Loading...
HomeMy WebLinkAboutAgenda - 06-18-2013 - 7eORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 18, 2013 Action Agenda Item No. 7 -e SUBJECT: Contract Award for Professional Design Services for the Northern Human Services Center Community Center Project DEPARTMENT: Asset Management Services PUBLIC HEARING: (Y /N) No ( "AMS "), Department of Environment, Agriculture, Parks & Recreation ( "DEAPR ") ATTACHMENT(S): UNDER SEPARATE COVER 1) November 8, 2012 Agenda Abstract 2) Supplemental Information 3) Charge for the Northern Human Services Center Informal Resident Design Advisory Work Group 4) MBAJ Base & Alternate Fee Proposal Illustrative 5) Agreement for Professional Design Services 6) Agreement for Professional Design Services with Alternates PURPOSE: To: INFORMATION CONTACT: Jeff Thompson, (919) 245 -2658 David Stancil, (919) 245 -2522 1) Receive a history and chronology of events and topics surrounding the operation and potential re- development of the Northern Human Services Center; 2) Review Board of County Commissioners' actions culminating in the decision to adaptively re -use a portion of the existing facility into a 10,000 square foot multi -use community center and de- construct portions of the facility; 3) Approve the suggested Charge for the Northern Human Services Center Resident Design Advisory Work Group; 4) Consider awarding a contract for professional services to MBAJ Architects, Inc. from Raleigh, NC, for the not -to- exceed amount of $167,500 for the architectural and engineering design work associated with the Northern Human Services Center Community Center project; or 5) Consider awarding a contract for professional services to MBAJ Architects, Inc. from Raleigh, NC, for the not -to- exceed amount of $208,300 for the architectural and engineering design work associated with the Northern Human Services Center Community Center project, including the programming and schematic design of potential alternates that would preserve the classroom wings for either deferred use ( "mothball "), open air "pavilion" use, or full use; and 6) Authorize the Manager to sign the chosen contract on behalf of the Board. 2 BACKGROUND: On November 8, 2012, the Board of County Commissioners ( "BOCC ") authorized the Manager to proceed with the development of a 10,000 square foot community center on the site of the Northern Human Services Center. The agenda abstract for this Board decision is depicted in Attachment 1, "November 8, 2012 Agenda Abstract ". The former Cedar Grove School was built in 1950 to serve the African - American community in northern Orange County. As a result of de- segregation in public schools, the facility was transferred to County control in 1976, with a deed restriction that the facility be used for a "public purpose ". The facility was initially purposed as a human services delivery location for the residents of northern Orange County, housing numerous County services, including a branch library, social services, educational offerings (including Durham Technical College classes), Head Start programs, other child care services, and recreation programs. The Northern Human Services Center Task Force Future Use Plan, presented to the Board in June 2001, provides a comprehensive overview of the services housed in the facility and contemplated future needs (including Cedar Grove Park that opened in 2009). This report is provided at Attachment 2, "Supplemental Information ", Section A. The Board has endorsed the formation of a resident design advisory group to be involved in the programming and design of this facility. Attachment 3, "Charge for the Northern Human Services Center Resident Design Advisory Work Group ", establishes a purpose, framework and a set of responsibilities for this group. Recent History The Board supported reducing County services programming of the space over the past several years due to a combination of falling demand and high fixed costs to maintain the facility. Although the 2001 Task Force report discussed current and potential uses at the time (as well as subsequent studies examining potential uses of the building), no potential use overcomes the very high operating cost of the facility (estimated at $100,000 annually when fully conditioned and operational) and necessary capital improvements. This general facility assessment summary, not including programming and staffing costs, is attached to the January 24, 2012 regular meeting agenda abstract provided at Attachment 2, "Supplemental Information ", Section B. The single most limiting factor for the facility is the lack of conventional water and sanitary sewer service. The current well and septic system can adequately service a low volume of flow (2,400 gallons per day) suitable for a 10,000 square foot community center use. A higher flow volume necessary to support the full facility and its potential capacity (6,000 gallons per day) was contemplated in the 2001 Task Force report. To accommodate this contemplated added capacity, the Board authorized an engineering study for adjacent land suitable for septic treatment in 2004. This study yielded the purchase of the adjacent 12 -acre parcel (east of the facility across Hwy 86 North) that would allow an expansion of the well and septic system at an estimated cost of $800,000. Information regarding the capacity constraints of the current septic system is located in Attachment 2, "Supplemental Information ", Section C. Based upon the lack of program service demand and the cost of improving the septic system, the Board agreed on June 19, 2012 to de- commission and de- construct the facility with a 3 budget of $250,000. This decision was reflected in the FY2012 -13 Board adopted Capital Investment Plan. The Board also established a placeholder in the FY2014 -15 CIP for a 10,000 square foot community center to be erected in its place in the amount of $2,000,000. This budget was established according to a reasonably up- fitted community center program of $200 per square foot. Information regarding the Capital Investment Plan decision is provided in Attachment 2, "Supplemental Information ", Section D. As a result of this decision, the facility became fully vacant on December 31, 2012, except for the office of the Cedar Grove Park supervisor. All utilities services have been reduced to the level required to preserve the plumbing lines and control humidity. Public Input Process and Results After the decision to invest in a community center, at the direction of the Board, staff engaged the public in a process whose purpose was to 1) facilitate a dialogue regarding the community center project; 2) receive input regarding community needs and desires that could be supported by the community center; and 3) solicit volunteers for an informal resident design advisory group to work with the County staff and its design consultant on integrating these needs and desires into the facility design and operation. Staff held two public meetings to meet these objectives. The first was held over two sessions on March 19, 2012, and the second on September 25, 2012. Both meetings were held in the cafeteria of the Northern Human Services Center. March 19, 2012 Staff solicited participation through a mailed flyer sent to every property owner of parcels within a one mile radius (per County Geographic Information Systems information), retail outlet postings along NC 86 North, and area churches. Individuals who participated in the Cedar Grove park master plan public input sessions held in 2004 and 2005 were also noticed via mail for the meeting. Approximately 30 -40 individuals attended the two sessions. The attendees received an update on the Board's decision to deconstruct the facility, the reasons for the Board's decision, and the Board's intent to construct a community center on the site. Staff also conducted a survey soliciting a desired preference among a series of potential activities and features of the facility, as well as an "intensity of preference" metric (solicited through a "dot" voting exercise) to measure the intensity of those surveyed preferences. Staff collated the comments and opinions of the attendees into three categories: 1) "Mixed Opinions "; 2) Strong Opinions` and 3) Moderate Opinions ". Staff also ranked the intensity of responses from "most intensive" to "least intensive ". A summary of these desires and needs communicated by the group include: Mixed Opinions (1:1 ratio in favor): • Deconstruction of existing facility with appropriate "memorialization" of the original facility, as opposed to adaptive re -use and renovation of the center portion of the facility (cafeteria and gymnasium) 0 Strong Opinions (greater than 3:1 ratio in favor): • If new building, it needs to be a closed building, not an open shelter; • If new building, preferred to be near site of existing building; • Locating cell tower on the property would be okay, if it meant improved reception • The facility (new construction or adaptive re -use) should be able to accommodate: o Family reunions • Community meetings • Stage for performances /speakers • Kitchen (warming /catering kitchen) o Rooms to be used for classes • Rooms that can be used for summer camps • Rooms for games and indoor athletics (basketball, etc.) Moderate Opinions (generally 3:1 to 2:1 ratio in favor): • If new building with warming kitchen, needs an exterior window for exterior concessions use; • Preference for a park- and -ride lot at the facility (just under a 3:1 ratio in favor) Intensity of Preference, ranked from highest to lowest intensity: 1) Keep cafeteria and gym (center section) and perform the adaptive re -use renovation (27 votes) 2) Accommodation for family reunions and community meetings (16 votes) 3) Build a new structure to replace existing facility (13 votes) 4) Not opposed to a cell tower on site to improve reception (9 votes) 5) If new building, should be an enclosed structure (9) 6) Have an exterior kitchen window for outdoor concessions (8 votes) 7) Accommodation for classes of various types (7 votes) 8) Accommodation for space for summer camps (6 votes) 9) Accommodation for a warming kitchen and a stage (5 votes) 10) If new building, should be on the same spot as original building with appropriate memorialization (2 votes) 11) Should have a park- and -ride lot, and would personally use this kind of building (1 vote) 12)lf new building, should be an outdoor structure (0 votes) The individuals on the mailing list were also sent a summary of the meeting and the next steps for the process. Information regarding the March 19, 2012 public meeting, its results, and other related material is located in Attachment 2, "Supplemental Information ", Section E. 5 September 25, 2012 Staff concluded the March 19, 2012 meeting committed to having a follow -up public meeting to review the comment and input solicited during the initial meeting. That follow -up meeting occurred on the evening of September 25, 2012 at the Northern Human Services Center cafeteria. In similar fashion to the March meeting, staff solicited participation through a mailing list generated from the March 19 meeting notification process, and flyers were posted in retail outlets along N.C. 86 North, and area churches. Additionally, participants who signed in during the March meeting were also notified. Approximately 35 -40 individuals attended this session. The attendees received an update on the process, the results of the March meeting, and participated in a listening walking tour of the full building so that staff could record memories and significant areas of the interior. Staff made a presentation outlining the comparative advantages and disadvantages of "Option 1" — deconstruction of the facility and building a new 10,000 square foot community center facility; and "Option 2" — deconstruction of the classroom wings and an adaptive re -use renovation of 10,000 square feet of the center section. The group was also presented with schematic renderings of both options, as well as how the preferred uses determined during the March meeting would potentially be configured. The attendees were ultimately asked to vote by a show of hands on the preference between options 1 and 2. Approximately 70% of the group participated in the vote; approximately 90% of the voters preferred Option 2. The group also overwhelmingly supported not separating the deconstruction phase of the project from the adaptive re -use renovation construction phase, as originally contemplated in the FY2012 -13 CIP. Integrating the two phases under one construction firm would insure that the facility would not be at risk of being partially de- constructed before the full commitment of the adaptive re -use renovation. The following is an excerpt from the November 8, 2012 regular meeting agenda abstract (Attachment 1) summarizing important portions of the public meeting and preferences for facility features: "The group validated the top preferences for the facility [from the March 19, 2012 meeting]: • A meeting room for community meetings, family reunions, etc. • Space for indoor athletic activities (gym or gym -like room) • Space for performances • Warming kitchen • Rooms for classes, summer camps • Cellular tower to improve area phone service Additional uses the group indicated would be preferred included: • Some type of room with computers and internet access (as the library used to have) • Some classrooms — could a few of them be retained? • Support for an Emergency Services base station — as long as it did not take space away from the proposed center" A Staff also led the attendees through a presentation that depicted conceptual renderings of the space based upon the group's feedback during the March 19, 2012 session. The conceptual space plan shared with the September 25th meeting attendees below illustrates how the various uses could be integrated into the adaptive re -use renovation option 14 11 The Board may note that virtually all of the desired uses discussed during the March meeting are accommodated in this conceptual plan. Staff also solicited volunteers for an informal resident advisory design work group to assist staff and its design consultant to participate in the development of the first phase of the initial and most critical phase of space needs programming. Eight of the meeting participants volunteered for this important group during the meeting; their names join seven others who have volunteered for this work group. The full group is as follows: Melinda Bradsher Luther Brooks Sue Florence Jacqueline McConnell -Graf Nancy Graves Malcolm Hester Sucovis Hester Vivian Herndon Latta Sheila Vanhook McDonald David Ogburn Clifford Rogers Roger Traynham Hattie Vanhook Cumilla White Information regarding the September 25, 2012 public meeting, its results, and other related information is provided in Attachment 2, "Supplemental Information ", Section F. Larger prints of the space and site illustratives are included in this section as part of the presentation slides. This section also includes the October 25, 2012 work session abstract materials as well. 7 Recent Board Actions and Activities Recommendation of award for professional design services to MBAJ Architecture, Raleigh, NC During the November 8, 2012 Board meeting, staff presented the results and recommendations based on significant public input. The Board approved the adaptive re -use option #2 for development, allowing a partial deconstruction of the facility (mainly the two classroom wings) and saving significant portions of the historic and culturally significant building. This would allow important features of the structure to become integrated within a modern, efficient, 10,000 square foot community center. The Board decided against the option of deconstructing the existing structure in its entirety and constructing an entirely new facility. The Board also authorized the Manager to engage a professional design firm for the project through a standard request for qualifications ( "RFQ ") process. County staff concluded the RFQ process in March 2013, recommending MBAJ Architects from Raleigh, NC as the design firm for the project. The RFQ response from MBAJ Architects is located at Attachment 2, "Supplemental Information ", Section G. Eleven firms submitted written proposals for evaluation. Five firms were selected to interview with a staff panel consisting of Susan Mellott (Planning and Inspections), David Stancil (DEAPR), Jeff Thompson and Wayne Fenton (AMS), and Michael Talbert (Manager's Office). David Cannell of Finance and Administrative Services managed the RFQ process. The firms were evaluated based upon the quality of the collective presentation, specifically their responses in the areas of relevant experience with adaptive re -use design, community center design experience, and experience with historic and culturally significant projects. Firms submitting RFQ proposals were: ADW Architects, Charlotte NC Building Technology Associates, Oak Park, MI *Corley Redfoot Architects, Chapel Hill NC Davis Kane Architects, Raleigh NC HH Architecture, Raleigh NC *Isley Hawkins Architecture, Durham NC *MBAJ Architecture, Raleigh NC *RND Architects, Durham NC Robert W. Car The MBAJ RFQ response is r Architects, Durham NC Summit Design and Engineering, Hillsborough NC *Weinstein Friedlein Architects, Carrboro NC *Firms invited to interview Representatives from MBAJ Architects will be available at the June 18 meeting to answer questions from the Board. 0 The design scope outlined in the RFQ encompasses all deconstruction work through final occupancy of the renovated facility. This path ensures that a single general construction firm will be responsible for the entire project to its finish and subsequent operation. The design will also consider potential complementary uses such as an Emergency Services base station and a communications tower to support both emergency communications and other services such as wireless technology access and cellular connectivity. April 16, 2013 Work Session Update As staff updated the Board regarding the recommended selection of MBAJ Architecture during this April 16th work session, the Board directed to staff to include programming and schematic design studies (and related cost - benefit benefit analysis) involving: 1) a potential deferred use option - -"moth- balling" the two classroom wings - -for future use; 2) potentially using some of the classroom wing structure for non - conditioned, open air spaces similar to the Farmers' Market Pavilion in Hillsborough, NC; and 3) adaptively re -using the full classroom wings for conditioned, interior space needs. With the Board's authorization, MBAJ will provide the additional programming and schematic design guidance for the three alternative scenarios discussed during the April 16, 2013 work session. This guidance will allow staff and consultant to provide useful cost - benefit analysis of these alternatives to the Board for potential action during the schematic design phase of the project. Attachment 4, "MBAJ Base & Alternate Fee Proposal Illustrative ", provides a framework of the base contract fees associated with the 10,000 square foot adaptive re -use project and the additional design fees (as well as associated estimated construction costs) for the three alternate scenarios discussed during the April 16, 2013 work session. Once the design process begins within days of the Board's decision to engage MBAJ Architects with the project, the resident design and review advisory work group will convene to assist in the critical space programming and follow -on design process. Assuming a June 18, 2013 appointment, this work will begin in earnest early in the month of July. 0 The general development timeline may be as follows: TASK PROPOSED END BY Deferred Use ( "Mothball Wings ") BEGINNING DATE Open Air Pavilion DATE $1,339,900 BOCC Action: Approval for Designer Professional Services 6/18/13 6/18/13 Agreement (est.) Project interior space use programming (in collaboration with 6/19/13 8/15/13 the Informal Resident Design Advisory Work Group) Project schematic design (in collaboration with the Informal 8/15/13 10/15/13 Resident Design Advisory Work Group) BOCC Action: Approval of Schematic Design and potential 10/15/13 10/15/13 alternatives (est.) Project final design, bid document preparation 11/1/13 1/31/14 Project Bid - abatement, deconstruction and adaptive re -use 2/1/14 4/28/14 construction est. BOCC Action: Bid Award, Budget Approval for Construction 6/20/14 6/20/14 est. Construction, Commissioning, Opening (est. 8 months duration) 7/1/14 3/1/15 FINANCIAL IMPACT: The Board approved the FY2012 -17 Capital Investment Plan ( "CIP ") that included $250,000 in FY 2012 -13 for deconstruction of sections of the facility in preparation for the future use on the site. The Board also approved $2.0 million in FY2014 -15 for the construction of the new facility. Since the project will be completed under one general contract, these funds are currently available for professional services with regard to the selected designer for either the base agreement of $167,500 (Attachment #5) or the base agreement plus the potential alternate programming and schematic design scope of work totaling $208,300 (Attachment #6). Approval of the contract including the alternate study (Attachment #5) may establish an expectation for the facility that could result in 1) additional costs that would need to be appropriated outside of the current contemplated CIP; 2) the potential need for additional septic system capacity; and 3) a lengthier delivery of an operational facility. The contemplated CIP amount of $2,250,000 cannot accommodate the design and construction of the three contemplated alternates discussed during the April 16, 2013 work session. The total estimated costs for the three contemplated options (and related CIP allocations) are as follows: Alternate Estimated Total Cost (Design and Construction Estimated Additional CIP Allocation Necessary Deferred Use ( "Mothball Wings ") $2,842,300 $592,300 Open Air Pavilion $3,589,900 $1,339,900 Full Interior Use $4,930,700 $2,680,700 10 RECOMMENDATION(S): The Manager recommends the Board: 1) Receive a history and chronology of events and topics surrounding the operation and potential re- development of the Northern Human Services Center; 2) Review Board of County Commissioners' actions culminating in the decision to adaptively re -use a portion of the existing facility into a 10,000 square foot multi -use community center and de- construct portions of the facility; 3) Approve the suggested Charge for the Northern Human Services Center Resident Design Advisory Work Group; 4) Consider awarding a contract for professional services to MBAJ Architects, Inc. from Raleigh, NC, for the not -to- exceed amount of $167,500 for the architectural and engineering design work associated with the Northern Human Services Center Community Center project; or 5) Consider awarding a contract for professional services to MBAJ Architects, Inc. from Raleigh, NC, for the not -to- exceed amount of $208,300 for the architectural and engineering design work associated with the Northern Human Services Center Community Center project, including the programming and schematic design of potential alternates that would preserve the classroom wings for either deferred use ( "mothball "), open air "pavilion" use, or full use; and 6) Authorize the Manager to sign the chosen contract on behalf of the Board. 11 COPY 1ATTACHMENT1 ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: November 8, 2012 Action Agenda Item No. 7 -a SUBJECT: Northern Human Services Center Project — Next Steps DEPARTMENT: Department of Environment, PUBLIC HEARING: (Y /N) No Agriculture, Parks & Recreation (DEAPR) & Asset Management Services (AMS) ATTACHMENT(S): 1) June 12, 2012 NHSC Project - Status Report 2) NHSC Development Option Comparison 3) September 25, 2012 NHSC Community Meeting #2 Summary INFORMATION CONTACT: David Stancil, DEAPR, (919) 245 -2522 Marabeth Carr, DEAPR, (919) 245 -2516 Jeff Thompson, AMS, (919) 245 -2658 Wayne Fenton, AMS, (919) 245 -2628 Michael Talbert, Assistant County Manager, (919) 245 -2308 PURPOSE: To provide specific direction to staff on efforts related to the Northern Human Services Center (NHSC) by: 1. Approving "Option 2" as the development path for the project; and 2. Authorizing the Manager to engage a professional design firm for the project through a request for qualifications ( "RFQ ") process. BACKGROUND: In June 2012, the Board of County Commissioners approved the FY2012 -17 Capital Investment Plan (CIP) that included $250,000 in FY 2012 -13 for deconstruction and demolition of the Northern Human Services Building (NHSC) in preparation for the future use of the site. The Board also approved $2.0 million in FY 2014 -15 for construction of a new facility at the site. The Board may recall that staff held a public meeting to receive input on the function, appearance, and characteristics of this proposed new facility. Attachment 1, a June 12, 2012 memorandum entitled "Northern Human Services Center (NHSC) Project - Status Report ", presents the summary provided to the Board in a work session prior to the summer break. The community meeting concluded with public consensus on the types of uses the proposed facility should include within its space plan. However, there were mixed opinions regarding either building a completely new facility or retaining components of the original facility. A "adaptive re- use" development model would incorporate components within a design that would retain more of the character and cultural significance of the original facility. Staff held an additional public input session on September 25, 2012. The focus of that meeting was to gather input and consensus on a development path of an approximate 10,000 square 12 foot facility that would follow a new construction path ( "Option 1 ") or the "adaptive re -use" construction path ( "Option 2 "). Attachment 2, entitled "NHSC Development Option Comparison ", compares and contrasts these two options. In summary, while both options are similar in total cost, Option 1 allows for more design and space planning flexibility. Option 2 maintains the important social, cultural, and historic elements within the design, but would restrict some space planning and use flexibility. The September 25, 2012 public meeting produced a strong preference for Option 2, the "adaptive re -use" path. Attachment 3 is a September 25, 2012 NHSC Community Meeting #2 Summary which provides the salient outcomes of that meeting. In addition to the preference for Option 2, the public meeting group embraced staff's suggestion that an informal resident design and review advisory group be presented to the Board for approval. This item was presented to the Board during the October 25, 2012 work session. Members of the public who had previously attended the public meetings were invited to attend this work session. These individuals have also been invited to the November 8, 2012 regular meeting and have been informed that they can comment on this item during its presentation. Should the Board approve the Manager's recommendations, the general development timeline may be as follows: TASK PROPOSED BEGINNING DATE END BY DATE BOCC Action: Decision on Manager recommendations 11/8112 11012 NHSC fully vacated 12/31/12 12131/12 Project design RFQ process; Board approval of Designer Contract 3/1/13 6/20/13 BOCC Action: Approval for Designer Professional Services Agreement (est. 6/20/13 6/20/13 Project schematic design 6/20/13 10/20/13 BOCC Action: Approval of Schematic Design est. 10120/13 10120/13 Project final design, bid document preparation 11/1/13 1/31/14 Project Bid - abatement, deconstruction and adaptive re -use construction est.) 2/1/14 4/28/14 BOCC Action: Bid Award, Budget Approval for Construction est.) 6120114 6/20/14 Construction, Commissioning, Opening est. 8 months duration 7/1/14 3/1/15 13 FINANCIAL IMPACT: There are adequate funds within the project account to retain a professional services design firm through a request for qualifications ( "RFQ ") selection process. RECOMMENDATION (S): The Manager recommends that the Board: 1) approve "Option 2" as the development path for the project; and 2) authorize the Manager to engage a professional design firm for the project through a request for qualifications ( "RFQ ") process. 14 ATTACHMENT 1 MEMORANDUM TO: Frank Clifton, County Manager FROM: Michael Talbert, Assistant County Manager Pam Jones, Asset Management Director David Stancil, Environment, Agriculture, Parks & Recreation Director DATE: June 12, 2012 SUBJECT: Northern Human Services Center (NHSC) Project - Status Report The purpose of this memorandum is to provide an update on the NHSC project, results of the March community input session, and planned next steps. The Board may find this information of use as it completes deliberation on the FY 2012 -13 Budget and the 2012 -17 Capital Investment Plan (CIP). The Manager's Recommended CIP includes $250,000 in FY 2012 -13 for preparation of the NHSC site for future use, which may involve full or partial deconstruction /demolition of the existing 1950 structure, and $2.0 million in FY 2014 -15 for construction of a new facility at the site. Background As brief background, the former Northern Human Services Center is located at 5800 NC 86 North, approximately seven miles north of Hillsborough in Cedar Grove Township. The land for the school was conveyed by the Vincent family in 1946, and the school was constructed in 1950 (with a 1957 kitchen addition) as the African - American school for this part of the county. With school integration in the late- 1960's, the Orange County Board of Education consolidated schools, and the building and eight -acre property was transferred to Orange County in August 1976. This deed included a stipulation that the property must be used "for a public purpose" or ownership would revert back to the Board of Education. By the mid- 1980's, the facility was in use for a variety of County purposes, which over the years have included, but are not limited to social services, a branch library, Durham Tech classes, a variety of child care services and Head Start programs and a variety of recreation classes and programs. 15 Over the past 15 years, a number of studies were undertaken to determine possible uses for the building. None of the potential uses, however, fared favorably when compared to the cost and effort that would be needed to bring the building up to a suitable standard of operating efficiency. Estimated costs to complete the needed work in 2001 ranged between $2.1 and $2.4 million. By today's construction costs, the estimated investment would likely go well beyond $3 million. While portions of the building have been closed off to help minimize the approximately $100,000 annual operating expenses, the construct of the building systems limit what can be done in this regard. One of the primary concerns of the existing facility is septic capacity. Although additional land for expansion was purchased across the highway from the main building, the designed facilities carried an anticipated cost well over $500,000, so the project was suspended. In 2001, county voters approved a bond referendum which included funds for a park on 40 -acres previously- acquired behind the structure. The Cedar Grove Park was constructed and opened in 2008. The last County functions left the facility in 2010, and the only remaining uses are the Cedar Grove Day Care (scheduled to vacate the building by January 1, 2013), storage of equipment by County departments, and a former classroom used as the park office by the Cedar Grove Park manager. In 2011, as part of capital planning deliberations, $250,000 was earmarked for FY 2012 -13 for deconstruction /demolition of the facility, and in 2012, based on Board discussions, an additional $2.0 million was included in the Manager's Recommended 2012 -17 CIP for FY 2014 -15 as a placeholder for a new facility. As a part of these discussions, the Board asked that staff solicit public input on the plans for the facility prior to final decisions. Community Input Session - March 19 As a precursor to a public input session, staff from the County Manager's office, Asset Management Services and the Department of Environment, Agriculture, Parks and Recreation invited a small group of community representatives who had been active in the previous park planning effort to an informal pre- meeting, to receive feedback on how to best solicit community input. This information was used to develop a Public Input Session that was held on March 19, 2012. A summary of this meeting is provided as Attachment 1. Flyers were mailed to all property owners within one mile of the NHSC, distributed to area stores and churches, and advance notice was posted on the marquee sign outside the building. 