HomeMy WebLinkAboutAgenda - 09-02-1997 - 9f i ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. ACTION AGENDA ITEM ABSTRACT Meeting Date: September 2, 1997 SUBJECT: Southern Human Services Center; Approve change order and provide funds for left turn lane DEPARTMENT: PURCHASING AND Public Hearing: No CENTRAL SERVICES Budget Amendment Reqd?Yes ATTACHMENT(S): INFORMATION CONTACT: PAM JONES, ext. 2650 Turn lane plan Chronology documents Telephone Number- Hillsborough 732-8181 Chapel Hill 967-9251 Mebane 227-2031 Durham 688-7331 PURPOSE: To consider approving a change order for the construction of a left turn lane at the Southern Human Services Center; and authorizing the appropriation of funds from the Capital Reserve Fund Balance to cover the associated cost. BACKGROUND: Bids for construction of the Southern Human Services Center (SHS) were solicited in April, 1996. As the Board may recall, bids significantly exceeded the budget and therefore steps were taken to remove certain elements from the project to bring it into line with available funds. One of the items removed during this process was the $120,000 left turn lane into the site. Since Homestead Road is on the Transportation Improvement Plan (TIP), it was anticipated that the Department of Transportation (DOT) might move this project up and accomplish the work in a timeframe which would make the use of local funds in the construction of the turn lane unnecessary. It has become apparent that the Homestead Road Improvements will likely maintain the original schedule, which calls for a 2001 start date. The DOT schedule will not allow us to meet the requirement to have a turn lane finished by the time we are ready to occupy the building. However, DOT has worked with the project engineer to modify the left turn lane in a manner that will make it less expensive. The left turn lane depicted on the attached diagram has been designed with the future Homestead Road improvements in mind and will be incorporated into the completed roadway. Further, the sidewalk, which is part of the work the Board is being asked to approve, is located in such a manner that it will not be disturbed when the final roadway improvements by DOT are completed. DOT has assisted in the design and approved the attached plan for the turn lane. Paving of the-access road into the site is scheduled to begin on August 25. Upon approval of this change order by the Board, the left turn lane can be constructed at the same time. The SHS project budget does not include funds for the construction of the turn lane. The Budget Office advises that there are funds available in the Capital Reserve Fund Balance to support this change order. It is recommended that the $83,248 be transferred from the Capital Reserve Fund Balance. RECOMMENDATION: The Manager recommends that the Board approve the change order for $83,248 to construct the left turn lane; and authorize appropriation of funds from the Capital Reserve Fund Balance. I � 40 to .� > t ♦ SU C ► ►�'to 'i tD G Z ST Q1 N� W 7• N D• i o• 0. 7 N i `c n O Prepared by: Beverly Kawalec, Chapel Hill Planning Department Return- Pam Jones Purchasing King St . Hillsborough: N, C, 27278 TOWN OF CHAPEL HILL xa Nawnc CM Ines VMF" �EQ CHAra.HLL NORTH c.><acawc mu 96aD-v0-e'�27 7-24­44 A86- TAOMM*I*s aim ORAM COMM NORTH CAFMV" SF=&_9ALJ1W= MOM ALL NE11 Ri ==MM M, that the uader"Wed property owner(s)I Orange County, having applied to the Town of Chapel Rill for a Special Use Remit for the use and development of the property hereinafter described, the same was granted by the Town of Chapel 8112 om July 5, 1996, the tome of which are as follows: MM Or PROJECT: orange county Southern Human Services Center KAM OF OsYiI M: orange County �pT�ar�zsa LOCATION: 2505 Homestead Road ?Ax NAP IZVZF RM : Chapel Hill Township Tax Nap 24, Lot 42 O11oss LAND AREh: 1,503,691 eq. ft. oM SPACt: 1,169,691 sq. !t. Num= OF Su===*. 2 L2YAiILM$PA=, 1,355,121 sq.ft. NUMM OP OW LLM UNX25: none RIMATION SPACl: N/A Man Anal: 35,700 sq. ft. WAMM Or#ARMING SPACM 186 • Saar*i�- ?� A1�,�0llTO LQIS Development according to the Site plan date! 2/9/96, revised 5/17/96 an file in the Chapel Hill Planning Dapantmsnt ansi according to the spacial terms and conditions not forth below: stians Apacille to the Davelonnnt 1. That Construction,begin by July S. 1996 (two years from the date of Council appgr 1) and be completed by July S. 1997 (three years from the date of Cowell approval). 2. �iaht_,_et 1a CAUM. TUt half of a 90 loot right-of-way be dedicated Chapel Hill 'M_ • +� property s Somestand Road frontage. requires 3. That Homestead Road be isps"ad along the subject Homestead Rd. ;i�bsoit a 51 toot cross-section with curb sod gutter, improvements 4, : That the entry drive be built to Tom public as requirement be innt�ecsection with an east-west to tno�TOwat�public is�treett staandards. of SUP for SHS. This can be accomplished by additional collaboration between tom and County staff as to design, location, and ispact an potential tutus County building sites an the seaters portion of the property. 