with highway improvement s on Buckhorn Road in
the Buckhorn Road Economic Development District.
This project was submitted for the 2011 -2017 TIP through the Triangle Rural
(TARPO) Planning Organization. The Dairyland segment ranked #3 in the SPOT
ranking of bicycle projects in the TARPO.
12. NC 86 (North of Hillsborough) Improvements: Widen NC 86 from US 70 bypass to
north of NC 57 to four lanes with intersection improvements at US 70 bypass and
NC 57. Improvements at the NC 86 /US 70 intersection should include extending
the queuing lane for traffic turning east onto US 70 Bypass from northbound Churton
Street/NC 86. Improvements at the NC 86 /NC 57 intersection should include a
crosswalk and provide a safe crossing for pedestrians with sidewalk connecting the
intersection of NC 86 and NC 57 to Rencher Street. Improvements at the NC 86 /NC
57 intersection are identified in the developing Safe Routes to School Action Plan for
Attachment 1
Stanford Middle School as a major need to provide a safe access for students living
north of US 70 and west of NC 86 to walk or bike to school. NC 86 is the major
north -south route through Orange County and is designated in North Carolina's
Long -Range Statewide Multimodal Transportation Plan as a Strategic Highway
Corridor. NC 57 converges into US 86 just north of US 70 Bypass. The segment of
NC 86 between NC 57 and US 70 is congested, rendering a high accident location
at the intersection of US 70 Bypass at NC 86.
Attachment 2: Resolution Endorsing Projects for the TARPO Regional Priority List 9
RES- 2013 -079
ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS
A RESOLUTION ENDORSING ORANGE COUNTY'S PRIORITY TRANSPORTATION PROJECTS
FOR THE TRIANGLE AREA REGIONAL PLANNING ORGANIZATION ( TARPO) REGIONAL
PRIORITY LIST FOR THE 2016 — 2022 TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide
Transportation Improvement Program (STIP) that identifies transportation projects to be implemented
over the next seven years with State and Federal funding; and
WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and
regional importance to be included in the FY 2016 -2022 STIP; and
WHEREAS, North Carolina has established Rural Planning Organizations (RPOs) to coordinate
regional transportation planning in rural areas in cooperation with the North Carolina Department of
Transportation ( NCDOT);
WHEREAS, Orange County is a member of the Triangle Area Regional Planning Organization
( TARPO) charged with developing and prioritizing proposed transportation projects that the RPO
believes should be included in the STIP;
WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to
transportation projects that encourage alternatives to automobile travel, to projects that minimize
adverse impacts on the natural environment and cultural sites, and to those projects that foster
economic development in the County's designated Economic Development Districts; and
WHEREAS, Orange County strongly encourages the NCDOT to design all highway projects, where
appropriate, to accommodate bicycle and pedestrian traffic to provide alternative means of
transportation that may result in reduced automobile traffic and related air and water impacts; and
WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with
sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along
any existing or planned trail- system connectors; and
WHEREAS, Orange County has outlined its transportation needs within the TARPO planning area in
an attachment to this resolution;
NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the
Board endorses the following prioritized list of transportation projects to be considered for the FY
2016 -2022 TARPO regional priority list.
1 NC 54 Widening: Widen NC 54 from Orange Grove Road (SR 1006) to Neville Road (SR
1945) from a two (2) -lane undivided thoroughfare to a four (4) -lane divided boulevard type
thoroughfare.
This project will be submitted as a new highway project to be considered for inclusion in the
TARPO regional priority list as well as the 2016 -2022 STIP.
Attachment 2: Resolution Endorsing Projects for the TARPO Regional Priority List 10
2 Efland -Cedar Grove Road Improvements: Widen Efland -Cedar Grove Road (SR 1004) from
Highland Farm Road (SR 1332) to the northern property line of the U.S. Post Office north of
Carr Store Road (SR 1352) from a two (2) -lane, 20 -foot cross section to a 24 -foot cross
section with straightening of the roadway where needed, improvements to turn lanes, and the
incorporation of bicycle facilities.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the TARPO regional priority list as well as the 2016 -2022 STIP.
3 Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union
Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4) -foot
paved shoulders.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the TARPO regional priority list as well as the 2016 -2022 STIP.
4 Orange Grove Road /Buckhorn Road Paved Shoulders: Widen Orange Grove Road (SR 1006)
from Dairyland Road (SR 1177) to Buckhorn Road (SR 1114) and Buckhorn Road (SR 1114)
from Orange Grove Road (SR 1006) to West Ten Road (SR 1144) to include four (4) -foot
paved shoulders.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the TARPO regional priority list as well as the 2016 -2022 STIP.
5 Old Greensboro Road Paved Shoulders: Widen Old Greensboro Road (SR 1005) from
Carrboro's extra - territorial jurisdiction (ETJ) to the Orange /Alamance County line to include
four (4) -foot paved shoulders.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the TARPO regional priority list as well as the 2016 -2022 STIP.
6 Orange Grove Road /Dodsons Crossroads: Widen Orange Grove Road (SR 1006) from 1 -40 to
Dodsons Crossroads (SR 1102) and Dodsons Crossroads (SR 1102) from Orange Grove
Road (SR 1006) to Dairyland Road (SR 1177) to include four (4) -foot paved shoulders.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the TARPO regional priority list as well as the 2016 -2022 STIP.
Upon motion of Commissioner , seconded by Commissioner
the foregoing resolution was adopted this the 15th day of October, 2013.
I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO
HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a
meeting held on October 15, 2013, as relates in any way to the adoption of the foregoing and that said
proceedings are recorded in the minutes of said Board.
WITNESS my hand and the seal of said County, this day of 12013.
Clerk to the Board of Commissioners
m
Attachment 3: Draft Triangle Area Regional Planning Organization (TARPO) Project Priority List
Map ID #
Project
Project Description /Need
Status
Existing Project Score/
Staff Recommendation
(New /Existing Project)
Rank
Description: Widen NC 54 from Orange Grove Road (SR 1006) to Neville Road (SR 1945)
(DCHC MPO boundary) from a two (2) -lane, 24 -foot undivided thoroughfare to a four (4) -lane
divided boulevard type thoroughfare with a travel - prohibitive median to improve mobility and
provide better access control. This project is recommended in the Orange County
Comprehensive Transportation Plan ( OCCTP).
