ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: October 15, 2013
Action Agenda
Item No. 5 -j
SUBJECT: Preliminary Information and Approval to Finance Various Capital Investment
Plan Projects and County Equipment
DEPARTMENT: Finance and Administrative PUBLIC HEARING: (Y /N)
Services
ATTACHMENT(S):
1. Resolution Supporting an Application
to the Local Government Commission
for its Approval of a Financing
Agreement for the County
2. Capital Investment Plan — Project
Pages
3. Vehicle Replacement Fund
Purchases Abstract
INFORMATION CONTACTS:
Clarence Grier, 919 - 245 -2453
Robert Jessup, 919 - 933 -9891
PURPOSE: To receive preliminary information and approve a resolution moving forward with
financing for capital investment projects and equipment
for the year.
BACKGROUND: As part of the FY2013 -18
Capital Investment Plan, several projects were
approved for equipment financing. The proposed projects to be financed are as follows:
Project
Jurisdiction Amount
Culbreth Middle School Science Wing
Schools - CHCCS $ 4,971,676
HVAC Projects
County $ 130,000
Roofing Projects
County $ 115,000
Information Technology ( including
Firehouse Software and Central
Permitting Software)
County $ 1,436,000
Whitted Building Renovations
County $ 1,700,000
Viper Radio System
County $ 500,000
Communication System Improvements
County $ 709,062
Vehicle Replacements
County $ 899,416
Total
$ 10,461,154
The County will be receiving bids from financial institutions to secure the financing. Staff
anticipates financing $10.5 million with terms between 15 to 20 years and anticipated interest
rates ranging between 2.65 to 2.75 percent, which will result in an average annual debt service
cost of $650,596 to $822,592 depending on the structure of the installment financing (interest
rate and term).
1
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: October 15, 2013
Action Agenda
Item No. 5 -j
SUBJECT: Preliminary Information and Approval to Finance Various Capital Investment
Plan Projects and County Equipment
DEPARTMENT: Finance and Administrative PUBLIC HEARING: (Y /N)
Services
ATTACHMENT(S):
1. Resolution Supporting an Application
to the Local Government Commission
for its Approval of a Financing
Agreement for the County
2. Capital Investment Plan — Project
Pages
3. Vehicle Replacement Fund
Purchases Abstract
INFORMATION CONTACTS:
Clarence Grier, 919 - 245 -2453
Robert Jessup, 919 - 933 -9891
PURPOSE: To receive preliminary information and approve a resolution moving forward with
financing for capital investment projects and equipment
for the year.
BACKGROUND: As part of the FY2013 -18
Capital Investment Plan, several projects were
approved for equipment financing. The proposed
projects to be financed are as follows:
Project
Jurisdiction Amount
Culbreth Middle School Science Wing
Schools - CHCCS $ 4,971,676
HVAC Projects
County $ 130,000
Roofing Projects
County $ 115,000
Information Technology ( including
Firehouse Software and Central
Permitting Software)
County $ 1,436,000
Whitted Building Renovations
County $ 1,700,000
Viper Radio System
County $ 500,000
Communication System Improvements
County $ 709,062
Vehicle Replacements
County $ 899,416
Total
$ 10,461,154
The County will be receiving bids from financial institutions to secure the financing. Staff
anticipates financing $10.5 million with terms between 15 to 20 years and anticipated interest
rates ranging between 2.65 to 2.75 percent, which will result in an average annual debt service
cost of $650,596 to $822,592 depending on the structure of the installment financing (interest
rate and term).
2
FINANCIAL IMPACT: There is no financial impact related to this action. However, there will be
a financial impact in proceeding with the financing. A preliminary estimate of maximum debt
service applicable to the School and County projects financing would require annual debt
service payments in the range of $650,596 to $822,592. The tax rate equivalent for the highest
debt service payment is approximately .4392 cents.
RECOMMENDATION(S): The Interim Manager recommends the Board receive the preliminary
information and approve the resolution moving forward with the financing of the stated capital
projects and equipment financing.
3
RES- 2013 -077 Attachment 1
Resolution Supporting an Application to the Local Government Commission for
its Approval of a Financing Agreement for the County
WHEREAS --
The Board of Commissioners has previously determined to carry out the
acquisition and construction of various public improvements, as identified in the
County's capital improvement plan.
The Board desires to finance the costs of these projects by the use of an
installment financing, as authorized under Section 160A -20 of the North Carolina
General Statutes.
Under the guidelines of the North Carolina Local Government Commission, the
Board must make certain findings of fact to support the County's application for the
LGC's approval of the County's proposed financing arrangements.
THEREFORE, BE IT RESOLVED by the Board of Commissioners of Orange
County, North Carolina, that the County makes a preliminary determination to finance
approximately $10,500,000 to pay capital costs of various public improvements. The
proposed list of projects and improvements to be financed appears on Exhibit A.
