SUBJECT: Summary of Ongoing Assessments and Estimates Related to Older Buildings
and Facilities for Both School Districts
DEPARTMENT: Finance and Administrative PUBLIC HEARING: (Y /N) No
Services
ATTACHMENT(S):
A. Chapel Hill — Carrboro Capital
School Facility Study
B. Orange County Schools —
Facilities Assessment Timeline
INFORMATION CONTACT:
Clarence G. Grier, 919 - 245 -2450
Todd LoFrese, 919 - 967 -8211
Pam Jones, 919 - 732 -8126
PURPOSE: To discuss the ongoing assessments of capital facility needs for older schools in
both the Chapel Hill — Carrboro City Schools ( CHCCS) and Orange County Schools (OCS)
Districts.
BACKGROUND: Over the past year, both school districts have discussed with the
County /Schools Collaboration Work group and their respective Boards of Education the growing
need to address repairs and upgrades for older school buildings and facilities.
CHCCS has conducted an assessment of their older schools and facilities prepared by Mosley
Associates. CHCCS assessment of their older school estimates and capital needs estimates
potential repairs and upgrades will range from $52 million (low end) to $170 million (all
encompassing).
Orange County Schools has just begun their assessment of the capital facility's needs. Based
on Average Daily Membership (ADM) percentage, a preliminary estimate for Orange County
Schools could range between $20 million (low end) to $68 million (upper end). Orange County's
Assessment will be provided later in the year.
FINANCIAL IMPACT: There is not a financial impact with information being provided. There will
be a financial impact in future years as decisions are made to proceed with funding to address
older facilities.
RECOMMENDATION(S): The Manager recommends that the Boards accept the information
and provide feedback and direction to staff.
2
HMEL HILL
J U
ORO
SC
Date: September 18, 2013
To: Allison Chambers, Budget Technician
From: Todd LoFrese, Assistant Superintendent for Support Services
Re: Information for the Joint Boards Meeting
Attachment A
On the September 26, Joint Boards meeting there is an agenda item related to our
facilities study of older schools. Attached please find a copy of a PowerPoint
presentation that is scheduled to be presented to the Chapel Hill - Carrboro City Schools
Board on September 19, 2013.
This presentation includes some general information about the study process, a review
of historical financial information, a summary of findings, three examples of needs and
potential projects, and a financial summary of the needs across our older schools. The
presentation concludes with some recommendations for next steps.
Staff will be present at the Joint Boards meeting on September 26, 2013 to answer
questions about our progress.
Attachment A
3
HMEL HILL-
II R
Board of Education
Agenda Abstract
Meeting Date: September 19, 2013
Agenda Type: Work Session
Agenda Item #: 5b
Subject: Facility Study Presentation
Division:
Support Services
Department:
Support Services
Person
Todd LoFrese, Assistant
Feedback
Responsible:
Superintendent for Support Services
Requested
From:
Previous Work Session Yes No Date
Previous Discussion and Action Yes No Date
Attachment(s): PowerPoint
PURPOSE: To inform the Board of the findings from the study.
BACKGROUND: At the September 19, 2013 Board of Education meeting, administration and
representatives from Moseley Architects will present summarized findings from the facility
study of our ten oldest facilities. As you know we conducted the study with the intention of
assessing the physical and educational needs of each schools included in the study and to
establish a plan to address the needed improvements through maintenance and capital projects.
The schools and locations studied included, Carrboro Elementary, Ephesus Elementary, Estes
Hills Elementary, Frank Porter Graham Elementary, Glenwood Elementary, Seawell Elementary,
Phillips Middle, Culbreth Middle, Chapel Hill High, and Lincoln Center.
The assessment was also conducted to identify code and life safety concerns, accessibility
limitations, environmental issues, mechanical and electrical deficiencies, and site constraints.