Need: NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Neville
Road will substantially exceed the existing roadway capacity by 2035, warranting an increase
Submit to TARPO for SPOT 3.0 scoring and
incapacity through widening. NCDOT traffic figures already indicate that traffic along the
consideration of inclusion in the TARPO regional
1
NC 54 Widening
segment of NC 54 from Butler Road /Dodsons Cross Road to Neville Road is at capacity and
New Highway Project
N/A
priority list and STIP as project priority #1 as a new
will only continue to substantially exceed capacity in future years. Among all projects
highway project.
recommended in the OCCTP, this project would likely score the highest relative to other
projects given the improvements the project would provide for both congestion and benefit -cost
factors. This project is also eligible for funding at both the regional and divisional tiers,
providing it a greater opportunity to be funded than projects that are only eligible for funding at
the division tier. The extension of this project into the Durham - Chapel Hill- Carrboro
Metropolitan Planning Organization (DCHC MPO) planning area is recommended as project
priority #5 in Orange County's DCHC MPO priority list. For this project to be funded, the
corresponding project in the DCHC MPO planning area would also need to be funded.
Description: Widen Efland -Cedar Grove Road (SR 1004) from Highland Farm Road (SR 1332)
to the northern property line of the U.S. Post Office north of Carr Store Road SR 1352) from a
two (2) -lane, 20 -foot cross section to a 24 -foot cross section with straightening of the roadway
where needed, improvements to turn lanes, and the incorporation of bicycle facilities. This
Scored in SPOT 2.0 prioritization as
project is recommended in the OCCTP.
Existing Highway
a Subregional Highway
Modernization Project
Modernization project. Ranked
This project proposal overlaps with STIP project W -5143 to improve the horizontal alignment of
submitted for scoring in SPOT
43/149 for all Subregional Highway
Submit to TARPO for SPOT 3.0 scoring and
Efland -Cedar Grove
the curve on Efland -Cedar Grove Road north of its intersection with Highland Farm Road. This
2.0. This project was
Modernization projects scored in
consideration of inclusion in the TARPO regional
2
Road (SR 1004)
project is scheduled for construction in April 2014 and for completion in December 2014.
recommended by staff in 2011
the state. Project is anticipated to
priority list and STIP as project priority #2 as a
Improvements
to be removed from the project
rank low for SPOT 3.0 because it
reprioritized highway project.
Need: The project would improve travel time with an increase in design speed and would
priority list for Orange County
would not score well with the
improve safety with travel lane straightening and an increase in pavement width. This segment
and was subsequently
State's adopted mobility scoring
of Efland -Cedar Grove Road is a travel alternative to NC 86 for traffic from northwestern
removed before submission.
factors.
Orange County to access 1- 40/85, and as such, traffic is projected to continue to increase in
future years. This project is not likely to score very high using the State's congestion scoring
factor and is only eligible for funding at the division tier. However, the project may score well
against the State's safety scoring factor.
Description: Widen Dairyland Road (SR 1004/1113/1177) from Union Grove Church Road (SR
1111) to Orange Grove Road (SR 1006) to include four (4) -foot paved shoulders. Part of this
Existing Highway
Scored in SPOT 2.0 prioritization as
project is located within the DCHC MPO planning area. The portion of this project within the
Modernization Project
a Subregional Highway
DCHC MPO planning area is being recommended for inclusion in that priority list. This project
submitted for scoring in SPOT
Modernization project. Ranked
is scheduled in the STIP for a feasibility study (STIP # EB- 5108). The project is recommended
2.0. This project was
62/149 for all Subregional
Submit to TARPO for SPOT 3.0 scoring and
3
ai Road
as a bikeway improvement in the OCCTP but will be submitted as a highway project with a cost
exceeding $1,000,000.
submitted by Orange County
Modernization projects scored in
consideration of inclusion in the TARPO regional
P
Paveed d S Shoulders'
as one segment of project
the state. Project is anticipated to
priority list and STIP as project priority #3 as a
Need. This project would provide one segment of a bikeway connection through western
priority #1 in 2011. The project
rank low for SPOT 3.0 because it
reprioritized highway project.
Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety
was scored in separate
would not score well with the
of the subject thoroughfare for motorized vehicular travel. The project is not likely to score very
segments in SPOT 2.0.
State's adopted mobility scoring
high using the State's congestion and benefit -cost scoring factors and is only eligible for
factors.
funding at the division tier. However, the project may score well against the State's safety
scoring factor.
12
Attachment 3: Draft Triangle Area Regional Planning Organization (TARPO) Project Priority List
Map ID #
Project
Project Description /Need
Status
Existing Project Score/
Staff Recommendation
(New /Existing Project)
Rank
Description: Widen Orange Grove Road (SR 1006) from Dairyland Road (SR 1177) to
Buckhorn Road (SR 1114) and Buckhorn Road (SR 1114) from Orange Grove Road (SR 1006)
Existing Highway
Scored in SPOT 2.0 prioritization as
to West Ten Road (SR 1144) to include four (4) -foot paved shoulders. This project is
Modernization Project
a Subregional Highway
recommended as a set of bikeway improvements in the OCCTP but will be submitted as a
submitted for scoring in SPOT
Modernization project. Ranked
Orange Grove
highway project with a cost exceeding $1,000,000.
2.0. This project was
10/149 for all Subregional
Submit to TARPO for SPOT 3.0 scoring and
4
Road /Buckhorn Road
submitted by Orange County
Modernization projects scored in
consideration of inclusion in the TARPO regional
Paved Shoulders'
Need: This project would provide one segment of a bikeway connection through western
as one segment of project
the state. In general, project is
priority list and STIP as project priority #4 as a
Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety
Priority #1 in 2011. The project
anticipated to rank low for SPOT
reprioritized highway project.
of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not
was scored in separate
3.0 because it would not score well
likely to score very high using the State's congestion and benefit -cost scoring factors and is
segments in SPOT 2.0.
with the State's adopted mobility
only eligible for funding at the division tier. However, the project may score well against the
factors.