The Board will determine the final amount to be financed by a later resolution.
The final amount financed may be slightly lower or slightly higher than $10,500,000.
Some of the financing proceeds may provide reimbursement to the County for prior
expenditures on project costs, and some proceeds may be used to pay financing costs.
BE IT FURTHER RESOLVED that the Board of Commissioners makes the
following findings of fact:
(a) The proposed projects are necessary and appropriate for the County under
all the circumstances.
(b) The proposed installment financing is preferable to a bond issue for the
same purposes.
The County has no meaningful ability to issue non -voted general obligation bonds
for this project. These projects will not produce sufficient revenues to support a self -
liquidating financing. The County has in the past issued substantial amounts of voter -
approved bonds, and it is appropriate for the County to balance its capital finance
program between bonds and installment financing.
The County expects that in the current interest rate environment for municipal
securities there would be no material difference in interest rates between general
obligation bonds and installment financings for these projects.
(c) The estimated sums to fall due under the proposed financing contract are
adequate and not excessive for the proposed purpose. The County will closely review
proposed financing rates against market rates with guidance from the LGC and its
financial adviser. All amounts financed will reflect either approved contracts, previous
actual expenditures or professional estimates.
(d) As confirmed by the County's Finance Officer, (i) the County's debt
management procedures and policies are sound and in compliance with law, and (ii) the
County is not in default under any of its debt service obligations.
(e) The County estimates that the maximum tax rate impact of paying debt
service on the financing will be the equivalent of up to approximately 0.04 cents per $100
of valuation. Given this low amount and based on the estimated interest rates to be
payable and the proposed financing term, the County expects to be able to repay the
financing within current resources, and no actual tax rate increase related to this financing
will be necessary.
(f) The County Attorney is of the opinion that the proposed project is
authorized by law and is a purpose for which public funds of the County may be
expended pursuant to the Constitution and laws of North Carolina.
BE IT FURTHER RESOLVED as follows:
(a) The County intends that the adoption of this resolution will be a declaration
of the County's official intent to reimburse project expenditures from financing proceeds.
The County intends that funds that have been advanced for project costs, or which may
be so advanced, from the County's general fund, or any other County fund, may be
reimbursed from the financing proceeds.
(b) This resolution takes effect immediately.
Exhibit A — proposed projects
Project
Estimated Amount
Description
Southern HSC (Future Planning)
$300,000
Expansion Master Plan and
Preliminary Design Work and Planning
HVAC Projects
$1,553,201
Community Geothermal Projects
Roofing Projects
$165,000
Jail, Justice Facility, Asset Management
Services, North Administrative Building
Information Technology
$702,500
Library Management System Software
(ILS), Equipment, BOCC initiatives
Whitted Building
$295,000
Preliminary Design Work
VIPER Radio System
$543,750
Additional Channels for Existing Towers to
increase the Viper System capacity
Communications System
Improvements
$164,000
Purchase of additional Viper Radios
Twin Creeks Park - Phase II
$600,000
Construction of a main entry road
Buckhorn EDD Phase 2
$4,256,046
To place Water and Sewer infrastructure in
the Buckhorn - Mebane Economic
Development District
Southern Human Services
Center
$280,000
Health Clinic and DSS Renovations
Information Technology
$500,000
Desktop, Laptop and Server Replacements
Vehicle Replacements
$640,503
Vehicle Purchases
Attachment 2
APPROVED - Schools Capital Projects Summary
Fiscal Years 2013 -18
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Proiects by School Svstem 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 Total Year 10
Chapel Hill Carrboro City Schools
Long Range Capital
Pay -As- You -Go Funds X11
Lottery Proceeds "2I
Culbreth MS Science Wing Addition
Middle School #5
Carrboro HS Additions
Elementary # 12
QSCBs
Elementary # 11
Total
Orange County Schools
Long Range Capital
Pay -As- You -Go Funds ?�
Lottery Proceeds r2)
OSCBs
Elementary #8
Cedar Ridge HS Auxilliary Gym
Cedar Ridge HS Classroom Wing
Total
Total all Schools
Revenues/Funding Source
2,290,782 2,290,782 2,325,144 2,360,021 2,395,421 2,431,353 11,802,720 12,714,884
815,000 839,960 839,960 839,960 839,960 839,960 4,199,800 4,199,800
600,000 3,854,042 517,634 4,971,676
1,168,474 6,686,266 7,854,740 31,995,940
19,743,948
35,476,053
21,500,000
24,605,782 3,730,742 7,019,146 3,717,615 4,403,855 9,957,579 28,828,936 104,130,625
1,434,067 1,434,067 1,455,578 1,477,412 1,499,573 1,522,066 7,388,696 7,959,722
506,350 513,851 513,851 513,851 513,851 513,851 2,569,255 2,569,255
21,478,200
3,328,750 - 3,328,750
12,282,960 12,282,960
1,940,417 5,276,668 1,969,429 14,274,223 2,013,424 2,035,917 25,569,661 32,007,177
26.546.199 9.007.410 8.988.575 17.991.838 6,417,279 11,993,496 54,398,597 136,137,802
General Fund (Pay-As-You-Go)
3,724,849
3,724,849
3,780,722
3,837,433
3,894,994
3,953,419
19,191,416
20,674,606
Lottery Proceeds
1,321,350
1,353,811
1,353,811
1,353,811
1,353,811
1,353,811
6,769,055
6,769,055
Debt Financing
21,500,000
3,928,750
3,854,042
12,800,594
1,168,474
6,686,266
28,438,126
108,694,141
QSCBs
9.007.410
8.988.575
17.991.838
6.417,279
11,993,496
54,398,597
136,137,802
26.546.199
Note 1: The Article 46 one quarter cent sales tact proceeds for schools is included in the Special Revenue Projects section of the CIP.
