HomeMy WebLinkAboutAgenda - 09-26-2013 - 7ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 26, 2013
SUBJECT: Pre -K Discussion
DEPARTMENT: Finance and Administrative
Services
ATTACHMENT(S):
A. Pre -K information for FY 2013 -14
- Chapel Hill — Carrboro City
Schools
B. Pre -K information for FY 2013 -14
- Orange County Schools
C. Draft Minutes from April 25, 2013
Joint Boards meeting regarding
Pre -K discussion
1
Action Agenda
Item No. 7
PUBLIC HEARING: (Y /N) No
INFORMATION CONTACT:
Clarence G. Grier, 919 - 245 -2450
Todd LoFrese, 919 - 967 -8211
Pam Jones, 919 - 732 -8126
PURPOSE: To provide updated Pre -K program information from both school systems for FY
2013 -14, and continue discussion of its impact on capacity.
BACKGROUND: At the April 25, 2013 Joint Boards meeting, both school systems provided
Pre -K program information with respect to their number and types of classrooms, as well as
program structure, funding sources, enrollment levels, and staffing levels. Attachments A and
B, on tonight's agenda, provide updated information for FY 2013 -14.
Also, included for review, as Attachment C, are the draft minutes from the April 25, 2013 Joint
Boards meeting regarding Pre -K classroom discussion.
FINANCIAL IMPACT: There is not a financial impact related to receiving this information.
RECOMMENDATION(S): The Manager recommends that the Boards accept the information
and provide feedback and direction to staff.
N
Attachment A
SITE Carrboro Ephesus Eries Was FPG Glemvood McDoO k Morris Grove Ruhlda Northside F Scruggs Seawall
LICENSING
Licensed
licensed
Licensed
Iecensed
Temporary License
Ines— Licensed
Lkeued
Licensed
Temporary license
licensed
l.ieeused
Srstem Loyd (EC): Unlicensed'
-
-
Nd. AND TYPE OF PHFB 2 Dual Lanewage PreK 2 Inclusive Prdt 1 Regular P.K 1211 ual -
r "e�,nP,e PreK 1 Regular Pnr1C Z Incisive PreK 1 Regular PreK 1 Irclusive PreK 1 Indhrsiye PrdC 1 Inrlusivrc
CLASSROOMS 1 Regular PreK 1 Regular PreK
ISvstem Level (EC) ]System lesrel (EC) IS stem Lnrcl (EC) 1 rtemlesKl (EC)
FUNDING
1 Dual Language classes:
Head
Inclusives PreK 3:
1 Regular PreK:
2 Dual Language classes:
1 Regular Prc&-
2 Inchhsne PreM
I Regular PreK
1 Inclusive PreK 314:
Lrchaii- Pre 1 3/4:
I hdushre PreK 3/4:
1 Regular PrcK
Start
Head Start
Head Start
Head Start
Head Start
Head Start
Head Stan
Head Stan
Head Start
Head Start
Head Start
NCP.K
Tuition
NCPreK
NCP.K
NCPreK
NCPreK
NCPreK
NCPreK
NCPolK
NCPrdC
NCPmK
Tinton
1 Pre,K 3142•
Exceptional Children
Title I
Tuition
Title I
Title I
Title I
Title I
Tuudon
Title I
Tunon
Tuition
Regu u IneJUSive PrcK 4: m 7luuon Tuition Tuition Tunition Exceptional Children Twhon, Exceptional Children
Head Stan Head Stan Exceptional Children 1 System Loyd (EC): Exceptional Children 1 System Level (EC):
NCPneK NC ,rI( 1 System Ind (EC)—Exceptional Child 1 System Levd (EC): Exceptional CltiWmn
Title I Title I Exceptional Children Head Stmt Exceptional Child= Had Start
Tuition Tuition Head Start Head Start
Exceptional Children
PR)E-K PERSONNEL Dual Language 3/4: Inclusive 3: Regular PreK 3/4: Dual Language 314: Regular PreK 3N: badusi- 4: Regular PreK 3/4: rndusiee 3N: Inclusive 3/4: Imh aive 3N: Regular PreK 314:
Lead Teacher: Shawn Williams Lead Taaclxr Tracy Kirkland Lead Teacher Jobe Wilson Lead Teacher Ginger Aguilar Lead Teacher: Julie Pow en Lcad Teaclur: Cheryl Jobr¢on lead Teadxx: Adri me Nettles Lead Teacher. lance Wamous Lead Teacher Rorcma Wanner Lead Teacher: Joanne Carlson Lead Teacher: Adelaide 7ahrw
