Loading...
HomeMy WebLinkAboutAgenda - 09-16-1997 - 10a I ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. /O_Q ACTION AGENDA ITEM ABSTRACT Meeting Date: September 16, 1997 SUBJECT: Status Report on High School Construction Standards and Coordinated Site and Facility Planning DEPARTMENT: County Manager PUBLIC HEARING: (Y/N) BUDGET AMENDMENT: (Y/1) ATTACHMENT(S): INFORMATION CONTACT: High School Construction Standards John M. Link, Jr. Memorandum of Agreement TELEPHONE NUMBERS: --ext. 2300 Proposed Agenda for September 30 Meeting Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 227-2031 PURPOSE: To receive a status report on the following: a) High School Construction Standards b) Memorandum of Agreement for Providing Coordinated Site and Facility Planning between County, Towns and School Systems BACKGROUND: a) High School Construction Standards- The standards as attached are recommendations of the Orange County Schools High School Standards Committee. These standards were reviewed by the School Superintendents, County Manager and respective staff on Monday, September 8. These standards are presented to the governing bodies for review and instructions for next steps. The governing bodies may choose to establish a short-term task force comprised of county and school systems representatives to review and make final recommendations similar to the process used in establishing elementary and middle school construction standards. b) Memorandum of Agreement for Providing Coordinated Site and Facility Planning between County, Town and School Systems- The County Manager and School Superintendents and staff have reviewed the attached memorandum,the content of which is very similar to one adopted in Wake County. This memorandum has also been reviewed and/or commented upon by the Town Managers in Chapel Hill and Carrboro. The governing bodies may want to establish a review process. The Schools and Land Use Councils could be the entity to conduct such a review. RECOMMENDATION(S): Receive as reports. Please refer to the attached proposed agenda for the September 30 meeting between the BOCC and School Boards. These two reports as cited above are scheduled to be topics for that meeting. 2 •- Orange County Schools High School Standards Committee Recommendations (July 17, 1997) The Orange County Schools High School Standards Committee met on July 17, 1997 in the Central Office Boardroom and came to the following recommendations for the purpose of beginning preliminary planning for a new 9-12 high school (1000 student capacity) in the Orange County School System. The Committee reviewed data supplied for the square footage considerations used in planning East Chapel Hill High and data supplied by the North Carolina State Board of Education (Facilities Guidelines.January, 1997)and suggested the following: 1.) That the new Orange County High School follow the square footage assign- ments used in planning East Chapel Hill High as they offer a more reasonable and accommodating footprint for High School students and teachers (e.g.,State Board Guidelines recommend 750 square feet per standard classrooms— English,Math,Social Studies,and Foreign Language and East Chapel Hill High calls for 850 square feet for these same areas. The 850 makes much more sense when one calls into consideration present and future classroom demands and technology enhancements). 2.) The Vocational Courses to be offered at the new Orange County High School is currently under examination and what flexibility for cross enrollments (if any) is also under study. 3.) This planned facility would not include in its preliminary stages an auxiliary gymnasium or an athletic stadium(The school would have an athletic component with appropriate practice and game fields,but would not have a stadium complex similar to the one at Orange High School in this initial construction phase). 4.) A minimum of 50 acres of land would be necessary to handle a 1000 student facility(State Guidelines call for 30 acres and 1 additional acre for each 100 ADM). The minimum here is a reasonable number when looking at rapidly disappearing land parcels here in the central piece of Orange County. 5.) The total square footage of the building(s)would be approximately 177,000 square feet(129,000 square feet for direct work area and 48,000 square feet for support areas equaling out to about 176 square feet per student). The High School Standards Committee will continue to meet to deal with issues of Vocational courses and suggested support areas throughout the building complex. 