Loading...
HomeMy WebLinkAboutAgenda - 09-17-2013 - 7b1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: September 17, 2013 Action Agenda Item No. 7 -b SUBJECT: Whitted Meeting Room Schematic Design Review DEPARTMENT: Asset Management Services PUBLIC HEARING: (Y /N) No ATTACHMENT(S): INFORMATION CONTACT: Schematic Floor Plans Jeff Thompson, (919) 245 -2658 PURPOSE: To continue review and comment on the schematic design of the Whitted Permanent meeting room initially presented during the September 12, 2013 work session, and authorize staff and the consultant to move forward with construction document preparation. BACKGROUND: On April 4, 2013, the BOCC authorized Orange County to move forward with the design of permanent Board meeting facilities within the Whitted 2nd Floor "A" building in Hillsborough, and included this capital project within the adopted Capital Investment Plan in FY 2013 -14. On June 18, 2013, the BOCC authorized the Manager to move forward with the design, award a bid, and complete the necessary site work for this project as "Phase 1" in order that the work be completed this fall during optimal outdoor weather. This site work, which will include significant paving, stormwater management, lighting, pedestrian access, handicapped access, and landscaping improvements, is currently out to bid and should be complete no later than the end of November 2013. The County has engaged Corley, Redfoot Architects as the designer for the project. Ken Redfoot and David Taylor with Corley, Redfoot Architects will continue presenting the schematic designs as well as corresponding three dimensional space modeling for additional BOCC review and comment introduced during the September 12, 2013 work session. 1 Should the BOCC approve the schematic design renderings and principles, the following timeline represents the delivery of the overall project: TASK PROPOSED END BY BEGINNING DATE DATE BOCC Action: Approval of Schematic Design; authorization 9/17/13 9/17/13 to prepare bid documents; authorization to advertise for bid Construction document prep, bid advertisement prep (2 month 9/18/13 11/5/13 duration) BOCC Action: Approval of Final Design; authorization to 11/5/13 11/5/13 advertise for bid BOCC Action: Bid Award 12/17/13 12/17/13 Construction est. 4 month duration 1/6/14 5/6/14 Grand Opening — first BOCC meeting (estimated date) 6/3/14 6/3/14 FINANCIAL IMPACT: The BOCC has approved $1,500,000 for this project as part of the FY2013 -14 Capital Investment Plan. RECOMMENDATION(S): The Manager recommends that the Board continue review and comment on the schematic design of the Whitted Permanent meeting room initially presented during the September 12, 2013 work session; and authorize staff and the consultant to move forward with construction document preparation. Proposed BoCC Layout Whitted Building Renovations ilia corley redfoot architects SCALE:- -�� e � > COUNTY OF ORANGE architects i engineers i plarners o��� August 30, 2013 HILLSBOROUGH, NORTH CAROLINA BoCC Joint Meeting Layout Whitted Building Renovations ilia corley redfoot architects a �a E:,,a - s > COUNTY OF ORANGE Wean: i engineers i Planers o��� August 30, 2013 HILLSBOROUGH, NORTH CAROLINA Proposed Theater Layout Whitted Building Renovations ilia corley redfoot architects SCALE:- -�� e � � COUNTY OF ORANGE architects i engineers i plarners o��� August 30, 2013 HILLSBOROUGH, NORTH CAROLINA