HomeMy WebLinkAbout2013-220 Amendment to Hobbs, Upchurch & Associates Contract: Buckhorn-Mebane EDD Water and Sewer Extension Project – Phase 2 s� NORTH CAROLINA CONTRACT AMENDMENT#3 ORANGE COUNTY ' 2 THIS CONTRACT AMENDMENT is made and entered into this_�day of 201 by and between ORANGE COUNTY (hereinafter referred to as "County") and HOBBS, UPC CH, & ASSOCIATES, P.A. (hereinafter referred to as the"Provider"). WITNESSETH: THAT WHEREAS, the County and Provider entered into a contract dated November 4, 2010, for the Buckhorn-Mebane EDD Water and Sewer Extension Project-Phase II, (hereinafter the"Original Agreement"); and WHEREAS,the Original Agreement has been previously amended by CONTRACT AMENDMENT#I and CONTRACT AMENDMENT#2; and WHEREAS, the County and Provider desire to further amend the Original Agreement while keeping in effect all terms and conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. NOW THEREFORE, for and in consideration for the mutual covenants and agreements made herein, the parties agree to amend the Original Agreement as follows: 1. The Term of the Original Agreement is hereby extended through June 30,2014. 2. Section 1(a)is modified to add a new sub-section"vii"as follows: vii) Provider has submitted a proposal to provide additional services on this project related to construction- phase engineering management, contract administration and inspection. Provider's letter of proposal, dated March 12, 2013 with the subject line "Construction Management and Inspection Services Proposal", is attached and is incorporated into this Amendment. The additional costs associated with these services are as follows: Section Administration Inspection Total Water Improvement(Lines W-1, W-2) $22,900 $27,000 $49,900 Sewer Segment No. 1 (Lines S-1 and S-2) $22,900 $27,000 $49,900 Sewer Segment No. 2 (Line S-3) $28,400 $32,300 $59,700 Total: $159,500 3. Section 3(a)(ii)is modified to add to the original task list as follows: Task 12. Monitor Construction activity Continual Task 13. Verify contractor pay requests Monthly Task 14. Provide engineering design and guidance As Needed - Task 15. Project Closeout, as-builts, certification At conclusion of project 4. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent it is not inconsistent with this Amendment. In the event that there is a conflict between the Original Agreement and this Amendment,this Amendment shall control. [SIGNATURE PAGE FOLLOWS] IN TESTIMONY WHEREOF,this Contract Amendment has been executed by the parties hereto, as of the date first above written. O GE COUNTY Provider: Ba y Jacornity�' ' Fred M. bs, P. . Orange oar of Co issioners Presiden Attest: Donn aker,Cl k to the Board Approved as to technical content Zraig Be ict,Department Director This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal Control Act. U a4'�_w 1J' , Office of the Finance Director Approved as to form and legal sufficiency: Offi of th ounty Attorney 1111 Hobbs Upchurch Associates engineer ng I pi nning surveying March 12,2013 Mr. Craig Benedict Orange County Planning& InspectionsJOPT Director 131 W. Margaret Lane Hillsborough, NC 27278 RE: Buckhorn-Mebane EDD Water and Sewer Extension Project—Phase II SUBJECT: Construction Management and Inspections Services Proposal Dear Mr. Benedict: This letter provides a revised proposal for construction administration and inspection services for the above referenced project. This letter revises the proposed fee estimates outlined in our August 3, 2012 correspondence to your office for these same services. The revised numbers reflect the reduction in scope of the work and a reduction in the amount of daily inspection to be provided. The specific breakdown for each section of work is as follows: Section Administration Inspection Total Water Improvements (Lines W-1, W-2) $22,900 $27,000 $49,900 Sewer Segment No. 1 (Lines S-1 and S-2) $22,900 $27,000 $49,900 Sewer Segment No. 2 (Line S-3) $28,400 $31,300 $59,700 Total _ $159,500 We look forward to the opportunity to continue working with the County on this important project. Please do not hesitate to contact us if you have any questions. Sincerely, HOBBS, UPCHURCH&ASSOCIATES,P.A. Robert Bernard,PE t:910.692.6616 i F:010.692.7342 j 300 SW BROAD STREET J SOUTHERN PINES,NC 28387 WWW.HOBBSUPCHURCH.COM SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN Hobbs Upchurch Associates engineering