HomeMy WebLinkAboutAgenda - 06-18-2013 - 6a 1
ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: June 18, 2013
Action Agenda
Item No. 6-a
SUBJECT: Proposed 2012-2013 Secondary Road (SR) Construction Program for Orange
County
DEPARTMENT: Planning & Inspections PUBLIC HEARING: (Y/N) YO
ATTACHMENTS: INFORMATION CONTACT:
1. Proposed 2012-2013 SR Construction Craig Benedict, 245-2592
Program Tom Altieri, 245-2575
2. Proposed 2012-2013 SR Construction
Program Map
3. Letter from J.M. Mills, Division Engineer
PURPOSE: To hold a public hearing, receive public comment, and discuss the North Carolina
Department of Transportation's Proposed 2012-2013 Secondary Roads Construction Program
for Orange County.
BACKGROUND: Chapter 136-44.8 of the General Statutes of North Carolina (NCGS) requires
that the North Carolina Department of Transportation (NCDOT) meet with the Board of County
Commissioners at a public meeting to present and discuss the proposed secondary road paving
projects (Secondary Roads Construction Program). NCDOT, in compliance with NCGS 136-
44.8, has published notice of the public hearing in the News of Orange County, The Chapel Hill
News, and the Mebane Enterprise.
The 2012-2013 allocation for Orange County secondary roads totals $700,080 (Attachment 1).
The allocation includes:
Est. Cost
II. General Secondary Road Improvements $ 650,000
IV. Surveying, right-of-way acquisition, additions, contingencies,
overdrafts, etc. $ 50,080
Total $ 700,080
The FY 2012-2013 allocation represents a 34% decrease in funding from the $1,053,833
allocation for the 2011-2012 Construction Program.
The roads included in the FY 2012-2013 program are:
• New Sharon Church Road from SR 1553 (Walker Road) to SR 1548 (Schley Road) -
Widen existing lanes 2' and resurface; and
• Lebanon Road from SR 1376 (Stagecoach Road) to SR 1004 (Efland Cedar Grove
Road) - Widen existing lanes 2' and resurface.
These projects can be seen on the project map (Attachment 2).
2
The program is subject to the availability of funds, rights-of-way, environmental and historical
review. If right-of-way is not available or if additional funds are allocated, other roads will be
programmed in order of priority.
In accordance with North Carolina General Statute §136-44.8, "the board of county
commissioners may (i) concur in the construction program as proposed, or (ii) take no action, or
(iii) make recommendations for deviations in the proposed construction program, except as to
paving projects and the priority of paving projects for which the board in order to make
recommendations for deviations, must vote to consider the matter at a later public meeting ..."
FINANCIAL IMPACT: There is no direct financial impact associated with this decision item.
RECOMMENDATIONS: The Manager recommends that the Board hold the public hearing to
discuss and receive comments regarding the 2012-2013 Secondary Roads Construction
Programs for Orange County, and concur with the proposed programs.
3
Attachment 1
North Carolina Department of Transportation
Secondary Roads Construction Program
ORANGE COUNTY
FY 2012/2013 Available Funds
Highway Fund $300,890
Trust Fund $399,190
Total $700,080
I. Paving Unpaved Roads Programmed Paving Goal: N/A
A. Rural Paving Priority
Priority Length Estimated
No. SR No. Miles Road Name and Description Cost
NIA N/A N/A N/A NIA
I
* Rural Paving Alternates
i
i
Priority Length
Number SR No. Miles Road Name and Description Est. Cost
N/A N/A N/A I NIA N/A
* In the event that any roads in priority have to be placed on the "Hold List" due to unavailable
right of way or environmental review, or if additional funding becomes available, funds will be
applied to the roads listed in priority order in the paving alternate list.
i
B. Subdivision Paving Priority
I
Priority Length
Number SR No. Miles Road Name and Description Est. Cost
i
N/A N/A N/A N/A N/A
i
4
* Subdivision Paving Alternates
Priority Length
Number SR No, Miles Road Name and Description Est. Cost
N/A N/A N/A I N/A NIA
* In the event that any roads in priority have to be placed on the "Hold List" due to unavailable
right of way or environmental review, or if additional funding becomes available, funds will be
applied to the roads listed in priority order in the paving alternate list.
II. General Secondary Road Improvements
A. Paved Road Improvements
SR No. Project Description Est. Cost
SR 1538 New Sharon Church Road from SR 1553, (Walker Road), to $225,000.00
SR 1548, (Schley Road)-Widen existing lanes 2' and
resurface.
*Partial funding to be combined with resurfacing funds to
com lete project.
SR 1306 Lebanon Road from SR 1376, (Stagecoach Road), to SR 1004, $425,000.00
(Efland Cedar Grove Road)-Widen existing lanes 2' and
resurface.