TA Alomq Grooms TA- Glenda Johnson TA- Whitley Barber TA: Maria Bonilla TA: Sandra Cooper TA- Kay Dixon TA, Ethelda Dyer -Major TA: Mary Pope TA: Charlotte Makoyo TA Raquel Pinrda TA- ChaCoby Dickerson
TA. Lim Bennett TA, Tamara Smith TA: Jadoe Parrish TA: Leslie Riley Tk Tona Cox
Dual Language 4: Inclusive 4: Dual Language 4: IucMsiee 3/4: System Levd 3N (EC): System Levi 3N (EC): System level 3 /4 (EC):
Lead Teacher: Sofa Ramie¢ Lead Teacher: Jenmil'er Allred Lead leacher. Carolina Sarcho Lead Tracb r Martian Morrow Lead Teacher. Leab Waldrop Lead Teacher. Portia Watson Lead Teacher Bonne Hill
TA: Christirc Ortiz TA Lisa Corbett TA: Dom Speight TA: Shayla Miller TA Crystal Di is TA, Yolanda Alston Irk Cynthur Currie
TA: Akan Farrington
TA: Nealry Whitmore TA- Victoria White TA: Hry R nda White TA. Rabin Danis
Regular PreK 314: is yalem Level 3/4 (EC):
Lead Tender: Ja®lah Moye
Lead Tender Sandy Atlry
TA. Candy Gomel¢
TA: Am Brassard
TA: Della Atwater
INFO 116 children in each class 115 child— in each elac2., 113 children
CLASSROOM TYPE(Mobih; 3— Inbuildng 2 —Mobile mats 1 —Mobile unit 2 —In budiding 1 —Mobile in 1 —In building(I lrelusive) 1— Inbuildiug 2 —Ise building 2 —In building 2 —In building I— Mobile Unit
In Building) 2 —Mabik units (I Jncl, 1 Sys Lyl)
Frontier-
1 System feud classes meet 4 hours per day
2 Indicates age range of children -3: 3 year old doss; 4: 4 year old class; 3/4: mixed age thus, 3 mud 4 year olds
3 Indicates 4 slots included for PreK Exceptional Children Students
4 Class sae is limited to 15 in rooms with one bathroom, per health inspeclor. Class size is limited to 16 in other classrooms to provide equitable services
2013 -14 CHCCS Pre-K Classrooms and SAPFO
In buildings 13 classrooms
In mobiles 7 classrooms
Total classrooms 20 classrooms
Less "Constructed" Pre-K Rooms 5 classrooms
Net absorbed Classrooms 15 classrooms
Lost Capacity 1:24 360 students
Lost Capacity (&1:21 315 students
Notes:
e These classrooms were built with the school (1 ea.) and are not considered capacity rooms
Schools with a "constructed" pre-k classroom are McDougle, Scroggs, Rasbkis, Morris Grove, Northside
PR)E-K PERSONNEL Dual Language 3/4: Inclusive 3: Regular PreK 3/4: Dual Language 314: Regular PreK 3N: badusi- 4: Regular PreK 3/4: rndusiee 3N: Inclusive 3/4: Imh aive 3N: Regular PreK 314:
Lead Teacher: Shawn Williams Lead Taaclxr Tracy Kirkland Lead Teacher Jobe Wilson Lead Teacher Ginger Aguilar Lead Teacher: Julie Pow en Lcad Teaclur: Cheryl Jobr¢on lead Teadxx: Adri me Nettles Lead Teacher. lance Wamous Lead Teacher Rorcma Wanner Lead Teacher: Joanne Carlson Lead Teacher: Adelaide 7ahrw
TA Alomq Grooms TA- Glenda Johnson TA- Whitley Barber TA: Maria Bonilla TA: Sandra Cooper TA- Kay Dixon TA, Ethelda Dyer -Major TA: Mary Pope TA: Charlotte Makoyo TA Raquel Pinrda TA- ChaCoby Dickerson
TA. Lim Bennett TA, Tamara Smith TA: Jadoe Parrish TA: Leslie Riley Tk Tona Cox
Dual Language 4: Inclusive 4: Dual Language 4: IucMsiee 3/4: System Levd 3N (EC): System Levi 3N (EC): System level 3 /4 (EC):
Lead Teacher: Sofa Ramie¢ Lead Teacher: Jenmil'er Allred Lead leacher. Carolina Sarcho Lead Tracb r Martian Morrow Lead Teacher. Leab Waldrop Lead Teacher. Portia Watson Lead Teacher Bonne Hill
TA: Christirc Ortiz TA Lisa Corbett TA: Dom Speight TA: Shayla Miller TA Crystal Di is TA, Yolanda Alston Irk Cynthur Currie
TA: Akan Farrington
TA: Nealry Whitmore TA- Victoria White TA: Hry R nda White TA. Rabin Danis