5. : That tha applicant Sales provisions for a future roadway c:omnse on to the west (University of Nasth Carolina property). ?he proposal shall provide at least the sinlans required=Abar of parking spaces. This eau bs accomplished by drawing final plans in such a way that a future roadway to the west is not precluded. G. yi� That t!w► applicant Sake provisions for future u lam connect onss to the seat and South, providing that the Rodstesd Road sidewalk be designed along a M"Marinq path, such that the sidewalk is as tar away fros the Homestead Road roadway as is reasonably practicable. 7, ei "1 use,tree h. Kee That the sidewalk from Homestead Road pasalleling the driveway provide for pedestrian access free the vast side of the driveway. 8. KRAQt2donce E M2traws Drive: That a note be included on the final plans feat aq ffit Orange County will be responsible for maintenance of the entrance drive. S, MEMORANDUM TO: COUNTY COMMISSIONERS FROM: PAM JONES RE: SOUTHERN HUMAN SERVICES BIDS DATE: APRIL 2, 1996 CC: John Link Albert Kittrell During Monday evening's meeting 1 referenced the bids which were received for the Southern Human Services Building last Thursday and I wanted to follow up by providing you the results. The apparent low bids are: General contract: D.H. Griffin, Raleigh: Base bid $2,964,000+ 120,000 Alternate for sitework= $3,084,000 NOTE. The sitework in the alternate is the left turn lane that we would like to see moved up on the TIP. We bid it as a separate item so it would be easy to identify in the event DOT agreed to move Homestead Road up on the priority list. If DOT dogs not build i w must Electrical contract: County made an Watson Electric, Graham: $314,300 effort to get the Mechanical Contract: Homestead Rd.Improvements Comfort Engineers, Durham: $518,850 moved up on the TIP. DOT did not Plumbing Contract: grant that request. Eakins Plumbing Co, Durham: $110,000 These bids (including the left turn lane)total $4,027,150. The budget for this project(including the $900,000 added by BOCC at various times during the process) stands at$3,166,895. There is a deficit of$860,255. HakanlCorley is presently looking at options regarding what can be done to reduce the cost of the project. As their information becomes available I will keep you apprised. Board awards bid for SHS construction without the Left Turn Lane on June 3, 1996. ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda ACTION AGENDA ITEM ABSTRACT Item No. IX(D) Meeting Date: June 3, 1996 SUBJECT: BID AWARD; SOUTHERN HUMAN SERVICES CENTER CONSTRUCTION DEPARTMENT: PURCHASING AND Public Hearing: No CENTRAL SERVICES Budget Amendment Reqd?Yes ATTACHMENT(S): INFORMATION CONTACT: PAM JONES, ext.2650 Value Engineering list Telephone Number- Bid Tabulation Hillsborough 732-8181 Chapel Hill 967-9251 Mebane 227-2031 Durham 688-7331 PURPOSE: To consider awarding a bid for the construction of the Southern Human Services Center. BACKGROUND: Bids were received on April 30, 1996 for the construction of the Southern Human Services Center, with bidders responding in accordance with the attached bid tabulations (Attachment 1). The apparent law bidders for the project include: General Contractor. D.H. Griffin, Raleigh Electrical Contractor:Watson Electric, Graham Mechanical Contractor: Comfort Engineers, Durham Plumbing Contractor. Eakins Plumbing, Durham The bids exceed available funds, however, the architect and contractors, in collaboration with County staff and a subgroup of the project planning committee (the"Finish Committee'l, have provided a list of items which can be removed without functional degradation to the project. While the modifications indicated in Attachment It bring the project closer to the budgeted amount, approximately$189,000 of additional funds is required to fully fund the construction of the building. The Manager recommends that the additional funds necessary for the completion of this project be reallocated from prior years allocations in the Solid Waste Convenience Center Capital Project. The Architect will be present at the meeting to provide additional information regarding the modified project and to answer any questions which the Board may have. RECOMMENDATION: The Manager recommends that the Board award a bid and approve a contract,contingent upon Attorney, Staff and Finish Committee review, to the following contractors for the construction of the Southern Human Services Center: General