16 Over 50 persons attended this input session, held in the cafeteria of the NHSC. Representatives completed a survey about preferences for the future uses at the site. There were mixed opinions about whether to try and retain the cafeteria /gymnasium "center mass" of the facility and retrofit it with new restrooms and upgraded facilities, or to memorialize and document the existing facility before taking it down for a new community facility. However, there was strong consensus on the types of activities and uses that residents favored for this location, including: • Large meeting room for community meetings, family reunions, • Stage area for performances, • Warming (catering) kitchen, • Rooms for classes, summer camps and gams or some indoor athletics, and • A cellular phone tower that improved area phone reception Respondees were unanimous that they would personally use a facility along these lines. Follow -up Discussions and Proposed Next Steps After tallying survey results and a dot - voting exercise conducted at the meeting, staff met on two occasions to discuss how to proceed. A report to the Board of Commissioners on the activities to date, and another community input session were deemed to be the most prudent next steps. From the first input session, it was clear that residents have a strong sense of place and community in being from Cedar Grove, and an attachment to some level of service provision in the community. It was also clear that many present desired additional information - both about the current status of the existing structure, and about "what could be" in the way of a new facility. A "vision" of what could be seemed to be one key piece that meeting attendees desired to be able to see and discuss. In that light, staff proposes the following course of action: 1. That this status report be shared with the BOCC as final CIP decisions are considered to provide an opportunity to provide feedback. (June), 2. That a letter be sent to the public input sessions participants thanking them for their assistance and attendance, and identifying these next steps and timetable. (June), 3. The staff work on developing visual images of both the current gymnasium /cafeteria (identifying and acknowledging both the opportunities and unique architectural features of the existing building, and the deficiencies of a 62 -year old building with outdated facilities and infrastructure); and a 17 vision of an alternative building and how it might be laid out and function. (summer), 4. That staff hold another community input session - starting with a tour of the existing facility (augmented by the good and bad images outlined above), and then a visual /graphic oriented meeting showing both current facility opportunities and challenges, and a visual of a possible future facility. Attendees would be invited to participate in hands -on design and discussion of what features of the old structure are most important, how they could be retained, and what kind of layout an alternative future facility might have. (September) 5. The results of this input session would be shared with the Board this fall, along with a staff recommendation on a course of action and an opportunity for residents to speak their feeling about the options and proposed course of action. (October), and 6. Board decision on the course of action for the new facility, and implementation of same as per the directed schedule. (October). In conclusion, staff was impressed and heartened to see the strong opinions and feedback provided in the March session. It is clear that Cedar Grove residents feel passionately about their community, and desire a place for community events to occur. It is hoped that this memorandum and this possible course of action will lead to a mutual agreement on the best way to meet the community's needs going forward. Please feel free to contact us if you have any questions. ATTACHMENT 2 Northern Human Services Center Development Option Comparison Abatement, Removal Design, Construction, Equipment Contingency Schematic Budget Estimate Schematic Budget per square foot Considerations: Development and Construction Cost Design Flexibility Programmed Use Flexibility Unforeseen Conditions Original Structure's Use? Estimated Future Operating Costs Option 1 New Construction, 10,000 square foot pre - engineered metal building, standing seam roof, masonry and /or block accented exterior walls; standard interior upfit $220K - $250K $1.3M - $1.5M $300K - $350K $1.82M - $2.10M $182-$210 Lower Higher Higher Lower No Low to Mid -Range Option 2 Removal of classroom wings, adaptive re -use of 10,000 square foot center portion; new roof and building systems; standard interior upfit $175K - $225K $1.36M - $1.58M $309K - $366K $1.84M - $2.17M $185-$217 Low to Mid -Range Lower Lower Higher Yes Low to Mid -Range 19 ATTACHMENT 3 Northern Human Services Center (Old Cedar Grove School) Project Community Meeting #2 September 25, 2012 Summary 31 persons and five staff were present for the meeting A building tour was held at 6:00 to look for important architectural features and share stories or information about the school and its history. After the tour, the group discussed the locations and topics discussed and seen in the building. Some of the notes and points were: • The building was last used as a school in 1969 • There were weekly Friday plays put on by classes at the school • Often had Dances and Talent shows in the Gym • Lunches cost .25 a day or $1 a week • There was a May Pole in the front yard • There was a small playground behind the school • The old ballfield was the location for the school's playing field • Interest in retaining the look of the school • Interest in reusing bricks, steel poles of the existing school - or purchasing some items from the school if sections are deconstructed. • Interest in purchasing salvaged items • Staff presented pros and cons of different building options: • The current Capital Investment Plan includes $250,000 for building deconstruction, and $2.0 million in FY 2014 -15 for a new facility of some type (to be determined) • Option 1 - New Pre - engineered 10,000 sf building, with masonry wall accents (Schematic Budget estimate - $1.93 million) • Option 2 - Adaptive Reuse of Central Portion of Current Structure (10,000 sf), remove classroom wings, some reworking and additions (Schematic budget estimate - $1.96 million). • Examples and pros /cons of each were shared. • The group then discussed preferences, important features or desired components, and a design and review advisory group • The group had a strong preference for Option 2 (adaptive reuse of central portion of building - cafeteria, gym, principals office area). Only two persons indicated preference for Option 1. • It was noted that some work would be needed to bring the remaining 1950/1957 structure up to building code, including new restrooms. • The group validated the top preferences for building uses from March: o. Meeting room for community meetings, family reunions, etc • Space for indoor athletics activities (gym or gym -like room) o Stage for performances • Warming kitchen • Rooms for classes, summer camps 20 o Cellular tower to improve area phone service • Additional uses the group indicated would be preferred included: o Some type of room with computers and internet access (as the library branch used to have). o Some classrooms - could a few of them be retained? o Support for an Emergency Services base station - as long as it did not take space away from the proposed center • There was a question about the naming of the facility and the future of the new playground built with the park (if the classroom wings were taken down). • There was interest in having residents serve on an informal design and review advisory group. Eight members volunteered to serve on this informal group to help advise on designing the new building as it moves forward. Conclusions 1. Staff will make a summary of this meeting and the group's recommendations. 2. The recommendations, along with the proposal to create the informal design and review advisory group, will be shared with the Board of County Commissioners at a worksession this fall. 3. Once direction has been received from the Board, a proposed course of action would be developed for Board approval. 4 21 Section A: 2001 Northern Human Services Center Task Force Report Section B: General Facility Assessment SU008Fy (attached tD the January 24.2012 regular meeting abstract) Section C: Current Septic System Capacity Constraints Section D: FY2012-13 Board Adopted Capital IDVe8t0BDt Plan: Northern HU0O@D Services Center c Section E: p�8[Ch1 9th .20i2 Public Meeting - Flyer - Agenda, Survey - Meeting Summary - Photos - Mailing List - Sign-In Sheet (address and contact information removed) - Post meeting summary sheet - Flyer � - Meeting Presentation - October 2Sm ' 2O12 Board Abstract - Sign-in Sheet (address and contact information removed) - Informal Resident Design Advisory Group Volunteer Sheet (address and contact information removed) Section G: MBAJ Architects Request for Qualifications Response « 22 SECTION A: 2001 Northern Human Services Center Task Force Report 23 COPY ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: June 25, 2001 Action Agenda Q Item No. SUBJECT: Northern Human Services Center Future Use Plan DEPARTMENT: County Manager PUBLIC HEARING: (YIN) No ATTACHMENT(S): INFORMATION CONTACT: Report Sharron Hinton, ext. 2300 (Under Separate Cover) TELEPHONE NUMBERS: Hillsborough 732 -8181 Chapel Hill 968 -4501 Durham 688 -7331 Mebane 336 -227 -2031 PURPOSE: To provide the Board with information regarding the assessment and proposed future plans for the Northern Human Services Center. BACKGROUND: In November 1999, the Board of Commissioners created the Northern Human Services Center Task Force. The charge of the task force is to identify the needs and develop a long -range plan for the Northern Human Services Center and the adjacent property owned by the County. The task force, chaired by Commissioner Brown and Commissioner Halkiotis, has met to assess the facility, adjacent property and available programming. The attached report outlines the current program operations, proposed program service expansions, facility issues and proposed enhancements, and proposed recreation areas and park amenities. This integrated plan addresses the physical facility as well as the external environment. Highlights of the proposed service expansions include adding the presence of Durham Technical Community College, El Centro Latino, Orange County Library and a human services component. This Phase I Report is an interim report on the status of the Northern Human Services Center. A follow -up report, or Phase I I Report, with more specific operational details will be presented in the fall. FINANCIAL IMPACT: No decision is required and there is no financial impact at this time. RECOMMENDATION(S): The Manager recommends that the Board receive this report as information only. 24 - - - - Future Use Plan Report to the Board of County Commissioners June 2001 In November 1999, the Orange County Board of Commissioners created the Northern Human Services Center Task Force. The charge of the task force is to identify the needs and develop a long -range plan for the Northern Human Services Center and the adjacent property owned by the County. • ME= The long -range plan for the Northern Human Services Center shall include, but not be limited to, the following: 1. Review past Capital Investments Plans and reports requesting improvements for the Northern Human Services Center. 2. Identify the specific needs of agencies occupying the building. 3. Prioritize the CIP needs for the building and adjacent property. 4. Assess the current and potential uses of the building to determine the possible impacts of those uses on the existing waste treatment system. 5. Evaluate the location of the park and ride lot and possible impacts on client parking for the building and future park. 6. Review the status of all easements on the property. 7. Review recreational programs at the Center to ensure the future park design will include existing programs and possibly expand active and low- impact recreational activities for the area. :, • • r Since 1999, the task force chaired by Commissioners Stephen Halkiotis and Margaret Brown, and staff has met to assess the facility, adjacent property and available programming. Because many of the discussions to date have focused on possible land acquisitions, citizens from the community have not been involved in this phase of the planning process. 25 The Northern Human Services Center is the only county building located in the Cedar Grove Township and is an integral resource for the community. It is a vital link to the citizens residing in this area. Citizens receive a variety of services throughout the week and use the facility to host community and /or family gatherings during the evenings and on weekends. At present, there are five agency occupants at the Northern Human Services Center (NHSC). These agencies include: Orange County Recreation and Parks Department, Joint Orange- Chatham Community Action (JOCCA), Cedar Grove Day Care Center, Head Start, and the Northern Family Resource Center (operated by Chapel Hill Training- Outreach Project). The Department on Aging/ Orange Public Transportation also provides services to center participants. An overview of current program operations, proposed program service expansions, facility issues and proposed enhancements, and a list of options to pursue are provided in this report for BOCC consideration. Orange County leases space to the non - profit agencies providing services at the Northern Human Services Center. Space is leased at minimal or no charge to the occupants. A map outlining the existing space allocations is included as Attachment I. Orange County Recreation and Parks Department — provides a variety of recreational programs throughout the year. These programs include Youth Girls Softball, Youth Soccer, Youth Basketball, Youth Wrestling, Youth Connections, and Summer Camp Activities. A detailed description of program activities is provided as Attachment II. Joint Orange- Chatham Community Action (JC) — provides year -round services for senior citizens. The agency operates daily, with a daily attendance averaging 35 clients. The seniors are primarily involved in various types of craftwork and receive catered lunches daily. The Cedar Grove Day Care Center has been operational since September 1981. The purpose of the Center is to provide a high quality educational program in a day care setting to families in the Northern Orange Community. With an AA license, the Center meets and exceeds the programmatic standards set by the state. The Center collaborates with three agencies to assist families with affordable day care.. These agencies, Child Care Services Association, Orange County Department of Social Services, and Chapel Hill Outreach Early Head Start Program provide subsidy dollars to help families who cannot afford the full price of day care. The Center also implements a sliding fee scale to make tuition 26 more affordable. The Center operates daily; serving infants and toddlers ages 0 -5 years. The average daily attendance is 30 children, with 13 staff. Head Start provides services to children from August through May of each year. Administrative staff is on -site throughout the year. With an average enrollment of 80 children and 15 staff, the program provides services to children ages 3, 4 and 5 years. In addition, volunteers contribute an average of 20 hours per week. Transportation is provided though Orange Public Transportation (OPT). The Head Start program was formerly operated by Wake Opportunities, Inc. of Raleigh, N.C. However, the US Department of Health and Human Services is scheduled to announce a new administrator of the program by the end of June 2001. It is our understanding that two local agencies have applied to operate the Head Start Program, JOCCA and Chapel Hill Training- Outreach Project (CHTOP). If the program is awarded to CHTOP, a large portion of the Head Start Program may move out of the facility. It is the intent of the CHTOP, with the permission of the Orange County Schools, to move all of the four year old children to four elementary schools and to place the three year olds and younger into various daycare programs in northern Orange County, including Cedar Grove Day Care. If JOCCA is designated as administrator, it is their intent to continue full service delivery at the NHSC. The Northern Orange Family Resource Center, which opened in 1995, serves the Cedar Grove, Efland- Cheeks and Perry Hill communities. The Family Resource Center provides family support programs and services that are designed to address the needs of children and families in these communities. It is operated by the Chapel Hill Training- Outreach Project, and receives its funding from the Orange County Partnership for Young Children and the Department of Human Resources, Division of Family Support. The Family Resource Center provides daily services to youth and adults, with some evening and /or Saturday programs. Programs include life skills workshops, computer lab, afterschool tutoring, preschool activities, literacy, and special events and outings. In January 2001, staff from the Family Resource Center conducted a survey to assess community needs. (See Attachment III). The survey results suggest that there is an interest in increased programming activities. Ninety -eight respondents (14 Hispanic) indicated a desire for computer classes, employment / job readiness training, GED, Spanish classes, English classes, literacy classes, tutoring, health care, social services / family support, housing assistance and respite support. There were also requests for transportation services and space to host family or community gatherings. 27 The results of the community survey were shared with representatives from Durham Technical Community College. This information, combined with data obtained from a September 2000 survey given to employees at Flynt Fabrics in Hillsborough, by the NC Department of Commerce, Division of Employment and Training, supports the need for increased service delivery for this area. (See Attachment IV). Ninety respondents from this survey (20 Hispanic) indicated strong interests in completing high school or obtaining a GED; training or learning a new skill; job seeking skills /employment; and community college, education or training opportunities. In addition, many of them expressed a desire to know more about health care, childcare, housing assistance and financial planning. Discussions with representatives from Durham Technical Community College (DTCC) have been very positive. A partnership, similar to that of the Skills Development Center, could also be established for this area of the county. With the strong community interest in computer training, DTCC is prepared to offer at least one computer class, with the possibility of a second class, as early as the fall 2001 semester. Additionally, they will determine the feasibility of offering either a Spanish or an Employment/Job Seeking Skills class as well. DTCC representatives have met with County staff to assess the proposed classrooms and identify design needs. The County IS Department has reserved 18 computers (scheduled for replacement) for the computer lab. The surplus PCs are being configured now by Orange High School students who are working as temporary county employees this summer. These students will also assist in configuration of the network in the room and setup of the computer systems and printers. In addition, RedHat Software, located in RTP, will donate technical support time onsite at NHSC to help set up the Linux server. A free server will be provided by Gateway Computers as part of the County's purchase of replacement PCs under the IT Plan this year. A network switch will be donated by 4Front Systems in RTP, the IS Department network technical support contractor that Orange County has been working with for the past two years. The IS Department is also investigating two other possible donations. The Hillsborough /Orange County Chamber of Commerce has been contacted to determine if any member companies would be able to donate a computer projector. And, Time Warner Cable has been asked to donate Internet connection installation and services. The Public Works Department is currently developing an implementation plan for facility modifications necessary to meet the needs identified by DTCC for the computer lab and classroom. The task force has also received a request from El Centro Latina for space to provide services to the Latino - Hispanic families in rural Orange County. Many of M these families are migrant or working in agriculture. Programming possibilities include assistance with translation, information and referrals, and transportation; support groups and counseling; children's programming; cultural programming; a legal clinic; and a leadership development project to promote leadership from within the Hispanic- Latino community. Since the Family Resource Center currently employs both a full -time and part - time Hispanic outreach worker, the presence of El Centro Latino would help to enhance the service delivery. By being co- located at the NHSC, these agencies could more effectively collaborate and coordinate programming efforts to this target population. In addition to developing a computer lab for DTCC, the task force has reviewed the overall space allocations for current facility occupants and anticipated program service expansions. Based upon the information obtained from the community surveys, a stronger human services presence is also requested at the NHSC. This would include, but is not limited to, health and dental screenings, nutrition and fitness classes, and other health education classes (e.g. prenatal, child safety, STD, breast cancer awareness, etc.). Also in an effort to ensure a balance of library services throughout the County, a cybrary, similar to that identified for Carrboro, is proposed for the NHSC. In order to accommodate the requested services and new agencies, a realignment of some of the space is suggested to provide a more efficient utilization of the building. A map illustrating the proposed space assignments for service providers is included as Attachment V. With an expansion of services offered at the NHSC, it is anticipated that the facility usage will increase substantially. A chart describing the percentage of facility usage (current and proposed) is included as Attachment VI. . Nil' - Wastewater Treatment System Built in 1951 to serve as a school and acquired by the County in 1977, the NHSC is in need of structural renovations and enhancements. The most pressing need is to replace the wastewater treatment system. According to the Health Department, the design flow for the current use of the building, based upon the estimated number of participants, is just over 3500 gallons per day. This septic system is sized for 2,400 gallons per day. It is therefore, overloaded by approximately 45% with the existing use. Although it is working properly by all accounts, overuse to this degree will have long -term 29 impacts on the functionality and life of the system. A breakdown of the existing use is included as Attachment VII. With the presumed potential design flow of 6,000 gallons per day in a new system and with the current use taken into account, the remaining available flow would be approximately 2,500 gallons per day. Based upon the information obtained from the community surveys, Environmental Health staff has prepared a sample scenario of potential use for the remainder of the flow. A chart illustrating the Expansion Wastewater Design Flow is included as Attachment VIII. In March 2000, the Kennedy tract portion of the NHSC property complex was evaluated by Orange County Environmental Health staff to determine the specifics of its utility for on -site wastewater treatment nitrification (ground absorption) fields. The staff's preliminary finding was that the Kennedy tract contained an area (approximately 6 acres in a more or less contiguous area generally described as being from its southern and southeastern boundaries toward the center of the tract) of soils suitable for conventional ground absorption technology wastewater disposal at a rate of approximately 5000 to 6000 gallons per day (gpd) with 100 percent repair area. Environmental Health staff have indicated that more extensive site evaluation and system layout/design work (involving site topography survey and soil test pit excavation) must be completed before an exact system treatment capacity can be determined. Unfortunately, the portion of the Kennedy tract containing soils suitable for use as nitrification field is also that which contains the large hardwood trees. Many, if not most, of the hardwood trees located in the active nitrification fields would have to be removed during the construction of the nitrification fields. Furthermore, recreational activities in the hardwood tree area that would be set aside for nitrification field repair area would be severely restricted. Activity in this area would be limited to low impact trails and the like. In November 2000, the County made a preliminary offer to purchase additional land (26 acres) adjacent to the Kennedy tract. The landowners expressed interest in selling the land but as of this date the terms for a purchase agreement have not been worked out. An appraisal of the property will be completed by the end of June 2001. The appraisal will be used in further negotiations for land acquisition. An evaluation of the property by the Division of Environmental Health revealed that only one very small portion of the property has soils that appear suitable for waste treatment purposes (500 gals. /day). Options to address the wastewater treatment system, as identified by the County Engineer are included as Attachments IX and X. 30 Facility Improvements The task force considers the improvements to the Northern Human Services Center as an opportunity for it to serve as a model demonstration project for solar and energy efficiency. There are several possibilities to pursue with respect to the HVAC system and water heating system. Staff is planning to contact the Solar Center, at North Carolina State University, to discuss possible options. In addition to replacement of the wastewater treatment system, the Public Works Department has assessed the facility and identified a list of possible improvements. The majority of these activities have been identified as needs in past Capital Investment Plans. Attachment XI is a list of these proposed improvements. However, the five most critical improvements are to: I. Relocate or expand the existing wastewater treatment system 11. Replace the HVAC system (research alternative%nergy efficient systems) III. Replace the windows and exterior doors and locks (investigate solar possibilities) IV. Replace the roof (after the 10 -year warranty expires in 2004; included in the CIP Roofing Reserve Account) V. Secure a new well, water distribution system, holding tanks, etc. (research feasibility of solar water heating system design) Staff will research HVAC alternative / energy efficient systems which may be suitable for the NHSC. A recommendation will be brought to the Board as soon as available. The roof replacement is included in the CIP. The above - referenced items are considered essential in order to make the building habitable, suitable for expanded use and functional. The remaining needs described in Attachment XI may be phased in over time. Another key component to this property assessment is the potential for increased recreational activities. Several amenities have been proposed — contingent upon surveys, soil analysis, site plans and public /community input through park design meetings. The following list highlights the possible recreational activities. For a more detailed description, see Attachment XI I, Proposed Recreational Facilities, which outlines three park scenarios, based on different designs and different size parks. Low Impact /Passive Recreation • Nature trail (natural surface) through woodlands to lake (with interpretive signage) • Picnic area with tables • Benches overlooking the lake • Rustic toilet facility (near picnic area) 31 Active Recreation • Two additional softball fields (lighted, irrigated, fenced with bleachers and dugouts) • Two wells (irrigation and drinking water) • Two water fountains • Restroom facility (near activity areas) • Expanded playground (with new equipment for 6 -12 year olds) • Large picnic shelter (with tables and grills) • Horseshoe pits and volleyball court (near picnic shelter) • Concession stand • Maintenance shed Contingent Upon Future Land Acquisition • Two multi- purpose soccer /football fields (lighted, irrigated and fenced) • Walking / Fitness track (hard surface) • Second driveway entrance and parking area The Kitchen functions primarily as a warming kitchen for JOCCA and Head Start. However, the Cedar Grove Day Care Center uses it to prepare meals. The current playground is designed for toddlers. If older children visit the facility on the weekends, there are no facilities for them to use. If approved by the BOCC this fiscal year, the proposed Clinical Nutritionist will be able to provide a health department presence at the NHSC for approximately 20 hours per week. With the purchase of the Kennedy tract, the issue regarding easements has been resolved. The NC Department of Transportation grant to pave the southern lot was not approved. Once we determine the outside design (i.e. circular drive, specific parking configurations, etc.) the County can resubmit in January 2002 for funding to pave the Park and Ride area. (Please note that the relocation of the waste treatment system will affect the ability to develop the circular drive. If administration of the Head Start Program is awarded to Chapel Hill Training- Outreach Project and the program subsequently relocates to the elementary schools and daycare centers in northern Orange County, the Orange County Schools Superintendent has requested to use this space as an alternative school. However, the task force has not had an opportunity to assess this most recent request. 32 Facility: 1. Pursue the top three facility improvements, as prioritized below: Activity Estimated Cost a) Relocate or expand the existing wastewater treatment system (main $300,000 building) b) Replace Windows /Exterior Doo rs/Locks(investig ate solar $250,000 possibilities) c) Secure a New Well, Water Distribution System, Holding Tanks, $50,000 etc. (research feasibility of solar water heating system design) Sub -Total $600,000 MOTE: (a) Staff will provide a recommendation regarding the HVAC options at a later date. (b) The roof replacement is included in the CIP. 2. Reallocate the existing program space as identified in the proposed expansions, pursuant to Attachment V. 3. Finalize arrangements with Durham Technical Community College to develop computer lab, classroom space and appropriate course offerings beginning in Fall 2001. 4. Develop a NHSC Management Team. The management team, similar to that at the Skills Development Center, will be composed of agency heads occupying the building (Recreation & Parks, Head Start, Family Resource Center; JOCCA, Cedar Grove Day Care, DTCC, El Centro Latino, and Orange County Public Library). The management team will oversee the day - to -day operations and will meet as often as necessary, but not less than weekly to discuss coordination and Center activities. The team leader will be designated by the County Manager from his office. The team leader is responsible for convening regular meetings of the management team, oversight of the physical facility and coordination with other county departments for services. 33 5. Relocate the sports and crafts equipment, currently stored in the facility to a climate - controlled environment. 6. Contact both Orange County Schools and Chapel Hill /Carrboro City Schools for the possible use of surplus kitchen equipment and furniture for the computer lab. 7. Invite community representatives to participate in Phase II of the task force planning process, to include design of the park and programming initiatives for the facility. 8. Investigate the feasibility of establishing.a Farmer's Market. 9. Develop marketing materials, to include but not limited to, signage to advise the community of new services and events. 10. Assume responsibility for providing custodial and cleaning services for the entire building. Note: The County currently provides cleaning services for common areas only. 11. Assess the feasibility of housing the Orange County Alternative School. A recent request was made from the Superintendent to use space that may be made available from the possible relocation of Head Start. Note: This request was received following the last task force meeting and the members have not had an opportunity for review and discussion. 12. Extend current lease agreements to December 2001 contingent upon the status of the Head Start program. 13. Develop a plan for establishing library and /or cybrary services at NHSC similar to those recommended for the Carrboro Century Center. (See Attachment XIII — Excerpt from Library Task Force 2001 Report — Library Services at the Century Center). Develop recreational facilities for the Kennedy tract, as identified in the Master Recreation & Parks Plan, and contingent upon the location of the sewer system. 2. Acquire additional property for recreational activities. 3. Pursue the septic system and external restroom facilities to serve the playing fields and park. 34 Attachment 1: Map Outlining Existing Space Allocations Attachment III: Family Resource Center Survey Results Attachment IV: Flynt Fabrics Survey Results Attachment VI: Chart: Percentage of Facility Usage (current and proposed) Attachment VII: Chart: Existing Wastewater Design Flow Attachment VIII: Chart: Expansion Wastewater Design Flow Attachment IX: County Engineer Memo dated July 27, 2000 Attachment X: County Engineer Memo dated June 5, 2001 Attachment XI: Potential Facility Improvements and Associated Costs 0 0=0 jili;I11111111111 1111111111 1 1111 1 Attachment XIIII: Excerpt from Library Task Force 2001 Report: Library Services at the Century Center 35 ATTACHMENT I c0 M m JOCCA ( 2,796 SQFT) u CEDAR GROVE DAY CARE ( 2,610 SQFT) HEAD START ( 4,920 SQFT) ® FAMILY RESOURCE CENTER ( 1,440 SQFT) - RECREATION & PARKS ( 2,520 SQFT) SHARED AREAS ( 1,200 SQFT) j COMMON AREAS ( 12,435 SQFT) ORANGE COUNTY NORTHERN HUMAN SERVICES CENTER HIGHWAY 86 NORTH CEDAR GROVE, N.C. ( EXISTING ) CAFETERIA fM I R I ST ST L n II �] �1 KITCHEN II GYMATORIUM STAGE COAL BIN M BOILER ROOM Attachment I RAC = RECREATION ARTS & CRAFTS MR = MEN'S RESTROOM WR = WOMEN'S RESTROOM JA = JANITOR ST = STORAGE SCR = SENIOR CITIZEN ROOM VAR = VISITING AGENCY ROOM RO = RECREATION OFFICE RMS = RECREATION MAINTENANCE & STORAGE R = RESTROOM K = KITCHEN EE = EAST EXIT WE = WEST EXIT SE = SOUTH EXIT NE = NORTH EXIT MECH. II w.�sR FF P ROOM DAYjICARE HEAD START DAY CARE I� IIIIIQ n r. NEE n �; 1. R,f.L' R W EE HEAD START HEAD START' HEAD START A R R '. �...6 —1 FIRST FLOOR PLAN CURRENT: 08/21 /2000 37 ATTACHMENT II W Orange County Recreation and Parks Existing Programs and Services Northern Human Services Center 'Activity Total # Registered Participants Total 9 of Total # of Practice Total # of Game Sport Season Youth Practices Participation Games Participation Dates Enrolled per (Players, per (Players, Season Coaches, Season Coaches, and and visitors). visitors) Youth Girls Softball (ages 7-16) Apr.-July 253 115 874/week 72 816/week Youth Soccer (ages 6-12) Aug.-Oct. 143 48 792/week 96 1092/week Youth Basketball (ages 7-16) Nov.- Mar. 479 140 476/week 0 0 Youth Wrestling (ages 7-14) Nov.- Mar. 45 24 188/week 0 0 Youth Connections Basketball (ages 9-14) Jan.- Mar. 53 12 154/week 0 0 'Activity Total # Registered Participants # Visits Summer Camp 100/week 4 Halloween Hoopla 500 1 Facility Reservations Total # of Facility Reservations (1999) Total # of Participants, (1999) 46 1150 Group s/Organizations: Census Bureau, Cedar Grove Recreation Club, 4-H, Upward Bound Parents, Family Reunions, Homemakers Club, Community Meetings 39 ATTACHMENT III 40 Attachment III Employment ESL Family/Comm. Health Care Job Readiness Gatherings . 