Regular PreK 314: is yalem Level 3/4 (EC):
Lead Tender: Ja®lah Moye
Lead Tender Sandy Atlry
TA. Candy Gomel¢
TA: Am Brassard
TA: Della Atwater
INFO 116 children in each class 115 child— in each elac2., 113 children
CLASSROOM TYPE(Mobih; 3— Inbuildng 2 —Mobile mats 1 —Mobile unit 2 —In budiding 1 —Mobile in 1 —In building(I lrelusive) 1— Inbuildiug 2 —Ise building 2 —In building 2 —In building I— Mobile Unit
In Building) 2 —Mabik units (I Jncl, 1 Sys Lyl)
Frontier-
1 System feud classes meet 4 hours per day
2 Indicates age range of children -3: 3 year old doss; 4: 4 year old class; 3/4: mixed age thus, 3 mud 4 year olds
3 Indicates 4 slots included for PreK Exceptional Children Students
4 Class sae is limited to 15 in rooms with one bathroom, per health inspeclor. Class size is limited to 16 in other classrooms to provide equitable services
2013 -14 CHCCS Pre-K Classrooms and SAPFO
In buildings 13 classrooms
In mobiles 7 classrooms
Total classrooms 20 classrooms
Less "Constructed" Pre-K Rooms 5 classrooms
Net absorbed Classrooms 15 classrooms
Lost Capacity 1:24 360 students
Lost Capacity (&1:21 315 students
Notes:
e These classrooms were built with the school (1 ea.) and are not considered capacity rooms
Schools with a "constructed" pre-k classroom are McDougle, Scroggs, Rasbkis, Morris Grove, Northside
INFO 116 children in each class 115 child— in each elac2., 113 children
CLASSROOM TYPE(Mobih; 3— Inbuildng 2 —Mobile mats 1 —Mobile unit 2 —In budiding 1 —Mobile in 1 —In building(I lrelusive) 1— Inbuildiug 2 —Ise building 2 —In building 2 —In building I— Mobile Unit
In Building) 2 —Mabik units (I Jncl, 1 Sys Lyl)
Frontier-
1 System feud classes meet 4 hours per day
2 Indicates age range of children -3: 3 year old doss; 4: 4 year old class; 3/4: mixed age thus, 3 mud 4 year olds
3 Indicates 4 slots included for PreK Exceptional Children Students
4 Class sae is limited to 15 in rooms with one bathroom, per health inspeclor. Class size is limited to 16 in other classrooms to provide equitable services
2013 -14 CHCCS Pre-K Classrooms and SAPFO
In buildings 13 classrooms
In mobiles 7 classrooms
Total classrooms 20 classrooms
Less "Constructed" Pre-K Rooms 5 classrooms
Net absorbed Classrooms 15 classrooms
Lost Capacity 1:24 360 students
Lost Capacity (&1:21 315 students
Notes:
e These classrooms were built with the school (1 ea.) and are not considered capacity rooms
Schools with a "constructed" pre-k classroom are McDougle, Scroggs, Rasbkis, Morris Grove, Northside
Notes:
e These classrooms were built with the school (1 ea.) and are not considered capacity rooms
Schools with a "constructed" pre-k classroom are McDougle, Scroggs, Rasbkis, Morris Grove, Northside
* *indicates 4 slots included for PreK Exceptional Children Students
W
ORANGE COUNTY SCHOOLS
Attachment B
2013 -2014
PRE - KINDERGARTEN
PROGRAMS
AT -A -G LANCE
SITE
CENTRAL
EFLAND- CHEEKS
GRADY BROWN
NEW HOPE
PATHWAYS
LICENSING
Licensed
Licensed
Temporary
Licensed
Licensed
NO. AND TYPE
1 District PreK
1 District PreK
1 District PreK (Autistic Class)
1 District PreK
I District PreK
OF PREK
1 Headstart
l Headstart
1 District Prek EC
CLASSROOMS
1 Headstart
FUNDING
District operated
District operated
Exceptional Children
District operated
District operated
NCPreK
NCPreK
NCPreK
NCPreK
Title I
Title I
Title I
Title I
EC
Headstart
EC
EC
Some possible tuition slots
Flow through dollars
Headstart
Headstart
Flow through dollars
Flow through dollars
01WAMSes-
IN No!
