ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: September 17, 2013
Action Agenda
Item No. 5-i
SUBJECT: Burlington-Graham Metropolitan Planning Organization Memorandum of
Understanding Adding Orange County as a Voting Member
DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No
ATTACHMENT(S): INFORMATION CONTACT:
1. Resolution to Approve Burlington- Abigaile Pittman, 245-2567
Graham Metropolitan Planning Tom Altieri, 245-2579
Organization (BG MPO) Memorandum of Craig Benedict, 245-2575
Understanding (MOU) Adding Orange
County as a Voting Member Past agenda material on this item may
2. Revised BG MPO MOU Adding Orange be found
County as a Voting Member at: http://orangecountync.gov/OCCLERKS
/1201248d.pdf and
http://orangecountync.gov/occlerks/12110
8.pdf
PURPOSE: To approve a resolution adding Orange County as a voting member of the
Burlington-Graham Metropolitan Planning Organization (BG MPO) to the Memorandum of
Understanding (MOU).
BACKGROUND: On August 12, 2011, the Chair of the BG MPO Technical Coordinating
Committee extended an offer to the County to formally join the MPO. On January 24, 2012 the
BOCC passed a resolution requesting representation on the BGMPO Transportation Advisory
Committee (TAC) and Technical Coordinating Committee (TCC). The BG MPO amended its
Memorandum of Understanding (MOU) to include Orange County as a voting member. The
MOU establishes membership, bylaws, responsibilities and voting structure for the member
jurisdictions of the BG MPO.
The amended MOU was initially approved by the TAC on August 21, 2012 and circulated to be
signed by the Mayors or County Commission Chairs of all member jurisdictions (including
Orange County), the NC Secretary of Transportation, the NC Assistant Attorney General, and
the Federal Highway Administration (FHWA) Division Administrator. The MOU was
unanimously approved by the BOCC on November 8, 2012. However, the City of Mebane
requested to amend its weighted voting rights under the MOU and declined approval pending
discussion and resolution of this issue. Following TAC discussion and several delays, the MOU
was again revised to give the City of Mebane 3 weighted votes, and approved by the TAC on
August 20, 2013. The Mebane City Council approved the revised MOU at its meeting on
September 9, 2013. The MOU must now be approved and executed again by the remaining
2
member jurisdictions, including Orange County. MOU approval and execution is occurring
simultaneously in all jurisdictions and should be complete before the end of the year.
The only revisions to the MOU document (Attachment 2) have been the addition of Orange
County as a member jurisdiction, and the revision of weighted votes from 1 to 3 for the City of
Mebane.
The contents of the MOU are consistent with the following provisions of the NC GS 136-200.2:
• Agreement for the participation in a continuing and cooperative comprehensive
transportation planning process.
• Creation of MPO Technical Coordinating Committee (TAC) and Transportation Advisory
Committee (TAC) subcommittees, responsibilities, membership, and provisions for open
meetings and public records.
• Distribution of regular and weighted voting power among the constituent counties,
municipal corporations, and other participating organizations. Weighted voting is based
on the jurisdictional population within the MPO boundaries according to the most recent
U.S. Census. The County's estimated population within the BG MPO planning area is
approximately 1,817. Based on this, the County will have 1 regular vote and 1 weighted
vote.
• Designation of the City of Burlington as the Lead Planning Agency (LPA), and detailing
the LPA's administrative responsibilities.
• Stipulation that all transportation and related federal aid planning grants funds available
to promote the cooperative transportation planning process be expended in accordance
with the MPO's Planning Work Program adopted by the TAC.
Update on the MPO Boundaries: In October and November, 2012, the revised BG MPO
boundary within the County was endorsed by the BG MPO TCC and TAC, the County, and the
Durham-Chapel Hill-Carrboro (DCHC) MPO TCC and TAC. Related to the revised boundaries,
the DCHC MPO and BG MPO executed a letter of agreement in January 2013 addressing a few
of Burlington's urbanized areas that will be planned by the DCHC MPO. Following full
jurisdiction endorsement of the MOU, the North Carolina Department of Transportation
(NCDOT) will officially receive the revised MPO boundaries, verify that they conform to legal
requirements, and submit them to the NC Secretary of Transportation for final approval. The
NCDOT reports that this process should be complete by the end of the year.