Note 2: School Construction is guided by the Schools Adequate Public Facilities Ordinance (SAPFO) projections of capacity and need.
III Pay- As- You-Go funds reflect same funding in FY 2013 -14 as in FY 2012 -13, and assumes a 1.5% annual growth throughout the 5 year CIP period.
NOTE: additional PAYG funding was approved in FY 2012 -13 to reflect savings in debt service in FY 2012 -13.
I2I Lottery Proceeds are assumed at the same amount throughout the 5 year CIP period, based on the most recent lottery estimates from the State. The
funds will be distributed on the basis of each school system's Average Daily Membership (ADM).
10
It
Project Name
Functional Service Area
County Capital Projects
Fiscal Years 2013 -18
HVAC Projects
Goveming and Management
7
Project Status Approved
Starting Date 7/4/2000
Completion Date Ongoing
Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budaet Fundina 2012 -13 1 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 Total I Year 10
Construction /RepairsrRenovations 617,223
-
168,883
Community Geothermal (DA Bld, Jail (wells only), Historic Courthouse, CSA) 1,709,200
-
1,623,820
Jail (distribution equipment/system only)
-
752,400
Efland CC HVAC Replacement
20,000 - 20,000
Battle Courtroom geo-thermal HVAC 50,000
-
SHSC - proposed for geo-thermal replacement
Transfer from General Fund
858,360
Hillsborough Commons -equipment replacement
45,000 30,000 75,000
52,500
503 W Franklin (SDC) - equipment replacement
30,000 22,500 52,500
WCOB - backup for cooling system for IT room,dw notification system
35,000 35,000
170,131 170,131 849,408
Total Project Budget Geothermal 617,223 1,759,200
130,000 52,500 - 182,
1 610,760
General Fund Related Operating Costs
Personnel Services
Operations
New Debt Service
Total Operating Costs
-
168,883
170,131 170,131
170,131 170,131 849,408
1,623,820
168,883 170,131 170,131 170,131 170,131 849,408
1,623,820
Revenues/Funding Source
Transfer from General Fund
617,223
-
52,500 -
52,500
General Fund - Debt Service
168,883
170,131 170,131
170,131 170,131 849,408
1,623,820
Available Funds Within the Project
Grant Funding ECCBG
Debt Financing
1,759,200
130,000
130,000
1,610,760
Total 617,223 1,759,2001 298,883 222,631 170,131 170,131 170,131 1,031,9081 3.234,5t;u
Project Description/Justification
In the absence of compelling reasons to the contrary, geothermal is projected for all HVAC replacement projects recommended in this Plan. While initial costs come at a slight premium over
conventional systems, the on -going operational cost savings (30 -35% annually) and the speed at which the premium capital cost is recovered, outweigh the initially more expensive installation.
For example, the Justice Facility, whose system has been in use since 2008, is on track to recoup the premium cost by 2016 and is experiencing a 30% savings in annual heating and cooling
costs. The Link Government Services Center geothermal project was completed in 2012 and is realizing energy reductions similar to the Justice Center. The Link Center project was partially
funded by ARRA grant funds. The system was sized in a manner that will accommodate any future development of the north end of the first floor_ The remaining components of the Community
Geothermal Project, approved for funding in 2012113, and currently in the design phase, will serve the remaining facilities on the "East Campus ", including the Jail, District Attorney's office,
Historic Courthouse, and the Court Street Annex. Staff will continue to investigate opportunities for grant funding for geo- thermal projects. If grant funds become available, project timelines
may move up. UPDATE: The timing of work for remaining east campus buildings has been revised as follows: 1) the well field required to serve the Historic Courthouse, Jail, Court Street
Annex and DA Building will be constructed in its entirety; 2) interior work will be completed for all facilities excluding the Jail, for which interior work will be completed following occupancy of the
proposed new Jail (2016/17). This will allow interior work at the Jail to be completed at lower occupancy levels; All pricing has been updated to reflect actual costs from Link Center
construction. 11/14/2012 update: Geo- thermal to serve the Southern Human Services Center may be included as part of the Southern Campus development project.