4 21 fw-nihes 13 families 32 families 37 families Literacy/ Parent Workshops Preschool Groups Respite Care Reading 14 families 11 families 11 families 12 families S. Work Services/ Transportation Tutoring Housing Family Support 12 families 34 families 23 hunihes 6 families Spanish Class, A erobics, GE D, Foster Patents, Ladies Auto care class 10 . 4 5 1 1 41 M MM MMM MM EMEMEM &2M E,121adultsand Ichildr-n), I Northern Orange [IMMMM, 1116101 Family Profile.xis Survey Results Programs, Services, Activities toring Other Areas ofinterest 21 Arts & Crafts Auto Clinic Enrichment Activities Spanish Foster Care Senior Programs Car Seats 43 ATTACHMENT IV Data From Survey Given at Flynt Fabric The following figures are extracted from a survey given to employees at Flynt Fabric in Hillsborough, NC, in September 2000, by the North Carolina Department of Commerce, Division of Employment and Training. A total of ninety (90) individuals completed the survey, twenty (20) of which are Hispanic. Survey respondents indicated their personal residence to be in the following areas: Burlington, NC, Cedar Grove, NC, Chapel Hill, NC, Danville, VA, Durham, NC, Graham, NC, Haw River, NC, Hillsborough, NC, Hurdle Mills, NC, Mebane, NC, Pelham, NC, Prospect Hill, NC, Timberlake, NC, Ringgold, VA, Roxboro, NC, Rougmont, NC * Of the total number, the numbers in parentheses indicate the number of responses from the Spanish language survey. Would like to know more about: s S �� £ ::� Y ^ S z �`§ + x ` i T * Of the total number, the numbers in parentheses indicate the number: of responses from the Spanish language survey. Prepared by Sarah Cooley 11 /00 P n ro H 45 �_ ■ ffiI I► IMIN DTCC ( 1440 SQFT ) JOCCA ( 1260 SOFT) CEDAR GROVE DAY CARE ( 2,320 SQFT) HEAD START ( 5,190 SQFT) FAMILY RESOURCE CENTER ( 1,080 SQFT) RECREATION & PARKS ( 400 SQFT) SHARED AREAS ( 180 SQFT) COMMON AREAS ( 12,435 SQFT) HEALTH ROOM ( 180 SQFT) ® CYBRARY ( 720 SQFT) SE ORANGE COUNTY NORTHERN HUMAN SERVICES CENTER HIGHWAY 86 NORTH CEDAR GROVE, N.C. ( PROPOSED ) R, ST ST V 1 II �] V CAFETERIA KITCHEN B 21 FOR r SCHEDULED < Ax-s - - S USES eu -s u � � COAL BIN �I DTCC - GYMATORIUM f� 'I - -. FAMILY COMPUTER = DTCC AJ43� ^�. MR WR WE BOILER I' RESOURCES LABJ�I S � I ROOM I' n II Attachment V DTCC = DURHAM TECH MR = MEN'S RESTROOM WR = WOMEN'S RESTROOM JA = JANITOR ST = STORAGE RO = RECREATION OFFICE R = RESTROOM EE = EAST EXIT WE = WEST EXIT SE = SOUTH EXIT NE = NORTH EXIT SCHEDULED USES ( 1,440 SQFT) ® SHERIFF ( 360 SQFT) AGENCY OFFICES ( 720 SOFT) a HUMAN SERVICES DELIVERY ( 540 SQFT) MECH. iR SCHEDULED AGENCY STAGE - -ROOM DAYCARE DAY CARE READ START -s; Rii OFFICES - it USES 11119 n 11 11-4 n -e NE � EE om. 9�iT fj HEAD START WAD STAR.Tik NEAO START au-s R R FIRST FLOOR PLAN CURRENT: 06/04/2001 Ri 47 ATTACHMENT VI Room 1 South Room 2 South Room 3 South Room 4 South Room 5 South Room 6 South Room 7 South Room 8 South Room 9 South Room 10 South Gymnasium Kitchen Dining Recreaton Office HS Screening Rms Room 1 North Room 2 North Room 3 North Room 4 North Room 5 North Room 6 North JUGCA Day Care Head Start Family Res Ctr Common Areas Northern Human Services Center Current Usage NOTES: Dining area is shared for lunch M -F from - 11 am - 1 pm. Kitchen is used M -F from - 8 am - 1:30 pm by Head Start for meal preparation. Meals for JOCCA are catered. Hatched cells indicate room is not available /suitable for other uses during unoccupied times due to layout, furnishings, equipment, etc. Usage Times - current.xls Prepared: 06/01/01 Printed: 06/21/2001 RE Room 1 South Room 2 South Room 3 South Room 4 South Room 5 South Room 6 South Room 7 South Room 8 South Room 9 South Room 10 South Gymnasium Kitchen Dining Recreaton Office HS Screening Rms Room 1 North Room 2 North Room 3 North Room 4 North Room 5 North Room 6 North Northern Human Services Center Current Usage JOG4� Day Care HeadSM Family Res Gtr Rec a 10aft Common Areas NOTES: Dining area is shared for lunch M -F from -- 11 am - 1 pm. Kitchen is used M -F from - 8 am - 1:30 pm by Head Start for meal preparation. Meals for JOCCA are catered. Family Resource Center holds an activity one Wednesday /month in the Gym from 10 am - 12 noon Hatched cells indicate room is not available /suitable for other uses during unoccupied times due to layout, furnishings, equipment, etc. • Room 1 South Room 2 South Room 3 South Room 4 South Room 5 South Room 6 South Room 7 South Room 8 South Room 9 South Room 10 South Gymnasium Kitchen Dining Recreaton Office HS Screening Rms Room 1 North Room 2 North Room 3 North Room 4 North Room 5 North Room 6 North Northern Human Services Center Current Usage JOCCA NOTES: Day Care Dining area is shared for lunch M -F from - 11 am - 1 pm. Head Start Kitchen is used M -F from - 8 am 1:30 pm by Head Start for meal preparation. Meals for JOCCA are catered. Family Res Gtr Rec & Parks Alli Common areas Hatched cells indicate room is not available /suitable for other uses during unoccupied times due to layout, furnishings, equipment, etc. O1 0 Room 1 South Room 2 South Room 3 South Room 4 South Room 5 South Room 6 South Room 7 South Room 8 South Room 8 South Room 10 South Gymnasium Kitchen Dining Recreaton Office HS Screening Rms Room 1 North Room 2 North Room 3 North Room 4 North Room 5 North Room 6 North Northern Human Services Center Current Usage JOCCA NOTES: Day Care Head Start Family Res Ctr 0- `E Common Areas Hatched cells indicate room is not available /suitable for other uses during unoccupied times due to layout, furnishings, equipment, etc. U1 52 ATTACHMENT VII NORTHERN HUMAN SERVICES CENTER of DESIGN TOTAL OPERATION PERSONS FLOW PER FLOW FUNCTION SPAN SERVED PERSON PER DAY AGENCIES August- October' 96 3 GPD 288 GPD Basketball November -March 80 Day Care Year Round 56 15 GPD 840 GPD 3 GPD 420 GPD Head Start September -May 115 15 GPD 1725 GPD JOCCA Year Round 22 10 GPD 220 GPD Family Resources Center - Clients Year Round . 10 5 GPD 50 GPD Family Resources Center - Staff Year Round 2 25 GPD 50 GPD . . ATHLETICS Soccer August- October' 96 3 GPD 288 GPD Basketball November -March 80 5 GPD 400 GPD Softball May -July 140 3 GPD 420 GPD . _ • • SPECIAL ACTIVITIES /RESERVATIONS I I I - NUMBERS from FY 96 -97 1 Year Round 1 401 5 GPD 1 200 GPD Em •• Note: The highest of these 3 figures was used for the total since the seasons do not overlap. c� C 54 ATTACHMENT VIII INIORTHERN HUMAN SERVICES CENTER 1=YPAK1C,T(')1\1 XA/Ac,-TP\A/ATI=D hr=CTr-Kl 9=1 nkA/ FUNCTION OPERATION SPAN # of PERSONS SERVED DESIGN FLOW PER PERSON or FLOOR AREA TOTAL FLOW PER DAY CLINICS Health Department - Medical - 2000 Ft2 Year Pound N/A 300 GPD/1000 Ft2 600 GPD Health Department - Dental - 1000 Ft2 Year Round NIA 480 6P[)11000 Ft2 480 GPD Total 1080 GPD PRE-SCHOOL/AFTER-SCHOOL PROGRAMS Children August-June 30 5 GPI) 150 GPD Faculty/Staff August-June 4 25 GPD 100 GPI) Total 250 GPO CONTINUING EDUCATION CLA55E5 Students ( 9 classes per day @ 2 hour duration) Year Round 90 5 GPD 450 .GPD Instructors Year Round 3 25 GPI) 75 GPI) Total 525 GPD E5LCLA55E5 Students 9 classes per day @ 2 hour duration) Year Round 12 5 GPD 60 GPD Instructors Year Round 1 25 GPD 25 GPD Total 85 GPD —MISCELLANEOUS GOVERNMENT Satellite 5herrif's Office Year Round 2 25 GPD 50 GPD Satellite bSS Office I Year Round 21 25 GPD 50 GPD NORTHERN HUMAN SERVICES CENTER MOM, mavmg�� • �' • i •! 57 ATTACHMENT IX 58 Attachment IX TO: Northern Human Services Center Task Force FROM: Paul Thames, PE, County Engineer DATE: July 27, 2000 SUBJECT: Wastewater treatment system options for the Northern HSC In March 2000, the, Kennedy tract portion of the Northern HSC property complex was evaluated by Orange County Environmental Health staff to determine the specifics of its utility for on -site wastewater treatment nitrification (ground absorption) fields. Environmental Health staff's preliminary finding was that the Kennedy tract contained an area (approximately 6 acres in a more or less contiguous area generally described as being from its southern and southeastern boundaries toward the center of tract) of soils suitable for conventional ground absorption technology wastewater disposal at a rate of approximately 5000 to 6000 gallons per day (gpd) with 100 percent repair area. Environmental Health staff have indicated that more extensive site evaluation and system layout/design work (involving site topography survey and soil test pit excavation) must be completed before an exact system treatment capacity can be determined. Unfortunately, the portion of the Kennedy tract containing soils suitable for use as nitrification field is also that which contains the large hardwood trees. Many, if not most, of the hardwood trees located in active nitrification fields would have to be removed during the construction of the nitrification fields. Furthermore, recreational activities in the hardwood tree area that would be set aside for nitrification field repair area would be severely restricted. Activity in this area would be limited to low impact trails and the like. The task force has expressed . an interest in evaluating the possibilities of obtaining additional properties in this area to either enhance recreational opportunities or to provide alternative sites for wastewater treatment nitrification fields. Environmental health staff have done some preliminary desktop evaluation (staff cannot do on -site soils evaluation without property owner permission) of a large parcel (the 25 acre Vanhook property) north of the Kennedy tract and one small parcel (the 2.33 acre Jones property) south of the Kennedy tract. The soils mapping and on -site soils evaluation near these tracts indicate that the Jones property may have soil types suitable for use as nitrification field while the Vanhook property appears unlikely to have suitable soil types. Furthermore, even if the small parcel does contain suitable soil types, there may be limitations (topographical constraints such as poor slopes, ditches, creeks, etc. or insufficient soil depths) to its use for nitrification field. The treatment capacity of the existing wastewater treatment system serving the Northern HSC is rated at 2400 gpd. System operational records show that wastewater flow to the system often exceeds a 3000 gpd average for as much as weeks at time. This hydraulic overloading will unquestionably shorten the life of the existing system. It is, however, impossible to predict how much the life of the system will be shortened or how much longer the existing system will continue to provide an acceptable level of wastewater treatment. 59 It is apparent that something must be done to: 1) increase the wastewater treatment capacity at Northern HSC; 2) replace existing plumbing fixtures with those which use less water; 3) modify existing programs which may generate wastewater through the use of the kitchen facilities; or 4) decrease the number of individuals or programs using the facility such that wastewater generation experiences a corresponding decrease. At this time, it appears to be unlikely that the use of the facility will decrease. In fact, it appears that there is some demand for an increase in the use of the facility. Furthermore, a desire has been expressed to convert the area currently utilized as the nitrification field for the existing wastewater treatment system to a circular access drive and parking area for the center. Assuming that the use of the center is to be increased and the existing nitrification field is to be converted to other uses, the only option available at this time is to relocate nitrification fields to the suitable areas in the Kennedy tract. Opportunities to shift all or some portion of the nitrification fields to other properties outside of the Kennedy property or the existing Northern HSC tract may present themselves at some point in the future. Insofar as the Northern HSC wastewater treatment capacity is concerned, there are a range of opportunities that present themselves. The only option that is not available is to do nothing. That option is eliminated because the treatment capacity of existing wastewater treatment facility is already being exceeded on a frequent basis. Other basic options, listed in order of cost from cheapest ($0) to most expensive (approximately $300,000) in terms of the County's expenditures, are outlined below. 1. Eliminate programs /reduce use of the facility as necessary to bring wastewater treatment demand in line with treatment capacity of existing system. 2. Eliminate use of the kitchen facilities to prepare food or wash dishes, pots, etc. 3. Replace all existing water using fixtures with those which useless water and generate less waste. 4. Marginally expand existing system (up to 3000 gpd) to utilize additional nitrification field capacity in Kennedy tract while leaving existing nitrification fields in place. 5. Marginally expand existing system (up to 3000 gpd) to utilize additional nitrification field capacity in Kennedy tract while leaving existing nitrification fields in place, eliminate use of the kitchen facilities to prepare food or wash dishes, pots, etc., and replace all existing water using fixtures with those which use less water and generate less waste. 6. Acquire Jones tract, if suitable for nitrification fields, marginally expand existing system (up to 3000 gpd) to utilize additional nitrification field capacity in Jones tract while leaving existing nitrification fields in place. 7. Acquire Jones tract, if suitable for nitrification fields, marginally expand existing system (up to 3000 gpd) to utilize additional nitrification field capacity in Jones tract while leaving existing nitrification fields in place, eliminate use of the, kitchen facilities to prepare food or wash dishes, pots, etc., and replace all existing water using fixtures with those which use less water and generate less waste. ME S. Abandon existing nitrification fields, develop marginally expanded existing system (up to 3000 gpd) in Kennedy tract. 9. Abandon existing nitrification fields, develop marginally expanded existing system (up to 3000 gpd) in Kennedy tract, eliminate use of the kitchen facilities to prepare food or wash dishes, pots, etc., and replace all existing water using fixtures with those which use less water and generate less waste. 10. Abandon existing nitrification fields, acquire Jones tract if suitable for nitrification fields, develop marginally expanded existing system (up to 3000 gpd) in Kennedy tract and Jones tract. 11. Abandon existing nitrification fields, acquire Jones tract if suitable for nitrification fields, develop marginally expanded existing system (up to 3000 gpd) in Kennedy tract and Jones tract, eliminate use of the kitchen facilities to prepare food or wash dishes, pots, etc., and replace all existing water using fixtures with those which use less water and generate less waste. 12. Abandon existing nitrification fields, develop up to maximally expanded existing system (up to 6000 gpd) in Kennedy tract. 13. Abandon existing nitrification fields, develop up to maximally expanded existing system (up to 6000 gpd) in Kennedy tract, eliminate use of the kitchen facilities to prepare food or wash dishes, pots, etc., and replace all existing water using fixtures with those which use less water and generate less waste. 14. Abandon existing nitrification fields, acquire Jones tract if suitable for nitrification fields, develop up to maximally expanded existing system (up to 6000 gpd) in Kennedy tract and Jones tract: 15. Abandon existing nitrification fields, acquire Jones tract if suitable for nitrification fields, develop up to maximally expanded existing system (up to 6000 gpd) in Kennedy tract and Jones tract, eliminate use of the kitchen facilities to prepare food or wash dishes, pots, etc., and replace all existing water using fixtures with those which use less water and generate less waste. There are a number of iterations that could be developed for the options listed above. Most of these options involve adjusting the capacity (and price) of various system capacities. It is important to note a few facts or assumptions used in generating these options and the cost range. One very important fact is that the Jones tract alone (assuming that it can be acquired), is not sufficient to provide for the full demand of existing use of the Northern HSC, even if every square foot is suitable for nitrification field and all available water conservation measures are incorporated in the facility. Another fact is that the $300,000 upper limit for system expansion costs does not include the purchase price of the Jones tract or any other property not currently owned by Orange County. The upper limit for system expansion costs does include the cost of purchasing and installing water conserving fixtures and equipment but does not include the cost 61 of general renovations to the cafeteria, public restrooms or individual class or office restrooms. The cost figures do not reflect any costs associated with soils evaluation, system design or layout or costs that may be incurred to demolish, remove, abandon or dispose of any of the existing wastewater treatment system equipment or infrastructure. And finally, the cost figures do not include any funds for unusual work elements during the construction of any new nitrification fields such as field layouts which minimize removal of existing trees or grinding of trees are removed into mulch products. If I may provide clarification of this material or any additional information, please advise. 62 ATTACHMENT X 63 Attachment X TO: Northern Human Services Center Task Force FROM: Paul Thames, PE, County Engineer BATE: June 5, 2001 SUBJECT: Updates on issue of wastewater treatment system options for the Northern HSC Since the NHSC Task Force received the July 27, 2000 report on wastewater treatment system options for the NHSC, there have been several developments, none of which have been particularly positive. For example, it has been determined that average flow to the existing NHSC treatment system is approximately 3500 gallons per day (gpd), an amount which exceeds its capacity (2400 gpd) by approximately 40 %. This overloading is definitely harming the existing system and shortening its life expectancy. Unfortunately, no one can predict the system's remaining life expectancy, either under existing flow conditions or under a condition where flow is reduced to .a point at or near design levels after years of overloading. To date, County Environmental Health staff have identified a number of properties just north of the NHSC on both sides of NC 86 that general soils mapping identifies as being suitable for wastewater disposal. However, staff does not yet have permission to enter any of those properties to make a preliminary on -site evaluation (one property owner, Fuqua, has actually refused entry permission). There are certainly no guarantees that: 1) the County will get permission to evaluate other nearby properties not now owned by the County; 2) any properties that. are evaluated will be suitable; or 3) that any properties that are evaluated and found suitable can be acquired by the County. If it is assumed that preserving the area of the Kennedy tract with the hardwoods to the maximum extent possible is — or perhaps the - a core value, I make the following recommendations: 1) Preserve the existing nitrification field to the extent possible by: a) immediately revamp any existing program requiring meal preparation to one which does not require washing any dishes, including cookwear and utensils b) immediately replace existing plumbing fixtures with those which minimize water consumption c) abandon plans to convert the existing nitrification field area to some combination of circular drive and parking area 2) .limit the proposed expansion of programs that would increase water use inside the existing building. by: a) provide portable toilets for baseball/outside recreational activities b) eliminate the use of the facility for non - County related after -hours uses c) , consider providing pit - privies for passive recreational activities on the Kennedy tract M 3) Design and size a system expansion that will use conventional wastewater disposal technology (pump- conventional), recirculating filtration (to extend system life), dual nitrification fields (new fields and existing fields), minimize immediate impact to Kennedy tract and preserve nitrification field potential on Kennedy tract 4) Continue looking for remote but nearby nitrification field property The strategy as contained within these recommendations is designed to maximize the flexibility in wastewater treatment system technology while preserving the potential to maximize the size and capacity of an expanded treatment system so that the NHSC site remains viable when the existing system eventually fails or wears out. This strategy does have some drawbacks in that it eliminates the use of the front area for driveways and parking (at least in the near term), limits expansion of the use of the facility and increases the system maintenance (low flow fixtures as well as enhanced wastewater treatment system) and operations costs. If it is determined that expanding the use of and access to the facility in the near term are the core values, then these values can be achieved at the cost of losing many, if not most, of the.hardwood trees in the nitrification field areas of the Kennedy tract. If I may provide additional information at this time, please advise. 65 ATTACHMENT XI „• r M a� M Activity Estimated Cost 1) Relocate or Expand Wastewater Treatment System main building) $300,000 2) Replace Windows /Exterior Doors /Locks (investigate solar $250,000 possibilities) 3) New Well, Water Distribution System, Holding Tanks, etc. $50,000 (research feasibility of solar water heating system design) Sub -Total $600,000 • Replace HVAC (research alternative/energy-efficient system) $600,000 • Replace Roof (after 2004) (included $500,000 in the revolving fund for roof replacement) • Parking /Access: ❑ Pave Existing Lots $150,000 ❑ Create Circle Drive /Pave It $ 50,000 Restrooms /Additions & Renovations ❑ Retrofit existing restrooms $127,000 • Upgrade Electrical Wiring System $30,000 • Paint Interior /Exterior $25,000 • Enclose the Breezeway $15,000 • Replace Flooring $143,000 • Alarm Systems: • Fire $30,000 • Bur lar $15,000 ® Complete Renovation of Kitchen/ Includes Replacement Equipment $100,000 Sub-Total $1,785,000 TOTAL. $2,385,000 M 67 ATTACHMENT XII Prupmed arned&s: AtdvdMayWg FWMs 0 12 Smcw fhAd., t fladd BaAeGaU com Expanded playgrcamd Othei- Faeffifie,sAceessm Items * Nem, entrance and puking afea * Restrwm facility (close to halt fit kh/picaw shelwo CommAn mmd Mahmance shed Mainwnancc, road (Corsorvicing t-iath w,onms, picnic areas and trad mw rite MMCC"I Two rwx wefls (one for NHS(-.') 14A ttir �'�7 TWA 14, r ,Attachment XII Luw4nipact AnwnRks Picnic- shclt(;� and trail he"d and in Naw,ae a. A docp trail dwoaii,i ro areas and back to stanj I bAeviov. picnic table and ben(Jies RUi�lc tAet facihty rrnfl: near lakk_n WflkiH 'Jifil (ILU'd ADA stamhrcfs� AM 1-4 ova Z­_ 'Ilk f T Cedar Grove Park - Scem,,trio 1, (74-acre park): iootfld ol' aMbonal land to the nonh, PIUS land acrossNC 86 Mr wasmaer Md. Est�J,ma �ed Cc)st, $1 , 250 , ODU H�MMHW F W-F Proposed amenifies: Active/Ptalying Fields d ?Ouhi-jxlr ,or L! 1"idd Basketball cxuu 0 Expanded playgrond Other FaxffiflesMccessory Items lb Re,tiuom facifiE,i w IwA fiu(dsipicnic shckev) Water fOLIMAr4S) Conct.,ssion Mand Mainterance shed Mainteriance rcad (for wrti rcmq. haLlt rooms, pwnic are,ts and rrml maintenartee) Two nnv vy�lls (.one for NIISC) f , 'N Low-ImIjuet Amenities Picr• ShejjeT. nj,jtt!, near nauwe trai,< head and in Al-aW wcoafnAv w, balk Nature trial Aclop U-M tflrou(„aJj vvoodlands to lakefrom. area.s and back to stan) Lakeview picnic arIll I.,cuclics Puistic toilet t,acifity O.,Ac,, uaill, agent lakcr) m Cedar Grove Park - Scenario 2 (48-acre park)' no rcv, uxc,:qx for land across NC 86 for vva.stovater drain field- L art imatc d Cost $85(),,()(-)0 lufle '2001 appr f1roposed tart enifies: Actiw/Playing Fields 0 1 Multi -purpose fieAd 0 Basketbffl courts 'D Expanded playground Other FacifificsiAccessox V Items ,& Ikestroom facility (rk)sc to baH fiwcklslpicmc Shelter) * water. fountain(o * Concession stand shed aw Maimenance road (for servicing bath moras, picnic ncap ind trail rnakiwmanco) Two now weils (ono, foT. NHS'("t < cl, L7 F'p as All IV C' Low-Impact A menifies PicnL� Shelto, and grilk mnr mwxe t•ad hz,n(l and in cl,:psc pooximit.y to ball Niworc h-ail d•op u-nd frcm po:nic '-'Ve1tcr w larkerront areas and hack to stno � Lak.evie,& pwna zables 'Ind been ckcs Rusk loflci a; aside track, fw:u kake) IN vJ VJ 6 LT) '�Sv Q rb Ced,ar Grove Park - Scenario 3 (48-acre park): no rte % liinds ac,,quired •Or plrk cor wasLewater disposal; WLAsWwaIer SVSUNTI located on-site, EstJ,mated Cos"t $835,000 J u ne 2CR) l N 70 71 ATTACHMENT XIII 72 Attachment XIII Library Services at the Century Center Library service at the Century Center in downtown Carrboro would meet a number of needs not currently being addressed in southern Orange County. The citizens of Carrboro currently enjoy only limited library service, at McDougle School, where the hours of operation are restricted to afternoons and evenings due to the school schedule. While this library does an admirable job of meeting the needs of sonic patrons, accessibility is an issue for significant segments of our population: seniors who don't drive, youths, and those of modest means. By its very nature, McDougle library is limited in what it can do. Providing some limited library service at the Century Center in downtown Carrboro meets some of the needs unmet by other library service on southern Orange County. By utilizing space that already exists and piggybacking on town services provided in the Century Center, the county can maximize resources. This proposal would continue the trend in library service of creating public library space in an existing public facility. Like the successful McDougle library example, expenses and resources would be shared with another entity. This creative use of space benefits all. A library as proposed at the Century Center would provide public access to the Internet. In this respect it fulfills one of the findings cited earlier in this report. The Century Center is accessible to any citizen in southern Orange County and would be the only truly accessible library in southern Orange. Located in the heart of North Carolina's most densely populated community, the Century Center is within walking distance of 10 to 15,000 residents of southern Orange County and is at a transit hub with three bus lines running past. Seniors, school children without available parents to drive them to other libraries, and citizens of more modest means would have access to this facility. This proposal enjoys strong support from the town of Carrboro, which is committed to providing financial support as outlined below. This support relieves the county of the complete burden of providing library service to the citizens. There are many different options for providing service. in this space. There is plenty of room to negotiate a model that meets the needs of the community and is affordable to the county. In addition, the proposal can be phased in over a number of years, if necessary. There are no restrictions on the number of hours this facility could be open. Library service at this facility could provide morning and early afternoon hours not available at McDougle library. Seniors and parents with toddlers, for example, are frequent morning library users and are currently not able to use McDougle during those hours. The Century Center library could meet some of their needs. 73 Because there have been no negotiations with the county with regard to how this library would be set up, what services would be provided, etc., there is some vagueness about how this proposal would be implemented. It should be noted that there are many options available for exploration. Determining the costs to the county requires some discussion. •MI,IX !, Number of Volumes To be determined Number of Staff Between .5 and 1.5 depending on h.dw the operation is structured Hours of Operation To be determined Square Footage 1,060 County Contributions $32,175 - $96,520 annual estimate; one- time $10,600 Private Contributions NA Municipal Contributions $30,800 estimate, one -time $13,200 Internet Access /OPAC Not applicable Public Transportation Chapel Hill Transit. Authority until midni ht The County's one -time (capital) costs would be as follows: A. Furniture 1. Hexagon Desk (two %2 hex tables) 2. Computer Stools (6 @ $129.95) 3. Couch, Love Seat 4. Library Table (use chairs already on premises) B. Shelving 1. Periodicals (15- compartment display and storage) 2. Newspaper Display (6 newspapers and storage) 3. Books The County's ongoing (operational) costs would be as follows: A. Staff (at least 1.5 plus benefits) B. Periodicals C. Laptop and wand for checkout (download daily) D. Van Delivery (twice weekly) E. Locking File Cabinet (2- drawer letter) F. Locking Storage Cabinet G. Librarian Desk and Chair H. Office Supplies I. Best Sellers C, /1 /1 2,000 850 1,100 700 3,000 10,650 :1.111 .111 111 160 160 700 500 6,000 96,520 74 75 SECTION B: General Facility Assessment Summary (attached to the January 24, 2012 regular meeting abstract 0 ORANGE COUNTY Meeting Date: January 24, 2012 SUBJECT: Next Steps: Northern Human Services Center ATTACHMENT(S): N HSC Facility Assessment Proposed Timeline (with Public Inp Plan) I Action Agenda Item No. 8 — r— #UBLIC HEARING: (Y/N) 76 PURPOSE: To receive information about community efforts regarding the disposition of the Northern Human Services Center; and to provide directiIon to staff on next steps. As previously discussed, the cost • operation is very expensive — over $100,000 in FY 2010- 201: 1. At this time, the building use is limited to a day rare and Head Start program, along with limited County recreation programs. The day care and Head Start program have been noticed that the facility would not be available beginning January 1, 2013. luring its work session in M�arch, 2011, the Board • Commissioners expressed interest in Aursuing some type of project at the site, but desired that the community be engaged in a meaningful dialogue that would help inform decons about the removal and eventual replacement of this facility. 77 Some key activity ideas expressed by local residents included: • County services continuing to be offered in some form at the site; • Meeting room /community center; • Potentially, an Emergency Services base station. Further, small group members agreed the County should solicit public input from other residents in the area. Various means to do so were discussed including, but not limited to, distribution via: mail; some method of surveying preferences (such as Survey Monkey) via the internet; and flyers in local stores, churches and other community organizations. An open house at the Northern Human Services site is also recommended in order to share ideas and provide a direct avenue for feedback from residents. Based on this discussion, a timeline of possible activities, including a two -part public input plan, is attached for the Board's comment. The small group discussed a number of ownership options, including leasing or selling the building to a private or other non -profit group. However, staff has learned that deed covenants from the 1976 property conveyance from the Orange County Board of Education to Orange County will require the land and uses of the land to remain `for a public purpose'. In the facility evaluation and subsequent discussion, staff has refined the most likely project possibilities and recommends that two options be identified and discussed with the community residents: Deconstruction /demolition of the existing facility (following a thorough documentation for historic preservation purposes), with future construction of a new public facility (in a future year to be determined as part of the CIP) that would include a "community center" similar to that existing at Efland- Cheeks Park, and perhaps other components to be determined; or Deconstruction /demolition of the existing building wings, and retention and renovation of a core center area, possibly including the gymnatorium and cafeteria (in a future year to be determined as part of the GIP). Staff is prepared to commence a formal public input effort, following a discussion regarding general parameters that should be followed when formulating the project possibilities with the community. The attached facility assessment provides an overview of the facility's status. FINANCIAL IMPACT: The FY 2011 -16 CIP includes $250,000 to fund removal of the building and grading /seeding of the site in preparation for future use. There is no current funding in the CIP for new construction or renovation of the facility as listed in the two options above, these would need to be added to the future CIP if desired. RECOMMENDATION(S): The Manager recommends that the Board discuss the proposed timeline and plan of action, make any changes as needed, and instruct staff to begin the public input and project activity process. W NORTHERN HUMAN SERVICES CENTER COMMUNITY FACILITY BACKGROUND The Northern Human Services Center, originally a school facility, was constructed in 1950, with a later addition in 1957 that included the kitchen and dining area. The facility has seen few significant changes since original construction and includes many of its original elements. Although the original coal -fired boiler was later replaced with an oil -fired boiler, most of the original radiator and steam line heating system is still in place, as are the original single - glazed, metal frame windows, and exterior doors, all of which are very inefficient from an energy standpoint. Interior plumbing lines were previously replaced, as were waste water lines outside of the footprint of the building. Very few structural changes have been made since original construction. OPTIONS Several options for maintaining a community facility at the Northern Center location exist, including: 1. Total removal of existing facility and replacement with a pre- engineered structure of approximately 10,000 square feet, with mason and /or block accented exterior walls at an approximate cost of $1,932,000 ($193 /square foot)., 2. Total removal of existing facility and replacement with a similarly designed structure (masonry block with brick veneer) of approximately 10,000 square feet, at an approximate cost of $2,618,000 ($262 /square foot). 