Loading...
HomeMy WebLinkAboutAgenda - 08-25-1997 - E1c ORANGE COUNTY BOARD OF COMMISSIONERS � G ACTION AGENDA ITEM ABSTRACT Meeting Date: August 20, 1997 Action Agenda Item SUBJECT: NC DOT's Public Involvement Process for Improvements to Homestead Road DEPARTMENT: Planning& Inspections PUBLIC HEARING: Yes_X—No BUDGET AMENDMENT REQUIRED: Yes_X—No ATTACHMENT(S): INFORMATION CONTACT: Slade McCalip NC DOT Handout for the Citizens Informational Extension 2595 Workshop held on June 25, 1997 NC DOT's Public Officials Meeting Minutes TELEPHONE NUMBERS: NC DOT's Citizens Informational Workshop Minutes Hillsborough - 732-8181 Durham - 688-7331 Mebane - 227-2031 Chapel Hill - 967-9251 PURPOSE: To consider information that may change the design and construction schedule of planned improvements to Homestead Road. BACKGROUND: On June 25, 1997 NC DOT held an informational meeting at the Chapel Hill Town Council Chambers for elected officials on planned improvements to Homestead Road. In attendance were the following officials and staff members: Elected Officials: Rosemary Waldorf,Mayor, Town of Chapel Hill Pat Evans, Council Member, Town of Chapel Hill Dr. Alice Gordon, Commissioner, Orange County NC DOT Staff: Missy Dickens, Planning and Environmental Branch Neil Dean, Planning and Environmental Branch Julie Hunkins, Planning and Environmental Branch Yvonne Goldblatt, Planning and Environmental Branch 2 , John W. Watkins, Division Engineer Mike Cowan, Division Construction Engineer H.T. Moon, Right of Way Engineer NC Board of Transportation Members: Doug Galyon, Division 7 Member Chapel Hill Staff: Richard Ternell Charles Quinlan, Police Department Orange County Staff: Slade McCalip, Planning Department At the meeting, NC DOT staff proposed four different cross-section designs for Homestead Road. These included: 1) a five lane curb and gutter road that would include wide (14') travel lanes (to accommodate bicycles)with sidewalks on both sides of the road, 2) a three lane paved shoulder(4' wide to accommodate bicycles)road that would not include sidewalks (this is what is currently programmed in the STIP for construction beginning in 2001), 3) a hybrid of both road design types whereby one half of a three lane road would have 14' wide lanes (for bicycles) with a sidewalk on the same side with a 4' paved shoulder on the opposite lane (for bicycles) with no sidewalk (the intent of this design type is to provide a sidewalk on one side of the road and also to prepare for the eventual need to widen the road to five lanes with the widening occurring only on the side of the road which has the paved shoulder), and 4) that only a portion of the road be widened to five lanes with the remainder widened to three lanes (with Seawell School Road as the likely transition area from five to three lanes). As the meeting progressed, it became apparent that there were three main issues of concern to local officials. These included: 1) the adequacy of the proposed capacity improvements for moving vehicles (i.e., are five lanes needed now instead of three), 2)whether or not sidewalks would be provided, and 3) whether or not bicycle facilities would be included in the proposed improvements. 3 . It should also be noted that the citizens informational meeting was held immediately after that of the elected officials. Most citizens preferred that sidewalks be built as a part of the improvements to Homestead Road. However, NC DOT requires that local governments partially fund approximately 30% of new sidewalk construction. Because this road is physically located outside the city limits of the Towns of Chapel Hill and Carrboro and because NC DOT does not maintain sidewalks, a local government would have to agree to accept and maintain the newly constructed sidewalks. The proposed improvements programmed in the 1998-2004 State Transportation Improvement Program include widening the road to a three lane facility with four foot paved shoulders to accommodate bicycles. If additional lanes, curb and gutter, etc. are requested, then construction will be delayed until additional funding for such improvements can be secured. RECOMMENDATION: The Administration recommends that the Board consider coordinating their comments to NC DOT on the proposed design of Homestead Road with the Towns of Chapel Hill and Carrboro. Since Homestead Road is located in the transition area for each town it will eventually be located within their respective municipal boundaries. Additionally, a town-county agreement will be necessary to implement sidewalks with this project until this area is annexed by the towns. 