State's safety scoring factor.
Description: Widen Old Greensboro Road (SR 1005) from Carrboro's extra - territorial
jurisdiction (ETJ) to the Orange /Alamance County line to include four (4) -foot paved shoulders.
Scored in SPOT 2.0 prioritization as
This project would be a segment of the North Carolina Mountains to Sea Bicycle Route
a Subregional Highway
(designated as North Carolina Bike Route 2). Part of this project is located within the DCHC
Existing Highway
Modernization project. Ranked
Old Greensboro
MPO planning area. This project is recommended as a bikeway improvement in the OCCTP
Modernization Project
21/149 for all Subregional
Submit to TARPO for SPOT 3.0 scoring and
5
Road Paved
but will be submitted as a highway project with a cost exceeding $1,000,000.
submitted for scoring in SPOT
Modernization projects scored in
consideration for inclusion in the TARPO regional
Shoulders'
2.0. This project was
the state. In general, project is
priority list and STIP as project priority #5 as a
Need: This project would provide a continuous paved bikeway segment from Carrboro through
submitted by Orange County
anticipated to rank low for SPOT
reprioritized highway project.
the southwestern portion of Orange County to connect with other bikeway segments that
as project priority #2 in 2011.
3.0 because it would not score well
comprise the state's Mountain to Sea bicycle route. The project is not likely to score very high
with the State's adopted mobility
using the State's congestion and benefit -cost scoring factors and is only eligible for funding at
scoring factors.
the division tier.
Description: Widen Orange Grove Road (SR 1006) from I -40 to Dodsons Crossroads (SR
1102) and Dodsons Crossroads (SR 1102) from Orange Grove Road (SR 1006) to Dairyland
Scored in SPOT 2.0 prioritization as
Road (SR 1177) to include four (4) -foot paved shoulders. This project is recommended as a set
Existing Highway
a Subregional Highway
of bikeway improvements in the OCCTP but will be submitted as a highway project with a cost
Modernization Project
Modernization project. Ranked
Orange Grove
exceeding $1,000,000.
submitted for scoring in SPOT
27/149 for all Subregional
Submit to TARPO for SPOT 3.0 scoring and
6
Road / Dodsons
2.0. This project was
Modernization projects scored in
consideration for inclusion in the TARPO regional
Crossroads Paved
Need: This project would provide bicycle facilities to the Grady Brown Elementary School and
submitted by Orange County
the state. In general, project is
priority list and STIP as project priority #6 as a
Shoulders'
Cedar Ridge High School from the area south of the schools and connect to a proposed
as p
project priorities #3 and #4
anticipated to rank low for SPOT
reprioritized highway project.
bikeway facility on Orange Grove Road northward into Hillsborough. The project would also
in 2011.
3.0 because it would not score well
improve safety for motorized vehicular travel on this segment of Orange Grove Road. The
with the State's adopted mobility
project is not likely to score very high using the State's congestion and benefit -cost scoring
scoring factors.
factors and is only eligible for funding at the division tier.
'Bike projects that are greater than $1,000,000 in cost can be submitted as highway projects if they involve highway modifications also of benefit to motorized vehicles. Projects will likely exceed $1,000,000. These projects are scored using the
highway scoring methodology, however, they are not likely to score well against the State's highway scoring criteria.
NOTES:
1) All projects previously submitted for consideration of inclusion in the TARPO regional priority list and the STIP are recommended for inclusion in this draft priority list; however, these projects are
shifted down in priority given their very low likelihood of scoring well against the SPOT 3.0 scoring criteria. The INC 54 project was added to the list as priority #1 given the need for the project, its
likelihood of scoring higher than other candidate projects, and its eligibility for funding from both the regional and divisional tiers, which makes it more likely to be funded. Although included as
priority #2 in this list, the Efland -Cedar Grove project was removed from Orange County's priority list in 2011 because it did not score well in previous scoring iterations and bikeway improvements
were anticipated not to meet the $1,000,000 threshold for being considered a highway project. The Efland -Cedar Grove Road improvements project is being added to the list because of some added
emphasis on safety in the State's scoring criteria, giving the project a higher likelihood for potential funding than in previous scoring iterations.
13
Attachment 3: Draft Triangle Area Regional Planning Organization ( TARPO) Project Priority List
2) The following projects within the TARPO planning area portion of Orange County are currently in the Statewide Transportation Improvement Program ISTIPI:
a) Construct four (4) -foot paved shoulders along a five (5) -mile segment on Orange Grove Road from NC 54 to Arthur Minnis Road. This project is programmed in the STIP to be constructed in 2018; however,
because the project is programmed for construction after July 2015, it will be subject to reprioritization under the newly adopted SPOT 3.0 process and is listed as a bike project with a total project cost of
$500,000.
b) Feasibility study for Dairyland Road paved shoulders project.
c) Construct paved shoulders and rumble strips and make geometric improvements on NC 86 from NC 57 to the Caswell County line a total length of 12.2 miles. This project is underway and is expected to be
completed by the end of October 2013.