09/97 l� 'n EAST CHAPEL HILL HIGH SCHOOL 2790 Space Allocation-Square Footage Assignment Academic Buildings(2) 16 Standard Classrooms @ 850 13,600 8 Science Labs @ 1,255 10,040 4 Sconce Prep Rooms @ 370 1,480 8 Seminar Rooms @380 2,880 8 Student Project Rooms @ 405 3,240 1 TMH Classroom @ 975 975 _ 1 EMH Classroom @ 975 975 2 Health Classrooms @ 885 1,770 2 BuwMkt Classrooms @ 1,095 2,190 2 R&D Classrooms @ 1,275 2,550 2 Technology Classrooms @ 1,575 3,150 2 Multi Media Rooms @ 1,085 2,170 1 Large Group Instruction a 1,730 1,730 1 Black Box Theater @ 1,730 1,730 2 Small Group Instruction @ 570 1,140 2 Admin/Guidance Areas @ 1260 2,520 4 Teacher Resource Areas @ 980 3,920 SUBTOTAL 56,060 Other Lower Laval Areas 1 CateterialCommons Area 7,235 1 Kitchen 3,595 1 Main Administrative Area 2,905 1 Student Activities Area 390 1 C.I.C. 485 1 Receiving Area 890 2 Toaets 1,250 SUBTOTAL 16,540 Other Main Level Aram 1 Media Center 7,415 1 Technology Oistributlon Area 400 1 Band/Choir Room and Storage 2,645 2 Art C>assrooms w/support @ 1,550 3,100 1 Darkroom 205 1 Tv Production Studio 800 1 Gymnasium 11,535 1 Gym Storage Area Sea 1 Locker AreWeam Room 10200 1 Student Store 365 1 Concessionsffidats Area 185 1 Pressbax 150 4 Taub 2,390 1 Main Lobby 5.235 SUBTOTAL 45.210 Total Assigned Space 117,810 MechanicallCirculabon Space 52.390 TOTAL BUILDING AREA 170,200 4 ' TYPICAL SPACE PROFILE HIGH SCHOOL(9-12)f t 0043CM co ca of swd.ats ( 80001 10002 14001 low Spaolai Edurmtlon JSM) 0 1 2 2 Video Produ,", taus. 0 0 1 1 Oymnassum a$same 000 1000 1400 1600 WM#Wq 1-y.00" 0 0 1 1 Auditorium seats Use Gym 400 Sao 640 Sa. Ft SCL Ft 11 n 1 Se Ft 0 n p Se.Ft Classrooms: Academia English Q 750 3 3750 7 5250 11 8230 15 11250 Foreign 1sM a 750 2 1500 3 2250 4 3000 5 3750 Soc stud"®750 4 3000 a 4500 9 $750 12 9000 Moth 12 750 5 3750 a 4500 10 7300 13 9750 $CMWe: PhymW sm Q 1200 1 1200 1 1200 2 2400 3 3600 Bicica® 1200 2 2400 2 2400 3 3600 4 4400 Chomsury Q 1500 1 1500 1 1500 2 3000 3 4500 Physas Q 1200 1 1200 1 1200 t 1200 1 1200 OMw so Q 1200 0 0 0 0 1 1200 1 1200 Pmo room Q 250 2 500 2 .500 4 1000 a 1500 W30 cornputtr lab 0 0 0 0 1 No 1 830 sub-ftmd 18800 23:!00 38750 51400 Acts Eduestim Visud an 01400 1 1400 1 1400 2 2800 2 2800 Art awAdin 200 200 400 400 Innuumanai music 0 0 1 1800 1 2000 1 2200 E 0 150 300 300 Band urdorm 0 300 400 400 Instrument star 0 300 400 400 Sttfng nst star 0 150 130 100 Barxgchoral ONAM rm 0 250 250 230 B and UarA M 0 ISO 150 150 Vocai Mug= 0 0 1 1200 1 1200 1 1200 Vocal music ON 0 200 200 200 Oanw 0 0 1 1800 1 law 1 1800 Drama eiassroom 0 0 1 1800 1 t 800 1 1800 Bux9chorus 1 law 0 a 0 0 0 0 Inssttment stet 300 0 0 0 undarmigm soot 400 0 0 0 Ofttworwoonr 250 0 0 0 submit 2 4150 5 9700 a 11850 a 12050 ReamrumtEueptlonat Resource rooms Q 430 2 900 3 1350 5 2250 a 2700 $OWN 9ct.SIC 01200 0 0 1 1200 2 2400 2 2400 Inst kitchwbift- 0 200 400 400 In-Schoa sw m. 450 800 750 750 sub4cm 1350 3350 saw am Busineaa/011 Eduo TypeyKeyboon" 1 1200 1 1200 2 2400 2 2400 Comptuerlaopliaa>sorte 1 1200 1 1200 1 1200 2 2400 BusirtesaroAica su1. 1 1000 1 1000 1 1000 1 1000 Faac *oBlatar. 250 250 250 250 sub-total 1 3 3650 3 3aSO 4 4850 5 $050 P 11 5 Num;z or sturseem I 800 800 1 Zoo -roc ssoacae Sm Ft seoaee: Sm Ft rlsoaees Sm Ft. esoat:w Ft Admirtlsumdwi6At1sc6 Prin 250 230 250 25C Asst PtincM*QISO 1 150 2 300 3 450 4 000 R eceown 400 SOO SOO 500 secretary 1 ISO 2 300 2 300 2 300 Sims 200 200 200 200 Attendance 120 120 120 120 Hea n 200 200 200 - 200 Office work room 225 275 325 350 Cantemce 200 230 250 250 Records 125 175 225 250 aft*sm. 100 150 ISO ISO 80owmeo nq 120 120 120 120; Guidance Sacry.Anb wetter 800 800 1000 10001 Caldwaf 1 p 200 250 250 2501 Caun"m atom® 150 2 300 3 430 S 750 5 7501 vocauartai eounsaor ISO ISO 150 ISO Other student servtees 200 200 200 200�• Student oPrlces 500 700 800 1000 Stan Suopm Tesener oAfedw ms 800 900 1350 1350 Teacrter iounge(s) $00 900 900 900 Ftoamtpf m onicse 4 400 7 700 4 900 11 1100 sub-*AM 5790 7890 9390 9000 3brap Book*Um" 800 1000 1200 1300 General ammo a 900 1100 1300 1400 subwatd 1700 2100 2500 2700 TOTAL MM 100044 15458a 183000 Waft todew tuna. mom 25473 39230 57189 07710 (net to 9ta=1 GRAND TOTAL 105.4?) 145.350 211.755 250.710 S4Ft131udertt 170 182 178 157 Total tesoturtq stx*m 35 45 72 92 stud stssiN 17 school P18.1.10.0 N.C.O.P 1. MK3M SCti00t 9-121 cage t 6- (1 of 3) DRAFT MEMORANDUM OF AGREEMENT FOR PROVIDING COORDINATED SITE AND FACILITY PLANNING This agreement between the Orange County and/or Chapel Hill/ Carrboro Boards of Education and the governing Boards of Orange County and/or the Towns of Chapel Hill, Carrboro and/or Hillsborough is intended to establish and implement a coordinated site and facility planning process for schools and eet compatible government facilities. The purpose of the coordinated planning process is to optimize the collocation and use of schools and other public facilities in a way that builds community,provides public services where they are most needed, assures the compatibility of collocated services, and efficiently uses public resources. To further these goals,the Orange County and/or Chapel Hill/Carrboro Boards of Education and the governing Boards of Orange County and/or the Towns of Chapel Hill and/or Carrboro do hereby agree to the following separate and shared responsibilities for coordinated facility planning to the extent