I planning surveying August 3, 2012 Mr. Craig Benedict Orange County Planning& Inspection 131 W. Margaret Lane Hillsborough,NC 27278 RE: Buckhorn-Mebane EDD Water&Sewer Improvements Project Construction Management/Inspection/Bid Management Services Dear Mr. Benedict: Per your request, please find attached detailed cost estimate and layout maps for the planned water and sewer improvements to serve Buckhorn-Mebane EDD. We also offer Resident Project Inspection and Construction Management Services in accordance with the attached scope for the noted amounts as summarized below: Water Improvements(Lines W-1, W-2 and W-3) $82,000.00 Sewer Segment#I (Lines S-I and S-2) $82,000.00 Sewer Segment#2 (Line S-3) $87,000.00 Sewer Segment#3 (Pump Station/Force Main) $52,000.00 As previously discussed we recognize that the project may move forward in its entirely, or in segments. As such, if the project should be constructed in its entirely concurrently, the above totals may be discounted to a total of $268,000.00 to account for savings associated with required manpower and total length of oversight. Likewise, there may be negotiated savings with other chosen combinations, however the actual improvements to be completed may not be known until after the bid opening. Also, note that this assumes we will provide daily inspection and oversight. Deviations from this concept will also impact costs. HUA offers to coordinate all technical services related to preparing construction documents, advertising the project, managing the bid process, issuing addenda, conducting the bid opening, reviewing all bids for completeness and accuracy, and making a recommendation of award to the County for the following amount: Bid Management Services $16,000.00 If you should have any questions regarding this information, or if you should require additional detail, please do not hesitate to contact this office. As always, I sincerely appreciate the opportunity to assist Orange County and look forward to the implementation of this project. \\\\%IIIIllffo' Sincerely, \N\��.�\► CAROB, BS, UP H &ASS'Q 5184. a SEAL 9r•; • 17651 fill Lester,Jr., �,Qj• IZ "'Z .•G1NE• �Q.\�� T.'910.692,6616 I F-910.692.7342 1 300 SW 4 �TI SOUTHERN PINES,NC 28367 WWW.HOBBSUPCHURCH.COM SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN Buckhorn- Mebane EDD-Phase 2 Water& Sewer Improvements Orange County, NC Manhour Estimate for Construction Management& Inspection Lines S1 &S2 (19 Week Construction Time) Hours Rate Fee Engineer 152 130 $19,760.00 Construction Manager 380 80 $30,400.00 Designer 40 90 $3,600.00 Administrator 401 60 $2,400.00 Subtotal: 612 360 $56,160.00 Lines W1,W2, &W3 (19 Week Construction Time) Hours Rate Fee Engineer 152 130 $19,760.00 Construction Manager 380 80 $30,400.00 Designer 40 90 $3,600.00 Administrator 1 401 60 $2,400.00 Subtotal: 612 360 $56,160.00 Line S3 (22 Week Construction Time) Hours Rate Fee Engineer 176 130 $22,880.00 Construction Manager 440 80 $35,200.00 Designer 60 90 $5,400.00 Administrator 601 60 $3,600.00 Subtotal: 7361 360 $67,080.00 PS& FM (12 Week Construction Time) Hours Rate Fee Engineer 96 130 $12,480.00 Construction Manager 240 80 $19,200.00 Designer 40 90 $3,600.00 Administrator 401 60 $2,400.00 Subtotal: 1 4161 360 $37,680.00 Total: $217,080.00 Total if all sections are constructed concurrently $193,000.00 CONSTRUCTION MANAGEMENT AND PROJECT INSPECTION DUTIES AND RESPONSIBILITIES OF THE ENGINEER AND THE RESIDENT PROJECT REPRESENTATIVE(S) The ENGINEER shall perform all required services to adequately inspect the project and insure compliance with the detailed drawings and contract documents.Services shall also include all work to maintain project schedule and budget, review all requisitions, and make recommendations for payment. The ENGINEER shall coordinate all construction management activities for the OWNER,including the following tasks: Construction Management Responsibilities of the ENGINEER 1. Prepare formal contract documents, including any and all documents required for execution of the construction contract by OWNER. 2. Provide construction inspection and construction management services as necessary to expedite construction in a timely fashion,insuring that total compliance with general and technical specifications are met by the successful bidder, and that construction is in strict accordance with the plans such that the OWNER receive FIRST-CLASS workmanship and materials,and maintain accurate inspection files. 