PRE -K
Headstart:
Headstart:
District EC (Autistic):
District:
Headstart:
PERSONNEL
Lead Teacher: Susan Read
Lead Teacher: Desiree Wiley
Lead Teacher: Susan Wilson
Lead Teacher: Pam Zornick
Lead Teacher: Veronica Fleming
TA: Anne Vanhook
TA: Terry Newton
TA: Amanda Chapman
TA: Vonnie Jordan
TA: Denise Mullinax
TA: Elanza Lozano de Landeros
TA: Giomaris Boyd
TA: Leticia Lozano
District #1:
District #1:
District #1:
Lead Teacher: Teresa Milton
Lead Teacher: Susan Banks
Lead Teacher: Sara Winters
TA: Natasha Williams
TA: Alicia Brown
TA: Rusty Sharpe
TA: Jacqueline Whitted
TA: Alicia Wright
TA: Cynthia Kenion
District EC #2:
Lead Teacher:
TA: Deborah Golobisky
TA: Kimberly Copeland
_
OMNI
STUDENT INFO
Headstart: l8 students
Headstart: 18 students
District EC: 8 students*
District: 16 students **
Headstart: 18 students
*Available Slots
District: 16 students **
District: 16 students **
District: 16 students **
District EC: 8 students*
* *indicates 4 slots included for PreK Exceptional Children Students
W
17
0
Attachment C
2 Pre -
3 CHCCS Chair Brownstein said this conversation has gone on for the past two years to
4 address having Pre -k in their elementary schools and its impact on capacity. She said the idea
5 behind the draft resolution is to have something in writing about the district philosophy on the
6 value of pre -k; and to create a consensus on decisions regarding capacity and when new
7 schools need to come on board.
8 Chair Jacobs noted several sheets at the Commissioner's places from the different
9 _ _ _schools, _relating to pre -k numbers.
10 OCS Chair Coffey said only one elementary school in the district has been built since
11 the 1996 school construction standards, so this is the only school that allows for pre -k. The rest
12 of the pre -k classes are absorbed by the current elementary capacity.
13 Chair Jacobs said the issue is how to count these classrooms toward school capacity.
14 He said some may feel that, by counting pre -k toward capacity, the county will rush too quickly
15 to having to build another elementary school. He said there was no consensus among the
16 three Chairs on how to finish the wording on the resolution because each of them came at it
17 from a different position.
18 CHCCS Chair Brownstein said the resolution is pretty factual, and then the meat of it is
19 the last paragraph, which discusses how the issue will be addressed.
20 Chair Jacobs said if no one has anything to add, this can be hashed out at school
21 collaboration.
22 CHCCS Board Member Jamezetta Bedford said that both school systems support
23 reflecting reality and that schools are very much overcrowded when you count these pre -k
24 classrooms.
25 CHCCS Chair Brownstein said there is not a version of SAPFO with and without these
26 classrooms. She said this would give a better view of the implications. She said this may be
27 needed in the school collaboration meetings.