While each school's needs are unique, there were many commonalities across all the schools
included in the study. These general observations and needs are listed below:
• Many buildings 50 -60+ years old
• Most buildings are in need of significant interior and exterior physical repair
• Many facilities need complete HVAC and lighting replacements
E
• Most buildings are lacking necessary support spaces for program delivery and require
additions
• Many are campus style facilities which are inefficient and more difficult to secure
• Many will require ADA and life safety code upgrades
• Many campuses are relying on temporary facilities that are also in need of significant
repair
We also have developed multiple approaches to make the necessary and recommended
improvements along with the associated cost estimates for each approach. In some cases, the
facility needs are so great that we question the value of making repairs and additions and instead,
suggest building replacements. Our Board presentation will include more details such as a
review of findings, an explanation of possible approaches to addressing the facility needs, and
recommended next steps.
FINANCIAL IMPACT:
PERSONNEL IMPACT:
RECOMMENDATION:
RESOLUTION:
0
I WEL HILL-
ARRBORO
,tz C ITY SCHOOLS
10 School Facility Study
September 19, 2013
MOSELEYARCHITECTS
CHAPEL HILL-
6 6
\C �.� SCHOOLS Presentation A genda
• Assessment Purpose and Scope
• Assessment Process
• Facility and Funding History
• Key Findings Examples
• Summary Costs
• SAPFO Impact
• Recommendations and Next Steps
MDSE LEYAIC H ITECTS
W I EL HILL -
�Ro Faci I ities Assessment
SCHOOLS
Purpose
Assess the physical and educational needs of the district's 10 oldest
facilities to determine required repairs and maintenance and what is
necessary to bring each school to the minimum student capacity as
established by the Orange County School Construction Standards.
Scope
1) Carrboro Elementary
2) Ephesus Elementary
3) Estes Hills Elementary
4) FP Graham Elementary
5) Glenwood Elementary
MOSELEYAf CH ITECTS
6) Seawell Elementary
7) Culbreth MS
8) Phillips MS
9) Chapel Hill HS
10) Lincoln Center
L HILL- .. .
LWI'SCHOOLS � L Faci I ities Assessment: Process
Surveys by a team of architects and engineers to identify:
— Building code issues and life safety improvements
— Accessibility limitations
— Environmental issues
— Mechanical and electrical deficiencies
—Site constraints
School staff and SIT members completed questioners identifying their
facility issues of concern.
School sizes /capacities were compared to DPI and OC Standards and
concept plans and costs (Options 1, 2, &3) were developed for:
— Repairs and renovations to existing facilities
— Additions to address capacity and programmatic needs
— Deconstruction /replacement of facilities that have exceeded their useful life
MOSELEYAf CH ITECTS
EL HILL -
AR B RO
CITY SCHOOL
Facility Assessment
10 Schools and Facilities Surveyed
40 to 60+ Years of Age
School /Facility
Year Opened
Square Footage
• Lincoln Center
1950
72,932
sf
• Glenwood Elementary
1952
55,372
sf
• Carrboro Elementary
1957
61,562
sf
• Estes Hills Elementary
1958
57,989
sf
• FP Graham Elementary
1963
68,513
sf
• Phillips Middle
1962
109,498
sf
• Chapel Hill High
1966
254,551
sf
• Culbreth Middle
1969
108,058
sf
• Seawell Elementary
1969
58,629
sf
• Ephesus Elementary
1972
73,096
sf
Tota 1
920,200
sf
2012/13
Enrollment
✓ 920,200 SF represents 46% of all District square footage
✓ 6,042 enrollment represents 50% of all District enrollment
MOSELEYAf CH ITECTS
I ;I*.