FINANCIAL IMPACT: Orange County staff would dedicate time to the BG MPO transportation
planning activities, and TCC and TAC meetings. The BG MPO MOU has no provisions for
membership fees. There are no membership fees associated with the County's membership in
the BG MPO. MPO staff and planning activities are currently funded by the Federal
government. The City of Burlington pays the local matching funds for Lead Planning Agency
(LPA) planning activities. However, this system of the LPA paying for 100% could be revised in
the future, and has already been revised in the DCHC MPO where matching funds will now
derive from participating agencies.
RECOMMENDATION(S): The Manager recommends the Board approve the resolution
(Attachment 1) approving the revised MOU adding Orange County as a voting member of the
BG MPO, and authorize the Chair and Clerk to the Board to execute the MOU (Attachment 2).
RES-2013-067 ATTACHMENT 1 3
RESOLUTION PASSED BY THE BOARD OF COMMISSIONERS OF
ORANGE COUNTY,NORTH CAROLINA
The following resolution was offered by and seconded by
and upon being put to a vote was carried on the day of
, 2013 :
THAT WHEREAS, it is recognized that the proper movement of travel within and through
the Burlington-Graham urbanized area is highly desirable element of a comprehensive plan for the
orderly growth and development of the area, and;
WHEREAS, there are a number of governmental jurisdictions within the Burlington-
Graham urbanized area which have been authorized with implementation and regulatory
responsibilities for transportation by North Carolina General Statutes, and;
WHEREAS, it is desirable that coordinated, comprehensive and cooperative transportation
planning processes be maintained in the Burlington-Graham urbanized area to insure that the
transportation system is maintained on an efficient and economical basis commensurate with the
public health, safety and welfare, and;
WHEREAS, a revised Memorandum of Understanding between the City of Burlington, City
of Graham, Town of Elon, Town of Gibsonville, City of Mebane, Town of Haw River, Town of
Whitsett, Town of Green Level, Village of Alamance, Alamance County, Guilford County, Orange
County, and the North Carolina Department of Transportation has been prepared that sets forth the
responsibilities and working arrangements for maintaining a continuing, comprehensive and
cooperative transportation planning process, and;
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COMMISSIONERS OF
ORANGE COUNTY,NORTH CAROLINA:
That the Memorandum of Understanding between the City of Burlington, City of Graham,
Town of Elon, Town of Gibsonville, City of Mebane, Town of Haw River, Town of Whitsett, Town
of Green Level, Village of Alamance, Alamance County, Guilford County, Orange County, and the
North Carolina Department of Transportation, Agreement Number 8-21-12, be approved and that
the Chair of the Board of County Commissioners and the County Clerk are hereby directed to
execute the Memorandum of Understanding.
I, , Clerk of Orange County, North Carolina, do hereby
certify that the above is true and correct copy of excerpts from the minutes of the Board of
Commissioners of said County.
WITNESS my hand and the official seal of Orange County this the day of
2013.
ATTEST (Seal)
County Clerk
4
ATTACHMENT 2
MEMORANDUM OF UNDERSTANDING
FOR
COOPERATIVE, COMPREHENSIVE,AND
CONTINUING TRANSPORTATION PLANNING
Between
THE CITY OF BURLINGTON, CITY OF GRAHAM, TOWN OF ELON,
TOWN OF GIBSONVILLE, CITY OF MEBANE, TOWN OF HAW RIVER,
TOWN OF WHITSETT, TOWN OF GREEN LEVEL, VILLAGE OF ALAMANCE,
ALAMANCE COUNTY, GUILFORD COUNTY, ORANGE COUNTY AND THE NORTH
CAROLINA DEPARTMENT OF TRANSPORTATION(NCDOT)in cooperation with
THE UNITED STATES DEPARTMENT OF TRANSPORTATION
WTTNES SETH
THAT WHEREAS, THE CITY OF BURLINGTON, CITY OF GRAHAM, TOWN OF ELON,
TOWN OF GIBSONVILLE, CITY OF MEBANE, TOWN OF HAW RIVER, TOWN OF
WHITSETT, TOWN OF GREEN LEVEL, VILLAGE OF ALAMANCE, ALAMANCE
COUNTY, GUILFORD COUNTY, ORANGE COUNTY, AND THE NCDOT entered into a
Memorandum of Understanding for Cooperative, Comprehensive, and Continuing Transportation
Planning, last amended in August 2003, regarding the Burlington-Graham Metropolitan Planning
Organization (BGMPO);
WHEREAS, each MPO is required to develop a transportation plan in cooperation with
NCDOT and in accordance with 23 U.S.C. 134, any subsequent amendments to that statute, and any
implementing regulations; and
WHEREAS, it is the desire of these parties that all prior Memoranda of Understanding between the
parties be superseded and replaced by this Memorandum of Understanding.