3. Prepare and issue change orders,and review any and all request for change order from the successful bidder. 4. Investigate any and all request for partial and final payments prior to approval to insure payment to bidder in accordance with the contract documents as executed and amended. 5. Conduct final inspection of construction upon completion of work by the successful bidder,and accompany OWNER on courtesy inspection prior to approval of final payment to successful bidder. 6. Prepare "AS-BUILT" record drawings and provide two (2) sets to OWNER along with certification of completion and satisfaction of project requirements and recommendation of final acceptance by the OWNER.Record Drawings shall also be provided in digital format based on OWNER's preference. . In order to assist in providing the highest quality project,the ENGINEER shall furnish a Resident Project Representative (RPR), assistance and other field staff to assist ENGINEER in observing performance of the Work of the Contractor. The duties and responsibilities of the RPR(s)are limited to those of ENGINEER in ENGINEERSs agreement with the OWNER and in the construction Contract Documents,and are further limited and described as follows: RPR is ENGINEER's agent at the site,will act as directed by and under the supervision of ENGINEER,and will confer with ENGINEER regarding RPR's actions. RPR's dealings in matters pertaining to the on-site work shall in general be with ENGINEER and CONTRACTOR keeping OWNER advised as necessary. RPR's dealings with sub-contractors shall only be through or with the full knowledge and approval of CONTRACTOR. RPR shall generally communicate with OWNER with the knowledge of and under the direction of ENGINEER. Duties and Responsibilities of RPR 1. Schedules: Review the progress schedule, schedule of Shop Drawing submittals and schedule of values prepared by CONTRACTOR and consult with ENGINEER concerning acceptability. 2. Conferences and Meetings: Attend meetings with CONTRACTOR,such as preconstruction conferences, progress meetings,job conferences,and other project-related meetings,and prepare and circulate copies of minutes thereof. 3. Liaison: a. Serve as ENGINEER'S liaison with CONTRACTOR, working principally through CONTRACTOR'S superintendent and assist in understanding the intent of the Contract Documents; and assist the ENGINEER in serving as OWNER'S liaison with CONTRACTOR when CONTRACTOR'S operations affect OWNER'S onsite operations. b. Assist in obtaining from OWNER additional details or information, when required for proper execution of the Work. 4. Shop Drawings and Samples: a. Record date of receipt of Shop Drawings and samples. b. Receive samples which are furnished at the site by CONTRACTOR, and notify ENGINEER of availability of samples for examination. C. Advise ENGINEER and CONTRACTOR of the commencement of any Work requiring a Shop Drawing or sample of the submittal of the submittal has not been approved by ENGINEER. 5. Review of Work,Rejection of Defective Work,Inspections and Tests a. Conduct on-site observations of the Work in progress to assist ENGINEER in determining if the Work is in general proceeding in accordance with the Contract Documents. b. Report to ENGINEER whenever RPR believes that any Work is unsatisfactory,faulty or defective or does not conform to the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise ENGINEER of Work that RPR believes should be corrected or rejected or should be uncovered for observation,or requires special testing,inspection or approval. C. Verify that tests, equipment and systems startups and operating and maintenance training are conducted in the presence of appropriate personnel, and the CONTRACTOR maintains adequate records thereof, and observe,record and report to ENGINEER appropriate details relative to the test procedures and startups. d. Accompany visiting inspectors representing public or other agencies having jurisdiction over the Project,record the results of these inspections and report to the ENGINEER 6. Interpretation of Contract Documents: Report to ENGINEER when clarifications and interpretations of the Contract Documents are needed and transmit to CONTRACTOR clarifications and interpretations as issued by ENGINEER. 