Contractor. D.H. Griffin, Raleigh; $2,623,670 Electrical Contractor: Watson Electric, Graham; $311,810 Mechanical Contractor. Comfort Engineers, Durham; $453,170 Plumbing Contractor: Eakins Plumbing, Durham; $101,300 (Total contracts: $3,489,950) and authorize the Manager to execute change orders incidental to the completion of the project ; and authorize the Chair to sign on behalf of the Board. ` These items were removed from the project to bring it closer to available funds. ORANC E COUNTY SOUTHERN HUMAN SERVICES CENTER VALUE I rNGINEERING OPTIONS QESCRIPTfON` AMOUNT OF CREDIT General Construction: Eliminate screen walls and fencing at service court $72,800.00 Lower building and parking lot to reduce fill and use existing small $43,000.00 clearing as onsite borrow area Change roof system to ballasted single ply $14,490.00 Modify entrance way $11,900.00 Delete curb and gutter at parking area $16,700.00 Reduce landscape by 20% $13,440.00 Hardware allowance duplicated in bid $15,000.00 Revise foundation drainage system $9,000.00 Delete onsite trailer for architect $3,350.00 Change to less expensive carpet backing(durability factor and $6,200.00 weight of carpet remain the same) Revise canopy at south face of building $4,8W00 Revise reception desk in lobby $2,500.00 Delete moveable sween"Is in waiting area $2,100.00 Revise operable partition finishes $1,850.00 Left turn Floor plan revisions. Deletes one small meeting room and $43,200.00 lane modifies the configuration of the others,thereby allowing two long removed. corridors to be deleted. Net square footage reduction approximately, 1,600 s.f. Defer purchase of furniture and signage $74,500.00 Defer construction of Homestead Road improvements $120,000.00 Delete screen walls and pads at chiller $5,500.00 Sub total general contract revisions: $460,330.00 Mechanlcal and Plumbing Systems. 9 Modifications to HVAC system; includes such items as elimination $62,000.00 of chiller and installing direct expansion rooftop units; install a single cast iron boiler in lieu of multiple packages; change controls. (Note: The estimated increase in annual energy costs associated with this change is$3,885, which represents a 20-year payback. This is four times as long as the Department of Energy standard.) Reduction as a result of floor plan revision $3,680.00 Change brand of plumbing fixtures $2,300.00 Change to PVC plumbing waste and vent,from cast iron $6,400.00 Sub total HVACIPlumbing contract revisions: $74,380.00 Electrical contract: Reduction as a result of floor plan revision $2,490.00 Sub total Electrical contract revisions: $2,450.00 Total contract revisions: $537,200.00 Estimated sales tax amount which Is reimbursed to the County by $71,500.00 the State(This amount is included in the bid amounts and will be included in the contract amounts, but will be shown as an offset expense item in the project account.The net effect of taxes paid is $0 since they are completely reimbursable by the State.) Total amount of credits against original bid amounts j $09,700.00 • When we applied to DOT for the SHS driveway permit, DOT advised us that �• the left turn lane was needed and STATE OF NmT H CAR(JUNA must be built prior DEPARTMENT Of T A tct�i'�NSPORUMON to the building 1 being occupied. Ja DIVISION Of HIGI W"s Goa 6.GARR r la P. o. Box 766 SMARMnr Graham, North Carolina 2 10 February 19 7 e� (,��� �tE��T ZACK, INsG. f ORAWN C Michael Hasp rsley FEB 1 2 19�� Corley Redfo Zack pp r P.O. Box 2368 R E C E , V ED Chapel Hill, C 27515-2368 919 942-8586 Subject: Reque ed Revision for Driveway Permit Orange County Southern Hunan Services Center locate off alt 1777 (Homestead Road) Dear Mr. Hammers eY: This letter is in response to your request to phase the roadway improvements alon SR 3777. As stated in your letter. SR 1777 will be improved by the State under TIP Project U-2805 and for this reason we agree with the wn of Chapel itt allowing you to phase the widening of your ex'sting roadway frontage to the Town's required half of a 51 foot c as-section with curb and gutter, sidewalk and bike lanes. However, to nlaae along the nee As you know, the Town's approval of your construction plans is conditional upon you receiving an encroachment and driveway permit from this office. I am sorry if you misinterpreted the Town's approval and awarding the contract without receiving all your permits. However, this oversight will not change the ninimum requirements for you to provide a turnlane along SR 1777 in conjunction with your site. Tf you have any questions or require additional information, please contact Michael Venable, Assistant district Engineer, at (910) 570-6833. sincerely, Tommy J. rer DISTRICT ENGINZER cc: J. W. Watkins, P.E., Division 8ngineer Town of Chapel Hill I)PR70210-MVI TOTAL P.02