4 . r North Carolina Department of Transportation Planning and Environmental Branch d� JAQ R � � 2 fi 0 OF TRAM HOMESTEAD ROAD (SR 1777) FROM HIGH SCHOOL ROAD (SR 1834) TO NC 86 CHAPEL HILL ORANGE COUNTY TIP PROJECT U-2805 JUNE 25, 1997 CITIZENS INFORMATIONAL WORKSHOP 5 i CITIZENS INFORMATIONAL WORKSHOP HOMESTEAD ROAD(SR 1777) FROM HIGH SCHOOL ROAD(SR 1834)To NC 86 CHAPEL HILL, ORANGE COUNTY STATE PROJECT No. 8.2501101 TIP No. U-2805 PURPOSE OF THE CITIZENS INFORMATIONAL WORKSHOP The purpose of the Citizens Informational Workshop is to involve the public in the project planning process. If you have comments or suggestions about the proposed improvements described in this handout, please inform a representative of the North Carolina Department of Transportation (NCDOT). We have provided a comment sheet upon which you may write your questions or concerns. We will keep a record of your comments, both oral and written, and we will fully consider your ideas,comments, and suggestions. The NCDOT realizes individuals living close to a proposed project want to be informed of the possible effects of the project on their homes and businesses. However, exact information is not available at this stage of the planning process. Additional design work is necessary before the actual right of way limits can be established. More detailed information will be available at a later date. The purpose of this workshop is to gather your input before final design decisions are made. Written comments on this project may be left with NCDOT representatives at the Citizens Informational Workshop or submitted through the mail. If additional information is needed or you would like to submit comments after the Workshop, please address your requests and comments to: Mr. H. Franklin Vick,P. E., Manager Planning and Environmental Branch Division of Highways North Carolina Department of Transportation Post Office Box 25201 Raleigh,North Carolina 27611 A summary regarding NCDOT's public involvement and project planning process is attached for your information. DESCRIPTION AND PURPOSE OF THE PROJECT The North Carolina Department of Transportation's 1997-2003 Transportation Improvement Program (TIP) proposes to improve existing Homestead Road (SR 1777) by widening the existing roadway from High School Road (SR 1834) to NC 86. The proposed widening will provide needed safety improvements and capacity benefits for automotive traffic. 6 . u i � r : ISS oSg�l ORA E r 1 aft bony UMYSS.fY 7 LOAr JaL t W.~ 6 � 1 ii PROJECT LIMIT UP 1� tnt k Ml _>7 Im ' t .sa —� PROJECT I 1 LIMIT w:s N �iu E?:• :i:r km a"wwwws A"o.n � Lai NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DMSION OF HIGHWAYS PLANNING AND ENVIRONMENTAL BRANCH SR 1777(HOMESTEAD ROAD) SR 1824(HIGH SCHOOL ROAD)TO NC N CHAPEL HILL ORANGE COUNTY T.L P. PROJECT NO.U- 2805 0 Mae 1/2 FIG. 1 7 . Data collected from July 1, 1992 through June 30, 1995 shows that the accident rate along this portion of Homestead Road is approximately 2.5 times the statewide average on similar routes. Currently, traffic volumes on Homestead Road range from 4,800 vehicles per day (just west of Rogers Road [SR 1729]), to 9,800 vehicles per day (just west of NC 86). In the year 2020, anticipated traffic volumes range from 9,800 vehicles per day (just west of Rogers Road [SR 1729]), to 17,000 vehicles per day(just west of NC 86). The proposed improvements include widening the existing cross-section to a three-lane shoulder section. Paved shoulders that can be used by cyclists will also be provided. The widening is expected to require 30 meters (100 feet) of right of way plus easements. NCDOT is studying both symmetrical and asymmetrical widening alternatives. PROJECT SCHEDULE AND CO T The schedule for right of way acquisition and construction of this project, as well as preliminary cost estimates, are summarized below: PROJECT SCHEDULE AND ESTIMATED COST PROJECT STAGE PROGRAM SCHEDULE CURRENT COST RIGHT OF WAY ACQUISITION FY 2000 $ 1,900,000 CONSTRUCTION FY 2001 $ 1,600,000 TOTAL PROJECT COST $ 3,500,000 CURRENT STATUS Currently, planning and environmental studies for the proposed improvements to Homestead Road (SR 1777) are in progress. Planning studies and conclusions regarding this project will be summarized in an Environmental Assessment, which will address the impacts that the proposed highway project may have on the natural and human environment. The Environmental Assessment is scheduled to be completed in March, 1998. It is anticipated that a public hearing for the project will be held in the spring of 1998. 