3. Removal of the classroom wings on the north and south ends of the facility, including the large central restrooms in the south wing, with adaptive reuse of the gymnasium, kitchen /dining areas, and the central lobby and offices, at an approximate cost of $1,963,000 ($196 /square foot). Metal building components (window and doorframes, roof trusses, etc.) would be recovered for recycling, and masonry products would be evaluated for processing and recycling on -site as aggregate substitute for fill and parking lot construction.' Figures 1 and 2 provide an overview of the approximate areas to be removed, and areas that would remain.2 The attached schematic budget comparisons include substantial contingencies for each option, and are not based on any developmental design plans or drawings. For comparative purposes, previous CIP estimates for refurbishment of the entire facility were approximately $3,278,000, not including parking improvements. Any of the options identified here could accommodate a park and ride lot. ' Crushing at the actual construction site using portable crushers reduces construction costs and the pollution generated when compared with transporting material to and from a quarry. http--I/en.vvikir)edia.org/wiki/Concrele recycling s An initial assessment by a structural engineer confirmed that the 'beings" can be removed without structurally compromising the portion of the building to remain. 79 FIGURE 1 FIGURE 2 M Certain materials in the facility test positive for the presence of asbestos, which will require abatement (removal and disposal at a licensed facility). If any portion of the existing structure is to be retained, it is strongly recommended that all asbestos containing materials be removed and abated from the entire facility, not just asbestos - containing materials found in the areas to be removed. While the existing masonry walls that would be left in place if the gymnasium, dining area, etc., were retained, have some value in their embodied energy3, most other infrastructure and components would need to be replaced, due to their age and condition, as well as the County's on going efforts to create energy efficient, sustainable facilities. It is not recommended to leave any portion of the existing facility in place without making the improvements identified below. Heating /Ventilation /Air Conditioning The entire complex is served by a heating system that includes an oil -fired boiler, steam lines and radiators throughout the building. The original boiler was coal fired, and the original coal bin remains in place, adjoining the partially below grade boiler room. There is no centralized cooling system for the facility, only a number of window air conditioning units, and a small package system that serves the kitchen. A modern, energy efficient HVAC system would be needed to serve the portions of the facility that would be left in service if only partial removal of the facility is pursued, or if the entire structure is left in place. Replacement of the boiler would also allow removal of the above ground fuel oil storage tank at the site. And a new HVAC system would also provide centralized cooling for the portions of the facility to remain, which they currently lack. Boiler 3 Embodied energy is defined as the sum of energy inputs (fuels /power, materials, human resources etc) that was used in the work to make any product, from the point of extraction and refining materials, bringing it to market, and disposal / re- purposing of it. Embodied energy is an accounting methodology which aims to find the sum total of the energy necessary for an entire product rrfecycle. This lifecycle includes raw material extraction, transport,w manufacture, assembly, installation, disassembly, deconstruction and /or decomposition. htti): / /en.wikipedia.orci/wiki /Embodied energy a Electrical The electrical service is adequately sized for the facility, though quantity and placement of devices does not meet modern expectations in many spaces. Improvements may be required for space that remains. Metal halide lighting in the gymnasium would be replaced with compact fluorescent bulbs and ballasts for energy efficiency. Most other lighting in the facility has previously been upgraded to T -8 fluorescent bulbs and ballasts. Plumbing Most existing plumbing fixtures, water supply lines, and wastewater lines would be removed as part of the process of removing the north and south wings, as this would include removal of the main restrooms. The existing well and septic systems would be left in place. New restrooms would be constructed to replace the existing central restrooms that would be removed. Existing water supply lines, and wastewater lines, which run under the remaining slab, would be left in place. Roof The existing roof was installed in 1995 with a ten -year warranty, and so is well past its expected useful life. Some roof sectors on the portions of the building that would remain have decking that has tested positive for the presence of asbestos, although the-decking on the gymnasium and dining hall did not. Abatement would be required for approximately 21,000 square feet of roof decking. Although encapsulation is possible, leaving any asbestos- containing materials or products in place is not recommended. 4 M Windows The windows are original to the facility, and are single - glazed, metal framed, which provide very low R- values. All windows and exterior doors in the portions of the building proposed to be retained should be replaced to reduce energy consumed, and to reduce on -going maintenance costs. Some caulking and glazing for windows and exterior doors tested positive for asbestos and will require abatement. Flooring Flooring in the sectors of the building that may not be removed include the gymnasium, main entrance /office area, dining hall and kitchen. The gymnasium floor is a carpet product complete with basketball court markings. The dining hall includes what are assumed to be the original floor tiles, which test positive for asbestos. Flooring in the corridors which contained asbestos was previously abated, and now includes a vinyl composition tile (VCT) that is recommended for replacement based on age and condition. Although asbestos containing tiles were previously removed form the south wing, mastic (flooring adhesive) in the south. wing tested positive and would also require abatement. The kitchen includes a red quarry tile that would need some minor repairs, if this portion of the facility is retained for use. Although not required, it is highly recommended to remove and abate the dining room floor tile, as well as asbestos containing mastic in other parts of the building. The existing VCT is more than 15 years old in all areas of the building that may not be removed, and so should be replaced. 5 W Fire Alarm System The fire alarm panel was replaced in 2011. Some contracted work would be required to remove attached devices from the areas of the building to be removed. Intruder Alarm System The existing intruder alarm system provided coverage only in the rooms on the south end of the facility, and is no longer in use. Attached devices would need to be removed, but could be re- installed in the portions of the building that would remain, if an intruder alarm system is to be retained. Masonry Virtually all walls in the facility are of masonry construction (brick, block) and are generally in good condition. Most settlement cracks have been repaired previously, though some additional work should be completed for the portions of the building to be left in place. All areas of the facility are slab on grade. n 0 CONSIDERATIONS Adaptive reuse of a portion of the existing facility would: • Capture the embodied energy of the associated masonry materials to remain; • Eliminate the opportunity for optimal alignment of a structure on the site; • Eliminate the opportunity for optimal placement of a structure on the site; • Limit flexibility for design of interior space; • Minimize opportunity for overall design of a facility; • Be accompanied with some unforeseen conditions. ® Construction of a new facility would: • Allow optimal alignment of a structure for solar, daylighting, etc.; • Allow optimal placement of a structure on the site for parking, and other land use; • Provide for greater flexibility of the overall design of a facility; • Provide greater flexibility for design of interior space • Be accompanied with few unforeseen conditions. 7 Northern Human Services Center Schematic Budget Comparison Notes: 1. Per FY2012 -13 CIP Budget 2. Contingency is 20% at schematic budget phase. 3. Option based on FY10 -11 CIP Northern Center refurbishment submitted in February 2010. Contemplates removing classroom wings and maintaining remaining structure, foundation, exterior walls. Also includes new windows, new roof, new mechanical, electrical, and plumbing systems. Contemplates similar upfit allowance to options 1 and 2 as well as furniture /equipment to suit desired space plan. All options contemplate a component of the project memorializing the historical significance of the original site and its use. •. RE Option 1 Option 2 Option 3' New Construction, New Construction, Removal of classroom wings, 10,000 SF pre- 10,000 SF of similar adaptive re -use of 10,000 SF engineered building, design to existing center portion standing seam roof, masonry construction masonry and /or block accented exterior walls Abatement, Removal' $250,000 $250,000 $250,000 Design, Construction, Equipment $1,401,760 $1,974,000 $1,427,218 Contingency2 $280,352 $394,800 $285,444 Schematic Budget $1,932,113 $2,618,800 $1,962,662 Budget per square foot $193 $262 $196 - sustainable bldg - sustainable bldg orientation, future orientation, future sustainable sustainable - adaptive re -use's captured Considerations: Infrastructure Infrastructure energy -more design control -more design control - higher costs -fewer unforeseen -fewer unforeseen - greater unforeseen conditions conditions conditions - requires re -work of existing wastewater treatment system Notes: 1. Per FY2012 -13 CIP Budget 2. Contingency is 20% at schematic budget phase. 3. Option based on FY10 -11 CIP Northern Center refurbishment submitted in February 2010. Contemplates removing classroom wings and maintaining remaining structure, foundation, exterior walls. Also includes new windows, new roof, new mechanical, electrical, and plumbing systems. Contemplates similar upfit allowance to options 1 and 2 as well as furniture /equipment to suit desired space plan. All options contemplate a component of the project memorializing the historical significance of the original site and its use. •. RE M Northern Human Services Center Project REVISED DRAFT 12/19/11 • Communicate public meetings by mailing to owners within one mile of property, persons who were on Cedar Grove Park master plan interest list to solicit attendance at input session and open house by mail. ® Send flyer /mailing out 7 -10 days in advance • Post meeting flyers to web site and distribute flyers in community stores and place on marquee sign, encourage those who receive mailing to invite other interested parties. • Open House (March) to use large group presentation, and small group discussions and questions to consider the two options (two 60- minute `drop -in /drop -out' sessions, one at 6:00 and repeat at 7:00, to allow flexibility for public schedules). Survey disseminated. • Public input session (June) to present options and recommended option, receive feedback (facilitated, small groups, reporting to large group). • Hold information session December 2012 to keep public informed on upcoming activities (courtesy update). August- October 2011 Staff reviews information to date, CIP, outlines data needed for project and develops public outreach outline. Four preliminary options identified. November 2, 2011 Staff small group meets with 4 -5 community leaders for brief overview and status, thoughts on community involvement process. December, 2011— Staff working team meets to receive report from focus group meeting, January, 2012 discuss outreach plan, framework of proposed process and options, and survey questions. January 24, 2012 Report to BOCC on Proposed Public Outreach Plan (including draft survey) and recommended options to BOCC. February, 2012 Staff refines the two options for project, creates conceptual (bubble) drawings, and implements public outreach. Early March 2012 Public Open House held to review site overview (limitations) and brief history, proposed options, receive feedback, and distribute survey. March —April 2012 Further distribute survey to those not present; collect survey results April 2012 Staff uses open house public input, analysis and survey results to further develop plans for the options. May 15, 2012 Project option plans and draft recommended option presented to BOCC for initial review prior to Public Input Session. June 2012 Public Input Session held to review recommended plan, as modified by BOCC, receive community feedback. (CIP confirmation of whether initial deconstruction /demolition is a project for FY 12 -13). M August 21, 2012 BOCC decision on recommended project September- November Preliminary planning and design work associated with project. November 2012 Permits acquired for deconstruction /demolition as per project decision and funding. December 2012 Deconstruction /demolition as per project decisions and funding. Informal information Session held for public prior to activity. December 2012 —? Final grading, seeding and site stabilization accomplished, to await next steps of project M SECTION C: Current Septic System Capacity Constraints M ORANGE COUNTY HEALTH DEPARTMENT Improving health. Inspiring change. 1 1 To: Michael Talbert CC: Jeff Thompson From: Tom Konsler Date: April 15, 2012 Re: Water and Sewer Capacity at Northern Human Services Center 5800 NC 86 N Hillsborough I am providing an update on the water and sewer capacity for Northern Human Services Center in anticipation of the work session on April 16th. Water System — The current well on the property is classified as a non - transient, non - community public water supply by the state. It has retained this classification because until recently, there was a daycare center in the facility. Now that the daycare is no longer in operation, the county will seek a reclassification as a transient non - community water supply. This will considerably reduce operating costs as there are fewer testing and monitoring requirements. The capacity of the well should not be a problem for considering anticipated uses for the facility. The wastewater system will be the key limiting factor in overall capacity and the well could produce the quantity needed up to the septic system capacity. Existing Wastewater System - The existing wastewater system is designed for up to 2400 gallons per day (GPD) of use. With the decrease in use of the facility building itself, some of this flow (up to 1000 GPD) was allotted to the bathrooms at the ballfield picnic shelter which is now also connected to the septic system. This leaves approximately 1400 GPD wasteflow capacity available for the building. Without knowing the potential usage for the building (childcare, offices, meeting space, food - service, etc.) it is difficult to put limits on the variety of options. Once potential usage types are identified, it would be relatively simple to find the capacities in terms of number of people, 919 245 2360 131 west Margaret lane, Suite 100 tr Chapel Hill, NC 27514 orangecountync.gov a ORANGE COUNTY HEALTH DEPARTMENT Improving health. Inspiring change. number of events, etc. In general, there are two fairly significant limitations that must be kept in mind: 1. Any extensive food service operation or food processing will likely be restricted. The system may be able to accommodate a limited kitchen where catered food is brought in, but to operate a fully functional food service operation would be beyond the system design capacity. 2. Before any additional use of the building, the plumbing system underneath the building and between the septic system and the building would need to be fully evaluated and likely replaced. The inflow of rainwater during rain events regularly exceeds the design capacity of the system, even with the current minimal use of the building. Wastewater System Expansion - Several years ago, the county applied for and received an Improvement Permit for the property on the opposite (east) side of NC 86 North. This permit identified enough suitable area to accommodate a septic system of just over 6000 GPD capacity. If this area is still available it could approximately double the wastewater capacity of the facility, but at quite a considerable cost. Much of the information that Jeff Thompson sent earlier is still applicable with regard to the wastewater system, including the examples that were developed for potential uses. I'll be happy to work with your office or others to respond to proposals with regard to the septic system capacity. 919 245 2360 131 west Margaret Lane, Suite 100 > Chapel Hill, NC 27514 P orangecountync.gov 91 tounre .r o, qupty Hp ea.? fi o ^Department Rosemary L. Summers MPH DrPH Jonathan Klein, MD, Chair + 9 Janet Southerland, DDS, Vice -Chair am °try en„ Orange County Board of Health Health Director Orange County Board of Health n.nne�ta.easxN..xn Environmental Health Division Ron Holdway, Division Director 306-0 Revere Road, P.O. Box 8181 Phone: (919) 732.8181, x2360 PAX. (919) 644.3006 Hillsborough, NC 27278 Betty Borland Barbara Patterson Chapel Hill Durham Mebane hnYn'- co."Mil e.nc u.: /oi me /envhlth/ Administrative Assistant Office Assistant (919) 968.4501 (919) 688.7331 (919) 217.2031 February 15, 2001 1► i�►�1�7 ►���I�i1► � TO: Pam Jones FROM: Ron Holdway RE: Northern Human Services Center ATTACHMENTS: Spreadsheet for Existing Use of NHSC Spreadsheet for Potential Use of NHSC Copy of Memo from Tom Konsler to Rich Shaw CC: Rosie Summers Tom Konsler Paul Thames Just a note to update you about our most recent work on the NHSC septic system situation. I don't know where things stand on the project right now, so lot me or Torn know if you need anything else. We in Environmental Health do not have further work planned for the site until the County is ready to finalize the soil work on the Kennedy tract or begin evaluation of the Fuqua tract. It was our understanding that the Fuqua tract may also be considered as part of the project. First, we ran some numbers both for the existing wastewater flow and for the potential of expanding the septic system to 6,000 gallons per day. This is the most current figure we have to work with, but keep in mind this is an approximation of the useable area of good soils on the Kennedy tract after preliminary soil work only. Further investigation and testing are necessary before any figure can be confirmed and permits issued. The design flow for the current use of the building, based on usage numbers from Recreation and Parks, is just over 3500 gallons per day. The current septic system is sized for 2,400 gallons per day, so it is overloaded by approximately 45% with the existing use. Although it is working properly by all N Jim Brown, RS Nrry Burn., RS Alan Clapp, RS, LSS Greg Grimes, RS Tom Konsler, RS David Hecht, RS Ron Hedrick, RS Jan Jackson, RS Wendy Thigpen, RS EH Specialist EH Specialist Soil Scientist EH Program Specialist EH Supervisor EH Specialist EH Specialist EH Specialist EH Specialist 92 ,Pam Jones memo, 2 -15 -01 Page 2 accounts, overuse to this degree will have long -term impacts on the functionality and life of the system. A breakdown of the existing use is attached as an Excel file. With the presumed potential design flow of 6,000 gallons per day in a new system and with the current use taken into account, the remaining available flow would be approximately 2,500 gallons per day. Based on the community survey Sharron presented at the last. meeting at the NHSC, we prepared a sample scenario of potential use for the remainder of the flow. This is not, by any means, the only possible use of the additional flow, but maybe it will give you some idea of what the future of the building could be. The breakdown is also attached in the above - mentioned file. We were asked during the last meeting to evaluate the Vanhook property, the ball field area and the junk car lot portion of the Kennedy tract. Only one small potential area of less than 500 gallons per day capacity was noted for any of these sites during testing by our Soil Scientist earlier this month. The remainder of the Vanhook tract contained unsuitable soils compounded by poor topography and landscape position. A good part of the property was ruled out for soils investigation because of the proximity to the reservoir. The ball field area and the junk, car area were deemed unsuitable for use because of a combination of poor soil characteristics, site disturbance and soil compaction. A copy of Tom's memo to Rich Shaw concerning the most recent evaluations is attached. I hope this information helps as we move towards some resolution in this matter. NORTHERN HUMAN SERVICES CENTER CVTCTTK!r MACTCIA /ATGD NCCTf_K1 1=1 r1V11 FUNCTION OPERATION SPAN # of PERSONS SERVED DESIGN FLOW PER PERSON TOTAL FLOW PER DAY AGENCIES " Day Care Year Round 56 15 GPD 840 GPD Head Start September -May 115 15 GPD .1725 GPD JOCCA Year Round 22 10 GPD 220 GPD Family Resources Center - Clients Year Round 10 5 GPD 50 GPD Family Resources Center -Staff Year Round 2 25 GPD 50 GPD Total 2885 GPD ATHLETICS Note: The highest of these 3 figures was used for the total since the seasons do not overlap. Soccer August- October 96 3 GPD 288 GPD Basketball November -March 80 5 GPD 400 GPD Softball May -July 140 3 GPD 420 GPD Total 420 GPD SPECIAL ACTIVITIEVRESERVATIONS NUMBERS from FY 96 -97 Year Round 40 5 GPD 200 GPD Total 200 GPD TOTAL EXISTING WASTEWATER DESIGN FLOW 3505 GPD w NORTHERN HUMAN SERVICES CENTER GY1)AnICTnK1 \AIASTI= \A /AT1 =D 111=CTr_K1 FI h \A1 FUNCTION OPERATION SPAN # of PERSONS SERVED DESIGN FLOW PER PERSON or FLOOR AREA ' TOTAL FLOW PER DAY CLINICS u Health Department - Medical - 2000 Ft2 Year Round N/A 300 GPD /1000 Ftz 600 GPD Health Department - Dental - 1000 Ft2 Year Round N/A 480 GPD /1000 Ft2 480 GPD Total 1080 GPD CHARTER SCHOOL (No cafeteria or showers) Students August -June 60 10 GPD 600 GPD Faculty /Staff August -June 8 25 GPD 200 GPD Total 800 GPD CONTINUING EDUCATION CLASSES Students ( 9 classes per day C 2 hour duration) Year Round 90 5 GPD 450 GPD Instructors Year Round 3 25 GPD 75 GPD Total 525 GPD MISCELLANEOUS GOVERNMENT Satellite Sherrif's Office Year Round 2 25 GPD 50 GPD Satellite D55 Office Year Round 2 25 GPD 50 GPD Total 100 GPD TOTAL EXPANSION WASTEWATER DESIGN FLOW 2505 GPD co a n - 95 Mrang.e (�ounta �i�e IO r ttrtment Jonathan E. Klein, Chair Rosemary L. Summers, MPH, DrPH Janet H. Southerland, Vice Chair Orange County Board of Health Health Director Orange County Board of Health. 306-C Revere Road, P.O. Box 8181 Hillsborough, NC 27278 ww�,c.ai.,n;urx. nc.us /oranee /etichlth/ TO: Rich Shaw From: Tom Konsler x.,.n ca.o,row6u. x..ph Environmental Health Division Ron Holdvvay, Division Director Phoner (919) 732.8181, x2360 FAX: (919) 644-3006 Betty Borland Barbara Patterson Chapel Hill Durham Mebane Administrative Assistant Office Assistant (919) 9684501 (919) 688.7331 (919) 22,7.2031 Date: February 8, 2001 Re: Preliminary Evaluation of the Vanhook Tract [2.25..5] Cc: David Stancil, Paul Thames, Bob Jones, Alan Clapp On February 5t", Alan Clapp and I made a visit to the Vanhook tract [2.25..5] located to the North of the "Kennedy Tract" adjacent to the Northern Human Services Facility. We conducted a preliminary investigation of the soil types present for the ,tential location of a wastewater system to serve the existing facility with potential for expansion. For these purposes an mation of a wasteflow of 6000 gallons per day was used. The results of the investigation yielded no area of suitable soils to support such a system. The vast majority of the tract contained soils that are unsuitable for the placement of a subsurface wastewater system due to shallow depths to saprolite, weathered rock, soil wetness, and expansive clay. Only one small area in the extreme Southeast corner would have potential for further investigation to see if enough area exists for a subsurface system. It is estimated that if an area of suitable soil exists in that location, it would not be of significant size and would be on the order of supporting a wasteflow of less than 500 gallons per day. The extreme western portion of the tract was not evaluated due to the required setback from the impoundment and the presence of unsuitable soil. There is a low area across the northern portion that would also rule out the potential for a system. Should you have any questions about our investigation, please feel free to contact me. Jim Brown, RS Pere Burns, RS Alan Clapp, RS, ISS Greg Grimes, RS Tom Konsler, RS David Hecht, RS Ron Hedrick, RS Jan Jackson, RS Wendy Thigpen, RS EH Specialia - EH Specialist Soil Scientist EH Program Specialist EH Supenisor EH Specialist EH Specialist EH Specialist EH Specialist 0 SECTION D: FY2012-13 Board Adopted Capital Investment Plan: Northern Human Services Center ti rn County Capital Projects Fiscal Years 2012 -17 Project Name Northern Human Services Center Project Status Approved Functional Service Area Governing and Management Starting Date 711/2012 Department Asset Management Services Completion Date 613012013 Available Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6 Prior Years Balances Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to Project Budget Funding 1131/2012 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 Total Year 10 Appropriation Land /Building - Construction /Repairs/Renovations 714,545 344,451 250,000 2,000,000 2,250,000 Equipment/Furnishings - Roof replacement - Total Project Budget 714,545 344,461 250,000 - 2,000,000 - - 2,250,000 - General Fund Related Operating Costs Personnel Services Operations New Debt Service 192,000 192,000 384,000 960,000 - - - 192,000 192,000 384,000 960,000 Total Operating Costs Revenues/Funding Source Transfer from General Fund 396,545 344,461 192,000 192,000 384,000 960,000 Available Project Balance 250,000 250,000 Debt Financing 318,000 2,000,000 2,000,000 Total 714,545 344,461 1 250,000 - 2,000,000 192,000 192,000 2,634,000 960,000 Project Description /Justification These funds would support the removal of the Northern Human Services Center, or components thereof as determined by the County Commissioners. A deconstruction /demolition combination process is recommended, whereby a salvage operation would be conducted to remove items of value or with re -use potential, with the remaining areas removed using traditional demolition techniques. Most masonry products that cannot be reclaimed for direct reuse can be processed for use as an aggregate substitute. Costs for this operation include abatement of asbestos that is present in the building as well. In 2011 The Board expressed interest in removing the building, or parts thereof, and replacing it with a functionally superior and environmentally sustainable facility. Cedar Grove Day Care and Head Start staff were notified last year that the facility would be closed by January 31, 2013. Staff has met with a small group of community representatives at the Manager's request, and discussed conceptual ideas for site development. The Board received information during their January 24 ,2012 meeting which allowed for increased specificity in the project development description and consequently, the cost estimate for construction. Existing project funds are available for use in FY 2012 -13 for the deconstruction /demolition of all, or part, of the building. M SECTION E: March 19th. 2012 Public Meeting - Flyer - Agenda, Survey - Meeting Summary - Photos - Mailing List - Sign -In Sheet (address and contact information removed) - Post Meeting Summary Sheet • i . • ! • 1I Me; 1a &1 Wei 1st Session 5:00 pm -6:00 pm 2nd Session 6:00 pm -7:00 pm You are Invited to an Informal Public Input Session to Discuss . Information on the state of the current 1950 facility • Options for a Possible New Structure? • What Needs Should the Structure Meet? . What Kind of Indoor Facilities? • Other Ideas? 100 7072WINO, WOW 1. Purpose of Session 2. Status of Current Structure and Limitations /Costs 3. Public Input and Expected Timetable 4. Small Group Discussions (see attached handout) a. What Are the Community Service Needs? b. What Would You Like to See at this Site? 5. Report Back from Group Discussions 6. Dot - Voting Exercise and Adjournment (Session Repeats at 6:00 p.m.) 101 Northern Human Services Center Future Facility Public Input Session March 19, 2012 s 0 z aU U v 4- 0 Please answer the following questions: 1 Do you think the existing portions of the building currently used as the cafeteria and gym should remain intact and serve as the proposed community center? OR 2 Do you think a new building should be built to replace the existing facility? 2A If you prefer a new building, do you think the new structure should be an enclosed structure (e.g.. Building)? OR 2B If you prefer a new building, do you think the new structure should be an outdoor structure (example, large picnic shelter with fireplace, restrooms )? 3 Should any new building be designed to accommodate activities like family reunions and community meetings? 4 Should any new building have a stage to accommodate speakers, performers, plays etc.? 5 Should any new building include a kitchen to warm food for events? 5a Should this kitchen have an exterior window so it could be used as a concession stand for events that may be going on in the park softball games, soccer games, etc.)? 7 Should any new building have space for classes of various types? 8 Should any new building have space for recreational summer camps? 9 Should any new building be used to play basketball or similar ames? 10 Would you be opposed to a cell tower on this site (improves cell hone services)? 11 Do you think any new building should be located close to the front of the site (example—at current building location)? 12 Would you personally use this building if these types of amenities were included? 13 Do you think there should be a park and ride lot at this site? PLEASE TURN SHEET OVER 102 Please discuss and rank the following types of services that you think are most desirable at the Site. Write 1 for top priority, down to 7 for lowest priority. Indoor Structure (example - community center) Outdoor Structure (example - large picnic shelter with fireplace, restrooms) Community Center (meeting room with restrooms) Large Outdoor Shelter /Pavilion Park and Ride lot Mini - gymnasium Cellular Tower (to improve cell phone service) Other (please list What Would You Like to Do Here? (check up to five) Play sports Have a room for community meetings Have classes and camps Have indoor restrooms Stage for plays and performances Warming kitchen Room for Family Reunions Concession Stand (opening to outside)? Basketball / Indoor Sports 103 Northern Human Services Center The following information was gathered from attendees at the Northern Human Services Center Public Input Sessions, held on March 19, 2012 at 5:00 and again at 6:00 pm in the cafeteria of the Center. The format of the meeting was as follows: • Staff Overview of Purpose of Sessions • Status of Current Structure, Limitations and Costs • Overview of "survey" and "dot- voting" exercises' • Review of survey questions, community thoughts and ideas • Closing remarks, next steps, website progress reports • Survey turn -in, dot- voting • Adjourn (repeated at 6:10 pm)2 Future Facility Questions ("Survey") At the public information session, attendees were given a list of questions and asked to vote yes /no. Of the estimated 52 attendees, around 29 submitted responses. Mixed Opinions 1. The attendees seemed to have a mixed opinion between two options: a. Deconstructing /demolishing the current 1952 building, with appropriate "memorialization," and construction of a new facility; or b. Retaining the middle portion of the existing facility (cafeteria and gymnasium), and retrofitting and building new facilities (restrooms, etc) around this. Strong Opinions (greater than 3:1) 1. If a new building, it should be an enclosed facility and not an open "shelter "; 2. If new, it should be located near the current location (front) of property; 3. If new, the old building should be memorialized in some way (plaques, retain a wall or some portion of the old structure, photo exhibit, etc) 4. Locating a cell tower on the property would be okay, if improved reception 1 It should be noted that some meeting attendees objected to filling out a survey or "voting" at the meeting, and expressed a desire for 1) more information and 2) the ability to submit surveys at a later date. Surveys were agreed to be accepted later, however only one such survey was received. 2 Only four persons attended the 6:10 session, which followed the 5:00 format but became more of a question and answer session. 104 5. The facility (new or retrofitted old) should be able to accommodate: a. Family reunions b. Community meetings c. Stage for performances /speakers d. Kitchen (warming /catering kitchen) e. Rooms that can be used for classes f. Room(s) that can be used for summer camps g. Room(s) for games and indoor athletics (basketball of some sort) 6. Members attending unanimously said they would use a facility such as the one described herein Moderate Opinion (generally 2:1 to 3:1) 1. If a new building with warming kitchen, an exterior window for use as concessions, etc (2:1 in favor) 2. Most attendees thought a park- and -ride lot at the facility was a good idea (just under 3:1 in favor) Dot - Voting — Intensity of Preference As attendees left, they were given five red dots to place on the list of questions to indicate their interest level. Cumulative voting was allowed. However, this exercise, because of the way questions were phrased and voting conducted, served more as a measure of the intensity of feeling about the issues /questions. Ranked from Most - Intensive Response to Least - Intensive 1. Keep cafeteria and gym (middle of structure) and retrofit /improve (27) 2. A new building should accommodate family reunions and community meetings (16) 3. Build a new structure to replace the 1952 building (13) 4. Not opposed to a cell tower to improve reception (10) 5. A new building should be an enclosed structure (9) 6. Have a kitchen that has exterior window for concessions (8) 7. New building should have space for classes of various types (7) 8. New building should have space for summer camps (6) 9. New building should have a warming kitchen, and a stage (5 each) 10. New building should be located in same spot on site, and old building should be memorialized (2 each) 3 The question about the cell tower has been thrown out since it asked a negative, and it is not clear whether voters were expressing favor or disfavor). 