Attachment 4: TARPO Project List Map
Caswell
w
0
O
Alamance
I
f1
O
v
IN
c
o'
%I
�l
O
L
A
o _
Chatham
B -G MPO DCHC MPO
?86s
RD
�O
Ro
ir
m
U
2
,p% Person
LAWS
14
Durham
N 1 in = 3 miles
0 1
Miles
Orange County Planning and Inspections
Brian Carson (10/3/2013)
Attachment 5: Resolution Endorsing Projects for the DCHC MPO Transportation
Improvement Program
RES- 2013 -080
ORANGE COUNTY BOARD OF COUNTY COMMISSIONERS
A RESOLUTION ENDORSING ORANGE COUNTY'S PRIORITY TRANSPORTATION PROJECTS
FOR THE DURHAM - CHAPEL HILL - CARRBORO METROPOLITAN PLANNING ORGANIZATION
(DCHC MPO) REGIONAL PRIORITY LIST FOR THE 2016 — 2022 TRANSPORTATION
IMPROVEMENT PROGRAM
WHEREAS, the North Carolina Board of Transportation (BOT), every two years, prepares a Statewide
Transportation Improvement Program (STIP) that identifies transportation projects to be implemented
over the next seven years with State and Federal funding; and
WHEREAS, the North Carolina BOT solicits input for identifying transportation projects of local and
regional importance to be included in the FY 2016 -2022 STIP; and
WHEREAS, the DCHC MPO Transportation Advisory Committee is charged with the development of
a Metropolitan Transportation Improvement Program (MTIP); and
WHEREAS, Orange County is a member jurisdiction of the DCHC MPO; and
WHEREAS, Orange County gives priority to identified safety needs on existing roads and bridges, to
transportation projects that encourage alternatives to automobile travel, to projects that minimize
adverse impacts on the natural environment and cultural sites, and to those projects that foster
economic development in the County's designated Economic Development Districts; and
WHEREAS, Orange County strongly encourages the North Carolina Department of Transportation
( NCDOT) to design all highway projects, where appropriate, to accommodate bicycle and pedestrian
traffic to provide alternative means of transportation that may result in reduced automobile traffic and
related air and water impacts; and
WHEREAS, Orange County encourages the NCDOT to design all new or replacement bridges with
sufficient clearance to allow wildlife to cross safely under them, and to allow pedestrian passage along
any existing or planned trail- system connectors; and
WHEREAS, Orange County has outlined its transportation needs within the DCHC MPO planning
area in an attachment to this resolution;
NOW, THEREFORE, BE IT RESOLVED by the Orange County Board of Commissioners that the
Board endorses the following prioritized list of transportation projects to be considered for the FY
2016 -2022 DCHC MPO MTIP.
South Churton Street (Old NC 86) Improvements: Widen South Churton Street (SR 1009) from
1 -40 to U.S. 70 Business to multiple lanes with congestion management, limited access,
bicycle and pedestrian, and aesthetic improvements.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the DCHC MPO MTIP as well as the 2016 -2022 STIP.
15
Attachment 5: Resolution Endorsing Projects for the DCHC MPO Transportation 16
Improvement Program
2 U.S. 70 East/1 -85 Connector: Modify the 1 -85 Connector (SR 1239) interchange at U.S. 70 to
provide access from all directions.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the DCHC MPO MTIP as well as the 2016 -2022 STIP.
3 Orange Grove Road Extension: Extend Orange Grove Road (SR 1006) from the east side of
South Churton Street (SR 1009) to U.S. 70 Business.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the DCHC MPO MTIP as well as the 2016 -2022 STIP.
4 NC 86 Improvements North of Hillsborough: Widen NC 86 from U.S. 70 Bypass to north of NC
57 to four (4) lanes with intersection improvements at U.S. 70 Bypass and NC 57.
This project will be submitted as a reprioritized highway project to be considered for inclusion
in the DCHC MPO MTIP as well as the 2016 -2022 STIP.
5 NC 54 Widening: Widen NC 54 from Neville Road (SR 1945) to Old Fayetteville Road (SR
1107/1937) from a two (2) -lane undivided thoroughfare to a four (4) -lane divided boulevard
type thoroughfare.
This project will be submitted as a new highway project to be considered for inclusion in the
DCHC MPO MTIP as well as the 2016 -2022 STIP.
6 1 -40 Widening: Widen 1 -40 from four (4) lanes to six (6) lanes from the 1- 40/1 -85 interchange to
the Durham County line.
This project will be submitted as a reprioritized highway project for consideration of inclusion in
the DCHC MPO MTIP as well as the 2016 -2022 STIP.
7 1 -85 Widening: Widen 1 -85 from four (4) lanes to six (6) lanes from the 1- 40/1 -85 interchange to
the Durham County line.
This project will be submitted as a reprioritized highway project for consideration of inclusion in
the DCHC MPO MTIP as well as the 2016 -2022 STIP.
8 Hillsborough Train Station: Construct a train station in Hillsborough and implement AMTRAK
service.
This project will be submitted as a new transit/rail project by Triangle Transit for consideration
of inclusion in the DCHC MPO MTIP as well as the 2016 -2022 STIP.
9 Buckhorn Economic Development District (EDD) Park - and -Ride: Construct a park- and -ride
facility to be located in the 1- 85 /Buckhorn Road EDD.
This project will be submitted as a new transit project by Triangle Transit or the Piedmont
Authority for Regional Transportation (PART) for consideration of inclusion in the DCHC MPO
MTIP as well as the 2016 -2022 STIP.
10 Eno Mountain Road /Mayo Street at Orange Grove Road: Realign the intersection of Eno
Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006)
and make safety improvements.
Attachment 5: Resolution Endorsing Projects for the DCHC MPO Transportation 17
Improvement Program
This project will be submitted as a reprioritized highway project for consideration of inclusion in
the DCHC MPO MTIP as well as the 2016 -2022 STIP.
11 Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old
NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor
where they do not exist.
This project will be submitted as a reprioritized highway project for consideration of inclusion in
the DCHC MPO MTIP as well as the 2016 -2022 STIP.
12 Eubanks Road Bike Lanes: Construct bicycle lanes on Eubanks Road (SR 1727) from Old NC
86 (SR 1009) to NC 86.
This project will be submitted as a reprioritized highway project for consideration of inclusion in
the DCHC MPO MTIP as well as the 2016 -2022 STIP.
13 Dairyland Road Paved Shoulders: Widen Dairyland Road (SR 1004/1113/1177) from Union
Grove Church Road (SR 1111) to Orange Grove Road (SR 1006) to include four (4) -foot
paved shoulders.
This project will be submitted as a reprioritized highway project for consideration of inclusion in
the DCHC MPO MTIP as well as the 2016 -2022 STIP.