575
566
513
642
1,360
693
703
482
6,042
011
HAPEL HILL -
AR B R
CITY SCHOOLS
Facility History:
School /Facility
Carrboro Elementary
Ephesus Elementary
Estes Hills Elementary
Glenwood Elementary
FP Graham Elementary
McDougle Elementary
Scroggs Elementary
Seawell Elementary
McDougle Middle
Chapel Hill High
East Chapel Hill High
Lincoln Center
District Totals
M OSE LEYAI C H ITECTS
Mobile Units
1
7
2
5
2
2
2
6
2
14
8
3
54
Mobile Classrooms
Square Footage
730 sf
6,144
sf
1,690
sf
4,608
sf
1,824
sf
1,920
sf
1,920
sf
5,760
sf
1,920
sf
13,440
sf
7,680
sf
2,880 sf
50,516 sf
wRBOROFunding History: Capital InvestmentiPlan
CIP Facility Investments for all school buildings — excluding Technology
Past 10 Years 2003/04 through 2012 -13
$26,636,605
In addition to annual Pay As You Go Funds, $26,636,605 includes;
1. $8,600,000 Alternative Financing for Older Schools in FY 2004/05, 05/06,
06/07,07/08
2. $4,630,000 Qualified School Construction Bonds (QSCB) in FY 2011/12,
12/13
3. $475,000 Article 46 Sales Tax in FY 2011/12, 2012/13
2013 -23 Capital Investment Plan budgets $20,442,700 for all school buildings.
MOSELEYARCHITECTS
CHAPEL HILL-
6 %-CARRBORO
Mok (31 Y SCHOOLS
Funding History Last 2 approved Bonds
2001 Bond - $27,600,000
$12,800,000 Carrboro High School (partial funding)
$12,800,000 Rashkis Elementary School
$ 2,000,000 CHHS HVAC Replacement Project
1997 Bond - $24,000,000
$ 3,000,000 ECHHS Phase II
$18,000,000 Smith Middle School
$ 3,000,000 Older Schools
MDSE LEYAIC H ITECTS
CHAPEL H1LL-
AT111DO11O 13
&C iT v[scHOOL s General Findings
• Significant interior and exterior physical repairs
required
• Complete HVAC and lighting replacements
• Insufficient support spaces for program delivery
• Campus style facilities are inefficient and more
difficult to secure
• ADA and life safety code upgrades
• Many campuses are relying on temporary
facilities that are also in need of significant repair
III[ SELEY IBCHITE T
W EL HILL- MOSELEYARCHITECTS
11DOIlO 14
��HOO s Key Findings
ESTES HILLS ELEMENTARY SCHOOL
AGING INFASTRUCTURE
CAMPUS SECURITY & MONITORING
ADA EGRESS ISSUES
LIGHTING & IT
W C EL HILL -
RBIO
SCFEooL
Option 1
ESTES HILLS ELEMENTARY SCHOOL
15
Option 1 consists of a "laundry list" of items that need
to be fixed, renovated or remediated. These items
similar to repairs included on the Capital Improvement
Plan. This option will not increase capacity.
TOTAL PROJECT COST:
$3,472,125 (Low) to $4,085,441 (High)
MOSELEYAf CH ITECTS
EL HILL -
AR B RO
C IT Y SCFEooL
LEGEND
T Nr&aOGTeP"WLPiA
■ WA, LrirlCG 2
M�w a .ra � Irnrl.s �s•.!�
rs•:r..rwsa�sa
■ �aLan+wvtL.o-■rwrLwuer ro�paw+w.+c
■ �v� i rwuw i+lr.+ta+r:Ir w �T
r �ra..a..aae�..w.n.ncwi.n+
it .R.I..�r.T 4! AYI W a+lal ra \•
■ ��Gr. V4la1P Iw'W
■ pr'w*KRNb■+'
� I�WY.6 L�U0[ICJu
• roa+wLMrolYw
rOYltlr -.AGIN wInIrLtN
09V.'ra:C.14
a prva''V MICn[Er+'S'ary
. VJrL+i WY14l- 'JFrRaaV
• bLMFIL
l LLldp■Y
n MIILYG4'LL�Wa
nc+r N11M
4 1�.[■4Ylf�O
r irlp.ykwM1 {l�Irllwllp
MOSELEYARCHITECTS
Option 1 16
ESTES HILLS ELEMENTARY SCHOOL
r :ter sal.. try.