23
Project Name
Functional Service Area
County Capital Projects
Fiscal Years 2013 -18
Roofing Projects
Governing and Management
Project Status Approved
Starting Date 7/1/2000
ComoIetion Date onaoina
Current I Year 4 Year 2 Year 3 Year 4 Year 5 Five Year 5
Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
Project Budget Funding 2012 -13 2013 -14 2014 -15 2045 -16 2016 -17 2017 -18 Total I Year 10
Construction /Repairs/Renovations 1,433,100
Court Street Annex 75,000
Jail (1997 Addition) 3 sectors
16,000
Justice Facility (New Courthouse) - Two flat roofs
35,000
503 W, Franklin (Skills Development Center - 9 sectors)
12,800
SHSC (three sectors, incl. mechanical building)
12,600
AMS North Administrative Bldg
14,000
AMS North Operations Warehouse 4,400 sf)
AMS North Operations Small storage (1,600 so
2,500
AMS North Motorpool Facility
EAC (no major expenditures to be made due to future use of facility.
20,625
EMS Station -Revere Road
20,625
EMS Communication tower (Eno Mtn)
Blackwood Farm House
Cate Farm House (Twin Creeks)
52,500
ENand Community Center (main building)
12,000
Link Center (metal roof)
DA Building (sector 2)
125,000
Central Recreation
30,000
Northern Human Services (roof work to be included in NHSC project account)
New Courthouse (courtroom EPDM, 4, 800 sf, 4 other sectors)
Battle Courtroom (2 sectors)
100,000
Total Project Budget 1,508,100 _
465,_000
General Fund Related Operating Costs
Personnel Services
Operations
New Debt Service
Total Operating Costs
Revenues/Funding Source
Transfer from General Fund
General Fund - Debt Service
Debt Financing
Total
85,000
30,000
142,000 18,000 160,000
15,840 15,840 15,840..__..._. 50,215 50,215 147,949_1 254,075
15,840 16,840 15,840 50,215 50,215 147,9491 251,075
1,508,100 I - 179,010 32,500 64,500 67,800 363,810
111 15,840 15,840 15,840 50,215 50,215 147,949 251,075
165,000 115,000 358,069 325,000 798,059
Project Description/Justification
Roofing replacement priorities are determined by a Roof Replacement Schedule prepared in 1998 and updated in 2003 and 2006. The Schedule was updated in 2011 -12 to reflect
additions and divestitures since 2005. Individual projects and their anticipated funding period are itemized above. If a deoonstruction/demolition combination process is not
completed and the County keeps the Northern Human Services facility in service a new roof will be needed by 2013. 0112012 UPDATE: Based on discussions to date, it has
been assumed that at least a portion of the NHSC will be removed and will not require reroofing. As such, $100,000 has been reallocated for reroofing of the Battle
Courtroom. 11/1412012 UPDATE: The portion of the NHSC building to be retained will require a now roof; this cost is included in the NHSC project cost, not in the
Roofing Project
24
E:?
69,800 154,800
325,000
325,000
35,200
35,200
12,800
12,600
91,069
91,069
2,500
2,500
16,225
16,225
20,625
20,625
30,000
52,500
52,500
12,000
12,000
125,000
125,000
94,160
30,000
124,160
15,840 15,840 15,840..__..._. 50,215 50,215 147,949_1 254,075
15,840 16,840 15,840 50,215 50,215 147,9491 251,075
1,508,100 I - 179,010 32,500 64,500 67,800 363,810
111 15,840 15,840 15,840 50,215 50,215 147,949 251,075
165,000 115,000 358,069 325,000 798,059
Project Description/Justification
Roofing replacement priorities are determined by a Roof Replacement Schedule prepared in 1998 and updated in 2003 and 2006. The Schedule was updated in 2011 -12 to reflect
additions and divestitures since 2005. Individual projects and their anticipated funding period are itemized above. If a deoonstruction/demolition combination process is not
completed and the County keeps the Northern Human Services facility in service a new roof will be needed by 2013. 0112012 UPDATE: Based on discussions to date, it has
been assumed that at least a portion of the NHSC will be removed and will not require reroofing. As such, $100,000 has been reallocated for reroofing of the Battle
Courtroom. 11/1412012 UPDATE: The portion of the NHSC building to be retained will require a now roof; this cost is included in the NHSC project cost, not in the
Roofing Project
24
E:?