*Partial funding to be combined with resurfacing funds to
complete project
Subtotal $650,000.00
B. Unpaved Road Spot Improvements
SR No. Project Description Est. Cost
N/A N/A N/A
III. Trust Fund Safety Improvements (GS 136-182)
SR No. Project Description Est. Cost
N/A N/A N/A
IV. Funds reserved for surveying, right of way acquisition,
road additions, contingencies, overdrafts, and
paving entrances to certified fire departments,
rescue squads, etc. Subtotal $50,080
Grand Total $700,080
Proposed 2012-2013 Secondary Road Programs
z --- ----------------- ----- — - - - - - - - - _ _ _ .
aJ oo oo o Attachment 2 I — i
0 Q I
w �m� ��O 4�• � m z Nr JIM Y II RD
��� o�RD Q ILL' RD 0 •• BROW'
C�<< AI S3 6 0 29 w RO
AO UL(pUGHR� J Q _�L\�
-k-- o Z -• ORMONr� LAWS Mil
4'C 6 --, --, CC :I' &IP
9 �
�-r 0 HAWK SR 0 ��
o TILL� S�
0 Lo I�O�< C OLIN A,./)
Ol WINI
00C w �'O @ •
•
RD a RD
MQF 0 0 " • LITT1• RI ER CI,
DRD
�{j ',URCH RD
,` C'' l'•
IE 'Q,p b� �a MERL T L \\L RD �� p�
o . v� li
Z Q� TO Z P = •Q FNRIL ,z
� z 'CO �FRD w .� 1,0 v�
V v J O ._0 Y
�� LON SMERD KIGE•
O r I> ® R D
,TRL • ' -R RO 0 Ch
�� U o ��O - WHI ; 0.
Q r. : GATE RD 0 0
'C�' � & ZLL < 0-, G ''NNYSDR
y' '104,:i.. w 9 r �CTARD
ZOO v p INCA RD Z
r 62 'St
>) ION RD Ay 2°� •�'
cy���v yPO F<p "'
0 R� e S 'u
• iY WA�� •••.
m �' HALLS MI\L ' �',,,co O F
R
U �o� 21 �� ` /IDW` DR ON L• Rp ■'
.` H BA ,RD ,.g ,pY p
Pv <c<\ M.;LORYCT
L. Ln
.BAN.filk O z ��OOP ` • 9
Klt LN — / 0
):2,
— w / v� T'Y`IRLN
400 v • (5C-1)
o J R• KY.N
H■ 1- Q r N 0 a a SHAWN: DR ��
• x 4c, o • -5.- OALTON r z RI DOLE A .PO •�
R w cc
> w �� RED GATE RD o m 0 REND ER ST w v\•
µ W O r ., 0b w el_ "N DR
r
w = v :. D'
ci)
O
$ ~A ° OA
Mebane _ I��. �.�. --
h O
� Hillsboroug �Er w • `'� w E K G ST to, 0/
•B-• DR I WEST TEN RD ����1S k STON RD? CALVIN ST - z °
I P�RD �� �O Y co
BO : N. U m :` zJ \sbS'r'
1 -2 'e,\.) `�r 3 N D.
3•0
KATHY D' O L�1\ OAkDP\-ED• i.`7 1 t`°n�. � , �tu�pi,,i •UGH RO X10 i +l ? ��<�i "."�
�' �.
1 m o;o M _ o o,,p a 1� ,�Lt
R
m yP 6>6 . : - P • :E DR OLD NC pCU A
• o Al o t
C:7 S o O .li C 1 1 DR �ll�
• v.
cyG� ��5� 1Q o o� Z co
z co
`\� ��� iPE ` �_
.pc., c .� w o <� = .'� p'•R. O ° �• �I INAI RD
0 'P $. IIII
•- R f"i t 1 in=1.8 miles II
U o JP 0 1
Z 2 �� o Al \� _Miles
Cr) Y
•Paved Road Improvements `.J( g L. Orange County Planning and Inspections Department
\ 1
4?•URPLE i-. GIS Map Prepared by Brian Carson.4/29/2013
Attachment 3 6
ST r,
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT MCCRORY ANTHONY J. TATA
GOVERNOR SECRETARY
May 28, 2013
Mr. Barry Jacobs, Chair
Orange County Commissioners
P. O. Box 8181
Hillsborough, NC 27278
Dear Mr. Jacobs:
Attached is the proposed 2012-2013 Secondary Road Construction Program for
Orange County. Please make this information available to the other Commissioners.
We are looking forward to meeting with the County Commissioners on Tuesday,
June 18, 2013.
Sincerely,
J. Mills, P.E.
ISION ENGINEER
JMM/jm
Atta.
cc: Cheryl McQueary, Board of Transportation w/atta.
Frank Clifton, County Manager w/atta.
Donna Baker, Clerk w/atta.
Chuck Edwards, Jr., District Engineer
P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 487-0000 Fax No. (336) 334-3637