NOW THEREFORE the following Memorandum of Understanding is made:
SECTION 1: It is hereby agreed that the CITY OF BURLINGTON, CITY OF GRAHAM,
TOWN OF ELON, TOWN OF GIBSONVILLE, CITY OF MEBANE, TOWN OF HAW RIVER,
TOWN OF WHITSETT, TOWN OF GREEN LEVEL, VILLAGE OF ALAMANCE,
ALAMANCE COUNTY, GUILFORD COUNTY, ORANGE COUNTY AND THE NORTH
CAROLINA DEPARTMENT OF TRANSPORTATION in cooperation with the UNITED
STATES DEPARTMENT OF TRANSPORTATION,will participate in a continuing transportation
planning process with responsibilities and undertakings as related in the following paragraphs:
1. The area involved, the Burlington-Graham Metropolitan Planning Area, will be the
Burlington-Graham urbanized area as defined by the United States Department of
Commerce, Bureau of the Census plus that area beyond the existing urbanized area
boundary that is expected to become urban within a twenty year planning period. This area
is hereinafter referred to as the Planning Area.
5
ATTACHMENT 2
2. The continuing transportation planning process will be a cooperative one and all planning
discussion will be reflective of and responsive to the comprehensive plans for growth and
development of the Planning Area.
3. The continuing transportation planning process will be in accordance with the intent,
procedures, and programs of Title VI of the Civil Rights Act of 1964, as amended.
4. The Planning Area may be periodically reassessed and revised in the light of new
developments and data projections.
5. A Burlington-Graham Transportation Advisory Committee, hereinafter referred to as the
TAC, is hereby established with responsibility for serving as a forum for cooperative
transportation planning and decision making for the Burlington-Graham Metropolitan
Planning Organization. The TAC shall consist of a representative appointed by member
Boards of Local Government and a member of the North Carolina Board of Transportation.
a. The TAC members shall have the responsibility for keeping their respective policy
boards informed of the status and requirements of the transportation planning process;
assisting in the dissemination and clarification of the decisions,inclinations, and policies
of the local boards they represent; and ensuring meaningful citizen participation in the
transportation planning process.
The membership and voting structure of the TAC is listed below:
Weighted Regular
Governmental Body Votes Votes
Burlington 6 2
Graham 3 1
Elon 1 1
Gibsonville 1 1
Mebane 3 1
Haw River 1 1
Whitsett 1 1
Green Level 1 1
Alamance 1 1
Alamance County 2 1
Guilford County 1 1
Orange County 1 1
Department of Transportation 1 1
TOTAL 23 14
b. Weighted votes shall be reevaluated every 10 years based on the results of the most
recent decennial U.S. Census. Weighted vote distribution is based on the population
within municipal /county /MPO boundaries and extra-territorial jurisdiction areas may
be adjusted at the discretion of the TAC depending on population changes.
6
ATTACHMENT 2
c. Members will vote on matters pursuant to the authority granted by their respective
governmental body. If a weighted vote is to be used, it must be called for prior to the
vote by a member. Otherwise, each member has regular vote privileges.
d. Any member who does not attend two consecutive TAC meetings will not be included
as part of the membership needed to obtain a quorum after the second meeting.
Membership, however, is immediately reinstated by the presence of the most recently
appointed member (or his/her alternate) at any future meeting. A quorum is required
for the transaction of all business, including conducting meetings or hearings,
participating in deliberations, or voting upon or otherwise transacting the public
business. A quorum consists of 51% of the members of the TAC, plus as many
additional members as may be required to ensure that 51% of possible votes are
present, excluding those who have been removed for absenteeism, and applies to regular
membership,not weighted vote. The TAC will meet as often as it is deemed necessary,
appropriate and advisable. On the basis of majority vote of its membership, the TAC
may elect a member of the committee to act as chairperson with the responsibility for
coordination of the committee's activities.