County Capital Projects
Fiscal Years 2013 -18
�
Project Name Information Technology
Project Status
Approved
Functional Service Area General Services
Starting Date
71914990
Department information Technolo ies
Completion Date
Ongoing
Current
Year 1 Year 2
Year 3 Year 4 Year 5 Five
Year 6
Prior Years Fiscal Year
I Fiscal Year Fiscal Year
Fiscal Year Fiscal Year Fiscal Year Year
to
Proiect Budaet Fundina 2012 -13
2013 -14 2014 -15
2015 -16 2016 -17 2017 -18 Total
Year 10
Professional Services
Transfer from General Fund
3,371,613 155,980
50,000
General Fund - Debt Service
260,892
Equipment /Fumishings - Infrastructure 3,371,613
650,000
750,000
450,000
450,000
450,000
450,000
2,550,000
2,250,000
Library Management Systems Software
250,000
-
BOCC Initiatives
50,000
50,000
50,000
50,000
50,000
50,000
250,000
250,000
Total Project Budget 3,371 613
950 000
800,000
500,000
500,000
500,000
500,000
2,800,000
2,500 000
General Fund Related Operating Costs
Personnel Services
Operations
New Debt Service
108,480
260,892
423,612
423,612
423,612
423,612
1,955,340
423,612
Total Operating Costs
108,480
260,892
423,612
423,612
423,612
423 612
1,955 340
423,612
Revenues/Funding Source
Transfer from General Fund
3,371,613 155,980
50,000
General Fund - Debt Service
260,892
Available Project Balance
200,000
Debt Financing
702,500
750,000
1,060,892
Total 3,371,613 1,058,480
Proiect Description /Justification
500,000 500,000 500,000 500,000 2,050,0001 2,500,000
423,612 423,612 423,612 423,612 1,955,340 423,612
The Information Technology project incorporates a number of technology improvement efforts the County plans to accomplish in the next five years. The improvements
include, but are not limited to: server replacements and upgrades, desktop and laptop replacements, PC software upgrades, US software and hardware upgrades.
$50,000 has been included each year for Board of Commissioners technology initiatives, FY 2012 -13 included an additional $200,000 to bring all County computers into
Win 7/Office2010 compliance (paid with available funds within the project), and $250,000 for Library Management Systems software. FY 2013 -14 initiatives include
$650,000 for backup data system replacement, SAN expansion, network replacements (replace aging switches, routers, and hubs), server replacements, desktop /laptop
replacements, and $100,000 in Audio Visual upgrades to the Battle Courtroom.
County Capital Projects
Fiscal Years 2013 -18
10
Project Name Whitted Building
Project Status
Approved
Functional Service Area Governing and Management
Starting Date
71912092
Department Asset Management Services
Completion Date
613012016
Current
Year 1
Year 2 Year 3 Year 4 Year 5 Five
Year 6
Prior Years Fiscal Year I
Fiscal Year
Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year
to
Proiect Budget Fundina 2012 -13
2013 -14
2014 -15 2015 -16 2016 -17 2017 -18 Total
Year 10
Land /Building
Professional Services - Design work
100,000 100,000
Construction /Repairs/Renovations
1,400,000 1,400,000
Generator upgradelreplacement 200,000
-
Replacement of exterior doors/storefronts 70,000
-
Additional controlled access doors 25,000
-
Total Project Budget: 295,000 J
1,500,000 - - - 1,60p,00
General Fund Related Operating Costs
Personnel Services
Operations
New Debt Service 28,320 162,720 162,720 162,720 162,720 679,200 81
Total Operating Costs 28,320 162,720 162,720 162,720 162,720 679,200 81
RevenueslFunding Source
Transfer from General Fund - 100,000 100,000
General Fund - Debt Service 28,320 162,720 162,720 162,720 162,720 679,200 813,600
Debt Financing 295,000 1,400,000 1,400,000
Total 295,000 1,528,320 162,720 162,720 162,720 162,720 2,179,200 813,600
Project Description/Justification
Funding for FY 2012 -13 included: 1) 600 kW emergency power generator wl 1000A ATS would be supplied and installed to meet the electdca[ needs of this facility during
power outages. A smaller emergency generator at the site currently powers only refrigeration equipment for drug storage and very limited other critical areas. Opportunities
for grant funding will also be explored in conjunction with Emergency Services staff. Since the Health Department will occupy the facility for the foreseeable future,
emergency power sufficient to keep the clinics in operation during times of disaster is recommended. 2) Exterior doorlstorefront replacement is required to meet security,
safety and accessibility needs for seven individual entrances at the Whiffed Complex. 3) Card controlled access door installations would provide additional safety and
security for this complex. 4) Funding approved for FY 2013 -14 provides for renovation of the former Library space for a shared use facility that would accomodate a
permanent meeting location for the Board of County Commisioners and potentially other uses, should this option be selected by the Board. Funding also includes an
allowance for associated parking improvements /modifications that may be required. This is one of several facilities that was discussed with the Board at their work
session on February 12, 2013.