105 11. Should have park- and -ride lot, and would personally use this kind of building (1 each) No one (0) selected 'anew building should be an outdoor structure" An extra sheet of blank paper was provided for any additional comments attendees had. These comments may be found on Attachment 1. 106 Josephine Paylor -Long Cedar Grove, NC Lawrence Vanhook Cedar Grove, NC Mae Catherine Watson Cedar Grove, NC Mary T. Villines Hurdle Mills, NC Melvin Beasley Cedar Grove, NC Phyllis Poole Poteat Cedar Grove, NC Roger Traynham Hillsborough, NC Toni P. Bradsher Cedar Grove, NC Vivian H. Latta Hillsborough, NC 4- Yvonne Villines Mebane, NC' Juanita Torain Hillsborough, NC Linda Schmitt Hurdle Mills, NC Mae Catherine Watson Cedar Grove, NC Mary V. Burt Hillsborough, NC Nancy Graven Cedar Grove, NC Rich Wiedmann Cedar Grove, NC Steve Yuhasz Hillsborough, NC Valerie Foushee -c Chapel Hill, NC Wandra Richardson Hillsborough, NC Bernadette Pelissier Hillsborough, N.C. Larry D. Gunn Cedar Grove, NC Lisa Pope Cedar Grove, NC Malcolm Hester c. Hillsborough, NC Melinda Bradsher Cedar Grove, NC Peggy Rafferty Cedar Grove, NC Robert E. Vanhook Burlington, NC Sucovis Hester Hillsborough, NC Wandra Richardson Hillsborough, NC 107 - 108 Anna Kenion Anna Kenion Barbara A Bradsher Hillsborough, NC : Cedar Grove, NC Mebane, NC Barbara Breeze Barbara White Betty Poole Cedar Grove, NC : Hillsborough, NC:- Cedar Grove, NC � . . Betty Rogers Brenda VanHook C. R. Cedar Grove, NC. Cedar Grove, NC Hillsborough, NC . Carol Hawkins Cindy Newport Camilla White Cedar Grove NC: Cedar Grove, NC : Cedar Grove, NC David Ogburn David Pettiford Donald Vanhook Hillsborough, NC : Cedar Grove, NC Cedar Grove, NC Earl McKee Eric Roeder Eula Allison Rougemont, N.C. Chapel Hill, NC Cedar Grove, NC Faye Poole Francis Beasley Francis Villines Cedar Grove, NC Cedar Grove, NC - -- Hillsborough, NC: Gloria Farrish Hattie Vanhook Howard C. Poole Cedar Grove, NC Cedar Grove, NC Cedar Grove, NC James H. Vanhook Jeff Schmitt Jerry J. Long Cedar Grove, NC Hurdle Mills, NC Cedar Grove, NC Jim Rafferty John Long John Tolar, Friends of Lake Orange Cedar Grove, NC Cedar Grove, NC Cedar Grove, NC rn -- 0 14 D Volunteer Building Committee Sign-Up 112 rtb s�aso`� June 28, 2012 To: Northern Human Services Center Meeting Attendees and Mailing List Thank you again for attending the public input session that was held in the cafeteria of the Northern Human Services Center on March 19. Since a few months have passed, we wanted to share with you an update on the status of this project. For those who may be on the mailing list but did not attend the March 19 meeting, the following is a summary of the information we provided that night about the reason for the meeting, and the status of the building: • The 1950 school building now has very little activity in it. The Cedar Grove Day Care will be moving out by December 31 to a new location. Most of the children being served there at present are not from Cedar Grove. • The only remaining uses are a classroom used by the Cedar Grove Park manager as an office, and some rooms used for storage of materials. • In 2010, it cost the County over $100,000 in annual operating expenses to keep the building open, resulting in the closing down of the wings. • The Board of County Commissioners has been apprised of this situation as part of their review of all County facilities. As a result, $250,000 was targeted in the five -year Capital Investment Plan (or CIP) for this site in 2012 -2013 - with an eye toward deconstruction /demolition of the facility in advance of a new as- yet - undetermined facility. However, before any further steps were taken, the Board asked staff to solicit resident feedback on the plans (and this led to the March 19 meeting in Cedar Grove). Upon sharing this information on March 19, a survey was distributed asking meeting attendees their thoughts about a new facility, versus trying to retain the gym /cafeteria section of the existing facility, and what uses residents were most interested in seeing. Orange County PO Box 8181 Hillsborough, NC 27278 113 Two things have happened since we last met that will likely be of interest to you: 1. The Board of Commissioners has adopted the new five -year CIP, which includes the $250,000 in funds described above for the fiscal year beginning July 1, 2012 - but also now includes a planned $2.0 million in new construction. These funds are currently slated for the fiscal year that begins July 1, 2014. This would allow a year for the deconstruction /demolition of the current building (after documenting and memorializing the facility) and stabilization of the site prior to new construction - OR - alternatively, for renovation and new construction using and enhancing the gymnasium /cafeteria as the new "center." A final decision on which option would be taken will not be made until later in 2012. It is important to note that five -year CIP's are only a plan for expenditures of future funds, but the funds are only appropriated one year at a time. The $250, 000 beginning July 1 of this year has been approved, but the $2.0 million for new constructionlrenovation will have to be approved again in the budget process. As currently planned, that would be in the spring of 2014. 2. Staff prepared a status report memo (attached to this letter) for the Board of Commissioners outlining the building situation, the results of the March 19 meeting, and possible next steps. This memo includes the findings of the survey results (please see pages 2 -3 of the attachment for details). The next steps proposed in this memo for the project are: • That the status report be shared with the Board of Commissioners (done - June 7), • That a letter be sent to the public input session participants thanking them for their assistance and attendance, and identifying these next steps and timetable. (done - this is the letter), • Staff will work on developing visual images of a) the current gymnasium /cafeteria (both identifying the opportunities and unique architectural features of the existing building, and the deficiencies of a 62 -year old building with outdated facilities and infrastructure); and b) a vision of an alternative building and how it might be laid out and function. (This would occur this summer), • Staff will hold another community input session - starting with a tour of the existing facility, followed by a visual /graphic oriented meeting showing both the opportunities and challenges of the gym /cafeteria, and a visual of a possible future facility. Attendees at this meeting will be invited to participate in hands -on design and discussion of what features of the old structure are most important, how they could be Orange County PO Box 8181 Hillsborough, NC 27278 114 retained, and what kind of layout an alternative future facility might have. (This is slated for late- September) • The results of this second input session would be shared with the Board of Commissioners this fall, along with a staff recommendation on a course of action and an opportunity for residents to speak about their thoughts on the options and proposed course of action. (October), and • The Board of Commissioners would then decide what course of action to take for the facility, and how /when this would be implemented. (tentatively, October /November). This is where the project stands at the present time. Staff plans to be back for the second public input session in late- September — a notice of which will be sent by mail and posted in stores (and on the center marquee sign in front) prior to the session. In the meantime, if you have any questions, please feel free to contact the following staff: David Stancil (245 -2510; dstancil(a_orangecountync.gov) Jeff Thompson (245 -2650, ithompson(a7orangecountync.gov) Marabeth Carr (245 -2510; mcarr(a7orangecountync.gov) We hope you have a pleasant summer, and thank you again for your attendance and attention to this subject. We look forward to seeing you in late- September. Sincerely, David Stancil, Director Orange County Department of Environment, Agriculture, Parks and Recreation Orange County PO Box 8181 Hillsborough, NC 27278 115 SECTION F: September 25th, 2012 Public Meeting - Flyer - Meeting Presentation - October 25th. 2012 Board Abstract - Sign-In Sheet (address and contact information removed) - Informal Resident Design Advisory Group Volunteer Sheet (Address and contact information removed) SEPTEMBER 25,2012 You are Invited • an Building Tour-6:00 p Meeting-6:45 pm I LOCATION: Northern Human Services Center 5800 Hwy 86 North Cedar Grove, NC 27231 Informal Public Input Session to: • Tour the current facility and discuss im- portant features, memories of the school. • Review top priorities for future use from March meeting. • Confirm priorities. • Discuss next steps. Please come join for future option Ils as we plar 117 NPAIDININK ovc co, it 116 17 52 4 �rfh that" Northern Human Services Center Development Options Discussion September 25, 2012 118 9/25/2012 Objectives Review of Options, Background Advantages, Disadvantages of Each Option Cost Estimates for Options Background Nature of "Schematic" Planning Input Space Planning and Design Budget and Cost Estimates Contingency Planning Unknowns Design and Cost Dynamics Time 119 9/25/2012 W Background (cont.) Existing Building, Site Factors Age Systems Conditions Cost of Maintenance, Fuel Lack of Occupancy Site Size Well and Septic Condition, Capacity 120 9/25/2012 L, 1 Coo, # a t 17 52 Option 1 orfh Cate, 10,000 square foot community center New construction, after de- constructing existing facility Pre - engineered, metal building with masonry accents Standard U pfit K '� r 121 9/25/2012 r 1z R Option 1 �a N QEACO Estimated Cost: $182 - $210 per square foot Advantages: More building for the money Maximum Design Flexibility Maximum Programming /Use Flexibility New Construction Fewer Unknowns 122 9/25/2012 1*1 Option 1 Estimated Cost: $182 - $210 per square foot Disadvantages: No presence of existing facility 123 9/25/2012 7 Option 2 10,000 square foot community center Adaptive re -use of existing central portion of facility De- construct classroom wings New Roof New Building Systems (Plumbing, Electrical, Mechanical) Standard Upfit 124 9/25/2012 0 (r°4� r 17 52 Option 2 Estimated Cost: $185 - $217 per square foot Advantages: More Architectural, Historical Character Embedded Energy in Existing Facility re -use Reasonable Cost Elements of Existing Building to Remain 125 9/25/2012 0 ®te ; t � �a¢n iz z Option 2 Otth pEaC °t� Estimated Cost: $185 - $217 per square foot Disadvantages: Significant Unknowns Restricted Design Flexibility Restricted Use and Programming Flexibility 126 9/25/2012 10 127 9/25/2012 11 Possible Community Center Renovated Cedar Grove School 128 9/25/2012 12 J I -- ! Existing Parking Existing North 1 -' Future i Building Wing i Recreation Removed Area ca Existing Parking ' - � (Tennis or Volleyball) Re ca � 1 lay - _ - New Raised Metal Roof Over ►Multi- Purpose Room _ 1 1 Existing Basketball Courts Existing Building' to Remain and be Renovated Existing Ball Field Covered Porch - -- — Z 'n V - , New Entrance 1 Existing South i Building Wing Removed 'I New Parking Area 1 J Existing Parking Area Removed Possible Community Center Renovated Cedar Grove School Site Plan �n 129 9/25/2012 13 130 9/25/2012 `II Z111. I I I I I I I I I I I I I Norm I Classroom Wing , Removed , I I I I I ILL r I F- — — I New I Coal Gva Ent-yin — Area ,Removed Mech. New Stage J l 1 Support New Prop New , Renovated Kitchen Game Room Offloes, Renovated Multi- Purpose Room F 'sting ' r — — (with Raised RooQ Stage Covered F", Porch School Renovated History CommunHy Walla Roam - - - - - -- —J New New Jan Restmom Restm.m J New 5 CN- Covered Covem d Entry Poch �i I I I rte' I I I South I Possible Community Center CiaRmo� d'ng Renovated Cedar Grove School Floor Plan I I I aoara I I I I Lr- n_n_i 7 " I I I I - - - I - -s 130 9/25/2012 `II Z111. r 17 52 a *� �►.► Moo i ,i - y 131 9/25/2012 m Q k t 17 52 Ott h (Eat°%.,% MIMI1 i 132 9/25/2012 16 r 17 Sz Next Steps °rth pEati�` Discussion Preferences Project Working Group Invitation BOCC Worksession Presentation Recommendation for Project Working Group Recommendation for Development Option Engagement of Professional Design Team FY13 -14 Budget Preparation 133 9/25/2012 17 M NORTHERN HUMAN SERVICES CENTER Public Input Session Tuesday, September 25, 2012 COPY ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: October 25, 2012 Action Agenda Item No. 1 SUBJECT: Northern Human Services Center Project Update DEPARTMENT: Department of Environment, PUBLIC HEARING: (Y /N) No Agriculture, Parks & Recreation (DEAPR) & Asset Management Services (AMS) ATTACHMENT(S): A) June 12, 2012 NHSC Project - Status Report B) NHSC Development Option Comparison C) September 25, 2012 NHSC Community Meeting #2 Summary INFORMATION CONTACT: David Stancil, DEAPR, (919) 245 -2522 Marabeth Carr, DEAPR, (919) 245 -2516 Jeff Thompson, AMS, (919) 245 -2658 Wayne Fenton, AMS, (919) 245 -2628 Michael Talbert, Assistant County Manager, (919) 245 -2308 135 PURPOSE: To receive an update from staff on efforts related to the Northern Human Services Center (NHSC) as well as to provide feedback and direction on: 1) a summary and outcome of the public meeting held on September 25, 2012; 2) a potential recommendation for the "Option 2" development path for the project; and 3) a potential recommendation to engage a professional design firm for the project through a request for qualifications ( "RFQ ") process. BACKGROUND: In June 2012, the Board of County Commissioners approved the FY2012 -17 Capital Investment Plan (CIP) that included $250,000 in FY 2012 -13 for deconstruction and demolition of the Northern Human Services Building (NHSC) in preparation for the future use of the site. The Board also approved $2.0 million in FY 2014 -15 for construction of a new facility at the site. The Board may recall that staff held a public meeting to receive input on the function, appearance, and characteristics of this proposed new facility. Attachment A, a June 12, 2012 memorandum entitled "Northern Human Services Center (NHSC) Project - Status Report", presents the summary provided to the Board in a work session prior to the summer break. The community meeting concluded with public consensus on the types of uses the proposed facility should include within its space plan. However, there were mixed opinions regarding either building a completely new facility or retaining components of the original facility. A "adaptive re- use"d evelopment model would incorporate components within a design that would retain more of the character and cultural significance of the original facility. 136 Staff held an additional public input session on September 25, 2012. The focus of that meeting was to gather input and consensus on a development path of an approximate 10,000 square foot facility that would follow a new construction path ( "Option 1 ") or the "adaptive re -use" construction path ( "Option 2 "). Attachment B, entitled "NHSC Development Option Comparison ", compares and contrasts these two options. In summary, while both options are similar in total cost, Option 1 allows for more design and space planning flexibility. Option 2 maintains the important social, cultural, and historic elements within the design, but would restrict some space planning and use flexibility. The September 25, 2012 public meeting produced a strong preference for Option 2, the "adaptive re -use" path. Attachment C is a September 25, 2012 NHSC Community Meeting #2 Summary which provides the salient outcomes of that meeting. In addition to the preference for Option 2, the public meeting group embraced staff's suggestion that an informal resident design and review advisory group be presented to the Board for approval. If the Board approves staff moving forward with the project as recommended at the November 8, 2012 regular meeting, the development timeline would be as follows: TASK PROPOSED BEGINNING DATE END BY DATE BOCC Action: Receive project update 10/25/12 10/25/12 BOCC Action: Decision on Manager recommendations 11/8/12 1118/12 NHSC fully vacated 12/31/12 12/31/12 Project design RFQ process; Board approval of Designer Contract 3/1/13 6/20/13 BOCC Action: Approval for Designer Professional Services Agreement est. 6/20113 6120/13 Project schematic design 6/20/13 10/20/13 BOCC Action: Approval of Schematic Design est. 10/20/13 10/20/13 Project final design, bid document preparation 11/1/13 1/31/14 Project Bid - abatement, deconstruction and adaptive re -use construction est. 2/1/14 4/28/14 BOCC Action: Bid Award, Budget Approval for Construction est. 6/20/14 6/20/14 Construction, Commissioning, Opening est. 8 months duration 7/1/14 3/1/15 137 FINANCIAL IMPACT: There is no financial impact associated with receiving this update and providing feedback to staff. RECOMMENDATION(S): The Manager recommends that the Board receive the Northern Human Services Center project update and provide direction to staff on the following: 1. the summary and outcome of the public meeting held September 25, 2012; 2. a potential recommendation for the "Option 2" development path for the project; and 3. a potential recommendation to engage a professional design firm for the project through a request for qualifications ( "RFQ ") process. 138 MEMORANDUM TO: Frank Clifton, County Manager FROM: Michael Talbert, Assistant County Manager Pam Jones, Asset Management Director David Stancil, Environment, Agriculture, Parks & Recreation Director DATE: June 12, 2012 SUBJECT: Northern Human Services Center (NHSC) Project - Status Report The purpose of this memorandum is to provide an update on the NHSC project, results of the March community input session, and planned next steps. The Board may find this information of use as it completes deliberation on the FY 2012 -13 Budget and the 2012 -17 Capital Investment Plan (CIP). The Manager's Recommended CIP includes $250,000 in FY 2012 -13 for preparation of the NHSC site for future use, which may involve full or partial deconstruction /demolition of the existing 1950 structure, and $2.0 million in FY 2014 -15 for construction of a new facility at the site. Background As brief background, the former Northern Human Services Center is located at 5800 NC 86 North, approximately seven miles north of Hillsborough in Cedar Grove Township. The land for the school was conveyed by the Vincent family in 1946, and the school was constructed in 1950 (with a 1957 kitchen addition) as the African - American school for this part of the county. With school integration in the late- 1960's, the Orange County Board of Education consolidated schools, and the building and eight -acre property was transferred to Orange County in August 1976. This deed included a stipulation that the property must be used "for a public purpose" or ownership would revert back to the Board of Education. By the mid- 1980's, the facility was in use for a variety of County purposes, which over the years have included, but are not limited to social services, a branch library, Durham Tech classes, a variety of child care services and Head Start programs and a variety of recreation classes and programs. 139 Over the past 15 years, a number of studies were undertaken to determine possible uses for the building. None of the potential uses, however, fared favorably when compared to the cost and effort that would be needed to bring the building up to a suitable standard of operating efficiency. Estimated costs to complete the needed work in 2001 ranged between $2.1 and $2.4 million. By today's construction costs, the estimated investment would likely go well beyond $3 million. While portions of the building have been closed off to help minimize the approximately $100,000 annual operating expenses, the construct of the building systems limit what can be done in this regard. One of the primary concerns of the existing facility is septic capacity. Although additional land for expansion was purchased across the highway from the main building, the designed facilities carried an anticipated cost well over $500,000, so the project was suspended. In 2001, county voters approved a bond referendum which included funds for a park on 40 -acres previously- acquired behind the structure. The Cedar Grove Park was constructed and opened in 2008. The last County functions left the facility in 2010, and the only remaining uses are the Cedar Grove Day Care (scheduled to vacate the building by January 1, 2013), storage of equipment by County departments, and a former classroom used as the park office by the Cedar Grove Park manager. In 2011, as part of capital planning deliberations, $250,000 was earmarked for FY 2012 -13 for deconstruction /demolition of the facility, and in 2012, based on Board discussions, an additional $2.0 million was included in the Manager's Recommended 2012 -17 CIP for FY 2014 -15 as a placeholder for a new facility. As a part of these discussions, the Board asked that staff solicit public input on the plans for the facility prior to final decisions. Community Input Session - March 19 As a precursor to a public input session, staff from the County Manager's office, Asset Management Services and the Department of Environment, Agriculture, Parks and Recreation invited a small group of community representatives who had been active in the previous park planning effort to an informal pre - meeting, to receive feedback on how to best solicit community input. This information was used to develop a Public Input Session that was held on March 19, 2012. A summary of this meeting is provided as Attachment 1. Flyers were mailed to all property owners within one mile of the NHSC, distributed to area stores and churches, and advance notice was posted on the marquee sign outside the building. 140 Over 50 persons attended this input session, held in the cafeteria of the NHSC. Representatives completed a survey about preferences for the future uses at the site. There were mixed opinions about whether to try and retain the cafeteria /gymnasium `center mass" of the facility and retrofit it with new restrooms and upgraded facilities, or to memorialize and document the existing facility before taking it down for a new community facility. However, there was strong consensus on the types of activities and uses that residents favored for this location, including: • Large meeting room for community meetings, family reunions, • Stage area for performances, • Warming (catering) kitchen, • Rooms for classes, summer camps and gams or some indoor athletics, and • A cellular phone tower that improved area phone reception Respondees were unanimous that they would personally use a facility along these lines. Follow -up Discussions and Proposed Next Steps After tallying survey results and a dot - voting exercise conducted at the meeting, staff met on two occasions to discuss how to proceed. A report to the Board of Commissioners on the activities to date, and another community input session were deemed to be the most prudent next steps. From the first input session, it was clear that residents have a strong sense of place and community in being from Cedar Grove, and an attachment to some level of service provision in the community. It was also clear that many present desired additional information - both about the current status of the existing structure, and about "what could be" in the way of a new facility. A "vision" of what could be seemed to be one key piece that meeting attendees desired to be able to see and discuss. In that light, staff proposes the following course of action: 1. That this status report be shared with the BOCC as final CIP decisions are considered to provide an opportunity to provide feedback. (June), 2. That a letter be sent to the public input sessions participants thanking them for their assistance and attendance, and identifying these next steps and timetable. (June), 3. The staff work on developing visual images of both the current gymnasium /cafeteria (identifying and acknowledging both the opportunities and unique architectural features of the existing building, and the deficiencies of a 62 -year old building with outdated facilities and infrastructure); and a 141 vision of an alternative building and how it might be laid out and function. (summer), 4. That staff hold another community input session - starting with a tour of the existing facility (augmented by the good and bad images outlined above), and then a visual /graphic oriented meeting showing both current facility opportunities and challenges, and a visual of a possible future facility. Attendees would be invited to participate in hands -on design and discussion of what features of the old structure are most important, how they could be retained, and what kind of layout an alternative future facility might have. (September) 5. The results of this input session would be shared with the Board this fall, along with a staff recommendation on a course of action and an opportunity for residents to speak their feeling about the options and proposed course of action. (October), and 6. Board decision on the course of action for the new facility, and implementation of same as per the directed schedule. (October). In conclusion, staff was impressed and heartened to see the strong opinions and feedback provided in the March session. It is clear that Cedar Grove residents feel passionately about their community, and desire a place for community events to occur. It is hoped that this memorandum and this possible course of action will lead to a mutual agreement on the best way to meet the community's needs going forward. Please feel free to contact us if you have any questions. ATTACHMENT B Northern Human Services Center Development Option Comparison Abatement, Removal Design, Construction, Equipment Contingency Schematic Budget Estimate Schematic Budget per square foot Considerations: Development and Construction Cost Design Flexibility Programmed Use Flexibility Unforeseen Conditions Original Structure's Use? Estimated Future Operating Costs Option 1 New Construction, 10,000 square foot pre - engineered metal building, standing seam roof, masonry and /or block accented exterior walls; standard interior upfit $220K - $250K $1.3M - $1.5M $300K - $350K $1.82M - $2.10M $182-$210 Lower Higher Higher Lower No Low to Mid -Range Option 2 Removal of classroom wings, adaptive re -use of 10,000 square foot center portion; new roof and building systems; standard interior upfit $175K - $225K $1.36M - $1.58M $309K - $366K $1.84M - $2.17M $185-$217 Low to Mid -Range Lower Lower Higher Yes Low to Mid -Range N 143 ATTACHMENT C Northern Human Services Center (Old Cedar Grove School) Project Community Meeting #2 September 25, 2012 Summary 31 persons and five staff were present for the meeting A building tour was held at 6 :00 to look for important architectural features and share stories or information about the school and its history. • After the tour, the group discussed the locations and topics discussed and seen in the building. Some of the notes and points were: o The building was last used as a school in 1969 o There were weekly Friday plays put on by classes at the school o Often had Dances and Talent shows in the Gym o Lunches cost .25 a day or $1 a week o There was a May Pole in the front yard o There was a small playground behind the school o The old ballfield was the location for the school's playing field o Interest in retaining the look of the school o Interest in reusing bricks, steel poles of the existing school - or purchasing some items from the school if sections are deconstructed. o Interest in purchasing salvaged items • Staff presented pros and cons of different building options: • The current Capital Investment Plan includes $250,000 for building deconstruction, and $2.0 million in FY 2014 -15 for a new facility of some type (to be determined) • Option 1 - New Pre - engineered 10,000 sf building, with masonry wall accents (Schematic Budget estimate - $1.93 million) • Option 2 - Adaptive Reuse of Central Portion of Current Structure (10,000 sf), remove classroom wings, some reworking and additions (Schematic budget estimate - $1.96 million). • Examples and pros /cons of each were shared. • The group then discussed preferences, important features or desired components, and a design and review advisory group • The group had a strong preference for Option 2 (adaptive reuse of central portion of building - cafeteria, gym, principals office area). Only two persons indicated preference for Option 1. • It was noted that some work would be needed to bring the remaining 1950/1957 structure up to building code, including new restrooms. • The group validated the top preferences for building uses from March: • Meeting room for community meetings, family reunions, etc • Space for indoor athletics activities (gym or gym -like room) • Stage for performances • Warming kitchen • Rooms for classes, summer camps `; 144 o Cellular tower to improve area phone service • Additional uses the group indicated would be preferred included: o Some type of room with computers and intereet access (as the library branch used to have). o Some classrooms - could a few of them be retained? o Support for an Emergency Services base station - as long as it did not take space away from the proposed center • There was a question about the naming of the facility and the future of the new playground built with the park (if the classroom wings were taken down). • There was interest in having residents serve on an informal design and review advisory group. Eight members volunteered to serve on this informal group to help advise on designing the new building as it moves forward. Conclusions 1. Staff will make a summary of this meeting and the group's recommendations. 2. The recommendations, along with the proposal to create the informal design and review advisory group, will be shared with the Board of County Commissioners at a worksession this fall. 3. Once direction has been received from the Board, a proposed course of action would be developed for Board approval. 145 SECTION G: MBAJ Architects Request for Qualifications Response ... ... . ....... 01 M w RAO F, Architectural and Engineering Services Northern Human Services Center Project Request for Proposal January 30, 2013 Directed to: Purchasing Agent 200 S. Cameron Street PO Box 8181 HIllsborough, NC 27278 146 NO, Completed Responder's Certcation Form and notarized Non-Collusion Affidavit 147 um NC)N~CQLLUS/[)NAFF|DAV|T State of North Carolina County nfOrange Proposal Request No. 51S1 beiOg first duly,swn0. deposes and says that: (H ejShe is the of the proposer that has submitted the attached proposal; 2. He/8h8 is fully informed respecting the preparation and contents 0fthe attached prOpV88| and of all pertinent circumstances respecting such proposal; 1 Such proposal iS genuine and iG not 8 collusive 0[ sham proposal; 4^ Neither the said proposer nor any of its officers, partners, 0wnens, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other proposer firm or Person to submit collusive OF sham proposal |O connection with the contract for which the attached proposal has been submitted or to refrain from proposing in oVnneo(jOn with such contract, or has in any rnonD8r, directly or indirectly sought by agreement Or collusion Of cQn0[n4DiCadUn or conference with any other p[op0se[, firm or person to fix the. price or prices in the attached proposal or of any other proposers, or to fix any overhead, profit or cost element Of the proposal price of the proposal 0f any other proposer o[t0 secure through collusion, conspiracy, connivance or unlawful agreement any advantage against the County 0f Orange Or any person interested in the proposed contract; and The price or prices quoted in the attached proposal are fair and proper and are not tainted by any collusion, conspiracy, COmliV@nce or UD|@vYfU| 8g[eeDl8Cd on the part, Ofthe proposer or any of its agents, representatives, {nmn8rS, employees, or parties in interest, including this affiant. Title I Subscribed and Sworn t0 Before Me, Notary Public `3 My COrnnias0n Expires: Pagel 1of11 �~�r 149 I have carefully examined the Request for Qualifications, the sample Agreement for Design Consultant Services and any other documents accompanying or made a part of this Request for Qualification. 1 hereby propose to furnish the professional design consultant services for Orange County in accordance with the instructions, terms, conditions, and requirements incorporated in this Request for Qualification. I certify that all information contained in this response is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to submit this response on behalf of the firm as its act and deed and that the firm is ready, willing and able to perform if awarded the contract. NAME OF FIRM: t1/)6A3 A rai -[ccf-u rc-, BY: (printed name SIGNATURE: MAILING ADARES6" 1�1n () n VVC� j J CITY/STATE/ZIP CODE: TELEPHONE NUMBER: FAX NUMBER: Responder hereby acknowledges receipt of all Addenda through and including: Addendum No. Date Ack /eedg ement /Z Jo ' W-F V t Page 10 of 11 dy t Orange County Financial Services Department ADDENDUM #1 January 10, 2013 RFP 5191 Professional Architectural /Engineering Services - Northern Human Services Center (N SC) Project To all Vendors: Modifications to bid documents for the above named Request for Proposal are made as follows and shall be included in the proposed amount. 1. See page 2 for questions with County's responses received for the above referenced project All other terms and conditions shall remain the same By: David E. Cannell, Purchasing Agent; dcannell, co.oranqe,.nc,us — (919) 245-2651 A signed copy of this addendum shall be included with the bid submitted by your company Company Name: M Date Received: P.O. Box 8181 200, South Cameron Street Hillsborough, North Carolina 27278 Telephones: Area Code 919 245-2.651 Fax: 919 644-3324 Page 1, C, 150 151 Orange County Financial Services Department ADDENDUM #1 January 15'2U13 RFP51Q1 Professional Arch itectural/Engineering Services - Northern Human Services Center (NHSC) Project To all Vendors: Modifications to bid documents for the above named Request for Proposal are mode as follows and shall be included in the proposed amount. 1. The due date has been moved back a week the new due date is January 30, 2013 at 5:00 pm 3. The facility will beavailable for site visits onthe following two dates and times only. Please note this is a site visit only and not a pre-proposal meeting • January 16. 