In addition, representatives from each of the following agencies will serve as non-voting
members of the TAC:
-Federal Highway Administration
-NCDOT Transportation Planning Branch, MPO Coordinator
-NCDOT Division 7 Engineer
-Burlington Graham MPO Coordinator/Secretary
- Other Local, State, or Federal agencies impacting transportation in the Planning Area
at the invitation of the TAC.
6. A member of any local elected board may serve as an alternate to the designated TAC
member for each member. The Burlington-Graham MPO Secretary shall be notified of a
TAC alternate member each year and as changes are made.
7. The TAC shall meet as often as it is deemed appropriate and advisable, and shall elect a
Chair and Vice-Chair based on a majority vote each January.
8. The duties and responsibilities of the TAC are as follows:
a. The TAC, in cooperation with the State, shall be responsible for carrying out the
urban transportation planning process specified by the U.S. Department of
Transportation in 23 U.S.C. 134. It shall review, develop, and endorse the Planning
Work Program (PWP), the Transportation Improvement Program (TIP) and the
Long Range Transportation Plan (LRTP);
b. Review and approval of the Metropolitan Transportation Improvement Program
(MTIP) for multi-modal capital and operating expenditures and to ensure
coordination between local and state capital and operating improvement programs;
7
ATTACHMENT 2
C. The TAC shall not set policy for the planning area but shall establish goals and
objectives for the transportation planning process reflective of and responsive to
comprehensive plans for growth and development in the MPO planning area;
d. Endorse, review and approval of the Comprehensive Transportation Plan (CTP). As
required by the NCGS 136-66.2(4), any revision in the CTP must be jointly
approved by the MPO and NCDOT;
e. The TAC, as required, shall review, approve, and endorse amendments to the
Planning Work Program, the CTP, the LRTP and the Transportation Improvement
Program;
f. The TAC shall have the responsibility for keeping boards of general purpose local
government informed of the status and requirements of the transportation planning
process; assisting in the dissemination and clarification of the decisions,inclinations,
and policies of these boards; and ensuring meaningful citizen participation in the
transportation planning process;
g. The TAC shall review, approve and endorse changes to the Federal-Aid Functional
Classification System and MPO's Metropolitan Planning Area Boundary(MPA);
h. The TAC shall review, approve, and endorse a "Prospectus for Transportation
Planning"which defines work tasks and responsibilities for the various agencies
participating in the transportation planning process; and
i. The TAC shall review and approve related air quality planning in conformance with
federal regulations if the Planning Area becomes non-attainment for air quality.
j. The representative from each general purpose local government on the TAC shall be
responsible for instructing the clerk of his/her local government to submit copies of
minutes or resolutions to the secretary of the TAC when formal action involving any
MPO plan is taken by his/her local government.
k. Any other duties identified as necessary to further facilitate the transportation
planning process.
9. Municipal councils, boards of alderman and county commissioners represented on the TAC
shall serve as the primary means for citizen input in the transportation planning process.
This citizen involvement will be obtained through goals and objectives surveys, forums, and
public meetings.
10. A Technical Coordinating Committee, hereinafter referred to as the TCC, shall be
established with the responsibility of general review, guidance and coordination of the
transportation planning process for the planning area, and with the responsibility for making
recommendations to the respective local and state governmental agencies and the TAC
regarding any necessary actions relating to the continuing transportation planning process.
The TCC shall be responsible for development,review, and recommendation for approval
8
ATTACHMENT 2
of the Comprehensive Transportation Plan, Prospectus, Transportation Improvement
Program, Long Range Transportation Plan, and Federal-Aid Urban System and Urbanized
Boundary. The TCC shall also be responsible for promoting citizen participation and
preparing documentation reports for transportation studies.
Membership of the TCC shall include technical representation from all local and state and
federal government agencies directly related to and concerned with the transportation
planning process for the BGMPO planning area.