30
County Capital Projects
Fiscal Years 2013 -18
Project Name
Viper Radio System
Project Status
Approved
Functional Service Area
Public Safety
Starting Date
71112012
Department
Emergenw Services
Completion Date
613012020
Current
Year 1
Year 2
Year 3
Year 4
Year 5
Five
Year 6
Prior Years Fiscal Year
Fiscal Year
Fiscal Year
Fiscal Year
Fiscal Year
Fiscal Year
Year
to
Project Budget
Funding 2012 -13
2013 -14
2014 -15
2015 -16
2016 -17
2017 -18
Total
Year 10
Appropriation
Additional Channels on Existing Towers
543,750
Towers
500,000
500,000
500,000
500,000
2,000,000
1,000,000
Total Project Budget
- 543,750
500,000 500,000 - 500,000 500,000 2,00010001
1,000,000
General Fund Related Operating Costs
Personnel Services
Operations
New Debt Service
118,701
227,853
337,005
337,005
446,157
1,466,721
1,309,824
Total Operating Costs
1 118,701
227,853
337,005
337,005
446,157
1,466,721
1,309,824
Revenues/Funding Source
General Fund - Debt Service
118,701
227,853
337,005
337,005
446,157
1,466,721
1,309,824
Capital Projects Fund Balance
Debt Financing
543,750
500,000
500,000
500,000
500,000
2,000,000
1,000,000
618,701
727,853
337,005
837,005
946,157
3,466,721
2,309,824
Total - 543,750
Proiect Description /Justification
Additonal Channels: Equipment and hardware on the existing towers in Orange County as well as the surrounding areas will be upgraded to allow for increased system
capacity which will reduce busy signals received by field units during times of high demand. If the upgrades are not funded, the system will not be able to alleviate the
current service /coverage issues. Channels and additional equipment will be added to the following locations based on the most current information from the state.
Chatham Site: 3 channels /1 combiner; Hillsborough Site: 2 channels/1 combiner /1 antenna package. The tower is currently full and may require additonal work to allow
channels to be added; Laws Site: 3 channels; UNC Site: 2 channels. Site is maintained by UNC and may require additonal work to add channels; Altamahaw Site: 1
channel; Mebane Site: 2 channels.
Towers: The addition of two towers over the next five years (costs for each tower are spread over a two year period) will expand coverage which in turn will increase
capacity allowing better access for field units increasing safety and more stable interoperability. A third tower is planned in Years 6 -10. Can not be funded by 9 -1 -1 funds.
Note: This Viper Radio System project was reviewed as part of the charge to the Emergency Services Work Group.
36
11
County Capital Projects
Fiscal Years 2013 -18
Project Name
Communication System Improvements
Project Status
Approve
Functional Service Area
Public Safety
Starting Date
71112012
Department
Efn2Mency Services
Completion Date
813012018
Current
Year 1
Year 2
Year 3
Year 4
Year 5
Five
Year 6
Prior Years
Fiscal Year
Fiscal Year
Fiscal Year
Fiscal Year
Fiscal Year
Fiscal Year
Year
to
Project Budget
Funding
2012 -13
2013 -14
2014 -15
2015 -16
2016 -17
2017 -18
Total
Year 10
OSSI -CAD Replacement
589,875
-
800 Mhz Radios
253,077
20,000
122,000
127,000
39,000
920,000
1,228,000
NextGen Phone System
402,000
402,000
9 -1 -1 Call Taker and Dispatch Software:
"'Emergency Police Dispatch
99,000
99,000
"Emergency Fire Dispatch
99,000
99,000
'Smart9 -1 -1
30,000
30,000
Paging Hardware
150,000
150,000
P25 Compliant Radio System Consoles (E- 9 -1 -1)
231,026
601,242
601,242
P25 Compliant Radios (Rural Fire Districts)
1 150,000
150,000
1 1,371,242
122,000
307,000
39,000
920,000
2,759,242
1 -
Total Project Budget
-
1,073,978
General Fund Related Operating Costs
Personnel Services
Operations
New Debt Service
35,801
291,921
318,554
379,023
387,537
1,412,836
1,528,769
Total Operating Costs
35,801
291,921
318,554
379,023
387,537
1,412,836
1,528,769
Revenues/Funding Source
Transfer from General Fund
193,474
General Fund - Debt Service
35,801
72,912
99,545
160,014
168,528
536,800
1,309,760
From 9 -1 -1 Funds - Debt Service
219,009
219,009
219,009
219,009
876,036
219,009
From 9 -1 -1 Funds
716,504
198,000
30,000
228,000
Capital Projects Fund Balance
Debt Financing - E -9 -1 -1
1,003,242
1,003,242
Debt Financing
164,000
170,000
122,000
277,000
39,000
920,000
1,528,000
1,407,043
413,921
625,554
418,023
1,307,537
4,172,078
1,528,769
Total
-
1,073,978
Proiect Description /Justification
Note. This Communications System Improvements project was reviewed as part of the charge to the Emergency Services Work Group.