8 . PUBLIC INVOLVEMENT AND THE PROJECT PLANNING PROCESS PROJECT PLANNING Planning and environmental studies for highway projects are conducted in order to comply with either the National Environmental Policy Act (NEPA) or the North Carolina Environmental Policy Act. The type of document published following the planning study depends on the magnitude of the project and its expected environmental impact. These documents may be one of the following types: EIS Environmental Impact Statement EA Environmental Assessment CE Categorical Exclusion These documents discuss the purpose and need for the proposed improvements, evaluate alternatives, and analyze the project's impact on both the human and natural environment. Areas of concern which these documents address include: -Efficiency and safety of travel -Neighborhoods and communities -Relocation of homes and businesses -Economy of project area -Historic properties and sites -Wetlands -Endangered species -Wildlife and plant communities -Water quality -Floodplains -Farmland and land use plans of project area - Hazardous materials involvement -Traffic noise and air quality PUBLIC INVOLVEMENT IN PROJECT PLANNING As stated above, project planning and environmental studies are conducted in order to comply with NEPA. NEPA requires that"agencies make diligent efforts to involve the public in preparing and implementing their NEPA procedures." Public involvement is an integral part of NCDOT's project planning process. The concerns of citizens and interest groups are always considered during project planning studies. Often, additional project alternatives are studied, or recommended alternatives are changed, based on comments received from the public. 9 . OPPORTUNITIES FOR PUBLIC INVO V KENT NCDOT provides a number of opportunities for citizen and interest group participation during project planning. Some of these opportunities are listed below: SCOPING LETTER Published in N.C. Environmental Bulletin. This letter notifies agencies and groups on the State Clearinghouse mailing list that a project study has been initiated and solicits comments from them. CITIZENS Informal meeting with the public. NCDOT staff conduct these INFORMATIONAL workshops to speak one-on-one with citizens about projects. WORKSHOP Comment sheets are provided for citizens to write down their questions, comments, and concerns. The number of workshops scheduled for a project depends on the scope and anticipated impact of the project. NEWSLETTER On some projects, newsletters are sent to area residents and interest groups. Newsletters describe the project, discuss the project's status,and outline the alternatives being studied. DOCUMENT Copies of environmental documents are submitted to the State DISTRIBUTION Clearinghouse for distribution and a notice is published in the N.C. Environmental Bulletin. Upon request, NCDOT will provide copies of the document to the public. Copies are available for public viewing at NCDOT Raleigh and Division offices; the State Clearinghouse office; local government offices, including the local council of government office; and local public libraries. SMALL GROUP Presentations are given at the request of neighborhood associations MEETING or other interest groups. PUBLIC HEARING One or more formal public hearings for the public record are held. Format typically involves a short presentation followed by an opportunity for citizens to comment. CITIZEN LETTER Citizens are encouraged to write NCDOT and provide information and express concerns regarding proposed improvements. Correspondence from citizens and interest groups is considered during the course of the planning study and is included in the project file. 10 . Engineer: Dickens COMMENT SHEET PROPOSED IMPROVEMENTS TO HOMESTEAD ROAD (SR 1777) CHAPEL HILL, ORANGE COUNTY TIP NO. U-2805 June 25, 1997 NAME: STREET ADDRESS: MAILING ADDRESS (if different from above): COMMENTS, CONCERNS,AND/OR QUESTIONS REGARDING TIP PROJECT U-2805: Additional comments can be sent to Mr. H. Franklin Vick, P.E., Manager, Planning and Environmental Branch, North Carolina Department of Transportation, P.O. Box 25201, Raleigh, North Carolina, 27611. NLL. U I,r cxt t7KK,0-rn r d.c.71 J—r , —y r"` HU9 4 y I t .U[ 11 . July 8, 1997 MEMORANDUM TO: File FROM: Missy Dickens,PE,Project Planning Engineer Planning and Environmental Branch SUBJECT: Public Officials Meeting Minutes for Homestead Road (SR 1777 ,From High School Road(SR 1834)to NC 86, Chapel Hill,Orange County,Federal Aid Project STP-1777(1),State Project 8.2501101,TIP Project LL2806 A Public Officials Meeting for the subject project was held on June 25, 1997 at , 2:30 p.m. in the Council Chambers of Chapel Hill Town Hall. This meeting preceded the Citizens Informational Workshop which was held at the same location from 4:00 tQ 7:00_ p.m. Planning and Environmental Branch representatives were; Julie Hunkins,PE Missy Dickens,PE Yvonne Goldblatt Neil Dean The following officials attended: Rosemary Waldorf Town of Chapel Hill Richard E.Ternell Town of Chapel Hill Charles Quinlan Chapel Hill Police Department Pat Evans Chapel Hill Town Council Slade McCalip Orange County Planning Department Alice Gordon Orange County Board of Commissioners Doug Galyon NC Board of Transportation Mike Cowan NCDOT Division 7 Construction H.T.Moon NCDOT Division 7 Right of Way J. W.Watkins NCDOT Division 7 I opened the meeting by describing the project;infomnal discussion follow"Id regarding