that it does not delay neeesrsafy time critical construction of either school or government facilities. These statements of responsibilities are intended to be consistent with all applicable laws and regulations;where they are not, they are superseded by those applicable laws and regulations. Specifically,this agreement is not intended to supersede the statutory authority of either Board of Education to select school sites or to build,maintain or repair school facilities or the other governing Boards to approve the amounts to be spent for sites and to determine the funds available for school and county or municipal facilities. The Orange County and/or Chapel Hill./Carrboro Boards of Education will: • Identify appropriate site criteria for public school facilities; and • Identify interior space and exterior site requirements for school facilities; and • Recommend school facility priorities,timetables for completion, and related funding needs; and • Determine the most appropriate means of managing the construction,renovation, or repair of public school facilities, within the funding available for these activities; and Assign to the superintendent the responsibility of providing the necessary staffing and other resources to participate in a joint facility planning process. • 7 (2 of 3) When joint development (or cooperative development) of facilities are planned for a school site, the Governing Boards of Orange County and/or the Towns of Chapel Hill, Carrboro and Hillsborough will, as appropriate and in their respective interests: • Identify appropriate site criteria for county and municipal government facilities and facilities in which contracted county or municipal services are provided; and • Identify interior space and exterior site requirements for county or municipal government facilities and facilities in which contracted county or municipal services are provided; and • Determine priorities,timetables for completion, and related funding requirements for county or municipal government facilities; and • Determine the most appropriate means of managing the construction, renovation, or repair of county or municipal government facilities; and • 'Determine the funding available for school and county or municipal government facilities; and • Assign to the County and/or Town Managers the responsibility of providing the necessary staffing and other resources to participate in a coordinated facility planning process. The Orange County and/or Chapel Hill/Carrboro Boards of Education and the governing Boards of Orange County and/or the Towns of Chapel Hill, Carrboro, and/or Hillsborough will jointly: • Identify opportunities for collocating compatible public facilities on eeFaffie sites, including facilities for schools, county government, municipal governments, state and federal government, other public authorities, and facilities for nonprofit organizations providing complementary public services; and • Develop master site plans on which public facilities will be collocated; and • Determine the most appropriate means of relating various public services on eee$sites, considering all program needs, and including opportunities for sharing spaces; and • Develop any interlocal agreements or understandings needed to allow participation of other units of government in the collocation of public facilities; and • Determine the most appropriate and effective means of coordinating the construction of shared facilities located on common sites; and (3 of 3) • Determine the most appropriate and effective means of coordinating maintenance of shared public facilities located on common sites; and • Determine the most appropriate and effective means of scheduling and establishing fees for usage of any shared public facilities on common sites; and • Determine the most appropriate and practical means of sharing operating costs for shared public facilities on common sites; and • Determine the most appropriate and practical means of providing public ownership of sites and site improvements where public facilities are collocated. This Memorandum of Agreement shall become effective upon approval by each governing board. It shall remain in effect until either party shall decide to terminate the agreement. ORANGE COUNTY CHAPEL HILL/CARRBORO BOARD OF EDUCATION BOARD OF EDUCATION ORANGE COUNTY TOWN OF CHAPEL HILL TOWN OF CA.RRBORO TOWN OF HILLSBOROUGH c:\msoffce\winword\kittrell\agmtboe2.doc 9 Draft Agenda Orange County Commissioners/Orange County Board of Education/Chapel Hill-Carrboro Board of Education September 30, 1997 7:30pm Homestead Community Center I. Substantial Equivalency of School Facilities II. Joint School/Parks Coordination III. High School Construction Standards IV. School System Reports on ABC Program Progress V. Brief Informational Reports a) Impact of Charter Schools b) Impact Fee Collections c) Meadowmont School Site d) Southern Village Elementary Design/Construction e) other topics as identified VI. Adjourn