rLi
1998'
1■1^ +i-- ---- a-��--
MOSELEYARCHITECTS
11tl CUi It 7� />toe�ns�v *cwka�
.,-.4 YOln6 4b (/:TJIOiili �F]luTrrrlr `•' -[04
1957
1986
1
r r r
w �J
`` II iR K
r�
J
.- 1957
Ir
i�
-� ESTES HILLS ELEMENTARY SCHOOL
W C EL HILL -
RBIO
SCFEooL
Option 2
MOSELEYA CHITECTS
17
ESTES HILLS ELEMENTARY SCHOOL
Option 2 consists of adding small additions that will
increase the existing school's student capacity. All
mobile units have been eliminated. This option also
includes the renovation of existing buildings from
Option 1. This option provides a 15 -20 year solution.
TOTAL PROJECT COST:
$8,236,599 (Low) to $9,643,994 (High)
New square footage = 20,361 sf
Total campus square footage including new addition = 76,630 sf
Increased capacity to 585 by adding 58 seats
W C EL HILL -
BOIO
SCFEooL
Option 2
MOSELEYARCHITECTS
18
ESTES HILLS ELEMENTARY SCHOOL
W C EL HILL -
RBIO
SCFEooL
Option 3
ESTES HILLS ELEMENTARY SCHOOL
W.11
Option 3 includes the deconstruction of existing buildings on the
campus that require excessive renovation and have exceeded
their useable life. Larger additions are added in this option to not
only replace the buildings that have been deconstructed but
increase the student capacity. This option provides a 50+ year
solution.
TOTAL PROJECT COST:
$13,358,710 (Low) to $16,715,364 (High)
New square footage = 43,050 sf
Total campus square footage including new addition = 84,572 sf
Increased capacity to 585 by adding 58 seats
MOSELEYAf CH ITECTS
EL HILL
ARBOIO
CITY SCFEooL
Option 3
MOSELEYARCHITECTS
20
ESTES HILLS ELEMENTARY SCHOOL
EL HILL -
AR B RO
C IT Y scFEooL
MOSELEYARCHITECTS
Key Findings 21
CHAPEL HILL HIGH SCHOOL
ENTRANCE ACCESSIBILITY
v
AGING OF FACILITY
WATER INFILTRATION
r
REPLACING AGING
MECHANICAL SYSTEMS
GRADING & DRAINAGE
CHAPEL HILL-
6 %-CARRBORO
Option 1
CHAPEL HILL HIGH SCHOOL
22
Option 1 consists of a "laundry list" of items that need
to be fixed, renovated or remediated. These items
similar to repairs included on the Capital Improvement
Plan. This option will not increase capacity.
TOTAL PROJECT COST:
$10,771,282 (Low) to $12,247,920 (High)
MDSE LEYAIC H ITECTS
EL HILL -
AR B RO
C IT Y SCFEooL
MOSELEYARCHITECTS
Option 1 23
CHAPEL HILL HIGH SCHOOL
CHAPEL HILL HIGH SCHCO_ FIRST LEVEL
ears
t+!:tiac ^w .— I�IC�V�TCM1i90 aEMOvar�NtrpC
• n
s i
... a LJ o r • � i w
iipq
w
Mai ■■ • m w . s • w
„ -� w � YY air aaY •w [N1
it i i p.ry ti4�
■ +r7 N , i R •s wwr f r . R w [�sr ■ } cwie es
i+ J.! w iN 1m! �p nil 7i
IN w s+
10 7 Me 403 13
R " , xs
ua �x ur R• . . \ 1
Be �� e � w � w aw • 3t t1 3i _ y. � LI .1
w
nir
rEI1QY/,igN 1Y11�i
Im Rboam
MOSELEYARCHITECTS
,x[M am[sex v11N a mi v"�olm;rm
f.re eon.. WYELF-. r..0
0
CMS s�
M rbR1W1w
�OrO�ii �
r : r
J w
w
u
,ON .eacnOw
w41R
R�
w 7300
rw 0,
M �
IrF]
No
mmm
a�
e�w
r
LEGEND
verso•
M wir.r6J �w4 ��
r
EL HILL- M S E LEYAI C H IT2FCTS
RRBIO
A •
�� Option C 1
CHAPEL HILL HIGH SCHOOL
CHAPEL HILL HIGH SCHOOL SECOM LEVEL
!