7. Modifications: Consider and evaluate CONTRACTOR'S suggestions for modifications in Drawings or Specifications and report with RPR's recommendations to ENGINEER. Transmit to CONTRACTOR decisions as issued by ENGINEER. 8. Records: a. Maintain at the job site orderly files for correspondence,reports of job conferences,Shop Drawings and samples,reproductions of original Contract Documents including all Work Directive Changes, Addenda,Change Orders,Field Orders, additional Drawings issued subsequent to the execution of the Contract, ENGINEERS clarification and interpretations of the Contract Documents, progress reports,and other Project related documents. b. Keep a diary or log book,recording CONTRACTOR hours on the job site,weather conditions,data relative to questions of Work Directive Changes, Change Orders or changed conditions,list of job site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case ofobserving test procedures;and send copies to ENGINEER. C. Record names,addresses and telephone numbers of all CONTRACTORS,subcontractors and major suppliers of materials and equipment. 9. Reports: a. Furnish ENGINEER periodic reports as required of progress of the Work and of CONTRACTOR'S compliance with the progress schedule and schedule of Shop Drawing and sample submittals. b. Consult with ENGINEER in advance of scheduled major tests, inspections or start of important phases of the Work. C. Draft proposed Change Orders and Work Directive Changes, obtaining backup material from CONTRACTOR and recommend to ENGINEER Change Orders, Work Directive Changes, and Field Orders. d. Report immediately to ENGINEER and OWNER upon the occurrence of any accident. 10. Payment Requests: Review applications for payment with CONTRACTOR for compliance with the established procedure for their submission and forward with recommendations to ENGINEER, noting particularly the relationship of the payment requested to the schedule of values, Work completed and materials and equipment delivered at the site but not incorporated in the Work. 11. Certificates, Maintenance and Operation Manuals: During the course of the Work, verify that certificates,maintenance and operation manuals and other data required to be assembled and famished by CONTRACTOR are applicable to the items actually installed and in accordance with the Contract Documents,and have this material delivered to ENGINEER for review and forwarding to OWNER prior to final payment for the Work. 12. Completion: a. Before ENGINEER issues a Certificate of Substantial Completion,submit to CONTRACTOR a list of observed items requiring completion or correction. b. Conduct final inspection in the company of ENGINEER,OWNER and CONTRACTOR and prepare a final list of items to be completed or corrected. C. Observe that all items on final list have been completed or corrected and make recommendations to ENGINEER concerning acceptance. Limitations of Authority Resident Project Representative: 1. Shall not authorize any deviation from the Contract Documents or substitution of materials or equipment, unless authorized by ENGINEER. 2. Shall not exceed limitations of ENGINEER'S authority as set forth in the Contract Documents. 3. Shall not undertake any of the responsibilities of CONTRACTOR, subcontractors or CONTRACTOR'S superintendent. 4. Shall not advise on, issue directions relative to or assume control over any aspect of the means,methods, techniques, sequences or procedures of construction unless such advice or directions are specifically required by the Contract Documents. S. Shall not advise on,issue directions regarding or assume control over safety precautions and programs in connection with the Work 6. Shall not accept Shop Drawing or sample submittals from anyone other than CONTRACTOR. 7. Shall not authorize OWNER to occupy the Project in whole or in part. 8. Shall not participate in specialized field or laboratory tests or inspection conducted by others except as specifically authorized by ENGINEER. The ENGINEER and RPR shall insure that the OWNER's project is completed in accordance with the contract documents and all permits.After final acceptance the ENGINEER and RPR shall maintain contact with the OWNER to address any issues that may arise during the warranty period of the project, including conduction a one year warranty inspection.Any outstanding items will be addressed and coordinated with the CONTRACTOR as required.