14 Orange Grove Road /1 -40 Pedestrian Bridge: Construct a pedestrian bridge over 1 -40 alongside
Orange Grove Road (SR 1006) and construct a sidewalk along the north side of Orange Grove
Road (SR 1006) from the pedestrian bridge to Timbers Drive.
This project will be submitted as a new pedestrian project for consideration of inclusion in the
DCHC MPO MTIP as well as the 2016 -2022 STIP.
Upon motion of Commissioner , seconded by Commissioner
the foregoing resolution was adopted this the 15th day of October, 2013.
I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO
HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a
meeting held on October 15, 2013, as relates in any way to the adoption of the foregoing and that said
proceedings are recorded in the minutes of said Board.
WITNESS my hand and the seal of said County, this day of 12013.
Clerk to the Board of Commissioners
18
Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project Priority List
Map ID #
Project
Project Description /Need
Status
Existing Project Score/
Staff Recommendation
(New /Existing Project)
Rank
Description: Develop congestion management, limited access, bicycle and pedestrian
improvements, and aesthetic and capacity improvements along South Churton Street (Old NC
86 /SR 1009) from 1 -40 to U.S. 70 Business. More specifically, the project would widen South
Churton Street along this segment to multiple lanes with a landscaped median and would
widen the railroad bridge. This project is recommended in the DCHC MPO Metropolitan
Transportation Plan (MTP). The feasibility study completed by NCDOT in February 2002
Scored in SPOT 2.0 prioritization as
recommends a four (4) -lane divided curb and gutter cross section with a 16 -foot median for the
a Subregional Highway Mobility
entire segment. Orange County will stress the need to study improvements within the current
project. Ranked 52/382 for all
right -of -way (ROW) for the segment north of 1 -85 because of the significant built constraints
Existing Highway Mobility
Subregional Highway Mobility
Submit to DCHC for SPOT 3.0 scoring and
South Churton Street
along the corridor and its proximity to the Town of Hillsborough's historic district. Orange
Project submitted for scoring in
projects scored in the state. Project
consideration of inclusion in the DCHC MPO TIP and
1
(Old NC 86)
County will request that, where conditions do not prevent the addition of frontage roads, the
SPOT 2.0. This project was
was ranked 38/71 by the MPO for
the STIP as project priority #1 as a reprioritized
Improvements
feasibility study include the addition of frontage roads with limited access from the corridor.
submitted by Orange County
highway projects scored in SPOT
highway project.
as project priority #2 in 2011.
2.0. The project is anticipated to
Need: Traffic counts along South Churton Street (Old NC 86) indicate that the corridor is near
rank about the same or slightly
capacity for average annual daily counts and over capacity for peak periods. Capacity
lower in SPOT 3.0 prioritization.
improvements would ease congestion and improve travel time along this primary north -south
corridor connecting the Town of Hillsborough and northern Orange County to 1 -40 and 1 -85.
This project scored the highest among subregional mobility projects in Orange County for
SPOT 2.0 and ranked 52/382 among those in the state within that category. Although the
project is anticipated to rank the same or lower for SPOT 3.0, it is still projected to be among
the highest scoring projects that are only eligible in the division funding tier.
Description: Modify the 1 -85 Connector interchange at U.S. 70 to provide access from all
directions. The existing Connectorjust east of Efland is not accessible to traffic on eastbound
U.S. 70 and there is no access to westbound U.S. 70 from the Connector. This project is
recommended in the DCHC MPO MTP.
Scored in SPOT 2.0 prioritization as
a Regional Highway Mobility
Need: The project would enable traffic from northwestern Orange County to access 1 -85 more
project. Ranked 208/268 for all
easily without risking the many points of traffic conflict through Efland. Traffic has increased on
"dog-
Existing Highway Mobility
Regional Highway Mobility projects
Efland -Cedar Grove Road as an alternative to NC 86. Much of that traffic currently legs"
Project submitted for scoring in
scored in the state. Project was
Submit to DCHC MPO for SPOT 3.0 scoring and
2
U.S. 70 East/I -85
through Efland via Forrest Avenue to Mt. Willing Road to access I -85. Traffic counts reveal that
SPOT 2 .0. This project was
ranked 66/71 by the MPO for
consideration of inclusion in the DCHC MPO TIP and
Connector
traffic has increased approximately 40 % over the past 10 years on Mt. Willing Road just south
submitted by Orange County
highway projects scored in SPOT
the STIP as project priority #2 as a reprioritized
of Forrest Avenue, while traffic on U.S. 70 east of Efland -Cedar Grove Road has increased
as project priority #5 in 2011.
2.0. Project is anticipated to rank
highway project.
only 2 %.
higher for SPOT 3.0 but will likely
not rank in the top tier of projects
The project would dramatically improve travel time for traffic from northwestern Orange County
within the regional and divisional
to 1 -85 and would dramatically ease congestion during peak periods in Efland. This project did
funding tiers.
not score very high for SPOT 2.0 prioritization but is projected to score higher for SPOT 3.0
because of the added emphasis on both benefit- cost/travel time and safety. It is also
anticipated that the project will be eligible at both the regional and divisional funding tiers.
Description: Extend Orange Grove Road from the east side of South Churton Street (SR 1009)
Scored in SPOT 2.0 prioritization as
to U.S. 70 Business. This project is recommended in the DCHC MPO MTP.
a Subregional Highway Mobility
Existing Highway Mobility
project. Ranked 77/382 for all
Need: This project would ease excess congestion on South Churton Street between Orange
Project submitted for scoring in
Subregional Mobility projects
Submit to DCHC MPO for SPOT 3.0 scoring and
3
Orange Grove Road
Grove Road and U.S. 70 Business and reduce travel time by providing a direct connection from
SPOT 2.0. This project was
scored in the state. Project was
consideration of inclusion in the DCHC MPO TIP and
Extension
Orange Grove Road to U.S. 70 Business. The project would also provide access to a potential
submitted by Orange County
ranked 35/71 by the MPO for
the STIP as project priority #3 as a reprioritized
site for the proposed Hillsborough train station and possibly other future public facilities. This
as project priority #7 in 2011.
highway projects scored in SPOT
highway project.
project scored relatively well for SPOT 2.0 and ranked 77/382 for all subregional mobility
2.0. The project is anticipated to
projects in the state. Although the project is expected to rank the same or lower for SPOT 3.0,
rank about the same or slightly
it is still projected to be among the higher scoring projects that are only eligible in the division
lower for SPOT 3.0 prioritization.
funding tier.