!
!
!
i
KhIWA.94V 1or3 ,
l
I MO ALtOf ON
MQSELEYARCHiTECTS
jMtwj!i 11n!!IR W WbInA mblbUkUr7fx
r Wrgasr�v� +Uglvaaar +aniiur�rtseou
MAW"
MEND
1 "a
!
W C EL HILL -
RBIO
SCFEooL
Option 2
CHAPEL HILL HIGH SCHOOL
25
Option 2 consists of adding small additions that will
increase the existing school's student capacity. This
option also includes the renovation of existing buildings
from Option 1. This option provides a 15 -20 year
solution.
TOTAL PROJECT COST:
$16,982,344 (Low) to $19,494,159 (High)
Additional square footage = 26,543sf
Total campus square footage including new addition = 267,654sf
Increased capacity to 1625 by adding 105 seats
MOSELEYAf CH ITECTS
EL HILL
ARBOIO
CITY SCFEooL
Option 2
MOSELEYARCHIT2�CTS
CHAPEL HILL HIGH SCHOOL
HAPEL HILL -
ARRB R
CITY SCHOOLS
Option 3
MOSELEYARCH�TECTS
CHAPEL HILL HIGH SCHOOL
Option 3 includes the deconstruction of existing buildings on the
campus that require excessive renovation and have exceeded
their useable life. Larger additions are added in this option to not
only replace the buildings that have been deconstructed but
increase the student capacity. This option provides a 50+ year
solution.
TOTAL PROJECT COST:
$22,537,891 (Low) to $37,144,826 (High)
New square footage = 50,540sf
Total campus square footage including new addition = 291,651 sf
Increased capacity to 1625 by adding 105 seats
W C EL HILL -
BOIO
SCFEooL
Option 3
CHAPEL HILL HIGH SCHOOL
M SELEYARCHITE TS
28
MOSEL EYARC H I TECTS
OPTION 3
kwEL HILL- MOSELEYARCHITECTS
RBORO 29
SCHOOL$ Key Findings
r - Z.
INSUFFICIENT LAYOUT
LINCOLN CENTER
MOISTURE ISSUES
ala
LACK OF ADAQUATE PARKING
AGING MECHANICAL UNITS
CHAPEL HILL -
ARRRO
Option 1
LINCOLN CENTER
MOSELEYARCHITE T
30
Option 1 consists of a "laundry list" of items that need
to be fixed, renovated or remediated. These items
similar to repairs included on the Capital Improvement
Plan.
TOTAL PROJECT COST:
$2,455,171 (Low) to $3,013,834 (High)
CHAPEL HILL -
ARRRO
■
L
LEGEND
. +�.rwu.r.w.r,e,Y.rrrrlTt
rwrn.Ka ..�� ni vrtw sYH
ya Wl'I�IWh MJW.
urw'wwlr� ��
- saw...srtru.rwu.l•
w w...0
� o.n..o.rm
'.�iw1Nw�IM1dr1YY48rt
u revs l�.nnwrs
Y hMQf1/GYC.