2O13 from S:O0 am to noon • January 23, 2013 from 9:00 am to noon All other terms and conditions shall remain the same By. David E. Cannell, Purchasing Agent; dc�gnnelfcCLco,g-rorQ;,�..ric,�,s - (919) 245-2651 A signed copy of this addendum shall be included with the bid submitted by your company �~�4- . CompanyNarno: Date Received: P.O. Box 8181 200 South Cameron Street Hillsborough, North Carolina 27278 Telephones: Area Code 919 245-2651 Fax: 919 644-3324 Page I 152 P7 '60 1 153 r Founded in 1981 as a sole proprietorship " MBAJ Architecture incorporated in 1987 and continues to grow in expertise. With offices in Shelby, Charlotte, and Raleigh, North Carolina and Lexington, South Carolina, and a staff of 25+ professionals, MBAJ serves clients throughout North and South Carolina. The cornerstones of MBAJ's practice are in the design and delivery of educational, governmental, religious, and commercial facilities. The professionals within the firm excel in renovations and additions on existing sites, and new facilities on undeveloped property. Additionally, MBAJ has a wealth of experiences with pre- funding planning, facility assessments, programming, master - planning, phased construction administration, and post-occupancy services. The MRAJ Principals Registered O. Stanhope Anthony, III, AIA - NC, SC, WV Robert B. Johnson, Jr., AIA NC, SC John F. Thomas, Jr., AIA NC, WV, VA G. Richard Brown, AIA NC Angela Crawford Easterday, AIA NC James S. Golightly, II, AIA NC, SC Previous Firm Names: James I. Martin, Architect 1981 Martin /Bardsley 1984 Martin Bardsley Anthony, Architects 1986 Martin Boa] Anthony & Johnson, Architects 1990 9131 Anson Way 201 South Washington Street 1230 W. Morehead Street 1070 South Lake Drive Suite 204 Suite 200 Suite 214 Suite J Raleigh, NC 27615 Shelby, NC 28150 Charlotte, NC 28208 Lexington, SC 29073 919-573 -6400 (p) 704406 -6000 704 -731 -7000 803- 356 -0507 919 -573 -6495 (f) 800 - 590 -MBAJ (6225) 800- 590 -MBAJ (6225) 800 -590 -MBAJ (6225) 800 - 590 -MBAJ (6225) Contact: John Thomas JTomas@mbaj.com Yti" 1 154 i a, 1230 West Morehead Street Suite 400 Charlotte, North Carolina 28208 Toll -free 800 - 590 -MBAJ Fax 704-731-6095 R 14 R January 28, 2013 Orange County Financial Services Purchasing Agent 200 South Cameron Street P O Box 8181 Hillsborough, NC 27278 RE: Request for Proposal SUBJECT: Northern Human Services Center Department RFP. NO.: 5191 Dear Selection Comrnittee: We appreciate the opportunity to submit our Statement of Qualifications regarding this project. Based on the scope of work, Adaptive Reuse of Culturally Significant Building, the type of proposed reuse and its location in Orange County, we have a high level of interest in this potential commission. This is the case due to our previous experience with all aspects of this work for other countries in North and South Carolina, especially with it being a culturally significant building slated to be repurposed makes it more meaningful to achieve exceptional results. Regards, 2 Rob Johnson MBAJ Architecture John Thomas MBAJ Architecture I I i�' , 156 157 Understanding of the scope of work /services: We have experience with all aspects of this proposal project. More specifically; • Adaptive reuse of culturally significant buildings • Satellite county facilities • Health and Human Services Centers • Recreation Facilities • Educational and Historical Recognition of Cultural Significance • Working for local units of local government Therefore, we have a clear understanding of the expected challenges and the opportunity for mean- ingful results which best support the operational needs of the county and its citizens. f g F 158 159 . lti ..'so..........':'m�"".b4�.twSxP�ESYh.. E Firms commitment to keep the originally - assigned project team: We are committed to keeping the team we have carefully compiled together from the conception to completion of the project. It is in our best interest to do so for the following reasons: • Programming efforts and needs can be best translated into design options • Best design solution may be achieved • This approach is the most cost effective • The reviews and approvals can be done most timely • Public bidding will be handled with the most knowledge and efficiency • The same is true of construction administration 160 r r Er M` +13?!1� i io- , }i ..l!'r.:w +i.'6��3% d"FJK%9i.'. "W,.i4 ...eY�AiYS£%d✓fGYIrS�.°.� — '.�.P£.%� ...... .... .�..:R .�M"l;:tNESi'ik!?4x'� =v1" ;;� € �;� John F. Thomas, Jr., AIA, LEED Green Associate Principal Selected Experience Civic & Government 9 Duplin County, Kenanville, North Carolina - Airport Terminal - New o Johnston County Economic Development, Smithfield, NC (joint venture - Johnston County, JCC, NCSU, Bayer Novo Nordisk, & Fresenius Kabi) - Johnston Workforce Development Center - New o North Carolina Dept. of Transportation, Raleigh, NC - Cumberland County DMV /SHP Complex New a North Carolina Justice Academy, Salemburg, NC - Dormitory A - Renovations o Onslow County, Jacksonville, NC - Administrative Office Complex - New (construction not funded) o Surry County, Dobson, NC - Administration & Social Services Building - Addition and Renovations EMS /911 Facility - Addition o Town of Princeton, Princeton, NC - Town Hall - New Higher Education : %'or•th Carolina Community Colle,e)e S stein o College of the Albemarle, Elizabeth City, NC - Facility Utilization Study and Campus Master Plan - Professional Arts Building - New - Roanoke Island Campus - Renovations o Davidson County CC, Lexington, NC - Facility Utilization Study and Campus Master Plan - Conference, Training, & Technology Building - New - Davie Campus Laboratory Building - Addition - Davie Campus Laboratory Building - Renovation - Gantt Building - Renovation - Histology /CNA Lab - Renovation Love Learning Resource Center - Renovation - Uptown Lexington Campus - Assessment & Renovation o Durham Technical CC, Durham, NC - Facility Utilization Study and Campus Master Plan - 807 Bacon Street Building - Addition and Renovation - N.B. White Building - Addition and Renovation o Edgecombe Community College, Tarboro, NC ACT Project Preliminary Design - Biotech & Medical Simulation Center - New o Fayetteville Technical CC, Fayetteville, NC - Facility Assessment /Campus Master Plan New Western Campus Master Plan - Long Range Plan - Early Childhood Education Center - New - Cumberland Hall - Renovations - Horace Sisk Building - Renovations o Johnston CC, Smithfield, NC - Facility Utilization Study and Campus Master Plan Auditorium - Renovation - Britt Building (Industrial Technology) - New ° Public Safety Building - New - Bioprocessing Simulation Laboratory - Renovation - Elsee Building - Renovation Graphic Arts Building - Renovation 161 7 777 IIII .i Health Building - Addition and Renovations TDT Building - Renovation Wilson Building - Addition and Renovation ° Workforce Development Center - New a Piedmont CC, Roxboro, NC - Facility Utilization Study and Campus Master Plan - Technical Education Building - New Learning Resource Center - Addition and Renovations - Student Center - Addition and Renovations o Sandhills Communtiy College, Pinehurst, NC - Stone Hall Auditorium - Renovations a Wake Technical Community College, Raleigh, NC - Physical Education Center - Addition and Renovation Coininu2Wy canal 7f>cj meal C.o11(ge .Sys tein of lk est W i -,q iniar a Advantage Valley Advanced Technology Center - New o North Central Advanced Technology Center - New o Facility Programming: - Advantage Valley Advanced Technology Center - North Central Advanced Technology Center - New River CTC Headquarter Building Professional License/Registration. North Carolina Board of Architecture Commonwealth of Virginia Board of Architects West Virginia State Board of Architects National Council of Architectural Registration Boards LEED Green Associate Certification Professional Mernbershi s American Institute of Architects Council of Educational Facility Planners Professional Recognition National School Public Relations Association Outstanding Communicator Award, 2005 (nominated by Dare County Board of Education) Recognized Educational Facility Planner University of North Carolina at Charlotte, NC Bachelor of Architecture, 1986 Bachelor of Arts Architecture, 1985 Wentworth Institute of Technology Associate of Engineering, 1981 Academic Honors Alpha Chi Rho - National Fraternity of Architects Honor Award, 1986 Community l rnvolvernen-nt Saint Andrews Presbyterian Church - Elder - Facility Committee (Chair) - Long Range Planning Committee (Chair) New Life Camp - Upward Basketball Coach Angela . w r'. Easterday, AI.,. Principal Selected Experience Civic & Government *Johnston County Economic Deveopment, Smithfield, NC (loint venture - Johnston County, JCC, NCSU, Hospira, Novo Nordisk, & Fresenius Kabi) - Johnston Workforce Development Center - New North Carolina Division of Forest Resources, Raleigh, NC - Bladen Lake Residence - Addition and Renovations - Turnbull Creek ESF - Renovations - Clemmons ESF - Renovations - Holmes ESF - Renovations o North Carolina Justice Academy, Salemburg, NC - Main Campus Dormitory A - Renovations o Onslow County, Jacksonville, NC - Administrative Office Complex - New Higher Education fort;: C�roli "eta C:;ax,tauuir; CollcreSvs-enl o Carteret Community College, Morehead City, NC - Facility Utilization Study and Campus Master Plan o Coastal Carolina Community College, Jacksonville, NC - Campus Master Plan - Maintenance Building - New o College of the Albemarle, Elizabeth City, NC - Facility Utilization Study and Campus Master Plan - Professional Arts Building - New - Roanoke Island Campus - Renovations - Building A - Renovations - Russell Twiford Library - Renovations o Davidson County Community College, Lexington, NC - Facility Utilization Study and Campus Master Plan - Davie Campus Master Plan Update - 3 -D Campus Map - Brick Donor Campaign - Brinkley Building - Addition - Brooks Building (Student Center) - Renovation - Conference, Training, & Technology Building - New Davie Campus Laboratory Building - Addition (Student Center) - Davie Campus Laboratory Building - Renovation - Davie Histology & CNA Lab - Renovation - Early College Mobile Unit - Davie Campus - Gee Building - Signage Upgrades - Life Sciences Building - Assessment - Love Building - Bookstore Renovation - Love Building - Library Renovation - Mendenhall Building - Assessment and Renovations o Durham Technical Community College, Durham, NC - Facility Utilization Study and Campus Master Plan - 807 Bacon Street - Renovations - N.B. White Building - Addition and Renovations o Edgecombe Community College, Tarboro, NC - Biotech & Medical Simulation Center - New - Autobody Shop - Addition a Fayetteville Technical Community College, Fayetteville, NC - Facility Utilization Study and Campus Master Plan Early Childhood Education Center - New Johnston Community College, Smithfield, NC Facilities Assessment and Campus Master Plan - Facility Master Plan Update (2008) (2007)(2005) 162 - New Clayton Campus Master Plan - Campus Hydrology /Stormwater Study - Early College Facility - Assessment - Arts Building Gallery Renovation - Bioprocessing Laboratory - Renovation /Conversion - Britt Building (Industrial Technology) - New - Cleveland Campus - ADA Upgrades - Elsee Building - Renovations - Graphic Arts Building - Renovations - Health Building - Addition and Renovations - Leaming Resource Center - New (Seeking LEED ) - Maintenance Plan Development - Parking Lot Improvements - Public Safety Building - New - Public Safety Building - Furniture Package - Student Life Center - New (AP) - Tart Building - Assessment - TDT Building- Renovations - Medical Simulation Ctr (Virtual Hospital) (Tart Bldg Reno) - Wilson Building - Addition and Renovations - Workforce Development Center - New o Piedmont Community College, Roxboro, NC - Facility Utilization Study and Campus Master Plan - Student Complex - Addition and Renovations - Technical Education Building - New - Allied Building - New (AP) o Pitt Community College, Greenville, NC - Facility Utilization Study and Campus Master Plan o Randolph Community College, Asheboro, NC - Facility Utilization Study and Campus Master Plan o Robeson Community College, Lumberton, NC - Facility Utilization Study and Campus Master Plan - Business & Industry Training Center Advanced Planning - Southeastern Economic Development Commission o Rowan - Cabarrus Community College, Salisbury, NC - Facility Study and Campus Master Plan - North Campus (2011) o Sandhills Community College, Pinehurst, NC - Hoke Early College Center - New - Stone Hall Auditorium - Renovation o Southeastern Community College, Whiteville, NC - Facility Utilization Study and Campus Master Plan - Building G Renovations (Student Center) - Health and Human Services Building - New o Vance- Granville Community College, Henderson, NC - Facility Utilization Study and Campus Master Plan - Kerr -Tar Hub Site Selection Study Professional. License/Registration North Carolina Board of Architecture Professional Memberships American Institute of Architects Council of Educational Facility Planners Edtication North Carolina State University, Raleigh, NC Master of Architecture, 1998 Texas A&M University, College Station, TX Bachelor of Environmental Design, 1995 Project Manager Selected Experience Civic & Government o N.C. Dept of Transporation, Raleigh, NC - Cumberland County DMV /SHP Complex - New o Surry County, Dobson, NC - New Courthouse & Jail Addition and Renovation o' Town of Princeton, Princeton, NC - Town Hall - New Higher Education .'1'orrb C- 'anoli ? ?t7 f. >? ?3 Yt;d77i1 v C"i 8 Syslc =ln a Coastal Carolina Community College, Jacksonville, NC - Campus Master Plan - New Maintenance Building o College of the Albemarle, Manteo, NC - Professional Arts Building - New - Roanoke Island Campus Renovations - Russell Twiford - Renovations o Davidson County Community College, Lexington, NC - Davie Campus Master Plan Update (2010) - Brinkley Building - Addition - Brooks Building (Student Center) - Renovations - Conference, Training & Technology Building - New - Davie Campus Lab Building - Addition - Finch Building - Structural Repairs - Gee Building - Signage Upgrades - Life Sciences Building - Assessment - Love Building (Bookstore and Library) - Renovations - Mendenhall Building - Assessment and Renovations o Edgecomb Community College, Tarboro, NC - Autobody Shop - Addition - Biotech & Medical Simulation Center - New *Johnston Community College, Smithfield, NC - Art Gallery - Renovation - Learning Resource Center - New (Seeking LEED ) - Medical Simulation Center (Virtual Hospital) - Public Safety Building - New - Student Life Center (AP) - New - Health Building - Addition and Renovation o Piedmont Community College, Roxboro, NC - Allied Health Building (AP) - New - Technical Education Building- New o Sandhills Community College, Pinehurst, NC - Hoke Early College Center - New o Southeastern Community College, Whiteville, NC - Building G (Student Center & Early College) - Renovations o Wake Technical Community College, Raleigh, NC - Physical Education Building - Addition and Renovation i'oaaatnii (in-d '?c rlicGl Collge ; tt/ t Viry f iaicr a Advantage Valley Advanced Technology Center - New c North Central Advanced Technology Center - New o New River Community and Technical College Headquarters Building - New - Fine Arts Center - Renovation K -12 Education - North Carolina * Brunswick County Schools, Bolivia, NC / l dry, Cedar Grove Middle School - New Town Creek Elementary School - New o Dare County Schools, Manteo, NC - Central Office Building - New - First Flight High School - New - New Nags Head Elementary School - Cape Hatteras Secondary School - Addition and Renovation - First Flight Middle School - Addition - Kitty Hawk Elementary School - Addition and Renovation Manteo Elementary School - Addition and Renovation o Franklin County Schools, Louisburg, NC - Bunn High School - Addition and Renovation o Martin County Schools, Williamston, NC - Williamston Middle School - New K -12 Education - South Carolina o Dorchester District 4 Schools, St. George, SC - St. George Middle School - Addition and Renovations Religious o Wendell Baptist Church, Wendell, NC - Family Life Center - Addition (Concept Design) Selected Experience with Other Firms o Gettysburg College, Gettysburg, PA a Millersville University, Millersville, PA o University of Alabama, Huntsville, AL o Nichols Research - Building 5, Huntsville, AL e Quality Research Building, Huntsville, AL o Redstone Arsenal, Huntsville, AL o Maxwell Air Force Base, Montgomery, AL Pra essio. nil License/Registration. North Carolina State Board of Architecture National Council of Architectural Registration Boards Professional Memberships American Institute of Architects Education. Virginia Polytechnic Institute and State University, Blacksburg, VA Bachelor of Architecture, 1986 163 164 Construction Administration Service Delivery Model 165 Preconstructio Monitoring — MBAJ Architecture's construction monitoring begins in the early stages of the project's design process. An MBAJ Construction Administrator partners with the MBAJ Project Team for the life of the project. As part of MBAJ's in -house quality control, the Construction Administrator performs constructability reviews throughout the document preparation. Upon award of the project, the selected contractor joins the MBAJ Project Team. The shared ownership of the project with the `7 have worked with two construction contractor is critical to the project success. MBAJ Architecture creates administrators from your firm. I am a Construction Project Team that is inclusive of the contractor and very pleased with theirprofessionalism, takes advantage of the contractor's knowledge and experience to attention to detail, courtesy and overall achieve the best possible product for the client. performance... They earn exceptionally high marks in the areas of documents Construction Monitoring — Successful construction administration depends on effective communication. During the construction period, MBAJ `Architecture's Construction Administrator visits the site weekly and remains on call at all times. The Construction Administrator serves as MBAJ's point -of- contact for clarity of communication. A timely MBAJ response to issues that arise in the field is critical to the project's success. All site visits, meetings, and contractor queries are documented, and in a timely manner, followed with a clearly - written communication from MBAJ. 'Emely Decision Ma — Most construction disputes arise out of poor communication or untimely decision - making. To minimize these occurrences, the MBAJ Project Team strives to remain ahead of potential problems and resolves issues as they arise. A tailored approach to Quality Assurance, coupled with positive communications, speeds up the MBAJ response time throughout the construction of 777 . your facility. ... Both our superintendent and I share the opinion that Dan is one of the best construc- tion administrators we've ever worked with. He did an amzaing job of balancing everyone's interests throughout the project..." — Craig Floyd Project Manager, Branch & Associates, Inc. Owner Occupancy — The culmination of the design and delivery process is owner occupancy of the new or reconditioned facility. This is the most rewarding aspect of a successful project. MBAJ assists the owner with a smooth and timely transition from construction completion to occupancy and operations. Construction Contract Closeout — The most critical milestone of the design and delivery process is the final payment to the contractor. Upon completion of all punch list items, receipt of operation and maintenance manuals, and submission of as -built and contract closeout documents, MBAJ will certify on behalf of the owner, the final payment to the contractor. MBAJ has long established proven procedures and checklists which are diligently respected to ensure proper project closeout. Post Occupancy Warranty Period. a. d Inspections — Just as MBAJ methodically closes out the construction contract on behalf of the owner, MBAJ also remains on call, during the contractor's twelve -month warranty period. Moreover, MBAJ conducts a twelve -month warranty review of the new or reconditioned facility to check, on behalf of the owner, items which may require action of the contractor. 166 Orange County's Desires to Enhance the Local Economy 167 r, How the firm would encourage local construction companies' participation: We will proactively recruit local construction companies to participate in this project, We will seek to do so as follows: • Notifying local contractors, subs and suppliers at the midway of our construction document phase when the scope of work and expected trades and materials are understood • We will require all of our consulting engineers to do likewise • Advertise upcoming prebid conference and bidding • Post the same on our web -site and the county web -site • Offer announcement of upcoming Pre -Bid Conferences and expected bid date at two County Commission meetings in advance • Conduct an informative pre -bid conference at the site Im WE= 169 ,., fMr, /;U'l6ffA� U». u; 15+/. Y✓+ 1'' ralY^ J! �; ti. YYYffi' A. rql �. i+, 1�ibWr, 5�i; 4�N1PJZ' 9": YkF�kU.. l' hv?.., k %7/tdi:';,::s"sk!£wwla5➢.'(+'.: FAF:?.�"h .. •,'"er. :R :in..Rq v�y.tir' :_. -, ..''. A!N:*,i'K+ �i. Yaiif Describe how existing trips to the area could contribute to cost savings: Our office in Raleigh is only 30 miles away. Therefore, we can make, trips easily and cost effectively during design, bidding, and construction. Especially during construction, we will make every effort to combine trips with other work as much as possible. Current Project List Phase Final Completion Completion Proj # Project Owner Phase Contract Amouni Project Start Date Date Date 1112 Duplin Airport Terminal Duplin County CA $86,895 Winter 2011 1016 Autobody Building Edgecombe CC CA $89,875 Fall 2010 5/15/2013 5/15/2013 WV Community & North Central Advanced Technical College 1008 Technology Center System CD $161,832 Spring 2010 11/31/2012 7/30/2014 New River Community 1026 Arts & Science Center &Technical College Bid $185,307 Summer 2010 10/30/2012 12/31/2013 Johnston County 1222 JNX Airport Terminal Airport Authority CD $107,650 Winter 2012 1/31/2013 11/31/13 Rodgers Elementary Multi- Martin County 1137 Purpose Building Schools CD $111,800 Winter 2011 11/15/2012 7/31/2013 Martin County 1140 Williamston Pre -K Center Schools CD $84,900 Winter 2011 12/31/2012 9/30/2013 1218 County Administration Building Onslow County Bid $748,000 Summer 2012 11/14/2012 6/30/2014 Aviation & Technical Training 1120 Center Currituck County CA $415,300 Summer 2011 3/31/2013 3/31/2013 Early College Classroom / Vance - Granville 1011 Library Building Community College SD $830,948 Spring 2010 1/31/2013 0 171 Scctlon 172 Dolly Oak Park Shelby, North Carolina City of Shelby, Parks & Recreation J:' Owner: Charles Holtzclaw, Director Number: 704- 669 -6596 In conjunction with the City of Shelby's construction of park facilities in the years following World War II, Holly Oak Park was developed during the 1950's as the park facility for the African - American community. The park opened in 1958 and the main Community Center building was dedicated in 1960. Very little had been done over the years to keep the facility up to current Parks and Recreation standards. MBAJ Architecture was commissioned to assist in developing a master plan for Holly Oak Park to upgrade the main buildings on the site. The 11,800 square foot Community Building contains a gymnasium, a game room, toilets, and administrative offices. The scope of the project was to renovate the building; provide handicap accessibility to all parts of the building, update the HVAC, electrical, and plumbing systems; and update the building's interior colors and finishes. One objective of the renovation was to use vibrant color and improved artificial lighting to change the character of space. Statistics Project Area: Date of Completion: Project Manager: Original Contract Amount: Number of Change Orders: Total Amount of Change Orders 19,000 Sq Ft (renovated) December 2005 Stan Anthony $961,281 4 $267,747 * *Under same contract as Shelby Community Center Shelby Community Center Shelby, North Carolina I City of Shelby, Parks & Recreation Owner: Charles Holtzclaw, Director I Number: 704 - 669 -6596 e � 173 The Community Center building was originally constructed in 1948 and was in need of a major update to carry out its mission to provide a multi - functional recreation center for Shelby residents. MBAJ Architecture responded with plans to update the mechanical services, improve the internal circulation patterns, invigorate the interiors, improve the lighting, and provide a new entrance. The centerpiece of the renovations, the gymnasium, was transformed from an under -lit institutional type space, to a community focal point through the use of energetic colors, translucent clerestory windows, and improved lighting. The space also includes a renovated stage area. The gymnasium lobby is now home to the Cleveland County Hall of Fame, recognizing persons or teams who have made the best contribution or brought positive recognition to the community. With renovations to the main entrance, administration, gym, aerobics room, and restrooms, the Shelby Community Park Center is poised to serve the Shelby residents for another fifty years. Statistics Project Area: Date of Completion: Project Manager: Original Contract Amount: Number of Change Orders: Total Amount of Change Orders 19,000 Sq Ft (renovated) December 2005 Stan Anthony $961,281 4 $267,747 * *Under same contract as Holly Oak Park Onslow County Administration Complex Jacksonville, North Carolina I Onslow County i Owner: Jeff Hudson, County Manager I Number: (910)347 -4717 First Floor 999 9� SIG a W9 tt �F.D Second Floor ° ° ° ° Third Floor 174 Onslow County, NC, has been named one of America's fastest - growing counties over the past five years due to its booming economy fueled by US Marine Corps, its agricultural base and its tourism industry. Currently, the County Government houses over 1,200 employees and maintains 47 worksites across the county. The average age of the Coun- ty's current facilities is 30+ years old. In order to best serve the rapidly growing population, Onslow County commissioned MBAJ to develop a one -stop County Government Center that will co- locate many of its worksites in one facility. The new Onslow County Government Center consists of a 70,000 sq. ft. three story office building and a one -story 20,000 sq. ft. meeting annex. The office portion of the facility will locate Planning and Environmental Health Departments on the first floor, Tax, IT, GIS, and Veteran Services Departments on the second floor, and Purchasing, Finance, Human Re- sources, County Attorney, County Administration and the Commissioners on the third floor. Additional shell space is available on the third floor for future growth of existing departments or opportunities for new depart- ments to be located in the facility. The meeting annex contains the Board of Elections offices, the Commissioner's Chamber, and six training /meet- ing rooms. The meeting annex will also serve as a backup Emergency Operations Center and a location for on -site voting. In addition, a 10,000 sq. ft. storage building is located in close proximity on the site to house departmental storage needs. The new Government Center is located on a county owned site in a local Business and Industrial Park. The aesthetic of the building was designed to complement other historic buildings owned by the County. Statistics v•t'it'm`rya 100,000 Sq Ft (3 buildings) Total Project Budget: $20,450,000 Anticipated Date of Completion: August 2014 Project Manager: Angela Crawford Easterday Original Contract Amount: $14,260,000 Number of Change Orders: Project under constriction Total Amount of Change Orders: Project under construction �y First Floor 999 9� SIG a W9 tt �F.D Second Floor ° ° ° ° Third Floor 174 Onslow County, NC, has been named one of America's fastest - growing counties over the past five years due to its booming economy fueled by US Marine Corps, its agricultural base and its tourism industry. Currently, the County Government houses over 1,200 employees and maintains 47 worksites across the county. The average age of the Coun- ty's current facilities is 30+ years old. In order to best serve the rapidly growing population, Onslow County commissioned MBAJ to develop a one -stop County Government Center that will co- locate many of its worksites in one facility. The new Onslow County Government Center consists of a 70,000 sq. ft. three story office building and a one -story 20,000 sq. ft. meeting annex. The office portion of the facility will locate Planning and Environmental Health Departments on the first floor, Tax, IT, GIS, and Veteran Services Departments on the second floor, and Purchasing, Finance, Human Re- sources, County Attorney, County Administration and the Commissioners on the third floor. Additional shell space is available on the third floor for future growth of existing departments or opportunities for new depart- ments to be located in the facility. The meeting annex contains the Board of Elections offices, the Commissioner's Chamber, and six training /meet- ing rooms. The meeting annex will also serve as a backup Emergency Operations Center and a location for on -site voting. In addition, a 10,000 sq. ft. storage building is located in close proximity on the site to house departmental storage needs. The new Government Center is located on a county owned site in a local Business and Industrial Park. The aesthetic of the building was designed to complement other historic buildings owned by the County. Statistics Project Area: 100,000 Sq Ft (3 buildings) Total Project Budget: $20,450,000 Anticipated Date of Completion: August 2014 Project Manager: Angela Crawford Easterday Original Contract Amount: $14,260,000 Number of Change Orders: Project under constriction Total Amount of Change Orders: Project under construction 175 Carlton Watkins Center Charlotte, North Carolina I Mecklenburg County Area Mental Health Authority - fir° Owner: Mecklenburg County Number: 704- 336 -2023 a The Carlton Watkins Center is a 47,600 sq ft office building occupied by the Mecklenburg County Area Mental Health Authority. The building, originally built in the early 70s for inpatient mental health care, was later converted to office space and is now used for the Preschool Screening & Assessment and Call Center Departments. Much of the building had not been modernized in 15+ years. The Owner wanted to update these areas to provide a better work environment and to optimize space. The employee space requirements vary from month to month, due to changing state regulations for county - provided service. Also the building's fire alarm system did not meet current code regulations. Renovations included enlarging the main waiting area by incorporating an adjacent small waiting area; installing new finishes and creating a more secure reception desk. Also, new finishes were installed in four team areas and several individual offices. The Owner reused existing modular furniture and recovered the panels with new fabric. Two tele /data closets were enlarged and modifications were made to other support spaces. Work also included new electrical and data wiring in renovated areas, upgrades to the HVAC system, and a new building fire alarm system. The project was successfully completed in small area phases, while the building remained operational. Statistics Project Area: 11,000 Sq Ft (Renovated) Total Project Cost: $650,000 Date of Completion: May 2007 (Construction - 11 months) Project Manager: Doug Buchanan Original Contract Amount: $645,500 Number of Change Orders: 1 Total Amount of Change Orders: $4,458 Lexington County Dept. of Health & Human Services Lexington, South Carolina Lexington County Owner: Katherine Hubbard Number: 803 -785 -8100 SO G "% s 176 Sustainable Design Features Low Impact Development Site Concepts Day Lighting Foot - candle prescribed low - energy light fixtures Iligh Efficiency Mechanical Equipment with WEB based Direct Digital Controls R -410 environmental sensitive refrigerants Low -flow plumbing fixtures Recycled materials; metal studs, carpet, gypsum board, ceiling tile, etc. Low VOC finished; paints, sealants, etc. Reconditioned office system work stations As the Lexington County Department of Health & Human Services had outgrown their existing facilities, which were spread across the County, they desired a new central facility to house the Department of Social Services, Health Department, Adult Services, Child Health/ Immunization, WIC, Vital Records, TB, Dental, and Central Records/ Administration departments. Rather than construct an entirely new facility, the County chose to purchase and renovate the existing Winn -Dixie and Revco buildings located at the Red Bank Crossing shopping center. The plan was arrived at collaboratively with the users, while also maintaining central administrative control of the resources available. The solution transforms the exterior of a dated "grocery store" into a more pleasing place with a new and clearly defined safe entry. The interior results in a very efficient and functional state -of -the -art work place, which supports client services for the citizens. Statistics Project Area: 55,350 Sq Ft (renovated) Total Project Cost: $4,618,846 Date of Completion: June 2010 Project Manager: James Golightly Original Contract Amount: $4,528,000 Number of Change Orders: 4 Total Amount of Change Orders: $111,311 County Tl�D7. »� /� � '~~^^^^��~~- -----/ ---r�- -- Health �- --------- ---v---- Page 2 01 WC �� UAM PublicLabbyJ Iredell Government Center South Mooresville, North Carolina I Iredell County Owner: Joel Mashburn I Number: 704 - 878 -3050 178 "They did a superb job in keeping costs to a { minimum while thoroughly meeting the objectives and scope of the renovation. The firm's attention Y a� ? to detail, planning, and communication with Iredell County was probably the best I have seen in my years in the construction field." ,;�,' —James J. Vernon, Director Support Services, Iredell County This project was the renovation of a 4 -story, abandoned hospital in downtown Mooresville, NC, into various County agency offices. The County purchased the old building to maintain the vitality of the neighborhood. This project has been an impetus for new growth and revitalization of the neighborhood. The first phase included renovation of the first floor, into space for the county health department offices; clinics; labs and support; environmental health services; parole /probation offices; civil court with holding facilities; and sheriff's office. Phase two converted the third and fourth floors into administration offices for the NCDENR. Each user group had an active role in the planning of their respective agency /area. The existing public entrance of the hospital was retained to serve as the new public entrance and lobby for the Health and the Environmental Health Departments. A new separate public entrance was created for the judicial areas, separating and directing people to court and the Sheriff's Office. Likewise, new separate /secure access points were created for the judges and the sally port. Statistics Phase I Phase II Project Area: 29,000 Sq Ft (renovated) 31,220 Sq Ft (renovated) Total Project Cost: $1,312,250 $1,265,300 Completed: 2003 2004 Project Manager: Rob Johnson Original Contract Amount: $1,448,900 Number of Change Orders: 10 Total Amount of Change Orders: $229,991 Iredell Government Center South 179 Iredell Department of Social Services Statesville, North Carolina I Iredell County Owner: Joel Mashburn I Number: 704 - 878 -3050 "The firm's attention to detail, planning, and communication with Iredell County was probably the best I have seen in my years in the construction field." - James J. Vernon, Director of Support Services, Iredell County :1 Iredell County needed a new facility that would unite all staff, from three locations, in one building, thus providing a one - stop -shop for persons requiring public assistance and increasing department efficiency. The design, a two -story building with 190 finished offices, includes space for future office upfit. The first floor has most of the Income Maintenance divisions, as these receive the most traffic. They include Food Stamps, Children's Medicaid, Adoption, Adult Services, and Adult Blind and Disabled Services. The second floor has most of the Social Services divisions. These include Family Support and Resource Teams, Daycare, and Work First. The administration staff offices are also located on the second floor. There is a plaza area at the back of the building for use by building occupants. The site is graded to allow for future installation of park benches and picnic tables overlooking the detention pond, which was reconstructed to allow for future development. There are 90 client parking spaces in front of the building with a covered drop -off area at the main entry. There are 246 staff parking spaces just north of the building in a separate lot. The public entry onto the site will be controlled by a traffic signal. The Department of Social Services Building was built on the north quadrant of a 23 -acre, L- shaped site. Future phases of work may include a maintenance building and an office building. 