Loading...
HomeMy WebLinkAboutAgenda - 04-09-1997 - 1d 1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: April 9, 1997 Action Agenda Item No. OL SUBJECT: Status of Reservoir Plans DEPARTMENT: Town of Hillsborough PUBLIC HEARING: (Y/N) No;' BUDGET AMENDMENT: (Y/N) �Vv ATTACHMENT(S): INFORMATION CONTACT: Hillsborough Reservoir Information Sheet Eric Swanson, 732-2104 TELEPHONE NUMBERS: Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 227-2031 PURPOSE: To receive a report on development of the Hillsborough Reservoir project. BACKGROUND: See attached. RECOMMENDATION(S): Receive as information. HILLSBOROUGH RESERVOIR ENO RIVER - WEST FORK PARAMETER PHASE I PHASE I Dam Height 54.5 feet 63 feet(58) Normal Pool Elevation 633 msl 643 msl Pool Area 206 acres 394 acres(475) Safe 20 yr. Yeild (Net) * 1.8 MGD 3.0 MGD Estimated Cost $ 5.86 M $ 1.95 M Dam Base Width 425 feet 425 feet(385) Dam Length 1450 feet 2200 feet(1640) Normal Pool Volume 786 MG 1.73 BG(2.3) Spillway Length 200 feet 200 feet Volume of Embankment 175,000 c.y. 200,000 c.y.(202,000) 100 Year Flood Elevation 635.2 msl 645.2 msl Flood Pool Area 236 acres 459 acres(629) Drainage Basin 9.45 square miles Feasibility Study completed March 1993, Bond Referendum November 1993,Environmental Impact Statement Issued October 1994. Final Mitigation Plan for 401/404 Permits submitted March 4, 1997. Construction Plans &Specifications 90% complete,out to Dam Safety in April. Construction Estimated to Begin Oct.1997 and be Complete by Nov. 1998. Seven of thirty properties purchased. 30-Day Notice Sent February 27, 1997 to Property Owners. The area around the reservoir was zoned by Orange County as "Upper Eno Critical Area" (1/1/94)which allows up to 1 dwelling unit per 2 acres and up to 6% impervious surface limit. New Structures and Septic Tanks shall be located at least 150 feet from a reservoir. Nitrification lines shall be located at least 300 feet from a reservoir. Certain smaller parcels existing prior to 1/1/94 may be exempt from certain requirements,see Orange County Planning Department. The Town Purchase Line is a minimum of 100 feet away from the Phase II reservoir pool and encompasses the 100 Year Flood Elevation. A fence is not planned to be placed around the reservoir. - Recreation is not allowed on the proposed reservoir at this time. A petition to the State of North Carolina is required to obtain approval for any form of recreation to be allowed.