,.
r r��s•w
•.
r4 `[.:, m 12rYS[A.�P'l.Ap4� rrR�`
� �U4 wciM.�ir'Y].[r
rIXKh_i141F{[+�4P1�+[�O[Vw
!� �4GCCM.4 Rl0\Y�
.IXi+OMl1[TMM2nT9MMVrMMiitiy]
a 11PM�Wr�l0,1 NY
...�� ��vL4ak Mn+b
.' WFI/R
Y M1iMlsa.tl •rm�+bibM
eKYn ;+NA'A]LLZW
F',wL
''tie'�na va®a•lui�
Y M1Y4Y #1�[vh�:. l4 it
M 41Wc.l�n�rro
a:a+•YCCwwws
w zwMaf
.f w+�twrr�.sa�asalr
'�•arwrawrl�cwianmr
M r�sq..n u+:cr*�'�angwr�r
-n+r3 �Y/�ClMSVII
..e�y[awla�.aowrra.uw�wao.. rxel.
� ��`N.lM�Gr V.Ci1,94wrP`{Y�
w �a.rn Y+�.n mr
v Y.l4�el MIl�rFlrlllYrflWl �'JOr*. M- OIF+• =iwF.P
4 Yna MlekwallaF
MOri4[+Mr�.iC11
Y IIC[rwf��M'a
Y �eprrsre �o-t
Y M!r rMti[K.INrw� Iri,M
MOSS LEYARCHTECTS
=G%Vm wR VRai! WaogJ�.X""K4r:Lr 1p.
Option 1
LINCOLN CENTER
uhr1rEw40E- WiJV4c
■ ■s
MOSELEYARCHITECTS
31
.r L2 ■;
■ 63 ®s
m 5
Moo v
a � 1
H I I
16i
tM . ■ d.
LINCOLN CENTER
MAIN ELILL.MG
■
slat
PHOEND(
ACADEMY
1a
CHAPEL HILL -
ARRRO
Option 2
LINCOLN CENTER
MOSELEYA CHITECTS
32
Option 2 consists of deconstructing the existing Lincoln
Center and building a new two -story Central Office at
this location that will provide the necessary space,
parking, and professional development space.
TOTAL PROJECT COST:
$6,740,000(Low) to $8,425,000(High)
EL HILL -
AR B RO
C IT Y SCFEooL
Aq y
4'
■
a
aa•
R
y
1 r
OR
MOSELEYARCHITECTS
Option 2 33
LINCOLN CENTER
�.
4 _
� + ti ►
f' 3 1
• 4
%} .'
MOSELEYARCHiTECTS
QRT.O1 t
TIM MONS GROUP -"
cKCCS run.rr� srwr
. �.�nmr rir�o a¢aWC i� i.r •}
CHAPEL HILL -
ARRB TIO 34
6L
MIL CITY SCHOOLS Option 3
LINCOLN CENTER
Option 3 consists of renovating the existing Lincoln
Center for an educational facility and building a new
Central Office on a different property that will provide
the necessary space, parking, and professional
development space.
TOTAL PROJECT COST:
$13,,744,,835 (Low) to $15..896..140 (High)
HVEL HILL- MCASELEYARCHITE T
ARRBO 35
'QTY SCHOOLS Option 3
LINCOLN CENTER
Lek u 'yy,
ti '
IW
AL
F�
MMELEYARCHITECTS
OPTION 3
TIMMONS GROUP - .
"l;GV FAC&rVnMDy
W (3EL HILL -
S 1, BOIO scoop
Base Level
Repair of
Deficiencies
School Option 1
IMMARY REPORT 36
Option 1 Base Level
Repair deficiencies Option 2 Inc. Capacity
and Capacity plus Major Replacement SF Added
Increase Capacity Increase Option 2 of Buildings in Option 3
Option 2 SF Added Option 3 Total Total New SF
Carrboro Elementary
4,173,286
13,549,536
52
28,850
22,146,930
60,600
Ephesus elementary
3,567,347
9,496,744
137
22,836
15,543,912
22,836
Estes Hills Elementary
4,085,441
9,643,994
58
20,361
16,715,364
43,050
FP Graham Elementary
4,752,434
10,099,412
47
19,586
20,321,427
53,628
Glenwood Elementary
3,804,774
12,376,974
162
31,400
26,820,437
80,000
Seawell Elementary
3,547,864
8,814,034
119
19,290
16,059,588
43,761
Culbreth Middle
6,749,600
10,093,850
see note below
12,250
-
-
Phillips Middle
6,149,660
10,269,230
52
15,090
-
-
CHHS
12,247,920
19,494,159
105
26,543
37,144,826
50,540
Lincoln Center 3,013,834 8,425,000 33,700 15,896,140 33,700
$ 52,092,160.00 $ 112,262,933.00 732 229,906 $ 170,648,624.00 388,115
Notes:
- Implementation of Option 2 will remove 27 elementary school mobile units and provide a dedicated Pre -K space at each school.