181 DA' YCARF Statistics Project Area: Total Project Cost: Date of Completion: Project Manager: Original Contract Amount: Number of Change Orders: Total Amount of Change Orders: 55,747 Sq Ft (new) $5,776,521 February 2006 (14 months) Rob Johnson $5,829,725 3 -$55,904 MEDICAID (CHILDREN) Iv-D FOOD STAMPS & FRAUD AABD-MA, SAA ADULT SERVICES ADM INISTRATION/SUPPORT CIRCULATION BUILDING SER-,.ncEs FUTURE UPFIT Statistics Project Area: Total Project Cost: Date of Completion: Project Manager: Original Contract Amount: Number of Change Orders: Total Amount of Change Orders: 55,747 Sq Ft (new) $5,776,521 February 2006 (14 months) Rob Johnson $5,829,725 3 -$55,904 Cabarrus Business & Technology Center ZMEMM Concord, NC I Cabarrus Business & Technology Center Owner: Mike Downs, County Manager I Number: 704 - 920 -2100 182 E In an effort to counter the Pillowtex Plant closing and historic layoffs, Cabarrus County commissioned MBAJ to work with Rowan - Cabarrus Community College to create a Workforce Development Business Counseling Center. The selected site was a County -owned regionally- centered site with an aging building. Phase one was planned, bid, renovated, and occupied in March 2004 on a very fast track. This phase encompassed the creation of teaching laboratories serving the Building Trade programs. Phase two, completed in 2005, accommodated programs with higher technology requirements. These programs were designed to `retool' a previously manufacturing- oriented workforce into a more technology- driven workforce for the current market place. While the majority of the project involved the renovation of existing spaces utilizing the North Carolina Rehab Code, an addition was very strategically planned and sited to serve as a symbolic gateway for a new community-use training and resource center. MBAJ reorganized the campus and redesigned the existing highway - focused entrance to create a new campus- centered entrance. The new campus arrangement is more efficient and allowed for much - needed expanded parking. Project Area: Total Project Cost: Date of Completion: Project Manager: Original Contract Amount: Number of Change Orders: Total Amount of Change Orders: Cabarrus Business & Technology Center Page 2 Both phases bid precisely in line with our estimates during a period in which steel, concrete, and other building products were escalating significantly. The landlord and tenant, as well as local governing authorities, were actively engaged in the planning, procurement, and implementation of the project. 183 Im MR w"Im M= / \ \ > \ \ } � : ^\ \may /.:. \ \�f ƒ� \{ \�\ \ ® \�" z `t 1111111 11 PIPE 11 M illill' M� LODC - Plumbing/Mechanical/Electrical Engineer 185 FIRM PROFILE LHC Structural Engineers was founded in 1966 and is currently managed by Bobby Lasater as President and Rob Stevenson as Vice President. The firm provides structural engineering services for buildings and building systems and has compiled an extensive list of projects throughout North Carolina and other southeastern states. These include municipal buildings, community college facilities and K-12 schools completed with MBAJ Architecture over a period of 15 years. LHC is proposed as the structural engineer for this project with Bobby Lasater serving as lead structural engineer. Bobby holds a bachelors' and masters' degree from North Carolina State University. He has been a structural designer with LHC for over 25 years and the Engineer of Record on over 200 projects including the recently completed Department of Social Services Building Renovation and the Orange County Courthouse Expansion. Bobby currently serves on the General Contractor's Licensing Board and on the organizing committee for the Paul Zia Distinguished Lecture Series at NC State University. He is a member of the American Concrete Institute (ACI), American Institute of Steel Construction (RISC) and American Council of Engineering Companies (ACEC). Recent LHC projects in Orange County include the following: Proiect Client Gateway Center Parking Deck Due Diligence Orange County Inspection Department of Social Services Building Renovation Orange County and Fit-Up Whitted Building Renovation Orange County Orange County Courthouse Expansion Orange County Chapel Hill Public Library Expansion Town of.Chapel Hill Town Operations Center Town of Chapel Hill Central Orange Senior Center Addition and Orange County Sportsplex Renovation Durham County Off-Campus Center Durham Technical CC East Chapel Hill High School Chapel Hill Carboro City Schools.. Gravelly Hill Middle School Orange County Schools :. Progressive Design Collaborative is a plumbing, mechanical, electrical and technology consulting engineering company located in Raleigh. We have been in business since 1974 and have been working with MBAJ for over 15 years. We have a diverse project experience that is highlighted below. HISTORICAL RENOVATION PROJECT EXPERIENCE • Cumberland County Courthouse (Old) — Fayetteville, NC -Three -phase renovation of approximately 35,000 square feet of existing courthouse /office area (constructed in 1915) into county office building. Renovation included a totally new HVAC system with upgrading of the existing plumbing and electrical systems. • Maureen Joy Charter School — Durham, NC Re novation of the former Y.E. Smith School (circa 1898). • Poole House — Poole Road, Raleigh, NC - Re novation of historical home into Wake County offices. • Wilson County Municipal Building — Wilson, NC - Co nvert an 80 -year old jail building into county offices. 16,000 square foot, 3 -story building. HEALTH CENTER PROJECT EXPERIENCE • Cumberland County Former Health Center — 1st Floor HVAC Renovation, Fayetteville, NC • Freedom Hill Community Health Center, Edgecombe County, NC • Wilson County Health Center — Medical Building, Wilson, NC NC DHHS PROJECT EXPERIENCE • Dorothea Dix Hospital — Lineberger Building — Building Renovation • Eastern Region VR Facility — HVAC and Electrical Upgrade • Governor Morehead School - Dormitory — HVAC Renovations - Vocational Building — HVAC Renovation • John Umstead Hospital — Barrett Building — Building Renovation • Murdoch Center — Meadowview Cottage Renovation • Walter B. Jones — Activities Building — Kitchen Upgrades =1000' PROGRESSIVE DESIGN COLLABORATIVE, LTD. 187 Firm Profile Established in 1993, CLH Design, PA is a 12 person design firm located in Cary, North Carolina offering award winning, collaborative civil engineering and landscape architecture services. With an impressive seven year resume of 40 municipal projects for 15 local governments, CLH Design has wide- ranging experience in the successful planning and construction of public facilities. Our reputation for excellence in practical, sustainable design is supported by our design of 21 LEED projects across the state, including the City or Raleigh's Neuse River Wastewater Treatment Plant Administration Building Additions which achieved LEED Silver Certification. Our other crowning achievement is the new Wake Forest Town Hall, the first LEED Platinum Town Hall in the state, third in the country. Of CLH Design's 21 environmental education projects, 17 have been within the past three years. Our goal is to maximize the opportunities for natural outdoor play, while emphasizing our strong understanding of healthy living. Our current projects include Onslow County Environmental Educational Center & Public Library; Annie Louise Wilkerson, MD Nature Preserve Park; Knightdale Historic Downtown Park; NC Aquarium at Fort Fisher Nautilus Fossil Dig Area for Outdoor Playground, and NC Zoo Kidzone Playground. We understand the importance of each project, how to have good humor and patience through each hurdle and how to end up with a personalized project for which we can all be proud. Additionally, CLH Design is HUB certified with the Federal Government and State of North Carolina, Department of Administration, as a Woman Owned Business Enterprise (WBE). .. r Role Principal -in- Charge, Civil Engineer . University of Massachusetts at Dartmouth Bachelor of Science, Civil Engineering, 1991 Registration Registered Professional Engineer: North Carolina # 22625 Experience Mr. Miller has over 20 years of engineering design, project management and construction administration of multiple commercial, institutional, industrial and residential projects. He remains involved in all phases of CLH projects from preliminary design until final construction through constant collaboration with owners, clients, regulators and CLH's landscape architects, design technicians and construction administrators. Mr. Miller utilizes his experience with complete project development to support CLH's production of consistent, clear and complete construction documents. Mr. Miller's field of specialization is technically sound high performance design of educational and institutional sites stressing environmentally friendly development to provide protection of natural resources by means of practices that also enhance the site's educational resources. :: Current Area Experience Chapel Hill — Carrboro YMCA Renovations (2013) UNC- Chapel Hill Projects Carolina North Campus Research Building, New Construction (2013) Craige Parking Deck Expansion Phase 1 (2012) & Phase II (2013) UNC Cogeneration Facility Landscape and Stormwater Revisions (2013) Area Experience Within The Past 5 Years Carrboro High School Fine Arts Addition (2011) Carrboro High School Physical Education Building Addition (2012) UNC- Hospitals Projects Imaging and Outpatient Center (2010) — LEED Certification Pending UNC - Chapel Hill Projects Cobb (North East) Parking Deck, Chiller Plant, & Tennis Courts, New Construction (2007) Cogeneration Facility Tunnel Replacement (2009) Cogeneration Plant Tunnel Replacement —South Columbia Street Realignment (2007) Gerrard Hall, Additions & Renovations (2008) Gilsulate Steam System Replacement Package A— Fetzer Path Restoration (2008) Hanes Hall Renovations (2008) Manning Hall Accessible Entrance Ramp (2012) Playmakers Theater (former Smith Hall) & Gerrard Hall Renovations (2008) Sara Lee Gifford Memorial Azalea Garden Improvements (2008) Steele Building Renovations (2008) Adaptive Reuse / Downtown Revitalization Project Experience Cary Arts Center & Elementary School Construction Coordination, Cary, NC (2010) Cary Arts Center & Cary Elementary School, Traffic Improvements, Cary, NC (2011) Cary Downtown Streetscapes Improvements, Cary, NC (2012) Cary Downtown Theatre Renovations, Cary, NC (2012) Garner Town Center Concept Plans, Garner, NC (2013) Garner Town Hall Study, Garner, NC (2013) Golden Belt Textile Warehouse Downtown Revitalization Project, Durham, NC (2008) — LEED GOLD Certification Winner of City of Durham's 2009 Golden Leaf Award for Sustainable Properties Holly Springs Library & Holly Springs Cultural Arts Center, Holly Springs, NC (2006) Knightdale Historic Downtown Park Master Plan (2010) & Phase I, Knightdale, NC (2013) Maureen Joy Charter School (in the historic YE Smith School Building), Durham, NC (2013) Moore Square Museums Magnet Middle School, Raleigh, NC (2002) Project Enlightenment Renovations / Conversions, Raleigh, NC (2005) Wake County Public Schools CTE High School (in the old Coke -a -Cola Bottling Plant), Raleigh, NC (2013) Wake Forest Town Hall, Wake Forest, NC (2010) — LEED Platinum Certification Third Town Hall in the Nation to achieve this level of certification, and one of only three buildings in the Triangle to earn this designation. Winner of First Annual, Greater Triangle Stewardship Development Award — GOLD, 2011 Wake Young Men's Leadership Academy at the Thompson Building, Raleigh, NC (2013) Wake Young Women's Leadership Academy on the Governor Morehead School Campus, Raleigh, NC (2013) I• Willingness to Affiliate Minority, Woman-owned, or Disadvantaged Businesses 190 MBAJ has selected to choose for this project: LHC - Structural Engineer - Minority Firm CLH - Civil Engineer - Woman -Owned Firm 191 I „/4rio /W ii 1)ra rl txit�;.!:5d�9 ��: ✓unF`r,A%k�4'.. .. .., k'M/'�k" '�kRdN/xt�".S kd.::v"A "d....:�kk�'.'WUSa .+ .� �� ,� ... �I�, / %j� � Quality Control and Assurance Processes 192 r � l ✓u 7xG,�1; Knr AI[�� Demonstration of Quality Control and Assurance processes: MBAJ Architecture's Quality Control System flogs seanrlessly as an effective tool throughout the life of a client's project. The Quality Control System leads and supports the project process from conception to completion. Quality Control System - MBAJ's face -to -face meetings at the beginning, middle, and end of each phase of work include all of the design team members. Client project management and maintenance teams are invited to attend these meetings. Throughout the project, an MBAJ Principal -In- Charge is the Project Manager and the primary contact. The MBAJ Principal- In- Charge performs the final document coordination review. First Flight High School, Kill Devil Hills, NC Additionally, another MBAJ Principal, acting as a second pair of eyes, performs a detailed check on coordination of trades and coordination between the plans and the specifications. This review serves to prevent construction- related problems and to minimize opportunities for change orders. Construction Administrator Reviews - The MBAJ Construction Administrator, a member of the Project Team, performs constructability reviews throughout the design phase of the project and conducts on -site document reviews at the end of each design phase. This extra effort, in addition to the Project Team's normal exploratory visits, enhances the Team's ability to ensure accuracy and thoroughness of the documents produced at MBAJ. are Quality Assurance Record. - MBAJ Architecture successfully completed approximately $2 billion of work in the past five years. MBAJ's change orders during construction over the same period averaged 1.5% of the construction cost. 193 Se,r,.-,Ntl*on 13 111,11, 111111 Pill il, iiiiiiiil 194 Technical and Legal Issues MBAJ Architecture has successfully completed over $2 billion work on public institutional proj- ects, but like all firms with a long history of designing successful publicly funded projects, a few of our projects have had some technical issues and two have required legal remedies for closure. Gaffney High School In 2004, MBAJ was named as a party in a lawsuit between Cherokee County Schools and USF&G (the contractor's bonding company) for a project constructed in 2000 and occupied in 2002. Mitchell Construction Company, the general contractor, bid the project significantly below the second low bidder. At that time we counseled the owner about the potential for issues during con- struction should they choose to award such a critically low bid. Consequently, during the project, the contractor encountered significant financial and schedule problems and declared bankruptcy. The project was finally delivered to the Owner for occupancy one year late with a number of construction deficiencies. Because of the contractor's financial difficulties, the project was turned over to USF &G, the contractor's bonding company, for completion of the project. USF &G took ex- ception to the scope of the documented deficiencies and was reluctant to complete all the items in the manner required by the contract documents. The Owner filed suit against the bonding com- pany. MBAJ was named, along with all other parties involved in the process, in an effort to avoid an `empty' seat in the litigation process. MBAJ fully supported and cooperated with Cherokee County Schools throughout the process. The suit was resolved through mediation with a finding of no fault against MBAJ Architecture. Rocky River Elementary School In 2006, MBAJ was commissioned by Mooresville Graded School District to design a new El- ementary School. Part of the contract involved the design of a new automobile access road into the school property. The construction of the new access road included a crossing over an exist- ing creek with a new bridge. Mooresville Graded Schools provided geotechnical and wetlands information about the creek and the required unsuitable soil remediation. MBAJ's Civil Engineer designed the bridge to meet those requirements. During Construction, when the contractor ex- cavated for the foundation of the new bridge, the degree of unsuitable soil remediation required exceeded the projections provided by the Owner's Geotechnical Engineer. As a result, significant additional undercut and re- design of the bridge was required, resulting in a Change Order from the General Contractor (GC). The Owner held MBAJ responsible for this additional work. Both parties agreed amicably to go through voluntary mediation to resolve the issue. 195 IV 11`1 VA 196 Hourly Rates for Professional Services Managing Principal $150.00 per hour Principal -in- Charge $125.00 per hour Project Manager $100.00 per hour Construction Administrator $100.00 per hour Project Architect / Project Captain $ 95.00 per hour Staff Architect / job Captain $ 80.00 per hour Architectural Intem $ 75.00 per hour Architectural Technician / Technical Support $ 75.00 per hour Administrative $ 60.00 per hour Services for professional consultants engaged for the normal structural, HVAC, plumbing and electrical engineering services at a multiple of 1.20 times the amount billed the Architect for such services. We shall inform the Owner of the extent of services in these areas before we engage engineers. Drawings and specifications are instruments of service and remain the property of this firm. Drawings and specifications are not to be used on other projects or extension of this project except by agreement in writing and with appropriate compensation. Reimbursable Expenses: Actual expenditures made by the Architect, his employees or his professional consultants in the interest of the project shall be billed at a multiple of 1.20 times the actual cost. Invoicing shall be monthly for the work completed to date; accounts shall be past due after thirty (30) days; one and one- half (15%) percent per month service fee will be added to past due accounts. Accounts will be adjusted to include legal fees for collection to the extent allowed by law if such fees become necessary. Section 197 Firms Willingness to Sign Orange County Standard Contract Agreement IM 'ju Firms Willingness to Sign Orange County Standard Contract Agreement for Design Consultant Services We have reviewed the Orange County Standard Agreement with our Professional Liability insur- ance agent. They did advise us of a few words and phrases that may imply different thing to different people. However, none are "deal breakers" as they say, and we trust that these could all be easily resolved thru open, professional discussions. 199 200 XUACHM ENT 3 Charge of the Northern Human Services Center Resident Design Advisory Work Group The Charge for the Northern Human Services Center Community Center Resident Advisory Work Group will be to work with County staff and MBAJ Architects of Raleigh, NC to provide recommendations to the Board on interior space design, utilization, and functionality of the new Community Center that best serves the residents of Orange County within the Board approved estimated 10,000 square foot adaptive re -use renovation area and a Capital Investment Plan budget of $2,250,000. The recommendations for the facility that will include but not be limited to the following contextual topics: 1. Recognition of the rich cultural and historical significance of the former Cedar Grove School; 2. The history and content of past public input for the facility, as well as future public comment during the Work Group's Charge duration; 3. The previous Board of County Commissioner decisions regarding the deconstruction of the classroom wings and the adaptive re -use renovation to yield an estimated 10,000 square foot community center facility on the site within a Capital Investment Plan project budget of $2,250,000; 4. Physical and operational limitations to the site and the property, to include but not be limited to sanitary sewer constraints that govern the intensity of use for the facility in a manner consistent with a community center use. The Work Group is directed to work with staff and MBAJ Architecture to present a schematic plan for the interior and grounds of the facility to the Board of County Commissioners by October, 2013. Approved by the Board of County Commissioners on June 18, 2013. 201 ATTACHMENT 4 MBAJ Architects Base & Alternate Use Fee Illustrative 5/20/2013 Cedar Grove Community Center Proposed Estimated Estimated Total Proposed CIP Notes Design Fee (Not Construction Cost to Exceed) Cost A. Base Fee - per 4/1/2013 proposal 167,500 2,000,000 2,167,500 2,250,000 10,000 SF Community Center, Deconstructed Classroom Wings Additional Cost Estimates - per 5/16/2013 proposal B. Alternate Uses - Progamming & Schem. Design 40,800 0 2,208,300 2,250,000 Option #1- Classroom Wings as deferred use ( "Mothball ") Option #2 - Open Air Pavilion Option #3 - Full Use C1. If Option #1 Selected (Deferred Use) - Construction 34,000 600,000 2,842,300 2,250,000 Documents, Construction Administration C2 If Option #2 Selected (Open Air Pavilion) - Construction 81,600 1,300,000 3,589,900 2,250,000 Documents, Construction Administration C3. If Option #3 Selected (Full Use) - Construction 122,400 2,600,000 4,930,700 2,250,000 Est. $1.7 million for renovation, $800,000 for sanitary sewer expansion Documents, Construction Administration Additional Notes: 1. Estimates do not contemplate any operating costs for the alternate scenarios. 2. Avoided deconstruction costs are substituted for construction costs for the alternate scenarios. 3. Alternate estimated costs include an allowance of $100,000 for potential stormwater improvements due to potential increases in impervious surfaces. 202 ATTACHMENT 5 [Departmental Use Only] TITLE NHSC Design FY FY12 -13 NORTH CAROLINA SERVICES AGREEMENT OVER $90,000.00 RFP — WITH REIMBURSABLE EXPENSES ORANGE COUNTY This Services Agreement (hereinafter "Agreement "), made and entered into this 4th day of June, 2013, ( "Effective Date ") by and between Orange County, North Carolina a body politic and corporate of the State of North Carolina (hereinafter, the "County ") and MBAJ Architects, Inc., (hereinafter, the "Provider "). WITNESSETH: That the County and Provider, for the consideration herein named, do hereby agree as follows: 1. Services a. Scope of Work. i) This Services Agreement ( "Agreement") is for professional services to be rendered by Provider to County with respect to (insert type of project): the Northern Human Services Center Community Center renovation, as outlined by the attached proposal dated April 1, 2013 ii) By executing this Agreement, the Provider represents and agrees that Provider is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. iii) Time is of the essence with respect to this Agreement. iv) The services to be performed under this Agreement consist of Basic Services, as described and designated in Section 3 hereof. Compensation to the Provider for Basic Services under this Agreement shall be as set forth herein. 2. Responsibilities of the Provider a. Services to be provided. The Provider shall provide the County with all services required in Section 3 to satisfactorily complete the Project within the time limitations set forth herein and in accordance with the highest professional standards. b. Standard of Care. i) The Provider shall exercise reasonable care and diligence in performing services under this Agreement in accordance with the highest generally accepted standards of this type of Provider practice throughout the United States and in accordance Revised July 2010 1 203 with applicable federal, state and local laws and regulations applicable to the performance of these services. Provider is solely responsible for the professional quality, accuracy and timely completion and /or submission of all work related to the Basic Services. ii) Provider shall be responsible for all errors or omissions, in the performance of the Agreement. Provider shall correct any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional cost to the County. iii) The Provider shall not, except as otherwise provided for in this Agreement, subcontract the performance of any work under this Agreement without prior written permission of the County. No permission for subcontracting shall create, between the County and the subcontractor, any contract or any other relationship. iv) Provider is an independent contractor of County. Any and all employees of the Provider engaged by the Provider in the performance of any work or services required of the Provider under this Agreement, shall be considered employees or agents of the Provider only and not of the County, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Provider. v) Provider agrees that Provider, its employees, agents and its subcontractors, if any, shall be required to comply with all federal, state and local antidiscrimination laws, regulations and policies that relate to the performance of Provider's services under this Agreement. vi) If activities related to the performance of this Agreement require specific licenses, certifications, or related credentials Provider represents that it and /or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. 3. Basic Services a. Basic Services. i) The Provider shall perform as Basic Services the work and services described herein and as specified in the County's Request for Proposals (the "UP ") "R-FP Number 5191 for "Northern Human Services Center Project" issued December 14, 2012, 2013, and the Provider's proposal, which are fully incorporated and integrated herein by reference together with Attachments issued by MBAJ Architects, Inc. entitled "Northern Human Services Center Renovation" dated April 1St, 2013 (designate all attachments). In the event a term or condition in any document or attachment conflicts with a term or condition of this Agreement the term or condition in this Agreement shall control. Should such conflict arise the priority of documents shall be as follows: This Agreement, the County's RFP together with attachments, Provider's Proposal together with attachments. Revised July 2010 2 204 ii) The Basic Services will be performed by the Provider in accordance with the following schedule: (Insert task list and milestone dates) Task 1. Schematic Design (15 %) 2. Final Design, CDs (65 %) 3. Project Bid Phase (70 %) 4. Construction (95 %) 5. Commissioning (100 %) 6. Grand Opening (100 %) 7. N/A 8. N/A 9. N/A 10. N/A Milestone Date 10/15/2013 1/31/2014 4/28/2014 3/1/2015 3/1/2015 3/1/2015 iii) Should County reasonably determine that Provider has not met the Milestone Dates established in Section 3(a)(ii), County shall notify Provider of the failure to meet the Milestone Date. The County, at its discretion may provide the Provider seven (7) days to cure the breach. County may withhold the accompanying payment without penalty until such time as Provider cures the breach. In the alternative, upon Provider's failure to meet any Milestone Date the County may modify the Milestone Date schedule. Should Provider or its representatives fail to cure the breach within seven (7) days, or fail to reasonably agree to such modified schedule, County may immediately terminate this Agreement in writing, without penalty or incurring further obligation to Provider. This section shall not be interpreted to limit the definition of breach to the failure to meet Milestone Dates. 4. Duration of Services a. Term. The term of this Agreement shall be from June 4, 2013 to May 1, 2015. b. Scheduling of Services i) The Provider shall schedule and perform his activities in a timely manner so as to meet the Milestone Dates listed in Section 3. ii) Should the County determine that the Provider is behind schedule, it may require the Provider to expedite and accelerate his efforts, including providing additional resources and working overtime, as necessary, to perform his services in accordance with the approved project schedule at no additional cost to the County. iii) The Commencement Date for the Provider's Basic Services shall be June 4, 2013. 5. Compensation a. Compensation for Basic Services. Compensation for Basic Services shall include all compensation due the Provider from the County for all services under this Agreement except reimbursable expenses as specified in section 5(c), below. The maximum amount payable for Basic Services is One Hundred Sixty Seven Thousand Five Hundred Dollars Revised July 2010 3 205 ($167,500). In the event the amount stated on an invoice is disputed by the County, the County may withhold payment of all or a portion of the amount stated on an invoice until the parties resolve the dispute. Payment for Basic Services shall become due and payable in direct proportion to satisfactory services performed and work accomplished. Payments will be made as percentages of the whole as Project milestones as set out in Section 3(a)(ii) are achieved. (For example, if there are 10 Project Tasks with Milestone Dates then Provider may invoice for the first 10% of the whole upon County's acknowledgement of the satisfactory completion of Task one. Upon the County's acknowledgement that the second Task has been satisfactorily completed Provider may invoice for the next 10% of the whole.) b. Additional Services. County shall not be responsible for costs related to any services in addition to the Basic Services performed by Provider unless County requests such additional services in writing and such additional services are evidenced by a written amendment to this Agreement. c. Reimbursable Expenses Reimbursable expenses are in addition to the fees for Basic Services and are for the following expenditures to the extent reasonable and actually incurred by the Provider with respect to the Project: i) Actual expenditures for postage, reproductions, photography, and long distance telephone charges directly attributable to this Project. ii) The actual cost of reproduction of reports, plans and specifications excluding documents for exclusive use by the Provider. iii) The Provider shall not be entitled to any mark -up on actual expenses incurred. iv) Reimbursable expenses shall be compensated by the County along with invoices for Basic Services provided by Provider. Payment of Reimbursable Expenses shall be subject to Provider's timely submission of valid receipts for any such expenses and approval by the County. Any additional charges not specified herein, must be mutually agreed to in advance by County and Provider and documented in writing with a letter signed by authorized representatives for County and Provider and, subject to budgeted funds. 6. Responsibilities of the County a. Cooperation and Coordination. The County has designated the (Jeff Thompson) to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager and /or the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. 7. Insurance a. General Requirements. The Provider shall purchase and maintain and shall cause each of his subcontractors to purchase and maintain, during the period of performance of this Agreement: i) Worker's Compensation Insurance for protection from claims under workers' or workmen's compensation acts; Revised July 2010 4 206 ii) Comprehensive General Liability Insurance covering claims arising out of or relating to bodily injury, including bodily injury, sickness, disease or death of any of the Provider's employees or any other person and to real and personal property including loss of use resulting thereof, iii) Comprehensive Automobile Liability Insurance, including hired and non -owned vehicles, if any, covering personal injury or death, and property damage; and C. Limits of Coverage. Minimum limits of insurance coverage shall be as follows: INSURANCE DESCRIPTION MINIMUM REQUIRED COVERAGE • Worker's Compensation Limits for Coverage A - Statutory State of N.C. Coverage B - Employers Liability $500,000 each accident and policy limit and disease each employee • Commercial General Liability ' $1,000,000 Each Occurrence; $2,000,000 Aggregate. • Automobile Liability Combined Single Limit $500,000 • Professional Liability $1,000,000 per claim/$ 1,000,000 aggregate d. Additional Insured. All insurance policies (with the exception of Worker's Compensation and Professional Liability) required under this Agreement shall name the County as an additional insured party. Evidence of such insurance shall be furnished to the County, together with evidence that each policy provides the County with not less than thirty (30) days prior written notice of any cancellation, non - renewal or reduction of coverage. 