alternatives and concerns. Following are points dw were discussed. ; A three-lane shoulder section is what is currently funded in the Transportation improvement Program(TIP),although volumes may warrant a five-lane section. o With a five-laude curb and gutter section,sidewalks could be constructed in ; accordance with the NCDOT Pedestrian Policy. • Doug Galyon stated that if the local governments support the construction of a five-lane curb and gutter facility under this project,he can lobby for funds. NCDOT%P&E BRANCH Fax:919-733-9794 Aug 4 '97 9:22 P.03 12 . • The following options were discussed regarding widening scenarios: 1)widening to five-lane curb and gutter facility;2)address five-lane curb and gutter widening in the EA and phase-construct it;3)construct a three-1 ate_ facility with curb and gutter and sidewalk on one side off-center of the I foot right of way;4)widen to a five-lane curb and gutter for the eastern: section and taper to a three-lane shoulder section for the western section; (Seawell School Road would be a likely transition point). • Any delays caused in the project schedule by changing the project scope would likely come from fu xUft concerns;planning and design schedules would not be affected by a change in scope at this point in the process. • Bicycle facilities that would likely be provided with a three-lane shoulder section are four-foot paved shoulders,while those that would be likely bye provided with a five-lane curb and gutter facility are 14-foot outside lanes. • Alice Gordon expressed concern over safety at the Airport Road(NC 86) intersection,especially regarding the crest vertical hill just west of that location. I stated that improving this vertical alignment is part of the scope of this project. • The Chapel Hill High School P'I'SA has communicated a desire to see aI pedestrian signal,or at kart a sign with a flasher,at the High School Road intersection. • Much research has been done regarding the safety of two-way left turn lanes. They are found to be significantly safer than no turn-lanes and in many cases to be of comparable safety with medimn-divided facilities with intermittently permitted left t»ins. • It was asked if ctaient traffic prolecdms mcludid a new landfill access on the west end. • Slade McCalip asked about access management,and the point was made]that: unless NCDOT were to buy cwMal of access,access management has 0 be monitored and controlled at the local level by zoning laws and land use plans. • Bus turnouts can be provided if Chapel Hill is willing to pay the ardditioral cost. • Land owned by LtNC-CH,which is to be developed in the future,is accessed from Homestead Road(other than access,the property has no frontage on Homestead Road). • The part of the project that lies outside the Chapel Hill town limits is uWde the joint planning jurisdiction of Chapel-Hill and Carrboro. cc: John Watkins,PE Kathy Lassiter,PE Glenda Gibson,PE Julie Hunkins,PE INCDOT/P&E BRANCH Fax:919-733-9794 Aug 4 '97 9:23 P.04 13 . July 7, 1997 MEMORANDUM TO: File FROM: Missy Dickens,PE,Project Planning Engineer Planning and Environmental Branch SUBJECT: Citizens Informational Workshop Minutes for Homesteadl Road(SR 1777),From High School Road(SR 1934)i to NC 86,Chapel Hill,Orange County,Federal Aid Project i STP-1777(1),State Project 8.2501101,TIP Project Lf 2805 A Citizens Infonnational Workshop for the subject project was held on June 25. 1997 from 4:00 to 7:00 p.m.in the Council Chambers of the Chapel Hill Town Half. Approximately 35 citizens attended NCDOT staff in attendance included: Julie i Hunkins,Missy Dickens,Neil Dean,and Yvonne GoldM&of Planning and I Environmental;Henry Moon of Division 7 Right of Way Office;Mike Cowan of the Division 7 Office;and Todd Dudley of the Citizens Participation Unit. The handout stated that proposed improvements included widening to a three-large shoulder section with four-foot paved shoulders to be used by bicycles. The aerial photograph mosaic which was displayed showed northside,symmetrical,and"de 1 construction limits,each 36 meters(120 feet)wide(including 30 meters[100 feet)of right of way plus up to 3 meters 110 feet]of casement on each side. In verbal discu�sions: with citizens,NCDOT staff mentioned that five-lane wideeniag now was a viable alternative. Recurring issues included the desire for sidewalks and bicycle facilities. Some People expressed the opinion that the widening was not needed,while others seemed to support a five-lane widening when they realized that would enable the construction�f sidewalks and would require the same amount of additional right of way. Furdmm�ce, many people expressed desire concerning impacts to their particular property or subdivision Comment sheets in the project file provide more specific information regarding these comments. CC. Kathy Lassiter,PE Glenda Gibson,PE Julie Hankins,PE Missy Dickens,PE