The TCC shall be comprised of the following members:
a. Alamance County, one representative
b. Alamance County Transportation Authority, one representative
C. City of Burlington, four representatives
d. City of Graham, two representatives
e. Burlington-Alamance Airport Authority, one representative
f. Town of Elon, one representative
g. Town of Gibsonville, one representative
h. Town of Haw River, one representative
i. City of Mebane, one representative
j. Town of Whitsett, one representative
k. Town of Green Level, one representative
1. Village of Alamance, one representative
M. Guilford County, one representative
n. Orange County, one representative
o. Burlington Regional Airport Authority, one representative
p. North Carolina Department of Transportation, Public Transportation Division, one
representative
q. North Carolina Department of Transportation, Transportation Planning Branch, one
representative
9
ATTACHMENT 2
r. North Carolina Department of Transportation, Division Engineer for Division 7
S. North Carolina Department of Transportation, Area Traffic Engineer
t. Federal Highway Administration(FHWA)North Carolina, one representative
Other local agencies,upon filing a request,will be notified and invited to all meetings of the
TCC. Such agencies may include Alamance-Burlington Schools and various city and county
departments/offices.
The TCC shall meet when it is deemed appropriate and advisable, and shall elect a Chair
and Vice Chair annually beginning each January based on a majority vote.
11. The City of Burlington shall serve as the Lead Planning Agency. Administrative
coordination for the TAC and the TCC will be provided by the City of Burlington as the
Lead Planning Agency who shall report to the City of Burlington Planning Director. The
Lead Planning Agency will be responsible for the following functions:
-Providing a secretary for the TAC and the TCC
-Arranging meetings and agendas
-Maintaining minutes and records
-Preparing a Prospectus and Planning Work Program
- Serving as custodian of all MPO plans and documents
- Collecting from local governments, minutes and resolutions that document
transportation plan revisions, and submitting these for mutual adoption by the North
Carolina Department of Transportation
- Monitoring the transportation planning process to insure its execution is in
accordance with the MPO goals and objectives.
- Performing other coordinating functions as assigned by the TAC from time to
time.
- Lead responsibility for structuring public involvement in the transportation
planning process.
-Preparation of the PL Expenditure Report and other grant management
12. All transportation and related Federal Aid planning grant funds available to promote the
cooperative transportation planning process will be expended in accordance with the
Planning Work Program adopted by the TAC. Administration of funding in support of the
transportation planning process on behalf of the TAC will be conducted by the City of
10
ATTACHMENT 2
Burlington which will execute appropriate agreements with funding agencies as provided by
the Planning Work Program.
13. The Transportation Advisory Committee(TAC) and the Technical Coordinating Committee
(TCC), as well as any established sub-committees are responsible for carrying out the
provisions on North Carolina G.S. Chapter 143, Article 33C regarding open meetings, and
Chapter 132 regarding public records. A quorum is required for transaction of all business,
including conducting meetings or hearings, participating in deliberations, or voting upon or
otherwise transacting public business. A quorum consists of 51% of the members of the
TAC or TCC, plus as many additional members as may be required to ensure that 51% of
possible votes are present. An alternate may be appointed to attend meetings should the
member not be able to attend. Alternates should be identified by name on the meeting
attendance log. Vacant seats will not count against the quorum. Electronic meetings and
voting ARE allowed as long as proper public notice is given and meeting materials are
available to the public upon request.
SECTION 2: Subscribing agencies to this Memorandum of Understanding may terminate their
participation in the Continuing Transportation Planning Process by giving sixty days written notice
to other parties prior to the date of termination. It is further agreed that these agencies will assist in
the transportation planning process by providing planning assistance, data, and other requested
information. Additionally, these agencies shall coordinate zoning and subdivision approval in
accordance with the adopted Transportation Plan(s).
SECTION 3: This Amended Memorandum of Understanding supersedes and replaces any prior
memorandum(s)of understanding between the parties regarding the Burlington-Graham MPO.
SECTION 4: In witness whereof, the parties of this Memorandum of Understanding have been
authorized by appropriate and proper resolutions to sign the same, the City of Burlington by its
Mayor, the City of Graham by its Mayor, the Town of Elon by its Mayor, the Town of Gibsonville
by its Mayor, the City of Mebane by its Mayor, the Town of Haw River by its Mayor, the Town of
Whitsett by its Mayor, the Town of Green Level by its Mayor, Village of Alamance by its Mayor,
Alamance County by its Chair of the Board of Commissioners, Guilford County by its Chair of the
Board of Commissioners, Orange County by its Chair of the Board of Commissioners, and the
Department of Transportation by the Secretary of Transportation. This day
of , 2013.
11
ATTACHMENT 2
(SIGNATURE PAGE FOR ORANGE COUNTY)
(Seal) Orange County
County Clerk Chair,Board of County Commissioners