37
12
OSSI: Project funded in FY 12 -13
800 MHz Radios: Portable and mobile 800 MHz radios for all Public Safety Departments County -Wide have or will be reaching seven -years of age. Replacement is
necessary to ensure reliability for emergency responders. Only the Emergency Services and Sheriffs departments are included in the CIP. It will be up to each individual
municipal or rural department to fund their replacement radios. It is important to establish standard features and specifications for 800 MHz radios (portables and mobiles)
to ensure system reliability, optimal integration with new platforms (P25) which will be placed in service by NCSHPNIPER starting in 2013. Regardless of funding source
or user, it is critical that units purchased be standardized to ensure integration, reliability and reduce potential for field failure. The replacement of radios for Emergency
Services will be phased over the next five years. The County started purchasing new 800 MHz radios in 2004 and replaced some in FY 2012 -13. Year 1 (FY 2093 -14)
includes funding to replace a repeater, and funding in subsequent years for these original radios plus sufficient radios for new staff and begin to replenish disaster radio
cache. Year 5 (FY 2097 -18) includes funding of $920,000 for replacement of Sheriff radios.
NextGen Phone System: Replacement of the main 9 -1 -1 switch, which is necessary to gain access to Internet (Next Generation) based services. The current switch will
have reached the end of its useful life and will no longer be supported by the vendor. If the switch is not replaced, the cost of repairs /maintenance /parts will become very
expensive. There is a risk that parts for this equipment will not be available in the coming years. Based on the most current vendor consultation, replacement is approved
in FY 2013 -2014. Pricing reflects updated quote and purchase is eligible from 9 -1 -1 funds if approved by 9 -1 -1 Board.
9 -1 -1 Call Taker and Dispatch Software:
EPD: ProQA Dispatch Software integrates the National Academy Protocols with today's critical computer technologies and assists telecommunicators in quickly
determining the appropriate response specifically configured by local agency authorities. ProQA guides dispatchers in providing relevant Post - Dispatch and Pre - Arrival
instructions prior to units arriving on scene. Pricing reflects updated quote and OSSI interface.
EFD: Fire Priority Dispatch system will allow all the benefits and safety features of a unified fire protocol system based on fire department approved parameters to
combine with the latest in caller integration and response prioritization. Pricing reflects updated quote and OSSI interface.
Smart 9 -1 -1: Allows citizens to enter information through a secure website that would be available in the event they need to call 9 -1 -1. When the citizen calls 9 -1 -1 the
data automatically displays on the 9 -1 -1 operators work station. The same information is also available via the web to police, fire and EMS units in the field which helps
them respond more quickly and effectively. It works seamlessly in today's infrastructure as well as future Next Generation solutions.
Paging Hardware: Will provide a reliable station notification system for all County Fire and EMS stations. Can not be funded through 9 -1 -1 funds.
P25 Compliant Radio System Consoles: The Project 25 New Technology Standards Project (known as Project 25 or P25) is a multi - phase, multi -year project jointly
conducted by the public safety communications community and industry to establish a suite of open standards (known as the Project 25 Standard) that enable the
manufacture, procurement, and operation of interoperable digital wireless communications equipment and systems to satisfy the service, feature, and capability
requirements of public safety practitioners and other users. Replacement of the current radio systems in the 911 center to continue to integrate with the state -wide VIPER
radio network. This upgrade will outfit eleven (11) 919 console positions and furniture for two workstations. Becoming compliant will allow for the capability to provide and
maintain a communciations infrastructure supported by the State. PURCHASE MAY BE ELIGIBLE FROM 9 -1 -1 FUND IF APPROVED BY 9 -1 -1 BOARD.
P25 Compliant Radios (Rural Fire Districts): Provides for P25 compliant upgrades and programming to existing portable radios for all rural fire districts.
38
13
ATTACHMENT 3
ORANGE COUNTY
BOARD OF COMMISSIONERS
COPYACTION AGENDA ITEM ABSTRACT
Meeting Date: September 17, 2013
Action Agenda
Item No. 5 -1
SUBJECT: FY 2013 -2014 Purchase of Vehicles through Vehicle Replacement Internal
Service Fund
DEPARTMENT: Financial and Administrative PUBLIC HEARING: (YIN) No
Services, Asset Management
Services
ATTACHMENT(S):
Internal Service Fund Vehicle Listing
INFORMATION CONTACT:
Clarence Grier, 919 - 245 -2453
Paul Laughton, 919- 245 -2152
Jeff Thompson, 919 - 245 -2658
Alan Dorman, 919 -245 -2627
PURPOSE: To approve the final list of County vehicles to be purchased through the Internal
Services Fund established within the FY2013 -2014 budget.