- Culbreth MS calculations do not include the addition of 14,749 square feet for Science Lab that will result in 104 increase in capacity.
MOSELEYAf H ITEGTS
W C EL HILL-
moo Impact on SAPFO projections
School Level
Current
Capacity
SAPFO
Threshold
Projected New
School Date
Project Cost
Elementary
51829
61120
2021 -22
$ 35,476,053
* Middle
21944
31150
2019 -20
$ 42,913,749
High
3,875
4,263
2020 -21
$ 19,743,948
Total
121648
131533
$ 9811331750
*Includes Culbreth Science Expansion
School Level
Potential
Capacity
Potential
SAPFO
Threshold
Potential New
School Date
Project Cost
Elementary
61404
61724
Beyond 10 Yrs
N/A
* Middle
21966
31206
2021 -22
$ 47,168,013
High
3,980
4,378
2022 -23
$ 21,742,339
Total
131350
141308
$ 6819101352
MOSELEYAf H ITEGTS
CHAPEL H1LL-
ARRBORO 8
\CI.Y SCHVOL$ Items and Questions to Resof e
• School Specifics, (ie ... Option 1, 2, or 3)
• Phasing and Swing Space
• Lincoln Center and Central Office Needs
• Timing and Funding
MDSE LEYAIC H ITECTS
CHAPEL HILL -
ARRRO
,� Su ort Services Recommendat'i'
ons
pp
• Form a working group to meet with school principals
and key staff ... daytime work with consultants
• Approve planning money
• Invite OC and OCS to participate in the process
• Develop a list of recommended projects by location
• Develop a rough phasing plan /approach
• Coordinate with Orange County for funding options
• Communicate our needs to our stakeholders
OSE LEYAIC H ITECTS
H
Questions and Feedback
El It,
Attachment B
41
Orange County Schools
Facilities Assessment Timeline
Over the past year, Orange County Schools (OCS) has undertaken three important
studies to comprehensively reflect the District's facility needs for the foreseeable future.
They are as follows:
December 2012 —OCS received Facilities Assessment Report from the
Department of Public Instruction
• This report identified areas where maintenance and capital expenditures
would be needed, but did not provide specific work details nor cost
estimates.
• Maintenance items have been addressed.
April 2013— Acknowledging the ever- increasing need to ensure safety in our
schools to the extent practicable, OCS commissioned Safe Havens International
to conduct a facilities assessment focusing on safety and risk management
practices in schools and District buildings.
• This excellent report holistically explored the effect facilities have on safety
and recommended several modifications. Funding constraints have
prohibited facility modifications or the addition of system controls to
address many of these recommendations.
• The report further identified work practices that should be changed to
promote a safer environment in the schools. Those recommendations are
currently being implemented within current funding.
October 2013 —The Board of Education will retain a consultant to conduct a
facilities assessment which builds on the findings of the other reports and adds
the needed detail and analysis for capital facility costs. The timeline for
completion of this report is as follows:
• Facilities Assessment Proposal due: 12:00 noon EDT October 3, 2013
• Anticipated date of award: No later than October 28, 2013
• Preliminary report requested no later than December 31, 2013
• Final report requested no later than January 31, 2014
This full body of work should provide information upon which the Orange County Board
of Education can confidently base future capital decisions.