19
Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project Priority List
Map ID #
Project
Project Description /Need
Status
Existing Project Score/
Staff Recommendation
(New /Existing Project)
Rank
Description: Widen NC 86 from U.S. 70 bypass to north of NC 57 to four (4) lanes with
intersection improvements at U.S. 70 bypass and NC 57. Improvements at the NC 86 /U.S. 70
intersection should include extending the queuing lane for traffic turning east onto U.S. 70
bypass from northbound Churton Street /NC 86. Improvements at the NC 86 /NC 57 intersection
Scored in SPOT 2.0 prioritization as
should include a crosswalk and provide a safe crossing for pedestrians with a sidewalk
Existing Highway Mobility
a Statewide Highway Mobility
connecting the intersection of NC 86 and NC 57 to Rencher Street. This project is not currently
Project submitted for scoring in
project. Ranked 60/306 for all
listed or recommended in the DCHC MPO MTP but is recommended in the DCHC MPO CTP.
SPOT 2.0. This project was
Statewide Mobility projects scored
Submit to DCHC MPO for SPOT 3.0 scoring and
4
NC 86 Improvements
submitted by Orange County
in the state. Project ranked 49/71 by
consideration of inclusion in the DCHC MPO TIP and
north of Hillsborough
Need: The segment of NC 86 between NC 57 and U.S. 70 is highly congested. Traffic counts
as project priority #12 in 2011.
the MPO for highway projects
the STIP as project priority #4 as a reprioritized
indicate that this segment of NC 86 is over capacity for average annual daily counts. Capacity
For this project to be funded, it
scored in SPOT 2.0. In general,
highway project.
improvements would ease congestion and improve travel time along this primary north -south
would need to be added to the
project is anticipated to rank about
corridor connecting the Town of Hillsborough to NC 57 and northern Orange County. This
DCHC MPO MTP.
the same or slightly lower for SPOT
project scored well for SPOT 2.0 and ranked 60/306 for all statewide mobility projects in the
3.0 prioritization.
state. The project will be scored as a regional and /or division tier project for SPOT 3.0 and is
anticipated to be among the higher scoring projects within these tiers with the added emphasis
on congestion and benefit -cost.
Description: Widen NC 54 from Neville Road to Old Fayetteville Road from a two (2) -lane
thoroughfare to a four (4) -lane divided boulevard type thoroughfare with a travel - prohibitive
median to improve mobility and provide better access control. This project would continue the
NC 54 widening project recommended in the OCCTP into Carrboro, however, this project is not
recommended in the DCHC MPO MTP or CTP. The proposed NC 54 widening project west of
Neville Road (TARPO priority project #1) would be contingent on the widening of this segment
of the roadway so that the benefits of a continuous improved higher capacity cross section
Submit to DCHC MPO for SPOT 3.0 scoring and
would be extended along logical termini.
consideration of inclusion in the DCHC MPO MTP,
5
NC 54 Widening
New Highway Project
N/A
TIP and the STIP as project priority #5 as a new
Need: NCDOT projections west of these project limits reveal that traffic on NC 54 is at
highway project.
capacity, implying that traffic along these project limits is likely at or above capacity warranting
an increase in capacity through widening. The project would improve congestion and reduce
travel time along the corridor. As such, the project is likely to score relatively well against the
State's congestion and benefit -cost scoring factors, and the project is eligible for funding at
both the regional and divisional tiers. An amendment to the DCHC MPO MTP to include this
project would be required for the project to be funded within the first four (4) years of the STIP
(FYs 2016 - 2019).
Scored in SPOT 2.0 prioritization as
Description: Widen 1 -40 from four (4) lanes to six (6) lanes from the 1- 40/1 -85 interchange to the
Existing Highway Mobility
a Statewide Highway Mobility
Durham County line. The project is recommended in the DCHC MPO MTP.
Project submitted for scoring in
project. Ranked 54/306 for all
SPOT 2.0. This project was
Statewide Mobility projects scored
Submit to DCHC MPO for SPOT 3.0 scoring and
6
I -40 Widening
Need: According to data from NCDOT, traffic along this corridor is near capacity and is
not submitted by Orange
in the state. Project ranked 63/71 by
consideration of inclusion in the DCHC MPO TIP and
expected to exceed capacity in future years. The project would reduce congestion and travel
County in 2011 but is already
the MPO for highway projects
the STIP as project priority #6 as a reprioritized
time and will likely score relatively well when compared to other projects submitted because of
in the DCHC MPO TIP and the
scored in SPOT 2.0. Project is
highway project.
the added emphasis on congestion and benefit -cost. This project is eligible for funding at the
STIP and is considered a
anticipated to rank higher for SPOT
statewide, regional and divisional tiers.
project of regional significance.
3.0 prioritization among highway
projects throughout the state.
Scored in SPOT 2.0 prioritization as
Existing Highway Mobility
a Statewide Highway Mobility
Description: Widen 1 -85 from four (4) lanes to six (6) lanes from the 1- 40/1 -85 interchange to the
Project submitted for scoring in
project. Two separate segments
Durham County line and reconstruct interchanges and bridge structures. The project is
SPOT 2.0. This project was
scored for the project ranked
Submit to DCHC MPO for SPOT 3.0 scoring and
7
1 -85 Widening
recommended in the DCHC MPO MTP.
not submitted by Orange
150/306 and 220/306 for Statewide
consideration of inclusion in the DCHC MPO TIP and
County in 2011 but is already
Mobility projects scored in the state.
the STIP as project priority #7 as a reprioritized
Need: The project would reduce congestion and travel time along the corridor during peak
in the DCHC MPO TIP and the
Project ranked 68/71 by the MPO
highway project.
periods. This project is eligible for funding at the statewide, regional and divisional tiers.