8. Indemnity a. Indemnity. The Provider agrees to defend, indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Provider except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Provider to indemnify the County to the fullest extent permitted under North Carolina law. Revised July 2010 5 207 9. Amendments to the Agreement a. Changes in Basic Services. Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the County and the Provider. The Provider shall proceed to perform the Services required by the Amendment only after receiving a fully executed Amendment from the County. 10. Termination a. Termination for Convenience of the County. This Agreement may be terminated without cause by the County and for its convenience upon seven (7) days prior written notice to the Provider. b. Other Termination. The Provider, may terminate this Agreement based upon the County's material breach of this Agreement; provided, the County has not taken all reasonable actions to remedy the breach. The Provider shall give the County seven (7) days' prior written notice of its intent to terminate this Agreement for cause. c. Compensation After Termination. i) In the event of termination, the Provider shall be paid that portion of the fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the County due to errors or omissions of the Provider. ii) Should this Agreement be terminated, the Provider shall deliver to the County within seven (7) days, at no additional cost, all deliverables including any electronic data or files relating to the Project. d. Waiver. The payment of any sums by the County under this Agreement or the failure of the County to require compliance by the Provider with any provisions of this Agreement or the waiver by the County of any breach of this Agreement shall not constitute a waiver of any claim for damages by the County for any breach of this Agreement or a waiver of any other required compliance with this Agreement. 11. Additional Provisions a. Limitation and Assignment. The County and the Provider each bind themselves, their successors, assigns and legal representatives to the terms of this Agreement. Neither the County nor the Provider shall assign or transfer its interest in this Agreement without the written consent of the other. b. Governing Law. This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. Revised July 2010 c. Dispute Resolution. Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non - performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina. It is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. The Parties may agree to nonbinding mediation of any dispute prior to the bringing of such suit or action. d. Entire Agreement. This Agreement, together with the RFP and its attachments and the Proposal and its attachments, represents the entire and integrated agreement between the County and the Provider and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. e. Severability. If any provision of this Agreement is held as a matter of law to be unenforceable, the remainder of this Agreement shall be valid and binding upon the Parties. f. Ownership of Work Product. Should Provider's performance of this Agreement generate documents, items or things that are specific to this Project such documents, items or things shall become the property of the County and may be used on any other project without additional compensation to the Provider. The use of the documents, items or things by the County or by any person or entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. g. Non - Appropriation. Provider acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable and not appropriated for the performance of County's obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Provider of the unavailability and non - appropriation of public funds. It is expressly agreed that County shall not activate this non - appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County's statutory authority, mandate and /or mandated functions, by state and /or federal legislative or regulatory action, which adversely affects County's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Provider of such limitation or change in County's legal authority. h. Notices. Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Attention: Jeff Thompson P.O. Box 8181 Revised July 2010 7 Provider's Name & Address MBAJ Architects, Inc. 9131 Anson Way, Suite 204 1: 209 Hillsborough, NC 27278 Raleigh, NC 27615 IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal, all as of the day and year first above written. ORANGE COUNTY: PROVIDER: By: By: Frank Clifton, County Manager Printed Name and Title Attest: Donna Baker, Clerk to the Board [SEAL] This instrument has been approved as to technical content. Jeffrey Thompson, Department Director This instrument has been pre- audited in the manner required by the Local Government Budget and Fiscal Control Act. Office of the Finance Director This instrument has been approved as to form and legal sufficiency. Office of the County Attorney Revised July 2010 8 9131 Anson Way, Suite 204 Raleigh, North Carolina 27615 Office: 919- 573 -6400 Toll-free: 800-590-MBAJ Fax: 919- 573 -6495 April 1, 2013 Mr. Jeff Thompson Orange County Director of asset Management Services 200 South Cameron Street P O Box 8181 Hillsborough, NC 27278 RE: Northern Human Services Center Renovation COMM. NO.: FILE NO.: A -1.0 Dear Jeff: We are excited to have been selected by Orange County for the design of renovations at the Northern Human Services Center project. We look forward to developing a strong working relationship with you through this project. As requested, below is our proposal for professional services. Project Scope MBAJ Architecture will provide architectural and engineering design services for the Northern Human Services Center Renovation. The scope of services will include Programming, Design and Construction Observation for upgrades and renovation to the existing Cedar Grove facility. The exact scope of the renovations will be determined during the programming phase utilizing a round table format to gather input from the project committee. The project scope will include a recognition of the cultural significance of this site. The exact nature of this recognition will be an integral part of the programming process. The final proposed scope of the project will be balanced against the funding available for the project. MBAJ will engage independent engineering consultants to provide Structural evaluation for the proposed demolition, along with Civil /Landscape, Plumbing, Mechanical, Electrical and Technology design for the proposed facility renovation. Design services shall be provided in the traditional phases of Programming, Schematic Design, Design Development, Construction Documents, Bidding and Construction Administration. Based upon our pre - contract discussions, our proposed fee does not include hazardous material abatement design, storm water BMP design, fire protection design, surveying, geothermal conductivity test wells or geotechnical investigation for the project. The total budget for the facility including design, construction, and contingency is $2 million. The fees proposed are based upon the scope of work as we understand it at this time and the project durations outlined in the attached schedule. M: \PROSPECT - CLIENT\Civic - Governmental \North Carolina\ County \Orange \Proposals \20130401jft_Revised Fee Proposal.docx 211 MBAJ Architecture Page 2 of 2 Letter to: Jeff Thompson April 1, 2013 Proposed A/E Fees Based upon the above outlined scope of professional services, and the terms of the Orange County Professional Services Agreement, MBAJ proposes a lump sum fee of $160,000 with additional reimbursable cost (printing, reproduction, shipping, fees paid to jurisdictional authorities, renderings, etc...) not to exceed $7,500. Engineers MBAJ will be utilizing the following engineers for the project: Structural Design LHC Engineers 1015 Wade Avenue Raleigh, NC 27605 Civil Engineering / Landscape Design CLH Design 400 Regency Forest Drive, Suite 120 Cary, North. Carolina 27518 Plumbing Mechanical, Electrical, and Technology Design Progressive Design Collaborative, LTD. 2900 Rowland Road, Suite 100 Raleigh, NC 27615 Schedule Our preliminary schedule is attached. We recognize that the County will not have construction funding available until July 2014 and we have formulated the proposed schedule to conform to that parameter. If there are any questions, please feel free to call. We look forward to hearing from you and working with you to make the Northern Human Services Center project a success. Sincerely, Jo as. Jr.., AIA Enclo e cc: Vanda Hamrick ®`poa °' SAO °A f 1T 52 a Coo Orange County Northern Human Services Center Preliminary Project Design Schedule 3/20/13 LIM N N 213 ATTACHMENT 6 [Departmental Use Only] TITLE NHSC Design FY FY12 -13 NORTH CAROLINA SERVICES AGREEMENT OVER $90,000.00 RFP — WITH REIMBURSABLE EXPENSES ORANGE COUNTY . This Services Agreement (hereinafter "Agreement "), made and entered into this 4th day of June, 2013, ( "Effective Date ") by and between Orange County, North Carolina a body politic and corporate of the State of North Carolina (hereinafter, the "County ") and MBAJ Architects, Inc., (hereinafter, the "Provider "). WITNESSETH: That the County and Provider, for the consideration herein named, do hereby agree as follows: 1. Services a. Scope of Work. i) This Services Agreement ( "Agreement ") is for professional services to be rendered by Provider to County with respect to (insert type of project): the Northern Human Services Center Community Center renovation, as outlined by the attached proposal dated April 1, 2013 as well as the additional proposal dated May 16, 2013 entitled "Northern Human Services Center Renovation A/E fee for Additional Project Scope" ii) By executing this Agreement, the Provider represents and agrees that Provider is qualified to perform and fully capable of performing and providing the services required or necessary under this Agreement in a fully competent, professional and timely manner. iii) Time is of the essence with respect to this Agreement. iv) The services to be performed under this Agreement consist of Basic Services, as described and designated in Section 3 hereof. Compensation to the Provider for Basic Services under this Agreement shall be as set forth herein. 2. Responsibilities of the Provider a. Services to be provided. The Provider shall provide the County with all services required in Section 3 to satisfactorily complete the Project within the time limitations set forth herein and in accordance with the highest professional standards. b. Standard of Care. Revised July 2010 214 i) The Provider shall exercise reasonable care and diligence in performing services under this Agreement in accordance with the highest generally accepted standards of this type of Provider practice throughout the United States and in accordance with applicable federal, state and local laws and regulations applicable to the performance of these services. Provider is solely responsible for the professional quality, accuracy and timely completion and /or submission of all work related to the Basic Services. ii) Provider shall be responsible for all errors or omissions, in the performance of the Agreement. Provider shall correct any and all errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional cost to the County. iii) The Provider shall not, except as otherwise provided for in this Agreement, subcontract the performance of any work under this Agreement without prior written permission of the County. No permission for subcontracting shall create, between the County and the subcontractor, any contract or any other relationship. iv) Provider is an independent contractor of County. Any and all employees of the Provider engaged by the Provider in the performance of any work or services required of the Provider under this Agreement, shall be considered employees or agents of the Provider only and not of the County, and any and all claims that may or might arise under any workers compensation or other law or contract on behalf of said employees while so engaged shall be the sole obligation and responsibility of the Provider. v) Provider agrees that Provider, its employees, agents and its subcontractors, if any, shall be required to comply with all federal, state and local antidiscrimination laws, regulations and policies that relate to the performance of Provider's services under this Agreement. vi) If activities related to the performance of this Agreement require specific licenses, certifications, or related credentials Provider represents that it and /or its employees, agents and subcontractors engaged in such activities possess such licenses, certifications, or credentials and that such licenses certifications, or credentials are current, active, and not in a state of suspension or revocation. 3. Basic Services a. Basic Services. i) The Provider shall perform as Basic Services the work and services described herein and as specified in the County's Request for Proposals (the "REP ") "RFP Number 5191 for "Northern Human Services Center Project" issued December 14, 2012, 2013, and the Provider's proposal, which are fully incorporated and integrated herein by reference together with Attachments issued by MBAJ Architects, Inc. entitled "Northern Human Services Center Renovation" dated April 1St, 2013 and "Northern Human Services Center Renovation A/E Fee for Additional Project Scope dated May 16th, 2013 (designate all attachments). In the event a term or condition in any document or attachment conflicts with a term or Revised July 2010 2 215 condition of this Agreement the term or condition in this Agreement shall control. Should such conflict arise the priority of documents shall be as follows: This Agreement, the County's RFP together with attachments, Provider's Proposal together with attachments. ii) The Basic Services will be performed by the Provider in accordance with the following schedule: (Insert task list and milestone dates) Task 1. Schematic Design (15 %) 2. Final Design, CDs (65 %) 3. Project Bid Phase (70 %) 4. Construction (95 %) 5. Commissioning (100 %) 6. Grand Opening(100 %) 7. N/A 8. N/A 9. N/A 10. N/A Milestone Date 10/15/2013 1/31/2014 4/28/2014 3/1/2015 3/1/2015 3/1/2015 iii) Should County reasonably determine that Provider has not met the Milestone Dates established in Section 3(a)(ii), County shall notify Provider of the failure to meet the Milestone Date. The County, at its discretion may provide the Provider seven (7) days to cure the breach. County may withhold the accompanying payment without penalty until such time as Provider cures the breach. In the alternative, upon Provider's failure to meet any Milestone Date the County may modify the Milestone Date schedule. Should Provider or its representatives fail to cure the breach within seven (7) days, or fail to reasonably agree to such modified schedule, County may immediately terminate this Agreement in writing, without penalty or incurring further obligation to Provider. This section shall not be interpreted to limit the definition of breach to the failure to meet Milestone Dates. 4. Duration of Services a. Term. The term of this Agreement shall be from June 4, 2013 to May 1, 2015. b. Scheduling of Services i) The Provider shall schedule and perform his activities in a timely manner so as to meet the Milestone Dates listed in Section 3. ii) Should the County determine that the Provider is behind schedule, it may require the Provider to expedite and accelerate his efforts, including providing additional resources and working overtime, as necessary, to perform his services in accordance with the approved project schedule at no additional cost to the County. iii) The Commencement Date for the Provider's Basic Services shall be June 4, 2013. 5. Compensation Revised July 2010 3 216 a. Compensation for Basic Services. Compensation for Basic Services shall include all compensation due the Provider from the County for all services under this Agreement except reimbursable expenses as specified in section 5(c), below. The maximum amount payable for Basic Services is Two Hundred Eight Thousand Three Hundred Dollars ($208,300). In the event the amount stated on an invoice is disputed by the County, the County may withhold payment of all or a portion of the amount stated on an invoice until the parties resolve the dispute. Payment for Basic Services shall become due and payable in direct proportion to satisfactory services performed and work accomplished. Payments will be made as percentages of the whole as Project milestones as set out in Section 3(a)(ii) are achieved. (For example, if there are 10 Project Tasks with Milestone Dates then Provider may invoice for the first 10% of the whole upon County's acknowledgement of the satisfactory completion of Task one. Upon the County's acknowledgement that the second Task has been satisfactorily completed Provider may invoice for the next 10% of the whole.) b. Additional Services. County shall not be responsible for costs related to any services in addition to the Basic Services performed by Provider unless County requests such additional services in writing and such additional services are evidenced by a written amendment to this Agreement. c. Reimbursable Expenses Reimbursable expenses are in addition to the fees for Basic Services and are for the following expenditures to the extent reasonable and actually incurred by the Provider with respect to the Project: i) Actual expenditures for postage, reproductions, photography, and long distance telephone charges directly attributable to this Project. ii) The actual cost of reproduction of reports, plans and specifications excluding documents for exclusive use by the Provider. iii) The Provider shall not be entitled to any mark -up on actual expenses incurred. iv) Reimbursable expenses shall be compensated by the County along with invoices for Basic Services provided by Provider. Payment of Reimbursable Expenses shall be subject to Provider's timely submission of valid receipts for any such expenses and approval by the County. Any additional charges not specified herein, must be mutually agreed to in advance by County and Provider and documented in writing with a letter signed by authorized representatives for County and Provider and, subject to budgeted funds. 6. Responsibilities of the County a. Cooperation and Coordination. The County has designated the (Jeff Thompson) to act as the County's representative with respect to the Project and shall have the authority to render decisions within guidelines established by the County Manager and /or the County Board of Commissioners and shall be available during working hours as often as may be reasonably required to render decisions and to furnish information. 7. Insurance Revised July 2010 4 217 a. General Requirements. The Provider shall purchase and maintain and shall cause each of his subcontractors to purchase and maintain, during the period of performance of this Agreement: i) Worker's Compensation Insurance for protection from claims under workers' or workmen's compensation acts; ii) Comprehensive General Liability Insurance covering claims arising out of or relating to bodily injury, including bodily injury, sickness, disease or death of any of the Provider's employees or any other person and to real and personal property including loss of use resulting thereof, iii) Comprehensive Automobile Liability Insurance, including hired and non -owned vehicles, if any, covering personal injury or death, and property damage; and c. Limits of Coverage. Minimum limits of insurance coverage shall be as follows: INSURANCE DESCRIPTION MINIMUM REQUIRED COVERAGE • Worker's Compensation Limits for Coverage A - Statutory State of N.C. Coverage B - Employers Liability $500,000 each accident and policy limit and disease each employee • Commercial General Liability $1,000,000 Each Occurrence; $2,000,000 Aggregate. • Automobile Liability Combined Single Limit $500,000 • Professional Liability $1,000,000 per claim/$ 1,000,000 aggregate d. Additional Insured. All insurance policies (with the exception of Worker's Compensation and Professional Liability) required under this Agreement shall name the County as an additional insured party. Evidence of such insurance shall be furnished to the County, together with evidence that each policy provides the County with not less than thirty (30) days prior written notice of any cancellation, non - renewal or reduction of coverage. 8. Indemnity Revised July 2010 5 218 a. Indemnity. The Provider agrees to defend, indemnify and hold harmless the County from all loss, liability, claims or expense, including attorney's fees, arising out of or related to the Project and arising from bodily injury including death or property damage to any person or persons caused in whole or in part by the negligence or misconduct of the Provider except to the extent same are caused by the negligence or willful misconduct of the County. It is the intent of this provision to require the Provider to indemnify the County to the fullest extent permitted under North Carolina law. 9. Amendments to the Agreement a. Changes in Basic Services. Changes in the Basic Services and entitlement to additional compensation or a change in duration of this Agreement shall be made by a written Amendment to this Agreement executed by the County and the Provider. The Provider shall proceed to perform the Services required by the Amendment only after receiving a fully executed Amendment from the County. 10. Termination a. Termination for Convenience of the County. This Agreement may be terminated without cause by the County and for its convenience upon seven (7) days prior written notice to the Provider. b. Other Termination. The Provider may terminate this Agreement based upon the County's material breach of this Agreement; provided, the County has not taken all reasonable actions to remedy the breach. The Provider shall give the County seven (7) days' prior written notice of its intent to terminate this Agreement for cause. Compensation After Termination. i) In the event of termination, the Provider shall be paid that portion of the fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be incurred by the County due to errors or omissions of the Provider. ii) Should this Agreement be terminated, the Provider shall deliver to the County within seven (7) days, at no additional cost, all deliverables including any electronic data or files relating to the Project. d. Waiver. The payment of any sums by the County under this Agreement or the failure of the County to require compliance by the Provider with any provisions of this Agreement or the waiver by the County of any breach of this Agreement shall not constitute a waiver of any claim for damages by the County for any breach of this Agreement or a waiver of any other required compliance with this Agreement. 11. Additional Provisions a. Limitation and Assigm-nent. The County and the Provider each bind themselves, their successors, assigns and legal representatives to the terms of this Agreement. Neither the Revised July 2010 6 219 County nor the Provider shall assign or transfer its interest in this Agreement without the written consent of the other. b. Governing Law. This Agreement and the duties, responsibilities, obligations and rights of respective parties hereunder shall be governed by the laws of the State of North Carolina. c. Dispute Resolution. Any and all suits or actions to enforce, interpret or seek damages with respect to any provision of, or the performance or non - performance of, this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County, North Carolina. It is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. The Parties may agree to nonbinding mediation of any dispute prior to the bringing of such suit or action. d. Entire Agreement. This Agreement, together with the RFP and its attachments and the Proposal and its attachments, represents the entire and integrated agreement between the County and the Provider and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both parties. Modifications may be evidenced by facsimile signatures. e. Severability. If any provision of this Agreement is held as a matter of law to be unenforceable, the remainder of this Agreement shall be valid and binding upon the Parties. f. Ownership of Work Product. Should Provider's performance of this Agreement generate documents, items or things that are specific to this Project such documents, items or things shall become the property of the County and may be used on any other project without additional compensation to the Provider. The use of the documents, items or things by the County or by any person or entity for any purpose other than the Project as set forth in this Agreement shall be at the full risk of the County. g. Non - Appropriation. Provider acknowledges that County is a governmental entity, and the validity of this Agreement is based upon the availability of public funding under the authority of its statutory mandate. In the event that public funds are unavailable and not appropriated for the performance of County's obligations under this Agreement, then this Agreement shall automatically expire without penalty to County immediately upon written notice to Provider of the unavailability and non - appropriation of public funds. It is expressly agreed that County shall not activate this non - appropriation provision for its convenience or to circumvent the requirements of this Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. In the event of a change in the County's statutory authority, mandate and /or mandated functions, by state and /or federal legislative or regulatory action, which adversely affects County's authority to continue its obligations under this Agreement, then this Agreement shall automatically terminate without penalty to County upon written notice to Provider of such limitation or change in County's legal authority. Revised July 2010 7 h. Notices. Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, return receipt requested to the following: Orange County Attention: Jeff Thompson P.O. Box 8181 Hillsborough, NC 27278 Provider's Name & Address MBAJ Architects, Inc. 9131 Anson Way, Suite 204 Raleigh, NC 27615 IN WITNESS WHEREOF, the Parties, by and through their authorized agents, have hereunder set their hands and seal, all as of the day and year first above written. ORANGE COUNTY: By: Frank Clifton, County Manager Attest: Donna Baker, Clerk to the Board [SEAL] PROVIDER: M. Printed Name and Title This instrument has been approved as to technical content. Jeffrey Thompson, Department Director This instrument has been pre- audited in the manner required by the Local Government Budget and Fiscal Control Act. Office of the Finance Director This instrument has been approved as to form and legal sufficiency. Office of the County Attorney r 4 Revised July 2010 E. 220 011 full " 9131 Anson Way, Suite 204 Raleigh, North Carolina 27615 Office: 919- 573 -6400 Toll -free: 800 -590 -MBAJ Fax: 919-573-6495 April 1, 2013 Mr. Jeff Thompson Orange County Director of Asset Management Services 200 South Cameron Street P O Box 8181 Hillsborough, NC 27278 RE: Northern Human Services Center Renovation COMM. NO.: FILE NO.: A -1.0 Dear Jeff: We are excited to have been selected by Orange County for the design of renovations at the Northern Human Services Center project. We look forward to developing a strong working relationship with you through this project. As requested, below is our proposal for professional services. Project Scope MBAJ Architecture will provide architectural and engineering design services for the Northern Human Services Center Renovation. The scope of services will include Programming, Design and Construction Observation for upgrades and renovation to the existing Cedar Grove facility. The exact scope of the renovations will be determined during the programming phase utilizing a round table format to gather input from the project committee. The project scope will include a recognition of the cultural significance of this site. The exact nature of this recognition will be an integral part of the programming process. The final proposed scope of the project will be balanced against the funding available for the project. MBAJ will engage independent engineering consultants to provide Structural evaluation for the proposed demolition, along with Civil /Landscape, Plumbing, Mechanical, Electrical and Technology design for the proposed facility renovation. Design services shall be provided in the traditional phases of Programming, Schematic Design, Design Development, Construction Documents, Bidding and Construction Administration. Based upon our pre- contract discussions, our proposed fee does not include hazardous material abatement design, storm water BMP design, fire protection design, surveying, geothermal conductivity test wells or geotechnical investigation for the project. The total budget for the facility including design, construction, and contingency is $2 million. The fees proposed are based upon the scope of work as we understand it at this time and the project durations outlined in the attached schedule. M: \PROSPECT - CLIENT\Civic - Governmental \North Carolina\ County\ Orange \Proposals \20130401jft_Revised Fee Proposal.docx 222 MBAJ Architecture Page 2 of 2 Letter to: Jeff Thompson April 1, 2013 Proposed A/E Fees Based upon the above outlined scope of professional services, and the terms of the Orange County Professional Services Agreement, MBAJ proposes a lump sum fee of $160,000 with additional reimbursable cost (printing, reproduction, shipping, fees paid to jurisdictional authorities, renderings, etc...) not to exceed $7,500. Engineers MBAJ will be utilizing the following engineers for the project: Structural Design LHC Engineers 1015 Wade Avenue Raleigh, NC 27605 Civil Engineering / Landscape Design CLH Design 400 Regency Forest Drive, Suite 120 Cary, North Carolina 27518 Plumbing, Mechanical. Electrical, and Technology Design Progressive Design Collaborative, LTD. 2900 Rowland Road, Suite 100 Raleigh, NC 27615 Schedule Our preliminary schedule is attached. We recognize that the County will not have construction funding available until July 2014 and we have formulated the proposed schedule to conform to that parameter. If there are any questions, please feel free to call. We look forward to hearing from you and working with you to make the Northern Human Services Center project a success. Sincerely, Jo as. Jr.., AIA Enclo e cc: Vanda Hamrick �: 52 o- �`rb Orange County Northern Human Services Center Preliminary Project Design Schedule 3/20/13 N N W 9131 Anson Way, Suite 204 Raleigh, North Carolina 27615 Office: 919- 573 -6400 Toll-free: 800 -590 -MBAJ Fax: 919- 573 -6495 May 16, 2013 Mr. Jeff Thompson Orange County Director of Asset Management Services 200 South Cameron Street P O Box 8181 Hillsborough, NC 27278 RE: Northern Human Services Center Renovation A/E Fee for Additional Project Scope COMM. NO.: FILE NO.: A -1.0 Dear Jeff: We are pleased to provide this proposal for Architectural and Engineering design services associated with the rehabilitation of the two existing classroom wings at the Northern Human Services Center project. Project Scope MBAJ Architecture will provide architectural and engineering design services for rehabilitation of the two existing classroom wings at the Northern Human Services Center. The initial scope of services will include programming, renovation scope exploration and concept development to determine the appropriate use and approach for the rehabilitation of the wings. MBAJ will work collaboratively, utilizing a round table format, to gather input from the project committee. The Committee input will be used to develop three possible approaches to the rehabilitation (mothballing, open air uses and full use redevelopment). MBAJ will develop each of these approaches through the Programming and Schematic Design phases and prepare estimates of probable cost. MBAJ will document and present each option to the Orange County Board of Commissioners for their consideration. Upon the receipt of a written notice to proceed, documenting the approved project approach, MBAJ will complete the development of project in the traditional phases of Design Development, Construction Documents, Bidding and Construction Administration. MBAJ will engage independent engineering consultants to provide Plumbing, Mechanical, Electrical and Technology design for the approved facility renovation scope. Proposed A/E Fees for Additional Scope Based upon the above outlined scope of professional services, and the terms of the Orange County Professional Services Agreement, MBAJ proposes the following schedule of lump sum fees: Programming and Schematic Design $40,800 (Three Options) M: \PROSPECT - CLIENT\Civic - Governmental \North Carolina\ County \Orange\ Proposals \20130516jft_Additional Scope Fee Proposal.docx 225 MBAJ Architecture Page 2 of 2 Letter to: Jeff Thompson May 16, 2013 Mothball Option $34,000 Limited rehabilitation of building systems in the classroom wings to prevent further deterioration of the existing facility and facilitate future redevelopment of the space. Phases DD -CA Rehabilitation area: 17, 500 square feet Anticipated Cost: $350,000 - $500,000 Open Air Uses Option $81,600 Limited rehabilitation of the classroom wings for use as open air shelters. Phases DD -CA Rehabilitation area: 17, 500 square feet Anticipated Cost: $1.0 - $1.2 million Full Reuse Option $122,400 Complete rehabilitation of the classroom wings for as yet undetermined fully conditioned and finished uses. Phases DD -CA Rehabilitation area: 17, 500 square feet Anticipated Cost: $1.4 - $1.7 million As we have previously discussed, the proposed fees do not include hazardous material abatement design, storm water BMP design, fire protection design, surveying, geothermal conductivity test wells or geotechnical investigation for the project. If there are any questions, please feel free to call.