Loading...
HomeMy WebLinkAboutAgenda - 06-30-1997 - 8ii i ORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. -t ACTION AGENDA ITEM ABSTRACT Meeting Date: June 30, 1997 SUBJECT: Bid Award: Efland Estates DEPARTMENT: Housing and Community Development PUBLIC HEARING: (Y/N) > >' BUDGET AMENDMENT: (Y/N) ATTACHMENT(S): INFORMATION CONTACT: Bid Tabulation Tara L. Fikes TELEPHONE NUMBERS: -- eat. 2490 Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 227-2031 PURPOSE: To consider awarding a bid and approving contracts for the Efland Estates Community Development Block Grant (CDBG)Program. BACKGROUND: In August 1996, the County was granted $145,750 in CDBG funds to provide the public water and sewer and street paving for a small, nine(9) single family subdivision being developed by Habitat for Humanity of Orange County, NC, Inc. in the Efland community. Bids were received for the required site improvements on June 12, 1997. A copy of the Engineer's certified bid tabulation is attached. The consulting engineering firm for this project recommends awarding the contract to the lowest responsible bidder, Carl Norris Construction Company. This company's bid price is $127,377.00. However, this amount exceeds the available funds for the project. The total grant amount is $145,750 less consulting engineer costs of$28,960 leaves $116,790 available for this project. The engineer for this project, Coulter, Hart, Jewell, and Thames, PA., in consultation with the County Engineer Paul Thames have identified the following project modifications to reduce project costs: Delete Items 7, 8, 14A, 14B, 14C , 16 and reduce the quantity of Item 10 to 75 tons. (These items are delineated on the Bid Tabulation Sheet attached to this abstract.) This will provide a cost savings of $13,900. Thus, the final contract price is $113,377 which is within the allocated budget for this project. RECOMMENDATION(S): The Manager recommends: 1)awarding the bid to for the Efland Estates CDBG Program to Carl Norris Construction Company of Burlington, NC; 2)Approve construction contracts, contingent upon staff and attorney review; and 3) Authorize the Chair to sign the contract on behalf of the Board. (-.�VVtA E ORANGE COUNTY, NORTH CAROLINA ,.1C71 y 1 WATER, SANITARY SEWER AND PAVING IMPROVEMENT" TO CAIN DRIVE IN EFLAND ESTATES, EFLANO, N.C. d ; JEWELL = 95 y BID TABULATION FOR CONTRACT 97-1 THAMES BIDS DUE: JUNE 12, 1997 - 2:00 P.M. .� P.A. PLANNMG ENGINEERING IA"SCAPE ARCMMCTURE III Teat Haft Kraat £ Durham, North Carellm 87701 919 MS 0306 FAX 919 886 6848 PLACE OF BID OPENING: ORANGE COUNTY DEPARTM ENT OF HOUSING AND COMM. DEV. n o p o n Y 300 W. TRYON STREET W�'11 HILLSBOROUGH, N.C. 27278 � a i I us ITEM DESCRIPTION x 51 €3 up3 � 3 1 M ALL NECESSARY LUMP SLIM 81000.00 3,000.00 1,250.00 2 OSTAINING ALL P LUMP SUM 2.600.00 5.500.00 2.343.75 3 ATTQND94G ALL REQUIRED MIEE7INX.S. LUMP SLIM 2.000.00 800.00 2.500.00 4 CLEARING. GRUBBING AND REMOVAL LUMP SUM 11.800.00 8.200.00 21.400.00 nr REMOVAL AND DEMOLITION OF EXISTING 3.123.00 5 STORM DRAINAGE CULVERTS AND EXISTING LUMP SUM 5.800.00 31800.00 ALONG CAIN DRIVE - 6 CLASSIFIED EXCAVATION 910 C.Y. 14.00 11.70 0.01 7 ROCK EXCAVATION 40 C.Y. 45.00 45.00 02.50 8 TRENCH ROCK EXCAVATION 25 CY. 80.00 83.00 62.50 9 M R . W 100 TONS 20.00 16.00 �� 10 INSTALLING CLASS '8' RIP-RAP 150 TONS 40.00 35.00 38.75 1 1 A NCU101►I6 STONE BEDOING 350 L.F. 35.00 21.00 32.04 INSTALLING i l B MANHOLES 0-8 IN DEPTH 3 EACH 1,360.00 11150.00 1191.65 11 C 8 FEET MAN S LF. 150.00 170.00 104.18 CONNECTING PROPOSED 8 SANITARY 1 1 D SEWER TO EXLSTO r M r#MLE ON SOUTH LUMP SUM 1.X)00.00 1.200.00 1.375.00 SHOE OF GREITG STREET 11 E �'��2� aO FORCE LUMP SUM 19.000.00 8.575.00 7.090.85 RLPLAGINU ASPWLT SECTION OF GREGO ST. FOR 11 F INSULLATION OF 8' PVC�MNTTARY 40 S.Y. 88.00 55.00 Q Q Q 52.08 SEWER W 2' 1-2 AND 8 TYPE N - 11 G INSTALLING 4-AFW 3EKVICE LUMP SUM 1.000,00 1.200.00 M M M 1.985.18 MO 29 11 H VACANT LOT AT INTERSECTION OF LUMP SUM 500.00 600.00 1.006.00 CNN DR. AND GREGG ST. N - 12 A WATERLINE TO EXIST. 2'VALVE AT LUANP SUM 480.00 800.00 1.250.00 STATION 0+00 12 B WATERLINE 720 L.F. 14.00 12.00 19.99 12 C � S tO EACH 65.00 250.00 33.13 12 D INSTALLING T-1 Z : 2-1 2 DUCTILE t EACH 80.00 3X6.00 43.75 IRON TEE 12 E A STALLISTATIONS 81/2 7+14-22 2 EACH `50.00 x•00 31.25 12 F INSTALLING T1 PVC WATERLINE SERVICE 9 EACH 1 500.00 500.00 539.74 DISCONNE WATLR SERVICE TO HWX 12 G AT 404 CNN DR. FROM EXIST. 2' LUMP SUM 100.00 800.00 1.250.00 WATERLINE AND CONN. TO PROPOSED 2-1/2*WATERLINE 12 H INSTALLING t- ASSEMW7-- LUMP SUM 430.00 500,00 563.27 13 A INSTALLING 15• REINFORCED CONCRETE 200 LF. 23.90 21.00 23.07 13 B INSTALLING 15' REINFORCED CONCRETE 3 EACH 200.00 500.00 525.38 13 C PAV,NG CAN ORNE, INCLUDIM. ERASE LUMP SUM 20.800.00 22.700.00 25.906.25 r�u ma 14 A CLASS 'A' CONCRETE - MISC. MASONIK 1.000.00 250.00 258.25 14 B CLASS 'B' cONCREIE - MISC. MA90NRY 420.00 250.00 250.00 14 C CU55 'C' CONCRETE - M ISC. MASONRY 180.00 250.00 .243.75 15 INSTALLING SILT FENCE F, 5.00 4.00 3.75 16 OUR 4 FEET WIDE 1800 L.F. 2.00 3.50 1.88 17 SEEDING AND MULCHING LUMP SUM 2.000.00 3.800.00 3.750.00 18 SITE CLEANUP AND OEM080.1ZATIOH LUMP sum 2.000.00 1,200.00 3.125.00 TOTAL ESTIMATED COST - CONTRACT 97-1 151,650.00 127.377.00 138.727.98 ORDER OF BID 3 1 2 TIME OF COMPLETION 120 DAYS 120 OAYS 120 DAYS 120 DAYS 120 DAYS 120 DAYS 5% BID BOND YES YES YES