STIP and is considered a
for highway projects scored in
project of regional significance.
SPOT 2.0. Project is anticipated to
rank higher for SPOT 3.0
20
Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project Priority List
Map ID #
Project
Project Description /Need
Status
Existing Project Score/
Staff Recommendation
(New /Existing Project)
Rank
prioritization among highway
projects throughout the state but will
likely not rank high enough to be
funded at the Statewide tier.
New Transit and /or Rail
Description: Construct a train station in Hillsborough and implement AMTRAK service as
project." This project will
designated in Hillsborough's Rail Station Small Area Plan and in the Orange County Bus and
technically require submission
Rail Investment Plan. The train station could also serve future commuter rail operations and
by Triangle Transit; however,
Submit to DCHC MPO for SPOT 3.0 scoring and
Hillsborough Train
anchor a multimodal transportation hub in Hillsborough.
the project is included in the
consideration of inclusion in the DCHC MPO TIP and
8
Station
priority list to act as a guide for
N/A
the STIP as project priority #8 as a new transit
Need: A revenue and ridership study conducted by NCDOT and AMTRAK has indicated there
assigning local input points to
and /or rail project.
is enough potential ridership to make a stop in Hillsborough financially feasible. The station and
potential projects. This project
service in Hillsborough would fill a sizable gap in area served along the rail line between
was submitted by Orange
Burlington and Durham.
County as project priority #2 in
2011.
New Transit Project."
This project will technically
require submission by Triangle
Ranked 10/17 among all DCHC
Description: Construct apark- and -ride facility to be located in the -85 /Buckhorn Road
Transit or the Piedmont
Authority for Regional
MPO transit projects scored in
2011. Final rank with MPO scores
Buckhorn Economic
Economic Development District (EDD) to collect ridership in eastern Alamance and western
Transportation (PART),
and Transportation Advisory
Submit to DCHC MPO for SPOT 3.0 scoring and
9
Development District
Orange Counties.
however, the project is
Committee (TAC)- assigned points
consideration of inclusion in the DCHC MPO TIP and
(EDD) Park - and -Ride
Need: The park- and -ride facility would provide a transit connection to an area with a growing
included in the priority list to
was 14/17. Project received no
the STIP as project priority #9 as a new transit
project.
commuting presence to and from the Triangle region.
act as a guide for assigning
points from the TAC for the DCHC
local input points to potential
MPO draft 2014 -2020 TIP priority
projects. This project was
list.
submitted by Orange County
as project priority #4 in 2011.
Scored in SPOT 2.0 prioritization as
a Subregional Highway
Eno Mountain Road
Description: Realign the intersection of Eno Mountain Road and Mayo Street with Orange
Existing Highway
Modernization project. Ranked
and Mayo Street at
Grove Road and make safety improvements. This project is not provided /recommended in the
Modernization project
59/149 for all Subregional
Submit to DCHC MPO for SPOT 3.0 scoring and
10
Orange Grove Road
DCHC MPO MTP.
submitted for scoring in SPOT
Modernization projects scored in
consideration of inclusion in the DCHC MPO TIP and
intersection
2.0. This project was
the state. Ranked 16/71 by the
the STIP as project priority #10 as a reprioritized
realignment and
Need: The project would improve safety, reduce travel time, and improve traffic flow between
submitted by Orange County
MPO for highway projects scored in
highway project.
safety improvements
residential and commercial areas in the Town of Hillsborough.
as project priority #8 in 2011.
SPOT 2.0. Project is anticipated to
rank low among all projects scored
in the division tier.
Description: Improve Homestead Road from Old NC 86 (SR 1009) to NC 86 to include bicycle
lanes and sidewalks in sections of the corridor where those facilities do not exist. This project is
Scored in SPOT 2.0 prioritization as
provided /recommended in the DCHC MPO MTP
a Subregional Highway
Existing Highway
Modernization project. Ranked
Homestead Road
Need: There are three (3) schools in the vicinity of Homestead Road: Chapel Hill High School,
Modernization project for
75/149 for all Subregional
Submit to DCHC MPO for SPOT 3.0 scoring and
11
bike lane and
Smith Middle School, and Seawell Elementary School. Many students live within walking and
submitted for scoring in SPOT
Modernization projects scored in
consideration of inclusion in the DCHC MPO TIP and
sidewalk installation'
biking distance of Chapel Hill High School and must walk or cycle along or across Homestead
2.0. This project was
the state. Ranked 19/71 by the
the STIP as project priority #11 as a reprioritized
Road on a daily basis. Provision of bikeway and pedestrian facilities is necessary to give
submitted by Orange County
MPO for highway projects scored in
highway project.
students a comfortable and safe place to travel separate from that of motorized vehicular
as project priority #9 in 2011.
SPOT 2.0. Project is anticipated to
traffic. Homestead Road is also a commuting route for adult utilitarian bicyclists connecting
rank low among all projects scored
residential areas to other arteries serving employment centers.
in the division tier.
21
Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project Priority List
Map ID #
Project
Project Description /Need
Status
Existing Project Score/
Staff Recommendation
(New /Existing Project)
Rank
Scored in SPOT 2.0 prioritization as
Description: Construct bicycle lanes on Eubanks Road from Old NC 86 (SR 1009) to NC 86.
Existing Highway
a Subregional Highway
Modernization project. Ranked
This project would likely exceed $1,000,000, and as such, would be submitted as a highway
Modernization Project
19/149 for all Subregional
Submit to DCHC MPO for SPOT 3.0 scoring and
Eubanks Road bike
project. This project is provided /recommended in the DCHC MPO MTP.
submitted for scoring in SPOT
Modernization projects scored in
consideration of inclusion in the DCHC MPO TIP and
12
lane installation'
Need: This project would provide separate facility for both recreational and commuter
2.0. This project was
the state. Ranked 6/71 by the MPO
the STIP as project priority #12 as a reprioritized
ke /automobile modal conflict along this corridor. The project
bicyclists reduce /eliminate the bike/automobile
submitted by Orange County
for highway projects scored in
highway project.
would also provide access to the Morris Grove Elementary School on Eubanks Road.
o
as roject riorit
p priority #10 in 2011.