28 Chair Jacobs said the Board is very supportive of Pre -K, but there is also not a mandate
29 for the county to provide that space. He said if Pre -K is moved into the SAPFO numbers, then
30 the schools start "bumping" into capacity issues and CAPS. He said he is skeptical at this
31 point.
32 Commissioner Dorosin said one issue is that these pre -k classes have fewer students
33 than a first or second grade class, and classrooms are underutilized from a space standpoint.
34 He asked if some pre -k classes are half days, and the answer was no.
35 Commissioner Dorosin said one thing to consider is a designated pre -k center. He said
36 some counties have this and it does not run up against SAPFO numbers.
37 Chair Jacobs said there are three sites at Twin Creeks. He said there has been
38 discussion about making one of these three sites into a joint Pre- K/administrative facility. He
39 said there have been previous discussions about this; however parents felt it was better to have
40 the pre -k spread throughout the elementary schools where they could move up into the
41 elementary grades.
42 Commissioner Dorosin said Pre -K is in a tenuous spot with the General Assembly and
43 there are question marks about funding and how this will look six months from now.
44 . CHCCS Chair Brownstein said the other link to this is that the new school construction
45 standards require a classroom for pre -k. This means there will be some adjustments needed if
46 a stand- alone site is chosen.
47 Chair Jacobs said numbers could be run for classrooms and for students to see how it
48 all works out. This can then be discussed at the next meeting. He said the pre -k classrooms
49 are an adjunct to what is going on in the building. He also addressed the safety implications of
50 having kids apart from the main building.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
2&
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
CHCCS Board Member Mia Burroughs asked if there can be agreement on philosophy,
without inclusion of the last paragraph.
Chair Jacobs suggested agreement on the "whereas" statements with more time to
digest the therefore statements.
Commissioner Dorosin noted the third whereas, which mentions co- location and he
asked for clarification on what this means. He feels that there needs to be broader thinking. He
suggested that the co- location sentence be removed.
Commissioner Rich clarified that schools built now are required to have pre -k on
campus and said that this would have to be changed.
CHCCS Board Member Mia Burroughs said she is comfortable taking that sentence out.
A motion was made by Commissioner Dorosin, seconded by Commissioner Gordon to
approve the three "whereas" paragraphs in the draft resolution (with the removal of sentence
proposed by Commissioner Dorosin) below:
Whereas, children who are at risk for school failure are more likely to succeed in school
and in later life if they attend a high quality preschool. North Carolina and national studies
have shown repeatedly that good preschool programs give children long term advantages in
cognitive and social development. Studies that track preschool graduates into adulthood
demonstrate positive impact on graduation rates, employment and arrest records.
Whereas, the public. schools in Orange County provide pre - kindergarten programs for
three and four year olds in order to improve the participants' success throughout their school
careers. This investment is good for the individual students and should also reduce the
districts' expenditure for specialized intervention services.
Whereas, the school systems are an integral part of a network of preschool providers in
Orange County who are willing to accept subsidies for low income children provided by the
state and federal preschool programs. The schools help their preschool students' transition
successfully to kindergarten by aligning their curriculum and services with the rest of the public
school program. Schools include their Pre -K programs in their efforts to evaluate what works
and to continuously improve outcomes for children.
Commissioner Pelissier said she thinks this isn't an opinion issue but is about what
works best. She said there needs to be information put forth to thoroughly discuss this issue.
Commissioner Dorosin said he is specifically addressing the older schools, where this is
an issue for the schools.
Commissioner Pelissier said, even with the older schools, the basis for decisions should
be based on information about what really works best in Pre -K.
Commissioner Gordon said the main point is that Pre -k education is valuable.
Chair Jacobs said on June 12 at 10am there will be another school collaboration
meeting and this will be addressed further at that time. .
VOTE: UNANIMOUS —Board of County Commissioners
Commissioner Pelissier said. it would be helpful to run some scenarios to see how this
issue affects debt capacity.
Commissioner McKee said there was no discussion on the "therefore be it resolved"
paragraphs and he feels the Board of County Commissioners needs to address this sooner
rather than later.
5