BACKGROUND: The Board of County Commissioners initially established the Vehicle
Replacement Internal Service Fund during FY 20122013 for County vehicle purchases. The
Internal Service Fund is an accounting device used to accumulate and allocate costs internally
among the functions of the County. All County vehicle purchases will eventually occur through
this Fund instead of through departments' operating budgets. The internal service fund
centralizes all vehicle purchases, which will improve the ability to monitor vehicle acquisition and
associated costs.
In June 2013 staff presented the attached list of vehicles recommended for purchase for FY
2013 -2014 and committed to bringing this list back for Board approval in the fall.
The list coincides with and outlines the vehicles approved in the FY 2013 -2014 budget and the
amounts to be funded with and without debt financing for the BOCC's consideration. The total
dollar amount of the vehicles to be purchased will be $899,416. The vehicles will be purchased
with installment financing.
FINANCIAL IMPACT: The financial impact of the purchase of the replacement vehicles is
$899,416.
RECOMMENDATION(S): The Manager recommends that the Board approve the final list of
County vehicles to be purchased through the Internal Services Fund established within the
FY2013 -2014 budget.
14
15
Vehicle Replacement - Internal Service Fund
Purpose of Fund
In FY 2012 -13, the Commissioner Approved Budget established a second Internal Service Fund, for
County vehicle purchases. Internal Service Funds are an accounting device used to accumulate and
allocate costs internally among the functions of the County. Historically, the County has used an
internal service fund to account for one activity - its employee dental insurance program. With the
creation of this Vehicle Replacement Fund, vehicles purchased occur through this fund instead of the
departments' operating budgets. The change centralizes vehicle purchases, which increases the
effectiveness of vehicle performance and cost monitoring.
Recommendations are founded upon vehicle age, mileage, maintenance costs, fuel efficiency, and
departmental mission need. The average age and accumulated mileage of the recommended
replacements are 14 years and 140,000 miles, respectively.
Recommended replacement vehicle platforms are the Toyota Prius for administrative, highway and
street use; the Chevrolet Captiva for moderate all- terrain use; the Chevrolet All Wheel
Drive Equinox for heavy all- terrain use; the Ford Transit Connect for highway utility, service and light
cargo use; the Ford F150 (both two and four wheel drive) for heavy utility use with the 4x4 option for
heavy all- terrain use for Environmental Health, Emergency Services, and DEAPR missions; and the
Chevrolet Tahoe for non jail law enforcement use. All platforms are evaluated for department mission
utility, durability, maintenance standardization, and fuel efficiency.
The list below outlines recommended vehicle requests for FY 2013 -14. Pricing is based upon current
State Contract rates. During the early fall, staff will provide a complete list of recommended, debt -
financed, vehicle purchases, for the BOCC's consideration.
FY 2013 -14 Recommended Vehicles
Department
Item Description
Cost
Asset Management
Services
Ford Transit Connect — replaces #532 2001 Dodge pick -up
$24,547
Ford F150 4x4 Crew Cab truck — replaces #533 1996 GM
$24,635
truck
Department of the
Environment, Agriculture,
F350 15 passenger van -- replaces #424 1999 Dodge
$24,181
Parks and Recreation
passenger van
F550 Light dump truck -- replaces #471 1995 Ford F250
$35,724
dump truck
2 Ford F150 4x4 Crew Cab Trucks — Replaces #663 2006
Ford Expedition (destroyed by fire) and #698 2006 Ford
$95,206
Expedition (existing EMS Supervisor); includes aftermarket
Emergency Services
u fit costs
FreightlinerlExcellance Ambulance to replace aging Wheeled
Coach ambulance unit (Emergency Medical Services);
$236,136
includes aftermarket u fit costs
16
3 Ford F150 4x4 trucks — replaces Environmental Health Ford
$58,216
Health
Rangers #388 (1997), #414 (1998), and #421 (1999)
Toyota Prius — replaces #455 2000 Dodge Stratus
$24,045
Housing, Human Rights,
and Community
Toyota Prius — replaces #498 2000 Dodge Intrepid
$24,045
Development
Planning and Inspections
2 Chevrolet Captiva Front Wheel Drive vehicles -- replaces
$38,045
Ford Rangers #450 (2000) and #464 (2000)
Sheriff
6 Chevrolet Tahoes - replacements for Ford Crown Victoria
Interceptors (Non -Jail Operations)
$140,785
4 Toyota Prius -- replacements of Chevrolet Cavaliers #381
Social Services
(1997) and #382 (1997); Chevrolet Malibus #441 (1999) and
$96,180
#442 1599
3 Chevrolet Equinox All Wheel Drive vehicles — replaces Ford
Tax Administration
Crown Victorias #366 (1997) and #377 (1997); Chevrolet
$77,671
Malibu #444 1995
FY 2013 -14 Recommended Total: $899,416
FY 2013 -14 Source of Funds: Short-term Installment Financing /Internal Reserves 899,416)
Net County Cost: $ -