SPOT 2.0. Project is anticipated to
rank low among all projects scored
in the division tier.
Description: Widen Dairyland Road from Union Grove Church Road to Orange Grove Road to
Scored in SPOT 2.0 prioritization as
include four (4) -foot paved shoulders. Part of this project is located within the TARPO planning
a Subregional Highway
area. The portion of this project within the TARPO planning area is being recommended for
Existing Highway
Modernization project. Ranked
inclusion in that priority list as priority #3. This project is scheduled in the STIP for a feasibility
Modernization Project
62/149 for all Subregional
Submit to DCHC MPO for SPOT 3.0 scoring and
Dairyland Road
study (STIP # EB- 5108). This project is provided /recommended in the DCHC MPO MTP.
submitted for scoring in SPOT
Modernization projects scored in
consideration of inclusion in the DCHC MPO TIP and
13
paved shoulders'
Need: This project would provide one segment of a bikeway connection through western
2.0. This project was
the state. Ranked 21/71 by the
the STIP as project priority #13 as a reprioritized
Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety
submitted by Orange County
MPO for highway projects scored in
highway project.
of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not
as project priority #11 in 2011.
SPOT 2.0. Project is anticipated to
likely to score very high using the State's congestion and benefit -cost scoring factors and is
rank low among all projects scored
n the division tier.
only eligible for funding at the division tier.
Description: Construct a pedestrian bridge over 1 -40 alongside Orange Grove Road and
construct a sidewalk along the north side of Orange Grove Road from the bridge to Timbers
Drive.
Scored in SPOT 2.0 prioritization as
Need: I -40 separates two schools, Grady Brown Elementary and Cedar Ridge High School,
a Pedestrian project. Ranked
559/629 for all bike /ed projects
p p
Submit to DCHC MPO for SPOT 3.0 scoring and
Orange Grove
from residential areas north of 1 -40. The schools are within walking distance from residential
Ranked 24/24 . scored in the state
consideration of inclusion in the DCHC MPO TIP and
14
Road /1 -40 Pedestrian
areas, but bicyclists and pedestrians must share the roadway with motor vehicles crossing the
New Pedestrian Project"
by the MPO for pedestrian projects
the STIP as project priority #14 or higher as a new
Bridge
existing narrow two (2) -lane bridge that carries Orange Grove Road over 1 -40. The bridge is too
. .
scored in SPOT 2 Project is
0
pedestrian project if the County can commit to provide
narrow to accommodate a pedestrian walkway. Lack of an adequate pedestrian crossing
anticipated to rank low among all
the 20% local match, acquire any necessary right -of-
presents an unsafe environment for students to walk to the schools. The Orange County Safe
bike /ped projects scored in the
way, and locally administer /manage the project.
Routes to School Action Plan identifies the pedestrian bridge as the central element in the plan
division tier.
for Grady Brown Elementary School. The school system has committed to construct a trail from
the bridge across Cedar Ridge High School property to the entrance of Cedar Ridge High
School.
Bike projects that are greater than $1,000,000 in cost can be submitted as highway projects if they involve highway modifications also of benefit to motorized vehicles. Projects will likely exceed $1,000,000. These projects are scored using the
highway scoring methodology, however, they are not likely to score well against the State's highway scoring criteria.
Bike /ped and transit projects will be considered new projects for SPOT 3.0 scoring. Previous bike /ped and transit projects submitted for scoring will not automatically be scored for SPOT 3.0. Transit projects in this priority list are meant to
function as a guide for Orange County's assignment of local input points. These transit projects would ultimately need to be submitted by the transit agency responsible for making the respective capital improvements.
'Pedestrian projects require a 20% local match and must be locally administered. Right -of -way acquisition is also not a permissible cost to be funded by NCDOT for these projects.
NOTES:
1) The 1 -85 and 1 -40 widening projects are already scheduled for reprioritization at the Statewide tier, and staff is suggesting that they be added to the priority list to provide a guide for
staff and elected officials to determine to which Orange County projects they should assign local input points in the event that these projects are not funded at the statewide tier and
become eligible at the regional or divisional funding tiers.
2) One project was removed from the priority list submitted in 2011: Old INC 86 bikeway improvements from Hillsborough Road in Carrboro to 1 -40. All other projects submitted in 2011
are included; however, the staff - suggested order of prioritization for those projects has changed.
22
Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project Priority List
3) The following projects within the DCHC MPO planning area portion of Orange County are currently in the Statewide Transportation Improvement Program (STIP):
a) 1 -40 widening
b) 1 -85 widening
c) Feasibility study for Dairyland Road paved shoulders project.
Attachment 7: DCHC MPO Project List Map 23
Caswell
W TRYON ST E TRYON ST
m =_ Person
J�
S
DIM�°G 0 y0
my
O
oM 70A $J LAWS STORE
G,y 3
157
10 j
2 I
PAM \LL RD
Q-
aG�G I
soH<Fy I
14 57
OAKOq�E OR O
O G�J
02 2D �PRO�
I �0 86
j PRVS RD
i
I
70
9 WEST'C
70A
r See Inset
I R °N
70 Q
Alamance
7
Durham
N O O O
�A e °P 0 751
86
O ° gORILANO RD O
ARTHUR M /,yNlsea
> I
6RP°y� ¢
EUBANKS RD �� I
u� TEERR° p p A PO Oc`P
Q A No HOMESTEgO
Z RO
ORD
15
.�'RO 54 501
M0 RO`N
? I
m° o
m J m
N
54
0" RO
O O ORO U
O Ay U OLD OREENSB
.4 0
_ I
f I
Chatham — " --
\_, N 1 in = 3 miles
0 1
1 - * Miles
B -G MPO DCHC MPO Orange County Planning and Inspections